BATCHING AND CRUSHING PLANT PROJECT INITIAL ENVIRONMENTAL EXAMINATION ( IEE ) CHECKLIST REPORT for
Project name or Title
Below is the IEE Report Checklist for Batching and Crushing Plant Project: Industry Parameter Batching Plant (with or without crushing) Metallic Mineral or Ore Processing (e.g. Annual processing copper, lead, nickel, cobalt, zinc, silver, (inputs) magnesium, and manganese, gold, placer with metal content) with Physical or Mechanical Processing Read the questions carefully before answering the space provided. necessary and indicate this in the appropriate space.
Threshold All Batching Plants >200.0 MT annually but 18%)
Tree cutting or vegetation clearing, and disturbance to wildlife within the influence area due to noise and other construction activities
Existing vegetation in the area: Forest Coastal/Marine Marshland Grassland Mangrove Wetland Others, specify __________ __________
Provide erosion control and slope protection measures Designate a Spoils Storage Area, with topsoil set aside for later use and allow maximum re-use of spoils Others, specify ____________ ____________ Compliance with conditions in permits secured during the Preconstruction Phase Implementation of tree planting around the facility ; Promote restoration of damaged or destroyed vegetation where possible; Vegetation to serve also as buffer to wildlife Limit land clearing as much as possible
Presence of slope
Slope/ Erosion Control protection in erosionintegrated in Construction prone areas Cost: Presence of new Others, specify ____________ eroded areas near the ____________ site
Others, specify ____________ ____________
Compliance with conditions of DENR/LGU SLUP, Tree Cutting Permit, ROW, PCA Permit Area replanted/ revegetated # incidence of violation to protection guidelines Presence of fences and markers Others, specify ____________ ____________
Replacement planting cost depends on area opened up: Compliance with other permit conditions integrated in Construction Cost: Others, specify ____________ ____________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN Possible Environmental/ Social Impacts
Project Phase / Activities
Baseline Data Parameter Specify the existing flora in the area ________ _________________ Specify the existing fauna in the area ________ _________________
Preventive/ Mitigating/Enhancement Measures
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Monitoring Parameters/ Implementation
Provide a temporary fencing to vegetation that will be retained Others, specify ____________ ____________
Operation Phase Cement based products manufacturing
Air Pollution
Air Quality Data Upwind: TSP_____ SOx____ NOx_____ PM10______ Other, specify _________ Air Quality Data Downwind: TSP_____ SOx____ NOx_____ PM10______ Other, specify _________
Water Pollution Receptor: Fresh Brackish Saline/Sally
Wet areas of dust sources to minimize discomfort to nearby residents Proper operation and maintenance of the dust producing installations (stone cutters) and its air pollution control facility Good housekeeping to be strictly enforced Proper operation of the generator set Control of vehicle speed to lessen suspension of road dust Remove soil. mud from tires of trucks and equipment before leaving the area Other, specify _______ ___________________
Set-up proper and adequate toilet facilities Strictly require the contractor and its workers to observe proper waste
# public complaints received by Proponent/ Contractor Presence of emission test results/certificate of conformance with emission standards Absence of white or black smoke from vehicles, heavy equipment and generator Result of air quality sampling
Water spraying/ Dust filters/barriers/fences Cost:____
Others, specify ____________ ____________
O&G traps: _____ Ring canals:______ Used oil containers: ________
Frequency : Monthly Quarterly Semi-Annual Annually Others, specify_______
# of public complaints received by the proponent or constructor Visible turbid and/or silted condition of the
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN Possible Environmental/ Social Impacts
Project Phase / Activities
Baseline Data Parameter
Preventive/ Mitigating/Enhancement Measures
Water Quality Data in upstream: TSS Oil and grease
Water Quality Data in downstream: TSS Oil and grease
Volume of solid waste Generation of solid waste from the project generated from current activities/ operations sources
Threat to public
Health Facilities within
disposal and proper sanitation Provision of wastewater treatment facility Proper operation and maintenance of the toilet facilities and septic tank Set up silt trap/stilling ponds to minimize downstream siltation Provide oil & grease traps upstream of any run-off discharge from the project to the waterbodies Provide ring canals around fuelling tanks/ motorpool/ maintenance areas Collect used oils in containers Limit, where possible, the extent of impervious (paved) areas Implementation of the Ecological Solid Waste Management Plan (ESWMP); Re-use and recycling Others, specify ____________ ____________
Provide appropriate
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Monitoring Parameters/ Implementation
river Visible oil & grease film on waterbodies TSS concentration
Frequency : Monthly Quarterly Semi-Annual Annually Others, specify_______
Silt trap/stilling ponds integrated in Construction Cost:______ Others, specify ____________ ____________
Presence of waste/recycling bins for segregation Absence of mixed garbage in the facility
Implementation cost of ESWMP: __________ Others, specify ____________ ____________
Safety standards, PPE,
Frequency : Monthly Quarterly Semi-Annual Annually Others, specify_______
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN Possible Environmental/ Social Impacts
Project Phase / Activities
Baseline Data Parameter
health and safety
Preventive/ Mitigating/Enhancement Measures
the project site, specify _____________ _____________ Heath and safety concerns Respiratory illness Specify type and rate of occurrence: _______________ _______________
Accidents Specify type and rate of occurrence: _______________ _______________
Increase in traffic volume and worsening of traffic flow
Traffic condition within the area: Light Moderate Heavy
warning signs, lighting and barricades, whenever practicable Observe proper housekeeping Provide on-site medical services and supplies for any emergency, thru institutional and administrative arrangements with the barangay health unit Identification of hot spots or critical areas based on levels of vulnerability Foster increased public awareness of resilience and develop approaches to climate adaptation Effective IEC program as regards potential risks and vulnerabilities as a result of project implementation on the environment, and vice versa; Others, specify ____________ ____________ Observe traffic rules Implementation of traffic management system; Promotion of green infrastructure, i.e. interconnected network of balancing open space with natural park and vegetation cover;
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Monitoring Parameters/ Implementation
Presence of signages Potable quality of water source & supply Presence of adequate sanitary facilities # of medical complaints or cases # of accidents
Frequency : ____________ ____________
Others, specify ____________ ____________
Presence of designated parking , pedestrian lanes, loading/ unloading zones, delivery areas, sidewalk vendor areas Presence of signages Presence/ Visibility of local traffic aide
safety signs are expected to be integral part of the Occupational Safety program of the Proponent Potability analysis integrated in Construction Cost: Others, specify ____________ ____________
Signages cost :______ Cost of barangay or city/town traffic aide: ________ Others, specify ____________ ____________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN Possible Environmental/ Social Impacts
Project Phase / Activities
Increase economic activities and economic opportunities to local Job opportunities Increase tax revenue
Baseline Data Parameter
Source of livelihood: Construction _____ Farming _____ Fishing ______ Trading ______ Others _______
Preventive/ Mitigating/Enhancement Measures
Monitoring Parameters/ Implementation
Others, specify ____________ ____________
Frequency : _____________ Others, specify ____________ ____________
Priority of employment Regular tax remittance
Cost of Mitigation/ Monitoring (Assumed to be integrated in project cost per project phase)
Number of jobs generated____ New jobs created :______________ _______________ Income tax generated TOTAL EMP COST________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN CLIMATE CHANGE RISK MANAGEMENT PLAN Project Phase / Activities
Baseline Data Parameter
Climate Change Risk
Occurrence of flooding
Drought
Historical data on flooding
Historical data on drought
Monitoring Parameters/ Implementation
Adaptation Measure
Improve efficiency of water supply/irrigation systems Protect water recharge areas to preserve quality and quantity Increase, when practical, storage capacities of water supply structures for resilience to greater variations and extremes In critical areas, develop flood plan maps, including climate change projections, and zoning measures to limit/restrict development activities Others, specify ____________ ____________ Tree planting to moderate temperature increases Adapting drain water system Water conservation techniques e.g. catchment basins Improving water use efficiency, planning
Review monitoring systems for water levels, flows and water quality rainfall drainage and flood control facilities to take into account climate change to date and projections; Others, specify ___________ ___________
Percent survival of trees planted Effectiveness of drain water system Effectiveness of water conservation techniques Improvement on water use efficiency Others, specify ____________
Cost of Adaptation / Monitoring (Assumed to be integrated in project cost per project phase) Construction cost:_____
Planting cost depends on area: ______________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Baseline Data Parameter
Climate Change Risk
Occurrence of landslide, gully erosion and rock falls
Damage to core operations and increased levels of heat stress, respiratory illness, chronic disease due to prolonged heat waves
Adaptation Measure
for alternative water sources (such as treated wastewater or desalinated seawater), and making changes to water allocation Others, specify ____________ ____________ Historical record on Slope stabilization landslide, gully Establishment of erosion and rock buffer zone falls Planting of trees Others, specify ___________ ___________ Record on heat waves
Monitoring Parameters/ Implementation
Cost of Adaptation / Monitoring (Assumed to be integrated in project cost per project phase)
_____________
Ocular inspection Maintenance of slope Percent survival of trees planted Others, specify ____________ ____________ Heat wave action Review and monitor plan changes in weather pattern Information program for employees Effectiveness of heat wave action plan Weather advisories to alert the public Temperature about dangerous Others, specify heat conditions ___________ Adequate financial ___________ and human public health resources, including training, surveillance and emergency response, and prevention and control programs Others,
Planting cost depends on area: ______________
II. ENVIRONMENTAL IMPACT AND CLIMATE CHANGE RISK MANAGEMENT PLAN
Project Phase / Activities
Baseline Data Parameter
Climate Change Risk
Longer and more intense rains that restrict access to construction sites and slow productivity
Historical data on intense rainfall
Monitoring Parameters/ Implementation
Adaptation Measure
specify_________ _______________ Scheduling the construction activity Others, specify___________ ________________
Earthquake
Volcanic Eruption
Historical Records Number of occurrence _______( indicate years) Highest magnitude recorded ____(indicate years) Historical Records Number of occurrence _______( indicate years)
Incorporate in emergency response plan the climate change risk reduction Engineering design
Establishment of buffer zone to prevent gaseous nuisance
Cost of Adaptation / Monitoring (Assumed to be integrated in project cost per project phase)
Review and monitor changes in weather events Monitor resilience of drainage and flood control facilities Others, specify, ______________
Constant communication with concerned line agency Regular inspection of buildings and related facilities and infrastructures Regular monitoring of early warning devices and preparedness systems to ensure their effectiveness Others, specify, _____________ _____________ TOTAL EMP COST________
III. ABANDONMENT /DECOMMISSIONING/REHABILITATION POLICIES AND GENERIC GUIDELINES (if Applicable) Project Life or Service : ___________ years Provide description of the Abandonment activities, such as, dismantling and waste disposal. IV. INSTITUTIONAL PLAN FOR EMP IMPLEMENTATION5 Organization Chart:
Insert chart here:
5
include in the plan improve coordination within and among affected stakeholders, organizing, and providing scientific, technical and managerial personnel on climate change.
Attach sketch plan/lay-out of project site
(Use additional sheet if necessary)
Attach drawing/plan of air pollution source and control installation s (with dimensions and descriptions)
(Use additional sheet if necessary)
Attach drawing /plan of waste water treatment facilities (with dimensions and descriptions)
(Use additional sheet if necessary)
SWORN STATEMENT OF ACCOUNTABILITY OF THE PROPONENT*
T hi s i s t o certif y t hat al l t he i nf orm at i on and commi tm ent s i n t hi s Initial Environmental Examination Checklist REPORT for PROJECT are accurate and complete to the best of our knowledge, and that an objective and thorough assessment of the Project was undertaken in accordance with the dictates of professional and reasonable judgment. Should I/we learn of any information, which would make this IEE Checklist REPORT inaccurate, I shall immediately bring the said information to the attention of DENR-EMB Region ____. I hereby certify that no DENR personnel was directly involved in the preparation of IEE Checklist REPORT other than to provide procedural and technical advice consistent with the guidelines in the DAO 03-30 Revised Procedural Manual. I hereby bind myself to answer any penalty that may be imposed arising from any misrepresentation or failure to state material information in IEE Checklist REPORT.
In witness whereof, I hereby ______________________.
set
my
hand
this
____
day
of
__________
at
NAME OF THE PROPONENT HEAD (Position) (Company)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 200_, affiant exhibiting his/her Community Tax Certificate No. ___________________ issued at ______________________ on __________________________.
Doc. No. Page No. Book No. Series of
____________________ ____________________ ____________________ ____________________
SWORN STATEMENT OF ACCOUNTABILITY OF PREPARERS (If applicable)
This is to certify that all information in Initial Environmental Examination Checklist REPORT for the (state name of project) PROJECT are accurate and complete to the best of our knowledge, and that an objective and thorough assessment of the Project was undertaken in accordance with the dictates of professional and reasonable judgment. Should we learn of any information which would make IEE Checklist REPORT inaccurate, we shall immediately bring the said information to the attention of the DENR-EMB Region ___. We hereby certify that no DENR personnel was directly involved in the preparation of this IEE Checklist REPORT other than to provide procedural and technical advice consistent with the guidelines in the DAO 03-30 Revised Procedural Manual. We hereby bind ourselves jointly and solidarily to answer any penalty that may be imposed arising from any misrepresentation or failure to state material information in this IEE Checklist REPORT.
In witness whereof, I hereby ______________________.
Name
set
my
hand
this
Field of Expertise
____
day
of
__________
at
Signature
1. 2. 3. 4. 5.
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 2006, affiants exhibiting their Community Tax Certificate information, as follows: Name 1. 2. 3. 4. 5.
Doc. No. Page No. Book No. Series of
____________________ ____________________ ____________________ ____________________
Community Tax Certificate Information CTC No. Place of Issue Date of Issue
View more...
Comments