Authority Submission List in Malaysia

February 6, 2017 | Author: Wan Mahiram | Category: N/A
Share Embed Donate


Short Description

Guideline for submission to authority...

Description

AUTHORITY SUBMISSION LIST No. 1.

Type of Approval Building plans

Authority

Authority’s Requirement

Local Council – Building department

   

Building plan submission guideline Forms Checklist Other relevant information*

Authority Submission  

 

   2.

Structural

Local Council – Engineering Dept

   

3.

Hoarding & signboard

Local Council – Building dept

   

Doc.Ref. : MAA/D&D/ASL

Building plans Acknowledged copy of submission letter of technical department (JKR, JPP(IWK), JPS, Bomba, Kesihatan) Submission fees (to be paid by client Blue Forms - Form A - Form B - Form C - Form D - Form E As – built drawings Inspection & Contribution Fee to be paid by client) CF Application

Authority’s Output  Acknowledged copy of submission letter  Endorsed building plans  Letter of approval

 Certificate of fitness

Structural submission guidelines Forms Checklist Other relevant information*

 Structural & calculation drawings (to be submitted by C&S engineer)

 Acknowledged copy of submission letter

‘Hoarding & Signboard’ submission guidelines Forms Checklist Other relevant information*

 Hoarding & Signboard drawings  Submission fees (to be paid by client)

 Acknowledged copy of submission letter  Endorsed hoarding & signboard drawings  Letter of approval

Rev.No. : 0

Issue Date : 22 July 2006

Page : 1 of 3

AUTHORITY SUBMISSION LIST No. 4.

Type of Approval Permit for Temporary Building

Authority

Authority’s Requirement

Authority Submission

Authority’s Output

  

‘Temporary Building’ submission guidelines Forms Checklist Other relevant information

 Temporary building drawings  Submission fees (to be paid by client)

 Acknowledged copy of submission letter  Endorsed temporary building drawings  Letter of approval

Earthworks guideline Forms Checklist Other relevant information*

 Earthworks drawing to be submitted by C&S engineer  Submission fees ( to be paid by client)

 Acknowledge copy of submission letter  Endorsed earthworks drawings  Letter of approval



Local Council – Building dept

5.

Earthworks

Local Council – Engineering Dept

   

6.

Road & Infrastructure

Local Council – Engineering Dept

 Road and Drain submission guideline  Forms  Checklist  Other relevant information*

 Road and Drain - drawing to be submitted by C&S engineer  Submission fees ( to be paid by client)  CF Application  Contribution fee ( to be paid by client)

 Acknowledge copy of submission letter  Endorsed road & drain drawings  Letter of approval.  Confirmed date of inspection  CF support letter

7.

Main Internal Roads and External Roads

‘Jabatan Kerja Raya’

   

Submission Forms Checklist Other relevant information*

 Submission drawings (to be submitted by C&S engineer)  Submission fees (to be paid by client)  CF Application

 Acknowledged copy of submission letter  Endorsed drawings  Letter of approval  Confirmed date of inspection  CF support letter

8.

Sewerage

‘Jabatan Perkhidmatan Pembentungan’ / IWK



‘Sewerage’ guideline (C&S engineer to submit) Forms Checklist

 Sewerage drawings (to be submitted by C&S engineer  Submission fees ( to be paid by client)

 Acknowledge copy of submission letter  Endorsed sewerage drawings  Letter of approval Page : 2 of 3

Doc.Ref. : MAA/D&D/ASL

 

Rev.No. : 0

Issue Date : 22 July 2006

AUTHORITY SUBMISSION LIST No.

9.

10

Type of Approval

Authority

Authority’s Requirement

River & Water Channels / Detention Ponds

‘Jabatan Perparitan & Saliran (JPS)

Water supply (external)

Jabatan Bekalan Air (JBA), (PUAS), (LAP) or etc

Authority Submission

Authority’s Output



Other relevant information*

     

    

Submission guidelines (C&S) MASMA Requirements Forms Checklist Other relevant information*

 Drainage and Detention Ponds drawings to be submitted by C&S Engineer  Submission fees (to be paid by Client)  CF Application

 Acknowledge copy of submission letter  Endorsed drawings  Letter of approval

   

Submission guidelines Forms Checklist Other relevant information*

 Water supply drawings (to be submitted by C&S engineer  Submission fees ( to be paid by client)

 Acknowledge copy of submission letter  Endorsed drawings  Letter of approval

 CF Application  As-built drawings forms  Contribution fee (to be paid by client)

 Confirm date of inspection CF  CF support letter

CF Application PDC 1 PDC 3 PDC 5 PDC 7/8 Contribution fee (to be paid by client)

 Confirm date of inspection CF  CF support letter

* Other relevant information – kindly refer to statutory & regulatory requirement table

Doc.Ref. : MAA/D&D/ASL

Rev.No. : 0

Issue Date : 22 July 2006

Page : 3 of 3