Development of National ICT Infra-Network  for Bangladesh Government (BanglaGovNet)

Bangladesh Computer Council (BCC) Ministry of Science and Information & Communication Technology Technology (MoSICT) March 2011

Title of the Project Development of National ICT Government (BanglaGovNet)

Infra-Network

for

Bangladesh

Owner of the Project Sponsoring Ministry

Ministry of Science and ICT

Executing Agency

Bangladesh Computer Council

Duration of the Project Date of Commencement

April‘ 2010

Date of Completion (With O&M)

April‘ 2010 to June‘ 2014 5 yrs

Estimated Project Cost GOB

EDCF Loan

Total

67,08.10

214,40.20

281,48.30

9.58

30.63

40.21

In Lac L ac Taka In Million US$

What is BanglaGovNet BanglaGovNet? ? 





BanglaGovNet Stands for Bangladesh Government wide Network. It is a Public Network to connect all the Government entities throughout the country under  a single Network.

It is a dedicated Government Intranet.

Why BanglaGovNet BanglaGovNet? ? 

To ensure a Basic Infrastructure for  e-Government.







To ensure a Secured Connectivity among all the Government entities. To ensure e-Governance through an integrated common platform. To provide vast free Bandwidth for data Communication within the Government.

Objectives of the Project



To improve Government efficiency and promote interaction between governments Ministry/ Divisions, Departments, Districts and Upazillas by construction of  Government network infrastructure



 

To construct a public network as a backbone for the effective implementation of eGovernment

To use ICT system within the public administration to improve efficiency and transparency,, reduce transparency wastage of resources, enhance planning and raise the quality of services.

To maximize the computerization of work processes and resources through integrated information management system enabling real time administration.

Master Plan for Government Wide Network  Phase

 Year wise Plan

Scope of Work 

- National ICT Center( NICTC) - Ministries/Divisions(45)  Apr 2010 ~ - Major Departments ( >100) Ⅰ June 2014 - District Offices(64 DICTC) (BanglaGovNet) - Upazila Offices(64 UICTC) - Expand Network to Upazila level - Interoperability between Central and Local Govt. Administration - Development of Bangladesh Education Network (“BanglaEduNet”) Ⅱ July 2011 ~ => Primary & Secondary level Education (Info-Sarker) Dec 2015 - Connecting High level education Institutions - Making an ICT-driven society - Final preparation for Digital Bangladesh

Estimated Budget (US Dollar)

40.21 Million

150 Million

Main Solutions - E-mail - Security Solutions - E-Document - Government WEB - G2G

- e-Education - e-Procurement - e-Financial Services - e-Local Government - e-Community - G2B, G2C, G2P - Etc

Location of the Project 

Bangladesh Computer Council (BCC), Dhaka



All Ministries and Divisions in Dhaka (Capital City). Ci ty).



Major Departments and Corporations under Ministries and Divisions in Dhaka.



64 Deputy Commissioner’s Offices.



Minimum 64 UNO Offices.

Scope of the Project (contd..)

 Construct

Government Data Resource Centre (Data ( Data Centre) Centre) which will be the core part of the network to interconnect every government Ministry/Division, Department, District and Upazila administration to provide : 

Centralized Control and Management of the Network (NOC (NOC); );



Secure Single Point of Entry/Exit to the Internet;



Secure Communication;



Broadband Connectivity through IP Backbone;



Centralized Government-wide Secure e-mail System and IP-based Voice Services;



Open Interoperability Standards;



Virtual Private Network (VPN) Connection for authorized agencies;



Hosting of Government Websites etc.

Scope of the Project (contd..)  Construct

District Data Resource Centre (DICTC) in each of the Deputy Commissioner  (DC) offices which will be connected with the NICTC.

 Construct

Upazila Data Resource Centre (UICTC) in 64 UNO offices in Dhaka, which will be connected with the NICTC and DICTC.

 Provide

the government-wide intranet enabling government agencies to access and share their information and data.

 Develop

the centralized government-wide electronic mail and filing system to provide an electronic mailbox and storage to the registered re gistered government users. (Gov e-Mail)

 Develop

and install related applications such as interactive websites, e-Approval, Electronic Document Management System etc. (Web Portal, Groupware)

Scope of the Project (contd..)

 Supply

and install comprehensive security solution such as Firewall, Anti-Spam Filters and Intrusion Prevention System (IPS) in order to ensure identification of hackers and abuses of government network and intruders into privacy of users. (UTM, Anti-Virus, Anti-Spam, Physical Security, etc.)

 Training & Visiting Program

for enhancing ICT Knowledge & Skill

 Consultancy Services  Operation & Maintenance  The

Services

project scope might be adjusted to accommodate the results of detailed site surveys, engineering requirements or as per demand.

Scope of the Project Government Infra-Network

Wireless Network

 NICTC (BCC (BCC ) 

 Distric t ICTC  ICTC   –  –

 Secretariat 

Upazila ICTC   –  –  Mesh WiFi  Broadband  Wireless 

 Major

Depts.  All Districts  as    L i m i t e d U p a z i l as

Software/  Application Development

Fellowship Training & Education

 TOSS 

 A d v a n c e d I CT CT  

 Web-Portal 

C u l t u r e & T ec ec h    Basic Network   W i r e l es es s N e t w o r k    Wired Network   etc.

 Mail  G r o u p W a r e  

Operation & Maintenance Support

 Fo r 2

year  /7    S u p p o r t 2 4 /7  Operating  Consulting   Keep  Maintenance  Quality 

Terms of EDCF Loan

Interest Rate

0.5% per annum

Maturity

30 yrs including grace period (10 yrs)

Method of Repayment

Semi-annual equal installment after the grace period

Interest Payment

Every 6 months in arrears on outstanding balances

Overdue Charge

2.0% per annum above the interest rate

Service Charge

0.1%

Major Components  Equipments and Machineries

41.15%

 Furniture

2.26%

 Software

6.75%

 Motor Vehicles

0.23%

 Installation &

10.75%

Services

 Connectivity (Line rent, Bandwidth Cost)

4.48%

 Manpower

1.85%

 Foreign

2.40%

Training and Visit

 CD/VAT

13.11%

 Consultancy

2.49%

 Operation

3.45%

& Maintenance

 Contingency/Others

11.08%

Estimated Cost No.

Section

Quantity Quantit y

GOB

EDCF

Total

Percentage(%) of  Total Budget

For  PIU,NICTC,DIC TC,UICTC

-

11582.02

115,82.02

41.15%

DO

635.51

-

6,35.51

2.26%

1

Equipment

2

Furniture

3

Software

As Required

-

1899.70

18,99.70

6.75%

4

Motor Vehicle

1xJeep, 2x Microbus

-

65.10

65.10

0.23%

5

CD/VAT

27.25

3691.51

-

36,91.51

13.11%

216 Officers and Staffs)

522.14

-

5,22.14

1.85%

6

Manpower

7

Foreign Training & Visit

70

-

676.84

6,76.84

2.40%

8

Consultancy

12

-

700

7,00

2.49%

LS

-

1260.00

12,60.00

4.48%

9

Connectivity (Line rent, Bandwidth Cost)

10

Operation & Maintenance

LS

-

970.52

9,70.52

3.45%

11

Service Charge

1%

-

21.70

21.70

0.08%

12

Installation

LS

-

3004.32

30,04.32

10.67%

13

Contingency (Physical, Price & Others)

LS

18,58.94

1260.00

31,18.94

11.08%

67,08.10

21440.20

28148.30

Grand Total

Manpower Unit

Proposed Location

Approved by MoFin

PIU

BCC Bhaban

08

NICTC

BCC Bhaban

16

DICTC

64 District x 3

192

UICTC

64 Upazila

0

Grand Total :

216

 Yearwise  Y earwise Manpower  Unit

1st Year

2nd Year

3rd Year

PIU

08

08

08

NICTC

-

16

16

DICTC

-

15

192

UICTC

-

-

-

Topology of BanglaGovNet Secretariat

NICT CT C UT M

WAN ROUER

L2 SW

GE

10GE

L4 SW SW

Int e rne t ROUER

DMZ

L3 SW

T o ta l OSS

Web Mail

Server

SAN SW

Slab-1 : 3~18Mbps

Fa rm

L4 SW

L3 SW

GE  – Dhaka

23 ~ 42 * E1

Internet

DHQ L 2 SW

L 3 SW

Inte rne t ROUE R

UT M

L 2 SW

512K ~ Slab-1 WAN RO ROUE R

512K ~ E1 per Site DICTC

Terminal/Host

UICTC L2 SW

Router

L3 SW

Terminal/Host

○ 4 Tier Hierarchy : NICTC  –  DHQ  –  DICTC  –  UICTC

○ Use Dark Fiber : NICTC  –  Secretariat (10 GE), - Dhaka DHQ (1GE) ○ Bandwidth (Speed) : Start at 64Kbps for saving rental fee

Infra-Network Wireless Connectivity Wireless Solution Providing Non-line of sight Mesh Wi-Fi Wireless Network or P-t-P Long Distance Wireless Broadband Connectivity between District Data ICT Centre (DICTC) - Upozila ICT Centre (UICTC) UICTC 3

UICTC 2 UICTC 4

UICTC 2

UICTC 1 UICTC 5

UICTC 3

UICTC 1 UICTC 6

Max 16Km

Internet Backbone

DICTC

Mesh WiFi

Max 48Km

Internet Backbone

DICTC

Long Distance Broadband Wireless

Benefit of Wireless Network

DICTC

High perform ance for voice, video and Internet services  Share of the Know ledge from Wireless  Data store Safety at Governm ent Data Resource Centre (GDRC) 

UICTC

UICTC

Infra-Network Security Network Security Internet

DMZ

DNS Server Web Server

: Primarily protecting harmful internet traffic : Blocking the traffic by Filtering and Security policing : Intrusion detection and Response to intrusion attempt

Place between Firewall  And Backbone Switches Switches

: Protect spam mail Mail Server

Backbone Switch - A

Backbone Switch - B

BanglaGovNet Connectivity Plan

BanglaGovNet Connectivity Plan BCC NICTC

Data Centre

 NOC

BanglaGovNet Connectivity Plan BCC NICTC

Data Centre

 NOC

FO

All Ministries/ Divisions

BanglaGovNet Connectivity Plan BCC NICTC

Data Centre

 NOC

FO

All Ministries/ Divisions

FO

Major Departments/ Organizations

BanglaGovNet Connectivity Plan BCC NICTC

Data Centre FO

 NOC FO

7 Divisions

DICTC 57 Districts

All Ministries/ Divisions

FO

Major Departments/ Organizations

BanglaGovNet Connectivity Plan BCC NICTC

Data Centre FO

 NOC FO

7 Divisions

DICTC 57 Districts FO/Wireless

UICTC

64 Upazilas

All Ministries/ Divisions

FO

Major Departments/ Organizations

BanglaGovNet Connectivity Plan BCC NICTC

Data Centre FO

 NOC

All Ministries/ Divisions

FO

Major Departments/ Organizations

Info-Sarker (2nd Phase)

FO

7 Divisions

DICTC

All District Level Govt. Offices 57 Districts FO/Wireless

UICTC

64X Upazilas

FO/Wireless

BanglaGovNet Connectivity Plan BCC NICTC

Data Centre FO

 NOC

All Ministries/ Divisions

FO

Major Departments/ Organizations

Info-Sarker (2nd Phase)

FO

7 Divisions

FO/Wireless

DICTC

All District Level Govt. Offices 57 Districts FO/Wireless

FO/Wireless

UICTC

64 Upazilas

417 Upazilas

BanglaGovNet Connectivity Plan BCC NICTC

Data Centre FO

 NOC

All Ministries/ Divisions

FO

Major Departments/ Organizations

Info-Sarker (2nd Phase)

FO

7 Divisions

FO/Wireless

DICTC

All District Level Govt. Offices 57 Districts FO/Wireless

FO/Wireless

UICTC

64 Upazilas

417 Upazilas

FO/Wireless FO/Wireless

All Upazila Level Govt. Offices

BanglaGovNet Implementation Plan

BanglaGovNet

Resources Plan for DICTC & UICTC

District  ICT Center  Layout 

Furniture and Fixtures to be Deployed for DICTC SL

Description of Works

Qty.

Unit

1

Secretarial Table

1

Nos

2

Operator’s Table

1

Nos

3

Secretarial Chair

1

Nos

4

Operator’s Chair

1

Nos

5

Visitor Chair

4

Nos

6

Side Rack

1

Nos

7

File Cabinet

2

Nos

8

Steel Almirah

1

Nos

9

Three Seated Sofa

1

Nos

10

Cyber Desk with Chairs for 4 users

1

Nos

11

Center table for Sofa

1

Nos

12

Tool/Cha ool/Chair ir for MLSS/Secu MLSS/Security rity

1

Nos

13

Window/Door Screen (7’(7’-0” Height)

140

Sft.

14

Half height partition (4(4-6” 6” height)

45

Sft.

15

Painting/Distemper work

700

Sft.

Equipment to be Deployed for DICTC SL

Description Descrip tion of Works

Qty.

Unit

1

Router

1

Nos

2

L2 Switch

1

Nos

3

Microwave Equipment

4

PC with UPS

2

Nos

5

Laser Printer

2

Nos

6

Security System

7

Air Cooler (Split type, Max. 3 ton)

1

Nos

8

Electricall Works Electrica

1

LS

As Required

Upazilla ICT Center  Layout 

Furniture and Fixtures to be Deployed for UICTC SL

Description Descript ion of Works

Qty.

Unit

1

Secretarial Table

1

Nos

2

Operator’s Table

1

Nos

3

Secretarial Chair

1

Nos

4

Operator’s Chair

1

Nos

5

Visitor Chair

4

Nos

6

Side Rack

1

Nos

7

File Cabinet

2

Nos

8

Steel Almirah

1

Nos

9

Three Seated Sofa

1

Nos

10

Cyber Desk with Chairs for 4 users

1

Nos

11

Center table for Sofa

1

Nos

12

Tool/Cha ool/Chair ir for MLSS/Secur MLSS/Security ity

1

Nos

13

Window/Door Screen (7’(7’-0” Height)

140

Sft.

14

Half height partition (4(4-6” 6” height)

45

Sft.

15

Painting/Distemper work

700

Sft.

Equipment to be Deployed for UICTC SL

Description Descrip tion of Works

Qty.

Unit

1

Router

1

Nos

2

L2 Switch

1

Nos

3

Microwavee Equipment Microwav

As Required

Nos

4

PC with UPS

2

Nos

5

Laser Printer

2

Nos

6

Security System

7

Air Cooler (Split type, Max. 3 ton)

1

Nos

8

Electrical Works

1

LS

Year wise Deployment Plan in DICTC & UICTC 1st Year

2nd Year

3rd Year

2010-2011

2011-2012

2012-2013

(PPNB Program)

( BanglaGovNet)

(BanglaGovNet)

Furniture

Computer Table & Chair (10 Set)

Table(02), Chair(06), Side Rack(01), Almirah(01), File Cabinet(01), Sofa Set(01), Internal Partitions & renovation etc.

------

Equipment

Server(01), Computer(15),

PC with UPS(02), Printer(02), Air Cooler(01), Router, L2 Switch, Microwave Equipment, Security System.

-------

Multimedia Projector(01), Network (LAN)

1 x Asstt. Programmer/ Manpower

Asstt. Maintenance Engr -------

1 x Computer Operator

Continue

1 x MLSS

Training

Basic Network  Operation, Maintenance & Troubleshooting(10 days for 300

Advanced Networking

Wireless and Wired Network 

What we need to do at present? 

We need to know the existing basic ICT infrastructure of all the Ministries/Divisions, Departments: 

Electrical connectivity



LAN, WAN



Computers, Servers, Switches, Routers



Internet connectivity and Bandwidth etc.

What we need to do at present? 



 



To select a suitable Room (min 15'x20') 15 'x20') for DICTC. To make available of 3 phase Electrical power line in the Room. Renovation of the Room (if necessary). To assign someone as In charge of the Room R oom until Manpower is deployed. Physical security should be ensured.

Concluding Remarks To have a Government wide Network to ensure delivery of citizen services through the effective implementation of e-Governance towards achieving a Digital Bangladesh by 2021.

A Typical Data Centre

BCC Data Centre Layout

Sample Network Operation Centre (NOC)