b Dep Piping and Instrument Diagram Appendix
March 13, 2018 | Author: AKSHEYMEHTA | Category: N/A
Short Description
P&ID...
Description
3
2
1 LINE DESIGNATION
PIPING AND COMPONENTS SYMBOLS MAIN LINE PROCESS & UTILITY
LINE NUMBER SHALL BE ASSIGNED TO ALL PIPING AND LDT (LINE DESIGNATION TABLES) AS FOLLOWS: 3=WAY VALVE F=FAIL POSITION (VA3WY)
END CAP SCREWED OR SOCKETWELD (ENDSCR) F
X - GR - ###YYY - ZZZ X - NOMINAL LINE SIZE GR - COMMODITY ### - PLANT UNIT NUMBER (V) - VACUUM SERVICE
ELEVATED FIRE MONITOR (SELF SUPPORTED)
E
LINE BREAK F
SECONDARY PROCESS LINE & SERVICE LINE
HOSE CONNECTION (HC)
4=WAY VALVE (VA4WY)
F
D FUTURE LINE
245
CW RETURN UNDERGROUND LINE
TO HEADER
TRACED LINE
AREA XXX B/L
BATTERY LIMIT (XXX=MATCHING AREA CODE NUMBER)
A
INITIAL FEED TO THE UNIT (ARROW 3)
CONTROL VALVE AND DIAPHRAGM ACTUATOR (CV)
CONTINUATION ARROW TO ANOTHER DRAWING (ARROW 1)
CONTROL VALVE AND DIAPHRAGM ACTUATOR [WITH HANDLEWHEEL] (CV1)
CONTINUATION ARROW TO/FROM ANOTHER DRAWING
CONTROL SELF ACTUATED REGULATOR. POINTS TO CONTROLLED PRESSURE SIDE (CVINTER)
DUPLEX TYPE STRAINER (DUPLEX)
PACKAGE UNIT BOUNDARY
GATE VALVE (VGA)
MOTOR OPERATED VALVE (MV)
SPECTACLE BLIND (CLOSED) (BLDC)
LINES CONNECTED (ARROWS AS REQUIRED)
GLOBE VALVE (VGL 1)
SINGLE ACTION CYLINDER ACTUATOR (AIR (PISTON) OPERATED VALVE) (AIRV)
SPECTACLE BLIND (OPEN) (BLDO)
SOLENOID VALVE MANUAL RESET (SOLEMANR)
SPADE BLIND (BLD)
SLIDE VALVE [MANUAL] (SLDE)
SPACER (SPACER)
S
C
LINES CROSSING NOT CONNECTED
Y TYPE GLOBE (VGLY)
PNEUMATIC SIGNAL [INSTAIR]
CONVAL VALVE W/HILTAP COUPLING
ELECTRICAL SIGNAL [ELECTRICAL]
R
NEEDLE VALVE (VND)
FIRE ISOLATION VALVE [GREENWOOD TYPE] (FIV)
CONCENTRIC REDUCER (RED)
PROCESS MEASUREMENT OR MECHANICAL LINKAGE [PROCESS]
POST INDICATOR VALVE
DRAIN OR VENT WITH PLUG OR BLIND FLANGE (DRORVT)
ECCENTRIC REDUCER (ECCFOT) (ECCFOB)
INSTRUMENT CAPILLARY TUBING (CAPILL)
PLUG VALVE (VPLG)
SILENCER (SIL)
FLAME ARRESTOR (FLAME)
SOFTWARE LINK (SOFTWARE)
CHECK VALVE (VCHK)
XX
INTERMITTENT PURGE REFER TO COMMODITY DESIGNATIONS FOR XX (PURGEINT)
DETONATION ARRESTOR
FOUNDATION FIELDBUS SIGNAL (FF)
STOP CHECK VALVE (VCHK_STOP)
XX
CONTINUOUS PURGE REFER TO COMMODITY DESIGNATIONS FOR XX (PURGECON)
HYDRAULIC (HYDRA)
MIN. FLOW CHECK VALVE (VCHKMIN)
X
TRAP STATION (TRAP)
T
XXX 001 TIE POINT SYMBOL (TP). SEE NOTES
NOTE NUMBER SP 001
ELECTROMAGNECTIC, SONIC OR NUCLEAR SIGNAL (ELECMAG)
BALL VALVE (VBA)
ELECTROMAGNECTIC, SONIC SIGNAL (NOT GUIDED)
BALL VALVE HIGH PRESSURE SIDE SHADED
DIAPHRAGM SEAL (SEAL)
SPECIALTY TAG (SPTAG)
HUB JOINT
SEWER DRAIN (SEWEROP) REFER TO SEWER DESIGNATIONS FOR XX
XX P&ID NO. JACKETED PIPE ((JACKET)
DOUBLE BLOCK & BLEED GAUGE VALVE
HUB JOINT WITH BLIND
XX
SS 001
P&ID NO. FLOW ARROW (ARRFLW)
MULTI PORT VALVE (VMULTI)
LINE SIZE ORIFICE (ORIF) ANNOTATE RO DIAMETER
S-4
CLOSED SEWER DRAIN (SEWERCL) REFER TO SEWER DESIGNATIONS FOR XX
SAMPLE POINT - MP - 001
PP 50
ET 20 50
INSTRUMENT ARROW (ARRINT)
RELIEF VALVE (RV)
GRADE (GRADE)
INSULATED LINE ANNOTATE H-HEAT OR C-COLD CONSERVATION, A-ACOUSTIC, PP-PERSONNEL PROTECTION SYMBOLS CAN BE COMBINED AS REQUIRED (INSUL). SHOW INSULATION THICKNESS
VACUUM RELIEF VALVE
SEAL LEG (SLEG)
UT
UTILITY STATION (USTN)
TRACED LINE ANNOTATE ET [ELECTRICAL], GT[GLYCOL] & ST[STEAM] SHOW TRACING MAINTENANCE TEMP. (INSULTRCD)
PRESSURE / VACUUM (RVPRES)
TEMPORARY STRAINER (TS)
XX
UTILITY CONNECTION (UTCON). REFER TO COMMODITY DESIGNATION FOR XX
EXPANSION JOINT (EXJ)
DIAPHRAGM VALVE (VDIA)
T.S.
MIXING OR INJECTION POINT
DAB(U) CAB
RS
P & ID No. GR
Y-TYPE PERMANENT STRAINERS (YTP)
BASKET TYPE STRAINER (BASKET)
M
FOR EACH SPECIFIC UNIT AND FOR EACH SPECIFIC FLUID DESIGNATION WITHIN THAT UNIT THE LINE NUMBERING WILL BEGIN AT 001.
D
COMMODITY DESIGNATIONS
CONTROL VALVE AND MANUAL ACTUATOR (HV)
TO / FROM HEADER
HAND OPERATED VALVES NO - NORMALLY OPEN NC - NORMALLY CLOSED LO - LOCKED OPEN LC - LOCKED CLOSED LN - LOCKED NEUTRAL CSO - CAR SEALED OPEN CSC - CAR SEALED CLOSED
YYY - LINE NUMBER (1 THRU 999) ZZZ - PIPE MATERIAL CLASS
T-TYPE PERMANENT STRAINERS (TTP)
LINE CONTINUED ON THE SAME DRAWING (ARROW 2)
LP STEAM
VALVE POSITIONS DESIGNATIONS
SPEC BREAK (SPECBRK)
REMOVABLE SPOOL
AA AC AI AP AR AU BA BD BO CA CL CT CWS CWR DM DO DT ET FL GC GF GH GHH GHL GI GN GO GP GR GS GW GX HS HT IN KA KC KP KS KW OF OH OL OS OP OPH OPL OM P PA PC PT RA RE RP SCH SC SCL SE SH SI SL SM SS SN SO ST SV TT VA VT WA WB WC WD WF WH WI WK WL WM WP WR WS WT WU WW WX WF WZ XT
UTILITY
FOR GR, USE THESE SYMBOLS - AERATION AIR - COMBUSTION AIR - INSTRUMENT AIR - PROCESS AIR - REGENERATION AIR - UTILITY AIR - BREATHING AIR - BLOWDOWN & RELIEF - BOILER BLOWDOWN - CATALYST - CHLORINE - COMPRESSOR TRIM - COOLING WATER SUPPLY - COOLING WATER RETURN - AMINE DRAIN - OILY DRAIN - DUCT TRIM - EXCHANGER TRIM - FLARE HEADER (UNDETERMINED) - CARBON DIOXIDE GAS - FUEL GAS - HYDROGEN GAS - HIGH PRESSURE H2 - LOW PRESSURE H2 - INERT GAS (NITROGEN) - NATURAL GAS - OXYGEN GAS - PURGE GAS - REFORMED GAS - SYNTHESIS GAS - WASTE GAS - HYDROGEN SULPHIDE GAS - SULPHURIC ACID - HEATER TRIM - INHIBITOR - AMMONIA, ANHYDROUS - CAUSTIC - PROCESS CHEMICALS - SULPHUR - AMMONIA, AQUEOUS - FUEL OIL - HOT OIL - LUBE OIL & SEAL OIL - SLOP OIL - PURGE/FLUSHING OIL - HIGH PRESSURE OIL - LOW PRESSURE OIL - OIL MIST - PROCESS PIPING - PROCESS AMMONIA - PROCESS CONDENSATE - PUMP TRIM - AMMONIA REFRIGERANT - ETHYLENE REFRIGERANT - PROPYLENE REFRIGERANT - HIGH PRESSURE CONDENSATE - STEAM CONDENSATE - LOW PRESSURE CONDENSATE - EXHAUST STEAM - HIGH-PRESSURE STEAM (2500 kPa(ga) SAT.) - HIGH-PRESSURE SULPHUR PLANT STEAM (4200 kPa(ga)) - LOW - PRESSURE STEAM (350 kPa(ga)) - SATURATED STEAM - HIGH-PRESSURE STEAM (4500 kPa(ga) SUPERHEATED) - MEDIUM-PRESSURE STEAM (900kPa(ga) SUPERHEATED) - STEAM OUT - STEAM TRACING - VACUUM STEAM - TANK TRIM - ATMOSPHERIC VENT - VESSEL TRIM - RAW WATER - BOILER FEED WATER - TEMPERED WATER SUPPLY - DOMESTIC WATER - FIRE WATER - HOT WATER SUPPLY - DEMINERALIZED WATER - HOT WATER RETURN - CHILLED WATER SUPPLY - CHILLED WATER RETURN - PROCESS WATER -TEMPERED COOLING WATER RETURN - SOUR WATER - TREATED WATER - UTILITY WATER - WASTE WATER - CIRCULATING WATER - FILTERED WATER - CLARIFIED WATER - MISCELLANEOUS TRIM, SAMPLE POINTS
CONTROL VALVES FO - FAIL OPEN FC - FAIL CLOSED FL - FAIL LOCK LAST POSITION FL(O) - FAIL LOCK (ULTIMATE OPEN) FL(C) - FAIL LOCK (ULTIMATE CLOSE) FX(C) - FAIL INTERMEDIATE (ULTIMATE CLOSE) FX(O) - FAIL INTERMEDIATE (ULTIMATE OPEN) TSO - TIGHT SHUTOFF
C TIE-IN POINTS SHALL BE DESIGNATED AS FOLLOWS PLT. UNIT NO. ### --SEQUENCE NO.
A 05/08/10 ISSUED FOR REVIEW REV
ISSUED DATE
DESCRIPTION
OTHER_DESIGNATIONS AE NNF HV FP
B
ADDITIONS / MODIFICATIONS
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA
- ANALYZER - NORMALLY NO FLOW - HAND CONTROL VALVE - FULL PORT
QUEST CCS PROJECT
A
SEWER_DESIGNATIONS FOR XX, USE THESE SYMBOLS
FLEXIBLE HOSE (FH)
BUTTERFLY VALVE (VBFY)
END CAP BUTTWELD (ENDCAP)
ANGLE VALVE (VANG)
END FLANGED (ENDFLG)
VALVE WITH BLEED OR PURGE CONNECTION (VBLEED)
4
O
O
FIRE HYDRANT
UP 1:500 LEVEL CHANGE OF SLOPE (SLOPE)
FIRE HYDRANT WITH MONITOR
DISSIMILAR MATERIAL WELDING
FREE DRAINING
3
FREE DRAINING
2
DA DB DC DF DK DM DO DP DR DS EF OS
- ACID SEWER - BENZENE DRAIN - CAUSTIC SEWER - DRAIN FLUSH (CLOSED HYDROCARBON DRAIN) - CHEMICAL SEWER - AMINE SEWER - OILY WATER SEWER (OPEN) - PROCESS DRAIN - STORM SEWER - SANITARY SEWER - POND EFFLUENT - OILY SEWER (CLOSED - ABOVE GROUND)
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 200 - COMMON LEGENDS AND SYMBOLS SCALE: NONE SHELL DWG NO.:
200.0000.000.041.007
1
REV.
A
200.007
FUTURE
ELEVATED FIRE MONITOR (SUPPORTED)
S
1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL DESCRIPTION.
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.007.pid MODEL DATE:2/1/2011 5:34:34 PM BY:ahm14887
4
4
3
2 LEGEND FOR FUNCTIONAL LOGIC DIAGRAMS
INSTRUMENT IDENTIFICATION LETTERS APPLICATION OF INSTRUMENT IDENTIFICATION TO P.&I.D.'S
WEIGHT
MISCELLANEOUS
POSITION
P PD Q PA PDA QA PAL PDAL QAL PC PDC QC PCV PDCV PE QE PG PDG PI PDI QI PIC PDIC QIC PIK PDIK QIK PIS PDIS QIS PIT PDIT QIT PR PDR QR PRC PDRC QRC PRS PDRS QRS PRT PDRT QRT PS PDS QS PSL PDSL QSL PT PDT QT PV PDV QV PX PDX QX PY PDY QY PZ PDZ QZ
VISCOSITY
M MA MAL MC ME MI MIC MIK MIS MIT MR MRC MRS MRT MS MSL MT MV MX MY MZ
MULTI VARIABLE
L LA LAL LC LCV LE LG LI LIC LIK LIS LIT LR LRC LRS LRT LS LSL LT LV LX LY LZ
TEMPERATURE DIFFERENCE
K KA KAL KC KE KG KI KIC KIK KIS KIT KR KRC KRS KRT KS KSL KT KV KX KY KZ
TEMPERATURE
MOISTURE OR HUMIDITY
J JA JAL JC JI JIC JIK JIS JIT JR JRC JRS JRT JS JSL JT JV JX JIY JZ
SPEED
LEVEL
I IA IAL IC II IIC IIK IIS IIT IR IRC IRS IRT IS ISL IT IV IX IY IZ
PRESSURE DIFFERENCE QUANTITY OR EVENT
TIME OR TIME SCHEDULE
H HA HAL HC HI HIC HIK HIS HR HRC HRS HS HSL HV HX HY HZ
PRESSURE
POWER
S SA SAL SC SE SI SIC SIK SIS SIT SR SRC SRS SRT SS SSL ST SV SX SY SZ
T TA TAL TC TCV TE TG TI TIC TIK TIS TIT TR TRC TRS TRT TS TSL TT TV TX TY TZ
TD TDA TDAL TDC TDCV TDIC TDIK TDIS TDIT TDR TDRC TDRS TDRT TDS TDSL TDT TDV TDX TDY TDZ
U UA UAL UC UCV UI UIC UIK UIS UIT UR URC URS URT US USL UT UV UX UY UZ
V VA VAL VC VE VG VI VIC VIK VIS VIT VR VRC VRS VRT VS VSL VT VV VX VY VZ
W WA WAL WC WCV WI WIC WIK WIS WIT WR WRC WRS WRT WS WSL WT WV WX WY WZ
X XA XAL XC XCV XE XG XI XIC XIK XIS XIT XR XRC XRS XRT XS XSL XT XV XX XY XZ
Z ZA ZAL ZC ZE ZI ZIC ZIK ZIS ZIT ZR ZRC ZRS ZRT ZS ZSL ZT ZV ZX ZY ZZ
THE COMBINATION OF LETTERS SHOWN INCLUDE THOSE MOST FREQUENTLY ENCOUNTERED. OTHER COMBINATIONS MAY BE DERIVED FROM TABLE 1 ISA-S-5.1 STANDARD. IF AN INSTRUMENT HAS ADDITIONAL FUNCTIONS, IT SHOULD BE SHOWN BY TWO GROUPS OF LETTERS RATHER THAN EXCEEDING THREE LETTERS (E.G. FQI AND FRC NOT FQIRC). XIS USED TO IDENTIFY COMPUTING TYPE RELAYS, FUNCTION CAN BE ANALYZERS MAY BE FURTHER IDENTIFIED BY DESCRIPTIVE LETTERS OR ASHOWN OUTSIDE BALLOON. WORDS WRITTEN OUTSIDE THE TAGGING BALLOON. YIS USED TO SHOW ON/OFF TYPE NON ADJUSTABLE RELAYS IN A LOOP. CIS USED WITH ZSC TO GIVE CLOSED POSITION. - I.E.- SOLENOIDS, PNEUMATIC 3-WAY VALVES ETC. ARE MODIFYING LETTERS FOR DIFFERENCE (D), FRACTION OR RATIO (F), THE SUFFIX LETTER "E" IS TO BE USED TO IDENTIFY COMPONENTS OF EAND QUALITY OR TOTAL (Q). THEY MAY BE USED WITH OTHER FIRST D, F, Q,A SAFETY SYSTEM - I.E.- SHUTDOWN, DEPRESSURING, LOCK UP, ETC., LETTERS THAN THOSE SHOWN IN THE TABLE , E.G. KQ-TOTAL TIME, (PALE - ALARM ON LOW PRESSURE SHUTDOWN). SD-SPEED DIFFERENCE, DF DENSITY RATIO. VWILL BE USED OUTSIDE BALLOON TO IDENTIFY VENDOR SUPPLIED INSTRUMENTS. JIS USED FOR SCANNING - I.E.- FOR TEMPERATURE TJI OR TJR. TWO STAGE VABIABLE ALARMS SHALL BE IDENTIFIED BY H AND HH, H/L IS USED FOR PILOT LGHT. THE LETTER "L" MAY BE USED ALONE OR L AND LL, - I.E.- H- HIGH LEVEL ALARM LOR IF PART OF A LOOP, IT CAN TAKE THE LOOP LETTERS AS A PREFIX. - HH- VERY HIGH LEVEL ALARM E.G.F. , ETC. NOTE: SAFETY SYSTEM WILL BE GENERALLY BE HE NOT HHE. NIS USER'S CHOICE - EITHER AS A MEASUREMENT OR OUTPUT FUNCTION. WILL BE USED OUTSIDE BALLOON TO IDENTIFY INSTRUMENTS AT LOCAL PANELS. LP IS USED WITH F TO GIVE FO, FLOW ORIFICE RESTRICTION. IF MORE THAN ONE PANEL, THEN IDENTIFY THEM NUMERICALLY AND OIS USED WITH ZSO TO GIVE OPEN POSITION. REFERENCE IN GENERAL NOTES. R-
IS USED AS A MEASURED VARIABLE FOR RADIOACTIVITY MEASUREMENT. IS ALSO USED TO MEAN SAFETY AS IN PSE RUPTURE DISC.
U-
IS USED TO SHOW A MULTIFUNCTION INSTRUMENT. - I.E.- COMBINATION RECORDING SCANNING, TOTALIZING, ETC. OR MULTIFUNCTION SYSTEM THAT MAY BE DETAILED SEPARATELY.
W-
2. XHS
O/C
OPEN CLOSED HAND SWITCH MOUNTED ON A LOCAL PANEL FOR ACTUATING A "XV" ON/OFF VALVE.
1
NUMBER DISPLAYED IN A SQUARE REPRESENTS THE STEP NUMBER SHOWN ON THE SQUENCE STEP INDICATOR.
A
LETTER DISPLAYED IN A DIAMOND REPRESENTS AN EXTERNAL CONNECTION BETWEEN THE LOAD SIDE OF AN OUTPUT MODULE AND THE LINE SIDE OF AN INPUT MODULE FOR TRIAC FAILURE DETECTION.
LP
XHIS
O/C
DCS COMPOSITE POINT SELECTOR SWITCH WITH OPEN/CLOSED INDICATION FROM "XV" LIMIT SWITCHES OR POSITION TRANSMITTER.
SOLENOID VALVE COIL
LC-
WILL BE USED OUTSIDE BALLOON TO IDENTIFY INSTRUMENT AT LOCAL CONSOLES.
CB-
CUT BACK CONTROL
PILOT LIGHT R = RED G = GREEN
R 3.
ALL CONTROLLERS COMING INTO DCS DO NOT NEED TO BE MARKED AS AN IC OR RC AS I AND R ARE IMPLICIT FOR EVERY POINT. ALARM PRESENTATION (MINIMIZE NUMBER OF BALLOONS) THE OPERATOR HAS THE ABILITY TO SET AN H OR L FOR ANY POINT. THESE OPERATOR ALERTS WILL NOT BE SHOWN ON P&ID ALARMS UNDER ENGINEERING CHANGE H CONTROL WILL BE SHOWN AS: PI FI
RELAY KR
RELAY COIL
IF MEASUREMENT POINT HAS A LOGIC INTERLOCK; THE INDICATED VALUE WILL BE AVAILABLE IN THE DCS. THE LL OR HH SIGNIFIES THE TRIP ACTION UNDER ENGINEERING CONTROL, WHICH THE OPERATOR CANNOT ADJUST.
5. 6.
SOLENOID VALVES ON NON- EMERGENCY SYSTEMS SHOULD BE TAGGED AS UYI- XXX.
8.
SOLENOID VALVES ON EMERGENCY SYSTEMS SHOULD BE TAGGED AS *YE-XXX, I.E. XYE-001. SOLENOID VALVES ON NON-EMERGENCY SYSTEMS SHOULD BE TAGGED AS *YI-XXX, I.E. LYI-001.
9.
CB 147 B
UE 197
FIC
113
113
BACK OF PANEL OR RACK MOUNTED INSTRUMENT
FRONT PANEL INSTRUMENT
PSHE 005
*YE 197
FR
TXE
113
147
HIGH PRESSURE SHUTDOWN SWITCH
SOLENOID VALVE ON EMERGENCY SYSTEMS
INSTRUMENT ON LOCAL PANEL
RELAY FUNCTION =SUMMING
MULTIFUNCTION LOGIC FOR EMERGENCY SYSTEMS
LP
002 SIS INTERLOCK NO.002
I 001
FT 004
AND
"NAND" LOGIC GATE
SIGNAL INVERTER
PUSHBUTTON, MOMENTARY TYPE NORMALLY CLOSED CONTACT BLOCK
3. LOGIC SYMBOLS REPRESENT FUNCTIONAL AND OPERATIONAL SEQUENCE OF EVENTS AND DO NOT NECESSARILY REFLECT ACTUAL LOGIC GATES.
C
4. STATE OF LOGIC IS SHOWN AT LOGIC "0" WITH POWER OFF AND ALL INPUTS AND OUTPUTS IN THE FAIL SAFE CONDITION. 5. ALL CONTACTS THAT REQUIRE ANNUNCIATOR POINTS AND/OR VALVE STATUS LIGHTS SHALL BE EITHER DOUBLE-POLE FOR INTERLOCK AND THE OTHER FOR ANNUNCIATOR OR STATUS LIGHT, OR DIRECT INPUT TO PLC WITH REPEATED OUTPUT TO AUXILIARY DEVICE.
ANNUNCIATOR [FIRST OUT] S ANNUCIATOR [STANDARD]
DCS INTERLOCK NO.001
*E HEAT TRACED TRANSMITTER
SNAP ACTING RELAY ON TEMP. TRIP SYSTEM
* - E SYMBOL USED WHEN TRACING POWER COMES FROM EMERGENCY SYSTEM.
GENERAL_INSTRUMENTS_SYSTEMS FUNCTION IN DCS SYSTEM DISPLAY TO OPERATE
INSTRUMENT ABBREVIATION DCS STATUS LIGHT A/S - INSTRUMENT AIR SUPPLY
SP - REMOTE SET POINT
FE - FLOW ELEMENT
RTD - RESISTANCE TEMPERATURE DETECTOR
FO - FLOW RESTRICTION ORIFICE
V
SIS - SAFETY INSTRUMENTED SYSTEM
INSTRUMENT IDENTIFICATION_NUMBERS
- WITH VENDOR SUPPLIED EQUIPMENT
THE IDENTIFICATION NUMBER FOR LOOPS WILL HAVE SIX DIGITS, THE FIRST THREE BEING UPGRADER COMPLEX UNIT NUMBER. THE FOLLOWING THREE DIGITS WILL PROVIDE A SINGLE SEQUENCE OF LOOP NUMBERS FOR EACH PROCESS VARIABLE IDENTIFICATION OF EACH LOOP. THE LOOP NUMBERING SEQUENCE WILL BEGIN WITH THE NUMBER 001 FOR EACH PROCESS VARIABLE IDENTIFICATION FOR EACH UNIT, INCLUSIVE OF THE FOLLOWING LOCAL INSTRUMENTS. PG - PRESSURE GAUGES
IDENTIFICATION LETTERS:
B
TG - DIAL THERMOMETER
HS - HAND SWITCH OR PUSH BUTTON L - INDICATING LIGHT, IF ASSOCIATED WITH HAND SWITCHES OR PUSH BUTTONS OR ALARM IF USED FOR ALARM AL, ALH
TXE 147
NOTES
TW - TEMPERATURE TEST WELL LG - LEVEL GAUGES FI
- PURGEMETERS
NOTES
FG - SIGHT FLOW GLASS
1. THE SWITCH/LIGHT FUNCTION SHALL BE SHOWN OUTSIDE OF CIRCLE
FO - FLOW ORIFICE
START HAND MANUAL STOP OFF TRIP 2. SOME TYPICAL FUNCTIONS ARE: RUN AUTO RESET READY JOG ARMED FUNCTIONAL ABBREVIATIONS MAYBE USED: -S/S - START/STOP -HOA - HAND-OFF-AUTO 3. NUMBERING SHALL FOLLOW THE SAME PROCEDURE AS INSTRUMENTS.
PSE - RUPTURE DISC RV - PRESSURE SAFETY VALVE FSV - EXCESS FLOW VALVE RV - RELIEF VALVE (SYMBOL REF. DWG. 245.0000.000.041.001)
4. FOR MOTOR CONTROL SWITCHES AND LIGHTS, ONLY PANEL MOUNTED ITEMS ARE SHOWN ON P&ID'S EXCEPT WHERE LOCAL DEVICES ARE OTHER THAN START/STOP. ALL LOCAL DEVICES ARE THE RESPONSIBILITY OF THE ELECTRICAL DEPT.
R/S
HIS 110
HARDWIRED INTERLOCK SYSTEM
DESCRIPTION
UNIT NO.
HOA HS 110
CKD
PRS
HIS 111
TO PUMP P-100A MOTOR
E
SIS INTERLOCK
HEXAGON DENOTES COMPUTER OR RTU FUNCTION
4
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
HOA
I
HS 111
A
INTERLOCK NUMBERS ARE SIX DIGITS AND ARE ASSIGNED BY THE INSTRUMENT DEPARTMENT. THE FIRST THREE DIGITS DESIGNATE THE UNIT AND THE LATTER THREE ARE SEQUENTIAL, COMMENCING AT 001 IN EACH UNIT. THE FIRST THREE DIGITS ARE OMITTED ON THE P&ID. R
EXAMPLE DCS OR PLC INTERLOCK
MC
PDP
WITH THE EXCEPTION OF HAND SWITCHES, FOR INSTRUMENTS THAT ARE LOCATED ON IDENTICAL PARALLEL EQUIPMENT, THE IDENTICAL INSTRUMENTS ON EACH PIECE OF EQUIPMENT SHALL BE NUMBERED XXXA, XXXB, XXXC ETC. EXAMPLE: PARALLEL INSTRUMENTS SHALL BE NUMBERED 017A, 017B & 017C.
R/S
DUAL FUNCTION (FOR SERVICES) INSTRUMENT
I
CS
LOOP NO.
THE FIRST THREE DIGITS (UNIT NUMBER) WILL BE OMITTED FROM THE BALLOONS FOR IMPROVED READABILITY OF LOOP IDENTIFICATION NUMBERS. A GENERAL NOTE ON THE P&ID WILL REFERENCE THIS AND IDENTIFY THE OMITTED PLANT NUMBER. THE INSTRUMENT LOOP NUMBERS WILL THEN BE THREE DIGITS, I.E. 017.
HARDWIRED SHUTDOWN INTERLOCK SYSTEM
BY
FC-245 017
SEL
HS 112
ISSUED DATE
EXAMPLE
LETTER CODE PER TABLE 6.
A 05/08/10 ISSUED FOR REVIEW REV
5. INDICATING LIGHTS SHALL BE COLOR CODED AS FOLLOWS: RUNNING/OPEN - BLUE STOPPED/CLOSED - YELLOW
FUNCTION IN DCS SYSTEM NOT REQUIRED TO BE DISPLAYED TO OPERATE
E
"NOR" LOGIC GATE
2. ALL ELECTRICALLY AND ELECTRONIC CONTROLLED DEVICES ARE SHOWN IN THE DE - ENERGIZED CONDITION PRIOR TO START-UP POSITION, UNLESS OTHERWISE SPECIFICALLY NOTED.
F
MOTOR CONTROL DISPLAYS IN THE DCS ARE DESIGNATED AS BELOW: - SOFT HAND SWITCH OR R/S HIS PUSH BUTTON WITH 401 RUN/STOP ACTION AND RUN STOPPED STATUS DISPLAY MOTOR CONTROL ITEMS ON LOCAL PANEL OR FIELD MOUNTED ARE DESIGNATED AS BELOW: STOP - ILLUMINATED PUSH BUTTON RUN - INDICATING LIGHT HS L WITH STOP ACTION LOCAL PANEL MOUNTED 402 403 LP LP HOA - LOCAL HAND-OFF-AUTO HS TO MOTOR 404 (ONE BALLOON CAN REPRESENT MORE THAN ONE FUNCTION)
SNAP
AUXILIARY LOCATION NORMALLY INACCESSIBLE TO AN OPERATOR
I
OR
1. GRAPHICS LOGIC SHOWN ON DWGS. CONFORM TO ISA GRAPHIC SYMBOLS.
RESISTOR
MOTOR CONTROL
FX
E
D
DCS ALARM
INSTRUMENTS SYMBOLS
8
"AND" LOGIC GATE
LEVEL SWITCH, SPST OPENS ON DECREASING LEVEL FLOW SWITCH, SPST OPENS ON DECREASING FLOW
PUSHBUTTON, MOMENTARY TYPE NORMALLY OPEN CONTACT BLOCK
TYPICAL CUTBACK CONTROL REPRESENTATION SEE APPLICABLE P&ID FOR COMPLETE INTERACTION.
IS USED WITH T AS TW FOR TEMPERATURE WELL.
INSTRUMENT FUNCTION PI 113 LOOP NO. FIELD OR LOCAL INSTRUMENT
AND
GENERAL NOTES FOR FUNCTIONAL LOGIC DIAGRAMS
PRESSURE SWITCH, SPST OPENS ON DECREASING PRESSURE
ELECTRICAL ACCESSORIES, COIL RELAYS, AMPLIFIERS AND I/P TRANSDUCERS AT CONTROL VALVES, ARE NORMALLY OMITTED ON THE P&ID. THE LATTER MAY BE SHOWN FOR THE LOOPS, WITH TWO OR MORE VALVES OR SEPARATE DEVICES, OR WITH THE AIR SIGNAL GOING TO AN INSTRUMENT PRIOR TO THE VALVE. THE BALLOONS MAY BE DRAWN TANGENTIALLY TO SHOW A COMMON INSTRUMENT WHERE PRACTICAL. FAILURE ACTION FOR SOLENOID AND PNEUMATIC 3-WAY INSTRUMENT VALVES WILL BE SHOWN WITH AND ARROW AND FO, FC, NOMENCLATURE- SIMILAR TO THAT USED FOR CONTROL VALVES.
7.
"OR" LOGIC GATE
CONTACTS
LIMIT SWITCH SINGLE - POLE SINGLE - THROW [SPST]
E LL
4.
OR
ELECTRONIC ALARM RELAY CONTACT OPEN ON POWER FAILURE AND ABOVE HI OR BELOW LO SET POINTS. CLOSED DURING NORMAL OPERATING LIMITS.
L
LTE
1. ALL REDUNDANT TRANSMITTERS HAVE DEVIATION ALARMS IN THE DCS. THE DEVIATION ALARMS ARE NOT SHOWN ON THE P&ID.
Y = AMBER B = BLUE KR
WILL BE USED FOR DIGITAL INPUT/OUTPUT TO MICROPROCESSOR BASED SYSTEMS. - I.E.- MECHANICAL EQUIPMENT ON/OFF MANUAL CONTROL OR EQUIPMENT STATUSRUN/STOP.
N-
S-
FOR ELABORATE CONTROL SYSTEMS A SEPARATE DRAWING (EITHER VENDOR OR CONTRACTOR) MAY BE REQUIRED. IN SUCH A CASE, A BLOCK WILL BE DRAWN ON THE P&ID WITH A DRAWING NUMBER IDENTIFICATION AND SHOWING ALL THE INPUT AND OUTPUT SIGNALS.
1
NUMBER DISPLAYED IN OR NEXT TO A SYMBOL REPRESENTS THE LOGIC GATE NUMBER.
TO PUMP P-100B MOTOR
START/STOP AND H-O-A HAND SWITCHES FOR PUMP "A" WILL HAVE A SEQUENTIAL NUMBER. A DIFFERENT SEQUENTIAL NUMBER IS USED FOR PUMP "B". THE DCS SOFT DEVICE BLOCK TAG WILL NOT HAVE A SUFFIX (I.E. HS-110) THE LOCAL HAND SWITCHES FOR H-O-A AND LOCAL START/STOP WILL HAVE SUFFIX STARTING WITH A (I.E. HS-110A). COMMON HAND SWITCH FOR BOTH PUMPS (I.E. SELECTOR SWITCH) WILL HAVE ITS OWN SEQUENTIAL NUMBER.
I
I
001
002
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 200 - COMMON INSTR ID LETTERS SYMBOLS AND LOOP NO SCALE: NONE SHELL DWG NO.:
3
2
200.0000.000.041.008
1
REV.
A
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.008.pid MODEL DATE:2/1/2011 4:22:31 PM BY:ahm14887
BV BX BY BZ
CURRENT
BS
F FF FQ G FA FFA FQA GA FAL FFAL FQAL GAL FC FFC FQC GC FCV FE GE FG FI FFI FQI GI FIC FFIC FQIC GIC FIK FFIK FQIK GIK FIS FFIS FQIS GIS FIT FFIT FQIT GIT FR FFR FQR GR FRC FFRCFQRC GRC FRS FFRS FQRS GRS FRT FFRT FQRT GRT FS FFS FQS GS FSL FFSL FQSL GSL FT FFT FQT GT FV FFV FQV GV FX FFX FQX GX FY FFY FQY GY FZ FFZ FQZ GZ
HAND
BE BG
GAUGING
E EA EAL EC EI EIC EIK EIS EIT ER ERC ERS ERT ES ESL ET EV EX EY EZ
FLOW TOTAL
D DA DAL DC DE DI DIC DIK DIS DIT DR DRC DRS DRT DS DSL DT DV DX DY DZ
FLOW RATIO
C CA CAL CC CE CI CIC CIK CIS CIT CR CRC CRS CRT CS CSL CT CV CX CY CZ
FLOW
VOLTAGE (EMF)
B BA -C
1. AS A GENERAL GUIDE, THE EXTENT OF INSTUMENTATION SHOWN ON THE P&ID SHOULD BE SUFFICIENT TO PERMIT THE OBSERVER TO IDENTIFY THE MAIN COMPONENTS AND THE FINAL READOUT CONTROL AND/OR ALARM ACTION AND TO UNDERSTAND THE FULL FUNCTION OF THE INSTRUMENT SYSTEM. IDENTIFICATION OF ALL COMPONENTS AND THE FULL SCHEMATIC RELATIONSHIP ARE SHOWN ON THE INSTRUMENT HARD WIRED LOOP DWGS.
LEGEND FOR FUNCTIONAL LOGIC DIAGRAMS
200.008
C
DENSITY
D
A AA AAL AC AE AI AIC AIK AIS AIT AR ARC ARS ART AS ASL AT AV AX AY AZ
CONDUCTIVITY
INSTRUMENT FUNCTION ALARM ALARM LOW (L), MEDIUM (M), HI (H) CONTROL CONTROL VALVE (SELF OPERATING) ELEMENT GAUGE GLASS (TUBE) INDICATOR INDICATING CONTROLLER INDICATING CONTROL STATION INDICATING SWITCH INDICATING TRANSMITTER RECORDER RECORDING CONTROLLER RECORDING SWITCH RECORDING TRANSMITTER SWITCH SWITCH LOW (L), MEDIUM (M), HI (H) TRANSMITTER CONTROL VALVE OR DAMPER MISCELLANEOUS RELAY TRANSDUCER ETC DRIVE OR ACTUATOR
BURNER FLARE
ANALYZER
MEASURED VARIABLES
1
4
3
2
1
IN LINE AND TANK MOUNTED INSTRUMENTS PNEUMATIC OR ELECTRONIC PER PROJECT REQUIREMENT
FLOW
LEVEL
PRESSURE
TEMPERATURE
CONT.
1. INSTRUMENT TAG REQUIRED FOR INTEGRAL DESUPERHEATING VALVE. 2. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL DESCRIPTION.
FE 169 ORIFICE PLATE WITH FLANGE TAPS
SOLENOID OPERATED DIAPHRAGM VALVE WITH SMART POSITIONER FAILS CLOSED
D
FE 169
GAUGE GLASS EXTERNALLY CONNECTED
LG 018
ORIFICE PLATE COMPLETE WITH LOCAL FLOW INDICATOR
TE 577
PRESSURE GAUGE DIRECT CONNECTED
TE 578
TE 579
TANK PSE 046 TANK
FC FE 172
FO DIAPHRAGM GLOBE WITH SMART POSITIONER WITHOUT HANDWHEEL FAILS OPEN
RUPTURE DISC
ORIFICE PLATE WITH VENA CONTRACTA RADIUS OR PIPE TAPS
LG 020
MAG
FE 173
FL
WATER SLIDE VALVE
HP STEAM
TANK
FV 001
PP 045 LT 020
TYPICAL FLOW LOOP
WINTERIZED LEVEL TRANSMITTER EXTERNAL FLOAT
TANK
TEMPERATURE FC 006
VENTURI TUBE OR FLOW NOZZLE MOTOR OPERATED (MOV) VALVE WITH HANDWHEEL
LEVEL TRANSMITTER DP TYPE
TANK
FT 179
PCV 420
LT 324 LEVEL TRANSMITTER DP TYPE WITH BUBBLER SYSTEM & DIP TUBE
FLUME
PCV 421
LY 324 WITH EXTERNAL PRESSURE TAP
FI 087
ROTAMETER OR PURGEMETER WITH NEEDLE VALVE ON INLET
TI 067
087
FT 184 TSE 536
TANK
LEVEL
TANK
LCV 314
LEVEL REGULATOR WITH MECHANICAL LINKAGE
FT 001
S
TG 069
LEVEL INDICATOR FLOAT WITH WIRE AND PULLEY
LI 325
A 05/08/10 ISSUED FOR REVIEW TEMPERATURE TRANSMITTER WITH TW & TE TT 070
LS 327
FLOW SIGHT GLASS
STRAIGHTING VANES (STVANES)
CORIOLIS (CORIO) M
L
CAPACITANCE, DIELECTRIC OR CONDUCTIVITY TYPE SWITCH
TANK
SP
ISSUED DATE
DESCRIPTION
101
101
TTE 311
TTE 311
P&ID ABBREV.
ACTUAL
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT FC 011
FX 011
E
CKD
FV 004
FE 004
FLOW COMP HH
BY
FC 004
TYPICAL LEVEL - FLOW CASCADE LOOP. WINTERIZED
TI 311
E
WEDGE (WEDGE)
H
FT 004
INLINE FLOWMETER WITH INTEGRAL TRANSMITTER
POSITIVE DISPLACEMENT (POSDISPL)
LC 002
LT 002
A R
LX 329
TANK
TANK
LT 329
RADIOACTIVE OR SONIC SOURCE
TAHH 311
TI 009
TT 009
PI 010
FE 011
FT 011
PT 010
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 200 - COMMON ID LETTERS SYMBOLS AND LOOP NO.
FV 010
MAGNETIC TEMPERATURE AND PRESSURE COMPENSATION
4
B
ADDITIONS / MODIFICATIONS
R
REV
FIXED RESTRICTION ORIFICE
VORTEX
I 003
TYPICAL FLOW LOOP INCLUDING DCS INTERLOCK
TANK
FO 185
FUSIBLE PLUG OR DISC
FYI 001
FO
TEMPERATURE (REFER TO PROJECT DWG. 245.0000.000.041.002)
L
THERMOMETER
POSITIVE DISPLACEMENT METER
FG
H
FV 001
FQI 182
PVSV 025
TYPICAL FLOW LOOP INCLUDING SIS INTERLOCK & SOLENOID VALVE
AI
TANK
TURBINE OR PROPELLER FLOW METER
VAC
FO
FILLED SYSTEM WITH WELL
FT 180
RV 024
R
FV 006
FC 001
PRESSURE RELIEF VALVES RV 023
S
TE 066
FE 186
SELF-CONTAINED
PRESSURE/VACUUM SAFETY VALVE SIZE AND SET PRESSURES
FT 006
TEMPERATURE ELEMENT WITH OR WITHOUT WELL (NOT CONNECTED TO SECONDARY INSTRUMENT)
ULTRASONIC FLOW METER
FYE 006
002
LT 323
SELF-ACTUATED REGULATORS
VACUUM RELIEF SAFETY VALVE SIZE AND SET PRESSURE
L
E
TW 064
WEDGE
SIZE AND SET PRESSURE
H
TEMPERATURE TEST CONNECTION WITH WELL
FE 178
(REFER TO PROJECT DWG. 245.0000.000.041.002)
C
FC
PRESSURE POINT
FE 177
M
L
FT 001
EXCESS FLOW VALVE
BUTTERFLY VALVE WITH SMART POSITIONER WITH HANDWHEEL FAILS CLOSED
H
FC 001
PRESSURE GAUGE DIAPHRAGM SEAL LINE MOUNTED
FSV 099
LP STEAM
FC
LEVEL TRANSMITTER INTERNAL FLOAT SIDE CONNECTION
LT 322
PITOT OR PITOT VENTURI OR ANNUBAR
DESUPERHEATER (DESUPER)
C
MICROPROCESSOR (DCS/PLC) BASED SYSTEM
PURGEMETER OR ROTAMETER
1
TYPICAL LOOPS
PG 044
FE 176
PCV 999
THERMAL RADIATION TYPE TEMPERATURE ELEMENT
REMOTE PRESSURE GAUGE WITH CAPILLARY & LINE MOUNTED DIAPHRAGM SEAL
ORIFICE PLATE CONNECTED TO DIFFERENTIAL PRESSURE FLOW TRANSMITTER FI 081
TE 581
PG 043
FT 173
DOUBLE ACTING CYLINDER THREE WAY VALVE FAILS LOCKED IN LAST POSITION
SINGLE ACTING CYLINDER ANGLE VALVE FAILS CLOSED
SIZE AND SET PRESSURE
FURNACE
LEVEL INDICATOR MAGNETIC TYPE
TANK
FC
D
MULTI-ELEMENT THERMOCOUPLE FOR DIFFERENT ELEVATIONS WITH WELL IN TANK
3
2
FO
SCALE: NONE SHELL DWG NO.:
200.0000.000.041.009
1
REV.
A
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.009.pid MODEL DATE:2/1/2011 4:21:15 PM BY:ahm14887
s
PG 042
200.009
CONTROL VALVE
4
3
2
1
1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL DESCRIPTION.
PIPING AND INSTRUMENT DIAGRAM (P&ID) SYMBOLS
D TXT NO.
FIELD INSTRUMENT (INSTR1)
I I
D
CURRENT TO CURRENT TRANSDUCER (FDR1)
FUNCTION DESIGNATIONS FOR RELAYS
(ISA S5.1)
THE FUNCTION DESIGNATIONS ASSOCIATED WITH RELAYS SHALL BE USED AS FOLLOWS, INDIVIDUALLY OR IN COMBINATION
NO.
TXT NO.
I
LP
K
INSTRUMENT ON LOCAL PANEL (INSTR3)
X
BACK OF PANEL OR RACK MOUNTED INSTRUMENT (INSTR4) PROGRAMMABLE LOGIC TYPE INTERLOCK SYSTEM (INTLOCK4)
WINTERIZED
NO.
PROPORTIONAL (FDR5)
n
A D
E I
d dt
C f(x)
f(t)
REV
A M
R
1.
EXPONENTIAL (FDR6)
SYMBOL 1-0 or ON - OFF
FUNCTION AUTOMATICALLY CONNECT, DISCONNECT, OR TRANSFER ONE OR MORE CIRCUITS PROVIDED THAT IS NOT THE FIRST SUCH DEVICE IN A LOOP
2.
or ADD
ADD OR TOTALIZE (ADD AND SUBTRACT)
3.
or DIFF
SUBTRACT * *
ANALOG TO DIGITAL (FDR7)
4. 5.
AVG.
AVERAGE
VOLT TO CURRENT TRANSDUCER
6.
% or 1:3 or 2:1 [TYPICAL]
GAIN OR ATTENUATE (INPUT : OUTPUT) *
DERIVATIVE (FDR10)
BIAS *
7.
MULTIPLY * *
8.
DIVIDE * *
9.
SQ. RT.
EXTRACT SQUARE ROOT
EXTRACT SQUARE ROOT (FDR11)
10.
n 1/n X or X
RAISE TO POWER
11.
f(x)
CHARACTERIZE
NONLINEAR OR UNSPECIFIED FUNCTION (FDR12)
12.
1:1
BOOST
13.
or HIGHEST (MEASURED VARIABLE)
HIGH- SELECT. SELECT HIGHEST (HIGHER) MEASURED VARIABLE (NOT SIGNAL, UNLESS SO NOTED).
FUNCTION OF TIME (FDR13)
14.
or LOWEST (MEASURED VARIABLE)
LOW- SELECT. SELECT LOWEST (LOWER) MEASURED VARIABLE (NOT SIGNAL, UNLESS SO NOTED).
15.
REV.
REVERSE
16.
A/D or D/A
FOR INPUT / OUTPUT SEQUENCES OF THE FOLLOWING: A - ANALOG, D - DIGITAL
REVERSE (FOR14)
17.
INTEGRATED (TIME INTEGRAL)
AUTO MANUAL (FDR15)
18.
D or d/dt
DERIVATIVE OR RATE
19.
I/D
INVERSE DERIVATE
RESET FOR LATCH TYPE SOLENOID (FDR16)
20.
AS REQUIRED
UNCLASSIFIED
*
USED FOR SINGLE - INPUT RELAY.
**
USED FOR RELAY TWO OR MORE INPUTS.
SUMMATION (FDR17)
X
MULTIPLY (FDR18)
1:1
BOOST (FDR19)
C
B
HIGH SELECTION (FDR20)
I P
P I
CURRENT TO PNEUMATIC TRANSDUCER (FDR21) PNEUMATIC TO CURRENT TRANSDUCER (FDR22)
A 05/08/10 ISSUED FOR REVIEW REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
LOW SELECTION (FDR24)
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 200 - COMMON FUNCTION DESIGNATIONS SCALE: NONE SHELL DWG NO.:
4
3
2
200.0000.000.041.010
1
REV.
A
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.010.pid MODEL DATE:1/5/2011 10:21:29 AM BY:ahm14887
TXT
FRONT PANEL INSTRUMENT (INSTR2)
200.010
TXT NO.
4
3
2
1 NOTES:
DEMISTER CENTRIFUGAL COMPRESSOR WITH GUIDE VANES (COMPC)
D
T
RECIPROCATING PUMP (PMPRECIP)
STEAM TURBINE (STMTUR)
DISTRIBUTOR TROUGH & TRAY LIQUID SPRAY (PERFORATED)
VERTICAL VESSEL BASIC SYMBOL (VES)
LIQUID SPRAY (NOZZLE)
TOTAL DRAW-OFF VACUUM PUMP (PMPVAC)
PARTIAL DRAW-OFF
TURBINE WITH PNEUMATIC SPEED CONTROL (STMTURPN)
T
SPHERE (SPHERE)
CHIMNEY
TOP SUCTION/DISCH. PUMP (PMPTT)
HALF PIPE MANWAY (MANWAY)
CENTRIFUGAL FAN OR BLOWER (CFB)
HIGH SPEED CENTRIFUGAL PUMP (PMPHSC)
VANE TYPE INLET (HORIZONTAL) VESSEL SWAGED (VESSWG)
VANE TYPE INLET (VERTICAL)
RECIPROCATING COMPRESSOR (RCOMP)
DIFFUSER
OPEN TANK (TKOPEN)
CONICAL ROOF TANK (TK)
C
CYCLONE
CENTRIFUGAL CANNED PUMP (PMPCCAN)
TRAYS
SHELL & TUBE (HORIZONTAL) (STHORIZ)
PACKED SECTION
REDISTRIBUTION (LIQUID/LIQUID)
TRAY WITH DOWNCOMERS
REDISTRIBUTION (GAS/LIQUID)
1) SINGLE PASS
BAFFLE WITH PARTITION
OPEN TOP FLGATER (TKOPF)
INTERNAL FLGATER (TKGF)
CETRIFUGAL SIDE IN/OUT BETWEEN BEARING PUMP
DOLLAR PLATE
GENERAL GRID SIEVE VALVE BUBBLE CAP
ROTARY LOBE BLOWER (RLB)
VERTICAL IN-LINE CANNED PUMP (PMPICAN)
VORTEX BREAKER
DOUBLE PIPE (DPIPE) INTERNALS WHEN DRAWN TO BE DASHED
EXAMPLES: METERING PUMP (PMPMETER)
2) TWO PASSES
INDICATION OF POINT OF CHANGE
G
NON-INTEGAL GEAR BOX (GEARBOX) VENDOR
INJECTION PUMP (PMPINJEC)
KETTLE REBOILER (REBOIL)
FIRED HEATER DEPICTION (HTRFIRE)
M ELEVATION FROM FINISHED SURFACE AT GRADE
VERTICAL SUMP PUMP (PMPSUMP)
1. ALL EQUIPMENT SHALL BE REPRESENTED BY A TAG NUMBER. COMPOSED OF A LETTER PLUS A NUMBER. THE FIRST THREE DIGITS OF WHICH ARE THE PLANT NUMBER AND THE FINAL TWO DIGITS ARE A NUMBER RUNNING CONSECUTIVELY FROM 01 FOR EACH GROUP OF EQUIPMENT. 2. WHERE A CHOICE BETWEEN TWO OR MORE LETTERS HAS TO BE MADE THE MORE IMPORTANT FUNCTION SHOULD PREVAIL FOR EXAMPLE, IF A JET IS USED FOR MIXING PUPPOSES, Mx IS USED OVER I. 3. DRIVERS ARE NUMBERED BY THE DRIVER EQUIPMENT AND TYPE OF DRIVER. E.G. EM-MOTOR FOR AIR COOLER, CT-TURBINE MOTOR FOR AIR COOLER, CT -TURBINE FOR COMPRESSOR, PM-PUMP MOTOR, EF-AIR COOLER FAN.
LETTER OF GROUP
DECSRIPTION
B
FIRED BOILERS
C
COMPRESSORS & BLOWERS LIQ RING VAC PUMP
CG
COMPRESSOR GEARS
CT
COMPRESSOR TURBINE
CM
COMPRESSOR MOTOR
E
EXCHANGERS, HEAT TRANSFER EQUIPMENT
EG
EMERGENCY GENERATOR
EM
EXCHANGER MOTOR
ER
EMERGENCY EQUIPMENT.
F
AIR COOLER FANS AND COOLING TOWER FANS
G
GENERATORS
GT
GAS TURBINE GENERATOR
H
FIRED HEATERS, INCINERATORS
I
JETS (INJECTORS & EJECTORS)
M
MOTORS
ME
ELECTRIC MOTORS
MF
FAN MOTOR
MM
MIXER MOTORS
Mx
MIXERS, AGITATORS
P
PUMPS
PG
PUMP GEARS
PM
PUMP MOTORS
PT
PUMP TURBINE
S
SPECIAL (SILENCERS, STACKS, PACKAGE UNITS DETONATION ARRSTOR FLAME ARRSTOR, STATIC MIXER STRAINER, SUMP)
3) CALMING SECTION CHANGE IN RESPONSIBILITY
PACKED COLUMN BASIC SYMBOL
ST
STEAM TURBINE
PLATE & FRAME (PLATEEXCH)
T
TURBINE
Tk
TANKS (ATMOSPHERIC)
V
VESSELS INCLUDING COLUMNS, PRESSURE STORAGE & FILTERS
HIC
X
STATIONARY TRANSPORT EQUIPMENT
XM
STATIONARY TRANSPORT EQUIPMENT MOTOR
XZ
BULK LOADING ARM MOTOR
Z
BULK LOADING ARMS
FORCED DRAFT SINGLE (COOLER) BAY AIR COOLER
SEPARATE CONVECTION COIL
(LOUVERS AS REQUIRED)
LOADING ARM (LOADARM)
TRUCK LOADING STATION (TRKLOAD)
FILTER (FLT)
15 14
VFD
VERTICAL CYLINDRICAL NATURAL DRAFT FURNACE WITH SEPARATE (HORIZONTAL OR CROSS FLOW) CONVECTION SECTION
VARIABLE/SINGLE SPEED MOTOR SHOWN AS REQUIRED VFD_VARIABLE FREQUENCY DRIVE
TYPICAL ARRANGEMENT SHOWN ACTUAL SYMBOL TO CONFIRM TO CORRECT CONFIGURATION
TYPICAL ARRANGEMENT SHOWN ACTUAL SYMBOL TO CONFIRM TO CORRECT CONFIGURATION
TRAYED COLUMN BASIC SYMBOL TRAY NUMBERS FROM BOTTOM
1
EJECTOR/INJECTOR EDUCTOR BASIC SYMBOL (EJECTOR) OIL MIST DISTRIBUTION BLOCK WITH 2 RECLASSIFIERS. ADD RECLASSIFIERS AS REQUIRED. (OILMIST)
IN-LINE STATIC MIXER (INMIX) TANK MIXER (TKMIX) ELECTRIC MOTORS AC MOTOR *VFD FOR VARIABLE FREQUENCY DRIVE (EM)
E
AIR ELIMINATOR (AIREL)
4. EQUIPMENT NUMBERING ON FLOW DAIGRAMS SHOULD PREFERABLY BE DONE FROM LEFT TO RIGHT. EXAMPLE OF EQUIPMENT NUMBERING: V-41101. V-EQUIPMENT DESIGNATION (REFER TO PARAGRAPH 1) 41101- VESSEL No. 01 IN PROCESS UNIT 411. EQUIPMENT SPARING WILL BE SHOWN AS FOLLOWS: EXAMPLE: (PUMP) P-41112A, B, C, ETC. ANY EXISTING EQUIPMENT WHICH IS TO BE REPLACED WITH NEW EQUIPMENT IN THE SAME SERVICE WILL RETAIN ITS OLD EQUIPMENT NUMBER WITH THE EXCEPTION THAT A "R" WILL BE ADDED TO THE END. IE) E-42011 WILL BECOME E-42011R. ANY EQUIPMENT THAT IS BEING COMPLETELY REMOVED FROM SERVICE WILL HAVE ITS NUMBER RETIRED AND NOT REUSED FOR OTHER EQUIPMENT. FOR REUSED EQUIPMENT IN THE SAME UNIT, THE EQUIPMENT NUMBER WILL STAY THE SAME AND THE SERVICE DESCRIPTION WILL CHANGE. REUSED EQUIPMENT TO BE USED IN A DIFFERENT UNIT WILL RECEIVE A NEW EQUIPMENT NUMBER AND SERVICE DESCRIPTION, THAT IS CONSISTENT WITH THE UNIT THAT IT IS BEING INSTALLED IN.
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A
STEAM DRUM
R
ROTATING DISC CONTACTOR
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
MUD DRUM SHELL & TUBE VERTICAL (OVHD_EXCH)
SYNCHRONOUS MOTOR *DC FOR DC MOTORS (EMDC)
4
B
ADDITIONS / MODIFICATIONS
A 05/08/10 ISSUED FOR REVIEW
TIC
MAP AV
ROTARY SCREW COMPRESSOR (COMPROTS)
C
T.L. ELEV. (TYP.)
24 ROTARY SCREW PUMP (PMPROTS)
D
SWIRL DECK
VORTEX BREAKER (VORTEX)
MULTISTAGE PUMP (PMPMULTI)
1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL DESCRIPTION.
3
UNIT 200 - COMMON FLOW DIAGRAM SYMBOLS FOR EQUIPMENT
SHELL & TUBE VERTICAL THERMOSYPHON (VERT_THER)
SCALE: NONE SHELL DWG NO.:
2
200.0000.000.041.011
1
REV.
A
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.011.pid MODEL DATE:2/1/2011 5:51:43 PM BY:ahm14887
CENTRIFUGAL PUMP (PMPCENT)
SCHOEPENTOETER HORIZONTAL VESSEL WITH BOOT (VESBOOT)
IDENTIFICATION OF EQUIPMENT
200.011
VERTICAL IN-LINE PUMP (PMPINL)
3 P
P
P
PIPING INSTR.
PIPING INSTR.
3/4"
PI 7
3/4"
7
SAMPLE BOMB (BY SHELL)
S-3
P
P
8
3/4"
3/4"
8
3/4"
3/4"
3/4"
3/4"
3/4"
SOUR LIQUIDS (SOUR WATER AMINE) BELOW 45°C
17
8
S-2
S-3
S-4
S-2
S-3
S-4
S-4A
P
FL
S-8
S-4A
SWEET/SOUR HYDROCARBON GAS/LIQUID BELOW 45°C
HYDROCARBONS 45°C AND ABOVE
LIQUID HYDROCARBONS BELOW 45°C
SWEET/SOUR HYDROCARBON GAS/LIQUID BELOW 45°C
P
S-1
LIQUID HYDROCARBONS AND WATER BELOW 45°C
S-8
17
3/4"
S-1
SAMPLE BOTTLE (BY SHELL)
S-4A
SWEET/SOUR HYDROCARBON GAS/LIQUID BELOW 45°C
17
P
FL
MAIN LINE CLASS
S-4
HYDROCARBONS 45°C AND ABOVE
17
3/4"
MIN. 3/4"
3/4" CWS
3/4"
FL MAIN LINE CLASS
AU
16
13
SAMPLE BOMB (BY SHELL) 3/4"
16
2
LIQUID HYDROCARBONS BELOW 45°C
3/4"
7 PI
7
S-2
PI
7
CWR
13
LIQUID HYDROCARBONS AND WATER BELOW 45°C
PIPING INSTR.
3/4"
5 3/4"
3/4"
10
PIPING INSTR.
7
SHORT NIPPLE AND CAP
S-1
PIPING INSTR.
3/4"
3/4"
9
TG
P&ID WILL SHOW
PIPING INSTR.
PI
16
C
LOWER PRESSURE SIDE CLASS MAIN LINE CLASS
PIPING INSTR.
1. SEE DRAWING 200.0000.000.041.007, 008, 009, 010, & 011 FOR SYMBOL IDENTIFICATION AND GENERAL NOTES. 2. ARRANGEMENT S-1 TO BE USED ONLY WHERE THE SAMPLING VALVE CAN BE WELDED DIRECTLY TO A NORMALLY FLOWING LINE IN AN ACCESSIBLE LOCATION. TO BE CONFIRMED IN EPC. 3. BRIDGE WELD ALL ROOT VALVES TO THE MAIN LINE EXCEPT IN ARRANGEMENT LOCATION. TO BE CONFIRMED IN EPC. 4. SEWER CHOICE PER AVAILABILITY. 5. SAMPLE COOLER MODEL NO. LATER. 6. ALL SAMPLE POINTS TO BE LOCATED AT GRADE. WHERE POSSIBLE, INCORPORATE SAMPLE POINT WITH ANALYZER CONDITIONING TO REDUCE ADDITIONAL COOLING, ETC. WHERE POSSIBLE, SAMPLES TO BE COOLED BELOW 45°C FOR PERSONNEL PROTECTION. 7. PRESSURE LIMIT FOR SNAP- ON SAMPLE BOMB FITTINGS IS 45 MPa AT 65°C. FOR HIGHER PRESSURES USE DIRECT SCREWED BOMB CONNECTIONS. 8. SAMPLE CONNECTION ON TOP OF HORIZONTAL LINE FOR GAS. SAMPLE CONNECTION ON SIDE OF HORIZONTAL LINE FOR LIQUID SAMPLE. 9. DELETE SECOND VALVE WHEN ROOT VALVE IS ACCESSIBLE FROM THE SAMPLE VALVE. 10. THE TYPE OF FITTING (SOCKOLET OR WELDOLET WITH FLANGE) AND THE FIRST VALVE OR VALVES AT THE MAIN LINE SHALL BE AS PER VENT (OR DRAIN) REQUIREMENTS FOR THE MAIN LINE PIPING CLASS. SEE SPECIFICATION 245.0311.035.005. 11. THE STEEL CABINET IS TO BE COMPLETE WITH AN INTEGRALLY MOUNTED AIR EJECTOR. THE FRONT WALL TO BE A CLEAR PLASTIC DOOR. PROVIDE SLOTS IN THE FLOOR FOR VENTILATION. SEVERAL SAMPLING CONNECTIONS CAN BE BROUGHT INTO THE SAME CABINET. HOWEVER EACH CONNECTION MUST HAVE ITS OWN SPIGOT TO PREVENT CONTAMINATION. 12. ISOKINETIC SAMPLE PROBE (JONAS) REQUIRED FOR STEAM SAMPLE. 13. SAMPLE LINE PIPING CLASS SHALL CORRESPOND TO THE PIPING CLASS OF THE MAIN LINE. 14. DO NOT MANIFOLD MORE THAN ONE SAMPLE LINE TO ONE COOLER TO PREVENT CONTAMINATION. 15. ADD APPROPRIATE WINTERIZATION AND PERSONNEL PROTECTION. 16. SAMPLING VALVES MUST BE CLOSE CONNECTED TO FAST LOOP (SAMPLING BYPASS). 17. ANY DEVICE OR INSTRUMENT THAT CREATES A PRESSURE DROP P TO ASSURE OF SUFFICIENT FLOW THROUGH THE FAST LOOP. P&ID SYMBOL MAY VARY ACCORDING TO DEVICE BEING USED.
MIN. 8m ABOVE GRADE
NC
13
(TYPICAL FOR ALL TYPES)
VA
8
NO
NO
3
PIPING INSTR.
NO
NO
PIPING INSTR.
PIPING INSTR.
3/4"
D
S-8
SWEET/SOUR HYDROCARBON GAS/LIQUID BELOW 45°C
SOUR LIQUIDS (SOUR WATER AMINE) BELOW 45°C
P
C
P
75 8
3/4"
3/4"
3" BLIND FLANGE
3/4" PIPE
PIPING INSTR.
3/4" VALVE
3/4"
9
CWR
CWS
PIPING INSTR.
5 CWR
CWR 3/4"
2" AND SMALLER 45°
IG
PI PI
3/4"
FLOW
16
9
3/4"
TG
LOWER PRESSURE SIDE CLASS MAIN LINE CLASS
PIPING INSTR.
3/4"
3/4"
5
MIN. 8m ABOVE GRADE AND AWAY FROM OPERATING PLATFORM
5
TO SAMPLE COOLER
3/4"
VA
3/4"
PIPING INSTR.
9
PIPING INSTR.
8
NO
PIPING INSTR.
NO
3/4"
MIN. DISTANCE FOR ACCESS
TG
AU 16
13
3/4"
APPLICATION AND DESCRIPTION
SAMPLE POINT ACTUAL DETAIL ARRANGEMENT
SEE DETAIL TO RIGHT
NO
FLOW
D
12
3/4"
7
13
7 3/4" FL
3/4"
3/4"
4
11 SAMPLE BOTTLE (BY SHELL)
CWS 3/4" VALVE
SAMPLE BOMB (BY SHELL)
CWS
MAIN LINE CLASS
MIN.
B S-9
S-12
SOUR LIQUIDS (SOUR WATER AMINE) 45°C AND ABOVE
17
17
P
P
SWEET/SOUR HYDROCARBON GAS/LIQUID 45°C AND ABOVE
17
P
8
8
A 05/08/10 ISSUED FOR REVIEW
S-5
S-9
S-5
S-9
STEAM AND CONDENSATE ABOVE 45°C
SOUR LIQUIDS (SOUR WATER AMINE) 45°C AND ABOVE
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
3/4"
3/4"
3/4"
3/4"
REV
3/4"
S-12
S-12 SWEET/SOUR HYDROCARBON GAS/LIQUID 45°C AND ABOVE
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 200 - COMMON STANDARD DETAIL - SAMPLING SYSTEMS SCALE: NONE SHELL DWG NO.:
4
3
2
200.0000.000.041.012
1
REV.
A
200.012
P&ID WILL SHOW
STEAM AND CONDENSATE AND HOT WATER ABOVE 45°C
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.012.pid MODEL DATE:2/1/2011 4:15:06 PM BY:ahm14887
S-5
12
3/4"
D
SAMPLE POINT ACTUAL DETAIL ARRANGEMENT APPLICATION AND DESCRIPTION
8
3
1
NO
P
2
NO
4
4
3
2
1
FIELD MOUNTED PRESSURE INSTRUMENT (PG, PT, PS, PP) EACH PRESSURE DIFFERENTIAL TAP IS AS SHOWN.
INST. PIPING
PIPING SPECS (UAB, UAZ, UAY, UJB, ULB)
ALL PIPING CLASSES
3
X"
3/4"
D
X"
3/4" X"
3/4"
3/4"
INST. PIPING
INST. PIPING
PIPING CLASSES (150#, 300#, 600#)
PIPING CLASSES (900#, 1500#, 2500#)
INST. PIPING
3/4"
PURGE
ALL PIPING CLASSES
BLEED
X"
1/2"
X"
3/4"
BLEED
X"
3/4"
INST. PIPING
INST. PIPING
X"
1/2" PURGE
BLEED
1/2"
X"
D
INST. PIPING
BLEED
1/2"
1. FOR GENERAL NOTES AND DETAILS SEE DWGS. 245.0311.000.053.005, 006, 007, 008, 009, 010, 011, 012, 013, 018 AND 019. 2. LEGEND: 3/4" - 3/4" 'PHOENIX' DOUBLE BLOCK & BLEED GAUGE VALVE. 1/2" - 1/2" 'SWAGELOK' DOUBLE BLOCK & BLEED GAUGE VALVE. 3. EXCEPT PIPING SPECS, UAB, UAZ, UAY, UJB, ULB. 4. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S. DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.
PURGE
PIPING CLASSES (150#, 300#, 600#)
C
PIPING CLASSES (900#, 1500#, 2500#)
C
FIELD MOUNTED TEMPERATURE INSTRUMENT (TG, TT) INST. PIPING
1"
1"
INST. PIPING 3/4"
3/4"
TT
2"
2"
TT
PIPING CLASSES (150#, 300#, 600#)
1-1/2"
PIPING CLASSES (900#, 1500#, 2500#)
TT
INST. PIPING
PIPING SPECS (150#, 300#, 600#, 1500#)
PIPING SPECS WITH THREADED CONNECTION
INST. PIPING
PIPING SPECS (1500#, 2500#)
ANALYZER CONNECTIONS AT
3/4"
PIPING INST.
X"x3/4"
PIPING INST.
X"x3/4" 3/4"
PIPING SPECS (UAB, UAZ, UAY, UJB, ULB) (FOR VESSEL CONNECTION)
AT
2"
PIPING CLASSES 3 (150#, 300#, 600#, 900#, 1500#) (FOR VESSEL CONNECTION)
2"
INST. PIPING
PIPING SPECS (150# TO 2500#)
INST. PIPING
B
PIPING SPECS (900# TO 2500#)
A 05/08/10 ISSUED FOR REVIEW 3/4"
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
PIPING INST.
X"x3/4"
REV
PIPING CLASSES (150#, 300#, 600#, 900#, 1500#) (FOR VESSEL CONNECTION)
SHELL CANADA QUEST CCS PROJECT
A PURGE IF REQUIRED 3/4"
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
PIPING INST.
UNIT 200 - COMMON PRESSURE INSTRUMENT CONNECTION DETAILS
PIPING CLASSES (1500#, 2500#) (FOR VESSEL CONNECTION)
4
SCALE: NONE SHELL DWG NO.:
3
2
200.0000.000.041.013
1
REV.
A
200.013
X"x3/4"
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.013.pid MODEL DATE:2/1/2011 4:13:45 PM BY:ahm14887
PURGE
4
3
2
1
LEVEL OR D/P INSTRUMENT ON VESSEL (PDT, LT,LTE)
4
D X"
3/4"
3/4"
INST. PIPING
1/2"
PIPING INST.
ALL PIPING CLASSES (150#, 300#, 600#, 900#, 1500#)
1/2"
3"
3"
3. EXCEPT PIPING SPECS, UAB, UAZ, UAY, UJB, ULB. 4. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S. DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.
INST. PIPING
BLEED
PIPING CLASSES (150#, 300#, 600#)
3
3"
- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.
D
3"
BLEED PIPING SPECS (UAB, UAZ, UAY, UJB, ULB)
3"
1/2"
4
3"
PIPING INST.
X"x3/4" 3/4"
3/4"
3"
3"
PIPING INST.
1/2"
3/4"
3/4"
X"
3/4"
X"x3/4" 3/4"
BLEED PIPING INST.
1/2"
PIPING INST.
PIPING INST.
BLEED
1. FOR GENERAL NOTES AND DETAILS SEE DWGS 245.0311.000.053.005, 006, 007, 008, 009, 010, 011, 012, 013, 018 AND 019. 2. LEGEND: 3/4" - 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.
PIPING CLASSES (600# H2 SERVICE, 900#, 1500#)
3/4"
3"
3"
3"
3"
1/2"
X"
PIPING INST.
PIPING INST.
1/2"
PURGE
3/4"
BLEED
INST. PIPING
4 X"
3/4"
3/4"
INST. PIPING
PURGE
BLEED PIPING CLASSES (150#, 300#, 600#, 900#, 1500#)
PIPING CLASSES (1500# , 2500#)
C
PIPING INST.
3/4"
3"
3"
3"
3"
1/2"
3/4"
PURGE
PIPING INST.
1/2"
BLEED
PURGE IF REQUIRED X"
C
INST. PIPING
4 X"
3/4"
3/4"
INST. PIPING
PURGE IF REQUIRED
PURGE
BLEED PIPING CLASSES (1500#, 2500#)
PIPING CLASSES (1500#, 2500#)
(1500#, 2500#) WITH UTILITY CONNECTION
PIPING INST. 3/4"
3/4" 2"
2"
MAG/ CAPACITANCE/ GUIDED WAVE
PIPING INST. 3/4"
PIPING INST. 3/4"
3/4"
D
3
PIPING CLASSES (600# H2 SERVICE, 900#, 1500#)
REV
ISSUED DATE
DESCRIPTION
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
PURGE
1/2"
3/4" V
2"
3/4"
2"
SHELL CANADA V
QUEST CCS PROJECT
A
INST. PIPING
2"
BLEED
PIPING INST.
INST. PIPING
3/4"
2"
PIPING CLASSES (600# H2 SERVICE, 900#, 1500#)
2"
2"
D
PIPING CLASSES (150#, 300#, 600#)
R
D
3
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 200 - COMMON LEVEL INSTRUMENT CONNECTION DETAILS SCALE: NONE SHELL DWG NO.:
3
2
200.0000.000.041.014
1
REV.
A
200.014
3"
GWR
3/4"
3"
GWR PIPING INSTR.
3"
PIPING SPECS (UAB, UAZ, UAY, UJB, ULB)
4
BY
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.014.pid MODEL DATE:2/1/2011 4:13:08 PM BY:ahm14887
PIPING CLASSES (150#, 300#, 600#)
PIPING INST.
3"
3/4"
1/2"
3/4"
3"
PIPING CLASSES (150#, 300#, 600#)
2"
PIPING INST.
4
BLEED
D
PIPING INSTR.
PURGE
1/2"
PIPING INST.
4
PURGE
2"
B
BLEED
3"
3"
2"
D
PIPING SPECS (UAB, UAZ, UAY, UJB, ULB)
3/4"
1/2"
3/4" 3"
2"
MAG/ CAPACITANCE/ GUIDED WAVE
V
A 05/08/10 ISSUED FOR REVIEW
BLEED PURGE
2"
V
3/4"
INST. PIPING
3/4"
PURGE IF REQUIRED
2"
3/4"
2"
PIPING INST.
2"
2"x3/4"
MAG/ CAPACITANCE/ GUIDED WAVE
PIPING INST. 3/4"
2"
3/4"
X"x2"
V
3/4"
X"x3/4"
PIPING INST.
3/4"
IF REQUIRED PURGE
PIPING INST.
LEVEL INSTRUMENT (LG/LT, LS)
4
3
2
1
ORIFICE FLANGE - MOUNTED FLOW MEASUREMENT (FT) FT
FT 1. FOR GENERAL NOTES AND DETAILS SEE DWGS. 245.0311.000.053.005, 006, 007 008, 009, 010, 011, 012, 013, 018 AND 019. 2. LEGEND: 3/4" - 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE. 1/2" - 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE. 3. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S. DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.
3/4"
INST. PIPING
PIPING INST.
INST. PIPING
D
3/4"
PIPING INST.
D
INST. PIPING
3/4"
3/4"
3/4"
INST. PIPING PIPING INST.
1/2" OR 3/4"
1/2" OR 3/4"
INST. PIPING
3/4"
FT
PIPING INST.
FE
FT
PIPING CLASSES (150#, 300#, 600#, 900#)
PIPING CLASSES (1500#, 2500#)
VENTURI - MOUNTED FLOW MEASUREMENT (FT) FT FT PURGE IF REQUIRED
FE
1/2" OR 3/4"
1/2" OR 3/4"
INST. PIPING
PIPING INST.
INST. PIPING
PIPING INST.
PIPING INST.
3/4"
PURGE IF REQUIRED
3/4"
INST. PIPING
PIPING INST.
FE
C
C
PIPING CLASSES (1500#, 2500#)
PIPING CLASSES
FT
FT
3/4"
PIPING INST.
FE
PIPING INST.
PURGE IF REQUIRED PIPING INST.
3/4"
1/2" OR 3/4"
INST. PIPING
3/4"
PURGE IF REQUIRED
INST. PIPING
3/4"
1/2" OR 3/4"
INST. PIPING
WEDGE - MOUNTED FLOW MEASUREMENT (FT)
PIPING INST. FE FT
PIPING CLASSES PIPING CLASSES (150#, 300#, 600#, 900#, 1500#) FT
FT
FT
B
PIPING INST.
X"
PIPING INST.
2"
1/2"
2"
3/4"
INST. PIPING
2"
1/2"
2"
2" PIPING INST.
INST. PIPING
BLEED
3/4"
3/4"
FE
BLEED
X"
BLEED
3/4"
PIPING INST.
3/4"
3/4"
PIPING INST.
INST. PIPING
1/2"
2"
INST. PIPING
2"
PIPING INST.
1/2"
2"
BLEED
3/4"
3/4"
INST. PIPING
A 05/08/10 ISSUED FOR REVIEW
PIPING INST.
FE
REV
FE
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
PIPING CLASSES (150#, 300#, 600#)
INST. PIPING
PIPING INST. 3/4"
3/4"
PURGE
X"
BLEED
BLEED
3/4"
INST. PIPING
3/4" PURGE
PIPING INST.
1/2"
PURGE
3
BLEED
QUEST CCS PROJECT
A PURGE
PIPING INST.
X"
FE
FE
PIPING CLASSES (150#, 300#, 600#)
PIPING CLASSES (900#, 1500#)
FT
4
SHELL CANADA
3/4"
PIPING INST.
PIPING CLASSES (150#, 300#, 600#, 900#, 1500#)
1/2"
2
PIPING INST.
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 200 - COMMON FLOW ELEMENT CONNECTION DETAILS SCALE: NONE SHELL DWG NO.:
200.0000.000.041.015
1
REV.
A
200.015
3/4"
PIPING CLASSES (900#, 1500#)
1/2"
2"
BLEED
PIPING INST.
INST. PIPING
2"
PIPING INST.
FE
1/2"
2"
INST. PIPING
2"
INST. PIPING
3/4"
FT
3/4"
FT
3/4"
3/4"
PIPING CLASSES (1500#, 2500#)
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.015.pid MODEL DATE:2/1/2011 4:12:18 PM BY:ahm14887
FT
4
3
2
1
WEDGE - MOUNTED FLOW MEASUREMENT (FT) 1. FOR GENERAL NOTES AND DETAILS SEE DWGS 245.0311.000.053.005, 006, 007, 008, 009, 010, 011, 012, 013, 018 AND 019. 2. LEGEND: 3/4" - 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.
FT
1/2" INST. PIPING
BLEED
2"
BLEED
3. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S. DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.
1/2" 2"
1/2"
D
D
PURGE IF REQUIRED 2"
2"
PURGE IF REQUIRED
- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.
PIPING INST.
X"
FE
PIPING CLASSES (1500#, 2500#)
FT
FT
BLEED
BLEED
BLEED
BLEED
INST. PIPING
1/2"
1/2"
1/2"
1/2"
BLEED
BLEED
BLEED
BLEED
3/4"
3/4"
2"
3/4"
3/4"
3/4"
3/4" 2"
2"
3/4"
INST. PIPING 2"
1/2"
3/4" 2"
1/2"
2"
1/2"
2"
1/2"
FT
2"
FT
C
C
X"
PIPING INST.
PIPING INST.
FE
FE
PIPING CLASSES (150#, 300#, 600#)
FT
PIPING CLASSES (900#, 1500#)
FT
1/2"
1/2"
1/2"
1/2"
BLEED
BLEED
BLEED
BLEED
3/4"
3/4"
FT
INST. PIPING
PURGE
PURGE
FT
1/2"
1/2"
1/2"
1/2"
BLEED
BLEED
BLEED
BLEED
3/4"
3/4"
3/4"
3/4"
PURGE
PURGE
X"
PIPING INST.
PURGE
3/4"
PURGE
INST. PIPING 3/4"
PURGE
PURGE
B
X"
PIPING INST.
PIPING INST.
FE
FE
PIPING CLASSES (150#, 300#, 600#)
FT
A 05/08/10 ISSUED FOR REVIEW
PIPING CLASSES (900#, 1500#)
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
FT
1/2"
1/2"
1/2"
1/2"
BLEED
BLEED
BLEED
BLEED
3/4"
3/4"
PURGE IF REQUIRED
X"
PIPING INST.
3/4"
PURGE IF REQUIRED
PURGE IF REQUIRED
INST. PIPING 3/4"
SHELL CANADA
PURGE IF REQUIRED
QUEST CCS PROJECT
A R
X"
PIPING INST.
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 200 - COMMON FLOW ELEMENT CONNECTION DETAILS
FE
SCALE: NONE SHELL DWG NO.:
PIPING CLASSES (1500#, 2500#)
4
3
2
200.0000.000.041.016
1
REV.
A
200.016
PIPING INST.
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.016.pid MODEL DATE:2/1/2011 4:06:58 PM BY:ahm14887
PIPING INST.
4
3
2
1
1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS.
D
D
HOA(TOA)
HIS
HOA(TOA)
SIS
ES
WINDING TEMP
C
SIS
VIB
VIB
VIB
TEMP
TEMP
TEMP
MCC
HOA(TOA)
C
VIB
TEMP
NON DCS STARTER CONTROL
DCS VFD CONTROL
HOA(TOA)
HIS
HS
HSZ
I
A/B
HIS
HOA(TOA)
HOA(TOA)
HOA(TOA) HS
SIS
SIS CONTROL
CONTROL
MONITORING
MONITORING
B MCC
ES
WINDING TEMP
MCC WINDING TEMP
ES
HS
VIB
VIB
VIB
VIB
TEMP
TEMP
TEMP
TEMP
C
REV
'A' MOTOR
12/02/10
B
ISSUED FOR CLIENT REVIEW ISSUED FOR PRELIMINARY REVIEW
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
'B' MOTOR
DCS STARTER CONTROL
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
SCALE: NONE SHELL DWG NO.:
4
3
2
200.0000.000.041.XX1
1
REV.
200.XX1
UNIT 200 - COMMON
FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.XX1.pid MODEL DATE:2/2/2011 2:35:55 AM BY:bes29451
VFD
WINDING TEMP
MONITORING
CONTROL ES
MOTOR RUN STATUS
I
HS
3
2
B
3/4"
3/4"
ANTI-FOAM
D
ET 10 38
3/4"-KP-246005-PJG(0.4)
246.014
12286
ET 10 FREE DRAINING 38
ET 10 38
TO V-24218
FROM P-24606 10
LEAN AMINE FLOW SIGNAL 246.011
FREE DRAINING CSO
12039
3/4" 3/4"
3/4"-KP-241001-PJG(0.4)
240.030 FL
6"-FL-241020-PAC
PAC HJE(0.4)
5
S-4
12967
6"x3"
2"-P-241057-HJE(0.4)
SP 001
6
3/4" 3/4"
242.021
12981
TO UC-246002
I 104
HH
TT 030
16"-P-246080-DAG LEAN AMINE
12"-P-241061-DAG 1-1/2"
16"x12" ET 10 50
246.011
12642
D
ET 10 50
D
241.022
TO V-24119
12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT. 13 . TOP CONNECTION.
12"
4"
PJG(0.4) DAG
MP-001
DETAIL 'A' SP 007
FV 075
12"x8"
HOLDS:
12"-P-241062-DAE
MIN 12"-P-241063-DJE(0.4) 16"x12"
36" MW
16"
12"x8" FC D
3"
PDT 064
8"
• • • • •
V-24118
3"
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. DETAILS FOR INJECTION QUILL TO BE FINALIZED. SAMPLE STATION SPECIALITY ITEM NUMBERS. CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
25
LEAN AMINE 242.021
CSC
12633
D
14 . 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE CENTERED IN PROCESS LINE.
8"
FO
M
3/4"
FROM P-24602A/B/C
FT 075 12
12055
FYE 075
S
3/4"
TI 030
H
H2 RAW GAS
3/4"
L
3/4"
FROM LX-246001
12"-P-241056-HJE(0.4)
V
DAE DJE(0.4)
FC 075
246.002
E 451
DAG DAE
SET POINT 12206
H 38
FREE DRAINING 10
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES AND CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "241" UNLESS OTHERWISE STATED. 3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS. 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT START-UP. 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 7 . ELECTRIC TRACE TO HLL (ET 10). 8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES, ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION. 9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE. 10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm. 11 . INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED BY INTERLOCK I-102
V
RV 023
CSO
ANTI-FOAM
3350 mm ID x 23400 mm T/T 3500 kPa-g @ 95 °C / HV @ 150° C CS + 3 mm 304L SS CLAD / 316L SS H/ 7 P-241080-HJE(0.4) (TOP) P-241084-DJE(0.4) (BTM)
CSC
V-24118 AMINE ABSORBER 1 SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
FIRE 1-1/2H3 SET@ 3500 kPa-g
2"x1-1/2"
4
PDI 064
TO V-24218 12"-P-241074-DAG
DETAIL "A" INJECTION QUILL
H
E 450 E 453
HZTE 015
C
S
I 104
FO ET 38 75
I 102
12"x8" FO 12"x8"14"x12"
E 453
HIC 014
HZTE 014
TO HMU 1 PSA
HV 015
3"
3/4"
2"
SWING ELBOW
2"
HHLL=4400 mm
NLL=2800 mm
24" MW
2"
3"
LG 155
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
ISSUED DATE
DESCRIPTION
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
2"-P-241065-DJE(0.4)
D
4"
12"x8" 3/4"
TT 031
XV 020
16"x12" 8"-P-241064-DJE(0.4)
16"
3/4"
FO
8"
6"
FC
D
LV 155
12
8"x6"
8"x6"
1-1/2"
FC D
D
D
SHELL CANADA
8"-P-241064-DJE(0.4) ET 10 50 8
QUEST CCS PROJECT
RICH AMINE 12635
242.021
A
TO E-24602A/B TWO PHASE FLOW R
T
5
VACUUM TRUCK
6
SP 004
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1 AMINE ABSORBER 1 SCALE: NONE SHELL DWG NO.:
3
2
241.0000.000.041.021
1
REV.
G
241.021
S-9
4"-P-241066-DJE(0.4) SP 003
4
BY
ISSUED FOR HAZOP
3/4"
4000 mm
3/4"
1"
s
XZTE 020
1"-SL-241XXX-SAB
TI 031
3/4"
3/4"
XYE 020
4"
12716
1"-SCL-241XXX-SAB
04/20/11
XZI 020
E 450
3
D
F
REV
A/S
3/4"
240.029 SCL
N/A ET 10
ISSUED FOR PHA III
LLLL=300 mm
3"
12715
L
LI 155B
LT 155B
2"x3/4" 3"-SL-240020-SAB
LC 155
06/13/11
B
2"
SO
240.029 SL
LHS 155
H
MAG
3"
D
3/4"
7
3"
SWING ELBOW
LI 155A
LT 155A
HLL=3500 mm
LLL=1900 mm
2" 3/4"
2"
DP
G
FILE:\\F:\1025\DRAWINGS\HMU\241\241.021.pid MODEL DATE:6/14/2011 1:17:48 PM BY:bes29451
2"
3/4"
2"
3/4"
3"
3"
B
3/4"
LL
GWR
3/4"
2"
HJE(0.4) ULB
LTE 154
3/4" 3/4"
2"-GI-240022-ULB START-UP
E 450
3/4" D
V
CSC
E 451
PP
MIN
HH
3/4"
MIN 4
2"
18"
3/4"
FC
9
18"x14"
MIN
HV 014
SP 002
13
2"
FROM HMU 1
12717
241.022
3/4"
14"
ET 38 14"-P-241054-HJE(0.4) 75
240.028 GI
12054
24" MW
3/4"
S
I 102
3/4"
241.009
BYPASS
H2 RAW GAS
1
HYE 014 FO
H2 RAW GAS
HIC 015
E 450
3"
11
C
FLOW
14"-P-241055-HJE(0.4)
14"x12" 8"
14
I 103
HYE 015 11
14"-P-241055-HJE(0.4)
PJG(0.4) DAG
4
3
2
V-24119 ABSORBER 1 WASH WATER VESSEL SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1 7
3
FI 074A
f(x)
FI 074B
HOLDS:
BYPASS H
PC 067
AI 016
CO2
I 101
HJE(0.4) PAC
HOLD PV 067
10"-FL-241021-PAC
6" 10"x6"
3/4"
FC TSO
FREE DRAINING
FT 076
246.022
2"-SCH-246003-SAG
2"x1"
ET 10 38
FV 076
2"x1"
1"
D
12"
AP 016B
14"x12"
3/4"
3/4" 3/4"
3/4" 3/4"
FREE DRAINING
INST PIPING
AP 016A
INST PIPING
TT 032
FT 074
C 1-1/2"
H2 RAW GAS ET 38 14"-P-241058-HJE(0.4) 75 TO HMU 1 PSA
DETAIL "B"
4
2" 3"
3"
CSC
8
2"x1"
MIN 8
3"
3"x2"
1"
PDI 066
PDT 066
H
24" MW
V-24119 9
2"-SCH-241XXX-SAD
7 CSC
4"
SAG SAD
24" MW
8
4"x3"
ET 10 38
3"-P-241XXX-HJE(0.4)
3"-P-241073-PJE(0.4)
CIRCULATING WATER 241.023
L H
L
E 453 E 452
DP
HH
LL
D
3/4" 3/4"
HHLL=2450 mm
2"
LTE 159 6
3"
2"
2"
MAG LG 157
24" MW
HLL=2300 mm
2" NLL=1050 mm
3"
3"
LLL=870 mm
2"
LLLL=300 mm
2"
3"
3"
LT 157A
LI 157A
DP LT 157B
3/4"
3"
2"
5
3"
3/4"
6
H
3"
2"
3/4"
LI 159
2"
3/4"
LI 157B
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
LC SIGNAL
LHS 157A
12409
241.023
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
TO LC-157
D
3/4"
LI 156
3"
14" 3/4"
FREE DRAINING
3"
B
3/4" 3/4"
14"x12"
3/4"
FROM V-24118
1
3/4"
241.021
H 38
12"-P-241056-HJE(0.4)
8
PP
3/4"
12055
GWR
3/4"
LTE 156
12408
FROM E-24129
6
H2 RAW GAS
241.009
24" MW
FC
3/4"
FROM P-24609A/B
2"x1"
13045
PJE(0.4)
12968
FO
9
WASH WATER
PT 065
XV 019
HJE(0.4)
TO V-24219
L
AP 016C
3/4" 3/4"
240.030 FL
FYE 076
SAD HJE(0.4)
12969
S
3/4"
242.022
2"-SCH-242XXX-SAG
2"-SCH-241XXX-SAG
WASH WATER
FC 076
DETAIL "B" SAMPLE QUILL
3/4" 3/4"
FO
12"
V 3"
TO FX-246076
H
AE 016
A/S
3/4"
E 453
13030
XYE 019
FC
CO2 RICH
FLOW
S
FREE DRAINING
246.022
PI 065
E 453
XZTE 019
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED. • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
CO2 LEAN
12061
E 450
PT 067
TI 032
AIT 016
240.030 FL
ET 10 50
ET 38 63 6"-P-241059-HJE(0.4)
C
FLOW SIGNAL
D
SO
7860 mm
6" ET 10 50
6"-P-241067-PJE(0.4)
SHELL CANADA
CIRCULATING WATER 12407
QUEST CCS PROJECT
241.023
TO P-24108A/B 3"
A
D R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT ISSUED FOR HAZOP
UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1 ABSORBER 1 WASH WATER VESSEL SCALE: NONE SHELL DWG NO.:
4
3
2
241.0000.000.041.022
1
REV.
G
FILE:\\F:\1025\DRAWINGS\HMU\241\241.022.pid MODEL DATE:6/14/2011 1:17:50 PM BY:bes29451
FROM HMU 1
FROM FC-377
FX 074A
ET 38 75
14"-P-241055-HJE(0.4)
241.009
241.022
241.021
12054
FC SIGNAL
FX 074B
D
H2 RAW GAS
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "241" UNLESS OTHERWISE STATED. 3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS. 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT START-UP. 5 . ELECTRIC TRACE TO HLL (ET 10). 6 . EITHER LTE-241156 OR LTE-241159 SHALL BE SELECTABLE AS THE INPUT TO SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE TWO INSTRUMENTS SHALL BE PROVIDED AT THE DCS. 7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST IS ISOLATED. 8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm. 9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UN IT.
FHS 074
SET POINT TO PSA LOGIC
1800 mm ID x 10900 mm T/T 3500 kPa-g @ 60 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ 5 P-241081-HJE(0.4)
4
3
2
1
E-24129 ABSORBER 1 CIRCULATING WATER COOLER RATED DUTY: SURFACE AREA: TEMA TYPE: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM: LC SIGNAL
D
12409
LC 157
241.022
FROM LHS-157A
H
0.2 MW 37.9 m^2 BEU SHELL 3900 kPa-g / HV 60 °C / 150 °C CS + 3 mm 304L SS CLAD / 6 P-241082-PJE(0.4)
TUBE 3010 kPa-g / 58 °C / SUPER DUPLEX 2507 + 0.38 mm CA / 6 CWR-241004-PJE(0.4)
LHS 157B
L
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE STATED. 3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012. 4 . CV OF CONTROL VALVE TO BE MINIMUM. 5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 6 . ELECTRIC TRACE (ET 10). 7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP. 8 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
2"-P-242076-PJE(0.4)
PURGE WATER 242.023
D
12638
FROM E-24229
HOLDS:
4
LV 157A
2"x1" 1"
12407
241.022
3
TW 035
5
XV 018
ET 10 50
6"-P-241067-PJE(0.4)
PT 070
S-8
3/4" 3/4"
CIRCULATING WATER
3/4"
SP 005
FO
XZTE 018
6"x4"
246.006
1-1/2"
V 6"x4"
ET 10 38
4"-CWR-241003-UAB
3"-P-241072-PJE(0.4)
COOLING WATER RETURN 12619
242.023
TO HEADER CSO
FC
FROM V-24119
12637
PI 070
3/4" 3/4"
3/4"
4
A/S
PURGE WATER
D
2"x1" FC
3/4" 3/4"
3"-P-241076-PJE(0.4)
TO V-24602
3/4"
6
NC
C
D
RS
S
LV 157B
3"x2"
ET 10 38
2"-P-241076-PJE(0.4)
2"
3/4"
8
D
XYE 018
D
FC
2"x1" 1"
2"-P-241075-PJE(0.4)
E 452
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • COMFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
2"x1"
D
XZI 018
8
3/4"
C
UAB PJE(0.4)
L
TG 033
3"x2"
ET 10 38
3"-P-241073-PJE(0.4) 3"
3/4"
TO V-24119
3"x2"
D
4"-CWS-242003-UAB
COOLING WATER SUPPLY 242.023
12618
FROM HEADER
6"x3"
D BACK FLUSH
1-1/2" 6"x3"
TG 034 ET 10 50
B
SEL
LOCAL/ REMOTE
SI 016
VFD
3/4"
3/4"
TO GRADE PP
SP 006A
3/4"
D
P-24108A
VFD FAULT
XL 017
LOCAL/ REMOTE
SI 017
PP
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
3/4"
TO GRADE PP
SP 006B
3/4"
3/4 " D
D D
3/4"
3"x2"
6"x3"
3/4"
3/4" 3/4"
D
XA 017
06/13/11
D
3"x2"
6"x3"
I
VFD
D PP
E 452
HOA
ET 10 N/A
XL 016
V
HS 017 A
G
MIN.
VFD FAULT
I 100
3/4"
XA 016
R/S
3"-P-241071-PJE(0.4)
HIS 017
ET 10 50
I
HOA
6"-P-241069-PJE(0.4)
E 452
HS 016A
N/A10 ET
3/4"
I 100
ET 10 50
V
R/S
MIN.
HIS 016
7
P-24108B
SHELL CANADA
3/4 " D
QUEST CCS PROJECT
A R
P-24108A /B 7 ABSORBER 1 CIRCULATING WATER WASH PUMPS
MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
39.1 m^3/hr 322 kPa 5.6 kW CASING INTERNALS 316 SS 316 SS / 6 P-241083-PJE(0.4)
ISSUED FOR HAZOP
UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1 ABSORBER 1 WASH WATER COOLER SCALE: NONE SHELL DWG NO.:
2
241.0000.000.041.023
1
REV.
G
241.023
RATED FLOW: DIFF. PR.: DRIVER:
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
FILE:\\F:\1025\DRAWINGS\HMU\241\241.023.pid MODEL DATE:6/14/2011 1:17:52 PM BY:bes29451
7
HS XXX
3"-P-241070-PJE(0.4)
12408
3"-P-241073-PJE(0.4)
1-1/2" 6"x3"
6"x3"
6"-P-241068-PJE(0.4)
241.022
ET 10 38
UAB
FT 077
3/4"
CIRCULATING WATER
LL
PJE(0.4)
RS
I 103
3"-P-241077-PJE(0.4)
FC 077
3"-P-241072-PJE(0.4)
E-24129
3
2 FIRE 1-1/2H3 SET@ 3500 kPa-g
2"x1-1/2"
ET 10 38
10
12982
5
2"-P-242057-HJE(0.4)
SP 001
TO UC-246002
6
H 38
FREE DRAINING
246.002
12403
FROM LX-246001
3/4"
L
V
D
FROM P-24602A/B/C
PJG(0.4) DAG
M
12"-P-241074-DAG
DETAIL 'A' SP 007
D
12"
12"x8" D
• • • •
MIN 12"-P-242062-DAE
12"x8" 3/4"
241.021
12633
12
ET 10 50
3/4"
LEAN AMINE
12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT. 13. TOP CONNECTION. 14. 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE CENTERED IN PROCESS LINE.
TO V-24219
HOLDS:
8" FV 075
FO MP-001
242.022
12064
FYE 075
S
FT 075
11 . INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED BY INTERLOCK I-102
H2 RAW GAS
4"
FC 075
E 451
12"-P-242063-DJE(0.4)
16"x12"
36" MW
16"
FC DAE DJE(0.4)
PDT 064
8" CSC DAG DAE
3/4"
SET POINT
12"-P-242056-HJE(0.4)
PDI 064
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. DETAILS FOR INJECTION QUILL TO BE FINALIZED. CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
V-24218
3"
25
DETAIL "A" INJECTION QUILL
H
E 450
C
PJG(0.4) DAG
E 453
HZTE 015
I 104
11 FO ET 38 75
14"-P-242055-HJE(0.4)
HZTE 014
TO HMU 2 PSA
HV 015
3" 9
14"-P-242054-HJE(0.4) FC
2"
3/4"
2"
LL
GWR
3"
2"
2"
2"
3/4" 3/4"
LTE 154
3/4"
HJE(0.4) ULB
B
HH
2"
HHLL=4400 mm
SWING ELBOW
DP HLL=3500 mm
7
NLL=2800 mm 2"
2"
2"
3"
LG 155
3"
3/4"
D
XYE 020
12712
s
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
L
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
ISSUED FOR HAZOP 2"-P-242065-DJE(0.4)
8"
8"-P-242064-DJE(0.4)
4"-P-242066-DJE(0.4)
TT 031
6"
FC
T
8"x6" FC 8"x6"
10"x8"
D
4"
8
5
6
SP 004
246.001
12634
FROM V-24118
R
TWO PHASE FLOW
241.021
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT 12635
FROM V-24118 TWO PHASE FLOW
2
A
RICH AMINE
RICH AMINE
SP 003
VACUUM TRUCK
3
ET 10 50
8"-P-241064-DJE(0.4)
S-9
D
D
QUEST CCS PROJECT
10"-P-242064-DJE(0.4)
12
D
3/4"
SHELL CANADA
D
LV 155
1-1/2" 3/4"
12"x8"
D
XV 020
3/4"
4"
16"
16"x12"
3/4"
FO
XZTE 020
4000 mm
3/4"
1"-SL-242XXX-SAB
1"-SCL-242XXX-SAB
D
04/20/11
B
TI 031
3/4"
240.029 SCL
3
3" N/A ET 10
F
LLLL=300 mm SO
A/S
12711
ISSUED FOR PHA III
XZI 020
E 450
2"
2"x3/4" 3"-SL-240018-SAB
06/13/11
MAG
D
240.029 SL
G
LI 155B
LT 155B
3/4"
3/4"
SWING ELBOW
H
LC 155
LHS 155
24" MW
3/4"
LLL=1900 mm
LI 155A
LT 155A
3/4"
2"-GI-240020-ULB START-UP
PP
3/4"
E 450
CSC V
18"
3/4"
E 451
MIN
2"
4
18"x14" MIN
MIN
15
ET 38 75
3/4"
13
SP 002
3/4"
HV 014
3/4"
FO 14"
4
242.022
12065
24" MW
3/4"
S
3/4"
I 102
12713
H2 RAW GAS
1
HYE 014
3"
11
240.028 GI
14"-P-242055-HJE(0.4) BYPASS
E 450
HIC 014
FROM HMU 2
HIC 015
I 102
12"x8" FO 12"x8" 14"x12"
E 453
242.009
FLOW
14"x12" 8"
C
14
I 103
HYE 015
S
H2 RAW GAS
D
UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2 AMINE ABSORBER 2 SCALE: NONE SHELL DWG NO.:
242.0000.000.041.021
1
REV.
G
FILE:\\F:\1025\DRAWINGS\HMU\242\242.021.pid MODEL DATE:6/14/2011 2:02:39 PM BY:bes29451
246.011
PAC HJE(0.4)
ET 10 38
10
LEAN AMINE FLOW SIGNAL
CSO
3/4"
12063
242.021
D
FREE DRAINING
S-4
FROM P-24606
240.030 FL
6"-FL-242020-PAC
CSC
3/4"-KP-241001-PJG(0.4)
6"x3"
CSO
241.021
12967
B
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES AND CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE STATED. 3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS. 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT START-UP. 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 7 . ELECTRIC TRACE TO HLL (ET 10). 8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES, ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION. 9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE. 10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL POSITION. SEPARATED BY AT LEAST 500 mm.
V
FREE DRAINING
ANTI FOAM
RV 023
3/4" 3/4"
SIZE: 3350 mm ID x 23400 mm T/T DESIGN PR. & TEMP: 3500 kPa-g @ 95 °C / HV @ 150 °C MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS INSULATION TYPE/THK: H / 7 TRIM: P-242080-HJE(0.4) (TOP) P-242084-DJE(0.4) (BTM)
3/4" 3/4"
V-24218 AMINE ABSORBER 2
1
3/4"
4
4
3
2
1
V-24219 ABSORBER 2 WASH WATER VESSEL SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
7
1800 mm ID x 10900 mm T/T 3500 kPa-g @ 60 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ 5 P-242081-HJE(0.4)
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE STATED. 3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS. 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT START-UP. 5 . ELECTRIC TRACE TO HLL (ET 10).
FHS 074
SET POINT TO PSA LOGIC
FI 074B 3
FI 074A
D
6 . EITHER LTE-242156 OR LTE-242159 SHALL BE SELECTABLE AS THE INPUT TO SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE TWO INSTRUMENTS SHALL BE PROVIDED AT THE DCS. 7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST IS ISOLATED. 8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm. 9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
FC SIGNAL
FX 074B
242.009 FROM FC-377
f(x)
FROM HMU 2
ET 38 75
14"-P-242055-HJE(0.4) BYPASS
AI 016
H
PC 067
6" 10"x6"
ET 10 50
3/4"
FC TSO
10"-FL-242021-PAC
FREE DRAINING
240.030 FL
ET 38 75
AP 016B
3/4" 3/4"
PT 065
14"x12"
INSTR PIPING
12707
3/4" 3/4"
AP 016A
TT 032
FT 074
C 1-1/2"
H2 RAW GAS ET 38 14"-P-242058-HJE(0.4) 75
S
TO HMU 2 PSA
DETAIL 'B'
3/4"
2" 3"
L
3"
FYE 076 24" MW
9
2"x1"
ET 10 38
2"x1"
2"-SCH-242XXX-SAD 8
3"
3"x2"
FC D
D
8
2"x1"
1"
3/4"
FROM P-24609A/B
2"x1"
3/4"
2"-SCH-241XXX-SAG
FV 076
H
9
1" SAD HJE(0.4)
DETAIL 'B' SAMPLE QUILL
24" MW
V-24219
MIN
7
CSC SAG SAD
PDI 066
PDT 066
HJE(0.4)
FT 076
4"
24" MW
8
4"x3"
8
ET 10 38
3"-P-242XXX-HJE(0.4)
3"-P-242073-PJE(0.4)
CIRCULATING WATER 242.023
14"x12"
3"
3/4"
HHLL=2450 mm
2"
2"
H
L
E 452
HH 6
LL
2"
LTE 159 D
24" MW
2" NLL=1050 mm 5
3"
3"
2"
LLL=870 mm 3"
2"
LG 157 2" 3/4"
H
E 453
3/4"
L
MAG
HLL=2300 mm
DP
3/4"
LI 159
3"
3"
3"
LT 157A LT 157B
LI 157B
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
LI 157A
DP
G
REV
LC SIGNAL
LHS 157A
12413
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
242.023
TO LC-157
D
LLLL=300 mm 3/4"
LI 156
3"
2"
3/4"
6
3"
3/4"
2"
3/4"
3/4"
FREE DRAINING
B
3"
14"
3/4"
FROM V-24218
1
3/4"
242.021
H 38
12"-P-242056-HJE(0.4)
FLOW
PP
3/4"
12064
GWR
3/4" 3/4"
LTE 156
INST. PIPING
12411
FROM E-24229
6
H2 RAW GAS
242.009
CSC
FO
241.022
12"
AP 016C
240.030 FL
3/4" 3/4"
PJE(0.4)
TO FX-246076
12969
XZTE 019
PI 065
FC
12"
3"
FC 076
13031
WASH WATER
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED. • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
4
FLOW SIGNAL 246.022
S
FO
FREE DRAINING
V
E 453
019 XV
HOLDS:
CO2 RICH
12146
A/S 3/4" 3/4"
FREE DRAINING
6"-P-242059-HJE(0.4)
XYE 019
CO2 LEAN
H
AE 016 E 450
PT 067
TI 032
AIT 016
HJE(0.4) PAC
E 453
I 101 HOLD
PV 067
C
CO2
SO
7860 mm
6" ET 10 50
6"-P-242067-PJE(0.4)
SHELL CANADA
CIRCULATING WATER 12412
QUEST CCS PROJECT
242.023
TO P-24208A/B 3"
A
D R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT ISSUED FOR HAZOP
UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2 ABSORBER 2 WASH WATER VESSEL SCALE: NONE SHELL DWG NO.:
4
3
2
242.0000.000.041.022
1
REV.
G
FILE:\\F:\1025\DRAWINGS\HMU\242\242.022.pid MODEL DATE:6/14/2011 1:50:47 PM BY:bes29451
242.021
242.022
12065
3/4" 3/4"
H2 RAW GAS
FX 074 A
D
4
3
2
1
E-24229 ABSORBER 2 CIRCULATING WATER COOLER RATED DUTY: SURFACE AREA: TEMA TYPE: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
D
LC SIGNAL 12413
LC 157
242.022
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE STATED. 3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012. 4 . CV OF CONTROL VALVE TO BE MINIMUM. 5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 6 . ELECTRIC TRACE (ET 10). 7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
TUBE 3010 kPa-g / 58 °C / SUPER DUPLEX 2507 + 0.38 mm CA / 6 WR-242004-PJE(0.4)
D
H
LHS 157B
L
HOLDS: • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
LV 157A
4
FROM LHS-157A
0.2 MW 37.9 m^2 BEU SHELL 3900 kPa-g / HV 60 °C / 150 °C CS + 3 mm 304L SS CLAD / 6 P-242082-PJE(0.4)
1" FC
3/4"
2"x1"
2"x1" ET 10 38
D LV 157B
2"-P-242076-PJE(0.4)
PURGE WATER 12638
241.023
TO V-24602
1"
3/4" 3/4"
4
D
SP 005 3/4" 3/4"
PI 070
FC
3"-P-242073-PJE(0.4)
6"x3"
1-1/2"
3"x2"
6"x3"
RS
3"-P-242077-PJE(0.4)
3"x2"
FROM HEADER 4"-CWS-240XXX-UAB ET 10 38
4"-CWS-242003-UAB
COOLING WATER SUPPLY 12618
241.023
TO E-24129
6"x3" 6"x3"
HS
7
E 452 ET 10 50
I
HIS 017
XA 016
VFD FAULT
XL 016
LOCAL/ REMOTE
SI 016
VFD
3/4"
PP
3/4"
3/4"
E 452
D
SP 006B
XA 017
VFD FAULT
XL 017
LOCAL/ REMOTE
SI 017
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
3/4"
D TO GRADE
PP
3/4"
3"x2"
SHELL CANADA
3/4"
3/4 " D
D D
P-24208A
HOA
PP
3/4"
3/4"
I
6"x3"
3/4 " D
D
HS 017A
VFD
3"x2"
6"x3"
I 100
3/4"
TO GRADE PP
SP 006A
V
R/S
3/4"
3/4"
HOA
ET 10 50
HS 016A
6"-P-242069-PJE(0.4)
I 100
N/A
R/S
B
SEL
7
ET 10
HIS 016
3/4"
240.003
1-1/2"
TG 034
ET 10 50
D
COOLING WATER SUPPLY
3"-P-242073-PJE(0.4)
D
6"-P-242068-PJE(0.4)
PJE(0.4) UAB
6"-CWS-240015-UAB
D BACK FLUSH
3/4"
TO V-24219
V
ET 10 50
FT 077
MIN.
12411
ET 10 38
LL
3"-P-242070-PJE(0.4)
CIRCULATING WATER
PJE(0.4)
3"
TG 033
UAB
E-24229
I 103
242.022
D 6
FC 077
C
CSO
NC
FROM V-24219
12619
QUEST CCS PROJECT
P-24208B
A R
P-24208A /B 7 ABSORBER 2 CIRCULATING WATER WASH PUMPS RATED FLOW: DIFF. PR.: DRIVER: MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
39.1 m^3/hr 322 kPa 5.6 kW CASING INTERNALS 316 SS 316 SS / 6 P-242083-PJE(0.4)
ISSUED FOR HAZOP
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2 ABSORBER 2 WASH WATER COOLER SCALE: NONE SHELL DWG NO.:
2
242.0000.000.041.023
1
REV.
G
FILE:\\F:\1025\DRAWINGS\HMU\242\242.023.pid MODEL DATE:6/14/2011 1:52:05 PM BY:bes29451
6"-P-242067-PJE(0.4)
241.023
242.023
242.022
3/4"
ET 10 50
COOLING WATER RETURN
ET 10 N/A
12412
4"-CWR-241003-UAB
FROM E-24129
MIN.
CIRCULATING WATER
XV 018
ET 10 50
6"x4"
3"-P-242072-PJE(0.4)
3"-P-242071-PJE(0.4)
C
3/4" 3/4"
FO
240.003
V
4"-CWR-242XXX-UAB 1-1/2" 6"x4"
COOLING WATER RETURN TO HEADER
TW 035
PT 070
5
6"-CWR-242003-UAB
2"
3
A/S XZTE 018
ET 10 50
S-8
XYE 018
S
2"x1"
RS
E 452
FC
2"x1"
3/4"
2"-P-242075-PJE(0.4)
XZI 018
4
3
2
1
E-24602A/B LEAN / RICH AMINE EXCHANGER 64.5 MW (TOTAL) 1521.0 m^2 HOT 2700 kPa-g / HV 130 °C / 150 °C PLATES: 316L SS / GRAPHITE FRAME: CS / 9 P-246121-DJE(0.4) P-246122-DJE(0.4) COMPABLOC
RATED DUTY: SURFACE AREA: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM: TEMA TYPE:
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 4 . SYMMETRICAL PIPING. 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 6 . EXCHANGER TO BE DRAINED IF ISOLATED FOR MAINTENANCE. 7 . LOCALIZED DEGASSING OF C02 MAY OCCUR AT RESTRICTIONS, BENDS, TEES, ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION. 8 . A PERMANENT SELF VENTING CONNECTION IS REQUIRED TO PREVENT ACCUMULATION AND TRAPPING OF GASES. 9 . ELECTRIC TRACE (ET 10). 10. VALVES ARE FOR BATTERY LIMIT ISOLATION.
COLD 3500 kPa-g / HV 120 °C / 150 °C /
9
D
D
HOLDS: • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
FC SIGNAL 246.003
12225
TO FFX-001A TI 004 PI 003
PT 003
3/4" 3/4"
TT 004 1-1/2"
ET 10 63
16"-P-246051-DAB
LEAN AMINE 246.008
12181
TO E-24604A H
ET 10 38
S-9 3
C
ET 10 38
5
PI 028
2"-P-246105-DJE(0.4)
2" D
2"-P-246106-DJE(0.4)
13145
DAB DJE(0.4) 2"
DJE(0.4) DAB
RS
20"
3"
V 2"
TI 002
2"
ET 10 63
D
246.033 DM 12227
2"-DM-246001-DAB
DO NOT POCKET
RS
E-24602B
2"
CSO
3"
14"-P-246007-DJE(0.4) RICH AMINE
TWO PHASE FLOW
B
246.002
12212
TO V-24601
PI 004
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
ET 10 50
20" PT 004
6
TI 005
TT 005 002
2" D ET 10 63
1-1/2"
D
B
20"
2"
TT 002
ET 10 63
RS
RS
20"
2"
12230
10"-P-246006-DJE(0.4)
8 2"
V
246.007
NC
3/4"
START-UP
PT 002
3/4" 3/4"
14"x10"
10"
13144
2"-DM-246004-DAB
246.033 DM
2"-DM-246002-DAB
246.033 DM
LEAN AMINE FROM P-24601A/B/C
8"
D 2"
2" CSO
4
16"-P-246048-DJE(0.4)
1-1/2"
16"-P-246054-DAB
LEAN AMINE
SHELL CANADA
246.009
12252
TO E-24604B
QUEST CCS PROJECT
A R
8"-P-246085-DAE START-UP / MINIMUM FLOW
LEAN AMINE 246.011
FROM P-24602A/B/C
ISSUED FOR HAZOP
4
3
2
12281
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON LEAN / RICH AMINE EXCHANGER SCALE: NONE SHELL DWG NO.:
246.0000.000.041.001
1
REV.
G
246.001
ET 10 50
FILE:\\F:\1025\DRAWINGS\CO2\246\246.001.pid MODEL DATE:6/14/2011 10:40:12 AM BY:bes29451
V
2"
3"
ET 10 63
1-1/2"
3/4" 3/4"
D
PI 002
12"-P-246050-DJE(0.4)
D
2"
TT 003
4
CSO
10"
CSO
3"
3/4"
TWO PHASE FLOW 2"
FROM V-44118
ET 10 50
V
4
10
10"-P-246002-DJE(0.4)
13143
DJE(0.4) DAB
10"-P-246004-DJE(0.4)
7 246.101
1-1/2"
6
246.033 DM
2"-DM-246003-DAB
14"x10"
2"
D
12686
M
ET 10 63
D
TWO PHASE FLOW
FROM V-24118 / V-24218
RICH AMINE
14"-P-246001-DJE(0.4)
2"
20"
12"
14"x10"
14"x10"
DAE DJE(0.4)
242.021
ET 10 50
MIN
12634
10"-P-242064-DJE(0.4)
MIN
RICH AMINE
242 246
D
E-24602A
2"
10"
7
3" 10"
TT 001
FT 001
PT 001
3/4" 3/4"
L
PI 001
2"
14"x10"
TI 001
3/4" 3/4"
FC 001
H
10"-P-246003-DJE(0.4)
20"
3"
ET 10 50
3/4" 3/4"
RS
16"x12"
RS
PT 028
12"-P-246049-DJE(0.4)
16"x12"
20"
V 2"
20"
RS
12"
RS
8 2"
CSO
ET 10 63
TI 003
10"-P-246005-DJE(0.4)
DAB DJE(0.4) 2"
8"
C
SP 001
3/4" 3/4"
PDI 002
PI 013
B
PT 013
PJB(0.4) DJB(0.4)
CSO
14"x10"
14"x8"
H
PDI 013
3/4"-KP-246001-PJE(0.4)
246.014
12283
TT 013
1-1/2" FREE DRAINING
MIN
V
OVERHEAD VAPOURS 246.005
12275
TO E-24601A/B
FC 003
8"
ANTI-FOAM
TO FFX-001B
42"-P-246015-PJB(0.4) 42"
246.003
12211
10"-P-246100-DJB(0.4)
3
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . ANTI-FOAM IS ADDED INTERMITTENTLY BY THE OPERATOR BASED ON HIGH DP ACROSS THE TRAYED SECTION OF THE AMINE STRIPPER. 4 . TOP OF WEIR IN REBOILERS E-24603A/B TO BE AT SAME ELEVATION AS HLL IN AMINE STRIPPER. 5 . SYMMETRICAL PIPING TO/FROM E-24603A AND E-24603B. 6 . CV OF CONTROL VALVES PV-010A/B TO BE MINIMUM. CV AFFECTS RV-005 SIZING FOR VAPOUR BLOWTHROUGH CASE. 7 . SYMMETRICAL PIPING ON INLET AND OUTLET OF CONTROL VALVE. 8 . PV-010A/B ARE 2x50% VALVES. SPARE VALVE TO BE MAINTAINED ON SITE. 9 . PIPING FROM CONTROL VALVE TO VESSEL NOZZLE TO HAVE 1.5 mm CORROSION ALLOWANCE. 10. SLUG FLOW DURING TURNDOWN. 11. ELECTRIC TRACE TO HLL (ET 10). 12. LOCATE RV-001 MINIMUM DISTANCE FROM PV-010A/B INLET. 13. TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm. 14. 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE CENTERED IN PROCESS PIPE. 15. 304SS PIPING FROM CONTROL VALVE TO V-24601 TO HAVE 1.5 mm CORROSION ALLOWANCE.
TC SIGNAL
TC 013
RV 005A
3/4"
B
CSO
CSO
10"-P-246107-DJB(0.4)
1
6300 mm ID x 30400 mm T/T 385 kPa-g @ 150 °C / FV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H / 50 mm 11 P-246123-DJB(0.4) (TOP) P-246124-DJB(0.4) (BTM)
3/4"
3/4"
BLOCKED DISCHARGE 8T10 SET@ 375 kPa-g
12"x10"
1/2" WEEP HOLE
B
8"-P-246100-DJB(0.4)
N/A ET 10
SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
10"x8"
12"x10"
1/2" WEEP HOLE 3/4"
RV 005B
12"-VA-246001-PJB(0.4)
PJB(0.4) DJB(0.4)
PJB(0.4) DJB(0.4)
1/2" WEEP HOLE
N/A ET 10
BLOCKED DISCHARGE 8T10 SET@ 375 kPa-g
10"x8"
D
RV 005C
8"x6"
N/A ET 10
BLOCKED DISCHARGE 6Q8 SET@ 385 kPa-g
2
V-24601 AMINE STRIPPER
TO ATMOSPHERE AT SAFE LOCATION
12"-VA-246002-PJB(0.4)
TO ATMOSPHERE AT SAFE LOCATION
8"-VA-246003-PJB(0.4)
TO ATMOSPHERE AT SAFE LOCATION
TO ATM
TO ATM
3
TO ATM
4
L
D
FROM P-24606
FREE DRAINING
3/4"
REBOILER FEED 12213
FL(C) 3/4" D
7
30"-P-246029-DJB(0.4)
TO E-24603A
D
20"-P-246012-DJE(0.4)
3/4" 3/4"
H 75
15
20"x10"
TWO PHASE FLOW DO NOT POCKET
DJE(0.4) DJB(0.4)
DAB
10"
14"x10"
4"-P-246026-PJB(0.4)
WATER REFLUX 246.006
12282 SP
FROM P-24603A/B
002
14
TI 010
TT 010
FLOW
20"
10
10
36"
MW 36"
20"-P-246013-DJB(0.4) 10
TWO PHASE FLOW DO NOT POCKET
C
TI 011
TT 011
2"
1
DAB
H
PDI 012
24" MW
2"-DM-246045-DAB
FREE DRAINING
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • DETAILS FOR CHEMICAL INJECTION QUILL TO BE FINALIZED.
24"x20"
20
7
9 DJB(0.4)
36"x24"
HOLDS:
36"x24"
36"
24"x20"
20"-P-246011-DJB(0.4)
2"
DJB(0.4)
6
SEE DETAIL "A"
9
2"
DJE(0.4)
15
PV 010B D
4"x3"
3/4" 3/4" 2"x3/4" 2"
3/4"
MIN
DJB(0.4)
DJE(0.4)
DJB(0.4)
DJE(0.4) PJE(0.4)
CSO FREE DRAINING
14"-P-246007-DJE(0.4) TWO PHASE FLOW 12 DO NOT POCKET
FROM E-24602A/B
3/4"
ET 10 63
FO
MIN
4"x3"
4"x2"
2"
2"
7 8
D
14
24
4"x2"
DETAIL "A" INJECTION QUILL
D
20"
FL(C) 3/4" D
14"x10"
4"x3"
246.001
3/4"
MP-001
20"x10"
PT 010
4"
21 20"-P-246010-DJE(0.4)
6
24" MW
PT 011
2"
8 PV 010A
ET 10 38
FREE DRAINING
PHS 010
13
CSC
4"-P-246008-DJE(0.4) RICH AMINE
PC 010
CSO
C
PI 011
4"-P-246009-DJB(0.4)
B 3/4"
246.003
DJB(0.4) PJB(0.4)
V
RV 001
12212
14"
14"-P-246100-DJB(0.4)
FT 003
FV 003
3/4"
BLOCKED DISCHARGE 3L4 SET@ 3500 kPa-g
5
30"
30"
H 75
30"-P-246035-DJB(0.4) FREE DRAINING
5
REBOILER FEED 246.004
12210
TO E-24603B
PI 012
FREE DRAINING
2"
L
LT 002
LL V
HHLL=7590 mm
HLL=6175 mm
12695
242.021
TO FC-242075
f(x)
1"-SCL-246010-SAB
11
24" 3"
SWING ELBOW
5
24"
H
SET POINT
LX 001 H 50
241.021
12206
TO FC-241075 24"-P-246083-DJB(0.4)
FREE DRAINING
LLL=2175 mm
246.004
4"
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
FROM E-24603B
ET 10 38
LLLL=475 mm
4"-P-246093-DAB
AMINE INVENTORY/MAKE-UP 246.012
SHELL CANADA
D DJB(0.4) DAB
ET 10 38 30"
3/4"
T
12696
FROM P-24605/24604
2"
D
30"x24"
TT 014 1-1/2"
TI 014
H
QUEST CCS PROJECT ET 10 75
24"-P-246041-DJB(0.4)
A
LEAN AMINE 12182
246.007
TO P-24601A/B/C
DJB(0.4) DAB
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
D
ISSUED FOR HAZOP
2"-DM-246005-DAB
UNIT 246 - REGENERATION/COMMON AMINE STRIPPER
6"
ET 10 50
6"-DM-246005-DAB
AMINE DRAIN 13125
TO V-24606
3
06/13/11
12207
D
4
G
B
REBOILER LIQUID RETURN
MIN.
2" SO
LC 001
LT 001
SPLIT
3/4"
N/A ET 10
LG 001
MIN.
3/4" 12694
NLL=4175 mm
2"
3"
3"-SL-246004-SAB
4
2"
2"
DJB(0.4) DAB
246.029 SCL
B
DAB
24"
FREE DRAINING
246.029 SL
TO FC-441075
12403
MW
5
H
FROM E-24603A
441.029
12405
12697
SET POINT
MAG
NNF
24"-P-246082-DJB(0.4)
SET POINT
246.030 GI
2"
3/4"
246.003
ET 10 38
2"-P-246098-DAB
2"
6"
12215
2"
DJB(0.4)
REBOILER LIQUID RETURN
2"
8600 mm
FROM V-24605
3/4"
FROM E-24603B
GWR
3/4"
246.013
2"-GI-246003-ULB START-UP
12288
2"
1"-SL-246XXX-SAB
12401
V-24601
3/4"
RECOVERED AMINE
2" PP
LL
246.004
2
246.007
SCALE: NONE SHELL DWG NO.:
246.0000.000.041.002
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.002.pid MODEL DATE:6/14/2011 10:40:14 AM BY:bes29451
I 001
FREE DRAINING
REBOILER VAPOUR RETURN
246.002
LI 002
2"x3/4" 2"
36"-P-246040-DJB(0.4)
3/4" 3/4"
I 002
HH
H 50
SWING ELBOW 3/4"
3/4"
I 020
3/4"
PT 012
3/4"
FROM E-24603A
5
36"
36"
D
246.003
36"-P-246034-DJB(0.4)
5
3/4"
12214
H 50
2"x3/4"
REBOILER VAPOUR RETURN
4
3
2
E-24603A STRIPPER REBOILER
V-24603A STRIPPER REBOILER CONDENSATE POT
50.4 MW (PER SHELL) 1755.5 m^2 (PER SHELL) BKU SHELL 385 kPa-g / FV 150 °C / 150 °C CS + 3 mm 304L SS CLAD H/ P-246125-DJB(0.4)
RATED DUTY: SURFACE AREA: TEMA TYPE: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
TUBE 500 kPa-g / FV 250 °C / 250 °C 316L SS + 0.6 mm CA NONE /
FFX 001A
246.001
FROM FC-001
FFX 001B
FLOW SET POINT
FC 005
TC SIGNAL 246.002
246.004
12234
TO FC-006
SPLIT
SP
251
H
PI 002 C
L
FROM TC-013
HOLDS: L LL 251.110 FROM PX-251022
LL
REBOILER FEED 12213
246.002
H 75
30"-P-246029-DJB(0.4)
PC 014
FREE DRAINING
FROM V-24601
FX 005
L
10
CB 101 A
CB 101 B
CB 101 C
I 020
CUTBACK SIGNAL
SP LIMIT
36"-P-246034-DJB(0.4)
FREE DRAINING
TO V-24601
V
FV 005
3/4"
24"x20"
24"-SL-246009-SAB
L
1-1/2"
10"
30"
2"
V
E-24603A
24"
7
N/A ET 10 B
4"x2"
6
RV 010
24" 24"-P-246031-DJB(0.4)
24"-P-246030-DJB(0.4) 5
30"x24"
12215
N/A ET 10 1/2" WEEP HOLE
PP
10"
HLL=4200 mm
D
ET 10 N/A
2"
FREE DRAINING
24" MW
B
MAG
V-24603A
LG 005
2920 mm
FREE DRAINING
LT 005
LC 005
L
LX 005
NLL=1020 mm
LC SIGNAL H
24"-P-246082-DJB(0.4)
FREE DRAINING
TO V-24601
13139
2"
LLL=250 mm
10"-SCL-246001-SAB
246.020
TO LV-005
10" 4 8"
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
REV
ET 10 50
8"-SCL-246002-SAB TWO PHASE FLOW
ISSUED FOR PRELIMINARY REVIEW
B
3/4"
2"
246.002
4"-VA-246005-SAB
4"
2"-P-246108-DJB(0.4)
REBOILER LIQUID RETURN
246.029 SCL
1"-SCL-246003-SAB
V
4
D
2"
ET 10 N/A
T
2"
2"
30"x24"
D
C
10"
RS
24"
2"
2"
4"x3"
3/4"
3"-SL-246005-SAB
12685
12228
3"x2"
30"
246.029
3/4"
24" MW
3
TO ATMOSPHERE AT SAFE LOCATION
FIRE 2J3 SET@ 500 kPa-g
LP STEAM
24"-SL-246009-SAB
CSO
5
TO ATM
V
DO NOT POCKET
30"-P-246033-DJB(0.4)
36"x30"
2"-SL-246010-SAB
30"-P-246032-DJB(0.4)
24"
N/A ET 10
2" 36"x30"
FE 005
FROM DISTRIBUTION D
RS
C
TT 015
H 50
24"x20"
20" FC
2"
TI 015
FT 005
1"-SL-246009-SAB
12214
246.004
13128
TO FX-006
3/4"
246.002
PT 014
H 50
3/4"
REBOILER VAPOUR RETURN
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • NUMBER AND LOCATION OF STEAM TRAPS TO BE DETERMINED BASED ON PIPING LAYOUT.
STM HDR PRESSURE
I 021
9
D
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
CONDENSATE 12454
246.020
TO E-24606
D
SHELL CANADA QUEST CCS PROJECT
A R
ISSUED FOR HAZOP
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON STRIPPER REBOILER "A" AND CONDENSATE POT SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.003
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.003.pid MODEL DATE:6/14/2011 10:40:16 AM BY:bes29451
12211
1500 mm ID x 4200 mm T/T 500 kPa-g @ 250 °C / FV @ 250 °C CS + 3 mm CA H/ 8 SL-246030-SAB
FFX 001C
TRIM
RATIO
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . CONTROL VALVE BYPASS TO BE INSTALLED SO FREE DRAINING. 4 . BOTTOM TAN LINE OF V-24603A TO BE SET 2920 mm BELOW BOTTOM TUBE SHEET OF REBOILER. 5 . ALL REBOILER PIPING TO BE SYMMETRICAL. 6 . WEIR TO BE SET AT SAME ELEVATION AS HLL IN AMINE STRIPPER. 7 . ELECTRIC TRACE PIPE TO ELEVATION OF WEIR IN REBOILER 8 . ELECTRIC TRACE (ET 10). 9 . HIGH HIGH AMINE STRIPPER LEVEL TO FORCE FX-005 INTO MANUAL WITH 0% OUTPUT, CLOSING FV-005. 10 . STAGED CUTBACK SCHEME FOR REDUCTION OF LP STEAM FLOW TO REBOILERS IN THE EVENT OF LOW UTILITY PLANT HEADER PRESSURE. FOR DETAILS. REFER TO CONTROL NARRATIVE 246.1611.000.012.xxx.
246.003
12225
SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
FFIC 001
FC SIGNAL
D
1
4
3
2
E-24603B STRIPPER REBOILER RATED DUTY: SURFACE AREA: TEMA TYPE: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
50.4 MW (PER SHELL) 1755.5 m^2 (PER SHELL) BKU SHELL 385 kPa-g / FV 150 °C / 150 °C CS + 3 mm 304L SS CLAD H/ P-246126-DJB(0.4)
1
V-24603B STRIPPER REBOILER CONDENSATE POT
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . CONTROL VALVE BYPASS TO BE INSTALLED SO FREE DRAINING. 4 . BOTTOM TAN LINE OF V-24603B TO BE SET 2920 mm BELOW BOTTOM TUBE SHEET OF REBOILER. 5 . ALL REBOILER PIPING TO BE SYMMETRICAL.
SIZE: 1500 mm ID x 4200 mm T/T DESIGN PR. & TEMP: 500 kPa-g @ 250 °C / FV @ 250 °C MATERIAL(VESSEL/INTERNALS): CS + 3 mm CA 8 INSULATION TYPE/THK: H / TRIM: SL-246031-SAB
TUBE 500 kPa-g / FV 250 °C / 250 °C 316L SS + 0.6 mm CA NONE /
6 . WEIR TO BE SET AT SAME ELEVATION AS HLL IN AMINE STRIPPER. 7 . ELECTRIC TRACE PIPE TO ELEVATION OF WEIR IN REBOILER. 8 . ELECTRIC TRACE (ET 10). 9 . HIGH HIGH AMINE STRIPPER LEVEL TO FORCE FX-006 INTO MANUAL WITH 0% OUTPUT, CLOSING FV-006. 10. STAGED CUTBACK FOR REDUCTION OF LP STEAM FLOW TO REBOILERS IN THE EVENT OF LOW UTILITY PLANT HEADER PRESSURE FOR DETAILS. REFER TO CONTROL NARRATIVE 246.1611.000.012.xxx.
D
FLOW SET POINT 12234
SP
246.003
FC 006
FROM FFX-001C
REBOILER FEED 12210
246.002
H 75
30"-P-246035-DJB(0.4)
D
H
HOLDS:
L
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • NUMBER AND LOCATION OF STEAM TRAPS TO BE DETERMINED BASED ON PIPING LAYOUT.
FREE DRAINING
FROM V-24601
9 REBOILER VAPOUR RETURN 246.002
12288
H 50
36"-P-246040-DJB(0.4)
PC 016
FREE DRAINING
TO V-24601
FX 006
L
I 020 10
SP LIMIT
24"x20"
24"-SL-246002-SAB
V
5
24" MW
FC
E-24603B
24"
6
7
N/A ET 10
3 FIRE 2J3 SET@ 500 kPa-g
N/A ET 10
TO ATMOSPHERE AT SAFE LOCATION
246.029
12665
1"-SCL-246006-SAB
T
246.029 SCL 12400
4"x3"
N/A ET 10
4"-VA-246006-SAB
1/2" WEEP HOLE
3"x2"
B
LP STEAM
3/4" CSO
24"-P-246037-DJB(0.4)
30"x24"
3"-SL-246004-SAB
D
FREE DRAINING
2"
D
ET 10 N/A
2"
ET 10 N/A
2"
30"x24"
5
3/4"
D
4 24"-P-246036-DJB(0.4)
10"
2"
24"
4"x2"
24"
RS
2"
24"-SL-246002-SAB
D
RV 011 PP
24"
C
3/4"
2" V
FE 006
FROM DISTRIBUTION
2"
10"
30"
H 50
D
DO NOT POCKET
30"
24"x20"
20"
1"-SL-246002-SAB
30"-P-246039-DJB(0.4)
36"x30"
2"-SL-246003-SAB
30"-P-246038-DJB(0.4)
3/4"
36"x30"
FV 006
3/4"
V
FT 006
3/4"
L
1-1/2"
13128
FROM CB-101A/B/C
RS
C
TT 016
246.003
PT 016
2"
TI 016
CUTBACK SIGNAL
B
2"-P-246109-DJB(0.4) 2"
V FREE DRAINING
4"
ISSUED FOR PHA III
HLL=4200 mm
F
04/20/11
ISSUED FOR ESTIMATE
V-24603B
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
LG 006
NLL=1020 mm
24" MW 10"-SCL-246004-SAB
LT 006
LC 006
LX 006
L
ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
LLL=250 mm
10"
LC SIGNAL
2"
13140
FREE DRAINING
246.020
TO LV-0006 4 8"
D ET 10 50
8"-SCL-246005-SAB TWO PHASE FLOW
CONDENSATE 12680
246.020
SHELL CANADA
TO E-24606
D
QUEST CCS PROJECT
A R
ISSUED FOR HAZOP
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.004
1
REV.
G
246.004
UNIT 246 - REGENERATION/COMMON STRIPPER REBOILER "B" AND CONDENSATE POT
FILE:\\F:\1025\DRAWINGS\CO2\246\246.004.pid MODEL DATE:6/14/2011 10:40:18 AM BY:bes29451
TO V-24601
06/13/11
3/4"
12207
G
2"
246.002
H 50
24"-P-246083-DJB(0.4)
2920 mm
REBOILER LIQUID RETURN
10"
4
3
2
1
E-24601A STRIPPER OVERHEAD CONDENSER RATED DUTY: SURFACE AREA: TEMA TYPE:
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THIK: HEAT TRACE MEDIA/TEMP: TRIM:
26.60 MW (TOTAL) 2272.0 m^2 BHU SHELL 385.00 kPa-g /FV 150 °C/150 °C CS + 3 mm 304L SS CLAD PP/
TUBE 1100.00 kPa-g/ 58 °C/ DUPLEX 2205 + 0.38 mm CA NONE/
P-246127-PJB(0.4) P-246128-PJB(0.4)
CWR-246030-UAB CWR-246031-UAB
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . SYMMETRICAL PIPING.
D
D
TW 018
V 2"
N/A ET 10
30"-P-246016-PJB(0.4)
10"-CWR-246011-UAB
1-1/2"
10"-CWR-246011-UAB
FREE DRAINING
12274
CSO
14"x10"
CSO
2"
TW 017 1-1/2"
14"x10"
10"-CWR-246012-UAB
FREE DRAINING
V
28"
28"
14"
TT 019
6" BACK FLUSH
42"x30"
2"
RS
30"x28"
3
1-1/2" FREE DRAINING
42"x30"
E-24601B
14"
RS
30"x28"
30"x28"
OVERHEAD VAPOUR/LIQUID 12246
246.006
TO V-24602
ET 10 12"-CWS-246029-UAB
D
246.025 CWS 13146
10"-CWS-246030-UAB
N/A ET 10
14"x10"
10"-CWS-246030-UAB
246.025 CWS
B
12271
6"
30"-P-246019-PJB(0.4) FREE DRAINING
42"-P-246020-PJB(0.4) TWO PHASE FLOW
N/A
2"
28"
28"
PP
BACK FLUSH G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
ISSUED FOR HAZOP
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.005
1
REV.
G
246.005
UNIT 246 - REGENERATION/COMMON STRIPPER OVERHEAD CONDENSER
FILE:\\F:\1025\DRAWINGS\CO2\246\246.005.pid MODEL DATE:6/14/2011 10:41:48 AM BY:bes29451
30"-P-246017-PJB(0.4)
TI 019
3/4"
30"-P-246018-PJB(0.4) FREE DRAINING
NC
4" 14"x12" 12"-CWS-246029-UAB
30"x28"
ET 10
D 4"
30"x28"
42"x30"
30"x28"
4"-CWS-246028-UAB
FREE DRAINING
FROM V-24601
14"
C
2"
42"-P-246015-PJB(0.4)
28"
RS
246.002
28" 3
12275
42"x30"
OVERHEAD VAPOURS
ET 10 38
E-24601A
V
NC
14"
4"-CWR-246014-UAB
28"
V
246.025 CWR 13147
N/A ET 10
28"
10"-CWR-246012-UAB
2"
30"x28"
RS
30"x28"
C
246.025 CWR
4
3
2
1
V-24602 STRIPPER REFLUX DRUM SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
36"-GC-246001-PJB(0.4)
D
FREE DRAINIING
36"
FREE DRAINIING
TO ATMOSPHERE AT SAFE LOCATION
TWO PHASE FLOW
N/A ET 10
2"-P-247004-PJB(0.4) TWO PHASE FLOW
4"x3"
4"
4"-VA-246004-PJB(0.4) ET 10 38
1/2" WEEP HOLE
10"
CSO
ET 10 38
D
247.002
12244
FROM V-24702
PURGE WATER 241.023
12636
C 2"x1" 2"-SC-246020-SAB NNF
WATER MAKE-UP 246.021
12131
FROM E-24607
D
SO
2"x1"
2"-P-246027-PJB(0.4)
2"x1"
1"
MINIMUM FLOW
FO
D
6"
FI 009
FT 009
PI 015
FC 007
PT 015
3"x1-1/2"
ET 10 38
3"x2"
FT 007
3"x1-1/2"
1-1/2" FC
WASTE WATER ET 10 3"-P-246028-PJB(0.4) 38 12653 246.027 TO WWTP 271
D
SP 003 S-8
D
3/4"
ET 10 50
4"
6"-P-246021-PJB(0.4)
3"x2"
LV 010
3/4" 3/4"
3/4"
2"
FV 007
3/4"
3/4"
KO LIQUIDS
D
L
3/4" 3/4"
LLLL=300 mm
FROM V-24704
LC 010A
2"
LLL=400 mm 2"
LT 010
FC
3/4"
2"
LG 010
LC 010B
2"x1" 2"x1"
1" 3/4"
MAG
NLL=675 mm
13032
FT 008
FV 008
2"x1"
ET 10 38
6
247.004
FC 008
SAB
HLL=3075 mm
3"-P-241076-PJE(0.4)
PJB(0.4)
H 24" MW
K.O. LIQUID
2"
MIN
2"
4"x3"
3
4"x3"
5
ET 10 38
4"-P-246026-PJB(0.4)
WATER REFLUX 12282
246.002
TO V-24601 SEL ET 10 38
B
8
3/4"
V
3/4"
V
HS 008A
3/4"
R/S
HIS 008
I 003
V
2"
3/4" 2" MIN
I
MIN
I
HOA
D D
P-24603A
PJB(0.4) DAB
3/4"-DM-246007-DAB
ET 10 38
D
D D
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
ISSUED DATE
DESCRIPTION
3/4"
P-24603B
3/4 "
PJB(0.4) DAB
3/4"-DM-246009-DAB
ET 10 38
3/4"
D
4
3
CS
MC
PDP
APE
PEM CLIENT APP
A 2"-DM-246011-DAB
246.033 DM
R
12391
3/4"
P-24603A/B 8 STRIPPER REFLUX PUMPS
MATERIAL: INSULATION TYPE/THK: TRIM:
PRS
QUEST CCS PROJECT
3/4" D
50.3 m^3/hr 559 kPa 15.0 kW CASING 316 SS /
CKD
SHELL CANADA
ET 10 38
RATED FLOW: DIFF. PR.: DRIVER:
BY
4"-P-246025-PJB(0.4)
3/4"
D
3/4 "
PP
3/4"
3/4"
3/4"
3/4"
4"-P-246024-PJB(0.4)
F
REV
PP SP 004B
ISSUED FOR PHA III
ET 10 38
3/4"
PP
06/13/11
B
4"
4" PP SP 004A
PJB(0.4) DAB
3/4"
PJB(0.4) DAB
G
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
D
ISSUED FOR HAZOP
INTERNALS 316 SS 7
UNIT 246 - REGENERATION/COMMON STRIPPER REFLUX DRUM & REFLUX PUMPS SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.006
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.006.pid MODEL DATE:6/14/2011 10:42:30 AM BY:bes29451
V
HIS 007
I 003
8
R/S
2"-DM-246010-DAB
HS 007A
HOA
246.006
HS 109
6"-P-246022-PJB(0.4)
LI 011
ET 10 38
MIN
3/4"
2"
3/4"
4800 mm
C
LL
FROM V-24703
FROM E-24129/24229
V-24602
LT 011
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
13033
4
3"
PP
GWR
247.003
PJE(0.4)
MIN
42" 3"-P-241113-PJB(0.4)
I 003
PJB(0.4)
FREE DRAINING
3"
FREE DRAINING
6"-P-246023-PJB(0.4)
FROM E-24601A/B
2"-P-247002-PJB(0.4)
K.O. LIQUID
3/4"
2"-DM-246008-DAB
246.005
3"x2"
TWO PHASE FLOW
4"-P-246074-PJB(0.4) 12246
D
3/4"
B
42"-P-246020-PJB(0.4) TWO PHASE FLOW
247.001
12368
HOLDS:
RV 013
V
CO2 TO V-24701
2"-P-247003-PJB(0.4)
BLOWTHROUGH 3K4 SET@ 385 kPa-g
OVERHEAD VAPOUR/LIQUID
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 4 . MAKE-UP WATER REQUIREMENTS TO THE AMINE SYSTEM ARE NORMALLY SATISFIED BY THE PURGE WATER FLOW FROM HMU 1 AND 2. 5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 6 . ELECTRIC TRACE TO HLL (ET 10). 7 . ELECTRIC TRACE (ET 10). 8 . AUTO-START BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
3300 mm ID x 7300 mm T/T 385 kPa-g @ 150 °C / FV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ 6 P-246129-PJB(0.4)
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . SUCTION PIPING TO BE AS SYMMETRICAL AS POSSIBLE. 4 . 3 x 50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 1510.6 m3/h. 5 . AUTO-START LOGIC FOR P-24601A/B/C SHALL TAKE INTO CONSIDERATION THE NUMBER OF LEAN AMINE CHARGE PUMPS COMMANDED TO RUN SIMULTANEOUSLY. REFER TO DRAWING 246.011. 6 . ELECTRIC TRACE (ET 10). 7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF EITHER PRIMARY PUMP. 8 . VALVE AND SPACER TO BE ORIENTED IN THE HORIZONTAL PLANE.
D
D
HOLDS: • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
FI 010
FT 010 LEAN AMINE 246.002
12182
14"
ET 10 75
24"-P-246041-DJB(0.4)
M
16"x14"
FROM V-24601
ET 10 63
16"-P-246048-DJE(0.4)
16"x14"
LEAN AMINE 246.001
12230
TO E-24602A/B
12"-P-246048-DJE(0.4)
C ET 10 63 DJB(0.4) DJE(0.4)
8
P-24601A
I 001
DAB
R/S
HIS 001
13130
12"-P-246047-DJE(0.4)
I
D
7 I 001
4
R/S
HS HOA 001A
HIS 002
DAB
3/4" 3/4"
2"
DAB DJE(0.4) DAB
LOCAL/ REMOTE VFD FAULT
16"x12"
D
DJE(0.4)
SI 003
" 3/4
2"-DM-246023-DAB
ET 10 63
2"-DM-246019-DAB
I 002
3/4" 3/4" SP 005C
DJE(0.4)
MIN
MIN
VFD
P-24601B
XL 003 XA 003
B
5
VFD
I
D
I 002
7
P-24601C
I 001
4
R/S
HS HOA 002A
3/4"-DM-246018-DAB
3/4"-DM-246014-DAB
246.013
12"x8"
16"x12" " 3/4
5
1"
1"
DJE(0.4)
VFD FAULT
PP
HIS 003
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
HS HOA 003A
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
3/4"-DM-246022-DAB
6"-DM-246006-DAB
TO V-24606
AMINE DRAIN 13125
246.002
SEL
SHELL CANADA
6"-DM-246005-DAB
QUEST CCS PROJECT
VFD SET POINT
FROM V-24601
246.011 4
MATERIAL: INSULATION TYPE/THK: TRIM:
4
7
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
755.3 m^3/hr 909 kPa 261.0 kW (EACH) CASING INTERNALS 316 SS 316 SS H/ 6 P-246132-DJE(0.4) P-246133-DJE(0.4) P-246134-DJE(0.4)
3
A
FROM PC-041
P-24601A /B /C LEAN AMINE PUMPS RATED FLOW: DIFF. PR.: DRIVER:
12904
ISSUED FOR HAZOP
UNIT 246 - REGENERATION/COMMON LEAN AMINE PUMPS SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.007
1
REV.
G
246.007
HS 104
FILE:\\F:\1025\DRAWINGS\CO2\246\246.007.pid MODEL DATE:6/14/2011 1:17:29 PM BY:bes29451
7
DAB
LOCAL/ REMOTE
2"-DM-246021-DAB
D
XL 002
3/4"-DM-246020-DAB 3/4"
I
SI 002
XA 002
4
AMINE DRAIN
16"-P-246044-DJE(0.4) MIN
MIN
VFD
DAB
DJE(0.4)
3/4" 3/4"
2"
DJE(0.4) I 002
3/4" 3/4"
ET 10 63
5
D
VFD FAULT
SP 005B
2"-DM-246017-DAB
DAB
" 3/4
LOCAL/ REMOTE
12"x8"
16"x12"
DJE(0.4)
2"
PP PP
3/4"-DM-246016-DAB 3/4"
XL 001 XA 001
2"
2"-DM-246013-DAB
D
3/4"-DM-246012-DAB 3/4"
DJE(0.4) DAB
PP
SI 001
2"-DM-246015-DAB
3/4" 3/4"
3/4" 3/4"
DJE(0.4) DAB
2"
MIN
MIN 1"
ET 10 63
PP
SP 005A
DJE(0.4) DAB
16"-P-246043-DJE(0.4)
DAB
DJE(0.4)
12"-P-246046-DJE(0.4)
ET 10 50 12"-P-246045-DJE(0.4)
16"-P-246042-DJE(0.4)
2"
PP
2"
DJE(0.4) DAB
V
12"x8"
2"
ET 10 50
V
ET 10 50
MIN
2"
MIN
8
8
V
DJB(0.4) DJE(0.4) MIN
DJB(0.4) DJE(0.4)
3
C
4
3
2
E-24604A LEAN AMINE COOLER RATED DUTY: SURFACE AREA: TEMA TYPE: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
E-24605A LEAN AMINE TRIM COOLER
20.8 MW 829.0 m^2 BEU SHELL 1500 kPa-g / HV 130 °C / 150 °C CS + 3mm 304L SS CLAD / 5 P-246135-DAB
RATED DUTY: SURFACE AREA: TUBE 1155 kPa-g / 58 °C / DUPLEX 2205 + 0.38 mm CA / CWR-246032-UAB
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM: TEMA TYPE:
FIRE 1-1/2G3 SET@ 1500 kPa-g
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . PIPING BETWEEN TRAIN "A" AND TRAIN "B" TO BE AS SYMMETRICAL AS POSSIBLE. 4 . LOCATE TT-027 MINIMUM 10 PIPE DIAMETERS DOWNSTREAM OF BYPASS MIXING POINT. 5 . ELECTRIC TRACE (ET 10).
COLD 1155 kPa-g / 58 °C / /
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
V 3"-DM-246062-DAB
D
TW 029
DM 246.033
V
CSO
1-1/2"
3/4"
12"
ET 10 N/A
ET 10 38
N/A ET 10
3"x1-1/2"
3/4"
RV 002
B
15.5 MW 676.0 m^2 HOT 1500 kPa-g / HV 105 °C / 150 °C PLATES: 316L SS / GRAPHITE FRAME: CS / 5 P-246136-DAB PLATE & FRAME
HOLDS:
2"
D
1
246.025 CWR
12"-CWR-246001-UAB
ET 10 38
ET 10 63
FROM E-24602A/B 16"
2"
V
16"
16" 2" D
RS
16"
4"-CWS-246019-UAB
4"
E-24604A
C 16"x12"
MIN.
C
16"-P-246057-DAB
BACK FLUSH
246.025 CWS
12"-CWS-246018-UAB
12958
ET 10 N/A
N/A ET 10
6"
12"
16"-P-246105-DAB
LEAN AMINE 246.009
12949
FROM E-24605B ET 10 63
16"-P-246051-DAB
4"-CWR-246002-UAB
TI 026
PP
TC 027
1-1/2"
RS
2"
2"
RS
RS
RS 2"
TT 026
ET 10 63
24"x16"
1-1/2"
2"
L
1-1/2"
4
24"-P-246059-DAB
LEAN AMINE 246.010
12253
TO FILTRATION/P-24602A/B/C
3 D
2"-DM-246063-DAB
ET 10 50
E-24605A
H
TT 027
24"x16"
ET 10 63
2"
3/4" 3/4"
TW 025
ET 10 50
3/4"
TW 028
D
12"-P-246104-DAB 12"x8"
8"-P-246052-DAB
3 12"x8"
6"
4"-CWR-246007-UAB
4"
10"-CWR-246006-UAB
NC
246.009
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
12251
FROM E-24604B
ET 10
ET 10 N/A
4"-CWS-246024-UAB
SHELL CANADA
10"-CWS-246023-UAB
ET 10 38
ET 10 N/A
BACK FLUSH
ET 10 50
LEAN AMINE
06/13/11
N/A 10"
MIN.
N/A ET 10
CSO MIN.
V
2"
8"-P-246055-DAB
G
QUEST CCS PROJECT
A
12960
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT ISSUED FOR HAZOP
UNIT 246 - REGENERATION/COMMON LEAN AMINE COOLING TRAIN "A" SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.008
1
REV.
G
246.008
246.025 CWS
12959
246.025 CWR
R
FILE:\\F:\1025\DRAWINGS\CO2\246\246.008.pid MODEL DATE:6/14/2011 1:17:30 PM BY:bes29451
8"
TV 027
12"x8"FC12"x8"
B
12596
246.033 DM 1-1/2"
10"
246.001
RS
12181
CSO MIN.
NC
3
LEAN AMINE
CSO
3"-P-246053-DAB
16"x12"
12957
4
3
2 E-24605B LEAN AMINE TRIM COOLER
E-24604B LEAN AMINE COOLER RATED DUTY: SURFACE AREA: TEMA TYPE: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
RATED DUTY: SURFACE AREA:
20.8 MW 829.0 m^2 BEU SHELL 1500 kPa-g / HV 130 °C / 150 °C CS + 3 mm 304L SS CLAD / 4 P-246137-DAB
12251
B
3"-DM-246064-DAB
V
DM 246.033
1-1/2"
12"
CSO
3/4"
CWR 13026
16"
2"
16"
16"
4"-CWS-246021-UAB
4"
E-24604B
D
16"-P-246058-DAB
RS
16"
C
NC
2"
V
4"-CWR-246004-UAB
FROM E-24602A/B
ET 10 38
16"x12"
ET 10 63
RS
C
N/A ET 10
16"x12"
MIN.
12"
12"-CWS-246020-UAB
CWS
6"
13027
BACK FLUSH PP
2"
2"
RS
RS
2"
2"
E-24605B
1-1/2"
ET 10 63
RS
3 16"-P-246110-DAB
LEAN AMINE 12949
246.008
TO FILTRATION / P-24602A/B/C
TW 038
B
V
2"-DM-246065-DAB
CSO MIN.
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
APE
PEM CLIENT APP
12262
246.033 DM
4"-CWS-246026-UAB
MIN.
A
10" R
6"
N/A
ET 10
N/A
BACK FLUSH
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT ISSUED FOR HAZOP
UNIT 246 - REGENERATION/COMMON LEAN AMINE COOLING TRAIN "B" SCALE: NONE SHELL DWG NO.:
3
MC
PDP
QUEST CCS PROJECT
13029
4
CS
SHELL CANADA
10"-CWS-246025-UAB
CWS
ISSUED FOR PHA III
B
ET 10 38
4"
4"-CWR-246009-UAB
13028
06/13/11
2
246.0000.000.041.009
1
REV.
G
246.009
CWR
ET 10 38
10"-CWR-246008-UAB
ET 10 N/A 10"
2"
N/A
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.009.pid MODEL DATE:6/14/2011 2:59:13 PM BY:bes29451
RS
D
ET 10 63
1-1/2"
2"
3/4" 3/4"
TW 035
NC
16"-P-246054-DAB
CSO
3 246.001
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
MIN. 3"-P-246056-DAB
12252
12"-CWR-246003-UAB
CSO
TO BYPASS
LEAN AMINE
HOLDS:
ET 10 N/A
ET 10 38
2"
3/4" 3"x1-1/2"
ET 10 50
/
ET 10 N/A
246.008
8"-P-246055-DAB
COLD 1155 kPa-g / 58 °C /
TW 039
V
RV 003
3
INSULATION TYPE/THK: TRIM: TEMA TYPE:
15.5 MW 676.0 m^2 HOT 1500 kPa-g / HV 105 °C / 150 °C PLATES: 316L SS / GRAPHITE FRAME: CS 4 / P-246138-DAB PLATE & FRAME
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . PIPING BETWEEN TRAIN "A" AND TRAIN "B" TO BE AS SYMMETRICAL AS POSSIBLE. 4 . ELECTRIC TRACE (ET 10).
D
FIRE 1-1/2G3 SET@ 1500 kPa-g
LEAN AMINE
DESIGN PRESS: DESIGN TEMP: MATERIAL:
TUBE 1155 kPa-g / 58 °C / DUPLEX 2205 + 0.38 mm CA / CWR-246034-UAB
N/A ET 10
D
1
4
3
2
V-24604 LEAN AMINE FILTER
246.012
12140
FROM P-24604
SIZE: RATED FLOW: DESIGN PR. &TEMP: PRESSURE DROP (CLEAN/DIRTY): MATERIAL: INSULATION TYPE/THK: TRIM:
3200 mm ID x 6000 mmT/T 71 m^3/hr 1500 kPa-g @ 90 °C / HV @ 150 °C 35 kPa / 70 kPa CS + 3 mm CA + PWHT / 316L SS INTERNAL / 5 P-246140-DAB
SIZE: RATED FLOW: DESIGN PR. &TEMP: PRESSURE DROP (CLEAN/DIRTY): MATERIAL: INSULATION TYPE/THK: TRIM: PARTICLE RETENTION SIZE:
4"-P-246088-DAB START-UP
NC
FX 015 FV 015
MIN 246.008
3/4"
FROM E-24605A/B
24"-P-246059-DAB
D
16"
SP 006
6"-P-246XXX-DAB
PP
6"x4"
S8
3
ET 10 50 2"-P-246084-DAB
FILTERED LEAN AMINE 12142
246.012
2"-DM-246030-DAB
246.033 DM
10"x6"
3/4"
246.033 DM
ET 10 3"-DM-246027-DAB 38
D
CSO
3/4"
B
1"
2"-P-246069-DAB D
CSC
3/4" 3/4"
ET 10 38
RS
3"
D
4"
3/4"
V
MIN
13142
ET 10 50
13135
6"-P-246068-DAB
PP
3/4" 3/4"
RV 021
3/4"
10"-P-246066-DAB
6"x4"
246.011
C
V
3/4" 3/4"
FT 016
H 3/4" 3/4"
3"
2"
PDC 035
FIRE 1-1/2H3 SET@ 1500 kPa-g 3/4"
SP 007 4
PDT 035
10"-P-246066-DAB
FX 016
CSO
B
13134
CSC
1"
CSO
FC 016
3/4" 3/4"
38 ET 10
ET 10 50
10"x8"
2"x1-1/2"
3/4"
3/4"
2"-DM-246025-DAB
6
FO 8"
D
246.033 DM
PP
10"-P-246063-DAB
2"x1" 2"-GI-246013-ULB
246.030 GI
3/4"
3/4" V RS
DAB ET 10 ULB N/A
DAB SAB
2"-P-246065-DAB
10"x8"
D
V
ET 10 50
3/4"
FT 015
10"x8"
ET 10 50
4
CSO
10"x8" MIN
MIN
C
L
12235
TO TK-24601
SHUT DOWN
FIRE 1D2 SET@ 1500 kPa-g RV 020
6"-P-246075-DAB FC
FV 016
2"x1"
1"-P-246064-DAB ET 10 38
FC 015
FILTERED LEAN AMINE
HZI 040
HZT 040
HV 040
D
S8 3
D
TO P-24602A/B/C 3/4"
3/4" 3/4"
3/4"
FO
ET 10 75
24"x16" FO 24"x16" D
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
A/S
6
3/4" 3/4"
12253
16"
ET 10 75
HOLDS:
HYI 040
S
24"-P-246059-DAB LEAN AMINE
O/C
HIS 040
ET 10 38
D
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 4 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 5 . ELECTRIC TRACE (ET 10). 6 . MECHANICAL MINIMUM FLOW STOP TO BE PROVIDED.
ID x F/T 71 m^3/hr 1500 kPa-g @ 90 °C / HV @ 150 °C 35 kPa / 103 kPa CS + 3 mm CA + PWHT / 316L SS INTERNAL / 5 P-246141-DAB 10 microns ABSOLUTE
13136
START-UP AMINE
ID x F/T 355 m^3/hr 1500 kPa-g @ 90 °C / HV @ 150 °C 35 kPa / 103 kPa CS + 3 mm CA + PWHT / 316L SS INTERNAL / 5 P-246139-DAB 10 microns ABSOLUTE
V-24609 LEAN AMINE POST FILTER
2"
SIZE: RATED FLOW: DESIGN PR. &TEMP: PRESSURE DROP (CLEAN/DIRTY): MATERIAL: INSULATION TYPE/THK: TRIM: PARTICLE RETENTION SIZE:
V-24608 LEAN AMINE CARBON FILTER
1
V-24604 V-24608
3"
3/4" 3/4"
2"-SC-246015-SAB
B PDC 036
PDT 036
H
PDC 037
H
SP 008
24" MW
3/4" 3/4"
3 3"
V 3/4"
4
PP
PDT 037
S8
12690
246.030 GI
2"-GI-246014-ULB
DAB SAB
12387
246.033 DM
ET 10 38
ET 10 2"-DM-246024-DAB 38
ET 10 DAB N/A ULB
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
3"
2"
G
REV
6"-P-246072-DAB
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SP 009
3"
4
S8
3" 3
246.034 SC
2"-SC-246012-SAB
ULB DAB N/A ET 10 ET 10 38
ET 10 38
R
D DAB
ISSUED FOR HAZOP
SAB
ET 10 38
UNIT 246 - REGENERATION/COMMON LEAN AMINE FILTRATION SCALE: NONE SHELL DWG NO.:
12462
4
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
12390
2"x1"
2"-DM-246029-DAB
A
ET 10 38
3
2
246.0000.000.041.010
1
REV.
G
246.010
2"-SC-246XXX-SAB
MIN 1"-P-246076-DAB
QUEST CCS PROJECT
246.033 DM
GI 246.030
2"-GI-246012-ULB
DM 246.033
3/4"
13141
12687
SHELL CANADA
3/4" 3/4"
3"-DM-246026-DAB
MIN
ET 10 38
ET 10 38
V-24609
FILE:\\F:\1025\DRAWINGS\CO2\246\246.010.pid MODEL DATE:6/14/2011 3:04:21 PM BY:bes29451
3/4" 3/4"
3/4"
ET 10 50
3/4"
3/4" 3/4"
6"-P-246070-DAB
MIN
2"-SC-246014-SAB
PP
4
3
LEAN AMINE FLOW SIGNAL
UC 002
FROM FC-241075 LEAN AMINE FLOW SIGNAL
FC 020
I 002
441.029
FV 020
FROM FC-441075 DAE DAG
8"x6" FO 8"x6"
START-UP / MINIMUM FLOW
DM
DAG DAB
24"-P-246059-DAB
10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm. I 002
PT 042
LL
11 . VALVE AND SPACER TO BE ORIENTED IN THE HORIZONTAL PLANE.
PI 042
12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT. 13 . 316 SS INJECTION QUILL AND 304 SS HEADER TEE. OUTLET OF INJECTION QUILL TO BE CENTERED IN PROCESS PIPE.
FT 020 ET 10 75
ET 10 63
24"x16"
24"-P-246080-DAG
16"-P-246080-DAG
DETAIL "A" INJECTION QUILL
LEAN AMINE 241.021
12644
TO V-24118/V-24218
ET 10 75
SP
FROM E-24605A/B & FILTRATION VFD SET POINT
3/4"
12
PC 041
12904
TO P-24601A/B//C
I 001
L
I 002
D
13
PJG(0.4)
3/4" 3/4"
PT 041
LL
010
DAG FLOW
SEE DETAIL "A"
MP-002
LL 24"x16"
13
24"x16"
ET 10 63
14"-P-246081-DAG
246.101
12238
HOLDS:
TO V-44118
DAG PJG(0.4)
C
LEAN AMINE
3/4"
D
MIN.
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • DETAILS FOR INJECTION QUILL TO BE FINALIZED. • SAFETY SYSTEM PUMP TRIP REQUIREMENTS TO BE CONFIRMED DURING DETAILED ENGINEERING.
5 ET 10 38
3/4"-KP-246003-PJG(0.4)
ANTI-FOAM 246.014
12239
C
FROM P-24606A/B 24"x18"
6
10
V
2"
ET 10 63
ET 10 63
V
16"-P-246077-DAG
PP
P-24602A I 002
I 001
MIN
MIN 1"
B
7
P-24602B 4
HS 005A
HOA
I 002
I 001
I
3/4"-DM-246037-DAG D
HIS 005
DAB
R/S
16"x8"
18"x12"
3/4 "
I D
P-24602C 4
7 HS 006A
HOA
I 002
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
I 001
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
3/4"-DM-246041-DAG 3/4"
DAG
3/4"
2"
D 3/4"
16"x8"
18"x12"
3/4 "
I D
3/4"-DM-246033-DAG
HIS 004
PP
HIS 006
D
R/S
2"
3"x2"
3"-DM-246043-DAB
3/4"
2"-DM-246043-DAB
R/S
3/4"
D DAB DAG
HOA
3/4" 3/4"
E
2"-DM-246040-DAG
7 HS 004A
SP 011C
3/4"-P-246039-DAG
D
D 2"-DM-246036-DAG
3/4"-DM-246035-DAG 3/4"
2"
16"x8"
18"x12"
I
4
PP
E
3/4 "
2"
D
2"-DM-246032-DAG
3/4"-DM-246031-DAG 3/4"
E
FO 108
3/4" 3/4"
SP 011B
2"
18"-P-246062-DAG
MIN
1"
MIN
18"-P-246061-DAG
3/4" 3/4"
3/4" 3/4"
3/4" 3/4"
PP
FO 107 PP
ET 10 63
2"-DM-246034-DAG
1"
MIN
MIN
18"-P-246060-DAG SP 011A
16"-P-246079-DAG
2"
PP 3/4" 3/4"
11
16"-P-246078-DAG
2"
FO 106
2"
ET 10 63
2"
ET 10 63
V
11
MIN
MIN
11
DAB DAG
11
ET 10 63
DAB DAG
MIN
11
2"-DM-246038-DAG
DAB DAG
11
10
D
HS 107
SHELL CANADA
SEL
QUEST CCS PROJECT
A ISSUED FOR HAZOP
P-24602A /B /C LEAN AMINE CHARGE PUMPS 4
RATED FLOW: DIFF. PR.: DRIVER: MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
709.0 m^3/hr (EACH) 3603 kPa 1119.0 kW (EACH) CASING INTERNALS 316 SS 316 SS 9 / P-246142-DAG P-246143-DAG P-246144-DAG
UNIT 246 - REGENERATION/COMMON LEAN AMINE CHARGE PUMPS SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.011
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.011.pid MODEL DATE:6/14/2011 1:17:35 PM BY:bes29451
24"x18"
246.011
246.007
9 . ELECTRIC TRACE (ET 10).
D
D
DAB DAG
246.010
12235
8"-P-246XXX-DAG
2"-DM-246042-DAG
FILTERED LEAN AMINE
ET 10 50
6"
D
8 . UC-002 SHALL MONITOR LEAN AMINE FLOWS TO EACH HMU PLANT AND THE TOTAL LEAN AMINE FLOW INCLUDING THE MINIMUM FLOW RECYCLE. UC-002 WILL PROVIDE A SET POINT TO FC-020 BASED ON THE NUMBER OF RUNNING PUMPS AND WILL AUTOMATICALLY PREVENT EXCESSIVE PUMPING BY STOPPING ONE OF THE RUNNING PUMPS VIA I-002.
3/4" 3/4"
TO E-24602A/B
ET 10 50
8"-P-246085-DAE
12985
12281
2"
246.001
2"-DM-246057-DAB
LEAN AMINE
L
3/4"
12983
8
SP
3
FROM FC-242075 LEAN AMINE FLOW SIGNAL
D
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . CLOSES FV-020 IF NO LEAN AMINE CHARGE PUMPS ARE RUNNING. 4 . 3 x 50% PUMPS FOR A TOTAL FLOW OF 1418 m3/h. 5 . ANTI-FOAM IS ADDED INTERMITTENTLY BY THE OPERATOR ON HIGH DP ACROSS THE AMINE ABSORBERS. ON HIGH DP IN EITHER V-24118 OR V-24218, ANTI-FOAM WILL BE SENT TO BOTH ABSORBERS. 6 . PUMP SUCTION PIPING TO BE AS SYMMETRICAL AS POSSIBLE. 7 . AUTO-START LOGIC FOR P-24602A/B/C SHALL ALSO CONSIDER THE NEED TO RAMP UP AND/OR AUTOSTART P-24601A/B/C. REFER TO DRAWING 246.007.
PV
242.021
12982
1
f(x)
PV
241.021
12981
2
4
3 TK-24601 AMINE MAKE-UP TANK SIZE: WORKING CAPACITY: DESIGN PR. & TEMP.: MATERIAL (SHELL/COIL): INSULATION TYPE/THK: TRIM:
PC 048A
CSO ? ?
2"x1-1/2"
? ?
? ?
LT 015
2"x1-1/2"
XHIS O/C SET@ kPa(g) Vacuum 005 kPa(g) Positive Press PVSV 047
FROM V-24605
5063357 ?
S
TK-24601
? ? 5163612 ET 10 N/A 5156168
MAKE-UP AMINE
1-1/2"
H 25
3/4"
? ? 2"-SCL-246015-SAB
ET 10 38
TK-24602
14
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
5
D
L
3/4" D
4" ? ?
NLL=2600 mm
2"
ET 10 38
2"x1-1/2"
ET 10 63
NLL=2600 mm
2" ? ?
FO N/A ET 10
24"
15
10 ET 10 38
? ?
3"
LT 017
5156893
3"
ET 10 38
ET 10 63
2"
3" ?
38 ET 10
0.75 M
?
FROM P-24608A/B
2"-SL-246020-SAB
2"x1-1/2"
0.75 M
246.029 SL
H 25
2"
D
T
6"
12125
1-1/2"
TV 041
ET 10 N/A
?
246.021
START-UP
FO ? ?
C
CONDENSATE
8
2"x1-1/2"
? ?
10
027
8 2"
LI 017
6
ET 10 63
FG
NC 5163480 5156168 C-1 C-1
LLL=1500 mm
ET 10
24"-P-246112-DAB
4"-SC-246009-SAB
4"
TT 041
2"
ET 10 63
2"-P-246111-DAB
DAB SAB MIN
2"
TT 040
L
4"-P-246092-DAB
HLL=11500 mm
(TYPICAL OF 2)
H
TC 041
HHLL=12000 mm 24" MW
T
? ?
12143
HORN SILENCE
• STORAGE FACILITY TO BE VERTICAL TANK (API 650) OR HORIZONTAL DRUM (ASME SECT VIII). MECHANICAL TO ADVISE LEAST COST ALTERNATIVE.
MIN. 2 m
LLL=1500 mm
2"x1-1/2"
2"
12144
246.029 SCL
HORN TEST
H
LI 016
HLL=11500 mm
(TYPICAL OF 2)
TV 040
5115227 ?
2"-SL-246009-SAB
LHS 016
HHLL=12000 mm
24" MW
5115227 ?
246.029 SL
H
TC 040
4
5156168 ?
2"
4"
SP 019
5163612 C-1
? ? 2"-SCL-246007-SAB ET 10 2"
13167
246.029 SCL
? ?
13168
D
6" 6" SP
12 BERM
BERM ET 10 63
2"-P-246091-DAB
4" 4" NC 5163612 5156168 C-1 C-1
2"
ET 10 50
3/4"-DM-246047-DAB
3/4 "
INTERMITTENT
? C-1
TO V-24601
246.023 DM
246.023 DM
13175
13176
2"-DM-246044-DAB
NC ? C-1
? ?
I
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
REV
R/S
PP
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
? C-2
2"x3"
3"x2"
ISSUED FOR PRELIMINARY REVIEW
B
3/4"
SP 022B
G
2"-DM-246055-DAB
? C-1
HIS 010
3/4"-DM-246052-DAB
3/4"-DM-246048-DAB
I 005
PP
2"
5156893 C-1
5063357 C-1
2"-P-246091-DAB HS 010A
3/4"-DM-246051-DAB
V
5061864 ?
3"-P-246087-DAB
2"-DM-246050-DAB
3/4" C- ? 1
246.002
B
ET 10 50
2"
5063357 C-1 ET 10 50
ET 10 50
ET 10 38
HOA
3/4"
4"x3"
3/4"-DM-246049-DAB
? C-2
PP
ET 10 50
2"-DM-246056-DAB
3/4" V 5061864 ?
3/4"
P-24604
3/4"
ET 10 38
? C-1
3/4" D ? C-1
3/4"
ET 10 38
C-2
3/4 "
P-24605
C- ? 1
SHELL CANADA 3/4"-DM-246054-DAB
2"-DM-246053-DAB
QUEST CCS PROJECT
ET 10 50
A
13174
P-24605 AMINE MAKE-UP PUMP
9
RATED FLOW: DIFF. PR.: DRIVER:
RATED FLOW: DIFF. PR.: DRIVER:
60.0 m^3/hr 758 kPa 12.6 kW CASING INTERNALS MATERIAL: 316 SS 316 SS 11 INSULATION TYPE/THK: / TRIM: P-246149-DAB
4
MATERIAL: INSULATION TYPE/THK: TRIM:
3
9
15.0 m^3/hr 3 300 kPa 1.3 kW CASING INTERNALS 316 SS 316 SS 11 / P-246150-DAB
2
12620
P-24604 AMINE RE-INVENTORY PUMP
246.033 DM
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON AMINE MAKE-UP TANK & PUMPS SCALE: NONE SHELL DWG NO.:
246.0000.000.041.012
1
REV.
G
246.012
246.023 DM
R/S
6"x4"
3/4"-DM-246046-DAB
FO 110
I
? C-2
3/4"
SP 022A
NC ? C-2
NC 5156168 C-1
3/4"
V
5061864 ?
HIS 009
12696
2"-P-246090-DAB
FT 025
4"-P-246088-DAB
PP
5063357 ? C-1 C-1
? C-2
2"x1-1/2"
3/4"
L
FO C-1
ET 10 38 I 004
FV 025 2"x1-1/2"
2"
1-1/2"
? C-1 D
FC 025
? C-1
HOA
TO V-24604
AMINE INVENTORY/MAKE-UP 4"-P-246093-DAB START-UP
NC ? C-2
NC ? C-1
2"-P-246089-DAB
HS 009A
246.010
ISSUED FOR ESTIMATE
? C-1
3/4" V 5061864 ?
12140
6"x3"
5156168 C-1
SP 020
START-UP AMINE 4"-P-246088-DAB START-UP
5163612 C-1
12
ET 10 50
FILE:\\F:\1025\DRAWINGS\CO2\246\246.012.pid MODEL DATE:7/8/2011 2:57:20 PM BY:ahm14887
6"-P-246086-DAB
3/4"
C
FC
C-1 C-1
4"
12 5156168 C-1
5
HS 116
D
HOLDS:
6" 5163612 ?
4"
14
XZT 005
ET 10 63
FROM V-24609
SP 021
FO
? ?
6"-P-246075-DAB
246.010
12142
1/2" WEEP HOLE
6"
24" MW
XV 005
FO
24" MW
A/S
FILTERED LEAN AMINE
GWR
N/A ET 10
6"x4"
GAUGE HATCH 8"
I 007
006
XYI 005
ET 10 38
6"
LT 016
PVSV 046
13
PV 048B
2"
2"-P-246099-DAB NNF
246.013
LAH 016A
7
6"x4"
? ?
SET@ kPa(g) Vacuum kPa(g) Positive Press
LI 016 A GAUGE HATCH 8"
6"
6"-P-246071-ULB
? ?
FC
I
12139
4"
RADAR
13
RECOVERED AMINE
L
3"
12145
LI 015
PIT 048
PV 048A
TO ATMOSPHERE AT SAFE LOCATION
? ?
2"-GI-246010-ULB
1-1/2"
3/4"
246.030 GI
V
HH
I 006
5119160 ?
PCV 045
3/4"
2"-GI-246011-ULB 2"
SET@ 75 kPa-g
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . PUMP WILL HAVE A WAREHOUSE SPARE. 4 . TRUCK CONNECTION NEAR TANK. LOCAL CONTAINMENT FOR TRUCK UNLOADING. TEMPORARY / RENTAL TANKS TO BE PLACED ON PAVED, CURBED AREA BESIDE AMINE STORAGE FACILITY. PAVED AREA TO BE PART OF THE CAPTURE AREA STORMWATER DRAINAGE FACILITIES. 5 . AMINE MAKE-UP TANK CONTAINS UNDILUTED AMINE. 6 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH CONDENSATE. 7 . LEVEL INDICATION AT GRADE TO BE VISIBLE AT TRUCK UNLOADING LOCATION. 8 . FG-027 TO BE VISIBLE FROM VALVE. FLOW GAUGE AND VALVE TO BE AT GRADE NEAR TANK. 9 . ALL AMINE PUMPS ARE CONTAINED WITHIN CURBED CONTAINMENT AREA. 10. STEAM COIL AND ALL TANK APPURTENANCES LOCATED BELOW LLL. 11. ELECTRIC TRACE (ET 10), PIPING,PUMPS & NOZZLES. 12. RENTAL TANK CONNECTION. 13. TANK VENDOR TO SUPPLY PVSV. 14. PLATFORM BETWEEN ROOF AREAS OF EACH TANK. 15. TANKS TO BE NO FURTHER THAN 2m APART, 24 NPS TIE LINE TO BE MINIMUM LENGTH AND TANK NOZZLES TO BE LOCATED AS CLOSE TO GRADE AS POSSIBLE, NO POCKET.
PC 048B
5119160 ?
D
5000 mm ID x 12600 mm HEIGHT 196 m^3 1 kPa-g @ -0.25 kPag @ 60°C LEAN DUPLEX 2101 + 0.4 mm CA / DUPLEX 2205 + 0.4 mm CA IH / SHELL __mm ROOF __mm P-24639039-DAB
3/4"
3/4"
SIZE: WORKING CAPACITY: DESIGN PR. & TEMP.: MATERIAL (SHELL/COIL): INSULATION TYPE/THK: TRIM:
? ?
H
5000 mm ID x 12600 mm HEIGHT 196 m^3 1 kPa-g @ -0.25 kPag @ 60°C LEAN DUPLEX 2101 + 0.4 mm CA / DUPLEX 2205 + 0.4 mm CA IH / SHELL __mm ROOF __mm P-246148-DAB
3/4"
4"x3"
4"-VA-246010-ULB
TK-24602 3 AMINE MAKE-UP TANK
? C-2
RV 046
1
6"-VA-246011-ULB
CV FAILURE 2J3 SET@ 90 kPa-g
TO ATMOSPHERE AT SAFE LOCATION
2
4
3
2
V-24606 AMINE DRAIN DRUM
V-24605 DRAINED AMINE FILTER SIZE: RATED FLOW: DESIGN PR. &TEMP: PRESSURE DROP (CLEAN/DIRTY): MATERIAL: INSULATION TYPE/THK: TRIM: PARTICLE RETENTION SIZE:
2600 mm ID x 8100 mm T/T 350 kPa-g @ 150 °C / HV @ 150 °C CS + 6 mm CA + PWHT / 316 SS + 0.4 mm CA H/ 6 P-246145-DAB
D V
TO ATMOSPERE AT SAFE LOCATION
H
3/4"
LHS 021A
FREE DRAINING
TO V-24601
H
246.034 SC
C
12463
ET 10 38
RS 3"
3/4" ET 10 38 2"-P-246094-DAB
S8
4"-P-246101-DAB
SP 013
9
HORN SILENCE 36" MW 2"
3/4"
ET 10 38
I 019
TI 045
LIT 021
TT 045 GWR 2"
L
I 008
NNF
WASTE WATER 12294
GWR 2"
TO WWTP 271
NC
36"
4"
2"
RS CSO
6" 6"
RS
D
B
4 4"
6" HHLL=2405 mm HLL=2255 mm
6
6"-DM-246060-DAB
AMINE DRAINS 13037
246.033
FROM COLLECTION HEADER
13 3/4"
ET 10 50
D
6"-DM-246061-DAB
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
REV
6"
ISSUED FOR PRELIMINARY REVIEW ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
LLL=200 mm
CSO
FREE DRAINING
G
B
CSO
FREE DRAINING
FROM COLLECTION HEADER
V-24606
6"
13
246.033
13036
ET 10 50
3/4"
AMINE DRAINS
246.027
L
LT 020 2"
2"-WP-246003-DAB
7
D
7
7
P-24607
S-24601
D
2"
SHELL CANADA QUEST CCS PROJECT
A R
P-24607 AMINE DRAIN PUMP RATED FLOW: DIFF. PR.: DRIVER:
S-24601 AMINE DRAIN DRUM SUMP
4
MATERIAL: INSULATION TYPE/THK: TRIM:
3
5
ISSUED FOR HAZOP
25.0 m^3/hr 641 kPa 7.5 kW CASING INTERNALS 316 SS 316 SS / 12 P-246147-DAB
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON AMINE DRAIN DRUM SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.013
1
REV.
G
246.013
FROM COLLECTION HEADER
246.002
FILE:\\F:\1025\DRAWINGS\CO2\246\246.013.pid MODEL DATE:6/14/2011 3:13:43 PM BY:bes29451
6"
ET 10 50
RS
RS 246.033
12477
12401
13
AMINE DRAINS
1m x 1m
HOLD
3/4"
6"-DM-246006-DAB
3/4"
ET 10 38 2"
11
8
PP
I
2"
4"x2"
LI 020
RS
3
2"-SC-246013-SAB
D
3"x2"
SP 012B
2"
HH
RS
4"x2"
3
LI 021
HS 011A
LAH 021A
CSO
SP 012A
LHS 021
H
I 008
HOA
RS
3/4" SO
FROM V-24701
2"
247.001
12626
HS 121
R/S
HIS 011
HORN HORN TEST SILENCE
ET 10 38
2"-DM-247002-PJB(0.4) NNF TWO PHASE FLOW
PDI 052
RECOVERED AMINE
2"
SO
ET 10 50
FROM COLLECTION HEADER KO LIQUIDS
PDT 052
ET 10 38
2"-P-246102-DAB
3/4"
6"-DM-246006-DAB
V-24605
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
2"-P-246098-DAB
V
RS
246.007
13130
ET 10 38
RS
D
AMINE DRAINS
HOLDS:
NC
D
FC
3/4"
12461
ULB DAB 1" 2"x1"
2"x1"
2"-GI-246007-ULB
TO TK-24601
3/4"
PCV 049
N/A ET 10
246.030 GI
PV 050A
2"-P-246097-DAB
DAB SAB
FREE DRAINING
PT 050
V
246.012
2"-P-246096-DAB
2"-DM-246058-DAB
SET@ 100 kPa-g
CSC
12139
NNF
3"
NC
8"-VA-246009-DAB
B
10
C
RECOVERED AMINE
2"
D
D
B
D
3"
CSC
4"-P-246103-DAB CSO
3/4"
FO
1/2" WEEP HOLE
3"x1-1/2"
3"
1-1/2"
3"x1-1/2"
4"x3"
PC 050A
PV 050B
FREE DRAINING
PC 050B
VAPOUR BLOWTHROUGH 4M6 SET@ 350 kPa-g 6"-VA-246007-DAB RV 025
2"-P-246099-DAB
2"
2"-P-246095-DAB
2"
3"-VA-246008-DAB
3/4"
CSO
CSO
ET 10 38
2"x1"
2"-DM-246059-DAB
FIRE 1D2 SET@ 1050 kPa-g
RV 026
3/4"
ET 10 38
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . VACUUM TRUCK CONNECTION. 4 . CHECKER PLATE ON TOP OF SUMP. 5 . PUMP WILL HAVE A WAREHOUSE SPARE. 6 . ELECTRIC TRACING TO HLL (ET 10). 7 . EXTEND BELOW LLL. 8 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 9 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 10. DISCHARGE PIPE FOR RELIEF VALVE TO BE DIRECTED INTO BOTTOM OF AMINE DRAIN DRUM SUMP. ENTRY PROCEDURES INTO SUMP ARE REQUIRED FOR OPERATION / MAINTENANCE TO ENSURE THERE IS NO RELIEF OR OVERFILL OF AMINE INTO THE SUMP. 11. ACCESS HATCH. 12. ELECTRIC TRACE (ET 10). 13. VALVE STEM TO EXTEND ABOVE GRADE. 14. PUMP P-24607 TO BE MANUALLY STARTED ON HIGH LEVEL ALARM.
ID x 25 m^3/hr 1050 kPa-g @ 150 °C / HV @ 150 °C 35 kPa / 150 kPa CS + 3 mm CA + PWHT / 316 SS INTERNAL / 12 P-246146-DAB 10 microns ABSOLUTE
3/4"
SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
4
3
2
1
S- 02NULL ANTI-FOAM INJECTION PACKAGE
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . POSITIVE DISPLACEMENT PUMP WITH ADJUSTABLE STROKE. 4 . GRADUATED GLASS COLUMN FOR CONTINUOUS TOTE TANK LEVEL INDICATION AND INJECTION PUMP CALIBRATION. 5 . SS TUBING TO PIPE CONNECTOR. 6 . VERTICAL ORIENTATION REQUIRED FOR ROTAMETER WITH INLET FLOW INTO THE BOTTOM OF THE INSTRUMENT. 7 . WAREHOUSE SPARE PUMP TO BE PROVIDED AND STORED IN THE ANTI-FOAM INJECTION SHELTER. 8 . ANTI-FOAM INJECTION PUMP TO AUTOMATICALLY STOP 5 MINUTES AFTER BEING STARTED.
D
D
HOLDS: • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
PI 055
S- 02NULL
OUTSIDE INSIDE
1"-VA-246017-PAB VENDOR
SP 017
1" HOSE
1" HOSE
SP 016
SET@ 3500 kPa-g
5
3/4" 3/4"
1"
(BY SHELL) 2"x1"
3/4"
FI 111
6
VENDOR
3/4" 1" HOSE
2"x1"
1-1/2"x1"
6" FILL CAP 2" 2"
LHS 023A
2"
LG 024
LL
LT 023
LG 023
1000 L TOTE TANK (OPERATING)
MAG
I 010
2"
HORN SILENCE
3/4" HOSE
3/4"
3/4" 3/4"
2"
D
D
P-24606
D
L
ET 10 38
N/A INSIDE
SS TUBING PJE(0.4) INSTR. PIPING
ANTI-FOAM 12286
241.021
ET 10 38 ET 10 OUTSIDE
ANTI-FOAM 12283
246.002
TO V-24601
HOA
B
8
7
I 010
I
D 3/4"
LI 023
H
3/4"-SS TUBING
C
TO V-24118/24218
3/4"-KP-246001-PJE(0.4)
HS 015A
3/4"
2"
2"x3/4"
246.011
PIPING SP 014B
SS TUBING PJG(0.4) INSTR. PIPING SP 015 5
PP
1-1/2"x1"
I 009
LHS 023
2"x1" 4
LAH 023A
12239
PULSATION DAMPENER
3/4"
3/4"
HORN SILENCE
3/4"-SS TUBING
ANTI-FOAM
VENDOR
3/4" 3/4"
VENDOR
SP 018
3/4"-SS TUBING
2" D
ET 10 38
TO V-44118
3/4"-KP-246005-PJG(0.4)
FI 112
3/4"
D
PG 057
INSTR.
6 PT 055
2"
3/4"-KP-246003-PJG(0.4) SS TUBING PJG(0.4)
RV 030 1000 L TOTE TANK (REMOVABLE)
SP 014A
5
FI 110
2"
1"-VA-246016-PAB
C
6" FILL CAP
CSC
1"-VA-246018-PAB 2"x1"
6
HS 015
R/S
I 009
3
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
HS 023
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
CURB
CURB
SHELL CANADA QUEST CCS PROJECT
A 7
R
P-24606 3 ANTI-FOAM INJECTION PUMP
MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
160 L/hr 3850 kPa 0.75 kW CASING 316 SS NONE /
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON ANTI-FOAM INJECTION PACKAGE
INTERNALS 316 SS
SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.014
1
REV.
G
246.014
RATED FLOW: DIFF. PR.: DRIVER:
ISSUED FOR HAZOP
FILE:\\F:\1025\DRAWINGS\CO2\246\246.014.pid MODEL DATE:6/14/2011 1:17:40 PM BY:bes29451
HORN TEST
4
3
2
V-24607 CONDENSATE FLASH DRUM SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
E-24606A /B LP COND. / DEMIN WATER EXCHANGER RATED DUTY: SURFACE AREA:
3000 mm ID x 6300 mm T/T 500 kPa-g @ 150 °C / FV @ 150 °C CS + 3 mm CA 5 IH / SCL-246XXX-SAG
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
CONDENSATE
HOT 1150 kPa-g / FV 150 °C / 150 °C PLATES: 304 SS FRAME: CS / SCL-246030-SAB WI-246020-UJB(0.4)
ET 10 100
8"-SCL-246002-SAB
246.003
COLD 1450 kPa-g / HV 125 °C / 125 °C /
5
8" 5156140 C-2
FROM E-24603A / V-24603A CONDENSATE 12680
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . HP CONDENSATE AND FLASHING LP CONDENSATE LINES TO ENTER V-24607 BELOW LLL. 4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH CONDENSATE. 5 . ELECTRIC TRACE TO HHLL (ET 10) AND EXCHANGERS. 6 . REQUIRE HEIGHT TO BE AS LOW AS POSSIBLE (MINIMUM 2.6m) FOR PROCESS HYDRAULICS. 7 . VESSEL SUPPORTED BY MODULE STRUCTURE AND IS LOCATED ABOVE EXCHANGERS E-24606A/B.
13.5 MW (TOTAL)
ET 10 100
8"-SCL-246005-SAB
246.004
6"
5156140 C-2
5242525 C-2
6"
FROM E-24603B / V-24603B
ET 10 75
8"
1-1/2"
1-1/2"
D ? C-2 TW 055
1-1/2"
D
1-1/2"
? C-2 TW 057
1-1/2"
TW 051
246.101
12681
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • RELIEF LINE (INLET AND OUTLET) SIZING.
TO V-25102
1-1/2" D ? C-2
D
? C-2
D
HOLDS:
HOT DEMIN WATER 6"-WI-246007-UJB(0.4)
CSO 5242525 C-2
D
12454
1
1-1/2"
TW 054
1-1/2"
6"-WI-246011-UJB(0.4)
E-24606B 1-1/2" TW 053 DEMIN WATER 246.023
1-1/2"
ET 10 50
1-1/2"
1-1/2"
? C-2
? C-2
1-1/2"
TW 056 D
? C-2
? C-2
D
5245480 C-2 ET 10 50
6"-WI-246010-UJB(0.4)
6" CSO 5245480 C-2
C 246.003
4"
LV 005
FC
LV 006
C
FC
4"
6"x4"
FROM LX-005
13140
1-1/2"
6"
FROM P-24610A/B
13139
1-1/2" D
TW 052
6"x4"
12270
6"-WI-246006-UJB(0.4)
D
E-24606A
246.004
FC C-1
4"x3"
3/4" B 5115227 C-2
CSO 5156140 C-1
2"
4"-VA-246014-SAB
5156862 C-1
5070551 C-2
2"
C-1
ULB SAB
10"
5156140 ?
4
TC 050
12" PP 8"
8"-SC-246016-SAB
ET 10 75
H
TX 050
3"
5156140 C-1 5115277 C-3
3/4"
5156140 C-1
MINIMUM FLOW SIGNAL 246.021
L
FROM FT-030
ET 10 50
4"x3" FO C-1
RECYCLED CONDENSATE 4"-SC-246016-SAB
246.021
5156140 C-1
12127
FROM E-24607
V-24607
5158143 2" C-2
HHLL=3800 mm
5158143 C-2 LG 025
HLL=2900 mm
ET 10 38
3" 5156863 C-1
FROM COLLECTION
5158143 2" C-1
LLLL=250 mm
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
ISSUED DATE
DESCRIPTION
248.002
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
12427
FROM V-24805
SHELL CANADA
3
5158143 2" C-1 5158143 C-2
QUEST CCS PROJECT D
A TT 050
7
6
04/20/11
HP CONDENSATE 2"-SCH-248002-SAG TWO PHASE FLOW
5115277 C-3
R
SLOPE
1-1/2"
ET 10 88
RECOVERED CONDENSATE 10"-SC-246002-SAB
12128
TO P-24608A/B
246.021
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON CONDENSATE RECOVERY EXCHANGER & FLASH DRUM SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.020
1
REV.
G
246.020
3"-SCL-246012-SAB
ET 10 38
3/4"
246.029
F
TO LC-025
5300 mm
12457
ISSUED FOR PHA III
246.021
12129
2"
LLL=1150 mm
07/11/11
LEVEL SIGNAL
LT 025
24" MW 5
G
REV
MAG
3
B
B
2"
LP CONDENSATE
ISSUED FOR ESTIMATE
12130
TV 050 4"x3"
8"x4"
FC 030
FILE:\\F:\1025\DRAWINGS\CO2\246\246.020.pid MODEL DATE:7/10/2011 9:29:49 PM BY:muk22296
2"x1-1/2"
12126
FROM TK-25101
1/2" WEEP HOLE
C-1
4"
246.027
5115227 C-2
2"x1-1/2"
6"x4" 8"x6"
FO 12"x10" C-1
ET 10 88 V
5115277 C-2
CONDENSATE 6"-SC-246011-SAB
START-UP
3/4"
? C-2
12664
PV 061A
ET 10 75
6"-SC-246XXX-SAB
ET 10 75
246.030 2"-GI-246005-ULB GI
1-1/2"
5119160 C-2
PCV 060
ET 10 75
6"x4"
033
3/4"
PT 061
3/4"
2"-GI-246006-ULB
SET@ 75 kPa-g
CSO ? C-1
2"
5119160 C-2
TO ATMOSPHERE CV FAILURE AT SAFE LOCATION 3L4 SET@ 500 kPa-g 6"-VA-246015-SAB RV
8"-SC-246001-SAB
PV 061B
5156140 C-1
H
PC 061
C-1 3/4"
10"
SPLIT
12" 12"x10"
4"x3"
RV 034
? C-1
4"-VA-246019-ULB
12"-VA-246020-SAB
6"
CV FAILURE 2J3 SET@ 90 kPa-g
5156140 ?
TO ATMOSPHERE AT SAFE LOCATION
6"
TO ATMOSPHERE AT SAFE LOCATION
6"x4"
FROM LX-006
4
3
2
1
E-24607A /B CONDENSATE COOLER RATED DUTY: 0.7 MW (TOTAL) SURFACE AREA: TBD TEMA TYPE: BEU SHELL DESIGN PRESS: 1200 kPa-g / FV DESIGN TEMP: 150 °C / 150 °C MATERIAL: / INSULATION TYPE/THK: 5 TRIM: SC-246040-SAB CWR-246035-UAB RECYCLED CONDENSATE
D
246.020
12127
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . 2x100% PUMPS FOR TOTAL FLOW RATE OF 183 m3/h. 4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH CONDENSATE. 5 . ELECTRIC TRACE (ET 10).
TUBE 1200 kPa-g / / 58 °C /
5
ET 10 38
4"-SC-246016-SAB
ET 10 38
NNF
TO V-24607 ET 10 38
6"x4"
TT 062
3"
D 5115227 C-2
5115273 C-2
5156140 C-2
BACK FLUSH
ET 10 50
6"x4"
246.006
D
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
TO V-24602 COOLED CONDENSATE
2"-SC-246017-SAB
12123
246.022
246.025 CWS
6"-CWS-246031-UAB
5307521 C-2
1-1/2"
12120
RS
6"x4"
TI 062
12131
TO P-24609A/B
3/4"
H
HOLDS:
WATER MAKE-UP 2"-SC-246020-SAB
E-24607B
RS
E-24607A
TW 064
6"x4"
C
1-1/2"
246.025 CWR
6"-CWR-246014-UAB
CSO 5307521 C-2
12119
5156140 C-2
6"x4"
D
5115273 C-2
1-1/2"
LC 025
4"-SC-246007-SAB
LL
ET 10 50
6"
D
5115227 C-2
FC C-1
12129
FROM LT-025
RECOVERED CLEAN CONDENSATE 6"-SC-246008-SAB
5156140 C-1
12654
246.027
TO TK-25101
ET 10 38
FLUSHING CONDENSATE 2"-SC-246010-SAB
L
12579
246.034
TO DISTRIBUTION
I
LL
HOA
MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
3/4"
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
PP
SHELL CANADA
? C-1
QUEST CCS PROJECT
A
3/4 "
P-24608B
D 5115227 C-1
R
P-24608A /B 3 RECOVERED CLEAN CONDENSATE PUMP RATED FLOW: DIFF. PR.: DRIVER:
ISSUED FOR PHA III
5163480 C-1
? C-1
3/4"
? C-1
D
D
5115227 C-1
D 5115227 C-1
5115227 C-1 3/4"
5156140 C-1
07/11/11
D 5115227 C-1
8"-SC-246004-SAB
3/4 "
P-24608A
SP 023B
3/4"
5115227 C-1
3/4" D
V
G
3/4"
R/S
PP
? C-1
B
246.012
I
PP
3/4"
6"-SC-246005-SAB
? C-1
3/4" D
5115227 C-1
5156140 C-1
8"-SC-246003-SAB
3/4"
D
5115227 C-1
3"
FROM V-24607
10"x8"
SP 023A
5115227 C-1
ET 10 50
HIS 018
5163480 C-1
ET 10 50
V 10"-SC-246002-SAB
I 012
D 5115227 C-1
3/4"
12125
REV
SEL
3/4"
PP
5156140 C-1
5156140 C-1
HS 119
I 012
I
RECOVERED CONDENSATE
HS 018A
6"-SC-246006-SAB
HIS 017
R/S
CONDENSATE 4"-SC-246009-SAB
TO TK-24601 / Tk-24602 4
HOA HS 017A
ET 10 38
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
183.0 m^3/hr 602 kPa 30.5 kW CASING INTERNALS CS CS 5 / SC-246041-SAB SC-246042-SAB
UNIT 246 - REGENERATION/COMMON CONDENSATE RECOVERY PUMPS & COOLER SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.021
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.021.pid MODEL DATE:7/10/2011 9:38:48 PM BY:muk22296
012
START-UP
246.021
PT 065
? C-2
246.020
L
246.020
ISSUED FOR ESTIMATE 3/4"
12128
NC 5156140 C-2
4"
TO FC-030
PI 065
C-2
FT 030
12130
011
6"
5156140 C-1
246.020
LEVEL SIGNAL
I
LV 025 6"
MINIMUM FLOW SIGNAL
H
3/4"
3/4" D 5115227 C-2
ET 10 50
6"x4" 3/4"
TW 061
C
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . 2x100% PUMPS. ONE OPERATING, ONE SPARE. 4 . ELECTRIC TRACE (ET 10). 5 . TOTAL WASH WATER MAKE-UP FLOW TO V-24119 AND V-24219.
D
D FLOW SIGNAL 241.022
13030
FROM FC-241076
5
FI 076
I 018
L
LL
FX 076
FLOW SIGNAL 242.022
13031
FROM FC-242076
ET 10 38
WASH WATER 2"-SCH-246003-SAG
12133
241.022
TO V-24119 / V-24219
3/4" ? C-2
C
I 014
PT 070
PI 070
LL
C
L
HOA
HOA
HS 020A
HS 021A I 018 SEL
HS 122
I 011
I 011
HIS 021
I 014
R/S
? C-1
3/4"
I
3/4"
I
D
D
SAB
D
D
2"-SCH-246002-SAG
? C-1
3/4"
2"-SC-246019-SAG
3/4 "
P-24609A
? C-1
V
?
D 5115277 C-1
C-1 SAB SAG
D
? C-1
? C-1 SAG
? C-1
FROM E-24607
? C-1
3/4"
2"-SC-246018-SAG
PP
C-1?
? C-1
? C-1
3/4"
ET 10 38
3/4"
D
3/4"
ISSUED FOR ESTIMATE
PP
? C-1
B
3/4 "
P-24609B
D 5115277 C-1
G
07/11/11
ISSURD FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
P-24609A /B WATER MAKE-UP PUMPS 3
RATED FLOW: DIFF. PR.: DRIVER: MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
9.9 m^3/hr 2741 kPa 7.5 kW CASING INTERNALS CS CS / 4 SCH-246XXX-SAG SCH-246XXX-SAG
UNIT 246 - REGENERATION/COMMON WASH WATER MAKE-UP PUMPS SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.022
1
REV.
G
246.022
246.021
2"-SC-246017-SAB
? C-1
12123
3/4"
COOLED CONDENSATE
V
PP 3/4"
3/4"
ET 10 38
PP
? C-1
5063246 C-1
2"-SCH-246001-SAG
? C-1
FILE:\\F:\1025\DRAWINGS\CO2\246\246.022.pid MODEL DATE:7/4/2011 1:16:19 PM BY:ahm14887
I 014
5063246 C-1
R/S
? C-1
HIS 020
I 018
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . 2x50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 185 m3/h. 4 . TRIP ONE PUMP ON HIGH LEVEL(3234 mm) AND BOTH PUMPS ON HIGH HIGH LEVEL (4801 mm) IN V-25102. REFER TO P&ID 251.0000.000.041.103. 5 . ELECTRIC TRACE (ET 10). 6 . INTERLOCK I-015 TO FORCE HV-027 OPEN WHEN BOTH DEMIN WATER SUPPLY PUMPS ARE STOPPED.
HOLDS:
D
D
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
DEMIN WATER
ET 10 50
6"-WI-246006-UJB(0.4)
12270
246.020
TO E-24606
C-2
RV 032
FROM LC-251001D
C
PI 075 ET 10 50
6
L
O/C
HIS 027
I 015
FC 035
HV 027
3/4"
L
PT 075
D
6"x4"
HOA
SI 025
HS 025A
XL 025
6"x4"
CSO 5242525 C-1
LOCAL/ VFD REMOTE FAULT
XA 025
B 5134289 C-2
4"
5242525 5248450 C-1 C-1
FO C-1
3/4"
? C-1
5242525 C-1
? C-2
6"
6"-WI-246021-UJB(0.4)
3/4"
C TO GRADE
LOCAL/ VFD REMOTE FAULT
HOA
SI 026
HS 026A
XL 026
XA 026
3/4"
3/4"
VFD
I
HIS 026
R/S
I 015
4
4"-WI-246005-UJB(0.4)
PP
? C-1
3/4"
4"-WI-246004-UJB(0.4)
PP 3/4"
ISSUED FOR ESTIMATE 3/4"
PP
B
? C-1
D
D
D 5134289 C-1
D
? C-1
P-24610A
5242525 C-1
3/4"
3/4 "
3/4"
6"-WI-246003-UJB(0.4)
6"-WI-246002-UJB(0.4) 5242525 C-1
FROM FV-251001
? C-1
3/4"
ET 10 50
? C-1
D
3/4 "
P-24610B
D 5134289 C-1
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
P-24610A /B 3 DEMIN WATER SUPPLY PUMPS RATED FLOW: DIFF. PR.: DRIVER: MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
92.5 m^3/hr 503 kPa 26.0 kW CASING INTERNALS 316 SS 316 SS / 5 WI-246031-UJB(0.4) WI-246032-UJB(0.4)
UNIT 246 - REGENERATION/COMMON DEMIN WATER PUMPS SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.023
1
REV.
G
246.023
6"-WI-246001-UJB(0.4)
5134289 C-1 3/4"
246.101
3/4"
12137
I
4 PP
DEMIN WATER
VFD
5248450 C-1
I 015
? C-2
? C-1
R/S
5134289 C-1
HIS 025
D
? C-2
5248450 C-1
ET 10 50
D
FILE:\\F:\1025\DRAWINGS\CO2\246\246.023.pid MODEL DATE:7/6/2011 10:42:58 PM BY:muk22296
ET 10 50
4"-WI-246009-UJB(0.4)
C-1
CSO 5242525 C-1
251.103
4"x3"
4"x3"
SP
H
4"-WI-246008-UJB(0.4)
SET POINT
CSO 5242525 C-1
FT 035
BLOCKED DISCHARGE 3L4 SET@ 1450 kPa-g
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . 2x50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 6236 m3/h. HOLD 4 . DESIGN CONDITIONS ARE 1200 kPag @ 58 °C AND ARE SUBJECT TO CHANGE BASED ON COOLING WATER BOOSTER PUMP DATA (P-24611). 5 . ELECTRIC TRACE (ET 10) PUMPS AND INDIVIDUAL SUCTION & DISCHARGE PIPING WITHIN BLOCK VALVES. 6 . HIGH POINT VENT. HOLD 7 . PROVIDE 30NPS FLANGES TO ALLOW PROVISION OF 3RD FUTURE PUMP. HOLD 8 . IF POSSIBLE, LEAVE SPACE IN PLOT PLAN FOR FUTURE 3RD CW PUMP. HOLD
D
D
HOLDS: • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • PUMP SIZING TO BE CONFIRMED PENDING SHELL COOLING WATER SURVEY & FINAL HEAT EXCHANGER COOLING WATER FLOWRATES. • DESIGN CONDITIONS TO BE CONFIRMED. • PUMP SELECTION, SIZING, TYPE, NUMBER AND LAYOUT FOR COOLING WATER PUMPS. • TOTAL REQUIRED FLOW WILL NOT CHANGE.
XHIS 006
I 016
XYI 006
7
O/C
COOLING WATER SUPPLY 30"-CWS-246007-UAB HOLD 4
12135
246.025
TO DISTRIBUTION
s A/S
7
XZT 006
F
XV 006 24"
24"-CWS-246002-UAB
UG
AG
COOLING WATER SUPPLY 282.001
TW 070 30"-CWS-246001-UAB
30"-CWS-282015-UAB
N/A
5280764 30"x24" C-1
FO C-1
C
ET 10
24"
C
D 5115273 C-1
1-1/2"
7
5307853 C-1
N/A ET 10
D
030
ET 10 88 5307853 C-1 N/A ET 10
" 3/4 D 5115273 C-1
D
I
I
HIS 030
ET 10 88 " 3/4 D 5115273 C-1
016
P-24611A
5115273 C-1
HS 030A
2"
JSLL
? C-1
5115273 C-1
HOA
6 3/4"
6
SP 024B
R/S
5280764 C-1
5280764 C-1
2"
30"-CWS-246004-UAB
2"
6
5115273 C-1
JSLL 031
HOA HS 031A
ISSUED FOR ESTIMATE
5115273 C-1
D
? C-1
PP
5115273 C-1
ET 10
5115273 C-1 3/4"
5307853 C-1 N/A
3/4"
ET 10 88
5115273 C-1
6 ? C-1 2"
SP 024A
3/4"
30"-CWS-246003-UAB
D 5115273 C-2
3/4"
PP
ET 10 88
? C-1
3/4"
D 5115273 C-2
3/4"
PP
24"-CWS-246006-UAB
3/4"
24"-CWS-246005-UAB
PP
N/A ET 10
30"-CWS-246001-UAB
I
I
B
016
P-24611B
HIS 031
R/S G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
HOLD
P-24611A/B 3 COOLING WATER BOOSTER PUMP
MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
3118.0 m^3/hr 260 kPa 225.0 kW CASING INTERNALS CS CS / 5 CWS-246036-UAB CWS-246037-UAB
UNIT 246 - REGENERATION/COMMON COOLING WATER BOOSTER PUMPS SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.024
1
REV.
G
246.024
RATED FLOW: DIFF. PR.: DRIVER:
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
FILE:\\F:\1025\DRAWINGS\CO2\246\246.024.pid MODEL DATE:7/6/2011 10:49:25 PM BY:muk22296
30"-CWS-246001-UAB
5307853 C-1
HOLD 4
5115273 C-1 3/4"
ET 10 N/A
4
3/4"
1200 kPag UAB DESIGN PRESSURE
5307853 C-1
800 kPag UAB DESIGN PRESSURE
24"
FROM HEADER
3
2
1 ET 10 50
E-24703 COMPRESSOR 12321 3RD STAGE 247.003 COOLER CWS
6"-CWR-247004-UAB
ET 10 63
6"-CWS-246013-UAB
ET 10 63
6"-CWR-247005-UAB
ET 10 63
6"-CWS-246014-UAB
ET 10 63
N/A ET 10
ET 10 N/A
N/A ET 10
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . DESIGN CONDITIONS ARE 1200 kPa-g @ 58 °C FOR ABOVE GROUND PIPING. DESIGN CONDITIONS ARE SUBJECT TO CHANGE BASED ON COOLING WATER BOOSTER PUMP (P-24611).
6"x4" 10"x6"
247.003 CWR
12895
CWR
12894
CWS
C-24701 LUBE OIL COOLING
ET 10 N/A
10"x6"
D
ET 10 N/A
ET 10 N/A
N/A ET 10
10"x6"
12352
5156140 C-3
ET 10 N/A
10"x6"
ET 10 63
10"x6"
6"-CWS-246015-UAB
10"x6"
ET 10 63
10"x6"
E-24705 COMPRESSOR 12351 5TH STAGE 247.005 COOLER CWS
6"-CWR-247006-UAB
10"x6"
247.005 CWR
12"x6"
6"x4"
4"
12"x6"
4
N/A ET 10
HOLDS:
ET 10 N/A
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • ELECTRIC HEAT TRACING AND INSULATION REQUIREMENTS WILL BE EVALUATED BASED ON COMPRESSOR INTERSTAGE COOLER LOCATION. • CW DESIGN CONDITIONS TO BE CONFIRMED WHEN P-24611A/B IS FINALIZED. • CW LINE SIZES TO BE CONFIRMED WHEN EXCHANGER CW FLOWS ARE FINALIZED.
D
4"
6"-CWR-246014-UAB
ET 10 63
246.021 CWR
247.004 CWR
E-24704 COMPRESSOR 12344 4TH STAGE 247.004 COOLER CWS
2"-CWR-247003-UAB
ET 10 63
2"-CWS-246012-UAB
HOLD 16"x12"
HOLD 16"x12"
12322
12345
E-24607 CONDENSATE 246.021 COOLER CWS 12119
? C-3 6"-CWS-246031-UAB
12120
ET 10 38
C
2"-CWS-246032-UAB
ET 10 38
246.028 CWS
LCP-XXX CONDENSATE RECOVERY 246.028 SAMPLING CWR
ET 10 38
2"-CWR-246015-UAB
C
ET 10 38
12434
12433
247.002 CWR
ET 10 63
6"-CWS-246011-UAB
ET 10 63
13047
12311
247.001 CWR
10"-CWS-246025-UAB
E-24701 COMPRESSOR 12364 1ST STAGE 247.001 COOLER CWS
6"-CWR-247001-UAB
ET 10 63
6"-CWS-246010-UAB
ET 10 63
3"-CWR-248001-UAB
ET 10 50
12363
248.001 CWR
ISSUED FOR ESTIMATE
12918
248.001 CWS
3"-CWS-246009-UAB
ET 10 50
12919
2" ? C-2
ET 10 63
18"x6"
ET 10
30"x24"
24"x18"
30"-CWS-246016-UAB
30"x16"
16"-CWS-246008-UAB
N/A
B
pH AE 001
AIT 001
AI 001
H
L G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
ET 10 63
18"x6"
24"x18"
30"x24"
ET 10 N/A
TO UTILITY/COGEN CWS
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
16"-CWR-246017-UAB
3
30"-CWR-282015-UAB
282.001
REV
TW 075
UG AG 282 246
COOLING WATER RETURN
30"-CWR-246016-UAB
30"x16"
3/4" S-1
SHELL CANADA
COOLING WATER SUPPLY 246.024
30"-CWS-246007-UAB
QUEST CCS PROJECT
FROM P-24611A/B
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON COOLING WATER DISTRIBUTION SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.025
1
REV.
G
246.025
12135
FILE:\\F:\1025\DRAWINGS\CO2\246\246.025.pid MODEL DATE:7/6/2011 11:03:09 PM BY:muk22296
E-24701 TEG COOLER
PIPING INST
CWR 246.009 246.009 CWS
12271
13046
E-24605B LEAN AMINE TRIM COOLER
10"-CWS-246008-UAB
12"-CWS-246030-UAB
246.005 CWS
12274
246.005 CWR 12"-CWR-246012-UAB
12898
10"-CWS-246023-UAB
12899
CWR 246.008 246.008 CWS
10"-CWR-246006-UAB
13146
246.005 CWS 12"-CWS-246029-UAB
246.005 CWR 12"-CWR-246011-UAB
13049
12"-CWS-246020-UAB
E-24601B STRIPPER OVERHEAD CONDENSER
E-24605A LEAN AMINE TRIM COOLER
18"x12"
12896
13048
CWS 246.008 246.009 CWS
12"-CWS-246018-UAB 18"x12"
12"-CWR-246003-UAB 18"x12"
12957
CWR 246.008 246.009 CWR
12"-CWR-246001-UAB 18"x12"
13147
E-24601A STRIPPER OVERHEAD CONDENSER
E-24604A/B LEAN AMINE COOLER
E-24702 COMPRESSOR 12300 2ND STAGE 247.002 COOLER CWS
6"-CWR-247002-UAB
4
3
2
1
S-24603 CO2 VENT STACK
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . VENT STOCK FLOW MEASUREMENT REQUIRED TO EVALUATE UNIT CAPACITY DURING INITIAL START-UP, AS PROPOSED TO THE GOVERMENT OF ALBERTA. TO BE LOCATED NEAR GRADE. 4 . COSTING BASED ON FLOW MEASUREMENT REQUIRED FOR REGULATORY (CEMS). 5 . INSULATION AND EHT TO HLL. 6 . INSULATION AND EHT (ET10) TO 1000mm ABOVE BOTTOM TAN LINE OF 900 mm DIA VENT BASE. 7 . INTERNAL 12 MPS PROJECTION WITH 45° LR ELBOW. PROVIDE 13 mm WEEP HOLE AT LOW POINT MINIMUM DISTANCE TO NOZZLE. 8 . ROUTE DRAIN LINE TO NEAREST POSWS MANHOLE.
SIZE: TIP- 500 mm DIA x 2440 mm H RISER- 600 mm DIA x 3000 mm H BASE- 900 mm DIA x 13830 mm H BOOT- 250 mm DIA x 500 mm H DESIGN: 100°C/50 kPag MATERIAL: VENT- 304 SS DERRICK- CS 6 INSULATION/THK: MDMT: -80°C TRIM: VA-246030-PJB(C)
D
D
HOLDS: • • • •
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. PRELIMINARY DESIGN IS FOR VENT AT HIGH POINT STRUCTURE. VENT SIZE LINE REQUIREMENTS FROM PIPELINE. VENT STACK DISPERSION MODELLING.
C
C
3
FE 080B 2" 4
TI 080
2"
TT 080
4"
AP 005
4
S-24603
2"
4 FE 080A
VENT GAS 13011
246.032
FQI 080
FT 080
8"
8"x6"
6"-VA-247009-PJB(C)
3
ISSUED FOR ESTIMATE
FREE DRAINING
DERRICK SUPPORT STRUCTURE
7
B
VENT GAS 24"-VA-247001-PJB(0.4) FREE DRAINING
24" MW
6" PJB(C)
?
? 3"
6
C-2 ? 2"
LIT 030
LI 030
H
ET 10 50
2"-WP-246004-PJB
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
NC ?
REV
C-1
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
8 POSWS
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.026
1
REV.
G
246.026
UNIT 246 - REGENERATION/COMMON CO2 VENT STACK
FILE:\\F:\1025\DRAWINGS\CO2\246\246.026.pid MODEL DATE:7/6/2011 11:09:45 PM BY:muk22296
PJB(C) PJB
246.032
PJB(0.4)
12474
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . CONNECTION FOR UTILITY WATER TO QUENCH POC IF REQUIRED BY WWTU. 4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH CONDENSATE.
HOLDS: • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
D
D
4
FI 085
CONDENSATE
ET 10 50
6"-SC-246011-SAB START-UP
RECOVERED CLEAN CONDENSATE
ET 10 50
6"-SC-246008-SAB
PROM P-24608A/B
RECOVERED CLEAN CONDENSATE
ET 10 50
6"-SC-246008-SAB
AP 003
2"
C
246.101
12615
TO TK-25101
C-2 PIPING INSTR.
ET 10 38
3"-P-246026-PJB(0.4)
FROM P-24603A/B 246.006
12653
WASTE WATER
WASTE WATER
ET 10 38
? C-2
2"
? C-1
HOLD
12614
246.101
TO WWTP 271
3 S-1
PJB(0.4) DAB
4"-WP-246002-PJB(0.4)
3/4"
4"x3"
? C-2
ET 10 38
SP 025
WASTE WATER 2"-WP-246003-DAB
246.013
NNF
12294
FROM P-24607
ISSUED FOR ESTIMATE
B
INDOOR TUBING PP 25
PP 25
316 SS TUBING
RECOVERED CLEAN CONDENSATE 12430
TO AE-003
246.028
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON RECOVERED CLEAN CONDENSATE & WW COLLECTION SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.027
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.027.pid MODEL DATE:7/4/2011 3:00:46 PM BY:ahm14887
OUTDOOR TUBING ET 10
246.027
246.021
5097550 C-2
12654
MIN
C
TO V-24607
NC 5156140 ?
FT 085
246.020
12126
4
RECOVERED CLEAN CONDENSATE 12430
246.027
FROM P-24608A/B
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . SELF CONTAINED MECHANICAL THERMAL SHUT OFF VALVE.
PP 25
316 SS TUBING
? ?
4.
FLUOR
5 . FOR CONTAMINATED CONDENSATE SWITCHING VALVES. REFER TO DRAWING 251.0000.000.041.XXX.
RC
INSTRUMENT SYMBOL DENOTES REAGENT ADDITION AND CONDITIONING.
VENDOR
D
D
HOLDS: TO SINK (TYP.)
• • • •
1"
V
5115273 ?
FLUOR
VENDOR
NC
INDOOR OUTDOOR ET 10 38
2"-CWR-246015-UAB
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. VENDOR PACKAGE DETAILS TO BE CONFIRMED. ANALYZER INDICATION DESTINATION DRAWING NUMBERS TO BE CONFIRMED.
246.025 CWR 12433
1"
V
5115273 ?
FLUOR
VENDOR
TO SINK (TYP.)
INDOOR OUTDOOR ET 10 38
2"-CWS-246032-UAB
246.025 CWS 12434
3
SET@ 69 kPa-g
TCV 090
PCV 085
SET@ 79 kPa-g RV 035
C
C
TG 091
FI 093
FI 091
FI 092
PG 086
ISSUED FOR ESTIMATE pH AIT 002
AE 002
RC
B
4
HOLD
AE 003
TO SINK (TYP.)
PCV 087
SET@ 61 kPa-g
AI 003
AIT 003
5 TO SINK (TYP.)
I 017
H
ANALYZER INDICATION
G
07/11/11
ISSUED FOR PHA III
251.XXX
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
TO UNIT 251
HH
REV
pH
AI 002
ISSUED FOR PRELIMINARY REVIEW
B
LL
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
ANALYZER INDICATION 251.XXX
L
TO UNIT 251
GRAB SAMPLE
SHELL CANADA
SAMPLE SINK
QUEST CCS PROJECT
A VENDOR FLUOR
1"-DO-246XXX-SAB
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.028
1
REV.
G
246.028
UNIT 246 - REGENERATION/COMMON CONDENSATE RECOVERY SAMPLING SYSTEM,LCP-XXX
GRADE
FILE:\\F:\1025\DRAWINGS\CO2\246\246.028.pid MODEL DATE:7/4/2011 1:28:28 PM BY:ahm14887
CC
CC
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND FIGURE 18-2 TO 18-5 FOR UTILITY STATION DETAILS. 4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE VALVED.
LP STEAM 36"-SL-246001-SAB
246.101
12438
H 50
FROM HEADER
D ET 10 38
U/S #2
2"x1"
H 38
2"-SL-246002-SAB
3"x2"
2"x1"
D
LP STEAM
H 38 H 50 LP STEAM
H 50
1"-SCL-246010-SAB
ET 10 38
246.002
2"x1"
2"-SCL-246019-SAB
2"x1"
STEAM OUT 246.002
C
12694
2"-SL-246015-SAB
LP STEAM
H 38
2"-SL-246016-SAB
H 50
3"-SL-246004-SAB
247.011
12610
TO E-24709A/B
36"x10"
FROM V-24601
LP STEAM
H 38
3"x2"
CONDENSATE
3"x2"
TO E-24603A
12695
2"-SL-246018-SAB
H 38
246.003
24"-SL-246009-SAB
12685
3"-SCL-246009-SAB
TO E-24603B
U/S #9
H 38
24"-SL-246002-SAB
36"x24"
12665
36"x24"
246.004
247.012
12449
TO E-24709C/D
C 10"x8"
TO V-24601 CONDENSATE
ET 10 38
2"-SCL-247008-SAB
247.012
12456
2"-SCL-246011-SAB
ET 10 38
3"-SCL-246012-SAB
ET 10 38
LP CONDENSATE
H 38
TO V-24607
2"-SCL-246013-SAB
H 38
2"-SL-246014-SAB
ET 10 38
2"-SCL-246018-SAB
2"x1"
2"x1"
ET 10 38
ET 10 38
ISSUED FOR ESTIMATE
ET 10 38
B
2"-SL-246020-SAB
ET 10
H 50
2"-SCL-246022-SAB
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
U/S #5
U/S #6
2"-SL-246021-SAB
2"x1"
2"x1"
2"x1"
2"x1"
H 50
2"x1"
B REV
U/S #7
ET 10
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
2"-SCL-246023-SAB
2"-SL-246022-SAB
2"-SCL-246024-SAB
SHELL CANADA
2"-SCL-247002-SAB
2"-SL-246011-SAB
3"-SL-246009-SAB
2"-SCL-246015-SAB
ET 10
QUEST CCS PROJECT
A
4
3
SCALE: NONE SHELL DWG NO.:
2
246.0000.000.041.029
1
REV.
G
246.029
247.007 12455
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 246 - REGENERATION/COMMON LP STEAM DISTRIBUTION AND COND. COLLECTION
FROM E-24708A/B
TO E-24708A/B
CONDENSATE
247.007
12447
LP STEAM FROM TK-24601
12661
246.012
TO TK-24601 CONDENSATE
246.012
12884
LP STEAM
R
FILE:\\F:\1025\DRAWINGS\CO2\246\246.029.pid MODEL DATE:7/10/2011 9:41:04 PM BY:muk22296
2"-SL-246013-SAB
2"-SCL-246017-SAB
H 38
H 38
H 38
ET 10 38 2"-SCL-246016-SAB
2"-SL-246010-SAB
H 38
ET 10
H 50
ET 10 38
3"-SL-246014-SAB
ET 10 38 2"-SCL-246014-SAB
H 38
8"x3"
2"-SL-246008-SAB
2"x1"
2"-SL-246007-SAB
2"x1"
2"x1"
12611
FROM E-24709A/B
U/S #10
12457
U/S #4
246.020
247.011
U/S #8
H 38
2"-SCL-247005-SAB
U/S #11
2"x1"
2"-SL-246006-SAB
CONDENSATE
ET 10 38
U/S #12
U/S #3
2"x1"
ET 10 38
H 50
FROM E-24709C/D
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"246' UNLESS OTHERWISE STATED. 3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND FIGURE 18-2 TO 18-5 FOR UTILITY STATIONDETAILS. 4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE VALVED. 5 . CONNECTION FOR TEMPORARY SUPPLY.
3"
? 5178780 C-2 C-2
5
INSTRUMENT AIR 12459
246.101
2"
3"-AI-246001-ULB
? ?
D
2"-AI-246001-ULB
FROM HEADER
2" UTILITY AIR 12458
246.101
D
? ? C-2 C-2
5
2"-AU-246001-ULB
FROM HEADER
FI 094
2" ? ?
2" NITROGEN 12460
246.101
? ? C-2 C-2
5
FT 094
2"-GI-246001-ULB
FROM HEADER
2"
1"-GI-246002-ULB U/S #2
? ? 1"-AU-246002-ULB
C
C NITROGEN 12697
2"
2"-GI-246003-ULB
1"-AU-246009-ULB
? ?
TO V-24601
U/S #9
246.002
1"-GI-246022-ULB
U/S #3
1"-GI-246004-ULB
1"-AU-246003-ULB
2"
2"
? ?
? ?
1"-AU-246008-ULB
246.020
12664
U/S #8
NITROGEN 2"-GI-246005-ULB
TO V-24607
? ?
2"
? ?
2"
1"-GI-246021-ULB
NITROGEN 246.013
12461
2"-GI-246007-ULB NITROGEN
TO V-24606
2"-GI-246020-ULB
12808
247.001
TO V-24701
1"-GI-246008-ULB U/S #4
ISSUED FOR ESTIMATE NITROGEN 2"-GI-246019-ULB
1"-AU-246004-ULB
12995
B
247.010
TO E-24707
NITROGEN 2"-GI-246018-ULB
12425
TO V-24806
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
248.002
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
U/S #10 1"-AU-246011-ULB
U/S #5
U/S #6
U/S #7
NITROGEN 246.010
13159
SHELL CANADA
2"-GI-246014-ULB
QUEST CCS PROJECT
1"-GI-246024-ULB
A
NITROGEN 13141
2"-GI-246012-ULB
R
1"-AU-246012-ULB U/S #12
246.010
1"-GI-246025-ULB
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON INST. AIR, UTILITY AIR & NITROGEN DISTRIBUTION SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.030
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.030.pid MODEL DATE:7/10/2011 9:44:03 PM BY:muk22296
2"-GI-246010-ULB
246.030
12729
1"-GI-246023-ULB
U/S #11
246.012
2"-GI-246026-ULB
NITROGEN
2"-AU-246013-ULB
1"-GI-246017-ULB
2"-GI-246013-ULB
1"-AU-246007-ULB
13142
1"-GI-246016-ULB
246.010
1"-AU-246006-ULB
NITROGEN
1"-GI-246009-ULB
1"-AU-246005-ULB
1"-AU-246010-ULB
4
3
2
1
SP 026
D
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . STANDALONE SAFETY SHOWER WITH INTEGRAL DELUGE TANK. ALARMED FOR LOW LEVEL. 4 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND FIGURE 18-2 TO 18-5 FOR UTILITY STATION DETAILS. 5 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE VALVED.
SP 027
3
D
3
HOLDS:
FAH 095
FSH 095
FAH 096
FSH 096
LAL 095
LSL 095
LAL 096
LSL 096
UA
UA
UA
UTILITY WATER 12470
246.101
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • SOURCE OF POTABLE WATER. • NUMBER AND LOCATIONS OF EYEWASH STATIONS & SAFETY SHOWERS TO BE DETERMINED.
UA
ET 10 38
2"-WU-246001-UAB
FROM HEADER
ANTI-FOAM INJECTION AREA/ AMINE REGENERATION AREA
COMPRESSION AREA/ TEG DEHYDRATION AREA
C
C
U/S #2
1"-WU-246003-UAB
1"-WU-246004-UAB
2"x1"
U/S #3
1"-WU-246010-UAB
U/S #9
U/S #4
1"-WU-246009-UAB
1"-WU-246005-UAB
U/S #8
ISSUED FOR ESTIMATE
B
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
1"-WU-246008-UAB
1"-WU-246007-UAB
1"-WU-246006-UAB
REV
1"-WU-246011-UAB
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
U/S #10
SHELL CANADA QUEST CCS PROJECT 1"-WU-246012-UAB
U/S #5
U/S #6
U/S #11
A
U/S #7
R
U/S #12
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 246 - REGENERATION/COMMON UTILITY WATER & SAFETY SHOWERS SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.031
1
REV.
G
246.031
1"-WU-246013-UAB
FILE:\\F:\1025\DRAWINGS\CO2\246\246.031.pid MODEL DATE:7/7/2011 12:51:28 AM BY:muk22296
B
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. 3 . LOW POINTS + DRAINS REQUIRE EHT AND INSULATION.
D
D
CO2 RELIEF / VENT 12809
247.001
FROM RV-247013
20"-VA-247002-PJB(0.4) DO NOT POCKET 3
C
C
CO2 VENT 247.001
FROM PV-247001
FREE DRAINING 3
246.026
TO S-24603
3
CO2
VENT GAS 247.010
6"-VA-247009-PJB(C)
6"-VA-247009-PJB(C) FREE DRAINING
FROM RV-247012 & PIPELINE VENT
3
13011
246.026
TO S-24603
ISSUED FOR ESTIMATE
B
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 246 - REGENERATION/COMMON VENT GAS COLLECTION SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.032
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.032.pid MODEL DATE:7/4/2011 5:33:19 PM BY:ahm14887
12327
12474
246.032
12471
VENT GAS 24"-VA-247001-PJB(0.4)
24"-VA-247001-PJB(0.4) DO NOT POCKET
4
3
FROM P-24603A/B 246.006 2"-DM-246011-DAB DM
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED. ET 10 50
12391
FROM E-24605A 246.008 DM
2"-DM-246063-DAB
ET 10 50
2"-DM-246065-DAB
ET 10 50
12596
D
FROM P-24605B 246.009 DM
D
12262
FROM FV-246020 246.011 DM
AMINE DRAINS
ET 10 75 2"-DM-246057-DAB
ET 10 50
2"-DM-246043-DAB
ET 10 50
6"-DM-246061-DAB FREE DRAINING
13037
246.013
TO V-24606
13152
FROM P-24602A/B/C 246.011 DM 13151
AMINE DRAINS
ET 10 75
6"-DM-246060-DAB FREE DRAINING
13036
246.013
TO V-24606
C
C FROM E-24602A 246.001 DM
2"-DM-246004-DAB
ET 10 50
2"-DM-246001-DAB
ET 10 50
2"-DM-246026-DAB
ET 10 50
2"-DM-246024-DAB
ET 10 50
2"-DM-246029-DAB
ET 10 50
13144
FROM E-24602B 246.001 DM 12227
FROM V-24608 246.010 DM 12687
FROM V-24604 246.010 DM 12387
FROM V-24609 246.010 DM 12390
FROM HV-246040 246.010 2"-DM-246030-DAB DM
ET 10 50
ISSUED FOR ESTIMATE
13136
FROM P-24605 246.012 DM
B
2"-DM-246055-DAB
13155
FROM P-24605 246.012 2"-DM-246XXX-DAB DM 12620
FROM P-24604 246.012 2"-DM-246056-DAB DM 13153
FROM P-24604 246.012 2"-DM-246050-DAB DM
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
13154
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
AMINE DRAINS 6"-DM-246006-DAB FREE DRAINING
12477
246.013
TO V-24606
SHELL CANADA FROM RV-246020 246.010 DM
2"-DM-246064-DAB
2"-DM-246025-DAB
13134
FROM RV-246003 246.009 DM
QUEST CCS PROJECT
A
13150
R
FROM RV-246021 246.010 DM
2"-DM-246022-DAB
2"-DM-246062-DAB
12240
FROM RV-246002 246.008 DM
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
13132
SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.033
1
REV.
G
246.033
UNIT 246 - REGENERATION/COMMON AMINE DRAIN SYSTEM
FILE:\\F:\1025\DRAWINGS\CO2\246\246.033.pid MODEL DATE:7/7/2011 4:25:02 PM BY:ahm14887
ET 10 75
4
3
2
1
1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS.
D
D
FLUSHING CONDENSATE 2"-SC-246012-SAB
C
12462
246.010
C
TO V-24604/V-24608/V-24609
CONDENSATE 12579
246.021
ET 10 38
2"-SC-246010-SAB
FROM P-24608A/B
FLUSHING CONDENSATE 2"-SC-246013-SAB
12463
246.013
TO V-24605
ISSUED FOR ESTIMATE
B
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
SCALE: NONE SHELL DWG NO.:
4
3
2
246.0000.000.041.034
1
REV.
G
246.034
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 246 - REGENERATION/COMMON FLUSHING CONDENSATE
FILE:\\F:\1025\DRAWINGS\CO2\246\246.034.pid MODEL DATE:7/4/2011 1:27:35 PM BY:ahm14887
B
4
3
2
1
1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2. ELECTRIC TRACE 10°C.
D
D
MH-246004
MH-246003
AMINE STRIPPING CATCHMENT
C
C HS
R/S
I
HS
I
PP
P-246012 ET 10
2"-WW-246001-UAB
L
L
MH-246005
MH-246002
3/4"
TO HMU1/2 MH-006
H
D
MH-246001
AMINE PUMP CATCHMENT
TEG/DEHYDRATION CATCHMENT
ISSUED FOR ESTIMATE
B
MH-246006
G
07/11/11
REV
ISSUED DATE
ISSUED FOR PHA III DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
AMINE STORAGE CATCHMENT
SHELL CANADA QUEST CCS PROJECT
A P-246012 STORM WATER PUMP RATED FLOW: DIFF. PR.: DRIVER: INSULATION TYPE/THK: HEAT TRACE MEDIA/TEMP:
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
10.00 m^3/hr 112.00 kPa 0.30 kW @ / 2.
CASING
UNIT 246 - REGENERATION/COMMON STORMWATER DRAINAGE & POTENTIALLY OILY SWS
INTERNALS
MATERIAL: TRIM:
4
SCALE: NONE SHELL DWG NO.:
3
2
246.0000.000.041.035
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\246\246.035.pid MODEL DATE:7/10/2011 9:57:36 PM BY:muk22296
240.031
LI
246.035
STORMWATER
H I
LT
4 3 TO E-24802
2 246.011
FROM P-24602A/B/C
12238
LEAN AMINE
TO E-24602A/B
12686
14"-P-246081-DAG
5242525 C-1
3/4"
?
1"-SCL-285003-SAB
2"x1"
2"-SCL-285001-SAB
6"-SC-285210-SAB
6"-WI-285003-UJB(0.4)
10"-P-285156-DJE(0.4)
14"-P-285155-DAG
ET 10 50
ET 10 50
ET 10 50
ET 10 63
2"-SS-285058-SAG
H 50
ET 10 38
36"-SL-285145-SAB
H 50
2"-AU-285148-ULB
2"-WU-285041-UAB
3"-AI-285150-ULB
4"-WP-285034-PJB(0.4)
2"-GI-285068-ULB
6"-WI-285002-UJB(0.4)
FROM HEADER
LP STEAM
FROM HEADER
UTILITY AIR
FROM HEADER
UTILITY WATER
FROM HEADER
FROM HEADER
TO V-44118
LEAN AMINE
285.217
TO TK-25102
285.217
FROM V-44118
RICH AMINE
285.217
HOT DEMIN WATER
TO TK-25101
285.217
RECOVERED CLEAN CONDENSATE
FROM HEADER TRAPS
285.217
LP CONDENSATE
285.217
LOW TEMP HP STEAM
285.217
285.217
285.217
285.217
INSTRUMENT AIR
TO WWTP 271
285.217
FROM HEADER
NITROGEN
FROM HEADER
WASTE WATER
285.217
285.217
DEMIN WATER
2
• VENT LINE SIZING FROM PIPELINE.
2"-AU-285149-ULB
G
07/11/11 ISSUED FOR PHA III
F
04/20/11 ISSUED FOR ESTIMATE
E
03/01/11 ISSUED FOR PHA II
D
01/10/11 ISSUED FOR CLIENT REVIEW
C
12/02/10 ISSUED FOR INTERNAL REVIEW
B
REV ISSUED DATE DESCRIPTION
SCALE: NONE SHELL DWG NO.:
1
BY CKD PRS
246.0000.000.041.101
CS PDP MC APE
SHELL CANADA QUEST CCS PROJECT
A
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON NORTH BATTERY LIMITS REV.
G FILE:\\F:\1025\DRAWINGS\CO2\246\246.101.pid MODEL DATE:7/7/2011 11:16:46 AM BY:ahm14887
ET 10 75
D
246.001
? C-2
ET 10 50
? C-2
10"-P-246002-DJE(0.4)
2"
RICH AMINE
D
FROM E-24606
3/4"
246.020
285 246
6"
3/4" 3/4" D 5115277 ?
ET 10 50
?
5115227 C-3
?
5115227 C-3
D
6"-WI-246007-UJB(0.4)
285 248
T
? ?
12681
ET 10 38 D
5156140 C-1
? C-3
3/4"
?
H ET 10 SAG SAB ? ?
6"
? ?
3/4" 3/4"
? C-3
HOT DEMIN WATER
ET 10 50
? C-1
2"
? ?
ET 10 38
FROM P-24608A/B
6"-SC-246008-SAB
? C-1
2"
1"
246.027
H 50
?
1"
12615
12545
2"-SS-248001-SAG
C-1
2"
H ET 10
RECOVERED CLEAN CONDENSATE
248.002
LOW TEMP HP STEAM
TO DISTRIBUTION
12438
? C-2
246.029
H 50
? C-2
36"-SL-246001-SAB
D
LP STEAM
3/4"
TO DISTRIBUTION
D
246.030
3/4"
2"-AU-246001-ULB
? C-3
12458
2"-GI-285069-ULB
UTILITY AIR
C-1
?
ET 10 38
ET 10 38
ET 10 50
3
246.101
12470
2"
5178780 C-1
3"
C
TO DISTRIBUTION
246.031
ET 10 38
? C-2
2"-WU-246001-UAB
D
UTILITY WATER
3/4"
TO DISTRIBUTION
12459
D
246.030
? C-2
3"-AI-246001-ULB
3/4"
INSTRUMENT AIR
?
5242525 C-1
4"
C-1
2"
2"
FROM P-24608A/B
246.027
? C-2
12614
ET 10 38
4"-WP-246002-PJB(0.4)
D
WASTE WATER
2"-GI-246001-ULB
2"
TO DISTRIBUTION
246.030 12460
NITROGEN
6" 5242525 C-1
285 246
TO P-24610A/B
12137
ET 10 50
6"-WI-246001-UJB(0.4)
D
246.023
DEMIN WATER
4 1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE NOTED. 3 . BATTERY LIMIT ACCESS IS ON NORTH SIDE OF 9TH AVE, ACROSS THE ROAD FROM UNIT 246. ALL LINES ARE DEDICATED TO SERVICING UNIT 246.
HOLDS:
D
1"-SCL-285002-SAB
T
U/S #1
C
2"
? C-3
3
2"
? C-2 D
ISSUED FOR ESTIMATE
B
ISSUED FOR PRELIMINARY REVIEW PEM CLIENT APP
4
3
2
V-24701 COMPRESSOR SUCTION KO DRUM
2.5 MW 317.0 m^2 BXU SHELL 385 kPa-g / HV 130 °C / 150 °C CS + 3 mm 304L SS CLAD H/ GC-247072-PJB(0.4)
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
UC SIGNAL
H
H
TI 002
L
PI 003
H
PI 021
L
UY 001B
HOLDS:
12"x10"
SURGE COUNTER
ET 10 75
12"
UQI 001
H
TO UV-001 TT SIGNAL
AUTO/MAN
HC 022
247.010
12331
FROM TT-057 PT SIGNAL
CSO ? C-1
12"-GC-247003-PJB(0.4)
247.010
12569
FROM PT-021
ET 10 N/A
246.030 GI
247.010
12571
001A
V
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • THE NEED TO TRIP THE COMPRESSOR ON EXCESSIVE SURGE CYCLE WILL BE DETERMINED IN DETAILED ENGINEERING.
UC SIGNAL
UC 5
D
TO UV-003
MASS FLOW LIMITER
H
TI 057
247.010
12578
001B PDI 029
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR THE COMPRESSOR. 4 . ELECTRIC TRACE TO HLL (ET 10). 5 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION. 6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 8 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM. 9 . THE ADDITION AL INSTRUMENTS ARE REQUIRED FOR ON-SITE COMPRESSOR PERFORMANCE TESTING (PTC-10). 10. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
TUBE 1200 kPa-g / 58 °C / DUPLEX 2205 + 0.38 mm CA / CWR-247010-UAB
UC
CSC 5242525 C-1
C-1
N/A ET 10
10"
18"x10"
RATED DUTY: SURFACE AREA: TEMA TYPE:
(V)
3/4" ? C-1
RV 013B
C-1
10"x8"
POWER FAILURE 8T10 SET@ 385 kPa-g
10"x8"
TO S-24603
CSO ? C-1
10"-GC-247032-PJB(0.4)
FREE DRAINING
RV 013A
18"x10"
N/A ET 10
20"
20"-VA-247002-PJB(0.4)
12809
20"x18"
18"-VA-247013-PJB(0.4)
246.032
? C-1
CO2 RELIEF / VENT
3/4"
V
D
POWER FAILURE 8T10 SET@ 385 kPa-g
E-24701 COMPRESSOR 1st STAGE COOLER
3500 mm ID x 3500 mm T/T 385 kPa-g @ 150 °C / FV @ 150 °C CS + 3 mm 304L SS CLAD/ 316L SS H/ GC-247070-PJB(0.4)
10"-VA-247012-PJB(0.4)
N/A ET 10
SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
ANTI SURGE SPILL BACK
2"-GI-246020-ULB
24"-GC-247045-PJB(0.4) DO NOT POCKET
FREE DRAINING
12808
247.010
12326
FROM C-24701H ANALYZER FAST LOOP
3/4" TUBING (FAST LOOP) CO2 VENT TO S-24603
FREE DRAINING E 001
C
HH
FROM AX-001
PC
PC 034
023 PERFORMANCE CONTROLLER
C
3/4"
3/4"
? C-2
HLL=700 mm
MAG
H
LT 001
L
HHLL=800 mm
5134289 C-2
START/STOP
HIS 001
24" MW
D
? C-2
2" 2"
5115273 C-2
H 38
CO2 30"-GC-247006-PJB(0.4) TWO PHASE FLOW
3/4"
PT 024
247.002
12305
TO V-24702
9
? C-2
3/4"
3/4"
(V)
PI 024
(V)
? C-2 E 001
6"-CWS-246010-UAB
PZTE 023
E 001
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
L REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
I MCC
3"x2"
HSE
MIN
3"
? C-1
C-2
3"
?
FC C-1
2"
5134289 C-2
? C-1
1-1/2" 2"x1-1/2"
3/4"
5097550 C-2
2"x1-1/2"
3"-DM-247001-PJB(0.4)
5134289 C-2
? C-2
FREE DRAINING
? C-2 (V)
246.025 CWS
? PDT 029
001
3/4"
? C-2
3/4"
ON/OFF
LLL=250 mm
? C-2
PV 023
? C-2
C-2
2"
2"
3/4"
PT 003
ISSUED FOR ESTIMATE ET 10 63
B
3/4"
4
LG 001
RS
PT 004
D
12363
TI 059
TT 059
RS
NNF
2"
9
001
RS
TO V-24606
TWO PHASE FLOW
ET 10 38
30"-GC-247005-PJB(0.4)
PI 004
3/4"
? C-2 3"
4" BACK FLUSH 5156140 C-2
1-1/2"
1-1/2" 2"
2"
30"x24"
OUTSIDE INSIDE
V-24701
3"
2"
30"x24"
? C-2
HH
E
LTE 002
24"
6"
GWR
I
LV 001
3/4"
V
5307521 C-2
NC ? C-2 3"
N/A H
24"
TI 003
TT 003
? C-2
2"-DM-247002-PJB(0.4)
LL
PTE 002
5134289 C-2
LC 001
12626
HH
? C-2
24"
E-24701
PP
E 001
36"
GAP
246.013
DO NOT POCKET
3"
MIN
H 25
KO LIQUIDS
3/4"
? C-2
? C-2 3/4"
3/4"
? C-3
3"
FREE DRAINING
V
2"
12364
C-24701A
001
D
? C-1
FROM V-24803
8
3/4"
248.003
36"-GC-247004-PJB(0.4)
36"
3/4" 3"-GC-248004-PJB(0.4) DO NOT POCKET
10
30"x24"
30"x24"
246.025 CWR
6"-CWR-247001-UAB
CSO 5307521 C-2
1-1/2"
RS
NC ? C-2 5097550 C-2 2"-GC-247002-PJB(0.4)
ET 10 38 2"
24"-GC-247001-PJB(0.4)
5134289 C-2 ET 10 N/A
5
12367
24"
3/4"
? C-1
FLASHED CO2
1-1/2"
T.S.
36"
DO NOT POCKET
TW 052
? C-1
FROM V-24602
SP 001
ET 10 50
6"
3/4"
246.006
36"-GC-246001-PJB(0.4)
PJB(0.4) 3/4" V 5134289 C-2
ET 40 N/A 1-1/2" ET 40 OUTSIDE INSIDE 88
36"
5242893 C-2
12368
ET 10 N/A
? C-1
3/4"
7
CO2
2"
ULB
DO NOT POCKET NNF
? C-2
2"
FO C-1 3/4"
PT 001
S-4
6
N/A ET 10
5242526 C-1
24"
PC 001
N/A ET 10
ET 10 75
SP 002
TT 002
TTE 001
PV 001
PT 034
? C-2
PP
? C-1
EMERGENCY STOP
SHELL CANADA OUTSIDE INSIDE
QUEST CCS PROJECT
CASING DRAIN 3"-WP-247001-PJB(0.4)
247.002
13160
A
FROM C-24701B/C/D TO GRADE AT SAFE LOCATION
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
C-24701A CO2 COMPRESSOR 1st STAGE RATED CAPACITY: DIFF. PR.: DRIVER : MATERIAL : INSULATION TYPE/THK: TRIM:
4
3
79877 Nm^3/hr 3 9163 kPa 16500 kW 304 SS PP / GC-247071-PJB(0.4)
UNIT 247 - COMPRESSION CO2 COMPRESSOR 1ST STAGE SCALE: NONE SHELL DWG NO.:
2
247.0000.000.041.001
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\247\247.001.pid MODEL DATE:7/7/2011 4:33:20 AM BY:muk22296
24"-VA-247001-PJB(0.4) NNF
12471
13165
247.001
246.032
247.009
4
3
2
V-24702 COMPRESSOR 2nd STAGE KO DRUM SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
E-24702 COMPRESSOR 2nd STAGE COOLER RATED DUTY: SURFACE AREA: TEMA TYPE:
3000 mm ID x 3100 mm T/T 385 kPa-g @ 115 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD/ 316L SS H/ GC-247073-PJB(0.4)
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
3.1 MW 507.0 m^2 BJU SHELL 530 kPa-g / HV 130 °C / 150 °C CS + 3 mm 304L SS CLAD PP / GC-247075-PJB(0.4)
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR THE COMPRESSOR. 4 . ELECTRIC TRACE TO HLL (ET 10). 5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM. 6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
TUBE 1200 kPa-g / 58 °C / DUPLEX 2205 + 0.38 mm CA / CWR-247011-UAB
D
D HOLDS: ET 10 50
6"-CWR-247002-UAB
246.025 CWR
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
TW 053
CSO 5307521 C-2
6"
12300
1-1/2" 2"
2"
? C-2
RS
V
? C-2
26"x24"
V
2"
? C-2
26"
ET 45 88
1-1/2"
4" BACK FLUSH 5156140 C-2
1-1/2"
6"
30"-GC-247007-PJB(0.4)
PP
6
? C-2
? C-2
C
ET 10 50
6"-CWS-246011-UAB
3"
TI 006
SP 004
TT 006
246.025 CWS 12311
H 38
OUTSIDE INSIDE
CO2 24"-GC-247009-PJB(0.4) TWO PHASE FLOW FREE DRAINING
T.S.
5242893 C-3
V
D
3/4"
PP
5
3"
FREE DRAINING
30"
30"
OUTSIDE INSIDE ET 45 N/A
TT 005
20"
5307521 C-2
TTE 004
20"
RS
C
24"x20"
001
H
24"x20"
TI 005
24"-GC-247008-PJB(0.4)
HH
E
2"
E-24702
247.003
12310
TO V-24703
1-1/2"
PI 006
FREE DRAINING
30" GWR LTE 004
5134289 C-2
HHLL=800 mm
L
D
? C-1
3/4"
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
5134289 C-2
REV
3/4"
ISSUED FOR PRELIMINARY REVIEW
B ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
MIN
? C-1
3"
G
C-2
FC C-1
3"x2"
3" ? C-2
? C-2
5242893 3"
2"
2"
5134289 C-2
3/4" ? C-1
TWO PHASE FLOW
3"-P-247002-PJB(0.4)
2"
C-24701B 2"
2"
5134289 C-2
TO V-24602
ET 10 38
2"-P-247002-PJB(0.4)
5134289 C-2
LG 003
ON/OFF 12244
? C-2 3" 4
LLL=250 mm
3/4"
246.006
3/4"
24" MW
LV 003 KO LIQUIDS
HLL=700 mm
2"
RS
LT 003
ISSUED FOR ESTIMATE
? C-2
RS
2"
MAG
H
? C-2
3/4"
B ? C-2
LC 003
001
3/4"
D
SHELL CANADA CASING DRAIN
CASING DRAIN 3"-WP-247001-PJB(0.4)
3"-WP-247001-PJB(0.4)
TO SAFE LOCATION
247.003
QUEST CCS PROJECT
12304
A
FROM C-24701C/D
R
C-24701B CO2 COMPRESSOR 2nd STAGE RATED CAPACITY: DIFF. PR.: DRIVER : MATERIAL : INSULATION TYPE/THK: TRIM:
4
3
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
79877 Nm^3/hr 9163 kPa 3 16500 kW 304 SS PP / GC-247074-PJB(0.4)
UNIT 247 - COMPRESSION CO2 COMPRESSOR 2ND STAGE SCALE: NONE SHELL DWG NO.:
2
247.0000.000.041.002
1
REV.
G
247.002
247.001
13160
FILE:\\F:\1025\DRAWINGS\CO2\247\247.002.pid MODEL DATE:7/7/2011 3:55:35 AM BY:muk22296
3/4"
V-24702
GAP
E
PT 005
HH
PT 006
3/4"
FROM E-24701
30"-GC-247006-PJB(0.4) TWO PHASE FLOW
DO NOT POCKET
247.001
12305
PI 005
H 38
? C-1
CO2
4
3
2
V-24703 COMPRESSOR 3rd STAGE KO DRUM SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
E-24703 COMPRESSOR 3rd STAGE COOLER RATED DUTY: SURFACE AREA: TEMA TYPE:
2600 mm ID x 2700 mm T/T 530 kPa-g @ 100 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ GC-247076-PJB(0.4)
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
3.0 MW 425.0 m^2 BEU SHELL 1200 kPa-g / HV 130 °C / 150 °C CS + 3 mm 304 L SS CLAD PP / GC-247078-PJB(0.4)
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR THE COMPRESSOR. 4 . ELECTRIC TRACE TO HLL (ET 10). 5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM. 6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
TUBE 1200 kPa-g / 58 °C / DUPLEX 2205 + 0.38 mm CA / CWR-247012-UAB
D
D
HOLDS: • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
ET 10 50
246.025 CWR
6"-CWR-247004-UAB
HH
E
H
TI 008
001
TW 054
CSO 5307521 C-2
6"
12321
1-1/2"
FROM E-24702
SP 006
PI 007
24" GWR
5134289 C-2
3/4"
V-24703
3/4"
HLL=700 mm
? C-2
5134289 C-2
PI 008
PT 008
3/4" ? C-2
HH
? C-2
RS 2"
2"
PP
? C-2
BACK 4" FLUSH 5156140 C-2
3/4" ? C-2
D
? C-2
2"
22"
ET 10 50
246.025 CWS
6"-CWS-246013-UAB
12322
H
CO2 20"-GC-247013-PJB(0.4) TWO PHASE FLOW
12320
247.004
TO V-24704
RS
? C-2
HHLL=800 mm
2"
1-1/2"
RS
2"
E 001
LTE 006
PT 007
OUTSIDE INSIDE
RS
? C-2
2"
FREE DRAINING
TT 009
C
E-24703
6"
ET 10 38
3/4"
22"
V
5307521 C-2
24"-GC-247009-PJB(0.4) TWO PHASE FLOW
PP
CSO ? C-1
2" 247.002
12310
H 38
V
2"
2"-GC-247010-PJB(0.4) CO2
TI 009
5
V
FREE DRAINING
V 5134289 C-1
1-1/2"
? C-2
22"x20"
24"
1-1/2"
DO NOT POCKET
3/4"
ET 45 88
? C-3
C-1
1/2" WEEP HOLE
24"-GC-247011-PJB(0.4)
6
2"
2"-VA-247004-PJB(0.4)
RV 004
ET 10 38
2"x1"
N/A ET 10
FREE DRAINING
C
24"
OUTSIDE INSIDE ET 45 N/A
TT 008
T.S.
FIRE 1D2 SET@ 530 kPa-g
TTE 007
22"x20"
TO ATMOSPHERE AT SAFE LOCATION
20"-GC-247012-PJB(0.4)
2"
ISSUED FOR ESTIMATE
3"
GAP
MAG
H
LC 005
LT 005
L
4
LG 005
24" MW
B
C-24701C
3"
LV 005
D
? C-1
3/4"
? C-1
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
D C-2
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
CASING DRAIN 3"-WP-247001-PJB(0.4)
3"-WP-247001-PJB(0.4)
TO SAFE LOCATION
247.004
13161
FROM C-24701D
SHELL CANADA QUEST CCS PROJECT
A R
C-24701C CO2 COMPRESSOR 3rd STAGE RATED CAPACITY: DIFF. PR.: DRIVER : MATERIAL : INSULATION TYPE/THK: TRIM:
4
3
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
79877 Nm^3/hr 9163 kPa 3 16500 kW 304 SS PP / GC-247077-PJB(0.4)
UNIT 247 - COMPRESSION CO2 COMPRESSOR 3RD STAGE SCALE: NONE SHELL DWG NO.:
2
247.0000.000.041.003
1
REV.
G
247.003
12304
ISSUED FOR PHA III
B
CASING DRAIN 247.002
07/11/11
FILE:\\F:\1025\DRAWINGS\CO2\247\247.003.pid MODEL DATE:7/7/2011 3:27:13 PM BY:ahm14887
FC C-1
MIN
TWO PHASE FLOW
2"
G
?
TO V-24602
? C-1
2"
2"
2"
13033
2"
5134289 C-2
246.006
ET 10 38
2"-P-247003-PJB(0.4)
3/4"
KO LIQUIDS
3/4"
? C-2
5134289 C-2
LLL=250 mm
? C-2
3/4"
5134289 C-2
3/4"
ON/OFF
2"
? C-1
2"
4
3
2
V-24704 COMPRESSOR 4th STAGE KO DRUM SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
E-24704 COMPRESSOR 4th STAGE COOLER RATED DUTY: SURFACE AREA: TEMA TYPE:
2300 mm ID x 3400 mm T/T 1200 kPa-g @ 110 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ GC-247079-PJB(0.4)
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
2.9 MW 343.0 m^2 BEU SHELL 2200 kPa-g / HV 130 °C / 150 °C CS + 3 mm 304L SS CLAD PP / GC-247081-PJE(0.4)
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR THE COMPRESSOR. 4 . ELECTRIC TRACE TO HLL (ET 10). 5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM. 6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
TUBE 1700 kPa-g / 58 °C / DUPLEX 2205 + 0.38 mm CA / CWR-247013-UAB
HOLDS:
D
D
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
ET 10 50
6"-CWR-247005-UAB
246.025 CWR
TW 055
CSO 5307521 C-2
6"
12344
1-1/2" 2"
6"x4"
? C-2
V
SP 007
20" 10"
RS 2"
2"
? C-2
3"
20"
HHLL=800 mm
LT 007
L
LG 007
PT 009
HH
3/4"
5134289 C-2
PJB(0.4) PJE(0.4)
24" MW
? C-2
C-24701D C-1
?
3/4"
3/4"
3"
ET 10 38
? C-1 PJE(0.4) PJB(0.4)
2"-P-247006-PJB(0.4)
247.005
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
KO LIQUIDS
D
01/10/11
ISSUED FOR CLIENT REVIEW
12346
C
12/02/10
ISSUED FOR INTERNAL REVIEW
FROM V-24705
ET 10 38
ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
KO LIQUID 2"-P-247010-PJB(0.4)
247.009
TWO PHASE FLOW
12372
FROM V-24707
C-2
?
2"
MIN
2"
? C-1
5134289 C-2
D
? C-2
? C-2
3/4"
5134289 C-2
3/4"
1-1/2" 2"x1-1/2" 2"
2"x1-1/2" FC C-1
LLL=250 mm
2"
3/4"
? C-1
TWO PHASE FLOW
2"
B
5134289 C-2
ON/OFF TO V-24602
2"
5307521 C-2
ISSUED FOR ESTIMATE
? C-2
3/4"
? C-2 3"
PT 010
2"
ET 10 38
TO V-24705
RS
HLL=700 mm
MAG
H
GWR
E 001
LTE 008
2"
2"
4
2"-P-247004-PJB(0.4)
247.005
RS
GAP
13032
12348
D ET 10 38
KO LIQUID 2"-P-247005-PJB(0.4) TWO PHASE FLOW
247.006
12353
FROM V-24706
SHELL CANADA QUEST CCS PROJECT
CASING DRAIN 13161
A
TO SAFE LOCATION R
C-24701D CO2 COMPRESSOR 4th STAGE
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr DIFF. PR.: 9163 kPa 3 DRIVER : 16500 kW MATERIAL : 304 SS INSULATION TYPE/THK: PP / TRIM: GC-247080-PJE(0.4)
4
3
UNIT 247 - COMPRESSION CO2 COMPRESSOR 4TH STAGE SCALE: NONE SHELL DWG NO.:
2
247.0000.000.041.004
1
REV.
G
247.004
247.003
3"-WP-247001-PJB(0.4)
FILE:\\F:\1025\DRAWINGS\CO2\247\247.004.pid MODEL DATE:7/7/2011 3:08:44 AM BY:muk22296
5134289 C-2
3/4"
V-24704
? C-2
246.006
RS
FREE DRAINING
1-1/2"
CO2 16"-GC-247017-PJE(0.4) TWO PHASE FLOW
? C-2
ET 10 38
2"
KO LIQUIDS
246.025 CWS
PI 010
FREE DRAINING
LC 007
H
TT 012
PI 009
LV 007
6"-CWS-246014-UAB
3/4"
3/4" 3/4"
FROM E-24703
ET 10 50
TI 012 PP
5
H
20"-GC-247013-PJB(0.4) TWO PHASE FLOW
1-1/2"
6
2"
CSO 5242893 C-1
3" 3"-GC-247014-PJB(0.4) 247.003
12320
1-1/2"
T.S.
3/4"
V 5134289 C-1
CO2
ET 45 88
BACK 4" FLUSH 5156140 C-2
D
C
12345
C-1
1/2" WEEP HOLE
20"-GC-247015-PJB(0.4)
OUTSIDE INSIDE
DO NOT POCKET
ET 10 50
OUTSIDE INSIDE ET 45 N/A
18"
TT 011
? C-3
ET 10
6"-VA-247005-PJB(0.4)
FREE DRAINING
N/A
RV 006
TTE 010
H
6"
CONTROL VALVE FAILURE 3L4 SET@ 1200 kPa-g
TI 011
V
E-24704
PP
TO ATMOSPHERE AT SAFE LOCATION
C
HH
18"
18"x16"
E 001
16"-GC-247016-PJE(0.4)
V
? C-2
18"x16"
? C-2
4
3
2
V-24705 COMPRESSOR 5th STAGE KO DRUM SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
E-24705 COMPRESSOR 5th STAGE COOLER
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR THE COMPRESSOR. 4 . ELECTRIC TRACE TO HLL (ET 25). 5 . MAXIMIZE LENGH OF PIPING THAT FREE DRAINS TO KO DRUM. 6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
RATED DUTY: SURFACE AREA: TEMA TYPE:
3.0 MW 281.0 m^2 BEU SHELL DESIGN PRESS: 4200 kPa-g / HV DESIGN TEMP: 130 °C / 150 °C MATERIAL: CS + 3 mm 304L SS CLAD INSULATION TYPE/THK: PP / TRIM: GC-247084-PJG(0.4)
2000 mm ID x 2200 mm T/T 2200 kPa-g @ 100 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ GC-247082-PJE(0.4)
TUBE 3300 kPa-g / 58 °C / DUPLEX 2205 + 0.38 mm CA / CWR-247014-PJE(0.4)
D
D
HOLDS: • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
ET 10 50
6"-CWR-247006-UAB
246.025 CWR
TW 056
CSO 5307521 C-2
6"
12351
1-1/2"
PJB(0.4) ET 10 PJE(0.4) ET 25
2"
? C-2
PI 012
E
PT 012
001
3/4" 3/4"
2"
? C-2
? C-2
HHLL=800 mm HLL=700 mm
? C-2
2"
? C-2
2"
? C-2
3/4" 3/4"
ISSUED FOR ESTIMATE
? C-2
B
? C-2
3/4"
? C-2
3/4"
2"
2"
? C-2 3"
2"
3/4"
? C-2
5134289 C-2
PJE(0.4) PJG(0.4)
C-24701E
4
C-1
?
3/4"
3/4"
? C-2
C-2
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
PJB(0.4) 3/4"
?
C-2
? C-2 3"
? C-1 PJG(0.4)
G
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
5134289 C-2
? C-2
2"
?
? C-2
2"
3/4"
2"
3/4"
5134289 C-2
3/4"
LLL=250 mm
2"
2"
? C-1
D
D OUTSIDE INSIDE
CASING DRAIN 3"-WP-247002-PJB(0.4)
247.006
13163
SHELL CANADA
FROM C-24701F/G/H
QUEST CCS PROJECT
A
TO GRADE AT SAFE LOCATION R
C-24701E CO2 COMPRESSOR 5th STAGE
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr DIFF. PR.: 9163 kPa 3 DRIVER : 16500 kW MATERIAL : 304 SS INSULATION TYPE/THK: PP / TRIM: GC-247083-PJG(0.4)
4
3
SCALE: NONE SHELL DWG NO.:
2
247.0000.000.041.005
1
REV.
G
247.005
UNIT 247 - COMPRESSION CO2 COMPRESSOR 5TH STAGE
FILE:\\F:\1025\DRAWINGS\CO2\247\247.005.pid MODEL DATE:7/7/2011 2:39:48 AM BY:muk22296
ET 25 38
MIN
FC 2"x1-1/2" C-1
2"
C-2
1-1/2"
2"
2"x1-1/2"
HH
V-24705
?
? C-1
TWO PHASE FLOW
PT 013
008
2"
16"
5134289 C-2
3/4" ET 10 PJB(0.4) PJE(0.4) ET 25 2"
TO V-24706
2"-P-247007-PJE(0.4)
5134289 C-2
TO V-24704
ET 10 38
247.006
12350
24" MW
3/4"
12346
CO2 14"-GC-247021-PJG(0.4) TWO PHASE FLOW
SP. ET 25 38
LG 009
ON/OFF 247.004
LV 009
246.025 CWS 12352
H
RS
2"-P-247006-PJB(0.4) KO LIQUIDS
6"-CWS-246015-UAB
RS
L
ET 10 50
3/4"
PP 10"
MAG LT 009
C
1-1/2"
FREE DRAINING
LTE 010
LC 009
6"
V
GWR
GAP H
TT 015
D
PI 013
16"
FREE DRAINING
FROM E-24704
1-1/2"
5
H
16"-GC-247017-PJE(0.4) TWO PHASE FLOW
OUTSIDE INSIDE
PJE(0.4) UAB BACK 4" FLUSH 5156140 C-2
6 FREE DRAINING
CSO ? C-1
2" 247.004
1-1/2"
3/4"
2"-GC-247018-PJE(0.4) 12348
ET 45 75
16"-GC-247019-PJE(0.4)
V 5134289 C-1
CO2
OUTSIDE INSIDE ET 45 N/A
TI 015
TT 014
T.S.
1/2" WEEP HOLE
C-1
TTE 013
DO NOT POCKET
ET 10 38
RV 008
? C-3
2"-VA-247006-PJB(0.4)
H
14"
2"x1"
N/A ET 10
TI 014
E-24705
5307521 C-2
FIRE 1D2 SET@ 2200 kPa-g
C
HH
14"
RS
E 001
V
PP
TO ATMOSPHERE AT SAFE LOCATION
UAB PJE(0.4)
? C-2
RS
14"-GC-247020-PJG(0.4)
2"
4
3
2
1
V-24706 COMPRESSOR 6th STAGE KO DRUM SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR THE COMPRESSOR. 4 . ELECTRIC TRACE TO HLL (ET 25). 5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM. 6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
1700 mm ID x 2000 mm T/T 4200 kPa-g @ 105 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ GC-247085-PJG(0.4)
D
D HOLDS: • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HH
E 001
ET 45 75
C-1
TI 018
2"
PI 015
FREE DRAINING 14" GWR E 001
? C-2
? C-2
MAG
ISSUED FOR ESTIMATE
? C-2
C-24701F 3/4"
5134289 C-2
? C-2
5134289 C-2
3/4"
3/4"
5134289 C-2
3/4"
LLL=250 mm
1" 2"x1"
2"x1" FC C-1
2"
D
? C-1
ET 25 38
2"
C-1
?
B
? C-1 PJG(0.4) PJB(0.4)
MIN
? C-1
? C-2
2"
D
? C-2
TWO PHASE FLOW
C-2
2"
2"
TO V-24704
2"
5134289 C-2
ET 10 38
12353
?
24" MW 2"
2"-P-247009-PJG(0.4)
3/4"
247.004
5134289 C-2
4
5134289 C-2
3/4"
ON/OFF
ET 10 PJB(0.4) PJG(0.4) ET 25
KO LIQUID
LV 011
HH
1-1/2"
HLL=700 mm
LG 011
2"
2"-P-247005-PJB(0.4)
? C-2
3/4"
? C-2
? C-2
TT 018
RS
L
HHLL=800 mm
2"
3/4" 3/4"
RS
LT 011
2"
5134289 C-2
H
LC 011
2"
3/4"
GAP
V-24706
5134289 C-2
2"
3/4"
3/4"
5134289 C-2
LTE 012
PT 015
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMARY REVIEW
B REV
CASING DRAIN 247.005
13163
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
CASING DRAIN 3"-WP-247002-PJB(0.4)
3"-WP-247002-PJB(0.4)
TO SAFE LOCATION
247.009
13162
FROM C-24701G/H
SHELL CANADA QUEST CCS PROJECT
A R
C-24701F CO2 COMPRESSOR 6th STAGE
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr DIFF. PR.: 9163 kPa 3 DRIVER : 16500 kW MATERIAL : 304 SS INSULATION TYPE/THK: PP / TRIM: GC-247086-PJG(0.4)
4
3
UNIT 247 - COMPRESSION CO2 COMPRESSOR 6TH STAGE SCALE: NONE SHELL DWG NO.:
2
247.0000.000.041.006
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\247\247.006.pid MODEL DATE:7/7/2011 2:57:25 PM BY:ahm14887
FROM E-24705
10"
H
14"-GC-247021-PJG(0.4) TWO PHASE FLOW
C
247.006
247.005
12350
SP 009
3/4"
CO2
TO E-24706
OUTSIDE
? ?
V
14"
ET 25 38
247.007
12313
3/4" 3/4"
PP
5
INSIDE
CO2 12"-GC-247024-PJG(0.4)
DO NOT POCKET
C
6
2"
2"-GC-247022-PJG(0.4) 2"
CSO ? C-1
V 5134289 C-1
PP
1-1/2"
PP
3/4"
1-1/2"
? C-3
PJB(0.4) ET 10 PJG(0.4) ET 25
FREE DRAINING
1/2" WEEP HOLE
OUTSIDE INSIDE ET 45 N/A 14"-GC-247023-PJG(0.4)
TT 017
3/4" 3/4"
RV 010
ET 10 38
2"-VA-247007-PJB(0.4)
TTE 016
? C-2
PT 016
FIRE 1D2 SET@ 4200 kPa-g
2"x1"
N/A ET 10
H
TI 017
T.S.
TO ATMOSPHERE AT SAFE LOCATION
PI 016
4
3
2 E-24708A /B COMPRESSOR 6th STAGE COOLER SPACE HEATERS
E-24706 COMPRESSOR 6th STAGE COOLER RATED DUTY: SURFACE AREA [FINNED]: TUBE DESIGN PR. & TEMP: TUBE MATERIAL: DRIVER & Nos.: WINTERIZATION: INSULATION TYPE/THK: TRIM:
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . SWITCH LOCATED AT PLATFORM LEVEL. 4 . MINIMUM VFD SETTING IS 30% SPEED.
RATED DUTY: TYPE: MATERIAL: 304 SS TRIM: (A) SCL-247020-SAB (B) SCL-247021-SAB
3.9 MW 9596.0 m^2 6500 kPa-g @ 130 °C / HV @ 150 °C 304L SS + 0.38 mm CA 22.0 kW & 2 TYPE 3, MODE C / GC-247087-PJG(0.4)
HOLDS:
D
CO2 247.006
12313
• NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED DURING DETAILED ENGINEERING.
PP
12"-GC-247024-PJG(0.4)
D
FROM C-24701F
TV 021B
(V)
C-1
TX 021B
FC
E-24706
TV 021A C-1
TX 021A
8"
8"
8"
8"
FO
1-1/2"
1-1/2"
TW 043
PP
3/4" 3/4"
TW 042
? C-2
(V)
CO2
H MIN 10D
12"-GC-247031-PJG(0.4) FREE DRAINING
TWO PHASE FLOW
12314
247.009
TO V-24707
1-1/2"
C
C FAN NO. 1
FAN NO. 2
TT 019
E 001
AVG RTD SENSOR (V)
V
FROM HEADER
? C-2
(V)
SI 001
? C-2
TV 021C
3/4"
H
2"-SL-246011-SAB
TT 021B
TX 021C
C-1
V
2"
L
4
4
VFD
XL 002
XA 002
I
I
VFD
XA 003
LOCAL/ FAULT REMOTE
XL 003
SI 002
FAULT LOCAL/ REMOTE
-SL-247001-SAB
FC
H
2"
FREE DRAINING
L
TI 021B
5115227 C-2
TX 021
AVG RTD SENSOR (V)
5115227 C-2
TC 021
TT 021A
3/4"
246.029
12447
TI 021A
H ET 10
LP STEAM
E 001
TC 019
TV 021D C-1 FC
(V)
TX 021D
FREE DRAINING
HS 005
3
3
E-24708B
11 Jul 2011
MANUAL
HIS 002
R/S
I 001
HIS 003
I 001
R/S
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
-SCL-247001-SAB
REV
CONDENSATE
HS 003A
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
HOA
T
? C-2
TWO PHASE FLOW
HOA
ISSUED DATE
D
? C-2
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 247 - COMPRESSION COMPRESSOR 6TH STAGE COOLER SCALE: NONE SHELL DWG NO.:
4
3
2
247.0000.000.041.007
1
REV.
G
247.007
TO HEADER
ET 10 38
2"-SCL-247002-SAB
5115227 C-2
12455
3/4"
246.029
HS 002A
ISSUED FOR PRELIMINARY REVIEW
B
FILE:\\F:\1025\DRAWINGS\CO2\247\247.007.pid MODEL DATE:7/7/2011 2:24:26 PM BY:ahm14887
HS 004
B
ISSUED FOR ESTIMATE
? C-2
5115227 C-2
3/4" D
E-24708A
R/S
MANUAL
T
? C-2
R/S
-SL-247004-SAB
-SL-247003-SAB
-SL-247002-SAB
4
3
2
V-24707 TEG INLET SCRUBBER SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
V-24708 COMPRESSOR 7th STAGE KO DRUM
900 mm ID x 3400 mm T/T 6500 kPa-g @ 105 °C /HV @ 150°C CS + 3 mm 304L SS CLAD / 316L SS H/ GC-247089-PJG(0.4)
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR THE COMPRESSOR. 4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE. 5 . ELECTRIC TRACE TO HLL (ET 25). 6 . DEHYDRATION UNIT BYPASS. 7 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE. 8 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT. 10. SAMPLE PROBE INCLUDES A DOUBLE BLOCK AND BLEED VALVE ASSEMBLY. 11. MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM. 12. THE FLOW MEASUREMENTS AND ADDITIONAL INSTRUMENTS ARE REQUIRED FOR ON-SITE COMPRESSOR PERFORMANCE TESTING (PTC-10). 13. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
SIZE: 900 mm ID x 3400 mm T/T DESIGN PR. & TEMP: 6500 kPa-g @ 105 °C/HV @ 150°C MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS INSULATION TYPE/THK: H / TRIM: GC-247090-PJG(0.4)
DO NOT POCKET
3/4"
NO 5242964 C-1
5134289 C-3
V
12"
12"
12"-GC-248001-PJG(0.4)
NO 5242964 C-1
ET 25 N/A
H
AI 001A
TO ATMOSPHERE AT SAFE LOCATION
AI 001B
FI 005
FT 005
FI 006
12
FT 006
ET 10 38
HH
001
TI 026
TTE 025
TT 026
E
L
CO2 PURITY TO ATMOSPHERE AT SAFE LOCATION
TO ATMOSPHERE AT SAFE LOCATION
AE 001B
C
H
2"x1"
C-1 PJB(0.4) ET 10 PJG(0.4) ET 25 3/4" V 5134289 C-1 ET 45 75
12
FIRE 1D2 SET@ 6500 kPa-g
RV 011
2"-VA-247008-PJB(0.4)
1/2" WEEP HOLE
12375
AX 001
3/4" TUBING (FAST LOOP)
13165
N/A ET 10
248.001
AT 001B
AE 001A
ANALYZER FAST LOOP TO C-24701A SUCTION
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • FACILITIES ARE TO BE DETERMINED FOR CLEANING AND WATER PURGE FROM THE COMPRESSOR PIPING DOWNSTREAM OF THE WATER ANALYZER (IN ORDER TO PREVENT CONTAMINATION OF THE PIPELINE DURING COMMISSIONING AND START-UP).
FROM V-24801
H2O
C
TO V-24801
CO2
AT 001A
247.001
248.001
12376
D
HOLDS:
9
N/A ET 25
12"-GC-247038-PJG(0.4)
ET 25 H
CSC 5242963 C-1
10"
6
CO2
H 75
CSO 5242964 C-1
CSO 5242964 C-1
H ET 25
12"
5134289 C-3
3/4"
12"
V
3/4"
V
9
5134289 C-3
D
ET 45 N/A OUTSIDE INSIDE 12"-GC-247040-PJG(0.4)
AP 001
1-1/2"
1-1/2"
4
10
CO2 10"-GC-247041-PJL(C) 2"
247.010
12325
TO C-24701H
13
TO ATMOSPHERE AT SP SAFE LOCATION 005 8
3/4" 3/4" S-4A ? C-1
5134289 C-2
s
T.S.
PI 026
3/4" 3/4"
? C-2
? C-2
PT 019
PJG(0.4) PJL(C)
L
13162
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
LZTE 015
3/4"
C-1
?
? C-1 PJL(C) PJB(0.4)
APE
PEM CLIENT APP
D
2"x1"
? C-1
FC 2"x1" C-1
LV 015
KO TEG
ET 10 38
248.003
12373
SHELL CANADA
TWO PHASE FLOW TO V-24803 NNF
QUEST CCS PROJECT
ET 25 ET 10 PJG(0.4) PJB(0.4)
A CASING DRAIN 3"-WP-247002-PJB(0.4)
TO SAFE LOCATION
C-24701G CO2 COMPRESSOR 7th STAGE RATED CAPACITY: 79877 Nm^3/hr DIFF. PR.: 9163 kPa 3 DRIVER : 16500 kW MATERIAL : 304 SS INSULATION TYPE/THK: PP / TRIM: GC-247091-PJL(C)
3
MC
PDP
4
2"
1"
3"-WP-247002-PJB(0.4)
4
CS
C-24701G
CASING DRAIN 247.006
B
2"-KP-247002-PJB(0.4)
2" ? C-1
G
B
5134289 C-2
D
ET 25 38
ISSUED FOR ESTIMATE
PI 019
2"-KP-247001-PJG(0.4) 2"
12
11 Jul 2011
3/4" 3/4"
3/4"
5134289 C-2
3/4"
3/4"
3"
PT 026
12
REV
ON/OFF
SO ? C-2
LYE 015
TI 027
3/4"
D
2"
? C-2
TT 027
? C-2
E 003
3/4"
? C-2
? C-2
LLL=250 mm
LT 015
2"
2"
5134289 C-2
2"
? C-2
LC 015
5134289 C-2
D
? C-1
? C-2
5134289 C-2
2"
ET 25 38
2"
2"
3/4"
? C-2
LG 015
TI 060
GAP H
MAG
24" MW
5134289 C-2
? C-2
2" ? C-2
? C-2
2"x1"
? C-2
HLL=700 mm
2"
FC C-1
? C-2
2"
MIN
2"x1"
? C-2
MIN
? C-1
2"
1"
5134289 C-2
? C-2
TO V-24704
TWO PHASE FLOW
2"
? C-2
HHLL=800 mm
LLL=250 mm
3/4"
2"
5134289 C-2
2"
2"
12372
ET 10 38
5134289 C-2
247.004
2"-P-247010-PJB(0.4)
? C-2
2"
3"
2"-P-247011-PJG(0.4)
3/4"
KO LIQUID
2"
3/4"
LV 013
ET 10 ET 25
3/4"
PT 018
5
? C-2 PJB(0.4) PJG(0.4)
3/4"
24" MW
3/4"
ON/OFF
3/4"
L
2"
5
LG 013
5134289 C-2
LT 013
3/4" ? C-2
MAG
H
2"
PI 018
V-24708
RS
LC 013
HLL=800 mm
? C-2
? C-2 GAP
2"
5134289 C-2
2"
5134289 C-2
3/4"
5134289 C-2
3/4"
V-24707
LTE 016
3/4"
12"
TT 060
3/4" 3/4"
12"
GWR
5134289 C-2
FREE DRAINING
LL
LT 017
SP 010
5134289 C-2
GWR
? C-2
2"
3/4"
H
12"-GC-247031-PJG(0.4) TWO PHASE FLOW
3/4"
FROM E-24706
E 003
5134289 C-2
247.007
12314
001
1-1/2"
3/4" 3/4"
PP
HH
E
5134289 C-2
CO2
H
3/4"
LI 017
1-1/2"
2
247.010
R
13166
FROM C-24701H
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 247 - COMPRESSION TEG INLET SCRUBBER & CO2 COMP. 7TH STAGE SCALE: NONE SHELL DWG NO.:
247.0000.000.041.009
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\247\247.009.pid MODEL DATE:7/7/2011 2:13:03 AM BY:muk22296
ET 25 38
1/2" WEEP HOLE
247.009
10"
7
DO NOT POCKET
12" 10"
PP
CSO ? C-1
2" 2"
12"
? C-3
RS
V
? C-3
2"
RS
V
11
2"-GC-247039-PJG(0.4)
FREE DRAINING
13
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR THE COMPRESSOR. 4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE. 5 . TWO CHECK VALVES IN SERIES SEPARATED BY AT LEAST 500MM. 6 . NON-SLAM CHECK VALVE. 7 . START-UP BYPASS VALVE TO BE LOCATED AT PIPING HIGH POINT WITH PIPING FREE DRAINING INTO THE MAIN PIPING. 8 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION. 9 . ANTI-SURGE SPILLBACK VALVE UV-247001 TO BE LOCATED AT PIPING HIGH POINT WITH PIPING FREE DRAINING INTO THE MAIN PIPING. 10. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
CO2 VENT 6"-VA-247010-PJB(C) DO NOT POCKET N/A ET 120 PJB(C) PJL(C)
FREE DRAINING
TO S-24603
? C-1
6"
6"-VA-247009-PJB(C)
C-1
? C-1
4"x3"
12327
UV 003
3/4"
FO C-1
UYE 003
V 5136407 C-1
HOLDS: • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
FO
4"
S
E 001
RV 012
CSO 5349470 C-1
246.032
D
3/4"
CO2 RELIEF / VENT
13039
FROM BATTERY LIMIT PIPIELINE
BLOCKED DISCHARGE 3K6 SET@ 14790 kPa-g
P
V
247.014
2"
D
? C-1
UC SIGNAL
PX 034
247.001
12578
FROM UC-001B
E 002
E 001
S
FO
MIN
9
HH
E
V
PC 022
001
E
5 10"
5351323 C-1 INSIDE OUTSIDE
5136407 C-3
XYE 001
L
? C-2
NC ? C-2
VISIBLE
2"-GI-246019-ULB
246.030 GI 12995
8 7
A/S FO
XZTE 001
10" FC
2"
PG 028
s
XV 001
2"
6" 5343525 C-1 10" 5349475 C-1
C-1
ET 120 PP
4
PP
CO2 10"-GC-247043-PJL(C)
12332
247.011
TO E-24707A/B
ET 120 100
MIN
5351323 C-1
10"
? C-3
SP 003B
3/4"
SP 003A
V
3/4"
4
PT 022
? C-2
? C-2
? C-2
3/4" 3/4"
4
6
6
3/4" 3/4"
TO UC-001A/B
4"-GC-247046-PJL(C)
12569
PTE 020
3/4" 3/4"
247.001
PT 021
8"-GC-247044-PJL(C)
001
PT SIGNAL
5119160 C-2
FREE DRAINING UV 001
E 002
3/4"
24"x8" C-1 FO PJB(0.4) PJL(C) N/A ET 120
3/4" 3/4"
TO V-24701
FREE DRAINING
ET 120 75
ET 120 75
12326
24"-GC-247045-PJB(0.4) DO NOT POCKET
? C-2
8"
ANTI SURGE SPILL BACK
? ? C-2 C-2
FROM UC-001A
247.001
C
UZTE 001
2" 2"
247.001
12571
TT SIGNAL
1-1/2"
TT 057
12331
TO UC-001A/B
ISSUED FOR ESTIMATE 11 Jul 2011
4 CO2 247.009
PP
10"-GC-247041-PJL(C)
FROM C-24701G
DO NOT POCKET
10
4
10"-GC-247042-PJL(C)
12325
B
1-1/2"
TTE 029
E 001
HH
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
B
ISSUED FOR PRELIMINARY REVIEW
ISSUED REV DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
RS
ET 120 PP
C-24701H ? C-1
3/4"
4
SHELL CANADA
? C-1 PJL(C) PJB(0.4)
QUEST CCS PROJECT
A
CASING DRAIN 13166
3"-WP-247002-PJB(0.4)
TO SAFE LOCATION
R
C-24701H CO2 COMPRESSOR 8th STAGE RATED CAPACITY: DIFF. PR.: DRIVER : MATERIAL : INSULATION TYPE/THK: TRIM:
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
79877 Nm^3/hr 9163 kPa 3 16500 kW 304 SS PP / GC-247092-PJL(C)
UNIT 247 - COMPRESSION CO2 COMPRESSOR 8TH STAGE SCALE: NONE SHELL DWG NO.:
REV.
247.0000.000.041.010
4
3
2
1
G
247.010
247.009
FILE:\\F:\1025\DRAWINGS\CO2\247\247.010.pid MODEL DATE:7/7/2011 2:20:07 PM BY:ahm14887
247.001
3/4"
C
UYE 001
UC SIGNAL
L
4
3
2 E-24709A /B CO2 COMPRESSOR AFTERCOOLER SPACE HEATERS
E-24707A 6 CO2 COMPRESSOR AFTERCOOLER RATED DUTY: SURFACE AREA [FINNED]: TUBE DESIGN PR. & TEMP: TUBE MATERIAL: DRIVER & Nos.: WINTERIZATION: INSULATION TYPE/THK: TRIM:
1
1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . COOLER DUTY DEPICTED IS THE TOTAL FOR ALL BAYS. 4 . SWITCH LOCATED AT PLATFORM LEVEL. 5 . MINIMUM VFD SETTING IS 30% SPEED. 6 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
RATED DUTY: TYPE: MATERIAL: 304 SS TRIM: (A) SCL-247025-SAB (B) SCL-247024-SAB
10.3 MW 3 1385.0 m^2 14790 kPa-g @ 175 °C 304L SS + 0.38 mm CA 22.0 kW & 2 TYPE 3, MODE C / GC-247093-PJL(C)
6 CO2 247.010
12332
CO2
PP
10"-GC-247043-PJL(C)
FROM C-24701H
12558
HOLDS:
247.012
TO E-24707B
TV 032B
D
• NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED DURING DETAILED ENGINEERING.
(V)
TX 032B
C-1 FC
TV 032A
6"
(V)
TX 032A
E-24707A
6"
BAY A C-1
6"
FO
6" 1-1/2"
1-1/2"
TW 047
PP
3/4" 3/4"
TW 046
? C-2
6 CO2 6"-GC-247055-PJL(C)
MIN 10D
12556
247.014
TO CO2 METERING STATION 1-1/2"
C FAN NO. 1
C
FAN NO. 2 TT 030
TI 032A
E 001
2"
AVG RTD SENSOR (V)
TT 032A
TC 030
246.029
5115227 C-2
V
5
VFD
I
I
VFD
(V)
TX 032C
SI 005 V 3/4"
C-1 FC
247.014
12557
FROM TC-031
001
? C-2
TV 032C
TC SIGNAL
E
XL 006
XA 006
XA 007
LOCAL/ FAULT REMOTE
XL 007
FREE DRAINING
FROM HEADER
L
SP
5
? C-2
5115227 C-2
12610
H
2"-SL-246015-SAB
2"
AVG RTD SENSOR (V)
TT 032B 3/4"
LP STEAM
L
TI 032B
TX 032
H ET 10
TC 032
H
SI 006
FAULT LOCAL/ REMOTE 2"-SL-247010-SAB
-SL-247009-SAB
TV 032D C-1 FC
(V)
TX 032D
R/S
R/S
E-24709A
HS 012
HS 013
4
4
ISSUED FOR ESTIMATE
E-24709B
MANUAL
11 Jul 2011
MANUAL
HIS 010
2"-SCL-247006-SAB
D
? C-2
5115227 C-2
3/4"
T
? C-2
CONDENSATE TO HEADER
HS 010A
ET 10 38
2"-SCL-247005-SAB
? C-2
TWO PHASE FLOW
HIS 011
I 001
R/S
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
D
HOA
HS 011A
ISSUED FOR PRELIMINARY REVIEW
B ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
HOA
-SL-247012-SAB
T
5115227 C-2
12611
I 001
G
REV
3/4"
246.029
R/S
B
? C-2
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 247 - COMPRESSION CO2 COMPRESSOR AFTERCOOLER-BAY A SCALE: NONE SHELL DWG NO.:
4
3
2
247.0000.000.041.011
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\247\247.011.pid MODEL DATE:7/7/2011 1:54:46 PM BY:ahm14887
-SL-247011-SAB
FREE DRAINING
247.011
D
PP
10"-GC-247043-PJL(C)
4
3
2 E-24709C /D CO2 COMPRESSOR AFTERCOOLER SPACE HEATERS
E-24707B 6 CO2 COMPRESSOR AFTERCOOLER RATED DUTY: SURFACE AREA [FINNED]: TUBE DESIGN PR. & TEMP: TUBE MATERIAL: DRIVER & Nos.: WINTERIZATION: INSULATION TYPE/THK: TRIM:
1
RATED DUTY: TYPE: MATERIAL: TRIM:
10.3 MW 3 1385.0 m^2 14790 kPa-g @ 175 °C 304L SS + 0.38 mm CA 22.0 kW & 2 TYPE 3, MODE C / GC-247094-PJL(C)
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . COOLER DUTY DEPICTED IS THE TOTAL FOR ALL BAYS. 4 . SWITCH LOCATED AT PLATFORM LEVEL. 5 . MINIMUM VFD SETTING IS 30% SPEED. 6 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
304 SS (C) SCL-247026-SAB (D) SCL-247027-SAB
6 CO2
D
12558
247.011
PP
10"-GC-247043-PJL(C)
HOLDS:
D
• NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED DURING DETAILED ENGINEERING.
FROM C-24701H
TV 035B
TX 035B
(V)
C-1 FC
E-24707B TV 035A
6"
(V)
6"
BAY B
TX 035A
C-1
6"
6"
FO
1-1/2"
TW 048
1-1/2"
TW 049
6 CO2 6"-GC-247058-PJL(C) MIN 10D
12560
247.014
TO CO2 METERING STATION
C
C
1-1/2" FAN NO. 1
2"
AVG RTD SENSOR (V)
TT 035A
TT 033
TC 033
TX 035C
V
C-1
-SL-247015-SAB
FC
TWO PHASE FLOW
247.014
12561
FROM TC-031
XL 009
SI 008
FAULT LOCAL/ REMOTE
TV 035D C-1
FREE DRAINING
-SL-247014-SAB
R/S
E-24709C
R/S
HS 016
HS 017
4
4
(V)
TX 035D
ISSUED FOR ESTIMATE
E-24709D
11 Jul 2011
MANUAL
I 001
HIS 015
I 001
HOA
HS 015A
HOA
R/S
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
-SL-247016-SAB
R/S
B
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
T
? C-2
D
5115227 C-2
? C-2
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 247 - COMPRESSION CO2 COMPRESSOR AFTERCOOLER-BAY B SCALE: NONE SHELL DWG NO.:
4
3
2
247.0000.000.041.012
1
REV.
G
247.012
TO HEADER
ET 10 38
2"-SCL-247008-SAB
XA 009
FC
HS 014A
3/4"
12456
TC SIGNAL
E 001
-SL-247013-SAB
-SCL-247007-SAB 246.029
VFD
LOCAL/ FAULT REMOTE
HIS 014
CONDENSATE
XA 008
I
? C-2
5115227 C-2
3/4" D
XL 008
I
MANUAL
T
? C-2
SI 007
? C-2
TV 035C
VFD
5115227 C-2
? C-2
(V)
5
FREE DRAINING
FROM HEADER
3/4"
H 38
2"-SL-246016-SAB
L
SP
5
V
3/4"
246.029
12449
L
2"
AVG RTD SENSOR (V)
TT 035B
5115227 C-2
LP STEAM
TI 035B
TX 035
H ET 10
TC 035
H
FILE:\\F:\1025\DRAWINGS\CO2\247\247.012.pid MODEL DATE:7/7/2011 5:52:42 AM BY:muk22296
TI 035A
E 001
FAN NO. 2
4
3
2
1
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE STATED. 3 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE. 4 . CONNECTIONS FOR METER PROVING AT SAFE ACCESSIBLE LOCATION. 5 . SCOPE BREAK WITH PIPELINE FACILITIES. 6 . CHECK VALVE TO REDUCE CONSEQUENCES OF POTENTIAL AIR COOLER TUBE RUPTURE. 7 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT. 8 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
D
D
HOLDS: • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
CO2 VENT 247.010
13039
TO S-24603
6"-VA-247010-PJB(C) DO NOT POCKET
? C-1
6"
C-1
PJB(C) PJL(C)
TO TC-030
NC
12557
?
247.011
3"
TC SIGNAL
TV 058
6"x3"
8
C-1 FC
12561
NC ? C-1
3"
TO TC-033 3"
C 3
PI 025
CO2 12556
247.011
6"-GC-247055-PJL(C)
C
NC ? C-1
247.012
3"
TC SIGNAL
FQI 004
MIN 10D 8"-GC-247059-PJL(C)
8"
FP 5349475 C-1
8"x4"
MIN 5D
8"x4"
6 5351323 C-1
TT 058 1-1/2"
7 8" 5349475 C-1
5136407 C-3
5
? C-3
FT 004
3/4"
NC 5349470 C-1
4" 3/4" V 5136407 C-1
V
3/4"
1-1/2"
3/4" V 5136407 C-1
TC 058
NC 5349470 C-1
1-1/2"
TTE 041
? C-2
TT 031
3/4" 3/4"
FROM E-24707B
4"
6"-GC-247058-PJL(C)
FI 004
4
3"
4
NC 5349470 C-1
PT 025
4"
7 CO2
8" 5349475 C-1
12993
MIN
TO PIPELINE
PJL(C)
3
ISSUED FOR ESTIMATE
B
11 Jul 2011
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 247 - COMPRESSION CO2 METERING STATION SCALE: NONE SHELL DWG NO.:
4
3
2
247.0000.000.041.014
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\247\247.014.pid MODEL DATE:7/7/2011 11:21:54 AM BY:ahm14887
B
247.014
247.012
HH
4"
12560
L
E 002
NC 5349470 C-1
CO2
H
NC 5349470 C-1
TC 031
3
3"-GC-247027-PJL(C)
FROM E-24707A
4
3
RV 004
3"x2" C-1
RATED DUTY: SURFACE AREA: TEMA TYPE:
1400 mm ID x 9700 mm T/T 6500 kPa-g @ 105 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ GC-248010-PJG(0.4)
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
3/4"
V 5134289 C-1
2"
D
190 kW 74.0 m^2 DOUBLE PIPE SHELL 7200 kPa-g / HV 210 °C / 150 °C CS / KP-248025-PAN
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE STATED. 3 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL POSITION, SEPARATED BY AT LEAST 500 MM. 4 . ELECTRIC TRACE TO HLL (ET10). 5 . FT-003 TO BE INSTALLED VERTICALLY WITH FLOW UPWARD. 6 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE. 7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
TUBE 1200 kPa-g / 58 °C / CS / CWR-248002-UAB
C-2
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
C-1 ?
D C-2
TW 011
V
2" 12"
2"
FI 003
5242963 C-2 24" MW
3
2"
2"
5063244 C-2
6"x2"
2"
1-1/2" 6"x2"
3/4"
3"
246.025 CWR
ET 10 38
CSO 5156863 C-2
12918
2"
2"
RS
L 2" RS
FT 003
5063244 C-2
6"x3"
6"x3"
3"x2"
2" RS
E-24804A
TT 010
3"
3"
5242963 C-2
H
RS
2"
5134289 C-2
3/4" 3"
TC 010
3"-CWR-248001-UAB
1-1/2" 2"
TO V-24708
HOLDS:
ET 10 38
12"-GC-248001-PJG(0.4)
12616
FROM P-24801A/B
2" ET 25 N/A
248.004
2"
5
E-24804B
C
ET 10 38
12375
D
? C-3
247.009
C-1
FC C-1
2"-KP-248016-PAN
ET 10 38
2"
2"-KP-248024-PAN
CO2
3/4"
2"-GC-248002-PJG(0.4)
?
1"
?
2"
2"x1"
D
LEAN TEG
ET 10 38
3/4"
2"x1"
?
ET 25 38
TV 010
5115273 C-2
2" 2"
ET 10 PJB(0.4) PJG(0.4) ET 25
E-24804A /B /C /D /E LEAN TEG COOLER
V-24801 TEG ABSORBER SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
CSO ? C-1
1/2" WEEP HOLE
ET 10 38
2"x1"
3"-VA-248002-PJB(0.4)
CSC CSC ? ? C-1 C-1
N/A ET 10
FIRE 1E2 SET@ 6500 kPa-g
PJG(0.4) ET 25
ET 10 PJB(0.4)
TO ATMOSPHERE AT SAFE LOCATION
2
2" 2"
C
RS
ET 10 38
2" RS
2"
ET 10 38
E-24804C 2" 2"
PDI 002
H
RS
PDT 002 2" RS
2"
ET 10 38
2" 2"
TO ATMOSPHERE AT SAFE LOCATION
RS
3"x2"
3" 2"
2" RS
6 3/4"-VA-248001-PJG(0.4)
ET 25 38
E-24804E
7 N/A ET 25
S-4A
V-24801
2"
? C-2
E-24804D
ET 10 38
3"-CWS-246009-UAB
5156863 C-2
246.025 CWS 12919
BACK FLUSH
ISSUED FOR ESTIMATE
B
11 Jul 2011
2"-KP-248021-PAN
2"
SO
2"
5134289 C-2
3/4"
MAG LG 002
2"
2"
? C-2
? C-2
? C-2
LT 002
LC 002
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
ISSUED DATE
DESCRIPTION
LYE 002
CS
MC
PDP
APE
PEM CLIENT APP
QUEST CCS PROJECT
? C-1
D
D
5134289 C-2
? C-1
1-1/2" 1-1/2"
3/4"
1-1/2"
5134289 C-2
1-1/2"
3/4"
? C-2
2"
3"x1-1/2"
FC C-1
1-1/2"
? C-1
1-1/2"
D
3"x1-1/2"
? C-1
ET 10 38
A
RICH TEG 3"-KP-248002-PJG(0.4) TWO PHASE FLOW
12379
248.002
TO E-24801
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
ET 10 38
CSC 5096787 C-1
UNIT 248 - DEHYDRATION TEG ABSORBER SCALE: NONE SHELL DWG NO.:
3
PRS
SHELL CANADA
S
LV 002 3" 3"-KP-248001-PJG(0.4)
4
CKD
L
E 003
D
BY
H
5134289 C-2
? C-2
04/20/11
B
3/4"
5134289 C-2
2"
F
REV
? C-2
4
LLLL=300 mm
ISSUED FOR PHA III
2
248.0000.000.041.001
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\248\248.001.pid MODEL DATE:7/7/2011 5:14:08 AM BY:muk22296
LLL=700 mm
07/11/11
248.001
? C-2
2"
G
5134289 C-2
NLL=880 mm
? C-2 24" MW
? C-2
2"
3/4"
? C-2
HLL=1050 mm
5134289 C-2
5134289 C-2
2"
5134289 C-2
2"
HHLL=1450 mm
3/4"
3/4"
12"
3/4"
GWR
3/4"
LL
LTE 001
5242963 C-2
5134289 C-2
5134289 C-2
3/4"
E 003
3/4"
12"-GC-247038-PJG(0.4) DO NOT POCKET
5242963 C-2
MIN
FROM V-24707
247.009
3"
3"
5134289 C-2
12376
H 38
3"
SP 001
3/4"
CO2
ET 25 H
? C-1
3/4"
1/2" WEEP HOLE
4
3
SIZE (COLUMN): 500 mm ID x 3500 mm T/T SIZE (STRIPPER): 400 mm ID x 2400 mm T/T DESIGN PRESS. & TEMP.: 350 kPa-g @ 230 °C / MATERIAL (COLUMN / INTERNAL): CS + 3 mm 316L SS CLAD / 316L SS MATERIAL (STRIPPER): 316L SS + 3 mm CA INSULATION TYPE/THK: H TRIM: KP-248026-PJB(0.4)
SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
RATED DUTY: SURFACE AREA: TEMA TYPE:
1300 mm ID x 3900 mm T/T 350 kPa-g @ 230 °C / HV @ 150° C CS + 3 mm 316L SS CLAD H/ KP-248027-PJB(0.4)
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE / THK: TRIM: PJG(0.4) PJB(0.4)
TV 002B
3"x1-1/2"
1-1/2"
1-1/2"
D
? C-1
FO C-1 TO ATMOSPHERE AT SAFE LOCATION
? C-1
SHELL 350 kPa-g / HV 230°C / 150°C CS + 3 mm 316 CLAD H KP-248029-PJB(0.4)
DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE / THK: TRIM:
6
FO C-1
3"
E-24801
? C-1 RICH TEG
ET 10 38
3"-KP-248005-PJB(0.4) TWO PHASE FLOW
3" H
TC 002
2"
S-24801 H ET 10
2" 2"
2"-SS-248002-SAG
? C-2 LG 008
E-24802
MAG
V 5115277 C-1 1"
? C-3
2"
1"-SS-248003-SAG
? C-2
V-24806
2"
D
4
D
5134289 C-2
? C-2
3/4"
5119160 C-2
3/4"
? C-1
12425
5
NC 5069816 C-1
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW
LT 004
LC 004
LC SIGNAL
ISSUED FOR PRELIMINARY REVIEW
H
12328
L
248.003
REV
ISSUED DATE
DESCRIPTION
5115277 C-2
D
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
TO LV-004
TI 003
? C-2
5134289 C-2
3/4"
7000 mm MIN.
? C-2
NLL=690 mm
3/4"
5115277 C-2
1" C-1
2"
11 Jul 2011
2"
4
LLL=260 mm
SHELL CANADA
TT 003 1-1/2" 6"x3"
2"
QUEST CCS PROJECT 6"x3"
D
ET 10 38
A
LEAN TEG 3"-KP-248008-PJB(0.4)
12386
248.003
TO E-24803
? C-2
? C-1
? C-1
2"x1"
2"x1"
FT 001
246.030 GI
B
MAG
2"
FC C-1
? C-1
2"
? C-2
? C-2
D
R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 248 - DEHYDRATION TEG STRIPPER, REBOILER & CONDENSATE POT SCALE: NONE SHELL DWG NO.:
4
3
2
248.0000.000.041.002
1
REV.
G
248.002
TO V-24607 TWO PHASE FLOW
2"
2"x1"
2"
2"
12427
1"
2"x1"
5115277 C-2
246.020
ET 10 38
3/4"
3 HP CONDENSATE
D
LV 003
2"
FREE DRAINING 2"
2"
HLL=1120 mm
3/4" 2"-SCH-248002-SAG
2"-SCH-248001-SAG
LG 004
LLLL=150 mm
SO ? C-2
3/4"
L
V-24805
8" HH
LG 003
FC C-1 1"
? C-1
2"
ISSUED FOR ESTIMATE
2"-GI-246018-ULB
? C-2
MIN
LT 003
2"x1"
V
PCV 009
B
5115277 C-2
3/4"
5115277 C-2
3/4" H
HLL=880 mm
1" 2"x1"
LLL=290 mm
? C-2
MAG
2"
PT 008
FV 001 2"
H
NLL=700 mm
2"
? C-2
? C-2 HHLL=1000 mm
2"
2"
2"
5097550 C-2
2"
V 5134289 C-2
V
2" 2"
3/4"
CSO C-1 ?
FC 001
5134289 C-2
SAB SAG
LL
TT 001
3/4"
3/4"
2"
PI 008
ULB
001
24" MW
H
PJB(0.4)
1/2" WEEP HOLE
LTE 010
2"x3/4" 3/4"
D
PI 016
PT 016
? C-2
2"
? C-2
002
C-1 E
PTE 004
2"x3/4" 3/4"
ET 10 38
ET 10 38
RV 001
E
HH
5134289 C-2
2"
2"
ET 10 38
2"-VA-248004-SAB
FIRE 1D2 SET@ 5170 kPa-g
5134289 C-2
2" ? C-1
2"x1"
2"
LC 003
C
10"
? C-2
V
FROM E-24803
V
CSC 5062543 C-1
N/A ET 10
12385
s
1"
TO ATMOSPHERE AT SAFE LOCATION
248.003
8" HH
L
3/4"
D
FC C-1
3"-KP-248023-PJB(0.4) TWO PHASE FLOW
MIN. 10D
4"
3/4"
? C-1
FROM HEADER
RICH TEG
ET 10 38
4"x3"
1"
2"x1"
2"
5115277 C-2
H 50
2"-SS-248001-SAG
TYE 001
TV 001
3/4"
246.101
12545
8" HH
H
TC 001
TO V-24803
? C-3
FT 004 LOW TEMP HP STEAM
L
248.003
12380
2"
TT 002
V-24802
C
D
HOLDS:
ET 10 38 PJG(0.4) PJB(0.4) 1-1/2" 1-1/2" 3"x1-1/2"
3"x1-1/2" 1-1/2"
D
E 002
SCH-248006-SAG
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
ET 10 38 TV 002A
? C-1
FI 004
TUBE 5170 kPa-g / FV 415°C / 415°C 316L SS
FILE:\\F:\1025\DRAWINGS\CO2\248\248.002.pid MODEL DATE:7/7/2011 2:34:26 PM BY:ahm14887
3"-KP-248002-PJG(0.4) TWO PHASE FLOW
TUBE 350 kPa-g / HV 230°C / 150°C 316L SS + 0.38 mm CA
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE STATED. 3 . CONDENSATE LINES SHOULD BE SUPPORTED FOR VIBRATING SLUGGING SERVICE. 4 . ELECTRIC TRACE TO HLL (ET 10). 5 . FT-001 TO BE INSTALLED VERTICALLY WITH FLOW UPWARD. 6 . 316/316L STAINLESS STEEL PIPING COMPONENTS ARE REQUIRED FOR THIS LINE.
396 kW
8"
5134289 C-2
FROM V-24801
ET 10 38
SHELL 1400 kPa-g / FV 105°C / 105°C CS + 3 mm 316 CLAD H KP-248028-PJB(0.4)
RATED DUTY: SURFACE AREA: TEMA TYPE:
8"-VA-248003-PJB(0.4)
3/4"
248.001
12379
3"-KP-248003-PJG(0.4)
RICH TEG
92 kW
3"-KP-248004-PJB(0.4) TWO PHASE FLOW
ET 10 38
D
1-1/2" 3"x1-1/2"
E-24802 TEG STRIPPER REBOILER
? C-2
600 mm ID x 1800 mm T/T 5170 kPa-g @ 415 °C/ FV @ 415°C CS +3 mm CA H/ SCH-248005-SAG
1
E-24801 TEG STRIPPER CONDENSER
S-24801 TEG REGENERATION PACKAGE
5134289 C-2
SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
V-24806 TEG SURGE DRUM
V-24802 TEG STRIPPER
3/4"
V-24805 TEG STRIPPER REBOILER CONDENSATE POT
2
4
3
2
V-24803 TEG FLASH DRUM SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
1
E-24803 LEAN/RICH TEG EXCHANGER
1900 mm ID x 4800 mm T/T 480 kPa-g @ 105 °C / FV @ 105°C CS +3 mm 304L SS CLAD/ 316L SS H/ KP-248030-PJB(0.4)
RATED DUTY: SURFACE AREA: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM: TEMA TYPE:
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE STATED. 3 . ELECTRIC TRACE TO HLL (ET 10). 4 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
0.6 MW
HOT 400 kPa-g / HV 230 °C / 150 °C PLATES: 304L SS FRAME: CS / KP-248031-PJB(0.4) COMPABLOC
COLD 520 kPa-g / FV 210 °C / 210 °C /
D
D
HOLDS:
TI 006
E-24803
LEAN TEG 12386
248.002
3"
FROM V-24806 RICH TEG 248.002
12385
TO V-24802
TT 006
ET 10 38
3"-KP-248008-PJB(0.4)
ET 10 38
3"-KP-248023-PJB(0.4)
6"x3"
TWO PHASE FLOW
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
3"
6"x3"
1-1/2" 6"x3"
3"
6"x3"
ET 10 38
LEAN TEG 3"-KP-248009-PAB
3"
1-1/2"
12378
248.004
TO P-24801A/B PJB(0.4) PAB
TT 005
PC 005
H
TI 005
PT 005
12367
TO V-24701
3"-GC-248004-PJB(0.4) DO NOT POCKET
3" 5242893 C-1
3/4"
H 25
3"x1" 1"
TO ATMOSPHERE AT SAFE LOCATION
2" FO C-1
2"x1"
CONTROL VALVE FAILURE 6Q8 SET@ 480 kPa-g
? C-1
D 1"
5134289 C-2
247.001
3/4"
FLASHED CO2
C
PV 005
? C-2
C
RV 002
NC 5096787 C-1
N/A ET 10
8"-VA-248005-PJB(0.4)
8"x6"
C-1 3/4"
24" MW
CSO 5242525 C-1
10"
2" 3/4"
8"
2" 2"-KP-247002-PJB(0.4) TWO PHASE FLOW NNF
FROM V-24708
V-24803
3
? 2" C-2
HHLL=1100 mm HLL=750 mm NLL=710 mm
5063244 C-2
LLL=350 mm
2"-KP-248022-PAB INTERMITTENT
LG 005
LI 005
LT 005
MAG
LLLL=250 mm
2"
MAKE-UP TEG
ET 10 38
E
TT 004
? C-1
D
FC C-1
? C-1
TWO PHASE FLOW
3"-KP-248007-PJB(0.4)
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
S-3
TI 004
4
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
? C-1
? C-1
1-1/2"
07/11/11
ET 10 38
1-1/2" 1-1/2" 3"x1-1/2"
3"x1-1/2" 1-1/2"
3/4" 3/4"
ET 10 38
5134289 C-2
3"-KP-248006-PJB(0.4)
3/4"
6"x3"
6"x3"
3/4" 3/4"
? C-2
2"
3"
G
? C-2
LV 004
3/4" 3/4"
3/4"
248.002
5134289 C-2
? C-2
3/4"
MIN
LC SIGNAL FROM LC-004
B
L HH
2"
12328
ISSUED FOR ESTIMATE
FROM P-24802 (S-24802)
11 Jul 2011
? C-2
? C-2
12831
H
004
SO
248.005
SHELL CANADA 5
SP 002
QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 248 - DEHYDRATION TEG FLASH DRUM & LEAN/RICH EXCHANGER SCALE: NONE SHELL DWG NO.:
4
3
2
248.0000.000.041.003
1
REV.
G
248.003
247.009
PAB
12373
ET 10 38
PJB(0.4)
KO TEG
FILE:\\F:\1025\DRAWINGS\CO2\248\248.003.pid MODEL DATE:7/7/2011 12:08:22 PM BY:ahm14887
MIN 10D
4"
V
5134289 C-2
TWO PHASE FLOW
FROM E-24801
TO GRADE WITHIN TEG CONTAINMENT AREA
2"-GC-248003-PJB(0.4)
248.002
4"x3"
ET 10 38
? C-3
12380
3"-KP-248005-PJB(0.4)
3/4"
2"
RICH TEG
8"-GC-248005-PJB(0.4)
8"
V 5134289 C-1
4
3 V-24808 LEAN TEG POST FILTER SIZE: RATED FLOW: DESIGN PR. &TEMP: PRESSURE DROP (CLEAN/DIRTY): MATERIAL: INSULATION TYPE/THK: TRIM: PARTICLE RETENTION SIZE:
2 V-24804A /B LEAN TEG FILTER
V-24807 LEAN TEG CARBON FILTER SIZE: RATED FLOW: DESIGN PR. &TEMP: PRESSURE DROP (CLEAN/DIRTY): MATERIAL: INSULATION TYPE/THK: TRIM:
mm ID x mm T/T x 1 m^3/hr 7200 kPa-g @ 210 °C / HV @ 150°C / 304L SS + 0.4 mm CA / 7 KP-248035-PAN 5 MICRONS
1
SIZE: RATED FLOW: DESIGN PR. &TEMP: PRESSURE DROP (CLEAN/DIRTY): MATERIAL: INSULATION TYPE/THK: TRIM:
mm ID x mm T/T x 1 m^3/hr 7200 kPa-g @ 210 °C / HV @ 150°C / 304L SS + 0.4 mm CA / 7 KP-248034-PAN
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE STATED. 3 . POSITIVE DISPLACEMENT PUMP. 4 . STANDBY PUMP WILL START AUTOMATICALLY ON MAIN PUMP FAILURE. 5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 6 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 7 . ELECTRIC TRACE (ET 10).
mm ID x mm T/T x 6 m^3/hr 7200 kPa-g @ 210 °C / HV @ 150°C / 304L SS + 0.4 mm CA / 7 KP-248032-PAN KP-248033-PAN 5 MICRONS
PARTICLE RETENTION SIZE:
H
PDI 007
D
HOLDS: PI 003
D
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
H
PDT 007
2"
2"
? C-2
NC ? C-2
D
3/4" 3/4"
? C-2
3/4" 3/4" ET 10 38
2"-KP-248014-PAN
2"-KP-248015-PAN
? C-1
3/4" 3/4"
3/4" 5115273 C-2 ? C-2
C
2"
RS
V-24804B
D
NC ? C-2
V-24807 ? C-2
D
RS
2"
1"
5115273 C-2
1" D
2"
3/4"-KP-248039-PAN
D
V-24808
V
5115273 C-2
2"-KP-248019-PAN
TO SAFE LOCATION
3/4"
RS
3/4"
RS
1"-VA-248011-PAB
2"
3/4" 3/4"
5115273 C-2
3/4" 3/4"
? C-2
3/4" 3/4"
5115273 C-2
? C-2
3/4"
RS
RV 008 C-1
FT 005
TO SAFE LOCATION
FIRE 3/4"x1" 3/4 SET@ 7200 kPa-g
PAB PAN
5115273 C-2
D
RS
5115273 C-2
? C-2
3/4"
2"
5115273 C-2
3/4" 3/4"
C
V
FC 005
D
3/4"
PDT 015
FX 005
2"-KP-248017-PAN
FIRE 3/4 3/4"x1" SET@ 7200 kPa-g RV PAN PAB 009
2"
ET 10 38
H
? C-2
V-24804A
2"-KP-248018-PAN
PDC 015
C-1
V
D
1-1/2" NC 5062541 C-1
2"
RS 5115273 C-2
D
V
5115273 C-2
? C-2
? C-1
1"-VA-248009-PAB
ET 10 38
D
H
PDT 016
2"-KP-248020-PAN
2"
? C-2 5115273 3/4"-KP-248044-PAN C-2
? C-1
3/4" 3/4"
PDC 016
FO C-1
2"x1"
TO SAFE LOCATION 3/4"-KP-248038-PAN 2" RS 3/4"
? C-1
TO E-24804
1"
2"x1"
3/4" 3/4"
2"
3/4"
ET 10 63
3/4"
248.001
12616
? C-2
LEAN TEG
5115273 C-2
2"-KP-248016-PAN
? C-2
C-1
PT 003
? C-2
1"-VA-248010-PAB FV 005
FIRE 3/4 3/4"x1" SET@ 7200 kPa-g
RV 007
? C-2
PAB PAN
D
SP 004
S-9 6
3/4"
D 5115273 C-1
3/4"
C-1
PG 012
RV 005 C-1
5063244 C-1
BLOCKED DISCHARGE 1D2 SET@ 7200 kPa-g
ISSUED FOR ESTIMATE 11 Jul 2011
PG 013
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
2"-KP-248043-PAN
3/4" 3/4" ? C-2
HOA E 01
? C-2
3/4" 3/4"
PAB PAN
D
5115273 C-1
D
5115273 C-1 3/4"
3/4"
? C-1
I
I
01
HIS 005
R/S
SP 003B
P-24801A
D
4
3
MC
PDP
APE
PEM CLIENT APP
01
SHELL CANADA QUEST CCS PROJECT
A
3
VFD
P-24801A /B LEAN TEG PUMPS
MATERIAL: INSULATION TYPE/THK: TRIM:
CS
R/S
P-24801B
VFD
6.2 m^3/hr 5742 kPa 10.0 kW CASING INTERNALS CS CS / KP-248037-PAN KP-248036-PAN
HIS 006
I
3"-KP-248011-PAN
3
RATED FLOW: DIFF. PR.: DRIVER:
PRS
HS 006A
E 01
I
D
CKD
4
3" ? C-1
BY
HOA ? C-2
4
3"
? C-2
HS 005A
3"-KP-248010-PAN
DESCRIPTION
3/4" 3/4"
? C-2
? C-2 SP 003A
PP
3/4" 3/4"
PP
ISSUED DATE
1"-KP-248042-PAN
PP
5115273 C-1 3/4"
PP
REV
5115273 C-1
2"-KP-248041-PAN
B
1"-KP-248040-PAN
XA 002
XL 002
VFD LOCAL/ FAULT REMOTE
XA 001
XL 001
VFD LOCAL/ FAULT REMOTE
SI 001
B
HIC 012
HS 007
PUMP DUTY SELECTOR
SI 002 R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 248 - DEHYDRATION LEAN TEG PUMPS & FILTERS SCALE: NONE SHELL DWG NO.:
2
248.0000.000.041.004
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\248\248.004.pid MODEL DATE:7/7/2011 4:30:49 PM BY:ahm14887
RV 003
ET 10 38
2"-KP-248013-PAN
BLOCKED DISCHARGE 1D2 SET@ 7200 kPa-g
2"-KP-248012-PAN
5063244 C-1
D 5115273 C-1
248.004
FROM E-24803
? C-1
2"
2"
ET 10 38
3"-KP-248009-PAB
3/4"
248.003
PAB PAN
12378
? C-1
LEAN TEG
ET 10 38
ET 10 38
5
4
3
2
1
S- 24802 TEG MAKE-UP PACKAGE
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE STATED. 3 . POSITIVE DISPLACEMENT PUMP WITH ADJUSTABLE STROKE. 4 . GRADUATED GLASS COLUMN FOR CONTINUOUS TOTE TANK LEVEL AND INJECTION PUMP CALIBRATION.
HOLDS: • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
D
3/4"-VA-248007-PAB
? ? 1" HOSE
SP 005
? ?
1"-VA-248006-PAB
INSIDE OUTSIDE
D
C
SET@ 530 kPa-g RV 006 1000L TOTE TANK (REMOVABLE) (BY SHELL)
3/4" 3/4" 2"x1"
2"
I 02
? ?
2"
? ? SP 006
2"
C-1
C-1
INSIDE N/A
OUTSIDE ET 10
ET 10 38
MAKE-UP TEG 2"-KP-248022-PAB
12831
248.003
TO V-24803
D
PG 010
LI 011
2"
L C-2
1" HOSE
D
PI 011
PT 011
C-1
C-2
1-1/2"x3/4"
2"x1" 6" FILL CAP
2"x1"
2" HOSE 3/4"
2" 1000 L TOTE TANK (OPERATING) X2
LG 009
4
PP
C-2
2"
MAG
3/4" 3/4"
C-2 2" HOSE
2"
004
I
D
D
2"
D D
ISSUED FOR ESTIMATE
I 002
HIS 008
P-24802
3
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
CURB
SHELL CANADA QUEST CCS PROJECT
A R
P-24802 TEG MAKE-UP PUMP RATED FLOW: DIFF. PR.: DRIVER: MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
620 L/hr 380 kPa 1.00 kW CASING CS /
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT UNIT 248 - DEHYDRATION TEG MAKE-UP TANK & PUMP
INTERNALS CS
SCALE: NONE SHELL DWG NO.:
2
248.0000.000.041.005
1
REV.
G
FILE:\\F:\1025\DRAWINGS\CO2\248\248.005.pid MODEL DATE:7/7/2011 12:09:35 PM BY:ahm14887
CURB
B
R/S
C-1
3/4"
C-1 3/4"
HS 008A
11 Jul 2011
2" 3/4"
3/4"
2" 2"
HOA E
C-2
LT 011
1-1/2"x3/4"
LG 011
248.005
1"-VA-248008-PAB
2"
3/4"
C
S-24802
C-2
2"x1"
6" FILL CAP
4
3
2
1
E-44014 WASH WATER MAKE-UP COOLER
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"440' UNLESS OTHERWISE STATED. 3 . ELECTRIC TRACE (ET10) E-44014. 4 . OPEN PATH (NO BLOCK VALVES) REQUIRED FROM E-44014 (FV-440076) TO V-44119 TO MEET SAD LINE SPECIFICATION REQUIREMENTS.
RATED DUTY: SURFACE AREA: TEMA TYPE:
0.7 MW (TOTAL) 31.8 m^2 BEU 4 SHELL TUBE 4025 kPa-g / FV DESIGN PRESS: 3100 kPa-g / 150 °C / 150 °C DESIGN TEMP: 58 °C / CS + 0.38 mm CA MATERIAL: CS + 3 mm CA 3 / / 3 INSULATION TYPE/THK: TRIM: PROCESS SIDE: WB-440012-SAD COOLING WATER SIDE: CWS-440077-SAD
D
D 441
FC 076
HH
E 453
FYE 076
S
L
FO FT 076 2"x1-1/2"
ET 10 38
1-1/2"
2"x1-1/2"
? ?
? ?
FROM HEADER
D 3/4"
5115277 ?
3/4"
1" ? ?
1-1/2"
1-1/2"
D
5115277 ?
2"x1-1/2"
5115277 ?
440.021
2"
2"-WB-440010-SAG
3/4"
BFW FOR WASH WATER
FV 076
FC
2"x1-1/2"
? ?
COOLING WATER RETURN
TW 010
1" CSC 5062543 ?
6"-CWR-441045-UAB
ET 10 38
3"
COOLING WATER RETURN
8"x3"
8"-CWR-440045-UAB
440.012
CSO ? ?
4
12722
FROM E-44129
1-1/2"
SAG SAD
441.031
TO HEADER
3/4"
TW 008
1-1/2"
V 5115277 ?
C RS
C UAB SAD
E-44014
SAD UAB
H
RS
TI 009
TT 009 4 1-1/2"
? ?
WASH WATER 12113
441.030
TO V-44119
3" 3"
2"-WB-440011-SAD
5115277 ?
3/4"
ET 10 38
ET 10 38
8"x3"
COOLING WATER SUPPLY 8"-CWS-440075-UAB
440.012
? ?
FROM HEADER
BACK FLUSH
COOLING WATER SUPPLY 6"-CWS-440076-UAB
12721
441.031
TO E-44129
ISSUED FOR ESTIMATE
B
11 Jul 2011
G
07/11/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRILIMINARY REVIEW
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
SHELL CANADA QUEST CCS PROJECT
A R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
SCALE: NONE SHELL DWG NO.:
4
3
2
440.0000.000.041.048
1
REV.
G
440.048
UNIT 440 - HYDROGEN MANUFACTURING UNIT WATER MAKE-UP COOLER
FILE:\\F:\1025\DRAWINGS\HMU\440\440.048.pid MODEL DATE:7/10/2011 10:26:02 PM BY:muk22296
B
3
2
12983
TO UC-246002
I 104
HH
L
3/4" 3/4"
PAC HJE(0.4) 5
S-4
SP.
6
4"-P-441097-HJE(0.4)
050
H
16"-P-441096-HJE(0.4)
485.213
14"-P-441101-DAG
11
ET 10
10"
3/4"
FROM P-24602A/B/C
D
TO V-44119
12. TOP CONNECTION.
HOLDS: • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
14"-P-441102-DAE
1-1/2" M
441.030
16"
FV 075
FO
14"-P-441103-DJE(0.4)
14"x10" FC 14"x10"
3/4"
LEAN AMINE
FT 075
12074
FYE 075
S
TT 030
H2 RAW GAS
D
V 6"
H
TI 030
E 451
18"x14"
36" MW
18"
MIN DAE DJE(0.4)
D 10"
CSC DAG DAE
3"
PDT 064
3/4"
FC 075
246.002
FROM LX-246001
12072
12777
FREE DRAINING
SET POINT 12405
FREE DRAINING CSO
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES AND CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE STATED. 3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS. 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT START-UP. 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012. 6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 7 . ELECTRIC TRACE TO HLL (ET 10). 8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES, ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION. 9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE. 10. INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED BY INTERLOCK I-102. 11. VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
440.049 FL
6"-FL-441035-PAC
3/4" 3/4"
LEAN AMINE FLOW SIGNAL 246.011
6"x3"
ET 10 FREE DRAINING
3/4" B
1
V 3/4"
CSC
RV 023
SIZE: 4270 mm ID x 23500 mm T/T DESIGN PR. & TEMP: 3500 kPa-g @ 95 °C / HV @ 150° C MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD/ 316L SS INSULATION TYPE/THK: H / 7 TRIM: P-441121-HJE(0.4) (TOP) P-441120-DJE(0.4) (BTM)
D
FIRE 1-1/2H3 SET@ kPa-g
CSO
V-44118 AMINE ABSORBER 3
4"x1-1/2"
4
V-44118
3"
25
H
PDI 064
E 450 E 453
HZTE 015
C
I 104 I 103
HYE 015
S
ET 35 88
10
I 102
FO 20"-P-441095-HJE(0.4)
C
HIC 015
12"
20"x12"
20"-P-441095-HJE(0.4)
FO 20"x12"
HIC 014
BYPASS
H2 RAW GAS 441.030
12110
TO HMU 3 PSA
HV 015
E 453 E 450 1 24" MW
2"
HHLL=4000 mm
7 24" MW
NLL=2550 mm LLL=1800 mm
2"
3"
LG 155
3/4"
3/4"
3"
3/4"
4500 mm
3/4"
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
ISSUED DATE
DESCRIPTION
20"
T
D 3/4"
20"x12"
XV 020 10"
10"-P-441104-DJE(0.4)
12"x10"
D
4"
3/4"
FO TT 031
8"
1-1/2"
10"x8"
FC
FC
LV 155
PRS
CS
MC
PDP
APE
PEM CLIENT APP
11
ET 10
10"x8"
D
SP 052
D
6
5
SHELL CANADA
10"-P-441104-DJE(0.4)
SP 053
QUEST CCS PROJECT
RICH AMINE 485.213
A
TO E-24602A/B 8
TWO PHASE FLOW R
S-9
VACUUM TRUCK
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT ISSUED FOR HAZOP
UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3 AMINE ABSORBER 3 SCALE: NONE SHELL DWG NO.:
3
CKD
D
12076
4"-P-441106-DJE(0.4)
4
BY
2
441.0000.000.041.029
1
REV.
G
441.029
2"-P-441105-DJE(0.4)
3/4"
12723
1"-SCL-441XXX-SAB
04/20/11
TI 031
A/S
4"
440.018 SCL
XYE 020
s XZTE 020
1"-SL-441XXX-SAB
F
XZI 020
450
3"
D
ISSUED FOR PHA III
LLLL=300 mm SO
N/A ET 10
06/13/11
REV
E
2"
D
12724
L
LI 155B
LT 155B
3 3"-SL-440XXX-SAB
LC 155
G
B
2"x3/4" 440.018 SL
LHS 155
H
MAG
2"
3"
SWING ELBOW 3/4"
LI 155A
LT 155A
HLL=3300 mm
2"
14
DP
HJE(0.4) ULB
SWING ELBOW
B
FILE:\\F:\1025\DRAWINGS\HMU\441\441.029.pid MODEL DATE:6/14/2011 1:17:42 PM BY:bes29451
2"
2"
3"
3/4"
13014
2"
2"
3"
3/4"
V 2"-GI-440072-ULB START-UP
LL 3/4"
4
440.046 GI
GWR
LTE 154
3/4"
CSC
PP
MIN
HH
3/4" 3/4"
MIN
E 450
24"
3/4"
E 451
24"x20"
3/4"
20"x16" FC 20"x16" MIN HV 014
FROM HMU 3
9
051
3/4"
441.016
12
2"
12077
ET 35 20"-P-441094-HJE(0.4) 88
3/4"
H2 RAW GAS
SP. 16"
3"
3"
FO
D
HZTE 014
3/4"
S
I 102
3/4"
10
HYE 014
4
3
2
1 FI 074B
V-44119 ABSORBER 3 WASH WATER VESSEL SIZE: DESIGN PR. & TEMP: MATERIAL(VESSEL/INTERNALS): INSULATION TYPE/THK: TRIM:
2100 mm ID x 11100 mm T/T FV 3500 kPa-g @ 60 °C / HV @ 150 °C CS + 3 mm 304L SS CLAD / 316L SS H/ 5 P-441126-HJE(0.4)
FC SIGNAL
FX 074B
3
441.016
FROM HMU 3
ET 35 88
20"-P-441095-HJE(0.4)
443.003
TO HMU 3 PSA SKID
7
D
HOLDS:
BYPASS
PC 067
AI 016
H
3/4"
6" 10"x6" FC TSO
10"-FL-441036-PAC
FREE DRAINING
440.049 FL
PI 065
PT 065
XV 019
20"x16"
INST PIPING
FLOW
AP 016A
TT 032
FT 074
C
20"-P-441098-HJE(0.4) 1-1/2"
H2 RAW GAS
ET 35 88
FC
12111
441.016
TO HMU 3 PSA
DETAIL "B"
2"
3/4"
3/4"
3/4"
AP 016B
FO 16"
12912
AP 016C
A/S XZTE 019
440.049 FL
3/4" 3/4"
INST PIPING
XYE 019
S
3/4" 3/4"
FREE DRAINING
H
AE 016
E 453
3"
16"
CSC
3"
3"
CO2 RICH
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. SCOPE FOR SIGNAL TRANSFER TO PSA PLC TO BE DETERMINED. INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED. CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
DETAIL "B"
E 450
PT 067
TI 032
AIT 016
• • • •
CO2 LEAN
12775
PAC
HJE(0.4)
ET 38 88 6"-P-441099-HJE(0.4)
ET 10
FREE DRAINING
V
I 101 HOLD
PV 067
C
CO2
3/4" 3/4"
441.029
12864
FX 074A
3/4" 3/4"
12110
SET POINT
FHS 074
f(x)
H2 RAW GAS
12714
FROM FC-377
FI 074A
D
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE STATED. 3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS. 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT START-UP. 5 . ELECTRIC TRACE TO HLL (ET 10). 6 . EITHER LTE-441156 OR LTE-441159 SHALL BE SELECTABLE AS THE INPUT TO SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE TWO INSTRUMENTS SHALL BE PROVIDED AT THE DCS. 7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST IS ISOLATED. 8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.
4
24" MW
440.048
3"
3"x2"
2"-WB-440011-SAD
MIN
FROM E-44014
24" MW
V-44119 9
SAD HJE(0.4)
HJE(0.4) PJE(0.4)
7 6"
24" MW
6"x4"
8
8
ET 10
4"-P-441113-PJE(0.4)
CIRCULATING WATER 441.031
FROM E-44129
6
3"
6
L
E 452
3/4"
3/4"
2"
DP
HH 6
LL
2"
LTE 159
2"
LG 157
24" MW
HLL=2380 mm
2"
2" NLL=1070 mm 5
D
3"
3"
LLL=910 mm
3"
DP
LI 157A
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
LI 157B
LC SIGNAL
LHS 157A
12416
441.031
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
TO LC-157
D
3/4"
2"
3"
LT 157A LT 157B
3/4"
H
2"
HHLL=2550 mm
3"
MAG
L E 453
3"
3/4"
H
3"
2"
3/4"
LI 159
2"
3/4"
B
3"
3/4"
LI 156
3/4"
FREE DRAINING
FROM V-44118
3"
18"
3/4"
441.029
18"x16"
H
16"-P-441096-HJE(0.4)
1
3/4"
12074
PP
3/4"
H2 RAW GAS
GWR
3/4" 3/4"
LTE 156
12415
LLLL=300 mm
SO
SHELL CANADA
7860 mm
8" 8"x6"
ET 10
6"-P-441107-PJE(0.4)
CIRCULATING WATER 12414
QUEST CCS PROJECT
441.031
3"
TO P-44108A/B
A
D R
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT ISSUED FOR HAZOP
UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3 ABSORBER 3 WASH WATER VESSEL SCALE: NONE SHELL DWG NO.:
4
3
2
441.0000.000.041.030
1
REV.
G
441.030
12113
8
H
FILE:\\F:\1025\DRAWINGS\HMU\441\441.030.pid MODEL DATE:6/14/2011 2:17:59 PM BY:bes29451
8
WASH WATER
PDI 066
PDT 066
4
3
2
1
E-44129 ABSORBER 3 CIRCULATING WATER COOLER 0.3 MW 49.3 m^2 BEU SHELL 3800 kPa-g / HV 60 °C / 150 °C CS + 3 mm 304L SS CLAD / 6 P-441122-PJE(0.4)
RATED DUTY: SURFACE AREA: TEMA TYPE: DESIGN PRESS: DESIGN TEMP: MATERIAL: INSULATION TYPE/THK: TRIM:
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS. 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE STATED. 3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012. 4 . CV OF CONTROL VALVE TO BE MINIMUM. 5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE. 6 . ELECTRIC TRACE (ET 10). 7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP. 8 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
TUBE 2950 kPa-g / 58 °C / SUPER DUPLEX 2507 + 0.38 mm CA / 6 CWR-441XXX-PJE(0.4)
D
D HOLDS:
LC 157
441.030
LHS 157B
L
LV 157A
4
FROM LHS-157A
H
2"x1"
1"
3/4"
FC
2"x1"
3/4"
FC
SP 054 3/4"
FO
XZTE 018
ET 10 50
6"-P-441107-PJE(0.4) FC
6"x4"
1-1/2"
3/4"
6"x4"
I 103
L
TO V-44119
6"x4"
1-1/2"
4"x3"
6"x4"
4"x3"
440.048
C
RS
UAB PJE(0.4)
E-44129 PJE(0.4) UAB
ET 10 50
4"-P-441113-PJE(0.4)
6"-CWS-440076-UAB
COOLING WATER SUPPLY 440.048
12721
FROM HEADER
4"
D
D BACK FLUSH
SEL
ET 10 50
HS
7
SI
3/4"
D PP
TO GRADE PP
SP 055
3/4"
P-44108A
XL 017
VFD FAULT LOCAL/ REMOTE
SI
G
06/13/11
ISSUED FOR PHA III
F
04/20/11
ISSUED FOR ESTIMATE
E
03/01/11
ISSUED FOR PHA II
D
01/10/11
ISSUED FOR CLIENT REVIEW
C
12/02/10
ISSUED FOR INTERNAL REVIEW ISSUED FOR PRELIMINARY REVIEW
B
3/4"
REV
ISSUED DATE
DESCRIPTION
BY
CKD
PRS
CS
MC
PDP
APE
PEM CLIENT APP
D PP
TO GRADE PP
SP 055
3/4"
3/4 " D
3/4"
3/4" 3/4"
D D
I
VFD
MIN.
VFD
E 452
XA 017
HOA
3/4"
D D
P-44108B
3/4 " D
SHELL CANADA QUEST CCS PROJECT
A R
P-44108A /B 7 ABSORBER 3 CIRCULATING WATER WASH PUMPS RATED FLOW: DIFF. PR.: DRIVER: MATERIAL: INSULATION TYPE/THK: TRIM:
4
3
ISSUED FOR HAZOP
56.5 m^3/hr 233 kPa 5.6 kW CASING INTERNALS 316 SS 316 SS / 6 P-441123-PJE(0.4)
PIPING AND INSTRUMENT DIAGRAM QUEST CCS PROJECT
UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3 ABSORBER 3 WASH WATER COOLER SCALE: NONE SHELL DWG NO.:
2
441.0000.000.041.031
1
REV.
G
FILE:\\F:\1025\DRAWINGS\HMU\441\441.031.pid MODEL DATE:6/14/2011 1:17:46 PM BY:bes29451
LOCAL/ REMOTE
3/4"
HS 017A
MIN.
XL 016
V
I 100
4"-P-441111-PJE(0.4)
I
VFD FAULT
R/S
3/4"
E 452
XA 016
HIS 017
ET 10 50
3/4"
HOA
6"-P-441109-PJE(0.4)
HS 016A
ET
I 100
ET 10 50
V
R/S
ET 10
HIS 016
B
7
4"-P-441110-PJE(0.4)
12415
ET 10 38
6"-P-441108-PJE(0.4)
441.030
4"-P-441113-PJE(0.4)
12722
CSO
FT 077
3/4"
CIRCULATING WATER
LL
COOLING WATER RETURN
D
RS
TG 033
6"-CWR-441045-UAB
TO HEADER
6
4"-P-441XXX-PJE(0.4)
FC 077
ET 10 50
4"-P-441112-PJE(0.4)
NC
FROM V-44119
1-1/2"
V
441.031
441.030
XV 018
TG 034
5
ET 10
12414
3
TW 035
3/4"
C
CIRCULATING WATER
PT 070
S-8
A/S
441.013 TO V-44111
PI 070
3/4"
4
D
PURGE WATER
2"x1"
3/4" 3/4"
XYE 018
S
2"x1" 1"
2"-P-441115-PJE(0.4)
XZI 018
2"-P-441116-PJE(0.4) 3/4"
LV 157B
E 452
8
ET 10 38
D
ET
12416
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED FOR QUEST.
2"
LC SIGNAL
View more...
Comments