 Peke Pekerjaa rjaann  Lo Loka kasi si  No/Tgl.  No/ Tgl. Kontr Kontrak ak  No/T No/Tgl. gl. SPMK  Item Item pek pekerj erjaan aan

: : : : :

Perpa Perpanjang njangan an dan Peleb Pelebaran aran Runwa Runwayy di Band Bandar ar Udara Silan Silangit git Ba Band ndar ar Ud Udar araa Sila Silang ngitit PJJ. PJJ.04.04 04.04.01/ .01/05/0 05/09/201 9/2016/26 6/260, 0, Tangg anggal al 2233 Sep Septembe temberr 201 20166 SPR.1 SPR.10.09/ 0.09/05/1 05/12/20 2/2016/30 16/305, 5, Tangga anggall 06 Dese Desember mber 2016 Pem Pemban bangun gunan an Turn urning ing Are Areaa 09

REKA VOLUME EMBANGUNAN TURNING 09 (MC 0)   EKERJAAN EMBANGUNAN TURNING 09 DI BANDAR UDARA SILANGIT

No. 1 2 3 4 5 6 7 8

UR AI AN Sub - Base Course, t = 40 cm CBR > 20% Ba se Cou rse , t = 2 3 cm CB R > 8 0% L a p i s R e s a p e n g i k a t ( r i me Co a t) , 1 l i te r /m 2 Laston AC-BC tebal rata - rata 5 cm L a p i s e r e ka t ( Ta ck C o a t ) , 1 kg / m 2 L a st o n A C- B C t e b a l r a t a - r a t a 5 c m Lapis erekat (Tack (Tack Coat), 1 kg/m2 Laston AC-WC tebal rata - rata 5 cm

Disetujui Oleh :   T. A n g k a sa u r a I I ( e r se r o )

H O TA S I MA N A L U Koordinator Lapangan

Diperiksa Oleh : Konsultan engawas, T. r o s ys B a n g u n e r s a d a

A H MA D HA FI D A S Team Leader  

 

REKA VOLUME EMBANGUNAN TURNING 09 (MC 0)  

S AT U A N M3 M3 M2 M2 M2 M2 M2 M2

  Ko nsul tan eng awas,   T. r o s y s B a n g u n e r sa d a

A HMA D H A FID A S  

VOL UME

KE TE RANGA N

1,0 09. 80 58 0.6 4 2,5 24. 50 2,5 24. 50 2,5 24. 50 2,5 24. 50 2,5 24. 50 2,5 24. 50

Silangit, 20 Maret 2017 Diajukan Oleh : K o n t r a kt o r, T. N i n d y a K a r y a ( e r s e r o )

A DR IHA D I Project Manager 

 

 Pe Peke kerj rjaa aann Lokasi No/Tgl.l. Kont No/Tg Kontrak rak No/Tgl. SPMK  Item peke pekerjaan rjaan

: : : : :

Pe Perp rpan anja jang ngan an da dann Pe Pele leba bara rann Runw Runway ay di Ba Band ndar ar Ud Bandar Udara Silangit PJJ. PJJ.04.0 04.04.01 4.01/05/ /05/09/20 09/2016/2 16/260, 60, Tangg anggal al 23 Sept Septemb emb SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember 2 Pemba Pembangun ngunan an Turning Turning Area 09

BREAKDOWN ERHITUNGAN VOLUME   EMBANGUNA N TURNING ST STA A 2+530 LASTON AC-WC (MC 00))  S/D STA 2+650 Sketsa Gambar Laston AC-WC

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Laston AC-WC embangunan Turning 09 STA  +

LEBAR (m)

JA RA K (m)

-

-

25.50

78.00

L UA S ( m2 ) 535.50 Luas A

2 + 572 1989.00

2 + 650 Total Luas Laston AC-WC

Disetujui Oleh :   T. A n g k a s a u r a I I ( e r s e r o )

2,524.50

Diperiksa Oleh : Konsultan engawas, T. r o s y s B a n g u n e r s a d a

KETERANGAN

 

 Pe Peke kerj rjaa aann Lokasi No/Tgl.l. Kont No/Tg Kontrak rak No/Tgl. SPMK  Item peke pekerjaan rjaan

: : : : :

Pe Perp rpan anja jang ngan an da dann Pe Pele leba bara rann Runw Runway ay di Ba Band ndar ar Ud Bandar Udara Silangit PJJ. PJJ.04.0 04.04.01 4.01/05/ /05/09/20 09/2016/2 16/260, 60, Tangg anggal al 23 Sept Septemb emb SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember 2 Pemba Pembangun ngunan an Turning Turning Area 09

BREAKDOWN ERHITUNGAN VOLUME   EMBANGUNA N TURNING ST STA A 2+530 LASTON AC-WC (MC 00))  S/D STA 2+650 Sketsa Gambar Laston AC-WC

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Laston AC-WC embangunan Turning 09 STA Y O S A AT TA M B U N A N Wakil Koordinator Lapangan

LEBAR (m)

JA RA K L UA S (m) ( m2 ) A K H M A D FA U Z I Ahli Teknik Sipil

KETERANGAN

 

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-WC (MC 0)  

ara Silangit  

r 2016 016

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

Laston AC-WC STA 2 + 650

STA 2 + 572

STA 2 + 530

t = 5 cm 0.05

25.50

  KETERANGAN

 

Silangit, 20 Maret 2017 Diajukan Oleh : Kontraktor,   T. Nindya Karya ( ersero)

 

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-WC (MC 0)  

ara Silangit  

r 2016 016

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

Laston AC-WC STA 2 + 650

STA 2 + 572

STA 2 + 530

t = 5 cm 0.05

25.50

  KETERANGAN JODI AKBAR Site Engineering Manager 

 

 Pek Pekerj erjaan aan Lokasi No/Tgl. Kontrak No/Tgl. SPMK  Item peke pekerjaan rjaan

: : : : :

Per Perpan panjan jangan gan dan Pel Peleba ebaran ran Run Runway way di Ban Bandar dar Uda Bandar Udara Silangit PJJ.04.04.01 PJJ.04.04.01/05/09/2016/2 /05/09/2016/260, 60, Tanggal 23 September SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember 20 Pemba Pembangun ngunan an Tu Turning rning Area 09

BREAKDOWN ERHITUNGAN VOLUME   EMBANGUN AN TURNING STA 2+530 TACK COAT 2 (MC 0)  S/D S TA 2+650 Sketsa Gambar Tack Coat 2

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Tack Coat Lapis 2 embangunan Turning 09 STA  +

LE B AR JA RA K (m) (m)

L UA S (m2 )

-

-

535.50

25.50

78.00

1989.00

KETERANGAN

Luas A

2 + 572 2 + 650 Total Lu Luas as T Tack ack Coat Lapis 2

Disetujui Oleh :   T. T. A n g k a s a u r a I I ( eerr s e r o )

Y O S A AT TA M B U N A N

  2,524.50

Diperiksa Oleh : Konsultan engawas, T. r o s y s B a n g u n e r sa d a

A K H M A D FA U Z I

 

 Pek Pekerj erjaan aan Lokasi No/Tgl. Kontrak No/Tgl. SPMK  Item peke pekerjaan rjaan

: : : : :

Per Perpan panjan jangan gan dan Pel Peleba ebaran ran Run Runway way di Ban Bandar dar Uda Bandar Udara Silangit PJJ.04.04.01 PJJ.04.04.01/05/09/2016/2 /05/09/2016/260, 60, Tanggal 23 September SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember 20 Pemba Pembangun ngunan an Tu Turning rning Area 09

BREAKDOWN ERHITUNGAN VOLUME   EMBANGUN AN TURNING STA 2+530 TACK COAT 2 (MC 0)  S/D S TA 2+650 Sketsa Gambar Tack Coat 2

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Tack Coat Lapis 2 embangunan Turning 09 STA Wakil Koordinator Lapangan

LE B AR JA RA K L UA S (m) (m) (m2 ) Ahli Teknik Sipil

KETERANGAN

 

BREAKDOWN ERHITUNGAN VOLUME TACK COAT 2 (MC 0)  

ra Silangit    

2016 16

Tack Coat 2

25.50

  KETERANGAN

 

Silangit, 20 Maret 2017 Diajukan Oleh : Kontraktor,   T. Nindya Karya ( ersero)

JODI AKBAR

 

BREAKDOWN ERHITUNGAN VOLUME TACK COAT 2 (MC 0)  

ra Silangit    

2016 16

Tack Coat 2

25.50

  KETERANGAN Site Engineering Manager 

 

 Peke Pekerjaan rjaan Lokasi No/Tgl No/ Tgl.. Kon Kontra trakk No/Tgl. SPMK Item peke pekerjaan rjaan

: : : : :

Perpa Perpanjan njangan gan dan Pele Pelebaran baran Runwa Runwayy di Banda Bandarr Bandar Udara Silangit PJJ PJJ.04 .04.04 .04.01 .01/05 /05/09 /09/20 /2016/ 16/260 260,, Tang anggal gal 23 Sep Septem tem SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember Pemba Pembangun ngunan an Tu Turnin rningg Area 09

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-BC LA IS 2 (MC 0)   EMBANGUNA N TURNING STA 2+530  S/D STA 2+650 Sketsa Gambar Laston AC-BC 2

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Laston AC-BC Lapis 2 embangunan Turning 09 STA  +

LE B AR (m)

JA RA K (m)

-

-

25.50

78.00

LUAS (m2) 535.50 Luas A

2 + 572 1989.00

2 + 650 Total Luas Laston AC-BC Lapis 2

Disetujui Oleh :   T. A n g k a s a u r a I I ( eerr s e r o )

 2,524.50

Diperiksa Oleh : Konsultan engawas, T. r o s y s B a n g u n e r s a d a

KETERANGAN

 

 Peke Pekerjaan rjaan Lokasi No/Tgl No/ Tgl.. Kon Kontra trakk No/Tgl. SPMK Item peke pekerjaan rjaan

: : : : :

Perpa Perpanjan njangan gan dan Pele Pelebaran baran Runwa Runwayy di Banda Bandarr Bandar Udara Silangit PJJ PJJ.04 .04.04 .04.01 .01/05 /05/09 /09/20 /2016/ 16/260 260,, Tang anggal gal 23 Sep Septem tem SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember Pemba Pembangun ngunan an Tu Turnin rningg Area 09

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-BC LA IS 2 (MC 0)   EMBANGUNA N TURNING STA 2+530  S/D STA 2+650 Sketsa Gambar Laston AC-BC 2

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Laston AC-BC Lapis 2 embangunan Turning 09 STA Y O S A AT TA M B U N A N Wakil Koordinator Lapangan

LE B AR (m)

JA RA K (m)

LUAS (m2)

A K H M A D FA U Z I Ahli Teknik Sipil

KETERANGAN

 

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-BC 2 (MC 0)  

dara Silangit  

er 2016 2016

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

Laston AC-BC 2 t = 5 cm 0.05

25.50

  KETERANGAN

 

Silangit, 20 Mare Marett 2017 Diajukan Oleh : Kontraktor,   T. Nindya Karya ( ersero)

 

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-BC 2 (MC 0)  

dara Silangit  

er 2016 2016

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

Laston AC-BC 2 t = 5 cm 0.05

25.50

  KETERANGAN JODI AKBAR Site Engineering Manager 

 

 Peker Pekerjaan jaan Lokasi No/Tgl. Kontrak No/Tgl. SPMK  Item peke pekerjaan rjaan

: : : : :

Perpa Perpanjan njangan gan dan Peleb Pelebaran aran Runw Runway ay di Banda Bandarr Udar Bandar Udara Silangit PJJ.04.04.01 PJJ.04.04.01/05/09/2016/2 /05/09/2016/260, 60, Tanggal 23 September SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember 201 Pemba Pembangun ngunan an Tu Turning rning Area 09

BREAKDOWN ERHITUNGAN VOLUME TACK COAT 1 (MC 0)   EMBANGUNA N TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Tack Coat 1

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA

STA

STA

2 + 650

2 + 572

2 + 530

25.50

Tabel erhitungan Tack Coat Lapis 1 embangunan Turning 09 STA  +

LE B AR (m)

JARA K ( m)

-

LUAS (m2)

KETERANGAN

535.50 Luas A

2 + 572 25.50

78.00

1989.00

2 + 650 Total Lu Luas as T Tack ack Coat Lapis 1

Disetujui Oleh :   T. A n g k a s a u r a I I ( e r s e r o )

Y O S A AT TA M B U N A N

  2,524.50

Diperiksa Oleh : Konsultan engawas, T. r o s y s B a n g u n e r s a d a

A K H M A D FA U Z I

T. N i n d y a K a r y a

 

 Peker Pekerjaan jaan Lokasi No/Tgl. Kontrak No/Tgl. SPMK  Item peke pekerjaan rjaan

: : : : :

Perpa Perpanjan njangan gan dan Peleb Pelebaran aran Runw Runway ay di Banda Bandarr Udar Bandar Udara Silangit PJJ.04.04.01 PJJ.04.04.01/05/09/2016/2 /05/09/2016/260, 60, Tanggal 23 September SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember 201 Pemba Pembangun ngunan an Tu Turning rning Area 09

BREAKDOWN ERHITUNGAN VOLUME TACK COAT 1 (MC 0)   EMBANGUNA N TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Tack Coat 1

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA

STA

STA

2 + 650

2 + 572

2 + 530

25.50

Tabel erhitungan Tack Coat Lapis 1 embangunan Turning 09 STA Wakil Koordinator Lapangan

LE B AR (m)

JARA K LUAS ( m) (m2) Ahli Teknik Sipil

KETERANGAN

 

BREAKDOWN ERHITUNGAN VOLUME TACK COAT 1 (MC 0)  

a Silangit  

016 6

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA

STA

STA

Tack

2 + 650

2 + 572

2 + 530

Coat 1

25.50

  KETERANGAN

 

Silangit, 20 Mare Marett 2017 Diajukan Oleh : Kontraktor,   T. Nindya Karya ( ersero)

JODI AKBAR

 

BREAKDOWN ERHITUNGAN VOLUME TACK COAT 1 (MC 0)  

a Silangit  

016 6

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA

STA

STA

Tack

2 + 650

2 + 572

2 + 530

Coat 1

25.50

  KETERANGAN Site Engineering Manager 

 

 Peker Pekerjaan jaan Lokasi No/Tgl No/ Tgl.. Kon Kontra trakk No/Tgl.l. SPMK No/Tg Item peke pekerjaan rjaan

: : : : :

Perpa Perpanjang njangan an dan Peleb Pelebaran aran Runwa Runwayy di Band Bandar ar Bandar Udara Silangit PJJ PJJ.04 .04.04 .04.01 .01/05 /05/09 /09/20 /2016/ 16/260 260,, Tang anggal gal 23 Sep Septem tem SPR.1 SPR.10.09 0.09/05/ /05/12/2 12/2016/ 016/305, 305, Tangg anggal al 06 Dese Desembe mbe Pemba Pembangun ngunan an Tu Turning rning Area 09

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-BC LA IS 1 (MC 0)   EMBANGUNA N TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Laston AC-BC 1

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

t

25.50

Tabel erhitungan Laston AC-BC Lapis 1 embangunan Turning 09 STA  +

2 + 572

LE B A R JARA K (m) (m)

25.50

L UA S (m2 )

535.50 Luas A 78.00

1989.00

2 + 650 Total Luas Laston AC-BC Lapis 1

Disetujui Oleh :   T. T. A n g k a s a u r a I I ( eerr se r o )

  2,524.50

Diperiksa Oleh : Konsultan engawas, T. r o s y s B a n g u n e r sa d a

KETERANGAN

 

 Peker Pekerjaan jaan Lokasi No/Tgl No/ Tgl.. Kon Kontra trakk No/Tgl.l. SPMK No/Tg Item peke pekerjaan rjaan

: : : : :

Perpa Perpanjang njangan an dan Peleb Pelebaran aran Runwa Runwayy di Band Bandar ar Bandar Udara Silangit PJJ PJJ.04 .04.04 .04.01 .01/05 /05/09 /09/20 /2016/ 16/260 260,, Tang anggal gal 23 Sep Septem tem SPR.1 SPR.10.09 0.09/05/ /05/12/2 12/2016/ 016/305, 305, Tangg anggal al 06 Dese Desembe mbe Pemba Pembangun ngunan an Tu Turning rning Area 09

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-BC LA IS 1 (MC 0)   EMBANGUNA N TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Laston AC-BC 1

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

t

25.50

Tabel erhitungan Laston AC-BC Lapis 1 embangunan Turning 09 STA Y O S A AT TA MB U N A N Wakil Koordinator Lapangan

LE B A R JAR A K L UA S (m) (m) (m2 ) A K H M A D FA U Z I Ahli Teknik Sipil

KETERANGAN

 

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-BC 1 (MC 0)  

dara Silangit  

ber 2016 r 2016

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

Laston AC-BC 1 STA 2 + 650

STA 2 + 572

STA 2 + 530

t = 5 cm 0.05

25.50

  KETERANGAN

 

Silangit, 20 Maret 2017 Diajukan Oleh : Kontraktor,   T. Nindya Karya ( ersero)

 

BREAKDOWN ERHITUNGAN VOLUME LASTON AC-BC 1 (MC 0)  

dara Silangit  

ber 2016 r 2016

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

Laston AC-BC 1 STA 2 + 650

STA 2 + 572

STA 2 + 530

t = 5 cm 0.05

25.50

  KETERANGAN JODI AKBAR Site Engineering Manager 

 

 Peke Pekerj rjaa aann Lokasi No/Tgl. No/T gl. Kontr Kontrak ak No/Tgl. SPMK Item peke pekerjaa rjaann

: : : : :

Perp Perpan anja jang ngan an dan dan Pe Pele leba bara rann Runw Runway ay di Ba Band ndar ar U Bandar Udara Silangit PJJ. PJJ.04.0 04.04.01/ 4.01/05/0 05/09/20 9/2016/26 16/260, 0, Tangg anggal al 23 Septe Septemb mb SPR.10.09/05/1 SPR.10.09/05/12/2016/305, 2/2016/305, Tanggal 06 Desember Pemba Pembanguna ngunann Tu Turnin rningg Area 09

BREAKDOW N ERHITUNGAN VOLUME RIME COAT (MC 0)   EMBANGUN AN TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Prime Coat

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan rime Coat embangunan Turning 09 STA  +

2 + 572

LEBAR (m)

JARA K (m)

25.50

LUAS (m2)

535.50 78.00

KETERANGAN

Luas A

1989.00

2 + 650 Total Luas Prime Coat

Disetujui Oleh :   T. A n g k a s a u r a I I ( eerr se r o )

  2,524.50

Diperiksa Oleh : Konsultan engawas, T. r o sy s B a n g u n e r s a d a

T. N i n d y a K a r y a

 

 Peke Pekerj rjaa aann Lokasi No/Tgl. No/T gl. Kontr Kontrak ak No/Tgl. SPMK Item peke pekerjaa rjaann

: : : : :

Perp Perpan anja jang ngan an dan dan Pe Pele leba bara rann Runw Runway ay di Ba Band ndar ar U Bandar Udara Silangit PJJ. PJJ.04.0 04.04.01/ 4.01/05/0 05/09/20 9/2016/26 16/260, 0, Tangg anggal al 23 Septe Septemb mb SPR.10.09/05/1 SPR.10.09/05/12/2016/305, 2/2016/305, Tanggal 06 Desember Pemba Pembanguna ngunann Tu Turnin rningg Area 09

BREAKDOW N ERHITUNGAN VOLUME RIME COAT (MC 0)   EMBANGUN AN TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Prime Coat

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan rime Coat embangunan Turning 09 STA Y O S A AT TA M B U N A N Wakil Koordinator Lapangan

LEBAR (m)

JARA K LUAS (m) (m2) A K H M A D FA U Z I Ahli Teknik Sipil

KETERANGAN

 

BREAKDOWN ERHITUNGAN VOLUME RIME COAT (MC 0)  

ara Silangit  

er 2016 016

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

Prime Coat

25.50

  KETERANGAN

 

Silangit, 20 Mare Marett 2017 Diajukan Oleh : Kontraktor,   T. Nindya Karya ( ersero)

 

BREAKDOWN ERHITUNGAN VOLUME RIME COAT (MC 0)  

ara Silangit  

er 2016 016

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

Prime Coat

25.50

  KETERANGAN JODI AKBAR Site Engineering Manager 

 

 Peker Pekerjaan jaan  Lokasi No/Tgl. Kontrak  No/Tgl. SPMK  Item peke pekerjaan rjaan

: : : : :

Perpa Perpanjan njangan gan dan Peleb Pelebaran aran Runw Runway ay di Banda Bandarr Udara Silan Silangit git B Baandar Udara Silangit PJJ.04.04.0 PJJ.04.04.01/05/09/2016/ 1/05/09/2016/260, 260, Tanggal 23 September 2016 SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember 2016 Pemba Pembangun ngunan an Turning Turning Area 09

BREAKDOWN ERHITUNGAN VOLUME BASE (MC 0)   EMBANGUNA N TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Base

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Base embangunan Turning 09 STA  +

LEBAR (m)

TEBAL ( m)

LUAS (m2)

-

0.23

535.50

25.50

0.23

-

  JA RA K (m)

V O L U ME ( m3 ) 123.17 Luas A

2 + 572 78.00

457.47

2 + 650 Total Volume Base

Disetujui Oleh :   T. A n g k a s a u r a I I ( eerr s e r o )

 

  580.64

Diperiksa Oleh : Konsultan engawas, T. r o s y s B a n g u n e r sa d a

KETERANG

 

 Peker Pekerjaan jaan  Lokasi No/Tgl. Kontrak  No/Tgl. SPMK  Item peke pekerjaan rjaan

: : : : :

Perpa Perpanjan njangan gan dan Peleb Pelebaran aran Runw Runway ay di Banda Bandarr Udara Silan Silangit git B Baandar Udara Silangit PJJ.04.04.0 PJJ.04.04.01/05/09/2016/ 1/05/09/2016/260, 260, Tanggal 23 September 2016 SPR.10.09/05/12 SPR.10.09/05/12/2016/305, /2016/305, Tanggal 06 Desember 2016 Pemba Pembangun ngunan an Turning Turning Area 09

BREAKDOWN ERHITUNGAN VOLUME BASE (MC 0)   EMBANGUNA N TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Base

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Base embangunan Turning 09 STA

LEBAR (m)

Y O S A AT TA M B U N A N Wakil Koordinator Lapangan

TEBAL ( m)

LUAS (m2)

  JA RA K (m)

V O L U ME ( m3 )

A K H M A D FA U Z I Ahli Teknik Sipil

KETERANG

 

BREAKDOWN ERHITUNGAN VOLUME BASE (MC 0)

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

Base Course t = 23 cm 0.23

25.50

KETERANGAN

 

Silangit, 20 Maret 2017 Diajukan Oleh : Kontraktor,   T. Nindya Karya ( ersero)

 

BREAKDOWN ERHITUNGAN VOLUME BASE (MC 0)

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

Base Course t = 23 cm 0.23

25.50

KETERANGAN JODI AKBAR Site Engineering Manager 

 

 Pekerjaan  Lokasi No/Tgl. Kontrak  No/Tgl. SPMK  Item  Item peke pekerjaa rjaann

: : : : :

Perpanjangan dan Pelebaran Runway di Bandar Udara Silangit B Baandar Udara Silangit PJJ.04.04. PJJ.04.04.01/05/09/2016/ 01/05/09/2016/260, 260, Tanggal 23 Se September ptember 2016 SPR.10.09/05/1 SPR.10.09/05/12/2016/305, 2/2016/305, Tanggal 06 Desember 2016 Pemba Pembanguna ngunann Turnin Turningg Area 09

BREAKDOWN ERHITUNGAN VOLUME SUB BASE (MC 0)   EMBANGUN AN TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Sub Base

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Sub Base embangunan Turning 09 STA  +

L E BA R (m)

T EB A L (m)

L UA S (m2 )

-

0.40

535.50

25.50

0.40

-

2 + 572

  JA R AK (m)

V OL UME (m3)

214.20 Luas A 78.00

795.60

2 + 650 Total Volume Sub Base

Disetujui Oleh :   T. A n g k a sa u r a I I ( eerr se r o )

 

  1,009.80

Diperiksa Oleh : Konsultan engawas, T. r o s y s B a n g u n e r s a d a

KETERAN

 

 Pekerjaan  Lokasi No/Tgl. Kontrak  No/Tgl. SPMK  Item  Item peke pekerjaa rjaann

: : : : :

Perpanjangan dan Pelebaran Runway di Bandar Udara Silangit B Baandar Udara Silangit PJJ.04.04. PJJ.04.04.01/05/09/2016/ 01/05/09/2016/260, 260, Tanggal 23 Se September ptember 2016 SPR.10.09/05/1 SPR.10.09/05/12/2016/305, 2/2016/305, Tanggal 06 Desember 2016 Pemba Pembanguna ngunann Turnin Turningg Area 09

BREAKDOWN ERHITUNGAN VOLUME SUB BASE (MC 0)   EMBANGUN AN TURNING ST STA A 2+530  S/D STA 2+650 Sketsa Gambar Sub Base

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

25.50

Tabel erhitungan Sub Base embangunan Turning 09 L E BA R (m) Y O S A AT TA MB U N A N Wakil Koordinator Lapangan STA

T EB A L (m)

L UA S (m2 )

JA R AK V OL UME (m) (m3) A K H M A D FA U Z I Ahli Teknik Sipil

  KETERAN

 

BREAKDOWN ERHITUNGAN VOLUME SUB BASE (MC 0)

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

Sub Base Course t = 40 cm 0.40 25.50

KETERANGAN

 

Silangit, 20 Maret 2017 Diajukan Oleh : Kontraktor,   T. Nindya Karya ( ersero)

 

BREAKDOWN ERHITUNGAN VOLUME SUB BASE (MC 0)

 

Runway 09

LUAS A=535.50 m2

78

42

         5   ,          5          2

STA 2 + 650

STA 2 + 572

STA 2 + 530

Sub Base Course t = 40 cm 0.40 25.50

KETERANGAN JODI AKBAR Site Engineering Manager 

 

MUTUAL CHECK - AWAL BANDARA SILANGIT 2 PAKET PERPANJANGAN DAN PELEBARAN RUNWAY

NO

URAIAN

I PEKERJAAN PENDAHULUAN 1 Mobili Mobilisas sasii & Demobi Demobilis lisasi asi 2 Administr Administrasi asi Proye Proyek, k, Dokumen Dokumentasi tasi,, dan Pelapo Pelaporan ran 3 Pembuat Pembuatan an Gudang, Gudang, Los Los Kerja Kerja dan Papan Papan Nama Proyek Proyek 4 Pengukur Pengukuran an Sebelum Sebelum dan Sesudah Sesudah ((term termasuk asuk Shop Shop Dra Drawing) wing) 5 Uji Lapang Lapangan an dan dan Labor Laborat atori orium um II PEKERJAAN SIPIL A Pekerjaan Tanah Untuk Pelebaran Dan Perpanjangan Runway 1 Soil Excava Excavaon on untuk untuk Segmen Peleba Pelebaran ran dan Perpan Perpanjang jangan an Runw Runway ay B Pada Pekerjaan Peningkatan Kapasitas Runway Segmen Pelebaran, Perpanjangan Runway dan Stopway (09 dan 27) 1 Sub - Base Base C Cour ourse, se, t = 40 40 cm CBR > 20% 20% 2 Ba Base se Cou Cours rse, e, t = 23 cm cm CBR CBR > 80% 80% 3 Lapis Resap Resap Pengik Pengikat at (Prime (Prime Coat), Coat), 1 liter/m2 liter/m2 4 Laston Laston AC-BC AC-BC tebal tebal rat rata a - rata rata 5 cm 5 Lapis Lapis P Per erek ekat at (Tack (Tack Coat Coat), ), 1 kg/m2 kg/m2 6 Laston Laston AC-BC AC-BC tebal tebal rat rata a - rata rata 5 cm 7 Lapis Lapis P Per erek ekat at (Tack (Tack Coat Coat), ), 1 kg/m2 kg/m2 8 Laston Laston AC-WC AC-WC teba teball rata rata - rat rata a 5 cm C Pada Segmen Pelebaran Turning Area 27 1 Sub - Base Base C Cour ourse, se, t = 40 40 cm CBR > 20% 20% 2 Ba Base se Cou Cours rse, e, t = 23 cm cm CBR CBR > 80% 80% 3 Lapis Resap Resap Pengik Pengikat at (Prime (Prime Coat), Coat), 1 liter/m2 liter/m2 4 Laston Laston AC-BC AC-BC tebal tebal rat rata a - rata rata 5 cm 5 Lapis Lapis P Per erek ekat at (Tack (Tack Coat Coat), ), 1 kg/m2 kg/m2 6 Laston Laston AC-BC AC-BC tebal tebal rat rata a - rata rata 5 cm 7 Lapis Lapis P Per erek ekat at (Tack (Tack Coat Coat), ), 1 kg/m2 kg/m2 8 Laston Laston AC-WC AC-WC teba teball rata rata - rat rata a 5 cm D Pembangunan Turning Area 09 1 Sub - Base Base C Cour ourse, se, t = 40 40 cm CBR > 20% 20% 2 Ba Base se Cou Cours rse, e, t = 23 cm cm CBR CBR > 80% 80% 3 Lapis Resap Resap Pengik Pengikat at (Prime (Prime Coat), Coat), 1 liter/m2 liter/m2 4 Laston Laston AC-BC AC-BC tebal tebal rat rata a - rata rata 5 cm 5 Lapis Lapis P Per erek ekat at (Tack (Tack Coat Coat), ), 1 kg/m2 kg/m2 6 Laston Laston AC-BC AC-BC tebal tebal rat rata a - rata rata 5 cm 7 Lapis Lapis P Per erek ekat at (Tack (Tack Coat Coat), ), 1 kg/m2 kg/m2 8 Laston Laston AC-WC AC-WC teba teball rata rata - rat rata a 5 cm E Pekerjaan Marka Sisi Udara 1 Penge Pengeca catan tan Marka Marka Runwa Runway y

BACK UP PER SUDAH

BELUM

 

NO

URAIAN

F Pekerjaan Drainase 1 Pek. Pek. Gali Galian an Untu Untuk k Salur Saluran an 2 Salura Saluran n berbe berbent ntuk uk Trapes rapesium ium (A1-1) (A1-1) 3 Salura Saluran n berbe berbent ntuk uk Trapes rapesium ium (A1-2) (A1-2) 4 Salura Saluran n berbe berbent ntuk uk Trapes rapesium ium (A2-1) (A2-1) 5 Salura Saluran n berbe berbent ntuk uk Trapes rapesium ium (A2-2) (A2-2) 6 Salura Saluran n berbe berbent ntuk uk Trapes rapesium ium (A3-1) (A3-1) 7 Salura Saluran n berbe berbent ntuk uk Trapes rapesium ium (A3-2) (A3-2) 8 Salura Saluran n berbe berbent ntuk uk Trapes rapesium ium (B1-1) (B1-1) 9 Salura Saluran n berbe berbent ntuk uk Trapes rapesium ium (B1-2) (B1-2) 10 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B2) 11 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B3) 12 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B4) 13 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B5) 14 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B6) 15 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B7) 16 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B8) 17 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B9-1) 18 Saluran Saluran berbentuk berbentuk Trapesium rapesium (B9-2) 19 Saluran Saluran berbentuk berbentuk Trapesium rapesium (C1) 20 Saluran Saluran berbentuk berbentuk Trapesium rapesium (C2) 21 Saluran Saluran berbentuk berbentuk Trapesium rapesium (C3) 22 Saluran Saluran berbentuk berbentuk Trapesium rapesium (C4) 23 Saluran Saluran berbentuk berbentuk Trapesium rapesium (C7) 24 Saluran Saluran berbent berbentuk uk Perse Persegi gi Tertut Tertutup up (C8) 25 Saluran Saluran berbent berbentuk uk Perse Persegi gi Tertut Tertutup up (C9) 26 Saluran Saluran berbent berbentuk uk Perse Persegi gi Tertut Tertutup up (C10) 27 Saluran Saluran berbentuk berbentuk Trapesium rapesium (C13) 28 Saluran Saluran berbent berbentuk uk Perse Persegi gi Terbuk Terbuka a (C16) 29 Saluran Saluran berbent berbentuk uk Perse Persegi gi Terbuk Terbuka a (C17) 30 Saluran Saluran berbent berbentuk uk Perse Persegi gi Terbuk Terbuka a (C18) 31 Saluran Saluran berbent berbentuk uk Perse Persegi gi Terbuk Terbuka a (C20) 32 Saluran Saluran berbent berbentuk uk Perse Persegi gi Terbuk Terbuka a (C23) 33 Saluran Saluran berbent berbentuk uk Perse Persegi gi Terbuk Terbuka a (C24) 34 Saluran Saluran berbentuk berbentuk Trapesium rapesium (C25) 35 Saluran Saluran berbentuk berbentuk Trapesium rapesium (C26) 36 Saluran Saluran berben berbentuk tuk Trape rapesium sium (C27-1) (C27-1) 37 Saluran Saluran berben berbentuk tuk Trape rapesium sium (C27-2) (C27-2) 38 Saluran Saluran berben berbentuk tuk Trape rapesium sium (C28-1) (C28-1) 39 Saluran Saluran berben berbentuk tuk Trape rapesium sium (C28-2) (C28-2) 40 Bo Boxx Cu Culv lvert ert (A1-1) (A1-1) 41 Bo Boxx Cu Culv lvert ert (A1-2) (A1-2) 42 Bo Boxx Cu Culv lvert ert (A2-1) (A2-1) 43 Bo Boxx Cu Culv lvert ert (A2-2) (A2-2) 44 Bo Boxx C Culv ulvert ert (A3) 45 Bo Boxx Cu Culv lvert ert (B1-1) (B1-1) 46 Bo Boxx Cu Culv lvert ert (B1-2) (B1-2) 47 Bo Boxx C Culv ulvert ert (B2) 48 Bo Boxx C Culv ulvert ert (B4)

BACK UP PER SUDAH

BELUM

 

NO

URAIAN

49 Bo Boxx C Culv ulvert ert (B5) 50 Bo Boxx C Culv ulvert ert (B6) 51 Bo Boxx C Culv ulvert ert (B7) 52 Bo Boxx C Culv ulvert ert (C2) (C2) 53 Bo Boxx C Culv ulvert ert (C3) (C3) 54 Bo Boxx C Culv ulvert ert (C4) (C4) 55 Bo Boxx C Culv ulvert ert (C5) (C5) 56 Bo Boxx C Culv ulvert ert (C6) (C6) 57 Bo Boxx C Culv ulvert ert (C7) (C7) III. PEKERJAAN VISUAL AIDS A. FASILITAS AIRFIELD LIGHTING SYSTEM 1 PEKERJAAN RUNWAY EDGE LIGHT La PEMBONGKARAN & PEMASANGAN RUNWAY RUNWAY EDGE LIGHT 1 High Intensity Elevated Runway Edge Light complete Base plate, dan transformer clear/clear 150 W; 6.6 A (Exisng) berikut connecng cable FL2XCY ke CCR 15 kVA 380 V, 5 Step (Exisng) Lb PENGADAAN & PEMASANGAN RUNWAY EDGE LIGHT A PENGADAAN MATERIAL UTAMA 1 High Intensity Elevated Runway Edge Light complete Base plate, clear/clear 150 W; 6.6 A 2 High Intensity Inset Runway Edge Light complete shallow base & accesories pemasangan clear/clear 2 x 105 W; W; 6.6 A 3 High Intensity Elevated Runway Runway Edge Light complete c omplete Base plate, clear/yellow 150 W; 6.6 A 4 High Intensity Inset Runway Edge Light complete shallow base & accesories pemasangan 5 Isolang Isolang Trans Transform former er 150 150 W W,, 6.6A 6.6A 6 Isolang Isolang Trans Transform former er 200 200 W W,, 6.6A 6.6A 7 Connector Connector Kit terdi terdiri ri dari F FAA AA plug dan socke sockett single po pole le (resin) (resin) 8 Two pole pole plug plug conn connect ector or kit kit lengka lengkap p 9 Series Series Cable Cable FL2X FL2XCY CY 1 x 6 Sqmm, Sqmm, 3/6 3/6 kV 10 Cable sekunder sekunder NYYHY 2 x 2,5 2,5 Sqmm 11 Cable catu catu days days NYY NYY 3 x 16 Sqmm ( AFL - CCR CCR ), 1 kv 12 Cable contr control ol CCR - Main co contr ntrol ol 2x10x0,6 Sq Sqmm mm 13 Kob Kobel el BC 1 x 50 mrn2 mrn2 14 Kabe Kabell BC 1 x 16 mm2 mm2 15 Pitz transf transformer ormer size size 1 termasuk termasuk pipa exible exible dia. 50 mm Pitz grounding c/w ROD Grounding (dia 1" panjang 3 m) c/w ROD Grounding (dia 16 1" panjang 3 m) B PEKERJAAN PEMASANGAN 17 Pekerjaan Pekerjaan pemasangan pemasangan lighng system system (Elevated (Elevated R/W lighng) 18 Pekerjaan Pekerjaan pemasangan pemasangan lighng system system (Inset I2/W lighng) Pekerjaan Penggalian, Penggelaran dan Penanaman Kabel Series, Power control, Pekerjaan 19 dan BC, Kabel Ground (volume galian 1849,87 m3) 2 PENGADAAN & PEMASANGAN THRESHOLD LIGHT

BACK UP PER SUDAH

BELUM

 

NO

URAIAN

A PENGADAAN MATERIAL UTAMA 1 High Intensity Elevated Elevated Wing bar Light complete Base plate, green 150 W , 6.6 A (R/W 27) 2 High Intensity Inset Threshold End Light complete shallow base & accesories pernasangan, green/red green/red 2 x 105 W W,, 6.6 A (R/W 27) 3 High Intensity Inset Threshold End Light complete shallow base & accesories pemasangan green/blank 2 x 105 W, W, 6.6 A (R/W 27) 4 High Intensity Inset Threshold End Light complete shallow base & accesones pemasangan, green/red 2 x 105 W, 6.6 ATR/W 09) 5 High Intensity Inset Threshold end Light complete shallow base & accesories pemasangan, green/blank 2 x 105 W, 6.6 A (R/W 09) 09 ) 6 Isolang Isolang Trans Transform former er 150 150 W W,, 6.6A 6.6A 7 Connector Connector Kit Kit terdiri terdiri da dan n FAA FAA plug dan socket socket single single pole 8 Two pole pole plug plug conn connect ector or kit kit lengka lengkap p 9 Kabel Kabel sek sektmd tmder er NYYH NYYHY Y 2 x 2, 2,5 5 Sqmm, Sqmm, I k kV V 10 Kabe Kabell BC 1 x 50 mm2 mm2 11 Kabe Kabell BC 1 x 16 mm2 mm2 12 Pekerjaan Pekerjaan Pitz Pitz Transf Transformer ormerss Size 3 2/18 13 Pekerjaan Pekerjaan Pitz Pitz Transf Transformer ormerss Size 2 2/5 B PEKERJAAN PEMASANGAN 14 Pemasang Pemasangan an pipa pipa PVC PVC dia. dia. 2" 15 Pekerjaan Pek erjaan Penggalian, Penggelaran dan Penanaman Kabel Series, Power control, dan BC, Kabel Ground (Volume galian 42 m3) 16 Pekerjaan Pekerjaan instalasi lighng system system (Elevated (Elevated wing bar lighng) lighng) 17 Pekerjaan Pekerjaan instalasi instalasi lighng system system (Inset threshold lighng) 3

PENGADAAN & PENIASANGAN PRECISSION P RECISSION APPROACH LIGHT SYSTEM (PALS 900M)

A PENGADAAN MATERIAL UTAMA 1 Undirecon Undireconal al Elevate Elevated d Light complet complete e Base Plate, Plate, clear 150 W, W, 6.6 A Undireconal Inset Light complete shallow base & accesories pemasangan, clear 2 150 W, 6.6 A 3 CC CCR R 25 kVA kVA 380 380 V, V, 5 Ste Step p 4 Isolang Isolang Trans Transform former er 150 150 W W,, 6.6A 6.6A 5 Connector Connector Kit terdi terdiri ri dari F FAA AA plug dan socke sockett single po pole le (resin) (resin) 6 Two pole pole plug plug connec connecto torr kit kit 7 Series Series Cable Cable FL2X FL2XCY CY 1 x 6 Scpnm, Scpnm, 3/6 3/6 kV 8 Kabel Kabel sek sekund under er NYYH NYYHY Y 2 x 4 Sq Sqmm, mm, I kV 9 Cable catu daya daya NYFGbY NYFGbY 2 x 2,5 2,5 Sqmm, (AFL - CCR), CCR), 1 kV 10 Cable contr control ol CCR - Main Main control control 2 x 10 x 0,8 0,8 mm2 11 Joint Joint Sleeve Sleeve FL FL2XC 2XCY Y 1 x 6 Sqmm, Sqmm, 3/6 kV kV 12 Kabe Kabell BC 1 x 50 mm2 mm2 13 Kabe Kabell BC 1 x 16 mm2 mm2 14 Pitz transf transformer ormer siz size e2 15 Tia Tiang ng Tung Tunggal gal PALS PALS 16 Ponda Pondasi si Lampu Lampu PALS PALS 17 Pondasi Pondasi Lampu Wing Bar (Bar (Bar 21) 21)

BACK UP PER SUDAH

BELUM

 

NO

URAIAN

B PEKERJAAN PEMASANGAN 18 Pekerjaan Pek erjaan Penggalian, Penggelaran dan Penanaman Kabel Series dan BC, Kabel Ground (Volume (Volume Galian 280 m3) 19 Pekerjaan Pekerjaan instalasi lighng system system (Undireconal Elevated Elevated lighng) lighng) 20 Pekerjaan Pekerjaan instalasi instalasi lighng system system (Undireconal (Undireconal Inset lighng) 4 PEKERJAAN MEDIUM APPROACH LIGHT SYSTEM (MALS) A PEMBONGKARAN MEDIUM APPROACH LIGHT SYSTEM (MALS) 1 Undireconal Elevated Light complete Base plate, dan traformer clear 200 W, 6.6 A (Exisng) 2 Constan Constantt Current Current Regulato Regulatorr 10 KVA, 220V, 220V, 50Hz. (Exisng) (Exisng) B PENGADAAN MATERIAL 1 Connector Connector Kit terdi terdiri ri dari F FAA AA plug dan socke sockett single po pole le resin resin 2 Two pole pole plug plug connec connecto torr kit kit 3 Series Series Cable Cable FL2X FL2XCY CY 1 x 6 Sqmm, Sqmm, 3/6 3/6 kV 4 Cable Cable sek sekund under er NYYH NYYHY Y 2 x 4 mm2, mm2, 1 kV 5 Cable catu daya daya NYY 3 x 16 Swim ((AFL-CC AFL-CCR), R), 1 kV 6 Cable control control CCR CCR - M Main ain control control 2 x 10 x 0,8 0,8 Sqmm/IkV Sqmm/IkV 7 Ka Kabe bell B BC C 1 x 50 50 m mm2 m2 8 Ka Kabe bell B BC C 1 x 16 16 m mm2 m2 9 Pitz Pitz tra trans nsfo form rmer er ssiz ize e2 10 Pitz groundi grounding ng c/w ROD Groundi Grounding ng (dia 1" panjang panjang 3 m) 11 Tia Tiang ng Tung Tunggal gal MALS MALS C PEKERJAAN PEMASANGAN 12 Pekerjaan Pek erjaan Penggalian, Penggelaran dan Penanaman Kabel Series, Power control, dan BC, Kabel Ground (volume galian 140 m3) 13 Pekerjaan Pekerjaan instalasi instalasi lighng-system lighng-system(Undireconal (Undireconal Elevated Elevated lighng) 5 PENGADAAN & PEMASANGAN TURNING LIGHT AREA A PENGADAAN MATERIAL UTAMA 1 Omni direcon direconal al Elevate Elevated d Light Comple Complete te Base Plate Plate,, Blue LED 6-15 6-15 W/6.6 A 8 unit 2 Isolang Isolang Trans Transform former er 15 W, 6.6A 8 Pa 3 Connector Connector Kit terdi terdiri ri dari F FAA AA plug dan socke sockett single po pole le resin resin 8 set 4 Two pole pole plug plug conn connect ector or kit kit lengka lengkap p 5 Cable Cable sek sekund under er NYYH NYYHY Y 2 x 2,5 2,5 mm2, mm2, 1kV 1kV 6 Pitz Pitz tra trans nsfo form rmer er ssiz ize e2 B PEKERJAAN PEMASANGAN 7 Pekerjaan Pekerjaan instalasi instalasi lighng lighng system system (Omni direconal direconal Elevated Elevated lighng) 8 k PENGADAAN & PEMASANGAN ROTATING BEACON, OBSTRUCTION LIGHT DI 6 TOWER

A PENGADAAN MATERIAL UTAMA 1 Rotang Rota ng beacon 500w/220V, Komplit Komplit motor 12 rpm/menit, clear/green lter main & standby lamp 2 Armature Armature Obst Obstruco rucon n Light Light LED 6-15W/220, 6-15W/220, rred ed glass glass

BACK UP PER SUDAH

BELUM

 

NO

URAIAN

3 Cable Cable daya daya unt untuk uk ROB ROB & OL NYY NYY 2 x 6 Scpam, Scpam, 1 kV B PEKERJAAN PEMASANGAN 4 Pekerjaan Pekerjaan instalasi instalasi rotang rotang beacon lighng lighng system system (Komplit motor motor 12 rpm/menit) Pekerjaan Pek erjaan Penggalian, Penggelaran dan Penanaman Kabel Series, Power control, 5 dan BC, 7 PEKERJAAN PAPI A PEMBONGKARAN PAPI 1 PAPI unit (2 lamps-200W/6,6Amp) (4 box) Komplit Isol trafo 200W/6,6A Kaki 3 (Exisng) 2 CCR 7,5 kVA kVA,, 220V, 220V, IP, IP, 50Hz, 5 step step (Exis (Exisng) ng) 3 CCR 4 kVA, kVA, 220V, 220V, 1P, 1P, 50Hz, 5 step step (Exis (Exisng) ng) B PENGADAAN MATERIAL I Connector Connector Kit te terdin rdin dari F FAA AA plug dan dan socket socket single single pole pole 2 Two pole pole plug plug connec connecto torr kit kit 3 Ca Cabl ble e FL2X FL2XCY CY 1 x 6 Sqmm Sqmm,, 1 kV 4 Cable Cable sek sekund under er NYYH NYYHY Y 2 x 4 Sqmm, Sqmm, 1 kV 5 Cable Cable catu catu days days NYY NYY 3 x 16 m mm2 m2 (AFL(AFL-CCR CCR)) 6 Cable control control CCR - Main conrol conrol 2 x 10 x 0, 0,8 8 Sqmm 7 Ka Kabe bell B BC C 1 x 50 50 m mm2 m2 8 Ka Kabe bell B BC C 1 x 16 16 m mm2 m2 9 Pers Persiap iapan an (Measu (Measurin ring g dots dots)) 10 Pitz transf transformer ormer siz size e1 11 Kalibras Kalibrasii dengan dengan pesawat pesawat kalibra kalibrasi si 12 Mu Mul lba barr R/ R/W W 13 Pond Pondas asii Pap Papii 14 Pembuat Pembuatan an Manhole Manhole uk uk 1 x 1 x 1,8 1,8 m C PEKERJAAN PEMASANGAN 15 Pekerjaan Pekerjaan instalasi instalasi lighng system system (PAPI (PAPI unit) 16 Pekerjaan Pek erjaan Penggalian, Penggelaran dan Penanaman Kabel Series, Power control, dan BC, Kabel Ground 8 PENGADAAN DAN PEMASANGAN APRON FLOOD LIGHT A PENGADAAN MATERIAL UTAMA 1 Armature Armature Flood Flood Light Light 1000 wa/220 wa/220 volt volt Me Metal tal halide halide /h /haloge alogen n 2 Armature Armature Flood Light 1000 wa/22 wa/220 0 volt volt Sodium Sodium HP 3 Armature Armature Obst Obstruco rucon n Light Light LED 6-15W/220, 6-15W/220, rred ed glass glass Kabel Catu daya NYFGbY 4 x 25 mm2 , 1 KV (Dan Panel LVMDP Terminal ke Panel 4 ADP Aprcin) 5 Kabel Kabel Control Control 16P x1,5 mm2 ( dari dari T Tower ower kontr kontrol ol ke M MPH) PH) 6 Kabel Kabel NYFGbY NYFGbY 4 x 6 mm2 (Dan Panel Panel ADP A Apron pron Ke Ke Tiap P Panel anel Flood Flood Light) Light) 7 Kabel Kabel NYFGbY NYFGbY 2 x 2,5 mm2 (Dan (Dan ap Panel Panel FloodLigh FloodLightt ke Tiap- Tiap-ap ap Lampu) Lampu) 8 Panel Panel ADP 31,8 KVA, KVA, 4P, 4P, 80 amp/380volt amp/380volt,, 15 KA. (Sesuai Gainba Gainbar) r) 9 Panel anel Fl Floo ood d Lig Ligh ht 10 Penarigk Penarigkal al Pe Per r Early Early Streamer Streamer

BACK UP PER SUDAH

BELUM

 

NO

URAIAN

11 Kab Kabel el BC 1 x 50 50 mm2 + cond conduit uit 12 Out door door socket socket outlet outlet 10 A, 220v 220volt olt 13 Tiang Flood Light 15 meter meter,, polygonal, Komplit dengan dengan pondasi (sesuai exisng) exisng) 14 Spar Sparing ing pipa pipa 2 " Fle Flexib xible le 15 Grounding Grounding penangka penangkall per berikut berikut bak kontrol kontrol 16 Pembuat Pembuatan an Manhole Manhole uk. uk. 1 x 1 x 1,8 1,8 m

B PEKERJAAN PEMASANGAN 17 Pekerjaan Pekerjaan pemasangan pemasangan lighng system system (APPRON lighng) 18 Pekerjaan Pek erjaan pemasangan Spalingan Mabel 1 Jalur Pipa 2" 2 " (Panjang 94 m) d dan an Tiang Flood Light ke masing-masing Spot Number Light 19 Pekerjaan Pek erjaan pemasangan Ducng Cable c/w pipa pvc 3" (8 Jalur) p panjang anjang galian 300 mtr,, lebar 1 mtr , nggi 1,8 mtr mtr Pekerjaan Pek erjaan Pemasangan Ducng Cable c/w pipa pvc 3" 3 " (4 Jalur) panjang gahan 5 55 5 mtr, lebar 1 tntr , nggi 1,8 inn 20 mtr, 9 PENGADAAN & PEMASANGAN SPOT NUMBER LIGHT A PENGADAAN MATERIAL UTAMA Spot Number light komplit dengan lampu ang (H) back bac k ground laming bumf hitam 1 dengan lampu LED 2 Kabel Kabel NYY 2 x 2,5 mm2 (dan Panel Panel Flood Flood Light ke ke Tiap-ap Tiap-ap Spot Number Number Light) Light) 3 Pondasi Pondasi SPOT NUMBER NUMBER lighng lighng sys system tem -B PEKERJAAN PEMASANGAN 4 Pekerjaan Pekerjaan instalasi instalasi SPOT SPOT NUMBER NUMBER lig lighng hng sys system tem 10 PENGADAAN & PEMASANGAN TAXI GUIDANCE SIGN (TGS) A PENGADAAN MATERIAL UTAMA 1 Taxi Guidance Sign box 6 Legend -type LED, komplit dengan support dan baseplate b aseplate (ICAO 2 Taxi Guidance Sign box 2 Legend - I.P1), komplit dengan support dan baseplate (ICAO 3 Isola Isolang ng tra trans nsfor former mer 150 w/6, w/6,6 6A 3 Connector Isola Isolang ng tra trans nsfor former mer 100 w/6, w /6,6 6 A dan socket single pole (resin)6 Kit terdiri dari FAA plug 4 ' 5 Two pole pole plug plug connec connecto torr kit kit 6 Cable Cable sek sekund under er NYYH NYYHY Y 2 x 4 Sqmm, Sqmm, 1 kV 7 Kabel Kabel FL2XCY FL2XCY 1 x 6 Sqm Sqmm, m, 3/6 KV 8 Ka Kabe bell B BC C 1 x 16 16 m mm2 m2 9 Pit Pitss Tra Trans nsfo forme rmerr type type 2 10 Pondasi Pondasi untuk untuk Taxi Taxi Guidance Guidance Sign Sign 6 Legend 11 Pondasi Pondasi untuk untuk Taxi Taxi Guidance Guidance Sign Sign 2 Legend B PEKERJAAN PEMASANGAN 12 Pekerjaan Pekerjaan instalas instalasii TGS lighng lighng system system 13 Pekerjaan Pekerjaan Penggalian, Penggalian, Penggelaran Penggelaran dan Penanaman Penanaman Kabel Series clan BC. 11 PENGADAAN & PEMASANGAN IWDI A PENGADAAN MATERIAL UTAMA

BACK UP PER SUDAH

BELUM

 

NO

1

URAIAN

Unit IWDI komplit dengan ang 7 meter, meter, spot lamp 250W/6,6 250W /6,6 A, Obstruct Light LED 10 W/6,6A c/w c/ w Panel, pondasi, rabat dan marks (marks warns puh)

2 Power Power Cable Cable N NYFG YFGbY bY 4 x 3 35 5 Sqmm, Sqmm, 1 k kV V B PEKERJAAN PEMASANGAN 3 Pekerjaan Pekerjaan Pengga Penggalian, lian, Penggel Penggelaran aran dan dan Penanaman Penanaman Kabel Kabel Power Power 4 Pekerjaan Pekerjaan instalasi instalasi IWDI lighn lighng g syst system em 12 PENGADAAN & PEMASANGAN SIRINE A PENGADAAN MATERIAL UTAMA 1 Unit SIRINE SIRINE kompli komplitt dengan dengan elek elektrom tromotor otor 2,3 2,3 KVA, KVA, 2850 rpm rpm 2 Kabe Kabell NYF NYFGb GbY Y 3x 2 25 5 Sq Sqmm mm 3 Pon onda dassi SIRI SIRINE NE B PEKERJAAN PEMASANGAN 3 Pekerjaan Pekerjaan Pengga Penggalian, lian, Penggel Penggelaran aran dan dan Penanaman Penanaman Kabel Kabel Power Power 4 Pek Pekerjaan erjaan iins nstal talasi asi unit unit Siri Sirine ne 13

PEMBONGKARAN & PEMASANGAN RUNWAY THRESHOLD INDIFICATION LIGHT (RTIL)

A PEMBONGKARAN RTIL I Pembo Pembongk ngkar aranR anRTTL TTL Unit Unit dan au auto to Tra Trafo fo B PENGADAAN MATERIAL 2 Pon onda dassi RTIL TIL 3 Peng Pengada adaan an Kabe Kabell NYYHY NYYHY 2 x 4 mm2 C PEKERJAAN PEMASANGAN 4 Pekerjaan Pekerjaan Penggal Penggalian, ian, Penggelar PenggelaraV aVan an Penanaman Penanaman Kabel Power Power 5 5 Pek Pekcjaa cjaan n ins instal talasi asi RTIL RTIL 14

PENGADAAN DAN PEMASANGAN REMOTE CONTROL &

MONITORING SYSTEM A PENGADAAN MATERIAL 1

Remote Control Desk AFL Touch screen 22" with recording system (Power House & 2 PLC Inter Interface face Panel Panel for for 10 CCR, IWDI, Sirine Sirine and Apron Apron Flood Flood Light Light (CCR room) room) 3 Fiber opc opc cable single single mode mode 2x6 core core - simplex simplex (Tower (Tower - Power Power House House Bans) Bans) 4 Fiber opc opc cable single single mode mode 2x6 core core - simplex simplex (Tower (Tower - CCR CCR Exisng) Exisng) 5 Fiber opc opc cable single single mode mode 2x6 core core - simplex, simplex, CCR (PH Exisn Exisng g ke PH Baru) Baru) 6 Flexib Flexible le Cond Conduit uit diam diamet eter er 1 1/2" 1/2" 7 UPS UPS lk lkV VA (Pow (Power er Hou House se)) B PEKERJAAN PEMASANGAN 8 Pekerjan Pekerjan instalas instalasii & set up remote remote control control & monitoring monitoring syste system m 9 Pekerjaan Pekerjaan Pengga Penggalian, lian, Penggel Penggelaran aran dan dan Penanaman Penanaman Kabel Kabel Power Power 15 PENGADAAN & PEMASANGAN SEQUANCE FLASHING LIGHT A PENGADAAN MATERIAL

BACK UP PER SUDAH

BELUM

 

NO

URAIAN

1 Elevate Elevated d Sequence Sequence Flash Flash Light Light lengk lengkap ap baseplat baseplate e 2 Inset Sequence Sequence Flash Flash Light Light lengk lengkap ap dengan dengan sshallo hallow w hasp 3 Power Power Cable Cable N NYE YEGbY GbY 4 x 35 Sq Sqmm, mm, 1 kV 4 Junco Juncon n Box beri beriku kutt Flexib Flexible le Condu Conduit it 5 Tian Tiang g Tun Tungg ggal al SQFL2 SQFL28 8 6 Pon onda dassi SQFL SQFL

B PEKERJAAN PEMASANGAN 6 Pek Pekerjaan erjaan in inst stala alasi si SQFL sys syste tem m 7 Pekerjaan Pekerjaan Pengga Penggalian, lian, Penggel Penggelaran aran dan dan Penanarnan Penanarnan Kabel Kabel Power Power 16 PENGADAAN CATU DAYA FAS AFL A PENGADAAN MATERIAL UTAMA 1 Panel Panel Modul Modul untuk untuk CCR, CCR, WDL WDL Sirine Sirine (13 Modul) Modul) 2 UPS 120 kva modular modular,, komplit komplit dengan dengan baery baery otonom otonomii 30 menit 3 Kabel Kabel catu days days UPS dan dan Panel Panel Mo Modul dul NYY NYY 4x35 mm mm2, 2, Ikv B PEKERJAAN PEMASANGAN 4 Pekerjaan Pekerjaan instalasi instalasi & set set up syste system m 17 Pek PEKERJAAN BOORING MESIN Pekerjaan erjaan booring mesin lengkap dengan pemasangan pipa sparing HDPE 1 dia 4" B. FACTORY ACCEPTANCE TEST & FACTORY TRAINNING 1 FACTORY ACCEPTANCE TEST 1 Pemb Pembua uata tan n Pas Passp spor ortt 2 Pembu embuat atan an Visa Visa 3 Tiket Tiket Jaka Jakarta rta - Airpo Airport rt Tuju Tujuan an (PP (PP)) 4 Tiket Tiket Silangi Silangitt - Jak Jakart arta a (P (PP) P) 5 Akomo Akomodas dasii Hotel Hotel Tuju Tujuan an (4har (4hari) i) 6 Uang Uang Sak Saku u 6 har harii (@ (@ USD USD 693) 693) 2 FACTORY TRAINING 1 Pembu embuat atan an Visa Visa 2 Tiket Tiket Jaka Jakarta rta - Airpo Airport rt Tuju Tujuan an (PP (PP)) 3 Akomo Akomodas dasii Hotel Hotel Tuju Tujuan an (5 hari hari)) 4 Uang Uang Sak Saku u 7 hari hari ((@, @, USD USD 808) 808) 3 SITE TRAINING 1 Uang Uang Sa Sak ku 7 ha hari ri 4 TESTING COMMISIONING 1 Tiket Tiket Jakart Jakarta a-S Sila ilangi ngitt (PP) (PP) 2 Akomo Akomodas dasii Hotel Hotel Tuju Tujuan an (2 hari hari)) 3 Uang Uang Sa Sak ku 3 ha hari ri

BACK UP PER SUDAH

BELUM

 

 

ITUNGAN KETERANGAN

 

 

ITUNGAN KETERANGAN

 

 

ITUNGAN KETERANGAN

 

 

ITUNGAN KETERANGAN

 

 

ITUNGAN KETERANGAN

 

 