CIVIL DEFENSE Fire Protection System SCOPE OF WORKS AS PER CIVIL DEFENSE REQUIREMENT REQUIREMENT
Status
Action
Done
Efeco / Arabtec
Done
Efeco / Arabtec
b. Fire Pumproom layouts
Done
Efeco / Arabtec
c.FM200 Layouts
Done
Efeco / Arabtec
d.Hydraulic Calculation for Fire Pump
Done
Efeco / Arabtec
e.Hydraulic Calculation for FM200 System
Done
Efeco / Arabtec
2
Approval of Shop drawings as above
Done
MZ & Partners
3
Submiss io ion of Shop dr aw awings to QCDD for approval
Done
MZ & Partners & QCDD
4
Inspection of Equipments
in progress
MZ & Partners
5
Installation of Equipments
in progress
Efeco / Arabtec
6
Approval of Installation
in progress
MZ & Partners
7
Testing & Commiss io ioning of of Fi Fire Protection System
not ye yet
Efeco / Arabtec
not yet
MZ & Partners
not yet
MZ & Partners & QCDD
SR.No. 1
8 9
1.b
Description Preparation of Shop drawings
Approval of Testing & commisioning commisioning of Fire Protection System Requ Reques estt QCDD QCDD for for Insp Inspec ecti tion on
Due Date
Remarks
Due Date
Remarks
Fire Alarm & Voice Evacuation System and Emergency Lighting System SCOPE OF WORKS AS PER CIVIL DEFENSE REQUIREMENT REQUIREMENT
SR.No. 1
2
3
Status
Action
Preparation of Shop drawings
Done
Efeco / Arabtec
a.Fire Alarm and Voice Evacaution System - Layouts and Installation details
Done
Efeco / Arabtec
b.Fire Alarm floor Mimic panel layouts
Done
Efeco / Arabtec
c.Fire Safety Diagram
Done
Efeco / Arabtec
d.Fire Control diagram
not yet Done
Efeco / Arabtec
e.Emergency lighting layouts
Done
Efeco / Arabtec
Approval of Shop drawings
Done
MZ & Partners
a.Fire Alarm and Voice Evacaution System - Layouts and Installation details
Done
MZ & Partners
b.Fire Alarm floor Mimic panel layouts
Done
MZ & Partners
c.Fire Safety Diagram
not yet Done
MZ & Partners
to be checked with MZ & Partners
d.Fire Control diagram
not yet Done
MZ & Partners
to be checked with MZ & Partners
e.Emergency lighting layouts
Done
MZ & Partners
Submiss io ion of Sh Shop dr aw awings to to QC QCDD fo for ap approval
partial
MZ & Partners & QCDD
Description
same as per IFC Drawing
rawng rece rece ve ,Cause and effect matrix
PROJECT: QATAR WORLD TRADE CENTRE PROJECT
4
Inspection & Approval of Equipments
in progress
MZ & Partners
5
Installation of Equipments
in progress
Efeco / Arabtec
6
Approval of Installation
in progress
MZ & Partners
7
Testing & Commissioning of Fire alarm & Voice Evacuation System
not yet ( test done only during installation)
Efeco / Arabtec
PROJECT: QATAR WORLD TRADE CENTRE PROJECT
8
Testing & Commissioning of Emergency Lighting System
9
Approval of Testing & Commissioning of FA & Voice Evacuation System and Emergency Lighting layout
10
Cause & Effect Matrix Inspection & Approval
11
not yet ( test done only during installation) not yet ( approved test done only during installation)
Efeco / Arabtec
MZ & Partners
in progress
MZ & Partners
Request QCDD for Inspection
not yet Done
MZ & Partners & QCDD
12
Interconnection of Fire alarm panel to Autodialer through a dedicated telephone line
not yet Done
Efeco / Arabtec
13
Request for interconnection of Autodialer to Fire Brigade
not yet Done
MZ & Partners & QCDD
1.c
Pressurization and Car Park Ventalation System SCOPE OF WORKS AS PER CIVIL DEFENSE REQUIREMENT
Status
Action
Preparation of Shop drawings
Done
Efeco / Arabtec
a.Fresh Air & Exhaust riser diagram
Done
Efeco / Arabtec
b. Pressurization Riser diagram
Done
Efeco / Arabtec
c.Ducting layouts
Done
Efeco / Arabtec
d.Equipement Schedule
Done
Efeco / Arabtec
e.Ducting Installation Details
Done
Efeco / Arabtec
f.Equipment Installation Details
Done
Efeco / Arabtec
in progress
Efeco / Arabtec
SR.No. 1
Description
g. Sequence of Operation 2
Approval of Shop drawings as above
Done
MZ & Partners
3
Submission of Shop drawings to QCDD for approval
Done
MZ & Partners & QCDD
4
Inspection of Equipments
in progress
MZ & Partners
5
Installation of Equipments
in progress
Efeco / Arabtec
6
Approval of Installation
in progress
MZ & Partners
7
Testing & Commissioning of Pressurization, Fresh Air & Exhaust System
8
Approval of Testing & Commissioning of Pressurization, Fresh Air & Exhaust System
9
Request QCDD for Inspection
not yet ( test done only during installation) not yet ( approved test done only during installation) not yet Done
Efeco / Arabtec
MZ & Partners
MZ & Partners & QCDD
Due Date
Remarks
Same as IFC drawing
PROJECT: QATAR WORLD TRADE CENTRE PROJECT
PROJECT: QATAR WORLD TRADE CENTRE PROJECT
PROJECT: QATAR WORLD TRADE CENTRE PROJECT
PROJECT: QATAR WORLD TRADE CENTRE PROJECT
PROJECT: QATAR WORLD TRADE CENTRE PROJECT
PROJECT: QATAR WORLD TRADE CENTRE PROJECT
2
KAHRAMAA
2.1
SUBJECT: HV SWITCHGEAR
SCOPE OF WORKS MATRIX AS PER KAHRAMAA HV SCHEME DIAGRAM & C OMPOUND/TOWER AG SL.NO.
DESCRIPTION
Status
Action
Done
KAHRAMAA
In Progress
EFECO
1
Supply of HV Switchgear
2
Installation, Testing & Commissioning of HV Switchgear
3
Supply of 3c 240mm2 HV cable from existing Kahramaa substation to HV Switchgear panel
not yet Done
KAHRAMAA
4
Installation of 3c 240mm2 HV cables
not yet Done
EFECO
5
Testing of 3c 240mm2 HV cables
not yet Done
EFECO
6
Supply and installation of 3c 70mm2 Hvcables
not yet Done
KAHRAMAA
7
Installation of 3c 70mm2 cable from HV panels to Transformer including termination and testing (hi pot test)
not yet Done
EFECO
8
Supply & installation of 11 nos. 1600 KVA Dry Type Resin Transformer including Testing & Commissioning (hiput test)
Done
EFECO
9
Earthing system for substation (HV panels and Transformer) bore hole will be carried out by Kahramaa
not yet Done
KAHRAMAA
10
Bus Bar Trunking from LV site of Transformer to MDB's
In Progress
EFECO
11
Electrical Connection Fees
not yet Done
CLIENT
12
Preparation of As Built Drawings
In Progress
EFECO
13
Transformer Room and HV Room civil works (By ACC)
In Progress
2.b
SUBJECT: LV SWITCHGEAR
Due Date
SCOPE OF WORKS MATRIX AS PER KAHRAMAA LV SCHEME DIAGRAM & C OMPOUND/TOWER AGR Status SL.NO. DESCRIPTION Action Due Date
1
Approval by Local Authority for Consultant's design
Done
2
Preparation of shop drawings for Electrical as per final load requirements
Done
3
Re-approval from Kahramaa due to changes in approved Electrical drawings
4
Request KAHRAMAA to inspect civil worksnot yet Done MV/LV Room
5
Request for re-inspection for reinspection of MV/LV Room (civil works)
not yet Done
TBA
6
Arrange reinspection of MV Room/LV Room -Electrical Equipment Layout
not yet Done
TBA
7
Request KAHRAMAA for inspection of LV Electrical installation
not yet Done
TBA
8
Arrange reinspection of LV Electrical Installation
not yet Done
TBA
9
Supply of Tariff Meters
not yet Done
TBA
10
Coordination with KAHRAMAA for energisation of power supply
not yet Done
2.c
not yet Done
MZ & Partners
EFECO MZ & Partners
check
WATER SUPPLY SYSTEM SCOPE OF WORKS FOR WATER SUPPLY SYSTEM
Status
Action
Preparation of Shop drawings
Done
Efeco
a.Water Supply Layouts
Done
Efeco
b.Installation Details
Done
Efeco
2
Approval of Shop drawings as above
Done
MZ & Partners
3
Inspection of Pipes and Equipments
Done
MZ & Partners
4
Installation of Pipes & Equipments
Done
Efeco
5
Construction of Manhole for main water meter
not yet done
Arabtec
6
Application for water supply connection to Kharama
not yet done
MZ & Partners
7
Installation of Main Water Meter
not yet done
Kharama Approval
SR.No. 1
Description
Due Date
8
Application for Sub water meter connection
not yet done
MZ & Partners
9
Installation of Sub Water meter
not yet done
MZ & Partners
10
Testing & Commissioning
not yet done
Efeco
11
Approval of Testing & Commissioning of Water Supply System
not yet done
MZ & Partners
Q-TEL SCOPE OF WORK MATRIX
SR.No.
Description
Status
Action
1
submission of services site plan showing the location of north direction , incoming entry to the building, size of ducts, telecom rooms,GSM rooms , cable tray,manholes and JRC boxes for the propposed project to Q-TEL for approval.
Done
CLIENT
2
Arrange inspection / reinspection of Q-TEL room and GSM room civil works for approval
not yet done
ACC
3
Arrange inspection / reinspection of Q-TEL room and GSM room MEP works for approval
not yet done
ACC & EFECO
4
Coordinate with Q-TEL to connect the communication duct from the building to the not yet done existing Q-TEL manhole.
5
Excavation / Backfilling of duct trench from building boundary to existing Q-TEL manhole
not yet done
ACC
6
connection of communication duct to existing Q-TEL manhole
not yet done
CLIENT & EFECO
7
supply of incoming communication cable including cable pulling & termination to QTEL room main communication equipment
not yet done
Q-TEL
8
supply of main communication equipments including terminal blocks and patch cords
not yet done
Q-TEL
9
installation of main communication equipments
not yet done
Q-TEL
CLIENT
Due Date
10
supply and install of GSM equipments
not yet done
Q-TEL
11
supply and install of GSM cables and antenna
not yet done
Q-TEL & ACC
12
Design of GSM coverage
not yet done
Q-TEL
13
request connection to network backbone cabling system from Q-TEL equipments
not yet done
EFECO
Civil Aviation Aircraft Warning Lights Scope of Works Matrix SL.NO.
DESCRIPTION
Status
Action
1
Preparation of AWL design drawing
Done
CLIENT
2
Submission of Aircraft Warning Lights to Authority
Done
EFECO
3
Qatar Civil Aviation Authority enclosing relevant documents of the project (Bldg
Done
EFECO
4
Resubmission of AWL to authority for approval
Done
EFECO
5
Request letter of AWL resubmission to authority for approval
Done
EFECO
6
Approval of AWL
Done
QCAA & EFECO
7
Installation of AWL
not yet done
EFECO
8
Request for inspection of AWL by QCAA
not yet done
EFECO
Due Date
SEWER DRAINAGE AND STROM WATER DRAINAGE SCOPE OF WORKS FOR DRAINAGE WORKS
SR.No. 1
2
Status
Action
Preparation of Shop drawings
Done
EFECO
a.Drainage Layouts
Done
EFECO
b.Installation Details
Done
EFECO
Approval of Shop drawings as above
Done
MZ & Partners
Description
Due Date
Done
MZ & Partners
Installation of Pipes & Equipments
In Progress
EFECO
5
Marking the Co-ordinates for the Sewer Manholes and Storm Water Manholes inside the plot area
not yet done
Arabtec
6
Construction of Sewer manholes and Storm not yet done water manholes
Arabtec
7
Installation of pipes to sewer manholes and connection between F-MH-1 & RF-MH-2
In Progress
EFECO
8
Installation of pipes to storm manholes and connection between S-MH-1 & RS-MH-2
In Progress
EFECO
9
Testing & Commissioning of Drainage System
not yet done
EFECO
10
Approval of Testing & Commissioning of drainage system
not yet done
MZ & Partners
11
Application to connect the manholes to the minsitry of municipality
not yet done
MZ & Partners
12
Connection between plot manholes to sewer manholes
not yet done
Ministry of Municipality
13
Connection between plot manholes to storm water manholes
not yet done
Ministry of Municipality
3
Inspection of Pipes and Equipments
4
EEMENT REMARKS
Testing results will be forwarded to Kahramaa assigned subcontractor and certify if the test is satisfactory, then the latter will submit to Kahramaa for approval prior to energization of substation.
To be verified (Since the other end of these cables have been terminated to existing Kahramaa substation) Only supply of cable by Kahramaa Testing results will be forwarded to Kahramaa assigned subcontractor and certify if the test is satisfactory, then the latter will submit to Kahramaa for approval prior to energization of substation.
The location of borehole will be decided by Kahramaa outside the plot boundary
All civil works to be completed (installation of doors, floor, ceiling, painting of walls etc.) prior to inspection by Kahramaa.