Approved drawing for battery rack and cell arrangement is vailable Civil work and acid resistant floor as per drawing is completed and area is clear from debris Battery Room is well ventilated Battery rating and type is verified Battery racks are installed as per drawing and anchored properly to floor Check the tightness of battery rack Check the alignment of battery rack Polarity of cells are checked No physical damage observed on batteries Cell terminals are cleaned Batteries are arranged in number wise and rack wise according to approved drawing Inter cell, inter tier links are done All exposed terminals and links are caped using manufacturer provided caps Adequate seperation as per approved drawing shall be provided between the cells for cooling purpose (For VRLA)
E L P M SA
Inter cell, inter row cablings for VRLA cells are done with appproved cable size or manufacturer supplied cable Terminal connections tightened/torqued properly as per vendor specification. Inter rack cabling & cable from isolation box to battery bank is complete A layer of anti oxidant grease recommended by manufacturer is applied on battery terminals
Page 1 of 4
CBM FIELD DEVELOPMENT PROJECT SHAHDOL (MP) CLIENT : Reliance Industries limited CONTRACTOR: L&T Hydrocarbon Engineering Limited Area / Location :
INSTALLATION CHECK LIST FOR BATTERY BANK LEAD ACID/VRL
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.