NICKEL CADMIUM BATTERY & CHARGER SIZING CALCULATION FOR STATIONARY APPLICATIONS (ELECTRICAL SUBSTATION) AS PER IEEE STD. 1115-2000 BATTERY DATA Nominal System Voltage Maximum Allowable System Voltage Minimum Battery Voltage Design Margin Aging Factor Cell Discharge-End Voltage Number of Cells Number of Battery Bank Total Number of Cells
-6 -7 Capacity Rating Temparature Factor at t Derating Factor Minute Rate for t Minute (Tt) (Kt)
Time to End of Section
(amperes) (amperes) (minutes) Section 1 - First Period Only - If A2 is greater than A1, go to Section 2 1 320.00 A1-0 = 320 M1= 0.080 t1 = M1 = A1=
(minutes)
-8 Required Section Size (3) x (6) x (7) Rated Amp Hrs (Ah) Positive Values
=
Negative Values
0.08
0.432 Section 1
1.230 Total
170.035 170.035
Section 2 - First Two Periods Only - If A3 is greater than A2, go to Section 3 1 A1= 320.00 A1-0 = 320 M1= 0.080 t1 = M1+M2 = 2 A2= 100.00 A2-A1= -220 M2= 29.920 t2 = M2 =
30.00 29.92
1.000 1.000 Section 2
1.000 1.000 Sub Total Total
320.000 0.000 320.000 490.035
0.000 -220.000 -220.000
Section 3 - First Three Periods Only - If A4 is greater than A3, go to Section 4 1 A1= 320.00 A1-0 = 320 M1= 0.080 t1 = M1+M2+M3= 2 A2= 100.00 A2-A1= -220 M2= 29.920 t2 = M2+M3 = 3 A3= 280.00 A3-A2= 180 M3= 30.000 t3 = M3 =
60.00 59.92 30.00
1.780 1.779 1.000 Section 3
1.500 1.500 1.000 Sub Total Total
854.400 0.000 180.000 1,034.400 447.330
0.000 -587.070 0.000 -587.070
Section 4 - First Four Periods Only - If A5 is greater than A4, go to Section 5 1 A1= 320.00 A1-0 = 320.00 M1= 0.080 t1 = M1+M2+M3+M4= 2 A2= 100.00 A2-A1= -220.00 M2= 29.920 t2 = M2+M3+M4 = 3 A3= 280.00 A3-A2= 180.00 M3= 30.000 t3 = M3+M4 = 4 A4= 200.00 A4-A3= -80.00 M4= 60.000 t4 = M4 =
120.00 119.92 90.00 60.00
1.000 1.000 1.000 1.000 Section 4
1.000 1.000 1.000 1.000 Sub Total Total
320.000 0.000 180.000 0.000 500.000 200.000
0.000 -220.000 0.000 -80.000 -300.000
Section 5 - First Five Periods Only - If A6 is greater than A5, go to Section 6 1 A1= 320.00 A1-0 = 320.00 M1= 0.080 t1 = M1+M2+M3+M4+M5= 2 A2= 100.00 A2-A1= -220.00 M2= 29.920 t2 = M2+M3+M4+M5 = 3 A3= 280.00 A3-A2= 180.00 M3= 30.000 t3 = M3+M4+M5 = 4 A4= 200.00 A4-A3= -80.00 M4= 60.000 t4 = M4+M5 = 5 A5= 40.00 A5-A4= -160.00 M5= 59.420 t5 = M5 =
179.42 179.34 149.42 119.42 59.42
1.000 1.000 1.000 1.000 1.000 Section 5
1.000 1.000 1.000 1.000 1.000 Sub Total Total
320.000 0.000 180.000 0.000 0.000 500.000 40.000
0.000 -220.000 0.000 -80.000 -160.000 -460.000
Section 6 - First Six Periods Only - If A7 is greater than A6, go to Section 7 1 A1= 320.00 A1-0 = 320.00 M1= 0.080 t1 = M1+M2+M3+M4+M5+M6= 2 A2= 100.00 A2-A1= -220.00 M2= 29.920 t2 = M2+M3+M4+M5+M6 = 3 A3= 280.00 A3-A2= 180.00 M3= 30.000 t3 = M3+M4+M5+M6 = 4 A4= 200.00 A4-A3= -80.00 M4= 60.000 t4 = M4+M5+M6 = 5 A5= 40.00 A5-A4= -160.00 M5= 59.420 t5 = M5+M6 = 6 A6= 120.00 A6-A5= 80.00 M6= 0.580 t6 = M6 =
180.00 179.92 150.00 120.00 60.00 0.58
1.000 1.000 1.000 1.000 1.000 1.000 Section 6
1.000 1.000 1.000 1.000 1.000 1.000 Sub Total Total