Development of National ICT Infra-Network for Bangladesh Government (BanglaGovNet)
Bangladesh Computer Council (BCC) Ministry of Science and Information & Communication Technology Technology (MoSICT) March 2011
Title of the Project Development of National ICT Government (BanglaGovNet)
Infra-Network
for
Bangladesh
Owner of the Project Sponsoring Ministry
Ministry of Science and ICT
Executing Agency
Bangladesh Computer Council
Duration of the Project Date of Commencement
April‘ 2010
Date of Completion (With O&M)
April‘ 2010 to June‘ 2014 5 yrs
Estimated Project Cost GOB
EDCF Loan
Total
67,08.10
214,40.20
281,48.30
9.58
30.63
40.21
In Lac L ac Taka In Million US$
What is BanglaGovNet BanglaGovNet? ?
BanglaGovNet Stands for Bangladesh Government wide Network. It is a Public Network to connect all the Government entities throughout the country under a single Network.
It is a dedicated Government Intranet.
Why BanglaGovNet BanglaGovNet? ?
To ensure a Basic Infrastructure for e-Government.
To ensure a Secured Connectivity among all the Government entities. To ensure e-Governance through an integrated common platform. To provide vast free Bandwidth for data Communication within the Government.
Objectives of the Project
To improve Government efficiency and promote interaction between governments Ministry/ Divisions, Departments, Districts and Upazillas by construction of Government network infrastructure
To construct a public network as a backbone for the effective implementation of eGovernment
To use ICT system within the public administration to improve efficiency and transparency,, reduce transparency wastage of resources, enhance planning and raise the quality of services.
To maximize the computerization of work processes and resources through integrated information management system enabling real time administration.
Master Plan for Government Wide Network Phase
Year wise Plan
Scope of Work
- National ICT Center( NICTC) - Ministries/Divisions(45) Apr 2010 ~ - Major Departments ( >100) Ⅰ June 2014 - District Offices(64 DICTC) (BanglaGovNet) - Upazila Offices(64 UICTC) - Expand Network to Upazila level - Interoperability between Central and Local Govt. Administration - Development of Bangladesh Education Network (“BanglaEduNet”) Ⅱ July 2011 ~ => Primary & Secondary level Education (Info-Sarker) Dec 2015 - Connecting High level education Institutions - Making an ICT-driven society - Final preparation for Digital Bangladesh
Estimated Budget (US Dollar)
40.21 Million
150 Million
Main Solutions - E-mail - Security Solutions - E-Document - Government WEB - G2G
- e-Education - e-Procurement - e-Financial Services - e-Local Government - e-Community - G2B, G2C, G2P - Etc
Location of the Project
Bangladesh Computer Council (BCC), Dhaka
All Ministries and Divisions in Dhaka (Capital City). Ci ty).
Major Departments and Corporations under Ministries and Divisions in Dhaka.
64 Deputy Commissioner’s Offices.
Minimum 64 UNO Offices.
Scope of the Project (contd..)
Construct
Government Data Resource Centre (Data ( Data Centre) Centre) which will be the core part of the network to interconnect every government Ministry/Division, Department, District and Upazila administration to provide :
Centralized Control and Management of the Network (NOC (NOC); );
Secure Single Point of Entry/Exit to the Internet;
Secure Communication;
Broadband Connectivity through IP Backbone;
Centralized Government-wide Secure e-mail System and IP-based Voice Services;
Open Interoperability Standards;
Virtual Private Network (VPN) Connection for authorized agencies;
Hosting of Government Websites etc.
Scope of the Project (contd..) Construct
District Data Resource Centre (DICTC) in each of the Deputy Commissioner (DC) offices which will be connected with the NICTC.
Construct
Upazila Data Resource Centre (UICTC) in 64 UNO offices in Dhaka, which will be connected with the NICTC and DICTC.
Provide
the government-wide intranet enabling government agencies to access and share their information and data.
Develop
the centralized government-wide electronic mail and filing system to provide an electronic mailbox and storage to the registered re gistered government users. (Gov e-Mail)
Develop
and install related applications such as interactive websites, e-Approval, Electronic Document Management System etc. (Web Portal, Groupware)
Scope of the Project (contd..)
Supply
and install comprehensive security solution such as Firewall, Anti-Spam Filters and Intrusion Prevention System (IPS) in order to ensure identification of hackers and abuses of government network and intruders into privacy of users. (UTM, Anti-Virus, Anti-Spam, Physical Security, etc.)
Training & Visiting Program
for enhancing ICT Knowledge & Skill
Consultancy Services Operation & Maintenance The
Services
project scope might be adjusted to accommodate the results of detailed site surveys, engineering requirements or as per demand.
Scope of the Project Government Infra-Network
Wireless Network
NICTC (BCC (BCC )
Distric t ICTC ICTC – –
Secretariat
Upazila ICTC – – Mesh WiFi Broadband Wireless
Major
Depts. All Districts as L i m i t e d U p a z i l as
Software/ Application Development
Fellowship Training & Education
TOSS
A d v a n c e d I CT CT
Web-Portal
C u l t u r e & T ec ec h Basic Network W i r e l es es s N e t w o r k Wired Network etc.
Mail G r o u p W a r e
Operation & Maintenance Support
Fo r 2
year /7 S u p p o r t 2 4 /7 Operating Consulting Keep Maintenance Quality
Terms of EDCF Loan
Interest Rate
0.5% per annum
Maturity
30 yrs including grace period (10 yrs)
Method of Repayment
Semi-annual equal installment after the grace period
Interest Payment
Every 6 months in arrears on outstanding balances
Overdue Charge
2.0% per annum above the interest rate
Service Charge
0.1%
Major Components Equipments and Machineries
41.15%
Furniture
2.26%
Software
6.75%
Motor Vehicles
0.23%
Installation &
10.75%
Services
Connectivity (Line rent, Bandwidth Cost)
4.48%
Manpower
1.85%
Foreign
2.40%
Training and Visit
CD/VAT
13.11%
Consultancy
2.49%
Operation
3.45%
& Maintenance
Contingency/Others
11.08%
Estimated Cost No.
Section
Quantity Quantit y
GOB
EDCF
Total
Percentage(%) of Total Budget
For PIU,NICTC,DIC TC,UICTC
-
11582.02
115,82.02
41.15%
DO
635.51
-
6,35.51
2.26%
1
Equipment
2
Furniture
3
Software
As Required
-
1899.70
18,99.70
6.75%
4
Motor Vehicle
1xJeep, 2x Microbus
-
65.10
65.10
0.23%
5
CD/VAT
27.25
3691.51
-
36,91.51
13.11%
216 Officers and Staffs)
522.14
-
5,22.14
1.85%
6
Manpower
7
Foreign Training & Visit
70
-
676.84
6,76.84
2.40%
8
Consultancy
12
-
700
7,00
2.49%
LS
-
1260.00
12,60.00
4.48%
9
Connectivity (Line rent, Bandwidth Cost)
10
Operation & Maintenance
LS
-
970.52
9,70.52
3.45%
11
Service Charge
1%
-
21.70
21.70
0.08%
12
Installation
LS
-
3004.32
30,04.32
10.67%
13
Contingency (Physical, Price & Others)
LS
18,58.94
1260.00
31,18.94
11.08%
67,08.10
21440.20
28148.30
Grand Total
Manpower Unit
Proposed Location
Approved by MoFin
PIU
BCC Bhaban
08
NICTC
BCC Bhaban
16
DICTC
64 District x 3
192
UICTC
64 Upazila
0
Grand Total :
216
Yearwise Y earwise Manpower Unit
1st Year
2nd Year
3rd Year
PIU
08
08
08
NICTC
-
16
16
DICTC
-
15
192
UICTC
-
-
-
Topology of BanglaGovNet Secretariat
NICT CT C UT M
WAN ROUER
L2 SW
GE
10GE
L4 SW SW
Int e rne t ROUER
DMZ
L3 SW
T o ta l OSS
Web Mail
Server
SAN SW
Slab-1 : 3~18Mbps
Fa rm
L4 SW
L3 SW
GE – Dhaka
23 ~ 42 * E1
Internet
DHQ L 2 SW
L 3 SW
Inte rne t ROUE R
UT M
L 2 SW
512K ~ Slab-1 WAN RO ROUE R
512K ~ E1 per Site DICTC
Terminal/Host
UICTC L2 SW
Router
L3 SW
Terminal/Host
○ 4 Tier Hierarchy : NICTC – DHQ – DICTC – UICTC
○ Use Dark Fiber : NICTC – Secretariat (10 GE), - Dhaka DHQ (1GE) ○ Bandwidth (Speed) : Start at 64Kbps for saving rental fee
Infra-Network Wireless Connectivity Wireless Solution Providing Non-line of sight Mesh Wi-Fi Wireless Network or P-t-P Long Distance Wireless Broadband Connectivity between District Data ICT Centre (DICTC) - Upozila ICT Centre (UICTC) UICTC 3
UICTC 2 UICTC 4
UICTC 2
UICTC 1 UICTC 5
UICTC 3
UICTC 1 UICTC 6
Max 16Km
Internet Backbone
DICTC
Mesh WiFi
Max 48Km
Internet Backbone
DICTC
Long Distance Broadband Wireless
Benefit of Wireless Network
DICTC
High perform ance for voice, video and Internet services Share of the Know ledge from Wireless Data store Safety at Governm ent Data Resource Centre (GDRC)
UICTC
UICTC
Infra-Network Security Network Security Internet
DMZ
DNS Server Web Server
: Primarily protecting harmful internet traffic : Blocking the traffic by Filtering and Security policing : Intrusion detection and Response to intrusion attempt
Place between Firewall And Backbone Switches Switches
: Protect spam mail Mail Server
Backbone Switch - A
Backbone Switch - B
BanglaGovNet Connectivity Plan
BanglaGovNet Connectivity Plan BCC NICTC
Data Centre
NOC
BanglaGovNet Connectivity Plan BCC NICTC
Data Centre
NOC
FO
All Ministries/ Divisions
BanglaGovNet Connectivity Plan BCC NICTC
Data Centre
NOC
FO
All Ministries/ Divisions
FO
Major Departments/ Organizations
BanglaGovNet Connectivity Plan BCC NICTC
Data Centre FO
NOC FO
7 Divisions
DICTC 57 Districts
All Ministries/ Divisions
FO
Major Departments/ Organizations
BanglaGovNet Connectivity Plan BCC NICTC
Data Centre FO
NOC FO
7 Divisions
DICTC 57 Districts FO/Wireless
UICTC
64 Upazilas
All Ministries/ Divisions
FO
Major Departments/ Organizations
BanglaGovNet Connectivity Plan BCC NICTC
Data Centre FO
NOC
All Ministries/ Divisions
FO
Major Departments/ Organizations
Info-Sarker (2nd Phase)
FO
7 Divisions
DICTC
All District Level Govt. Offices 57 Districts FO/Wireless
UICTC
64X Upazilas
FO/Wireless
BanglaGovNet Connectivity Plan BCC NICTC
Data Centre FO
NOC
All Ministries/ Divisions
FO
Major Departments/ Organizations
Info-Sarker (2nd Phase)
FO
7 Divisions
FO/Wireless
DICTC
All District Level Govt. Offices 57 Districts FO/Wireless
FO/Wireless
UICTC
64 Upazilas
417 Upazilas
BanglaGovNet Connectivity Plan BCC NICTC
Data Centre FO
NOC
All Ministries/ Divisions
FO
Major Departments/ Organizations
Info-Sarker (2nd Phase)
FO
7 Divisions
FO/Wireless
DICTC
All District Level Govt. Offices 57 Districts FO/Wireless
FO/Wireless
UICTC
64 Upazilas
417 Upazilas
FO/Wireless FO/Wireless
All Upazila Level Govt. Offices
BanglaGovNet Implementation Plan
BanglaGovNet
Resources Plan for DICTC & UICTC
District ICT Center Layout
Furniture and Fixtures to be Deployed for DICTC SL
Description of Works
Qty.
Unit
1
Secretarial Table
1
Nos
2
Operator’s Table
1
Nos
3
Secretarial Chair
1
Nos
4
Operator’s Chair
1
Nos
5
Visitor Chair
4
Nos
6
Side Rack
1
Nos
7
File Cabinet
2
Nos
8
Steel Almirah
1
Nos
9
Three Seated Sofa
1
Nos
10
Cyber Desk with Chairs for 4 users
1
Nos
11
Center table for Sofa
1
Nos
12
Tool/Cha ool/Chair ir for MLSS/Secu MLSS/Security rity
1
Nos
13
Window/Door Screen (7’(7’-0” Height)
140
Sft.
14
Half height partition (4(4-6” 6” height)
45
Sft.
15
Painting/Distemper work
700
Sft.
Equipment to be Deployed for DICTC SL
Description Descrip tion of Works
Qty.
Unit
1
Router
1
Nos
2
L2 Switch
1
Nos
3
Microwave Equipment
4
PC with UPS
2
Nos
5
Laser Printer
2
Nos
6
Security System
7
Air Cooler (Split type, Max. 3 ton)
1
Nos
8
Electricall Works Electrica
1
LS
As Required
Upazilla ICT Center Layout
Furniture and Fixtures to be Deployed for UICTC SL
Description Descript ion of Works
Qty.
Unit
1
Secretarial Table
1
Nos
2
Operator’s Table
1
Nos
3
Secretarial Chair
1
Nos
4
Operator’s Chair
1
Nos
5
Visitor Chair
4
Nos
6
Side Rack
1
Nos
7
File Cabinet
2
Nos
8
Steel Almirah
1
Nos
9
Three Seated Sofa
1
Nos
10
Cyber Desk with Chairs for 4 users
1
Nos
11
Center table for Sofa
1
Nos
12
Tool/Cha ool/Chair ir for MLSS/Secur MLSS/Security ity
1
Nos
13
Window/Door Screen (7’(7’-0” Height)
140
Sft.
14
Half height partition (4(4-6” 6” height)
45
Sft.
15
Painting/Distemper work
700
Sft.
Equipment to be Deployed for UICTC SL
Description Descrip tion of Works
Qty.
Unit
1
Router
1
Nos
2
L2 Switch
1
Nos
3
Microwavee Equipment Microwav
As Required
Nos
4
PC with UPS
2
Nos
5
Laser Printer
2
Nos
6
Security System
7
Air Cooler (Split type, Max. 3 ton)
1
Nos
8
Electrical Works
1
LS
Year wise Deployment Plan in DICTC & UICTC 1st Year
2nd Year
3rd Year
2010-2011
2011-2012
2012-2013
(PPNB Program)
( BanglaGovNet)
(BanglaGovNet)
Furniture
Computer Table & Chair (10 Set)
Table(02), Chair(06), Side Rack(01), Almirah(01), File Cabinet(01), Sofa Set(01), Internal Partitions & renovation etc.
------
Equipment
Server(01), Computer(15),
PC with UPS(02), Printer(02), Air Cooler(01), Router, L2 Switch, Microwave Equipment, Security System.
-------
Multimedia Projector(01), Network (LAN)
1 x Asstt. Programmer/ Manpower
Asstt. Maintenance Engr -------
1 x Computer Operator
Continue
1 x MLSS
Training
Basic Network Operation, Maintenance & Troubleshooting(10 days for 300
Advanced Networking
Wireless and Wired Network
What we need to do at present?
We need to know the existing basic ICT infrastructure of all the Ministries/Divisions, Departments:
Electrical connectivity
LAN, WAN
Computers, Servers, Switches, Routers
Internet connectivity and Bandwidth etc.
What we need to do at present?
To select a suitable Room (min 15'x20') 15 'x20') for DICTC. To make available of 3 phase Electrical power line in the Room. Renovation of the Room (if necessary). To assign someone as In charge of the Room R oom until Manpower is deployed. Physical security should be ensured.
Concluding Remarks To have a Government wide Network to ensure delivery of citizen services through the effective implementation of e-Governance towards achieving a Digital Bangladesh by 2021.
A Typical Data Centre
BCC Data Centre Layout
Sample Network Operation Centre (NOC)