TYPICAL, FOR INFORMATION ONLY
TYPICAL, FOR INFORMATION ONLY Doct no: GTEI/Fr-6 Typical-Bat Siz Rev: 00
BATTERY SIZING CALCULATION PROJECT
:-
Typical 1X Fr6 GTG
CUSTOMER
:-
Tender
CONSULTANT
:-
NA
SITE
:-
NA
APPLICATION
:-
Gas Turbine
TYPE OF BATTERY
:-
NI-CAD .
DC NOMINAL VOLTAGE :-
125V DC
FLOAT VOLTAGE
:-
1.4V/Cell
BOOST VOLTAGE
:-
1.6V/Cell
MIN AMBIENT TEMPERATURE:- 15 Deg C (for battery design) However, Battery sizing considered for worst condition of 5 Deg C MAXIMUM DC VOLTAGE :-
125 X 1.1
=
137.5V DC (+10%)
MINIMUM DC VOLTAGE :-
125 X 0.9
=
112.5V DC (-10%)
CELL END VOLTAGE
:-
1.14V/Cell .
NUMBER OF CELLS
:-
Maximum DC voltage / Float voltage per cell 137.5 / 1.40 = 98 Nos.
The type of battery is KPM, Pocket plated Ni-Cad
E:\RAKIA-UAE\battery-sizing\BATTERY & CHGR SIZ CALC-tender-Typical.doc
2
OF
7
TYPICAL, FOR INFORMATION ONLY Doct no: GTEI/Fr-6 Typical-Bat Siz Rev: 00
The battery is sized for safe shutdown of gas turbine in the event of failure of AC supply.
TABLE – I DC LOAD DATA PER GAS TURBINE
Sl Tag No No
Loads in Description KW
Load current Starting for 10 secs
01
88QE-1
7.5
DC Emergency Lube Oil Pump Motor
106.67
66.67 Amps
02
88DS
7.5
DC Diesel Engine Starting Motor
106.67
66.67 Amps
03
88HR
0.56
DC Hydraulic Ratchet pump motor
8A
5 Amps
04
Lighting
0.2
Lighting in GT Acc. Compartment
2A
2A
05
TURBINE CONTROL PANEL (Mark-VI)
1.875
Turbine Control PANEL
15A
15 Amps
06
07
Emergency lighting 40 watts (12 numbers)
GT MCC (I/C )
08
GCP
09
GRP
10
AVR
11
Generator Emergency lighting
0.480
250 W
GT MCC (for incomers )
Generator 1.25KW Control Panel Generator 1.25KW Relay Panel Automatic 1.25KW Voltage regulator 0.25KW
3
OF
7
Refer duty cycle Refer duty cycle Refer duty cycle Refer duty cycle Refer duty cycle
5
5
Refer duty cycle
4
4
Refer duty cycle
10
10
Refer duty cycle -
10
10
Refer duty cycle
10
10
Refer duty cycle
2
Refer duty cycle
2
E:\RAKIA-UAE\battery-sizing\BATTERY & CHGR SIZ CALC-tender-Typical.doc
Load Load current current Remarks Normal Duration Requirement for coasting down and cool down Requirement for start-up Requirement for cool down Requirement for coasting down and cool down
The load requirement occurs when AC lighting fails. Considering 2A/ breaker & 2 breakers operating simultaneously.
TYPICAL, FOR INFORMATION ONLY Doct no: GTEI/Fr-6 Typical-Bat Siz Rev: 00
DUTY CYCLE ON BATTERY IS AS FOLLOWS:
159.7A L O A D C U R R E N T
1Min 127.7A
Load cycle continues
119.7 A
2 Min
10 secs
15min
2hrs
TIME LOADS : A1: FIRST 10 secs (Considering Starting :Loads sl.no 1, 4, 5,7,8,9,10,11,12 of Table –I Current ) starting currents are considered 159.67 Amps A2: Next 14 Min , 50 secs
:
Loads sl.no 1,4 ,5,7,8,9,10,11,12 of
Table – I Normal currents are considered 119.67 Amps A3: Next 1 Min
:
Loads sl no.1,3,4 ,5,7,8,9,10,11,12 of table I are considered Starting currents for 88HR 127.67 Amps
A4: Next 2 Min
:
Load 1,4 ,5,7,8,9,10,11,12 Normal currents are considered 119.67 Amps.
E:\RAKIA-UAE\battery-sizing\BATTERY & CHGR SIZ CALC-tender-Typical.doc
4
OF
7
TYPICAL, FOR INFORMATION ONLY Doct no: GTEI/Fr-6 Typical-Bat Siz Rev: 00
Section A3, A4 repeats sequentially for the next 105 Min (till the total duration of 2 hours) at the rate of 3min/cycle (1 min ON 2 min OFF and 35 such cycles occur in 105 Min. DUTY CYCLE : 1) 2) 3) 4)
159.7 Amps for 10 secs followed by 119.7 Amps for 14 min 50 secs followed by 127.7 Amps for 1 min followed by 119.7 Amps for 2 min.
3 & 4 repeats for remaining duty cycle time. FACTORS TO BE CONSIDERED: 1) Aging factor = 2) Design margin = 3) Temp correction factor = TABLE -1 Period
20% 10% For 5 deg C
Load ( In amps)
Duration
Performance factor (A/AH)
Temperature derating factor
as per vendor Datasheet-M/s HBL
( As per table01 of enclosed annexure-01)
Combined performance factor
I1= I2=
181.7
10 sec.
2.56 1.08
0.81 0.85
141.7
14 min 50 sec.
I3 = I4 =
149.7
1 min.
2.06
0.81
1.68
141.7
2 min.
1.88
0.82
1.53
2.06 0.92
E:\RAKIA-UAE\battery-sizing\BATTERY & CHGR SIZ CALC-tender-Typical.doc
5
OF
7
TYPICAL, FOR INFORMATION ONLY Doct no: GTEI/Fr-6 Typical-Bat Siz Rev: 00
TABLE -2 Step .No.
Opening balance
Load in Amps
Duratio n
Combined Performan ce Factor
Ah Reqd.
Ah Drain
Ah Balan ce
1
0.00
159.7
2.06
77.37
2.662
2
74.71
119.7
10 sec 14 min 50 sec.
0.92
130.70
27.93
3
102.77
127.7
1 min.
76.14
2.13
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
100.64 96.65 94.52 90.53 88.40 84.41 82.29 78.30 76.17 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01
119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7 127.7 119.7
2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min. 1 min. 2 min.
78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33 76.14 78.33
3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990 2.13 3.990
74.71 102.7 7 100.6 4 96.65 94.52 90.53 88.40 84.41 82.29 78.30 76.17 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 74.01 74.34 Total
Min. capacity required :
1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53 1.68 1.53
196.71 Ah
E:\RAKIA-UAE\battery-sizing\BATTERY & CHGR SIZ CALC-tender-Typical.doc
6
OF
7
Ah to Add 77.37 55.988 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.163 1.797 4.322 1.797 4.322 1.797 4.322 1.797 4.322 1.797 4.322 1.797 4.322 1.797 4.322 1.797 4.322 1.797 4.322 1.797 4.322 196.71
TYPICAL, FOR INFORMATION ONLY Doct no: GTEI/Fr-6 Typical-Bat Siz Rev: 00
Design margin of 10% : Aging factor of 20% : Cell selected :
216.38 Ah 259.65 Ah KPM 300P
THE BATTERY SELECTED IS 98 KPM 300P CHARGER SIZING CALCULATION BATTERY CAPACITY
: 125 VDC 300 AH Ni-Cd
TRICKLE CHARGING CURRENT @ 2 MILLIAMPS PER AH
: 1.1 A
CONTINUOUS LOAD CURRENT
:
45AMPS. (Loads no. 5 (15A), no 8 -(10A), no 9-(10A) no 10-
(10A)
(Float charge current= Continuous load + trickle current) THE CURRENT IN ON LINE FLOAT CHARGING
: 46.1
THE CURRENT REQUIREMENT FOR BOOST CHARGING
: 0.2 X 300 : 60A
Total charger rating
: 105 A
Charger rating selected
: 110 Amps
The charger selected is 2 X 100% Float cum boost charger 125VDC, 110 A
E:\RAKIA-UAE\battery-sizing\BATTERY & CHGR SIZ CALC-tender-Typical.doc