BBU3900 Installation Guide 19

November 26, 2017 | Author: slavun | Category: Electrical Connector, Screw, Cable, Equipment, Computer Hardware
Share Embed Donate


Short Description

BBU3900 Installation Guide 19...

Description

BBU3900

Installation Guide

Issue: 19 Date: 2011-01-20

HUAWEI TECHNOLOGIES Co., Ltd.

Contents Installation Tools………………………………… 2 Installation Scenarios…………………………… 3 BBU Hardware…………………………………… 5 Installation Procedure…………………………… 6 Installing the BBU in the APM30……………… 7 Installing the BBU in the APM30H(Ver.A) …… 13 Installing the BBU in the 19-Inch Rack………… 15 Installing the BBU in the TMC…………………… 17 Installing the BBU in the PS4890 Cabinet…… 20 Installing the BBU in the RRU3004 Rack……… 23 Installing the IMB03 on the H-Shaped Stand… 27 Installing the RRU on the H-Shaped Stand … 28 Installing the BBU on the Wall………………… 29 Installing the BBU in the APM30H(Ver.B)…… 33 Installing the BBU in the TMC11H(Ver.B)…… 37 Installing the BBU in the APM30H(Ver.B, +24V) …………………………… 39 Installing the BBU in the OMB ………………… 41 BBU Hardware Installation Checklist………… 47 Powering On the BBU…………………………… 47 Obtaining the ESN ……………………………… 48 Appendix…………………………………………… 48 Change History…………………………………… 56

1

Copyright © Huawei Technologies Co., Ltd. 2011. All rights reserved.

Installation Tools

Measuring tape

Phillips screwdriver (M3-M6)

Flat-head screwdriver (M3-M6)

Adjustable wrench

Socket wrench

ESD wrist strap

Vacuum cleaner

Torque wrench

Marking pen

Level

Rubber Mallet

RJ-45 crimping tool

Multimeter

Power cable crimping tool

Cable cutter

2

Hammer drill

Wire stripper

ESD gloves

Installation Scenarios The GTMU in this document is based on the first type of GTMU.

In the APM30/APM30H(Ver.A)

In the PS4890

In the 19-inch rack

In the APM30H(Ver.B)

In the TMC

In the RRU3004 rack

3

Installation Scenarios

In the TMC11H(Ver.B)

In the APM30H (Ver.B, +24V)

On the wall

In the OMB

4

BBU Hardware 1. Exterior of the BBU

442

mm

86 mm (2U) 310 m

m

2. Configuration Principles of the BBU Boards

Board

Mandatory/ Optional

Full Configuration

Installation Slot

Remarks

GTMU

Mandatory

1

S5 and S6

Can be installed only in S5 and S6.

UPEU

Mandatory

2

S18 or S19

A single UPEU is preferentially configured in the S19 slot.

FAN

Mandatory

1

S16

Can be installed only in the S16 slot.

UTRP

Optional

1

S0 or S4

Preferentially installed in the slot4.

UELP

Optional

2

S0 or S4

A single UELP is preferentially configured in the S4 slot.

UFLP

Optional

2

S0 or S4

A single UELP is preferentially configured in the S4 slot.

USCU

Optional

1

S0 or S1

Preferentially installed in the S1 slot.

UEIU

Optional

1

S18

Preferentially installed in the S18 slot.

z The UELP and UFLP need to be optionally configured in the BBU or SLPU on site according to the field requirements. z UTRP is supported in V300R012 and later versions.

5

Installation Procedure

When the equipment is unpacked, it must be powered on in seven days. The maximum duration of the power-off state of the equipment is 48 hours during maintenance.

6

Installing the BBU in the APM30 a Installing the BBU Case 1. Install the mounting ears at both sides of the BBU reversely.

PDU

BBU M6 bolt

2. Slide the BBU case into the cabinet.

b

Installing the BBU Cables

Cable connections of the BBU External power supply External monitoring device External alarm device E1/T1 surge protection transfer cable E1/T1cable CPRI signal cable Alarm cable Monitoring signal cable

FE/GE surge protection transfer cable

Power cable

FE/GE cable

7

Installing the BBU in the APM30 b Installing the BBU Cables 1. Install BBU power cable. Connect the OT terminal of the power cable to the LOAD3 terminal of the PDU, and then fix the 3V3 connector of the power cable to the PWR port on the BBU.

LOAD3 NEG(-) RNT(+)

PWR

The OT terminals of the power cable is to be made on site.

2. Install the CPRI optical cable. Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the GTMU, and connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU.

Optical module Puller

a. Insert the optical module into the CPRI0, CPRI1, CPRI2 CPRI3, CPRI4 or CPRI5 port, and then turn outwards the puller on the optical module.

Winding pipe

b. Insert one end of the CPRI optical cable into the optical module, and then lead the CPRI optical cable out of the cabinet along the right side of the cabinet. c. Wrap the fiber tail with the winding pipe.

The single-mode optical module is labeled "SM" and multi-mode optical module is labeled "MM“. If the puller of an optical module is blue, the module is a single-mode optical module. If the puller of an optical module is black or grey, the module is a multi-mode optical module. The TX port on the BBU is connected to the RX port on the RRU. The RX port on the BBU is connected to the TX port on the RRU.

8

Installing the BBU in the APM30 b Installing the BBU Cables 3. Install the E1/T1 surge protection transfer cable. Fix the DB25 connector of the E1/T1 surge protection transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the GTMU. 4. Install the E1/T1 cable. 4.1. Cabling the E1/T1 cable. 4.2. Fix the DB26 connector of the E1/T1 cable to the OUTSIDE port on the UELP. 4.3. Strip the jacket off the E1/T1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer Shielding layer of the E1/T1 cable (25 mm)

4.4. Thread the E1/T1 cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the E1/T1 cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the ground bolt of the APM30.

Shielding layer of the E1/T1 cable

E1/T1cable

E1/T1 surge protection transfer cable

Grounding clip

Before soldering the connectors to the E1/T1 cable, ensure that both ends of the E1 cable are disconnected from any devices. In addition, all the connectors should be soldered to the cable.

9

Installing the BBU in the APM30 b Installing the BBU Cables 5. Install the FE/GE surge protection transfer cable (FE/GE transmission mode). Connect one end of the FE/GE surge protection transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the GTMU.

6. Install the FE/GE cable (FE/GE transmission mode). 6.1. Connect one end of the FE/GE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet. (25 mm)

FE/GE surge protection transfer cable

FE/GE cable

6.2. Thread the FE/GE cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the FE/GE cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the ground bolt of the APM30.

The shielded straight-through cable must be used as the FE/GE Ethernet cable.

Shielding layer of the FE/GE cable

7. Install the monitoring signal cable between the APMI and the BBU. 7.1. Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU. 7.2. Cut off the RJ45 connector at the other end of the cable on site, and then connect the four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI.

10

Installing the BBU in the APM30 b

Installing the BBU Cables

8. Install the EMUA monitoring signal cable. (The EMUA is configured if there are external dry contacts or analog detection is required.) Cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI. Fix the DB9 connector to the corresponding port on the EMUA.

EMUA monitoring signal cable Pin on the RJ45 Connector

Pin of the DB9 Male Connector

Wire Color

Wire Type

Port on the APMI

X1.1

X2.3

White

Twisted pair

TX+

X1.2

X2.7

Orange

Twisted pair

TX-

X1.4

X2.2

Blue

Twisted pair

RX+

X1.5

X2.6

White

Twisted pair

RX-

11

Installing the BBU in the APM30 b

Installing the BBU Cables

9. Install the alarm cable.

Connect one end of the alarm cable to the EXT-ALM port on the UPEU and the other end to the corresponding alarm device.

12

Installing the BBU in the APM30H(Ver.A) a BBU Cable Connections The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see pages 7 to 12. The following figure shows the cable connections of the BBU. For details on how to install the monitoring signal cable between the HEUA and the BBU in the APM30H, see page 14.

No.

Cable

Installation Position One end is connected to...

The other end is connected to...

BBU power cable

LOAD3 terminal of the PDU

PWR port on the BBU

E1/T1 surge protection transfer cable

E1/T1 port on the GTMU

INSIDE port on the UELP

E1/T1 cable

OUTSIDE port on the UELP

External transmission device

Monitoring signal cable

COM IN port on the HEUA

MON1 port on the BBU

CPRI optical cable

CPRI port on the GTMU

CPRI port on the RRU

13

Installing the BBU in the APM30H(Ver.A) b

Installing the Monitoring Signal Cable Between the HEUA and the BBU

HEUA

COM IN MON1 UPEU on the BBU

14

Installing the BBU in the 19-Inch Rack a Space Requirements

When the BBU3900 is installed in the 19-inch cabinet, no space is required on the left and right of the BBU3900.

b

Installing the BBU Case

c Installing the DCDU-03B

15

Installing the BBU in the 19-Inch Rack d Installing the BBU Cables

No.

Cable

Installation Position One end is connected to...

The other end is connected to...

CPRI optical cable

CPRI port on the GTMU

CPRI port on the RRU

External power cable

BEG(-) and RTN(+) on the DCDU-03B

External power equipment

BBU power cable

PWR1 on the UPEU

LOAD6 on the DCDU-03B

16

Installing the BBU in the TMC a

Installing the DCDU-03B

Slide the DCDU-03B into the TMC. Then, tighten the four M6 screws.

b

Installing the BBU Case Slide the BBU into the TMC. Then, tighten the four M6 screws.

17

Installing the BBU in the TMC c

Installing the BBU Cables

DCDU-03B input power cable

z For details on how to install the TMC alarm cable, see page 19. z The DCDU-03B input power cable is connected to the external DC power supply system. z For cable connections of the BBU, see page 7.

18

Installing the BBU in the TMC c

Installing the BBU Cables

Procedure for installing the TMC alarm cable:

APMI panel

Door status sensor

a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the BBU. b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring terminals of the door status sensor. c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT1+ and OUT1alarm wiring terminals on the APMI. d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring terminals of the DCDU.

The white and green bare wire terminals are not distinguished from different wiring terminals.

19

Installing the BBU in the PS4890 Cabinet a

Installing the DCDU-03B

1. Slide the DCDU-03B into the PS4890 cabinet. Then, tighten the four M6 screws.

2. Install the DCDU-03B input power cable. Connect one end of the power cable in blue to the DC output terminal LOAD2(-) on the power subrack and the other end to the DC input terminal NEG(-) on the DCDU-03B . Connect one end of the power cable in black to the DC output terminal RTN(+) on the power subrack and the other end to the DC input terminal RTN(+) on the DCDU-03B.

DC input terminal on the DCDU-03B

b

Installing the BBU Case

Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.

20

DC output terminal on the power subrack

Installing the BBU in the PS4890 Cabinet c Installing the BBU Cables Cable connections of the BBU

Connect the BBU power cable to the DC output terminal LOAD6 of the DCDU-03B.

CPRI optical cable

BBU power cable

Monitoring signal cable between the PMU and the BBU

E1/T1 cable

BBU alarm cable

In addition to the BBU cables installed in the APM30, a monitoring signal cable between the PMU and the BBU needs to be installed when the BBU is installed in the PS4890 cabinet. The monitoring signal cable between the APMI and the BBU is not required. For details on how to install the monitoring signal cable between the PMU and the BBU, see page 22.

21

Installing the BBU in the PS4890 Cabinet c Installing the BBU Cables Install the monitoring signal cable between the PMU and the BBU.

Connect one end of the cable to the MON port on the BBU and the other end to the RS232/RS422 port on the PMU.

Monitoring signal cable between the PMU and the BBU

RS232/RS422 port

22

Installing the BBU in the RRU3004 Rack a

b

Marking Anchor Points (Unit: mm)

Drilling Holes and Installing the Expansion Bolt Assembly

Bolt M10x60 Spring washer 12 Flat washer 12

Expansion tube

c Installing the H-shaped Stand a 1. Secure the stand.

2. Adjust the level of the stand.

3. Install the beam.

Pre-tightening

Tightening

The beam on the other side is installed in the same way.

23

Installing the BBU in the RRU3004 Rack d Removing the Washers a

e

Fitting the Tabs on One Side of the RRU3004 Rack into the Anchor Slots on the Stand

f a

g

Installing the Adapting Pieces

i

Installing the DCDU-03B (–48 V Input Power)

Fixing the Lower Part of the RRU3004 Rack

Tighten the screws

h Installing the BBU Case

Case 2

Installing the EPS30-4815AF (AC Input Power)

24

Installing the BBU in the RRU3004 Rack j

Installing the BBU Cables –48 V input power

DCDU

Cable

One End Is Connected to...

The Other End Is Connected to...

The end with the optical cable labels 2A and 2B is

The end with the optical cable labels 1A and

connected to CPRI ports 0 to 5 of the GTMU of the

1B is connected to the CPRI_W port of the

BBU.

cabling cavity of the RRU.

Ground cable for the subrack

Ground terminal of the RRU3004 rack

Ground bar of the stand

Power cable for the BBU

PWR port of the BBU

LOAD6 port of the DCDU

E1/T1 cable

E1/T1 port of the BBU

GEHUB or HUBBTS

Power cable for the DCDU

RTN (+) and NEG (-) terminals at the DC input end of External power supply system

CPRI optical cable

the DCDU External PGND cable

Ground bar of the stand

External ground busbar

Equipotential cable for the

Ground terminal of the RRU3004 rack

Ground terminal of the RRU3004 rack

Ground terminal of the RRU3004 rack

Ground terminal of the DCDU

subrack Ground cable for the DCDU

25

Installing the BBU in the RRU3004 Rack j

Installing the BBU Cables 220 V input power

4815

The mounting ears need to be installed in an inverse manner during the installation of the 4815.

Only two countersunk screws are required. Cable

One End Is Connected to... CPRI optical cable

The Other End Is Connected to...

The end with the optical cable labels 2A and The end with the optical cable labels 1A and 2B is connected to CPRI ports 0 to 5 of the

1B is connected to the CPRI_W port of the

GTMU of the BBU.

cabling cavity of the RRU.

PGND cable for the RRU3004 rack

Ground terminal of the RRU3004 rack

Ground bar of the stand

External PGND cable

Ground bar of the stand

External ground busbar

Equipotential cable for the rack

Ground terminal of the RRU3004 rack

Ground terminal of the RRU3004 rack

Power cable for the BBU

PWR port of the BBU

LOAD1 port of the 4815

4815 - BBU monitoring signal cable

MON1 port of the BBU

RS232/RS485 port of the 4815, close to the

E1/T1 cable

E1/T1 port of the BBU

GEHUB or HUBBTS

PGND cable for the 4815

Bolts for the mounting ears of the 4815

Ground terminal of the RRU3004 rack

Input power cable for the 4815

AC INPUT port of the 4815

Power supply equipment of the customer

232 side

26

Installing the IMB03 on the H-Shaped Stand a

b Installing the Bolts

Installing the Mounting Ears for the IMB03

Upper mounting hole for the IMB03

Insulation pad Fitting to the mounting hole M6x16

Beam Lower mounting hole for the IMB03

3 N•m

c a Installing the IMB03

d Securing the IMB03 M10x30

30 N•m

20 mm to 30 mm

For details about how to install the BBU and DCDU, see page 24.

27

Installing the RRU on the H-Shaped Stand a Preparing the Installation

b Installing the Main Bracket

Auxiliary Bracket Main bracket

Dual-nut bolt

Main bracket

Brackets for installing the RRU

When the expansion bolt assemblies are used to secure the H-shaped stand, only the bolt and spring washer are used, and the expansion tube and plastic tube are removed.

Only the main bracket is used for installing the RRU on the H-shaped stand, and the dual-nut bolt and auxiliary bracket are not used.

c a Installing the RRU

d Securing the RRU

For details about cable connections, see pages 25 and 26.

28

Installing the BBU on the Wall a Space Requirements A single BBU

BBU+DCDU-03B DCDU-03B BBU

0mm ≥ 10

The DCDU should be installed close to the BBU, but the distance between BBU and DCDU must be greater than 100 mm.

a b

Installing the Mounting Ears for Wall Installation

Mounting ears on the BBU case

Mounting ears for wall installation Use screws to join the mounting ears for wall installation and the mounting ears on the BBU case.

29

Installing the BBU on the Wall c a

Determining the Anchor Points on the Wall Place the BBU against the wall, and then use the marking pen to mark the anchor points.

Wall

BBU

a d

Installing the Expansion Bolts

e

Bolt M6×60 Nut Spring washer 6 Flat washer 6

Fixing the BBU Case on the Wall

Flat washer

Spring washer Expansion tube

30

Installing the BBU on the Wall f

Installing the DCDU-03B Case 2. Place the mounting ears for wall installation against the wall, and then use the marker to mark the holes of the mounting ears for wall installation.

1. Installing the mounting ears for the DCDU-03B.

Wall M6x12

2 N•m

3. Install the expansion bolt.

4. Install the DCDU-03 on the wall.

Bolt M6×60 Nut Spring washer 6 Flat washer 6 Expansion tube

31

Installing the BBU on the Wall g

Installing the BBU Cables

External ground bar

External power equipment

External ground bar

External transmission equipment

External monitoring equipment

SN

Cable

Installation Position One End Connected to...

The Other End Connected to...

RRU power cable

LOAD0 to LOAD5 on the DCDU-03

Power supply socket on the RRU

CPRI optical cable

CPRI port on the BBU

CPRI port on the RRU

E1/T1 cable

E1/T1 port on the GTMU

GEHUB or HUBBTS

Monitoring signal cable

MON/ALM port on the BBU

External monitoring equipment

BBU power cable

PWR port on the BBU

LOAD6 on the DCDU-03

DCDU power cable

DC input port on the DCDU-03

External power equipment

PGND cable

Ground bolt on the equipment

External ground bar

32

Installing the BBU in the APM30H(Ver.B) a Installing the BBU Case 2. Installing the SLPU Case Slide the SLPU box into the 1U space above the EPS in the cabinet, and then fasten the two M6 screws on the panel.

1. Installing the BBU Case Slide the BBU into the 2 U space close to the EPS along the guide rails, and then tighten the four M6 screws on the BBU panel. M6x16

EPS 01

2 N•m

BBU SLPU

M6 screws

b BBU Cable Connections

FE/GE cable

Monitoring signal cable

FE/GE surge protection transfer cable E1/T1 surge protection transfer cable CPRI optical cable

Alarm cable BBU power cable E1/T1 cable

33

Installing the BBU in the APM30H(Ver.B) c Installing the BBU Cables 1. Install power cable. Link the easy power receptacle (pressfit type) connector at one end to the LOAD1 terminal of the EPS01, and then link the 3V3 connector at the other end to the -48V port on the BBU. LOAD1

2. Install the CPRI optical cable. Insert the DLC connectors labeled 2A and 2B at one end of the CPRI optical cable into the optical module on the GTMU, and then insert the DLC connectors labeled 1A and 1B at the other end into the optical module on the RRU. 2.1. Turn the puller on the optical module outwards, and then insert the optical module to the port CPRI 0 to CPRI5.

Optical module Puller

The single-mode optical module is labeled "SM" and multi-mode optical module is labeled "MM“. If the puller of an optical module is blue, the module is a single-mode optical module. If the puller of an optical module is black or grey, the module is a multi-mode optical module.

Winding pipe

2.2. Remove the dustproof caps from the optical connectors. Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

If both ends of the optical cable are the LC connectors, the TX and RX ports on the BBU are respectively connected to the TX and RX ports on the RRU.

2.3. Wrap the winding pipe at the fiber tails.

34

Installing the BBU in the APM30H(Ver.B) c

Installing the BBU Cables

3. Install the E1/T1 surge protection transfer cable. Fix the DB25 connector of the E1/T1 surge protection transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the GTMU.

4. Install the E1/T1 cable. 4.1. Cabling the E1/T1 cable. 4.2. Fix the DB26 connector of the E1/T1 cable to the OUTSIDE port on the UELP.

E1/T1 cable

Before soldering the connectors to the E1/T1 cable, ensure that both ends of the E1 cable are disconnected from any devices. In addition, all the connectors should be soldered to the cable.

E1/T1 surge protection transfer cable

5. Install the FE/GE surge protection transfer cable (FE/GE transmission mode).

Connect one end of the FE/GE surge protection transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the GTMU.

6. Install the FE/GE cable (FE/GE transmission mode). 6.1. Connect one end of the FE/GE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.

FE/GE surge protection transfer cable

The shielded straight-through cable must be used as the FE/GE Ethernet cable.

35

FE/GE cable

Installing the BBU in the APM30H(Ver.B) c Installing the BBU Cables 7. Install the monitoring signal cable between the CMUA and the BBU.

COM_IN

MON1

36

Installing the BBU in the TMC11H(Ver.B) a Installing the BBU Slide the SLPU into the TMC11H along the guide rails, and then tighten the two M6 screws on the SLPU panel.

Slide the BBU into the TMC11H along guide rails, and then tighten the four M6 screws on the BBU panel. M6x16

M6x16

DCDU 2 N•m

2 N•m

SLPU BBU

b Installing the BBU Cable Install the BBU power cable.

LOAD6

37

Installing the BBU in the TMC11H(Ver.B) b Installing the BBU Cable z The procedure for installing BBU cables (except the power cable) in the TMC11H cabinet is the same as that in the APM30H(Ver.B). For details, see the description on pages 33 to 36. z For details on the BBU cable connections, see BBU Cable Connections on pages 33.

Cable

Connector Type

Connects to

CPRI optical cable

DLC

The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI5 on the GTMU.

DLC

The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU.

DB26 connector

OUTSIDE port on the UELP

The connector needs to be made on site according to the field requirements.

Port on the transmission device

DB26 connector

E1/T1 port on the GTMU

DB25 connector

INSIDE port on the UELP

RJ45 connector

FE0 port at the OUTSIDE side on the UFLP

RJ45 connector

Port on the transmission device

FE/GE surge protection transfer cable

RJ45 connector

FE0 port at the INSIDE side on the UFLP

RJ45 connector

FE0 port on the GTMU

Monitoring signal cable between the CMUA and the BBU

RJ45 connector

MON1 port on the BBU

RJ45 connector

COM_IN port on the CMUA

BBU power cable

3V3 connector

-48V port on the UPEU

OT terminal

LOAD6 port on the DCDU-03B

E1/T1 cable

E1/T1 surge protection transfer cable

FE/GE cable

38

Installing the BBU in the APM30H(Ver.B, +24V) a Installing the BBU Slide the SLPU to the APM30H (+24V) along guide rails, and then tighten the two M6 screws on the SLPU panel.

Slide the BBU to the APM30H (+24V) along guide rails, and then tighten the four M6 screws on the BBU panel. M6x16

M6x16

EPS48100D

2 N•m

2 N•m

BBU

b Installing BBU Cables Installing the monitoring signal cable for the PSU and the in-position signal cable for the PSU PRESENT ALM

EXT-ALM1

39

EXT-ALM0

Installing the BBU in the APM30H(Ver.B, +24V) b Installing BBU Cables z The procedure for installing BBU cables (except the power cable) in the APM30H(+24 V) cabinet is the same as that in the APM30H(Ver.B). For details, see the description on pages 33 to 36. z For details on the BBU cable connections, see BBU Cable Connections on pages 33.

Cable

Connector Type

Connects to

CPRI optical cable

DLC

The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI2 on the GTMU.

DLC

The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU.

DB26 Connector

E1/T1 port on the GTMU

The connector needs to be made on site according to the field requirements.

Port on the transmission device

E1/T1 Surge Protection Transfer Cable

DB26 connector

E1/T1 port on the GTMU

DB25 connector

INSIDE port on the UELP

FE/GE cable

RJ45 connector

FE0 port on the GTMU

RJ45 connector

Port on the transmission device

FE/GE Surge Protection Transfer Cable

RJ45 connector

FE0 port at the INSIDE side on the UFLP

RJ45 connector

FE0 port on the GTMU

Monitoring signal cable between the CMUA and the BBU

RJ45 connector

MON1 port on the BBU

RJ45 connector

COM_IN port on the CMUA

Monitoring signal cable for the PSU

RJ-45

EXT-ALM0 port on the UPEU

RJ-45

ALM port on the EPS48100D

In-position signal cable for the PSU

RJ-45

EXT-ALM1 port on the UPEU

Cord end terminal

PRESENT port on the EPS48100D

BBU power cable

3V3

-48V port on the UPEU

OT

LOAD6 port on the DCDU-03B

E1/T1 cable

40

Installing the BBU in the OMB a Installing the Brackets on the Metal Pole and Mounting Plate 1. Install the brackets on the metal pole. Use a level to adjust the level of the brackets to ensure that the front and back brackets are on the same plane. M10x110 Flat washer Spring washer Bolt

255-306 kgf·cm

2. Install the mounting plate. M10x40

255-306 kgf·cm

Flat Spring Bolt washer washer

Mounting plate

41

Installing the BBU in the OMB b Installing the OMB

Remove the two ground screws on the right side of the BBU panel before installing the BBU.

Ensure the FAN is in the bottom when installing the BBU.

b

Installing the OMB Cabinet

Slide the BBU case into the OMB cabinet gently. Then, tighten the four M6 screws.

c

Installing the BBU Cables

The procedures for installing the cables as follows in the DC OMB and in the AC OMB are the same: z PGND cable z E1/T1 cable or FE/GE ethernet cable z optical cable If the cable connection scenarios are similar, the description is based on the DC cabinet.

1. Install the PGND cable of OMB cabinet.

Grounding bar

42

Installing the BBU in the OMB c Installing the BBU Cables 2. Install the input power cable for the DC OMB.

RNT (+) NEG(-)

3. Install the input power cable for the AC OMB.

L

N

PE

43

Installing the BBU in the OMB c Installing the BBU Cables 4. Install the BBU power cable for the DC OMB.

5. Install the BBU power cable for the AC OMB. DC INPUT

PWR

LOAD1

44

LOAD6

Installing the BBU in the OMB c Installing the BBU Cables 6. Install the E1/T1 cable (E1/T1 transmission mode).

E1/T1

OUTSIDE

INSIDE

b

PGND

Shielding layer (25 mm)

Shielding layer

45

Installing the BBU in the OMB c Installing the BBU Cables c

7. Install the FE/GE cable (FE/GE transmission mode). a

a c b

b The shielded straight-through cable must be used as the FE/GE Ethernet cable.

8. Install the CPRI optical cable. Insert the DLC connectors labeled 2A and 2B at one end of the CPRI optical cable into the optical module on the GTMU, and then insert the DLC connectors labeled 1A and 1B at the other end into the optical module on the RRU. 1. Insert the optical module into the CPRI0, CPRI1, CPRI2, CPRI3, CPRI4 or CPRI5 port. 2. Turn outwards the puller on the optical module.

Optical module

Puller

The single-mode optical module is labeled "SM" and multi-mode optical module is labeled "MM“. If the puller of an optical module is blue, the module is a single-mode optical module. If the puller of an optical module is black or grey, the module is a multi-mode optical module.

If both ends of the optical cable are the LC connectors, the TX and RX ports on the BBU are respectively connected to the TX and RX ports on the RRU.

3. Remove the dustproof caps from the optical connectors.

4. Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

46

BBU Hardware Installation Checklist SN

Item

1

All self-made PGND cables are copper-based with the proper wire diameters. No breaking device such as switch and fuse is allowed for the electric connection of the grounding system. No short circuit is allowed. Each terminal on the ground bar can be connected with only one wiring terminal of the PGND cable.

2

The redundant part of the power cable or PGND cable is stripped off rather than coiled.

3

The terminals at both ends of the power cable or PGND cable are securely soldered or crimped.

4

The bare wires and the terminal handles at the wiring terminals are coated with heat-shrinkable tubes.

5

The flat washer and the spring washer are well mounted on all OT terminals.

6

All cables are connected securely and reliably. Pay special attention to the cable connections at the bottom of the cabinet.

7

The cables are neatly and tightly bound. The cable ties are evenly spaced and face the same direction.

8

The power cable, PGND cable, feeder, optical cable and the E1/T1/FE/GE signal cable are bound separately with a spacing of larger than 3 cm.

9

The cable layout facilitates maintenance and future capacity expansion, and the bending radius of the cables meet the requirements.

10

All the labels at both ends of the cables are legible.

11

The extra length of each indoor cable tie is cut, and the cut surface is smooth without sharp edges. An extra length of 3 mm to 5 mm is reserved for each outdoor cable tie.

12

The idle connectors of the cables are properly protected.

Powering On the BBU

47

Obtaining the ESN Record the Electronic Serial Number (ESN) shown on the label attached to the mounting ear of the BBU, and report the ESN to the engineer for the commissioning of the base station.

ESN

Appendix a Setting the DIP Switches Remove the GTMU and UELP from the BBU.

Wear an ESD wrist strap during the operations on the boards to prevent damage to the boards.

The UELP is optional. Please check the settings of the DIP switches according to the field conditions.

48

Appendix a Setting the DIP Switches Set the DIP switches of the BBU. Settings of the DIP switches on the UELP 75-ohm E1 Mode

Other Modes

Settings of the DIP switches on the GTMU T1 Mode

75-ohm E1 Mode

120-ohm E1 Mode

All the DIP bits of S2 on the GTMU are set to OFF by default in all modes. When four 75-ohm E1/T1 links are faulty, all the DIP bits of S2 should be set to ON so that the faults are rectified.

49

Appendix a Setting the DIP Switches Settings of S4 and S5 on the GTMU DIP Switch

Setting of DIP Bit

S4

Description

1

2

3

4

ON

ON

ON

ON

The E1 link can be bypassed.

OFF

OFF

OFF

OFF

The E1 link cannot be bypassed.

Miscellaneous

DIP Switch

S5

Not available

Setting of DIP Bit

Description

1

2

3

4

ON

ON

ON

ON

The E1 link can be bypassed.

OFF

ON

ON

OFF

The E1 link of the Level 1 cascaded BTS can be bypassed.

ON

OFF

ON

OFF

The E1 link of the Level 2 cascaded BTS can be bypassed.

OFF

OFF

ON

OFF

The E1 link of the Level 3 cascaded BTS can be bypassed.

Reinstall the GTMU and the UELP.

50

Appendix a Setting the DIP Switches No.

Function

Operation

1 to 5

Defining the communication address of

(1) Switches 1 to 5 correspond to bits

the PMU

0 to 4. ON:1; OFF: 0 For example: to set the address of PMU to 3, set switches 3 to 5 as OFF. (2) Default setting before delivery: 1 (BIT0), ON 2 (BIT1), ON 3 (BIT2), OFF 4 (BIT3), OFF 5 (BIT4), OFF

6

Selecting baud rate for communicating

Set as ON, indicating that the baud

with the BTS

rate is 9600. (If it is set as OFF, the baud rate is 19200.)

7 and 8

Set as OFF

Reserved and not defined

Set the DIP switches of the PMU.

51

Appendix b Pin Assignment for the BBU Signal Cables 75-ohm E1 cable Pin of the DB26 Male Connector

Wire Type

Coaxial Series No.

Label

X1.1

Tip

1

RX1+

X1.2

Ring

X1.3

Tip

X1.4

Ring

X1.5

Tip

X1.6

Ring

X1.7

Tip

X1.8

Ring

X1.19

Tip

X1.20

Ring

X1.21

Tip

X1.22

Ring

X1.23

Tip

X1.24

Ring

X1.25

Tip

X1.26

Ring

52

RX13

RX2+ RX2-

5

RX3+ RX3-

7

RX4+ RX4-

2

TX1+ TX1-

4

TX2+ TX2-

6

TX3+ TX3-

8

TX4+ TX4-

Appendix b Pin Assignment for the BBU Signal Cables 120-ohm E1 cable Pin of the DB26 Male Connector

Wire Color

X1.1

Blue

Wire Type

Label RX1+

Twisted pair X1.2

White

RX1-

X1.3

Orange

RX2+

X1.4

White

X1.5

Green

X1.6

White

X1.7

Brown

Twisted pair

RX2RX3+

Twisted pair RX3RX4+ Twisted pair X1.8

White

RX4-

X1.19

Grey

TX1+

X1.20

White

X1.21

Blue

Twisted pair TX1TX2+ Twisted pair X1.22

Red

TX2-

X1.23

Orange

TX3+

X1.24

Red

TX3-

X1.25

Green

TX4+

X1.26

Red

Twisted pair

Twisted pair

53

TX4-

Appendix b Pin Assignment for the BBU Signal Cables Monitoring signal cable between the APMI and the BBU Pin of the RJ45 Connector

Wire Color

Pins of X2, X3, X4, and X5

Wire Type

Port on the APMI

X1.1

White

X2

Twisted pair

TX+

X1.2

Orange

X3

Twisted pair

TX-

X1.4

Blue

X4

Twisted pair

RX+

X1.5

White

X5

Twisted pair

RX-

EMUA monitoring signal cable Pin on the RJ45 Connector

Pin of the DB9 Male Connector

Wire Color

Wire Type

Port on the APMI

X1.1

X2.3

White

Twisted pair

TX+

X1.2

X2.7

Orange

Twisted pair

TX-

X1.4

X2.2

Blue

Twisted pair

RX+

X1.5

X2.6

White

Twisted pair

RX-

54

Appendix b Pin Assignment for the BBU Signal Cables BBU alarm cable Pin of the RJ45 Connector

Pin of the RJ45 Connector

Wire Color

Wire Type

X1.1

X2.1

White/orange

Twisted pair

X1.2

X2.2

Orange

X1.3

X2.3

White/green

X1.6

X2.6

Green

X1.5

X2.5

White/blue

X1.4

X2.4

Blue

X1.7

X2.7

White/brown

X1.8

X2.8

Brown

55

Twisted pair

Twisted pair

Twisted pair

Change History This describes the changes in the BBU3900 Installation Guide. 19(2011-01-20) This is the ninth commercial release. Compared with issue 18(2010-11-30) of V300R008&R009, 1. Added the description about the difference between single-mode optical modules and multi-mode optical modules. 2. Modified the information about installing an SLPU. 3. Modified the requirements of the duration for equipment power-on and poweroff operations. 18 (2010-11-30) This is the eighteenth commercial release. Compared with issue 17 (2010-09-03) of V300R008&R009, this issue modified some descriptions. 17 (2010-09-03) This is the seventeenth commercial release. Compared with issue 16 (2010-07-30) of V300R008&R009, this issue added safety information about the FE/GE Ethernet cable. 16 (2010-07-30) This is the sixteenth commercial release. Compared with issue 15 (2010-06-30) of V300R008&R009, this issue excludes the safety information. 15 (2010-06-30) This is the fifteenth commercial release. Compared with issue 14 (2010-04-10) of V300R008&R009, this issue incorporates the description about installing the IMB03 on the H-Shaped stand. 14 (2010-04-10) This is the fourteen commercial release. Compared with issue 13 (2010-03-15) of V300R008&R009, the UTRP is added. 13 (2010-03-15) This is the thirteenth commercial release. Compared with issue 12 (2010-01-30) of V300R008&R009, the procedure for obtaining the ESN is added.

56

HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People’s Republic of China www.huawei.com

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF