BBA summer training project report, IP University...
SUMMER TRAINING PROJECT REPORT
XYZ. Ltd Logo ON THE TOPIC “WORKING ANALYSIS OF AN ORGANISATION” In Partial Fulfillment for the Degree of Bachelor of Business Administration Under Supervision of: Mr. xxxxxx xxxxx Production Manager “XYZ ltd.”,
GURU GOBIND SINGH INDRAPRASTHA UNIVERSITY Submitted to:
Submitted by:
ACKNOWLEDGEMENT I, ……………… of BBA 5th Semester, am having immense pleasure in bringing out the Project Report on the topic ‘WORKING ANALYSIS OF AN ORGANISATION’. A department………………
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact
[email protected]
Date:
(Name)……… ROLL NO………
4
INDEX CHAPTER
CONTENTS
PAGE NO.
1.
INTRODUCTION
6
2.
LITERATURE REVIEW
22
3.
RESEARCH METHODOLOGY
33
4.
42
5.
WORKING ANALYSIS OF AN ORGANISATION (xyz ltd) SUMMARY
6.
BIBLIOGRAPHY
67
5
63
CHAPTER-1 INTRODUCTION
6
Automotive industry in India: Over a period of more than two decades the Indian Automotive Industry has been driving its own growth through phases. The entry of Suzuki Corporation in Indian passenger car manufacturing is often pointed as the first sign of India turning to a market economy. Since then the automotive sector witnessed rapid growth year after year. By late-90's the industry reached self reliance in engine and component manufacturing from the status of large scale importer. With comparatively higher rate of economic growth rate index against that of great global powers, India has become a hub of domestic and exports business. The automotive sector has been contributing its share to the shining economic performance of India in the recent years. With the Indian middle class earning higher per capita income, more people are ready to own private vehicles including cars and two-wheelers. Product movements and manned services have boosted in the sales of medium and sized commercial vehicles for passenger and goods transport.
7
The data obtained from Ministry of Commerce and Industry, shows high growth obtained since 2001-02 in automobile production continuing in the …………………………………………………..
………………….. MEANS MORE WORDS ARE THERE.
………………….. MORE.
OBJECTIVES OF STUDY
•
…………………………………………………………….
• ……………………………………………………… • This ………………………………………………….. is a sample of SUMMER
TRAINING upon exactly IP
PROJECT REPORT based university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact
[email protected]
8
CHAPTER-2 Literature Review (XYZ ltd.)
9
The XYZ Group of Industries, a US $40 Million Conglomerate, is a Leading OEM
(Original
Equipment
Manufacturer)
catering
to
leading
auto…………………………………………………………………………… ……………………………………………………………………………… ………………………………………………………………………………
………………….. MEANS MORE WORDS ARE THERE.
……………………………………….
……………………………………………………………………………… …………………………………………..
………………………………………………………………..and the stress on the mantra of “Perfection in Quality, Cost and Delivery.”
10
Components Manufacturing in XYZ ltd: Products for Domestic Market: As an OEM of M/s Hero Honda, TVS, Yamaha and other Auto Majors, the Group supplies the following major parts: •
………………….. MEANS Chassis parts……….. MORE WORDS ARE THERE.
• ………………. • …………………..more
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact
[email protected]
Financial Performance: 11
The Groups Growth curve is snapped below:
Other Interests: The Group also has interests and association, other than its main line of Business: The xyz School: An International School of repute, cocooned inside the commercial hub of Gurgaon. It follows the Primary Years Programme of the International Baccalaureate of Switzerland and the ICSE/ISC programme of the Council for the Indian School Certificate Examination, New Delhi. Website.: www.xyz.com
12
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP Anuniversity association ofrequirement the xyz Group, which is involved in the design, production (BBA). Ifsales u need anelectronic original and complete report file in MS and of hi-tech Word format + Presentation on this file PPT, Then u may contact
[email protected] Flash xyz devices Pvt. Ltd.:
energy meters. Had been the largest supplier to the Government of State of Punjab in the Year 2004 –05.
13
ABC India Pvt. Ltd.: ABC India, a market leader in the field of children related products, an entirely new collection of futuristic models of tricycles, perambulators, and battery operated cars and cycles etc for new borns to 12 year olds.
14
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact
[email protected]
15
CHAPTER-3 RESEARCH METHODOLOGY
16
Research: Research in common parlance refers to a search of knowledge. Research comprises defining and redefining problems, formulating hypothesis or suggested solutions; collecting, organizing and evaluating data; making deductions and reaching conclusions; and at last carefully testing the conclusions to determine whether they fit the formulating hypothesis. One can also define research as scientific and systematic search for pertinent information on a specific topic.
Objectives of Research: ……………………………………………………………………………… ………………………………………………………………………………
………………….. MEANS …………………… MORE WORDS ARE THERE. …………….. …………….
17
Research Process:
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact
[email protected]
……………………………………………………………………………… ………………. ……………………………………………………………………………… …………………………….. …………………………………………………..
18
Research Design: Decisions regarding what, where, when, how much, by what means concerning an inquiry or a research study constitute a research design. “ A research design is the arrangement of conditions for collection and analysis of data in a manner that aims to combine relevance to the research purpose with economy in procedure.”
More explicitly, the designing decisions happen to be in respect of: • What is the study about? • Why is the study being made? • Where will the study be carried out? • What type of data is required? • Where can the required data be found? • What periods of time will the study include? • What will be the sample design? • What techniques of data collection will be used? • How will the data be analyzed? • In what style will the report be prepared?
19
Research Approach: ……………………………………………………………………………… ……………………………………………………………………………… …………………………… Data Collection: TYPES OF DATA 1) PRIMARY DATA: Are those which are collected afresh and for the first time and thus happen to be original in character and known as Primary data. Personal Interview Close observation Survey conduction Group Discussion etc...
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP else and which requirement have already been(BBA). passed through the statistical process are university If u as need an original and complete report file in MS known Secondary data. Word format + Presentation on this file PPT, Then u may contact
[email protected] 2) SECONDARY DATA: Are those which have been collected by someone
The
data
for
report
has
taken
from
……………………………………………………………………………… ………………….
20
CHAPTER-4 WORKING ANALYSIS OF AN ORGANISATION(XYZ LTD.)
21
MANUFACTURING DEPARTMENT ANALYSIS: The manufacturing of the automotive spare parts passes through various sub manufacturing departments to reach at the final component.
MANUFACTURING PROCESS: Procuring the order
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). Arranging the Raw material If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact
[email protected] Manufacturing dies to make components
……………..
Dispatch
Production Department: The Production/Manufacturing Department is the back bone of a company. In this the whole process starting from the getting of the order then on to
22
manufacturing Dies then to the Cutting, Parsing, Bending.. Welding then on to Paint & Powder Coating and then Dispatching of the order is done. To reach at a Final Component, the manufacturing process passes through various Sub Departments. These are as follows:
1) Store Department:
•
The department deals in with the storage of the raw
material
for
the
p……………………………………………………………………… ………………. ……………………………………………………………………………
………………….. MEANS ……………………………………………………….. MORE WORDS ARE THERE. . 23
2) Tool Room:
This department is one among the major departments, prepares different dies (tools) for the machines which are used in production. Number of
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP machines are given below: university requirement (BBA). If u need an original and complete report file in MS ……………………………………………………………………………… Word format + Presentation on this file PPT, ……………………………………………………………………………… Then u may contact
[email protected] machines used for this process. The names and working of some major
……………………………………………………………………………… ……………………………………………………………………………… ……………………………………………………………………………… …………………………………………..
24
………………….. MEANS ……………………………………………………………………………… MORE WORDS ARE THERE. ………………………………………………………………………………
…………………………………………………………………………….
8) Quality Assurance and Dispatch:
Quality assurance, or QA for short, is the set of planned and systematic actions necessary to provide appropriate confidence that a product or service will satisfy the requirements for quality. Quality Assurance is a wide range concept concerning all the matters collectively or individually, which directly
25
affect the quality of product. It controls the quality of a product by doing in-process quality checks, effectively functioning as the brain of an organization. The objective of Quality Assurance is to delight there Customers by involving state of the art, manufacturing techniques and ontime delivery
This is a sample of SUMMER TRAINING with consistent quality. REPORT PROJECT based upon exactly IP university requirement (BBA). After the quality assurance if the component quality is as per the quality If u need an original and complete report file in MS standards by the organization then furtheron it will for PPT, Dispatch. Wordsetformat + Presentation thissentfile u may contact
[email protected] TheThen process in Dispatch involves sending the components from organization to there designated customers. Main Components which are assembeled are as follows: • Top Bridge(Handle Plate) • Swing Arm • Chain Adjuster • Battery Case Processes: For Top Bridge: Visual Inspection Reaming Retapping 26
Handle Holder Assembling Dispatch For Swing Arm: Visual Inspection Reaming Retapping Bush Fitting Brake Arm Fitting Dispatch For Chain Adjuster: Size Checking Cap Assembly Dispatch
9) Vendor Development:
27
………………….. MEANS It is anMORE important department of any ARE industry. THERE. The main purpose of this WORDS department is to establish contacts with vendors which are able to fulfill the ……………………………………………………………………………… ……………………………………………………………………………… ……………………………………………………………………………… ……………………………technical and business assistance by means of relevant training, seminars, and workshops.
28
CHAPTER-5 SUMMARY
29
Observations: •
Various methods adopted to store data in store department…
• ………………………………………………………………………… ……………………….. • ………………………………………………………………………… …………………… • …………………………………………………………………………
………………….. MEANS ………………………………….. MORE WORDS ARE THERE.
• ………………………………………………………………………… ………………………… • Methods adopted to provide layer coating on components.
30
Recommendations: ………………………………………………………………………………
………………….. MEANS MORE WORDS ARE THERE.
………………………………………………………………………………
……………………………………………………………………………… ….. ………………………………………………………………………………
This is a sample of SUMMER TRAINING …………………………………………………. PROJECT REPORT based upon exactly IP university (BBA). • Companyrequirement should adopt new technology to meet modern business If u need an original and complete report file in MS requirements. Word format + Presentation on this file PPT, Then u may contact
[email protected]
31
Limitations: • Non-cooperative approach and rude behavior of employees • The time available for the completion of the project was limited. •
Research work was carried out only in the branch of xyz. Therefore it may not be possible to know various methods adopted by other production branches of the company.
32
CHAPTER-5 BIBLIOGRAPHY
33
Bibliography:
………………….. MEANS MORE WORDS ARE THERE. ……………………….
• company’s annual report •
• ………………………….. • …………………………. • Research Methodology ( CR KOTHARI) This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact
[email protected]
34