PEMERINTAH KABUPATEN ACEH UTARA
DINAS SUMBER DAYA AIR Jln. Tgk. Chik Ditiro No 19 - Telp (0645) 43763 Fax (0645) 43994
LHOKSEUMAWE - 24312
PERHITUNGAN VOLUME - PEKERJAAN TANAH - PEKERJAAN BETON PERBAIKAN DAN PEMBANGUNAN JARINGAN IRIGASI DAN PENANGGULANGAN BANJIR
SALURAN SEKUNDER BS.3 – BS.4
KECAMATAN PAYA BAKONG – KABUPATEN ACEH UTARA
TAHUN ANGGARAN 2007
Konsultan Perencana
CV. TOTAL ENGINEERING CONSULTANT Jln. Kenari No. 9B – Telp./Fax. 0645 – 41538 LHOKSEUMAWE - 24312
PERBAIKAN DAN PEMBANGUNAN JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR
SALURAN SEKUNDER BS.3 – BS.4
KECAMATAN PAYA BAKONG – KABUPATEN ACEH UTARA
PERHITUNGAN VOLUME PEKERJAAN TANAH TAHUN ANGGARAN 2007
Konsultan Perencana
CV. TOTAL ENGINEERING CONSULTANT Jln. Kenari No. 9B – Telp./Fax. 0645 – 41538 LHOKSEUMAWE - 24312
PERHITUNGAN VOLUME PEKERJAAN TANAH PERBAIKAN DAN PEMBANGUNAN JARINGAN IRIGASI DAN PENANGGULANGAN BANJIR SALURAN SEKUNDER RUAS BS.3 - BS.4 - D.I. ALUE UBAY KECAMATAN PAYA BAKONG - KABUPATEN ACEH UTARA Bangunan Air / Saluran
Pot
Jarak Profi
AREA (m2)
Langsung
Galian
Volume (M3)
Timbunan
Galian
Timbunan
A.0 / BS.3 50.0 A.1
50.0
3.00
0.69
74.98
17.33
100.0
0.75
0.00
93.84
17.33
150.0
3.04
3.52
94.86
87.99
200.0
2.10
0.00
128.49
87.99
250.0
2.29
0.35
109.76
8.73
300.0
1.70
0.09
99.82
10.92
350.0
0.83
0.00
63.19
2.20
400.0
1.41
0.00
55.93
0.00
450.0
0.91
0.01
57.98
0.18
500.0
0.94
0.00
46.08
0.18
550.0
0.54
0.28
36.93
6.90
600.0
0.39
0.25
23.41
13.15
650.0
3.07
3.25
86.68
87.37
72.20
76.26
50.0 A.2 50.0 A.3 50.0 A.4 50.0 A.5 50.0 A.6 50.0 A.7 50.0 A.8 50.0 A.9 50.0 A.10 50.0 A.11 50.0 A.12 50.0 A.13 47.0 A.14
697.0 43.4
A.15
740.4
-
-
-
-
808.0
-
-
-
-
852.0
-
-
-
-
902.0
-
-
-
-
948.0
-
-
-
-
67.6 A.16 44.0 A.17 50.0 A.18 46.0 A.19 / BS.4
JUMLAH
948.0
1,044.14
416.55
Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara
CROSS A.1
KOORDINAT GALIAN X 0 0.51 1.91 2.71 3.91 4.13 3.75 3.75 3.61 3.61 2.01 2.01 1.87 1.87 -
Y 9.398 9.527 9.412 8.166 7.850 7.911 7.528 7.328 7.328 7.453 7.453 7.328 7.328 7.528 9.398 Jumlah
CROSS A.2
Y 8.517 7.900 7.621 7.810 9.104 9.080 7.517 7.317 7.317 7.442 7.442 7.317 7.317 7.517 8.517 Jumlah
CROSS A.3
YX 4.79 18.20 25.51 31.93 32.42 29.67 28.23 26.45 26.45 14.98 13.94 13.70 13.70 0.00 0.00
273.98
279.97
X 0.00 1.18 0.88 0.00
KOORDINAT GALIAN X 0 0.84 1.94 3.14 4.44 4.44 2.87 2.87 2.74 2.74 1.11 1.14 1.00 1.00 -
Y 9.664 9.703 9.627 7.886 7.799 7.837 7.506 7.306 7.306 7.431 7.431 7.306 7.306 7.506 9.664 Jumlah
Y 7.91 9.09 8.16 7.19
XY 0.00 9.62 6.33 0.00
YX 9.33 8.00 0.00 0.00
15.95
17.34
YX 7.15 15.33 23.93 34.68 40.42 26.06 21.57 20.05 20.05 8.29 8.48 7.32 7.32 0.00 0.00
239.14
240.65
X
Y
XY
YX
YX 6.96 14.75 25.22 29.34 34.00 31.58 30.25 28.42 28.42 17.02 17.02 15.85 15.71 0.00 0.00
288.46
294.54
TIMBUNAN
3.00
0.69
3.00
0.69
GALIAN
TIMBUNAN
0.75
0.75
X 0.00 1.05 0.75 0.00
Y 7.837 8.886 1.882 7.837
0.00
AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 6.93 11.99 20.43 29.15 32.73 29.44 29.44 28.91 28.91 16.73 16.73 16.29 20.78 0.00
GALIAN
AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 6.40 15.15 28.59 40.32 33.38 21.00 21.00 20.39 20.39 8.15 8.34 7.52 8.52 0.00
KOORDINAT GALIAN X 0 0.72 1.52 2.62 3.72 4.36 4.03 4.03 3.89 3.89 2.29 2.29 2.17 2.15 -
AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 4.80 15.60 21.27 30.93 31.09 27.48 27.48 26.91 26.91 15.13 14.73 14.08 17.57 0.00
XY 0.00 1.98 5.88 0.00
YX 8.23 6.66 0.00 0.00
7.85
14.89
GALIAN
TIMBUNAN
3.04
3.52
3.04
3.52
Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara
CROSS A.4
KOORDINAT GALIAN X 0 0.59 1.06 1.89 2.89 4.09 4.39 5.37 3.82 3.82 3.69 3.69 2.08 2.08 1.95 1.95 -
Y 9.44 9.346 8.986 7.831 7.567 8.015 8.982 9.038 7.492 7.292 7.292 7.417 7.417 7.292 7.292 7.492 9.440 Jumlah
CROSS A.5
Y 9.464 8.653 7.991 7.779 7.485 7.285 7.285 7.410 7.410 7.285 7.285 7.485 9.464 Jumlah
CROSS A.6
XY 0.00 5.30 8.30 14.30 23.16 36.74 39.68 40.23 27.86 27.86 27.37 27.37 15.17 15.17 14.61 18.41 0.00
YX 5.57 9.91 16.98 22.63 30.95 35.19 48.23 34.53 28.62 26.91 26.91 15.43 15.43 14.22 14.22 0.00 0.00
341.51
345.71
KOORDINAT GALIAN X 0 1.90 2.40 4.13 3.83 3.83 3.70 3.70 2.10 2.10 1.96 1.96 -
Y 9.136 8.844 8.734 7.579 7.494 7.989 7.474 7.274 7.274 7.399 7.399 7.274 7.274 7.474 9.136 Jumlah
X
Y
XY
YX
YX 17.98 20.77 33.00 29.79 28.67 26.95 26.95 15.56 15.56 14.28 14.28 0.00 0.00
239.22
243.80
YX 7.67 16.27 17.82 23.80 30.35 28.28 26.46 24.73 24.73 13.32 13.32 12.07 12.07 0.00 0.00
247.50
250.90
TIMBUNAN
2.10
X 0.00 1.09 0.57 0.00
Y 7.779 8.868 7.708 7.779
X 0.00 0.97 0.39 0.00
Y 7.989 8.957 8.197 7.989
0.00
AREA (m2)
XY 0.00 8.40 4.43 0.00
YX 8.48 5.05 0.00 0.00
12.84
13.53
GALIAN
TIMBUNAN
2.29
0.35
2.29
0.35
AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 7.34 13.95 15.29 25.09 30.27 25.75 25.75 25.16 25.16 13.09 13.09 12.41 15.17 0.00
GALIAN
2.10
KOORDINAT TIMBUNAN
XY 0.00 15.18 18.67 30.91 27.90 27.90 27.42 27.42 15.30 15.30 14.67 18.55 0.00
KOORDINAT GALIAN X 0 0.84 1.84 2.04 3.14 4.05 3.54 3.54 3.40 3.40 1.80 1.80 1.66 1.66 -
(lanjutan) AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 7.95 3.12 0.00
YX 7.75 3.49 0.00 0.00
11.07
11.24
GALIAN
TIMBUNAN
1.70
0.09
1.70
0.09
Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara
CROSS A.7
KOORDINAT GALIAN X 0 0.10 1.73 2.40 3.70 3.90 4.70 4.88 3.59 3.59 3.45 3.45 1.85 1.85 1.72 1.72 -
Y 9.179 9.139 7.453 7.437 7.636 8.627 8.759 8.751 7.464 7.264 7.264 7.389 7.389 7.264 7.264 7.464 9.179 Jumlah
CROSS A.8
Y 8.753 8.485 7.597 7.572 7.675 8.727 9.037 8.975 7.453 7.253 7.253 7.378 7.378 7.253 7.253 7.453 8.753
Jumlah
CROSS A.9
XY 0.00 0.75 12.87 18.33 31.92 34.16 41.13 36.42 26.08 26.08 25.49 25.49 13.44 13.44 12.84 15.79 0.00
YX 0.92 15.81 17.89 27.52 29.78 40.55 42.74 31.42 26.80 25.06 25.06 13.67 13.67 12.49 12.49 0.00 0.00
334.21
335.86
X
Y 8.666 8.561 7.713 7.532 7.614 7.443 7.243 7.243 7.368 7.368 7.243 7.243 7.443 8.666
Jumlah
XY -
YX -
0.00
YX 4.73 10.52 17.02 23.78 27.94 38.75 42.47 28.45 23.63 22.05 22.05 10.62 10.62 9.43 9.43 0.00 0.00 0.00
298.66
301.48
X
Y
XY -
YX -
-
-
0.00
0.00
YX 6.59 9.93 16.66 24.63 23.53 23.00 21.44 21.00 10.02 10.02 8.84 8.84 0.00 0.00 0.00
182.68
184.49
X 0.00 0.17 0.09 0.00
Y 7.614 7.787 7.621 7.614
XY 1.30 0.70 2.00
TIMBUNAN
0.83
0.00
0.83
0.00
GALIAN
TIMBUNAN
1.41
0.00
1.41
0.00
AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 5.86 8.74 16.45 24.34 22.38 22.38 21.81 21.37 9.85 9.85 9.08 10.57 0.00 0.00
GALIAN
AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 4.10 9.39 17.19 27.40 32.89 39.85 35.03 22.99 22.99 22.43 22.43 10.44 10.44 9.69 11.38 0.00 0.00
KOORDINAT GALIAN X 0 0.76 1.16 2.16 3.27 3.09 3.09 2.96 2.90 1.36 1.36 1.22 1.22 -
Y
0.00
KOORDINAT GALIAN X 0 0.54 1.24 2.24 3.14 3.64 4.44 4.70 3.17 3.17 3.04 3.04 1.44 1.44 1.30 1.30 -
(lanjutan) AREA (m2)
KOORDINAT TIMBUNAN
YX 1.29 0.72 2.01
GALIAN
TIMBUNAN
0.91
0.01
0.91
0.01
Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara
CROSS A.10
KOORDINAT GALIAN X 0 0.36 0.70 -
1.06 2.26 2.76 3.20 1.99 1.99 1.86 1.86 0.26 0.26 0.12 0.12 -
CROSS A.11
Y 8.555 8.496 7.860 8.555
XY 0.00 2.83 5.99 0.00 0.00
YX 3.08 5.95 0.00 0.00 0.00 9.03
XY 2.44 2.44
YX 2.44 2.44
Jumlah 01
8.82
7.553 7.598 7.789 8.652 8.637 7.432 7.232 7.232 7.357 7.357 7.232 7.232 7.432 7.553
0.00 8.26 19.55 23.84 23.78 14.39 14.39 13.68 13.68 1.88 1.88 0.89 0.91 0.00 0.00
8.01 17.17 21.50 27.69 17.19 14.79 13.45 13.45 1.91 1.91 0.87 0.87 0.00 0.00 0.00
-
-
Jumlah 02
137.14
Y 7.617 7.567 7.641 7.421 7.221 7.221 7.346 7.346 7.221 7.221 7.421 7.617 Jumlah 01
Jumlah 02
X 0.00 0.31 0.00
Y 7.860 7.553 7.860
0.00
0.00
138.80 JUMLAH (01 + 02)
KOORDINAT GALIAN X 0 0.90 2.29 2.07 2.07 1.93 1.93 0.33 0.33 0.19 0.19 -
(lanjutan) AREA (m2)
KOORDINAT TIMBUNAN
YX 6.86 17.33 15.82 15.36 13.94 13.94 2.42 2.42 1.37 1.37 0.00 0.00 0.00 90.83
X 0.00 0.70 0.40 0.00
Y 8.313 7.617 7.633 8.313
XY 5.34 3.33 8.67
YX 5.82 3.05 8.87
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.91 0.41 0.00
7.641 8.554 7.663 7.641
0.00 6.97 3.13 0.00
6.95 3.51 0.00 0.00
10.11
10.46
0.00 JUMLAH (01 + 02)
TIMBUNAN
0.10
0.00
0.83
0.00
0.94
0.00
AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 6.88 16.99 14.95 14.95 14.18 14.18 2.38 2.38 1.41 1.45 0.00 0.00 89.74
0.00
GALIAN
GALIAN
TIMBUNAN
0.54
0.10
0.00
0.18
0.54
0.28
Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara
CROSS A.12
KOORDINAT GALIAN X 0.18 0.34 -
Y 8.45 8.40 8.11 8.45
XY 0.00 1.46 2.87 0.00 0.00 4.33
YX 1.52 2.85 0.00 0.00 0.00 4.38
X 0.58 0.33 -
Y 8.108 7.526 7.526 8.108
XY 4.37 2.68 7.04
YX 4.70 2.48 7.19
7.526 7.498 7.411 7.211 7.211 7.336 7.336 7.211 7.211 7.411 7.526
0.00 15.41 14.35 14.35 13.57 13.57 1.80 1.80 0.89 0.90 0.00 0.00
15.65 14.92 14.75 13.34 13.34 1.83 1.83 0.87 0.87 0.00 0.00 0.00
0.91 0.41 -
7.641 8.554 7.663 7.641 -
0.00 6.97 3.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6.95 3.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Jumlah 02
76.66
10.11
10.46
Jumlah 01 2.08 1.99 1.99 1.85 1.85 0.25 0.25 0.12 0.12 -
CROSS A.13
77.40 JUMLAH (01 + 02)
KOORDINAT GALIAN X 1.11 2.13 2.04 2.04 1.91 1.91 0.31 0.31 0.17 0.17 -
Y 1.570 7.385 7.487 7.400 7.200 7.200 7.352 7.325 7.200 7.200 7.400 7.570 Jumlah 01
-
(lanjutan) AREA (m2)
KOORDINAT TIMBUNAN
-
Jumlah 02
YX 1.74 15.73 15.30 15.13 13.75 13.75 2.28 2.27 1.22 1.22 0.00 0.00 0.00 82.40
X 0.49 1.49 0.90 0.50 -
Y 8.573 8.583 7.570 7.669 8.428 8.573 -
XY 3.71 11.43 7.59 4.29 27.01
YX 4.20 12.79 6.81 3.83 27.64
-
-
1.06 1.18 0.68 -
7.487 8.548 8.548 7.554 7.487
0.00 9.06 8.91 0.00 0.00
7.94 10.09 5.81 0.00 0.00
17.97
23.84
0.00 JUMLAH (01 + 02)
TIMBUNAN
0.02
0.07
0.37
0.18
0.39
0.25
AREA (m2)
KOORDINAT TIMBUNAN
XY 0.00 8.31 15.76 14.72 14.72 14.04 13.99 2.23 2.23 1.26 1.29 0.00 0.00 88.55
0.00
GALIAN
GALIAN
TIMBUNAN
3.07
0.31
0.00
2.93
3.07
3.25
Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara
CROSS
KOORDINAT GALIAN X -
Y Jumlah 01
Jumlah 02
XY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
YX 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
X -
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
-
0.00
(lanjutan) AREA (m2)
KOORDINAT TIMBUNAN
0.00 JUMLAH (01 + 02)
Y -
-
XY 0.00
YX 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00
0.00
GALIAN
TIMBUNAN
0.00
0.00
0.00
0.00
0.00
0.00
PERBAIKAN DAN PEMBANGUNAN JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR
SALURAN SEKUNDER BS.3 – BS.4
KECAMATAN PAYA BAKONG – KABUPATEN ACEH UTARA
PERHITUNGAN VOLUME PEKERJAAN BETON TAHUN ANGGARAN 2007
Konsultan Perencana
CV. TOTAL ENGINEERING CONSULTANT Jln. Kenari No. 9B – Telp./Fax. 0645 – 41538 LHOKSEUMAWE - 24312
PERBAIKAN DAN PEMBANGUNAN JARINGAN IRIGASI DAN PENANGGULANGAN BANJIR
SALURAN SEKUNDER RUAS BS.3 - BS.4 KECAMATAN PAYA BAKONG - KABUPATEN ACEH UTARA
BACK UP DATA II.3
II.4
Beton Bertulang K.175 Linning Saluran (dasar gambar) = 778,20 M
2 { 0,20 + 0,21x 0,10 x 778,20 } 2
=
31.91
M3
2 { 0,92 + 1,05x 0,10 x778,20 } 2
=
77.82
M3
109.73
M3
Beton Cor 1 : 3 : 5 Lantai Saluran Panjang Saluran
Volume
II.5
=
778,20 - ( 196 x 0,14 )
=
750.76
=
0,15 x 1,60 x 750,76
=
180.18
~> Balok Diafragma Setiap 4 m
m
m3
Beton Bertulang K.175 diafragma / setiap 4 meter = 14/28 Jumlah Balok Diafragma =
778,20 m + 1 = 4m
Volume
=
{ 0,14 x 0,28 x 1,60 } x 196
=
12.29
196
m3
Beton Bertulang K.175 Balok 14/28 Pada Kaki Linning ( 0,14x0,28x778,20 ) x2
=
61.01
m3
Total Volume
=
12,29 m3 + 61,01 m3
=
73.30
m3
Buah
View more...
Comments