KI/FORM/OHS/029/100 Rev. 0
SMK3 & OHSAS 18001 : 2007 RECORD & IMPLEMENTATION / AUDIT CHECK LIST HEAD OFFICE - ALL SECTION NO
OHSAS 18001:2007
AKUNTABILITAS OHSAS
FORM
4.2. KEBIJAKAN K3
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN PENJELASAN KRITERIA
AKUNTABILITAS SMK3
RESPONSIBILITY
STATUS
1. KOMITMEN DAN KEBIJAKAN 1.1. Kepemimpinan dan Komitmen
1 2
3
Communication and sosialization of KI OHS Policy (invite letter, minutes meeting, attendance list, distribution list) Put Policy at strategic place (Meeting room, Visitor room etc) Management Commitment
1.2. Tinjauan Awal K3 1.3. Kebijakan K3
Terdapat Kebijakan K3 yang tertulis, bertanggal, di TTD Presdir Daftar Hadir Pembuatan dan Review di MRM (Termasuk Wakil Tenaga Kerja : Yefrihendi dan Anang P. pada saat pertama dibuat dan setiap MRM) Memasang Policy di Ruang Tamu dan Proyek Membuat Kebijakan mengenai Lingkungan, Drug dan Alcohol
1.1.1.
OHS Policy
Daftar Hadir MRM/ pembuatan Policy
1.1.2.
Daftar Hadir MRM/ pembuatan Policy
Komunikasi Policy
1.1.3.
Komunikasi Policy
Kebijakan Khusus
1.1.4.
Kebijakan Khusus
Review Policy
1.1.5.
Review Policy
Materi MRM dan Daftar Hadir MRM (masukin nama Yefrihendi dan Anang pada RIS setiap daftar hadir MRM)
OK
2.1.1.
Ada prosedur HIRADC
Prosedur HIRADC
GP
OK
Petugas kompeten telah membuat HIRADC RIS
OK
Hirarchi Pengendalian dalam HIRADC (Revisi HIRADC dengan memasukkan metode control : Eliminasi, Substitusi, EC, Rambu/ Adm, APD)
RIS
NOK
OHS Policy
4.3. PERENCANAAN
2. PERENCENAAN
4.3.1. Identifikasi Bahaya, Penilaian Risiko dan Penetapan Pengendalian
2.1. Perencanaan Identifikasi Bahaya, Penilaian dan pengendalian Resiko
KI/OHS-P/002 : HIRADC Procedure
6.1.1. Sistem Kerja
GP
OK
RIS
OK
RIS
OK
GP
NOK
3
Develop of HIRADC document
Up date HIRADC 2011
6.1.2.
5
Involvement evidence all element to make hazard identification (attendante list)
Daftar hadir peserta dalam pembuatan HIRADC (Irie, Gp, Herman R, Bakti, Achsien, Tgl. 7/11/2011)
6.7.1.
Prosedur Kesiapan Keadaan Darurat
Identifikasi Keadaan darurat didalam HIRADC, Prosedur Keadaan Darurat dikomunikasikan (Induction dan ditempel)
RIS
OK
6
HIRADC Monitoring of evectiveness (all location)
Buat monitoring efektivitasnya, tambahkan kolom disisi paling kanan MONITORING EFECTIVITAS dan isi dengan OK
9.1.1.
Terdapat Prosedur Identifikasi
Pengendalian Manual dan Mekanis dalam HIRADC
RIS
OK
7
HIRADC revision evidenced (min. every there is insident )
Bukti bahwa HIRADC selalu ditinjau setelah terjadi insident, apabila item insiden belum ada didalam HIRADC, maka HIRADC harus di revisi
9.1.2
Identifikasi oleh Petugas Kompeten
Daftar Pembuat HIRADC (Jabatan dan AK3K)
RIS
OK
Apabila ada item pekerjaan yang belum ada didalam HIRADC, maka HIRADC harus di revisi
2.2. Peraturan Perundangan dan Persyaratan Lainnya
4.3.2.Persyaratan Hukum dan Persyaratan Lainnya KI/OHS-P/003 : Legal & other requirement Procedure
10.1.1.
Prosedur Identifikasi, Pengumpulan, Pengarsipan, Pengumpulan, Pengarsipan, pemeliharaan, Penyimpanan dan pengantian Catatan K3
10.1.2.
Memelihara Perundangan, standard dan pedoman Teknis K3
Prosedur Pengendalian Dokumen
Mudah didapat (buat Katalog dan Daftar Isi RIS Ordner)
8
To make acces list to regulation publisher
KI/FORM/OHS/003/028
ada di MRM
9
Acces evidence to regulation publisher
KI/FORM/OHS/003/029
buat list tgl. Menghubungi pada period 2012
RIS
KI/FORM/OHS/003/030
Up date masukin legal yang baru 2 bh (pastikan)
RIS
10 Regulation List (applicable only)
Legal monitoring harus sama dengan legal list
4.3.3. Sasaran dan Program KI/OHS-P/004 : Objective & programme(s) procedure
NOK
RIS
2.3. Tujuan dan Sasaran 2.4. Indikator Kinerja 2.5. Perencanaan Awal dan Perencanaan Kegiatan yang sedang berlangsung
Menetapkan Objective dan Target
2.1.5.
Safety Objective (HQ dan Project)
RIS
OK
Daftar Kompetensi
ADHI
OK
2.1.2.
HIRADC dilakukan oleh orang yang Kompeten
Monitoring Objective 2013
2.1.3.
Safety Plan (Rencana Strategi K3) berdasarkan Tinjauan Awal, HIRADC, Perundangan, dan info Safety Plan K3 dari Dalam dan Luar perusahaan
RIS
OK
Bukti Monitoring Obj (siapkan Back up data)
2.1.4.
Menetapkan Objective dan Target dalam Safety Safety Plan dan Monitoring Objective Plan
RIS
OK
11 Objective and target
KI/FORM/OHS/004/056
Objective 2013
12 Monitoring of objective and target
KI/FORM/OHS/004/057
13 OHS Program & monitoring
KI/FORM/OHS/004/058
Safety performance 2013 List of KI equipment (all site) Legal comply Emergency drill report List of Competence dan Copy sertifikat Objective monitoring Event
OK
RIS
Event Tahun 2013 (HQ dan Project) Monitoring actual event HQ dan Project
NO
OHSAS 18001:2007
FORM
AKUNTABILITAS OHSAS
ELEMEN SMK3 PP. No. 50 TAHUN 2012
4.4. IMPLEMETASI DAN OPERASI
3.IMPLEMENTASI
4.4.1. Sumber Daya, Peran Tanggung Jawab, Tanggung Gugat dan Wewenang
3.1.3. Tanggung Jawab dan Tanggung Gugat
14 Organization chart
15 Certifcate of P2K3
Establishment/ Duty letter to safety employees ( 16 Safety committee members, safety section/ department, emergency respons team)
KRITERIA
PENJELASAN PENJELASAN KRITERIA
1.2.1.
Tugas dan tanggung jawab personil (job description) ada item terkait K3
Struktur organisasi KIHQ dan Job desc Top Management - pasang di dinding
1.2.2.
Penunjukkan Sekretaris dan Safety Officer sesuai UU (AK3K license)
Struktur organisasi TTD, Job Desc dan Pasang didinding
AKUNTABILITAS SMK3
RESPONSIBILITY
STATUS
HR
OK
Competence List dan copy sertifikat, surat tugas MR, SK Sekretaris, surat tugas Safety HR Officer dll
OK
1.2.3.
Pimpinan unit kerja bertanggung jawab terhadap Safety Objective tggjwb Pimpinan Unit kerja Ris Kinerja (manager dan PM), P2K3
OK
Sertifikat P2K3 dari Depnakertrans untuk HO -rev 2011 - Buat surat ke Dinas Nakertrans - Tgl. 1 Juni 2011 ; karena perubahan Presdir, lampirkan dengan Organisasi P2K3 yang baru. buat juga bukti kirim ke Depnaker
1.2.4.
Pimpinan bertanggung jawab penuh terhadap pelaksanaan K3
P2K3, Jadwal patrol HQ, PM, Objective, MRM
RIS
OK
P2K3 UCI 3RD
1.2.5.
OK
1.2.6.
Surat Tugas dan daftar hadir training Damkar untuk Tim TTD Proyek dan HQ Bukti kunjungan APHOSO, Seminar SGS, Kunjungan ke Depnaker dll
Ris
P2K3 HOTEL
Ris
OK
P2K3 NGK
1.2.7.
Petugas Keadaan darurat telah mendapat pelatihan dan sudah ditetapkan Saran2 dari ahli dibidang K3 yang berasal dari dalam atau luar Kinerja termuat dalam laporan tahunan perusahaan atau laporan lain yang setingkat
MRM, Annual Report Kajima
Ris
OK
P2K3 HPSI
1.2.8.
Up date CV berdasarkan Training
1.2.9.
17
Job description (Roles, responsility, accountability and authority) for all employees
Job description semua personil proyek (terutama personil safety dan emergency respons)
1.4.3.
Pembentukan P2K3
Sertifikat P2K3 Kajima, dan sertifikat Unit K3 internal untuk proyek
Ris
OK
18
Communication Evidences of job description to all employees
Bukti bahwa Job desc sudah dikomunikasikan kepada personil ybs (Bukti kirim)
1.4.4.
Ketua P2K3 adalah Presdir/ Pucuk pimpinan
Ketua P2K3 Presdir dan ketua Unit K3 PM
Ris
OK
Surat penetapan Internal Auditor (lihat didalam list kompetensi)
1.4.5.
Sekretaris P2K3 adalah Ahli K3
Sekretaris P2K3 dan Unit K3 adalah AK3K
Ris
OK
1.4.6.
Titik berat P2K3 adalah pengembangan kebijakan dan prosedur pengendalian resiko
MRM dan Risalah rapat Unit K3 di proyek (Report SSP)
Ris
OK
12.1.1.
Analisis kebutuhan pelatihan K3 (Gap analysis kompetensi)
Gap analisis kompetensi
HR
NOK
Program pelatihan (sosialisasi K3) kepada : HQ : 1. Manajemen, 2. Staff, 3. Safety Officer (based on Gap analysis); Project : 1. Staff, 2. Safety Subkont, 3. Worker specialis (lifting, welding, operator dll), 4. General HR dan Safety worker, 5. Supervisor (WI), 6. TTD, 7. Kantin/ Food handler, 8. Scaffolder, 9. Digger, 10. Masonry, 11. ME, 12. Ass. Safety , 13. Carpenter, 14. Operator (simper), 15. Welder, 16. Work at height dll
4.4.2. Kompetensi, Pelatihan dan Kepedulian
3.1.5. Pengembangan Keterampilan dan Kemampuan
KI/OHS-P/005 : Training procedure
19
Gap analisys & competence (training need identification)
KI/FORM/OHS/005/063
Gap Analysis
12.1.2.
Rencana pelatihan K3 untuk semua tingkatan
20
Training matrix (job description and risk identification based)
KI/FORM/OHS/005/064
Training matrix 2012
12.1.3.
Training matrix 2013
12.1.4.
Training program 2012 dan Actual Training 2012
12.1.5.
Training Program 2013
12.1.6.
Bukti2 sertifikat, dokumentasi dan daftar hadir
12.1.7.
Jenis pelatihan sesuai dengan kebutuhan untuk Gap analisis dan resiko pengendalian bahaya Pelatihan oleh badan yang kompeten dan A2K4, Damkar, Depnaker, Dinkes dll berwenang Ruang meeting, Ruang Induction dan Terdapat fasilitas training infocus Penyimpanan dokumen training Dokumentasi actual training Meninjau ulang program pelatihan agar tetap Risalah rapat review training (Risalah rapat relevan dan efektif P2K3/ MRM)
21 Training program and realization
KI/FORM/OHS/005/065
22 Training evaluation PERSONAL COMPETENCY (KI belonging)
12.2.1.
Anggota manajemen berperan dalam pelatihan
TTD Gap analysis, program pelatihan dan menyetujui materi pelatihan, menyetujui pelatihan external
23
Safety Expert (Ahli K3)
12.2.2.
Manajer dan Spv menerima pelatihan yang sesuai dengan peran dan tanggung jawabnya
Program pelatihan K3 untuk Manajer dan Spv sesuai Gap analysis
24
Electrical Safety License
12.3.1.
Pelatihan kepada tenaga kerja baru dan yang dipindahkan
Safety Induction, Training khusus dan Training kepada tenaga kerja yang dipindahkan (training scaffolding dll)
25
Scaffolder competency
12.3.2.
26
Electrical safety
12.3.3.
27
Rigger & Lifting Competency
12.4.1.
28
First Aider Competency
Pelatihan kpd tenaga kerja bila ada perubahan sarana produksi Pelatihan penyegaran Prosedur Komunikasi / Briefing kepada Tamu dan Mitra kerja Prosedur kepatuhan terhadap persyaratan lisensi
29
Fire Fighting Competency Safety Awareness
31
Auditors competency (Certificate Internal Auditor)
RIS Ris HR HR Gp
12.1.8.
KI/FORM/OHS/005/066
30
NOK
Buat list personnel competency 2012 (incld. subkont ) DAN COPY SERTIFIKAT
12.5.1.
HR
Buat program saja Masukin program Visitor Safety Induction Prosedur Safety Inspection (SIO dan SILO)
OK
List of Operator License (SIO) - KI Belonging 32
Welder License
33
Excavator Lit of Equipment certificate - KI Belonging
34
Scaffolding
35
Tower crane
36
Excavator
37
Genset
38
Compressor
Sertifikat dari manufacture
RIS
Wire Rope
4.4.3. Komunikasi, Partisipasi dan Konsultasi
3.1.4. Konsultasi, Motivasi dan Kesadaran
1.4.1.
Keterlibatan dan Jadwal konsultasi dengan tenaga kerja di dokumentasikan dan disebarluaskan
Jadwal SSP, Minutes meeting dan daftar hadir SSP, Laporan SSP, Bukti kirim Minutes Meeting dan Ditempel di Papan Info
KI/OHS-P/006 : Communication, participation and Consultation procedure
(1. Pembangunan dan pemeliharaan Dokumen/ 1.4. Keterlibatan dan Konsultasi dengan Tenaga Kerja)
1.4.2.
Prosedur Konsultasi tersedia untuk memudahkan bila ada perubahan K3
Prosedur Konsultasi
1.4.7.
39 Safety Information board
Project
OK
OK
Bukti Kirim / email pengurus P2K3 dan Unit Susuan pengurus P2K3 didokumentasikan dan K3 kepada semua subkont dan ditempel di Project di informasikan kepada tenaga Kerja papan info MRM, bukti kirim MRM dan Schedule SSP, Rapat P2K3 dilaksanakan teratur dan minutes minutes meeting SSP dan bukti kirim SSP Ris dan Project meeting di sebarluaskan dan ditempel
OK
40 P2K3/ Safety committee report to Depnakertrans
Kirim report, Surat Revisi P2K3
1.4.8.
41 Laporan Unit K3 ke P2K3
Laporan triwulan P2k3 , maret 2012, Juni 2012 , October 2012 dan Deember 2012Ke Sudin Nakertrans
1.4.9.
P2K3 melaporkan kegiatannya kepada Disnaker
Laporan P2K3 ke DInasnakertrans dan Unit RIS K3 ke HQ (SK Unit K3 proyek)
OK
1.4.10.
Pembentukan kelompok kerja K3 ditempat kerja
SK Unit K3, Data Tim KY Meeting (Leader dan Anggotanya)
OK
Project
OK
NO
OHSAS 18001:2007
AKUNTABILITAS OHSAS
FORM
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN AKUNTABILITAS SMK3
PENJELASAN KRITERIA
RESPONSIBILITY
STATUS
3.2.1. Komunikasi
2.3.1.
Prosedur untuk mengidentifikasi, memperoleh, memelihara dan memahami UU, standard, pedoman teknis
Prosedur Legal
Ris
OK
(2.3. Peraturan Perundangan dan Persyaratan lain dibidang K3)
2.3.2.
Penanggung jawab untuk memelihara dan mendistribusikan peraturan terbaru telah ditetapkan
Job desc DC (ris)
HR
OK
12.4.2.
4.4.4. Dokumentasi
2.2.1.
Manual SMK3 meliputi Kebijakan, tujuan, rencana, prosedur K3, IK, Formulir, catatan dan Daftar Manual, Prosedur, IK, Job Desk tanggung jawab serta wewenang untuk semua tingkatan
Ris
OK
(2. Pembuatan dan Pendokumentasian Rencana K3)
2.2.2.
Manual khusus untuk produk, proses, dan tempat kerja tertentu
WI Confined space dll
Ris
OK
2.2.3.
Manual, prosedur, WI, form mudah di dapat
Katalog, daftar isi, Distribusi Hard Copy untuk Manual, prosedur dan WI dan akses Aksan/ Ris LAN untuk Manual, Prosedur, WI dan form2 (bukti notifikasi di email ke semua project)
OK
4.4.5. Pengendalian Dokumen
3.2.3. Pengendalian Dokumen
4.1.1.
Dokumen K3 mempunyai Identifikasi status, wewewnang, tanggal pengeluaran dan tanggal modifikasi
Status Master, Control Copy dll
Ris
OK
KI/OHS-P/007 : Control of document
(4. Pengendalian Dokumen)
4.1.2.
Penerima distribusi dokumen tercantum dalam dokumen tersebut
Dokumen Master List, Distribution List
RIS
OK
Document Master List up date 2013, WI terakhir sudah masuk
4.1.3.
Dokumen K3 edisi terbaru disimpan secara sistematis pada tempat khusus
Katalog, daftar isi, Distribusi Hard Copy untuk Manual, prosedur dan WI dan akses RIS LAN untuk Manual, Prosedur, WI dan form2 (bukti notifikasi di email ke semua project)
Distribution List, up date 2013, semua proyek yang ada sudah di distribusikan
4.1.4.
Dokumen usang disingkirkan dari penggunaannya, dokumen usang yang disimpan diberi tanda khusus
Berita Acara pemusnahan, Stempel Absolute (untuk yang disimpan)
RIS
OK
Bukti kirim Dokumen
4.2.1.
Sistem untuk membuat, menyetujui perubahan dokumen K3
Prosedur pengendalian Dokumen
RIS
OK
Cek ohs doc di komputer Site Office dan HO
4.2.2.
Alasan perubahan
Kronologi dokumen
RIS
OK
Dokumen Master - Ada Daftar isi dan di Stempel master
4.2.3.
Pengendalian dokumen
Master List Dokumen dan status
RIS
OK
42 Document masterlist - controller
43
3.2.3. Dokumentasi
KI/FORM/OHS/007//039
Distribution list of Document (Manual, Prosedur, Work KI/FORM/OHS/007//040 Instruction)
4.4.6. Pengendalian Operasional
3.3. Identifikasi Sumber Bahaya, Penilaian dan Pengendalian Resiko
6.1.3
Terdapat prosedur HIRADC
Prosedur HIRADC
KI/OHS-P/008 : Project safety plan procedure
(6.1. Sistem Kerja)
6.1.4.
Kepatuhan terhadap UU dan standard diperhatikan ketika membuat WI
WI
6.1.5.
Terdapat sistem izin kerja
PTW
OK
6.1.6.
APD disediakan dan dipelihara
Prosedur APD, Daftar dan Matrix APD dan schedule masa pakai (ada tgl pakai dan Project masa expired, tgl pengantian)
OK
6.1.7.
APD yang digunakan layak sesuai aturan UU
APD yang digunakan ber SNI (buat daftar APD dan SNI nya)
HQ dan Project
NOK
HIRADC di evaluasi berkala apabila terjadi perubahan atau ketidaksesuaian pada proses kerja
Revisi HIRADC
HQ dan Project
OK
Project dan Schedule OK patrol Gp
Senayan Apart, Hotel, UCI3rd, HPSI, NGK, Musashi dll
44 Project Safety Plan
KI/OHS-P/009 : Safety aspects in the project planning phase procedure 45 List of input document planning phase
KI/FORM/OHS/009//094
46 Planning phase checklist
KI/FORM/OHS/009//095
6.1.8.
47 Verifikasi form of safety aspect in planning phase
KI/FORM/OHS/009//096
6.1.9.
48 Preliminary risk assesment-Planning phase
KI/FORM/OHS/009//097
OK
Ris
(6.2. Pengawasan)
6.2.1.
Dilakukan pengawasan untuk menjamin kerja aman
Schedule, actual dan report Safety patrol
3.3.1. Identifikasi Sumber Bahaya
6.2.2.
Setiap orang diawasi sesuai dengan tingkat kemampuan dan tingkat resiko tugas
Buat daftar pekerjaan/ task, kompetensi kelompok, awarenessnya dan beri penilaian Project tingkat resikonya (link ke Hasil patrol dan HIRADC), dan level pengawasannya
Ada lampiran persyaratan safety dalam kontrak dengan vendor (PO/WO)
6.2.3.
Ada lampiran persyaratan safety dalam kontrak dengan vendor (PO/WO)
6.2.4.
List of Equipment KI-HQ (9 alat)
6.2.5.
Spv ikut serta dalam Identifikasi bahaya dan Daftar hadir pembuatan HIRADC HQ dan Project pengendaliannya Supervisor ikut dalam investigasi dan Buat daftar Tim Investigasi (Spv harus ikut) HQ dan Project pembuatan laporan accident dan menyerahkan dan lengkapi dengan daftar hadir laporan kepada pimpinan Daftar Hadir Konsultasi pembuatan : WI, Supervisor ikut dalam proses Konsultasi HQ dan Project Rapat P2K3, HIRADC dll
OK
KI/OHS-P/010 : Purchasing procedure
49 Subcontractors questioner/ assesment
KI/FORM/OHS/010//042
50 Clauses of safety req. in Vendors pre-qualification 51
Clauses of safety requirement in vendor contracts (in Work Order and PO)
Buat daftar Subkontraktor terpakai dan check yang sudah mengembalikan questionnaire (lihat data prosentase di MRM)
53 Vendor evaluation
KI/OHS-P/012 : Operational, maintenance & service of equipment procedure
KI/FORM/OHS/013//071
6.3.2.
Penugasan harus berdasarkan kemampuan dan List of Competence keterampilan serta kewenangan
HR
OK
3.3.2. Penilaian resiko
6.4.1.
Pengurus melakukan penilaian resiko untuk mengetahui area yang memerlukan izin masuk
Buat daftar area yang memerlukan izin masuk
Project
(6.4. Area Terbatas)
6.4.2.
Terdapat pengendalian atas area dengan pembatasan izin masuk
Input dalam HIRADC dan pasang rambu
Project
6.4.3.
Terdapat fasilitas dan layanan ditempat kerja sesuai dengan standard dan pedoman teknis
Input dalam Presentasi Safety Action
Ris
6.4.4.
Rambu-Rambu K3 harus dipasang sesuai dengan standard dan pedoman teknis
Rambu di HQ (Komputer dan Plotter)
Project dan HQ
Apabila ada pekerjaan perbaikan di dalam office harus membuat Work Permit kepada OHS Section
KI/OHS-P/014 : Lock out Tag out procedure
3.3.3. Tindakan Pengendalian
6.5.1.
Jadwal pemeriksaan dan pemeliharaan sarana produksi serta peralatan mencakup verifikasi alat-alat pengaman dan persyaratan sesuai standard
Buat jadwal inspeksi, Jadwal Maintenance Alat (kalau punya subkont, minta ke subkont) dan Jadwal Kalibrasi alat
Project
KI/OHS-P/015 : Housekeeping procedure
(6.5. Pemeliharaan, Perbaikan dan Perubahan sarana produksi)
6.5.2.
Semua catatan data kegiatan pemeriksaan, pemeliharaan, perbaikan dan perubahan yang dilakukan atas sarana dan peralatan harus disimpan
Data Safety Patrol, Data Inspection, Data Maintenance alat, Data perubahan perbaikan alat
Project
6.5.3.
Peralatan memiliki sertifikast yang masih berlaku
Daftar peralatan dan sertifikatnya (SILO dan Project dan Ris SIO)
6.5.4.
Pemeriksaan, pemeliharaan, perawatan, perbaikan serta perubahan dilakukan oleh petugas yang kompeten
Di dalam schedule Inspection dan Maintenance memuat nama badan pemeriksa/ PIC
6.5.5.
Terdapat prosedur apabila terjadi perubahan sarana produksi dan peralatan, perubahan tersebut harus sesuai dengan persyaratan peraturan perundangan, standard dan pedoman teknis
55 House keeping program
KI/FORM/OHS/015/077
Program house keeping area kantor (pembuangan sampah, cleaning telepon, cleaning kantor dll)
KI/OHS-P/016 : Health & hygiene procedure
56 Health & Hygiene facilities program
KI/FORM/OHS/016/088
NOK
NOK
KI/OHS-P/013 : Working permit procedure
54 Working permit
OK
6.3.1.
Coretan bahwa safety menjadi pertimbangan dalam comparison form
ISO form
OK
Tetapkan jenis penyakit berbahaya (minta data asuransi), Buat Persyaratan kesehatan untuk staff, DW dan Subkont (untuk staff Persyaratan tugas tertentu termasuk bila hasil MCU menunjukkan memiliki persyaratan kesehatan di identifikasi dan dipakai HQ dan Project penyakit yang berbahaya atau bawaan, untuk seleksi dan penempatan kerja maka kontrak kerja bisa putus, untuk DW dan subkont buat data Surat Keterangan sehat dokter/RS)
KI/OHS-P/011 : Control of subcontractors procedure
52 Vendor determination check list
NOK
3.3.4. Perancangan (design) dan Rekayasa
Project
Ris
OK
OHSAS 18001:2007
NO
AKUNTABILITAS OHSAS
FORM
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN AKUNTABILITAS SMK3
PENJELASAN KRITERIA
RESPONSIBILITY
KI/OHS-P/017 : PPE procedure
6.5.6.
Terdapat prosedur permintaan pemeliharaan sarana dan peralatan produksi dengan kondisi K3 yang tidak memenuhi syarat dan perlu segera diperbaiki
KI/OHS-P/018 : Safety meeting procedure
6.5.7.
Terdapat sistem penandaan bagi peralatan yang sudah tidak aman digunakan atau sudah tidak Prosedur Rambu digunakan
Project
Project
Form Premob
STATUS
Project
57 KIHQ Safety Committee Minutes Meeting
KI/FORM/OHS/018/023
Safety report - Monday meeting, data kecelakaan terakhir di Hitachi jgn dimasukkan
6.5.8.
Apabila diperlukan dapat diterapkan system Lock Out System
58 Communication list of emergency bodies concerning
KI/FORM/OHS/018//023
Bukti koordinasi ke Building Management, Dinas PMK, PMI, Kepolisian dll
6.5.9.
Terdapat prosedur yang dapat menjamin Keselamatan dan Kesehatan tenaga kerja dan orang lain pada saat proses pemeriksaan, pemeliharaan, perbaikan dan perubahan
Ris
6.6.1.
Apabila perusahaan di kontrak untuk penyediaan pelayanan yang tunduk pada standard dan perundangan mengenai K3, maka Dokumen Tender, Cek list persyaratan K3 perlu disusun prosedur untuk menjamin bahwa pelayanan memenuhi persyaratan
Ris
NOK
3.3.5. Pengendalian Administratif
6.6.2.
Apabila perusahaan diberi pelayanan melalui kontrak dan pelayanan tunduk pada standard dan peraturan perundangan K3, maka perlu disusun prosedur yang menjamin bahwa pelayanan memenuhi standard
Ris
NOK
(9. Pengelolaan material dan Perpindahannya)
9.1.3.
Pengusaha menerapkan dan meninjau cara pengendalian resiko yang berhubungan secara HIRADC manual dan mekanis
HQ dan Project
OK
9.1.4.
Terdapat prosedur untuk penanganan bahan meliputi metode pencegahan terhadap kerusakan, tumpahan dan kebocoran
WI
HQ dan Project
OK
Bulanan
9.2.1.
Terdapat prosedur yang menjamin bahwa bahan disimpan dan dipindahkan dengan cara yang WI aman sesuai dengan peraturan perundangan
HQ dan Project
OK
Bulanan (peralatan keselamatan : fire alarm, splingker, smoke detector, emergency lamp)
9.2.2.
Terdapat prosedur yang menjelaskan persyaratan pengendalian bahan yang dapat rusak dan kadaluarsa
WI
Ris
NOK
9.2.3.
Terdapat prsedur yang menjamin bahwa bahan dibuang dengan cara yang aman sesuai WI peraturan
RIS
NOK
3.3.6. Tinjauan Ulang Kontrak
9.3.1.
Penerapan prosedur penyimpanan, penangganan dan pemindahan BKB sesuai dengan standard
WI
(9.3. Bahan Kimia Berbahaya)
9.3.2.
Terdapat LDKB / MSDS yang mudah diperoleh
WI
Project
OK
9.3.3.
Terdapat sistem untuk mengidentifikasi dan pemberian label pada bahan
WI
Project
OK
9.3.4.
Rambu peringatan bahaya terpasang pada bahan
Pasang rambu
Project
OK
3.3.7. Pembelian
9.3.5.
Penanganan BKB/ B3 dilakukan oleh Petugas yang kompeten
Project
OK
(3.Pengendalian perancangan dan Peninjauan Kontrak)
9.3.6.
KI/OHS-P/019 : Safety promotion procedure
60 House keeping assesment report
KI/FORM/OHS/019/034
KI/OHS-P/020 : Safety inspection procedure
61 Safety assesment report
KI/FORM/OHS/020/002
62 Cek list ruangan
63 Fire extinguisher
KI/FORM/OHS/020/017
Cek list Bulanan
64 First aid box
KI/FORM/OHS/020/021
Cek list Daftar, kelengkapan, form penggunaan
(3.1. Pengendalian Perancangan)
(5.1. Spesifikasi pembelian Barang dan Jasa)
LOTO
Ceek list persyaratan K3
3.1.1.
Prosedur yang terdokumentasi mempertimbangkan identifikasi potensi bahaya, penilaian dan pengendalian resiko yang Prosedur Planning Phase dilakukan pada tahap perancangan dan modifikasi
3.1.2.
Prosedur, WI dalam penggunaan produk, pengoperasian mesin dan peralatan, instalasi, pesawat atau proses serta informasi terkait K3 telah dikembangkan selama perencanaan dan modifikasi
3.1.3.
Petugas yang kompeten melakukan verifikasi bahwa peraancangan dan modifikasi memenuhi Prosedur Planning Phase persyaratan K3 yang ditetapkan sebelum penggunaan hasil rancangan
3.1.4.
Semua perubahan dan modifikasi perancangan yang mempunyai implikasi terhadap K3 diidentifikasi, di dokumentasikan, di review dan Prosedur Planning Phase disetujui oleh petugas yang berwenang sebelum pelaksanaan
3.2.1.
Prosedur yang terdokumentasi harus mampu mengidentifikasi bahaya dan menilai resiko bagi tenaga kerja, lingkungan kerja dan masyarakat, dimana prosedur tsb digunakan pada saat memasok barang dan jasa dalam suatu kontrak
Prosedur pengendalian Subkontractor, Safety Plan subkont di verifikasi, Evaluasi Subkont/ Supplier, lampiran Kontrak Subkont/ Supplier
3.2.2.
Identifikasi bahaya dan penilaian resiko dilakukan pada tinjauan kontrak oleh petugas yang kompeten
Prosedur pengendalian Subkontractor, Safety Plan subkont di verifikasi, Evaluasi Subkont/ Supplier, lampiran Kontrak Subkont/ Supplier
3.2.3.
Kontrak di tinjau ulang untuk menjamin bahwa pemasok dapat memenuhi persyaratan K3 bagi pelanggan
3.2.4.
Catatan tinjauan kontrak di pelihara dan didokumentasikan
5.1.1.
Terdapat prosedur bahwa spesifikasi teknik dan info K3 yang relevan telah di periksa sebelum Purchasing Prosedur membeli
5.1.2.
Spesifikasi pembelian untuk sarana produksi, zat kimia atau jasa harus dilengkapi dengan spesifikasi yang sesuai dengan persyaratan
OK
Prosedur Planning Phase
Spesifikasi pada penawaran ditandai
Purchasing/ Logistik
OHSAS 18001:2007
NO
AKUNTABILITAS OHSAS
FORM
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN AKUNTABILITAS SMK3
PENJELASAN KRITERIA
RESPONSIBILITY
5.1.3.
Konsultasi dengan tenaga kerja yang kompeten pada saat keputusan pembelian dilakukan untuk menentapkan persyaratan K3 dicantumkan Purchasing Prosedur dalam spek pembelian barang dan tenaga kerja di informasikan
5.1.4.
Kebutuhan pelatihan, pasokan APD dan perubahan prosedur kerja harus dipertimbangkan sebelum pembelian dan penggunaan
Buat form ceklist pembelian material/ bahan Purchasing/ Logistik
5.2.1.
Barang dan jasa yang dibeli diperiksa kesesuaiannya dengan spesifikasi pembelian
Buat form ceklist verifikasi pembelian
5.3.1.
Barang dan Jasa yang dipasok pelanggan, Buat daftar barang dan jasa yang dipasok sebelum digunakan terlebih dahulu diidentifikasi owner, lakukan HIRADC khusus
Purchasing/ Logistik
Project
5.3.2. 4.4.7.Kesiagaan dan Tanggap Darurat
3.3.8. Prosedur Menghadapi Keadaan Darurat atau Bencana
6.7.1.
KI/OHS-P/021 : Emergency preparedness & response procedure
(6.7 Kesiapan untuk Menangani Keadaan Darurat)
8.1.1.
65 Emergency response plan
8.2.1.
KI/FORM/OHS/021/079
66 ER Organization chart & responsibility 67 Emergency drill program
KI/FORM/OHS/021/080
68 Flow chart emergency response
KI/FORM/OHS/021/081
New Organization
8.2.2.
Buat program tahun 2011 HO
6.7.2. 6.7.3.
69 Communication list of emergency bodies
KI/FORM/OHS/021/082
Daftar komunikasi / koordinasi ke badan terkait emergency (Building Management, Fire Brigade, kepolisian dll)
70 List of emergency facility
KI/FORM/OHS/021/083
Daftar perlengkapan emergency (Uniform floor warden, spanduk evakuasi, tas P3K, senter dll)
71 Emergency minutees drill
KI/FORM/OHS/021/084
Report Building managent dan report internal (jumlah peserta)
72 Emergency response handled report
KI/FORM/OHS/021/085
73 Emergency evaluation
KI/FORM/OHS/021/086
Evaluasi drill terakhir
74 Emergency facility check list
KI/FORM/OHS/021/087
Cek list kelengkapan semua peralatan
75 Refill programmes of Fire extinguisher 76 77 78 79
3.3.2. Pelaporan
6.7.4. 6.7.5. 6.7.6 6.7.7.
Keadaan darurat yang potensial telah di identifikasi dan prosedur sdh dibuat dan diinformasikan kesemua orang Terdapat prosedur pelaporan bahaya yang berhubungan dengan K3 dan diketahui oleh pekerja Terdapat prosedur bahwa semua kecelakaan kerja, penyakit akibat kerja, kebakaran atau peledakan serta kejadian berbahaya lainnya ditempat kerja di catat dan dilaporkan
HIRADC Emergency, Flow chart dan Prosedur
HQ dan Project
Safety Call Center, Anomaly form
Project
laporan kecelakaan
Ris dan Project
Penyediaan alat/ sarana dan prosedur keadaan Cek list Inspecksi alat emergency dan darurat berdasarkan hasil identifikasi dan diuji APAR serta ditinjau secara rutin oleh petugas Tenaga kerja mendapat pelatihan mengenai prosedur darurat Petugas TTD ditetapkan dan mendapat pelatihan khusus dan diinformasikan kepada semua orang Instruksi keadaan darurat diperlihatkan secara mencolok Peralatan dan sistem bahaya keadaan darurat disediakan, diperiksa, diuji dan dipelihara secara berkala Jenis, jumlah, penempatan dan kemudahan mendapatkan alat keadaan darurat tekah sesuai dengan persyaratan
Program dan actual Drill organisasi TTD Jalur evakusi, muster point dan flowchart keadaan darurat Daftar peralatan emergency, schedule drill, schedule pemeriksaan dll Pemasangan APAR dan alat emergency lainnya
3.3.9. Prosedur Menghadapi Insiden 3.3.10. Prosedur rencana pemulihan keadaan darurat
Buat program refill (per 2 tahun dari refill terakhir)
Put of the Fire Extinguisher, comply to regulation (1:200m2 atau distance 1:15m) Monthly/6th Month/ Annual checklist of Fire Extinguisher Check list kelengkapan Tas Besar First Aid Menimbang berat APAR
Bulanan Data berat APAR
4.5. PEMERIKSAAN
4. PENGUKURAN DAN EVALUASI
4.5.1. Pemantauan dan Pengukuran Kinerja
4.1. Inspeksi dan Pengujian
KI/OHS-P/022 : Measurement, monitoring and calibration procedure
7.1.1.
Inspeksi terhadap tempat kerja dilaksanakan secara teratur
7.1.2.
Pemeriksaan dilakukan oleh petugas yang telah mendapat pelatihan identifikasi bahaya
Safety inspection dan Safety patrol schedule and actual report
79 Safety performance
KI/FORM/OHS/022/053
Manhour, FR, SR, IR (MRM)
7.1.3.
Inspeksi juga mencari masukan dari tenaga kerja yang melakukan tugas ditempat kerja
80 Measurement & Monitoring workplace program
KI/FORM/OHS/022/054
Buat Program pengukuran faktor fisik, kimia dan biologi tahun 2011 external pada Oktober 2011
7.1.4.
Check list tempat kerja telah disusun untuk digunakan
Check list2
81 Analysis of measurement result
KI/FORM/OHS/022/055
Analisa dan rekomendasi
7.1.5.
Laporan inspkesi berisi rekomendasi untuk tindakan perbaikan dan ditujukan kepada pengurus dan P2k3 sesuai kebutuhan
PIC juga kepada CM dan anggota P2K3
82 Data of calibration measurement equipment
Data kalibrasi alat ukur internal maupun external
7.1.6.
Pimpinan menetapkan penanggung jawab tindakan perbaikan dari laporan inspeksi
PIC
83 External Measurements :
Buat program pengukuran tahun 2011 external
7.2.1.
Pemantauan/ pengukuran lingkungan kerja Buat program tahunan pemeriksaan dilaksanakan secara teratur dan hasilnya untuk Lingkungan Kerja HIRADC
84
workplace temperature
7.2.2.
Pemantauan meliputi : Faktor Fisik, kimia, biologi, ergonomi dan psikologi
85
Lumen/ lighting meausrement
7.3.1.
pemantauan dilakukan oleh petugas yang kompeten
86
Dust concentrate
7.3.2.
Alat dipelihara dan di kalibrasi oleh petugas yg kompeten
87
Workplace Humidity
7.4.1.
Dilakukan pemantauan kesehatan tenaga kerja Program MCU (HO dan Hotel) dan Data yang bekerja yg mengandung potensi bahaya Pemeriksaan Fisik proyek tinggi
88
Noise
7.4.2.
Identifikasi tempat pemeriksaan kesehatan
Klinik Cito
7.4.3.
Pemeriksaan kesehatan dilakukan oleh Dokter yang ditunjuk sesuai UU
Klinik Cito
7.4.4.
Perushaan menyediakan pelayanan kesehatan Klinik CITO, Bringin Life, Klinik project kerja sesuai aturan UU
7.4.5.
Catatan pemantauan kesehatan dilakukan
89 Monthly Activity report
KI/FORM/OHS/WI/107
90 Safety activity report
KI/FORM/OHS/WI/111
91 Report to KOA
KI/FORM/OHS/WI/117
Laporan bulanan safety department ke OHS Section HO
Laporan bulanan safety department ke KOA
Minta Kalibrasi alat dan alat internal di kalibrasi (buat shcedule)
Data MCU, Follow up MCU
project
STATUS
OHSAS 18001:2007
NO
FORM
AKUNTABILITAS OHSAS
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN PENJELASAN KRITERIA
AKUNTABILITAS SMK3
RESPONSIBILITY
KI/OHS-P/023 : Medical check up procedure 92 Medical check up program
KI/FORM/OHS/023/050
Disease history interview for new employee and 93 workers
KI/FORM/OHS/023/051
Actual program tahun 2011
HR/ ARIF HR/ ARIF
Surat Keterangan Sehat dari Dokter untuk Pegawai baru/ DW baru
94 Surat keterangan sehat dari dokter untuk Staff baru Surat keterangan sehat dari dokter untuk Daily Worker baru 96 Medical record hasil MCU
HR
95
HR
97 Rekomendasi hasil MCU
MCU Record Follow up MCU
HR HR
KI/OHS-P/024 : Evaluation of compliance procedure 98 Monitoring of Regulation (percentage of comply)
KI/FORM/OHS/024/038
Monitoring tahun 2012
RIS
99 Statistic data
KI/FORM/OHS/024/052
Data statistik incident, MCU, Percentage Comply dll
RIS
4.5.3. Penyelidikan Insiden, Ketidaksesuaian dan Tindakan Perbaikan dan Pencegahan
3.3.9. Prosedur Menghadapi Insiden
8.3.1.
Prosedur pemeriksaan dan pengkajian kecelakaan dan penyakit akibat kerja
8.3.2.
Pemeriksaan dan pengkajian kecelakaan kerja dilakukan oleh Ahli K3
Cek apakah semua Accident sudah dibuat reportnya
8.3.3.
Laporan pemeriksaan berisi sebab akibat serta Buat target tgl countermeasure (cocokan rekomendasi dan jadwal pelaksanaan perbaikan dengan CAR nya)
RIS
List Incident lengkap dengan Investigasi, CAR dan Alert
8.3.4.
Penanggung jawab tindakan perbaikan atau laporan pemeriksaan telah di tetapkan
Menetapkan PIC (dalam CAR)
RIS
Cek apakah semua Accident sudah dibuat alertnya
8.3.5.
Tindakan perbaikan di informasikan kepada tenaga kerja yang bekerja ditempat kerja
Catat dalam record TBM/ KY Meeting
Project
8.3.6.
Pelaksanaan tindakan perbaikan di pantau, di dokumentasikan dan diinformasikan
Safety Alert
Ris
8.1.1.
Terdapat prosedur pelaporan bahaya yang berhubungan dengan K3 dan prosedur ini diketahui oleh pekerja
Anomaly box dan Safety Call Center
Project
8.2.1.
Terdapat prosedur yang terdokumentasi yang Proesdur Pelaporan Kecelakaan & Incident menjamin semua kejadian kecelakaan, PAK dan Ris Investigation kebakaran dicatat dan dilaporkan
KI/OHS-P/025 : Incident & illhealth procedure 100 Incident report (Accident & Nearmiss)
KI/FORM/OHS/025/069
101 List of Incident
102 Safety alert
KI/FORM/OHS/025/061
KI/OHS-P/026 : Incident investigation procedure 103 Incident investigation (Accident & Nearmiss)
KI/FORM/OHS/026/067
Cek apakah semua Accident sudah di investigasi
4.3. Tindakan Perbaikan dan Pencegahan
KI/OHS-P/027 : NC, CA & PA procedure
104 Non conformity request
KI/FORM/OHS/027/059
Setiap ketidaksesuaian yang bersumber dari : Temuan audit, khusus temuan Joint safety patrol, SSP, KIHQ Site Patrol setelah 2x kegiatan namun belum close, keluhan/ komplain pelangan/lingkungan/pegawai, hasil pemantauan/ pengukuran, pemenuhan undang-undang
105 Corrective Action request
KI/FORM/OHS/027/068
Setiap NCR dan Incident harus dibuatkan CAR. Khusus Nearmiss tidak perlukan kecuali terjadi kejadian yang sama 3x atau ada permintaan khusus
8.2.2.
106 Preventive Action
KI/FORM/OHS/027/070
Potensial NC saat audit atau berdasarkan evaluasi 3 bulanan terhadap ketidaksesuaian dan insiden yang potensial
8.4.1.
107 Register of NCR/CAR/PAR
KI/FORM/OHS/027/104
Buat Daftar NC, CAR dan PAR
8.4.2.
Terdapat prosedur untuk menangani masalah keselamatan dan kesehatan kerja yang timbul
Ris
7.1.6.
Pengusaha telah menetapkan tanggung jawab untuk melaksanakan tindakan perbaikan hasil pemeriksaan dan inspeksi
Prosedur Inspeksi dan Prosedur Investigasi Ris
10.1.1.
Pengurus telah mendokumentasikan dan menerapkan prosedur pelaksanaan identifikasi, pengumpulan, arsip, pemeliharaan, penyimpanan dan pengantian catatan K3
10.1.3.
Terdapat prosedur yang menentukan persyaratan untuk menjaga kerahasiaan catatan
NAH
Buat data lifetime unruk dokumen dan record
10.1.4.
Catatan kompensasi kecelakaan dan rehabilitasi kersehatan tenaga kerja dipelihara
ALL
Memudahkan pencarian dokumen
10.1.5.
4.5.4. Rekaman dan Pengelolaan Rekaman
3.2.5. Pencatatan dan Manajemen Informasi
KI/OHS-P/028 : Record control procedure 108 Record keeping
KI/FORM/OHS/028/062
109 Label of ordner, Catalog and list of content
Prosedur investigasi
4.5.5. Internal Audit
4.2. Audit SMK3
KI/OHS-P/029 : Internal audit procedure
10.2.1.
Data K3 terbaru dikumpulkan dan dianalisa
10.2.2.
Laporan rutin kinerja K3 dibuat dan disebarluaskan didalam tempat kerja
11.1.1.
Audit internal SMK3 yang terjadwal dilaksanakan untuk memeriksa kesesuaian Schedule Internal Audit perencanaan dan untuk menentukan efektivitas
Ris
11.1.2.
Audit Internal SMK3 dilakukan oleh Petugas yang independent, kompeten dan berwenang
Ris
Laporan Audit di distribusikan kepada pengusaha atau pengurus dan petugas lain yang berkepentingan dan dipantau untuk menjamin tindakan perbaikan
Laporan MRM
Training Internal Auditor SMK3
110 Annual internal audit program
KI/FORM/OHS/029/098
11.1.3.
111 Audit check list
KI/FORM/OHS/029/100
11.1.4.
112 Detail Audit plan
KI/FORM/OHS/029/099
RIS
113 Audit report
KI/FORM/OHS/029/102
RIS
114 Audit notes/ observation
KI/FORM/OHS/029/101
RIS
115 Internal Audit report
KI/FORM/OHS/029/102
116 Status of follow up action
KI/FORM/OHS/029/103
RIS Follow up dari Auditee, mana yg sudah close mana yang belum, up date sampai kamis 14/7, push semua proyek untuk mengirimkan closingnya
KI/OHS-P/030 : Management review procedure 117 Management Review Schedule KI/FORM/OHS/030/049
1.3.1
Tinjauan penerapan SMK3 yang meliputi Kebijakan, Perencanaan, Pelaksanaan, Pemantauan dan Evaluasi telah dilakukan, dicatat dan didokumentasikan
Laporan MRM 2013 (Desember) & MOM
1.3.2
Hasil tinjauan dimasukkan dalam perencanaan tindakan manajemen
Status MOM MRM 2013 (Desember) & Program K3 tahun 2014
1.3.3
Pengurus harus meninjau ulang pelaksanaan SMK3 secara berkala
Pelaksanaan MRM 2013 (Desember)
OHS MR OHS MR
119 Management Review Minutees Meeting 120 Attended list, invite letter, distribution list
RIS
5. TINJAUAN ULANG DAN PENINGKATAN BERKELANJUTAN OLEH PIHAK MANAJEMEN
4.6. TINJAUAN MANAJEMEN
118 Management Review Agenda
RIS
OHS MR Distribution list MRM dan Minutess
OHS MR
STATUS
KI/FORM/OHS/029/100
Rev. 0
OHSAS 18001 : 2007 RECORD & IMPLEMENTATION for PREPARATION AUDIT OHSAS PROJECT : SAFETY DEPARTMENT RECORD NO DESCRIPTION FORM OTHER EVIDANCE/ REMARK Clause 4.2. OHS Policy OHS Policy 1
Communication and sosialization of KI OHS Policy (invite letter, minutes meeting, attendance list, distribution list)
Bukti sosialisasi OHS Policy KI dalam Materi Induction dan Induction form Tertulis Dalam TBM, Safety Campaign atau Safety Talk report
Clause 4.3. Planning 4.3.1. Hiradc KI/OHS-P/002 : Hiradc procedure 3
Develop of HIRADC document
KI/FORM/OHS/002/041
Up date, disesuaikan dengan kondisi terkini, spt Kumkang, area CABANA, CAFETARIA harus masuk, Pindahan Site Office ke Carpark, cek semua item termasuk Bising, komplain, las dll Jangan lupa tanda tangan
4
JSA
5
Involvement evidence all element to make hazard identification (attendante list)
6
HIRADC Monitoring of evectiveness (all location)
7
HIRADC revision evidenced (min. every there is insident )
KI/FORM/OHS/WI/114
Pasang JSA pada setiap lantai, lokasi kerja, workshop, gudang Daftar hadir peserta dalam pembuatan dan Revisi Hiradc (Setiap revisi ada Daftar Hadirnya) Bukti bahwa hiradc selalu ditinjau setelah terjadi insident, apabila item insiden belum ada didalam Hiradc, maka Hiradc harus di revisi (Rev. 1 tgl. 12 November 2010- Pin loncat ke bibir) Semua kecelakaan tahun 2010 dan 2011 dipastikan teridentifikasi/ ada dalam HIRADC dan accident tgl. 12 Nov karena merevisi HIRADC agar diberi tanda bintang (menandakan item tersebut yang merevisi HIRADC) Revisi hiradc tidak otomatis merevisi Safety Plan, HIRADCnya aja yang direvisi, Safety Plan tidak usah, hanya tolong di tandatangani semua dan distempel MASTER
4.3.2. Legal and Others Document / 4.5.2. Evaluation of Compliance KI/OHS-P/003 : Legal & other requirement procedure 8 To make acces list to regulation publisher KI/FORM/OHS/003/028 Hotel 9 Acces evidence to regulation publisher KI/FORM/OHS/003/029 Hotel 10 Regulation List (applicable only) KI/FORM/OHS/003/030 Hotel 4.3.3. Objective & Programme(s) KI/OHS-P/004 : Objective & programme(s) procedure 11 Project Objective and target 12 Section Objective and target 13 Monitoring of objective and target
KI/FORM/OHS/004/056 KI/FORM/OHS/004/056 KI/FORM/OHS/004/057
Objective 2012 dan Monitoringnya
Back Up data Objective disipakan / bukti2 Monitoring Objective ( Performance, pemantauan UUD dll) 14 OHS Program & monitoring
KI/FORM/OHS/004/058
Daily work cycle, monthly even & actualnya Daftar inventaris alat angkat dan angkut untuk inspeksi color coding
Clause 4.4. Implementation & Operation 4.4.1. Resources, Roles, Responsibility, Accountability and Authority 16 Certifcate Unit K3 Proyek (Safety Committee)
sertifikat Unit K3/ Safety Committee proyek dari P2K3 head Office Bukti rapat Safety Committee (Und, Daftar Hadir, MOM dan distribusi MOM
RESPONSIBILITY
STATUS
NO
RECORD
DESCRIPTION
FORM
OTHER EVIDANCE/ REMARK
4.4.2. Competence, Training and Awareness KI/OHS-P/005 : Training procedure 46 47 48
Lightning protection/ Penangkal petir Temporary electrical Temporary Grounding test untuk Genset dll Gap analisys & competence (training need 20 KI/FORM/OHS/005/063 identification) Training matrix (job description and risk identification 21 KI/FORM/OHS/005/064 based) 22 Training program and realization KI/FORM/OHS/005/065
Sertifikat dari Depnakertrans/ Uji Internal BA pemeriksaan oleh Pak Waringin BA pemeriksaan oleh Pak Waringin
Program HO Program HO Program HO
Buat realisasi Training program (Campaign, TBM dll) 23 Training evaluation
KI/FORM/OHS/005/066
HO
PERSONAL COMPETENCY 24
Safety Expert (Ahli K3)
25
Electrical Safety License
26
Scaffolder competency
28
Rigger & Lifting Competency
29
First Aider Competency
30
Fire Fighting Competency
31 32
Safety Awareness Auditors competency (Certificate Internal Auditor)
Buat daftar Competence employee
4.4.3. Communication, participation and Consultation KI/OHS-P/006 : Communication, participation and Consultation procedure 49 Safety Performance Board
Up date safety performance board (visual)
50 Safety Information board
Up date safety information board (visual) Untuk induction visitor, ada lembar yang harus diberikan kepada visitor oleh Security ketika akan masuk proyek - Up Date Induction Visitor Daftar induction Pegawai, DW, subkont dan pekerja Visual sesuai persyaratan dan kebutuhan dilapangan Daftar frequency HT
51 Safety induction (new employees & visitors)
KI/FORM/OHS/006//060
52 Evidance of Safety induction 53 Signage, Poster, banner (BSI Standard)
KI/OHS-WI/029
54 HT Code of frequency 55 P2K3/ Safety committee report to Depnakertrans 56 Communication list of emergency bodies concerning
KI/FORM/OHS/018//023
57 Bukti-Bukti Partisipasi
Laporan Unit K3 ke P2K3 KIHQ Bukti koordinasi ke Dinas PMK, PMI, Kepolisian dll (Lihat di MRM) Partisipasi dalam Pembuatan dan revisi HIRADC (Daftar hadir)
58 59 Bukti-Bukti Konsultasi
Konsultasi ke Badan pengukuran, Dinas Pemadam kebakaran, Badan sertifikasi, Konsultan, Depnaker dll (lihat MRM)
4.4.6. Operation Control KI/OHS-P/008 : project safety plan procedure 62 Project Safety Plan
Sudah di approved oleh PM (TTD)-Revisi Terakhir DI copy 2x untuk Safety Dept dan PM (pake bukti kirim) dan di stempel CONTROLLED COPY Plan rest area, plan rambu dll masukkan dalam safety plan Plan pengukuran internal, plan inspeksi, plan pemeriksaan kesehatan, plan pengukuran eksternal masukkan juga
KI/OHS-P/009 : Safety aspects in the project planning phase procedure KI/FORM/OHS/009//094 Up date (Major subcont only) 64 Planning phase checklist KI/FORM/OHS/009//095 Up date (Major subcont only) 65 Verifikasi form of safety aspect in planning phase KI/FORM/OHS/009//096 Up date (Major subcont only) 66 Preliminary risk assesment-Planning phase KI/FORM/OHS/009//097 Up date (Major subcont only) 63 List of input document planning phase
RESPONSIBILITY
STATUS
NO
RECORD
DESCRIPTION
FORM
OTHER EVIDANCE/ REMARK
KI/OHS-P/010 : Purchasing procedure
67 Subcontractors questioner
KI/FORM/OHS/010//042
Questionnaire yang sudah di isi oleh Subkont didata dan dibuat list sesuai form KI/FORM/ OHS-WI/122 (monitoring status of PQ subcontractors) -PROSENTASE SESUAI MRM
73 Safey plan subcontractor
KI/FORM/OHS/011//047
Sesuai list subcont
74 Vendor monitoring
KI/FORM/OHS/011//048
Bulanan, TTD Safety dan Logistik
KI/OHS-P/011 : Control of subcontractors procedure 72 Kick of meeting of subcontractors
KI/FORM/OHS/011//046
Buat BA Kick off meeting, sesuai jumlah subkont
73 Safey plan subcontractor
KI/FORM/OHS/011//047
74 Vendor monitoring
KI/FORM/OHS/011//048
Subcont Major harus membuat Safety Plan Buat Vendor monitoring 6 bulan kebelakang sesuai dengan Daftar Subkont
KI/FORM/OHS/WI/121
Buat Monitoring status of subcontractor
77 General Working permit
KI/FORM/OHS/013//071
Work permit dibuat setiap senin oleh Subkont dan Spv, work permit asli disimpan oleh Subkont/ Spv, copi di tempel di papan work permit dan disimpan oleh Safety Department, Khusus Hot Work harian
78 Hot Work permit
KI/FORM/OHS/013//072
Pekerjaan pengelasan dan gurinda HARIAN
79 Work at heigh permit
KI/FORM/OHS/013//073
Bekrja diketinggian >2m
80 Excavation work permit
KI/FORM/OHS/013//074
Galian >4m
81 Confined Space permit
KI/FORM/OHS/013//075
82 Electrical / LOTO Permit
KI/FORM/OHS/013//093
STP, GWT dan Storage tank - Pasang dilokasi Pengambilan power dari main sourch (PLN atau Genset ke panel)
KI/OHS-P/013 : Working permit procedure
KI/OHS-P/014 : Lock out Tag out procedure 83 LOTO inspection
KI/FORM/OHS/014/078
Bulanan Pada panel terpasang kunci/ gembok, Rambu listrik dan Tagging Personil Autority Gudang pasang Tagging LOTO dan terkunci Ruang lainnya harus terpasang tagging LOTO
KI/FORM/OHS/015/077
Program house keeping area proyek
84 Tag / symbol
KI/OHS-P/015 : Housekeeping procedure Gudang / Genset Gudang eks. Kantin/ Mess
KI/OHS-P/016 : Health & hygiene procedure 87 Health & Hygiene facilities program
KI/FORM/OHS/016/088
89 Check list kantin
KI/FORM/OHS/016/090
KI/OHS-P/017 : PPE procedure 92 PPE Standard
KI/FORM/OHS/017/044
Mock up PPE Board diperbaiki, yang rusak ganti
93 PPE Matrix
KI/FORM/OHS/017/045
Pasang PPE matrix di Board
98 PPE Inventory
KI/FORM/OHS/017/046
Buat inventory PPE (in Out Stok)
Data PPE
KI/OHS-P/018 : Safety meeting procedure 94 Project Safety Committee Minutes Meeting
KI/FORM/OHS/018/024
95 Weekly Safety Meeting
KI/FORM/OHS/018/025
Minutees Dilengkapi dengan surat undangan, daftar hadir dan lembar distribusi Minutes Dilengkapi dengan surat undangan, daftar hadir dan lembar distribusi
KI/OHS-P/019 : Safety promotion procedure 96 TBM report
KI/FORM/OHS/019/031
Setiap hari
97 Safety Talk report
KI/FORM/OHS/019/032
Mingguan
98 Safety campaign report
Safety campaign documentation
99 Best employee assesment form
KI/FORM/OHS/019/033
100 House keeping assesment report
KI/FORM/OHS/019/034
101 Anomally form
KI/FORM/OHS/019/035
102 Safety violation
KI/FORM/OHS/019/036
Documentation
Data Tilang
RESPONSIBILITY
STATUS
NO
RECORD
DESCRIPTION
FORM
OTHER EVIDANCE/ REMARK
KI/OHS-P/020 : Safety inspection procedure 103 Daily safety patrol
KI/FORM/OHS/WI/115
Setiap hari
104 Joint (Weekly) safety patrol
KI/FORM/OHS/020/001
Mingguan
105 KI-HQ site patrol
KI/FORM/OHS/020/003
Bulanan
106 SSP report
KI/FORM/OHS/020/004
Bulanan
107 Pre-Use check list EQUIPMENT & SCAFFOLD
Equipment Inspection Monyhly Schecule
108 DAFTAR ALAT YANG DI COLOR CODING
Bulanan
123 INSPEKSI PPE
KI/FORM/OHS/020/020
Mingguan (Setiap Safety Talk)
124 First aid box
KI/FORM/OHS/020/021
Mingguan
125 First aid equipment
KI/FORM/OHS/020/022
Bulanan
132 Loading test TC
BA dengan Depnakertrans dan Internal
133 Loading Test PH
BA dengan Depnakertrans
135 Arde / grounding test penangkal petir & Genset
ME Pasang hasil pengukuran penerangan, bising dan Gas, Suhu, kelembababan di Site Office, Basement (pintu masuk), dan area lain yang sesuai (Workshop Taiyo)
136 Pengukuran fisik
Clause 4.5. Checking 4.5.1. Performance, Measurement and Monitoring KI/OHS-P/022 : Measurement, monitoring and calibration procedure 155 Safety performance
KI/FORM/OHS/022/053 Papan Safety Performance di up date Safety On Duty di buat dan pasang
169 Monthly Activity report
KI/FORM/OHS/WI/107
170 Safety activity report
KI/FORM/OHS/WI/111
171 Report to KOA 172 Daily report
KI/FORM/OHS/WI/117 KI/FORM/OHS/WI/108
Laporan bulanan safety department ke OHS Section HO Laporan bulanan safety department ke OHS Section HO
Log Book Monitoring Measurement Program pengukuran external provider 181 Data pemeriksaan kesehatan internal
Oleh Paramedic proyek (tensi dan fisik) Program dan Schedule dan Data pemeriksaan fisik (%)
KI/OHS-P/024 : Evaluation of compliance procedure 182 Monitoring of Regulation (percentage of comply)
KI/FORM/OHS/024/038
Monitoring 2012
183 Statistic data
KI/FORM/OHS/024/052
Data statistik incident, Percentage Comply dll
4.5.3. Incident investigation, NC, CA & PA. KI/OHS-P/025 : Incident & illhealth procedure 184 Incident report (Accident & Nearmiss)
KI/FORM/OHS/025/069
Pastikan semua incident ada report, investigasi, CAR dan Alert. Dan kolom tanda tangan semua sudah terisi (tidak boleh ada Tandatangan yang terlewat
KI/FORM/OHS/025/061
Buat alert semua incident
185 List of Incident 186 Safety alert
KI/OHS-P/026 : Incident investigation procedure 187 Incident investigation (Accident & Nearmiss)
KI/FORM/OHS/026/067
buat investigasi semua incident
KI/FORM/OHS/027/059
Setiap ketidaksesuaian yang bersumber dari : khusus temuan Joint safety patrol, SSP, KIHQ Site Patrol setelah 2x kegiatan namun belum close, keluhan/ komplain pelangan/lingkungan/pegawai, hasil pemantauan/ pengukuran, pemenuhan undang-undang, atau dari hasil inspeksi Rinto
KI/OHS-P/027 : NC, CA & PA procedure
188 Non conformity request
Buat NC pada Komplain
RESPONSIBILITY
STATUS
NO
DESCRIPTION
189 Corrective Action request
RECORD FORM KI/FORM/OHS/027/068
OTHER EVIDANCE/ REMARK Setiap NCR dan Incident harus dibuatkan CAR. Khusus Nearmiss tidak perlukan kecuali terjadi kejadian yang sama 3x atau ada permintaan khusus CAR internal audit
SITE IMPLEMENTATION CONTROL KANTIN DAN MESS Siapkan Berita Acara test perlengkapan Emergency Mess (PT. SUA)
Emergency lamp, sirine, hydrant
Daftar perlengkapan Emergency Mess
Buat daftarnya, jumlah dan penempatan dmn (tanya SUA)
Buat program pemeriksaan (check list) perlengkapan emergency Mess
yang melakukan ceklist security
Cek list Mingguan Emergency lamp, Cek list APAR, Hydrant, Tandu, Mobil Operasional
Buat semua ceklist selama 2011, cek list keberadaaan Mobil Operasional dengan menghubungi FASO (setiap hari siapa driver dan mobil apa)
BA Evakuasi Mess (Minimal buat Program Evakuasi Drill Mess) Pasang rambu yang sesuai di Mess Tim Tangap darurat Mess di Up date
BA Drill kebakaran (pernah dulu) Pastikan coordinator mengerti tugasnya dan ada Job desc tertulis Organisasi TTD dipasang Emegrecy Flowchat terpasang Rambu-rambu peringatan Flowchart kebakaran Flowchart kecelakaan Flowchart Sakit
APD UMUM 195 196 197 198 199 200 201 202 203 204
Helmet Safety Belt Safety shoes/ safety Boot/ Sepatu kerja Masker Ear Plug/ Ear Muff Masker respirator Masker Las sarung tangan las Celemek las/ apron sarung tangan CONTROL SESUAI DENGAN WORK INSTRUCTION (30 WI)
lengkap dengan tali dagu
Hampir seluruh pekerjaan, fasilitas safety dan peraturan proyek terkait safety di site diatur oleh Work Instruction, bandingkan WI dengan Implementasi di lapangan
List of WI : 1
Working in the project
2
Office safety
3
Pemakaian safety belt
4
Standard Panel
5
Crane, lifting and rigging
Safety Induction Visitor di gate Site Office, DAN Safety Induction Visistor di Gate 2 Proyek, APD Auditor Kabel-kabel, Material tidak terpakai, material B3 (diberi label nama bahan / symbol Beracun), kebersihan kamar toilet (cek list), halaman, tempat sampah, dapur, tabung gas (cek list) MINOR OT 3 : Semua akses masuk ke Tower pasang rambu Safety Belt, Semua pekerja di lantai atas area Carpark, Tower C dan D harus pakai dan mencantolkan Safety Belt Buat label SWL lifeline untuk Safety Belt Rambu listrik, LOTO dan label tagging Authority Inventaris Lifting material, Daftar Equipment /SILO/SIO
RESPONSIBILITY
STATUS
NO
6
DESCRIPTION
Generator set
RECORD FORM
OTHER EVIDANCE/ REMARK Ruang genset di gembok, Ada Authority personil, rambu Earplug, Mudah terbakar, laranga merokok dan menyalakan api, Monitoring Measurement, ada Spillage Kit (drum kecil berisi pasir) sekop dan Kotak APD (earmuff, sarung tangan lateks, masker)
RESPONSIBILITY
STATUS
NO
DESCRIPTION
7
Excavator
8
Pengelasan/ welding
9 10 11 12 13 14 15
Cara pakai Safety Harness Cara pakai Masker resporator Loading and unloading Fire handling Oil trap design cara pakai Ear plug Gondola
16 Concrette work 17 Oil and fuel spil handling 18 Hazardous material
RECORD FORM
OTHER EVIDANCE/ REMARK MINOR OT3 : SWL Alat berat, SIO dan SILO MINOR di OT3 : Tidak boleh jadi temuan lagi, Semua pengelasan harus menggunakan Blanket/ Karung basah, tidak boleh ada bunga api/ spark jatuh, pekerja menggunakan APD Las lengkap, ada Rambu Sedang ada Pengelasan dan Baricade area pengelasan, tidak boleh ada bahan mudah terbakar dalam radius 10m. Bila dimungkinkan, ketika audit jgn ada aktivitas Las dan Gurinda dan pasang JSA Pekerja yang cor kolom harus pakai Harness
Oil Trap yang sudah penuh agar dibersihkan Pekerja pengecoran harus pakai APD lengkap (kacamata, masker) Fuel tank dipasang rambu, MSDS dan JSA / WI Pisahkan material B3 dalam gudang ke area khusus, pasang label, simbol beracun dan MSDS
19 Confined space 20 Working at height 21 Gas tube handling 22 Rebar bending and cutting operation 23 24 25 26
MINOR OT3 : Semua tabung gas harus pakai CUP, terikat, berdiri, ada Flashback arestor, tersedia air sabun untuk inspeksi selang Pasang Rambu wajib, JSA dan Poster2, Safety Alert bending accident di OT3
Waste handling manual handling Bore Pilling Site security
27 Keselamatan kerja pada saat hujan
Anemometer harus ada dilapangan dan ada Log Book hasil pengukuran Anemometer tiap hari (tulis dalam Daily Patrol)
28 Material handling and storage
Storage di workshop site office kondisi parah, berantakan = dirapikan sesuai material, beri nama material, JSA, Rambu, Sampah dibuang dll
Pemasangan bendera, signboard, rambu, simbol, poster 30 Scaffolding 29
31 APAR 32 33 34 35
Rangka Baja sarana Proteksi Tower Crane Steger
Cek list APAR di cek semua apakah sudah, termasuk yang di HO dan HOTEL
RESPONSIBILITY
STATUS
KI/FORM/OHS/029/100
Rev. 0
OHSAS 18001 : 2007 RECORD & IMPLEMENTATION / AUDIT CHECK LIST PROJECT : EMERGENCY RESPONSE TEAM RECORD NO DESCRIPTION FORM OTHER EVIDANCE/ REMARK KI/OHS-P/021 : Emergency preparedness & response procedure 136 137 138 139
Emergency response plan ER Organization chart & responsibility Emergency drill program Flow chart emergency response
KI/FORM/OHS/021/079 KI/FORM/OHS/021/080 KI/FORM/OHS/021/081
140 Communication list of emergency bodies
KI/FORM/OHS/021/082
141 142 143 144 145 146
KI/FORM/OHS/021/083 KI/FORM/OHS/021/084 KI/FORM/OHS/021/085 KI/FORM/OHS/021/086 KI/FORM/OHS/021/087
List of emergency facility Emergency minutees drill Emergency response handled report Emergency evaluation Emergency facility check list Refill programmes of Fire extinguisher Pemasangan Emergency Lamp pada jalur exit di site 147 office dan project 148 To make Assembly Poin at Site Office and Project 149 To make emergency signage
Daftar komunikasi / koordinasi ke badan terkait emergency ( Fire Brigade, kepolisian dll) Daftar perlengkapan emergency Bila sudah melakukan emergency drill
Visual dan mapping Visual Visual (panah evakuasi menuju Assembly Point)
150
Put of the Fire Extinguisher, comply to regulation (1:200m2 atau distance 1:15m)
Visual, persyaratannya : Tinggi atas 120cm atau
151
Monthly/6th Month/ Annual checklist of Fire Extinguisher
Check list bulanan, 6 bulanan dan tahunan APAR
152 Safetyman first aid basket 153 First Aid Bag Check list kelengkapan Tas Besar First Aid / Medpack 154 cek list Evacuation Map Site Office Evacuation Map Site Project Daftar No telepon Penting Organisasi ERT dan No telepon Lokasi penempatan APAR Lokasi P3K Security Pegang data jumlah tenaga kerja setiap hari, 155 Time Keeper setiap hari memberikan data jumlah tenaga kerja kepada Security Gate 2
Visual Safetyman membawa tas pinggang berisi First Aid Visual Tas Besar berisi perlengkapan First Aid Bulanan
Pasang di tempat strategis Pasang di tempat strategis Pasang di tempat strategis Pasang di tempat strategis
RESPONSIBILITY
STATUS
KI/FORM/OHS/029/100
Rev. 0
OHSAS 18001 : 2007 RECORD & IMPLEMENTATION / AUDIT CHECK LIST PROJECT : DOCUMENT CONTROL RECORD NO DESCRIPTION FORM OTHER EVIDANCE/ REMARK 4.3.2. Legal and Others Document / 4.5.2. Evaluation of Compliance KI/OHS-P/003 : Legal & other requirement procedure 8 To make acces list to regulation publisher KI/FORM/OHS/003/028 ada dalam MRM ada dalam MRM, buat data jadwal 9 Acces evidence to regulation publisher KI/FORM/OHS/003/029 menelpon/ menghubungi 10 Regulation List (applicable only) KI/FORM/OHS/003/030 Tambahkan Permen baru No. 8 dan 9 4.4.4. Documentation 4.4.5. Control of Documentation KI/OHS-P/007 : Control of document 60 Document masterlist - controller KI/FORM/OHS/007//039 Distribution list of Document (Manual, Prosedur, Work 61 KI/FORM/OHS/007//040 Instruction)
List of Document Senayan Apartment Distribution list, buat stempel Control Copy Distribusikan dokumen sesuai distribution list, buat bukti kirim Beri sekat pada dokumen, buat daftar isi dan katalog dokumen
4.5.4. Control of Record KI/OHS-P/028 : Record control procedure 192 Record keeping 193 Label of ordner, Catalog and list of content Buat bukti kirim Safety Plan ke PM, CM/SM, Chief Spv, Logistic dan FASO
KI/FORM/OHS/028/062
Buat data expired dokumen pada label (lihat prosedur No. 28) buat label ordner dan katalog dokumen Safety Plan harus sudah di stempel Master, Copy Safety Plan distempel Control Copy
RESPONSIBILITY
STATUS
KI/FORM/OHS/029/100
Rev. 0
OHSAS 18001 : 2007 RECORD & IMPLEMENTATION / AUDIT CHECK LIST PROJECT : ADMINISTRASI NO
RECORD
DESCRIPTION
RESPONSIBILITY
FORM
OTHER EVIDANCE/ REMARK
Clause 4.2. OHS Policy OHS Policy 2
Memasang OHS Policy dengan bingkai ditempat strategis (ruang tamu, ruang rapat), juga sebagai informasi kepada publik (salah satu syarat dalam policy)
Put Policy at strategic place (Meeting room, Visitor room etc)
Clause 4.4. Implementation & Operation 4.4.1. Resources, Roles, Responsibility, Accountability and Authority Struktur organisasi proyek & struktur organisasi safety dept. ditempel di tempat strategis
15 Organization chart Establishment/ Duty letter to safety employees (Safety 17 committee members, safety section/ department, emergency respons team) Job description (Roles, responsility, accountability and 18 authority) for all employees Communication Evidences of job description to all 19 employees
Surat tugas kepada personil safety dan ERT Job description semua personil proyek (terutama personil safety dan emergency respons) Bukti bahwa Job desc sudah dikomunikasikan kepada personil ybs
KI/OHS-P/015 : Housekeeping procedure 85 House keeping inspection (site office)
KI/FORM/OHS/015/076
House keeping area site office
86 House keeping program
KI/FORM/OHS/015/077
Program house keeping area kantor
KI/OHS-P/016 : Health & hygiene procedure 88 Check list Toilet
KI/FORM/OHS/016/089
90 Check List Working room
KI/FORM/OHS/016/091
91 Check List Mess & Canteen
KI/FORM/OHS/016/092
Clause 4.5. Checking 4.5.1. Performance, Measurement and Monitoring KI/OHS-P/022 : Measurement, monitoring and calibration procedure 156 Measurement & Monitoring workplace program
KI/FORM/OHS/022/054
Dalam Program pengukuran faktor fisik, kimia dan biologi tahun 2012 external
157 Analysis of measurement result
KI/FORM/OHS/022/055
Analisa dan rekomendasi
158 Data of calibration measurement equipment
Data kalibrasi alat ukur internal maupun external Buat program / schedule kalibrasi alat ukur external, rencanakan bulan Pebruari 2011 untuk yang belum ada kalibrasi dari pabrik, yang sudah ada dari external dan dari pabrik skedulkan untuk di kalibrasi ulang sesuai tgl expired
STATUS
NO
RECORD
DESCRIPTION
RESPONSIBILITY
FORM
159 External Measurements : Underground water quality(color, smell, metal 160 concentrate, bactery colony) Dringking water quality (Certificate from distributor is 161 available) Waste domestic water quality (BOD, COD, pH, 162 temperatute) 163 workplace temperature 164 Lumen/ lighting meausrement 165 Dust concentrate 166 Workplace Humidity 167 Noise 168 Vibration
OTHER EVIDANCE/ REMARK Badan external : Pusat Hiperkes, BBTKL&PPM
KI/OHS-P/023 : Medical check up procedure 174 Medical check up program
175
Disease history interview for new employee and workers
176 Surat keterangan sehat dari dokter untuk Staff baru Surat keterangan sehat dari dokter untuk Daily 177 Worker baru 178 Medical record hasil MCU 179 Rekomendasi hasil MCU
KI/FORM/OHS/023/050
Program Apartment (10o sampai akhir tahun, actual sampai dgn Juli sesuai kondisi setelah MCU) Arif dan HO dibuat terpisah (HO 20% dari total all employees)
KI/FORM/OHS/023/051
Buat data, olah data Buat data, olah data Update actual Update actual
180 Data pemeriksaan kesehatan Jamsostek
CONTROL SESUAI DENGAN WORK INSTRUCTION (34 WI)
1 2 3 4 5 6 7
List of WI : kebersihan dan kerapihan kantor Site Office, kantin dan Mess Tidak ada material B3 ditempatkan di dalam kantor Material B3 diberi label dan MSDS Kabel listrik terikat rapi Tidak ada penggunaan kabel roll Tidak ada penggunaan steker bertumpuk Tidak ada material dan alat kantor yang menghalangi jalan keluar / akses bebas dari material
8
APAR terlihat jelas Tempat sampah tertutup dan ada rambu : jagalah kebersihan, buang sampah pada tempatnya 10 Ratio Toilet sesuai peraturan 1:20 maks. Alat rusak diberi label "Rusak atau Dalam Perbaikan" 11 9
12 Tidak ada bau menyengat dari toilet 13 Dapur bersih, makanan tersimpan dalam lemari Tidak terlihat ada lalat pada tempat sampah di dapur 14 15 16 17 18 19
Tidak ada makanan/ minuman kemasan yang kadaluarsa didalam Kulkas, tidak ada obat-0batan Tidak ada obat-obatan disimpan didalam kulkas berdekatan dengan makanan yang sudah terbuka Puntung-puntung rokok tidak ada di halaman dan area sekitar smoking area Penggunaan Kompor elpiji diyakinkan aman, periksa apakah selang masih baik atau tidak ada keretakan, bau gas dll Regulator elpiji harus menggunakan regulator SNI
Hampir seluruh pekerjaan, fasilitas safety dan peraturan proyek terkait safety di site diatur oleh Work Instruction, bandingkan WI dengan Implementasi di lapangan Kantor Site Office Carpark Umpetin aja sementara
STATUS
KI/FORM/OHS/029/100
Rev. 0
OHSAS 18001 : 2007 RECORD & IMPLEMENTATION / AUDIT CHECK LIST PROJECT : PROCUREMENT/ LOGISTIC NO
RECORD
DESCRIPTION FORM
OTHER EVIDANCE/ REMARK
KI/OHS-P/010 : Purchasing procedure
67 Subcontractors questioner
69
KI/FORM/OHS/010//042
Questionnaire yang sudah di isi oleh Subkont didata dan dibuat list sesuai form KI/FORM/ OHS-WI/122 (monitoring status of PQ subcontractors) Semua PO/WO harus ada lampiran persyaratan safety (kalau nanti diminta sama Auditor, pastikan ada lampirannya)
Clauses of safety requirement in vendor contracts (in Work Order and PO) KI/OHS-P/011 : Control of subcontractors procedure
Buat coretan pada comparison, bahwa persyaratan safety (antara lain sudah menyerahkan questionaire, alat ada SILO, operator ber SIO dll) menjadi pertimbangan, bila comparison di minta oleh Auditor Buat 2 daftar subkont, daftar subkont under Kajima (yang major aja) dan Subkont under STS (NSC)
70 Vendor determination check list
KI/OHS-P/012 : Operational, maintenance & service of equipment procedure 75 Maintenance schedule
KI/FORM/OHS/012//037
Jawab, alat yang ada kita sewa semua, kita tidak urus maintenance, kita taunya kalo rusak, vendor harus ganti
KI/FORM-OHS/WI/120
Buat Daftar Alat Berat sesuai form List of Heavy equipment (KI/FORM-OHS/WI/120, semua sertifikat alat belum di Riksa Ulang, akan dibuat sendiri (stempel buat) Koordinasi dengan Nur Agus Haryadi (NAH)
SITE IMPLEMENTATION CONTROL (VISUAL) 1 House keeping gudang
Gudang di lapangan di rapikan, pasang label nama material sesuai penempatannya Pisahkan material B3 (beracun dan Berbahaya) pada lokasi terpisah, pasang simbol B3, rambu peringatan, MSDS, sediakan APD (Masker, sarung tangan) Pastikan kaleng, dirigen, botol aqua yang digunakan untuk menaruh material cair telah diberi label nama material Tabung Gas yang tidak digunakan harus terikat, berdiri, ada CUP, ada label nama material Semen dan mortar ditumpuk rapi Material tidak terpakai disingkirkan Menaruh material yang berat dibawah dan yang ringan diatas, pasang rambu instruksi ini
RESPONSIBILITY
STATUS
NO
RECORD
DESCRIPTION FORM
OTHER EVIDANCE/ REMARK
Instalasi listrik di gudang (dilarang 2 menggunakan kabel roll, steker bertumpuk, sambungan kabel tidak aman dll) Pengaturang barang di dalam gudang, tumpukan tidak terlalu tinggi, poster manual 3 handling, larangan merokok dalam gudang, sistem FIFO (First in first out) MSDS tertempel dekat material B3 (Beracun 4 dan berbahaya) 5 Material B3 diberi label nama material 6
Pengadaan CUP untuk tabung Oxygent, Accyteline dan LPG
Dirijen dan botol untuk digunakan menempatkan material diberi label nama barang
7 Fuel Tank diberi label nama : Solar / bensin 8
Penempatan material B3 terpisah dengan material lain
9 Tersedia APAR pada penempatan material B3 10
Fuel tank dan Genset menggunakan Oil Trap (Perangkap tumpahan solar dan oli)
Oil Trap dibersihkan
11 Genset terpasang Grounding dan alarm
Harus Sudah di inspeksi oleh Pak Waringin
12 Cover Pedal bar bending/ Cutting
Pasang Cover Pedal Ditutup penuh, tidak ada akses dari Smoking area, bilang itu adalah area Taiyo Sinar (NSC) sampah dibuang, dirapikan
13 Lokasi Gudang & Genset 14 Penampungan sampah depan Taiyo
RESPONSIBILITY
STATUS
KI/FORM/OHS/029/100
Rev. 0
OHSAS 18001 : 2007 RECORD & IMPLEMENTATION / AUDIT CHECK LIST PROJECT : SUPERVISOR NO
RECORD
DESCRIPTION
RESPONSIBILITY
FORM
OTHER EVIDANCE/ REMARK
KI/OHS-P/013 : Working permit procedure 77 General Working permit
KI/FORM/OHS/013//071
Semua working permit harus sudah di tanda tangani dan semua harus OK / Approved
78 Hot Work permit
KI/FORM/OHS/013//072
Pekerjaan pengelasan dan gurinda
79 Work at heigh permit
KI/FORM/OHS/013//073
Bekerja diketinggian >2m
80 Excavation work permit
KI/FORM/OHS/013//074
Galian >4m
81 Confined Space permit
KI/FORM/OHS/013//075
STP, GWT dan Storage tank
82 Electrical / LOTO Permit
KI/FORM/OHS/013//093
Pengambilan power dari main sourch (PLN atau Genset ke panel)
VISUAL CONTROL LAIN-LAIN Proteksi tehadap jatuh dari ketinggian 1
Proteksi terhadap benda jatuh 2 3
Proteksi terhadap lubang / void Proteksi manuver alat berat
4 Proteksi area galian dan lubang galian 5 6 7 8
Proteksi pintu lift Proteksi tepi lantai perimeter Proteksi benda terhadap tajam
9 Proteksi akses orang dan pekerja 10 Smoking / Smoking area 11 Rest Area
Railling perimeter, handrailling harus rapat, Climbing corewall dalam kondisi baik, bila sedang install , dipastikan ada Tagging dilarang naik ke corewall dan akses di baricadde merah putih Area dibawah terminal material dipastikan dibaricade, dipasang rambu "Awas ada pekerjaan diatas" Semua lubang harus tertutup, cat kuning hitam Semua stek lantai dan pen support struktur harus di cover dengan selang, pasang rambu awal Pen sejajar mata Semua Area galian harus di baricade dengan pipa dan ditutup dengan terpal, pasang rambu : awas lubang galian, awas longsor Area yang licin pasang rambu Awas Licin Semua handrail harus double pipa Semua tangga harus standard, tangga yang tidak standard harus dibongkar Scaffolding harus ada Tagging status
KI/FORM/OHS/029/100 Rev. 0
SMK3 & OHSAS 18001 : 2007 RECORD & IMPLEMENTATION / AUDIT CHECK LIST HEAD OFFICE - ALL SECTION NO
OHSAS 18001:2007
AKUNTABILITAS OHSAS
FORM
4.2. KEBIJAKAN K3
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN PENJELASAN KRITERIA
AKUNTABILITAS SMK3
RESPONSIBILITY
STATUS
1. KOMITMEN DAN KEBIJAKAN 1.1. Kepemimpinan dan Komitmen
1 2
3
Communication and sosialization of KI OHS Policy (invite letter, minutes meeting, attendance list, distribution list) Put Policy at strategic place (Meeting room, Visitor room etc) Management Commitment
1.2. Tinjauan Awal K3 1.3. Kebijakan K3
Terdapat Kebijakan K3 yang tertulis, bertanggal, di TTD Presdir Daftar Hadir Pembuatan dan Review di MRM (Termasuk Wakil Tenaga Kerja : Yefrihendi dan Anang P. pada saat pertama dibuat dan setiap MRM) Memasang Policy di Ruang Tamu dan Proyek Membuat Kebijakan mengenai Lingkungan, Drug dan Alcohol
1.1.1.
OHS Policy
Daftar Hadir MRM/ pembuatan Policy
1.1.2.
Daftar Hadir MRM/ pembuatan Policy
Komunikasi Policy
1.1.3.
Komunikasi Policy
Kebijakan Khusus
1.1.4.
Kebijakan Khusus
Review Policy
1.1.5.
Review Policy
Materi MRM dan Daftar Hadir MRM (masukin nama Yefrihendi dan Anang pada RIS setiap daftar hadir MRM)
OK
2.1.1.
Ada prosedur HIRADC
Prosedur HIRADC
GP
OK
Petugas kompeten telah membuat HIRADC RIS
OK
Hirarchi Pengendalian dalam HIRADC (Revisi HIRADC dengan memasukkan metode control : Eliminasi, Substitusi, EC, Rambu/ Adm, APD)
RIS
NOK
OHS Policy
4.3. PERENCANAAN
2. PERENCENAAN
4.3.1. Identifikasi Bahaya, Penilaian Risiko dan Penetapan Pengendalian
2.1. Perencanaan Identifikasi Bahaya, Penilaian dan pengendalian Resiko
KI/OHS-P/002 : HIRADC Procedure
6.1.1. Sistem Kerja
GP
OK
RIS
OK
RIS
OK
GP
NOK
3
Develop of HIRADC document
Up date HIRADC 2011
6.1.2.
5
Involvement evidence all element to make hazard identification (attendante list)
Daftar hadir peserta dalam pembuatan HIRADC (Irie, Gp, Herman R, Bakti, Achsien, Tgl. 7/11/2011)
6.7.1.
Prosedur Kesiapan Keadaan Darurat
Identifikasi Keadaan darurat didalam HIRADC, Prosedur Keadaan Darurat dikomunikasikan (Induction dan ditempel)
RIS
OK
6
HIRADC Monitoring of evectiveness (all location)
Buat monitoring efektivitasnya, tambahkan kolom disisi paling kanan MONITORING EFECTIVITAS dan isi dengan OK
9.1.1.
Terdapat Prosedur Identifikasi
Pengendalian Manual dan Mekanis dalam HIRADC
RIS
OK
7
HIRADC revision evidenced (min. every there is insident )
Bukti bahwa HIRADC selalu ditinjau setelah terjadi insident, apabila item insiden belum ada didalam HIRADC, maka HIRADC harus di revisi
9.1.2
Identifikasi oleh Petugas Kompeten
Daftar Pembuat HIRADC (Jabatan dan AK3K)
RIS
OK
Apabila ada item pekerjaan yang belum ada didalam HIRADC, maka HIRADC harus di revisi
2.2. Peraturan Perundangan dan Persyaratan Lainnya
4.3.2.Persyaratan Hukum dan Persyaratan Lainnya KI/OHS-P/003 : Legal & other requirement Procedure
10.1.1.
Prosedur Identifikasi, Pengumpulan, Pengarsipan, Pengumpulan, Pengarsipan, pemeliharaan, Penyimpanan dan pengantian Catatan K3
10.1.2.
Memelihara Perundangan, standard dan pedoman Teknis K3
Prosedur Pengendalian Dokumen
Mudah didapat (buat Katalog dan Daftar Isi RIS Ordner)
8
To make acces list to regulation publisher
KI/FORM/OHS/003/028
ada di MRM
9
Acces evidence to regulation publisher
KI/FORM/OHS/003/029
buat list tgl. Menghubungi pada period 2012
RIS
KI/FORM/OHS/003/030
Up date masukin legal yang baru 2 bh (pastikan)
RIS
10 Regulation List (applicable only)
Legal monitoring harus sama dengan legal list
4.3.3. Sasaran dan Program KI/OHS-P/004 : Objective & programme(s) procedure
NOK
RIS
2.3. Tujuan dan Sasaran 2.4. Indikator Kinerja 2.5. Perencanaan Awal dan Perencanaan Kegiatan yang sedang berlangsung
Menetapkan Objective dan Target
2.1.5.
Safety Objective (HQ dan Project)
RIS
OK
Daftar Kompetensi
ADHI
OK
2.1.2.
HIRADC dilakukan oleh orang yang Kompeten
Monitoring Objective 2013
2.1.3.
Safety Plan (Rencana Strategi K3) berdasarkan Tinjauan Awal, HIRADC, Perundangan, dan info Safety Plan K3 dari Dalam dan Luar perusahaan
RIS
OK
Bukti Monitoring Obj (siapkan Back up data)
2.1.4.
Menetapkan Objective dan Target dalam Safety Safety Plan dan Monitoring Objective Plan
RIS
OK
11 Objective and target
KI/FORM/OHS/004/056
Objective 2013
12 Monitoring of objective and target
KI/FORM/OHS/004/057
13 OHS Program & monitoring
KI/FORM/OHS/004/058
Safety performance 2013 List of KI equipment (all site) Legal comply Emergency drill report List of Competence dan Copy sertifikat Objective monitoring Event
OK
RIS
Event Tahun 2013 (HQ dan Project) Monitoring actual event HQ dan Project
NO
OHSAS 18001:2007
FORM
AKUNTABILITAS OHSAS
ELEMEN SMK3 PP. No. 50 TAHUN 2012
4.4. IMPLEMETASI DAN OPERASI
3.IMPLEMENTASI
4.4.1. Sumber Daya, Peran Tanggung Jawab, Tanggung Gugat dan Wewenang
3.1.3. Tanggung Jawab dan Tanggung Gugat
14 Organization chart
15 Certifcate of P2K3
Establishment/ Duty letter to safety employees ( 16 Safety committee members, safety section/ department, emergency respons team)
KRITERIA
PENJELASAN PENJELASAN KRITERIA
1.2.1.
Tugas dan tanggung jawab personil (job description) ada item terkait K3
Struktur organisasi KIHQ dan Job desc Top Management - pasang di dinding
1.2.2.
Penunjukkan Sekretaris dan Safety Officer sesuai UU (AK3K license)
Struktur organisasi TTD, Job Desc dan Pasang didinding
AKUNTABILITAS SMK3
RESPONSIBILITY
STATUS
HR
OK
Competence List dan copy sertifikat, surat tugas MR, SK Sekretaris, surat tugas Safety HR Officer dll
OK
1.2.3.
Pimpinan unit kerja bertanggung jawab terhadap Safety Objective tggjwb Pimpinan Unit kerja Ris Kinerja (manager dan PM), P2K3
OK
Sertifikat P2K3 dari Depnakertrans untuk HO -rev 2011 - Buat surat ke Dinas Nakertrans - Tgl. 1 Juni 2011 ; karena perubahan Presdir, lampirkan dengan Organisasi P2K3 yang baru. buat juga bukti kirim ke Depnaker
1.2.4.
Pimpinan bertanggung jawab penuh terhadap pelaksanaan K3
P2K3, Jadwal patrol HQ, PM, Objective, MRM
RIS
OK
P2K3 UCI 3RD
1.2.5.
OK
1.2.6.
Surat Tugas dan daftar hadir training Damkar untuk Tim TTD Proyek dan HQ Bukti kunjungan APHOSO, Seminar SGS, Kunjungan ke Depnaker dll
Ris
P2K3 HOTEL
Ris
OK
P2K3 NGK
1.2.7.
Petugas Keadaan darurat telah mendapat pelatihan dan sudah ditetapkan Saran2 dari ahli dibidang K3 yang berasal dari dalam atau luar Kinerja termuat dalam laporan tahunan perusahaan atau laporan lain yang setingkat
MRM, Annual Report Kajima
Ris
OK
P2K3 HPSI
1.2.8.
Up date CV berdasarkan Training
1.2.9.
17
Job description (Roles, responsility, accountability and authority) for all employees
Job description semua personil proyek (terutama personil safety dan emergency respons)
1.4.3.
Pembentukan P2K3
Sertifikat P2K3 Kajima, dan sertifikat Unit K3 internal untuk proyek
Ris
OK
18
Communication Evidences of job description to all employees
Bukti bahwa Job desc sudah dikomunikasikan kepada personil ybs (Bukti kirim)
1.4.4.
Ketua P2K3 adalah Presdir/ Pucuk pimpinan
Ketua P2K3 Presdir dan ketua Unit K3 PM
Ris
OK
Surat penetapan Internal Auditor (lihat didalam list kompetensi)
1.4.5.
Sekretaris P2K3 adalah Ahli K3
Sekretaris P2K3 dan Unit K3 adalah AK3K
Ris
OK
1.4.6.
Titik berat P2K3 adalah pengembangan kebijakan dan prosedur pengendalian resiko
MRM dan Risalah rapat Unit K3 di proyek (Report SSP)
Ris
OK
12.1.1.
Analisis kebutuhan pelatihan K3 (Gap analysis kompetensi)
Gap analisis kompetensi
HR
NOK
Program pelatihan (sosialisasi K3) kepada : HQ : 1. Manajemen, 2. Staff, 3. Safety Officer (based on Gap analysis); Project : 1. Staff, 2. Safety Subkont, 3. Worker specialis (lifting, welding, operator dll), 4. General HR dan Safety worker, 5. Supervisor (WI), 6. TTD, 7. Kantin/ Food handler, 8. Scaffolder, 9. Digger, 10. Masonry, 11. ME, 12. Ass. Safety , 13. Carpenter, 14. Operator (simper), 15. Welder, 16. Work at height dll
4.4.2. Kompetensi, Pelatihan dan Kepedulian
3.1.5. Pengembangan Keterampilan dan Kemampuan
KI/OHS-P/005 : Training procedure
19
Gap analisys & competence (training need identification)
KI/FORM/OHS/005/063
Gap Analysis
12.1.2.
Rencana pelatihan K3 untuk semua tingkatan
20
Training matrix (job description and risk identification based)
KI/FORM/OHS/005/064
Training matrix 2012
12.1.3.
Training matrix 2013
12.1.4.
Training program 2012 dan Actual Training 2012
12.1.5.
Training Program 2013
12.1.6.
Bukti2 sertifikat, dokumentasi dan daftar hadir
12.1.7.
Jenis pelatihan sesuai dengan kebutuhan untuk Gap analisis dan resiko pengendalian bahaya Pelatihan oleh badan yang kompeten dan A2K4, Damkar, Depnaker, Dinkes dll berwenang Ruang meeting, Ruang Induction dan Terdapat fasilitas training infocus Penyimpanan dokumen training Dokumentasi actual training Meninjau ulang program pelatihan agar tetap Risalah rapat review training (Risalah rapat relevan dan efektif P2K3/ MRM)
21 Training program and realization
KI/FORM/OHS/005/065
22 Training evaluation PERSONAL COMPETENCY (KI belonging)
12.2.1.
Anggota manajemen berperan dalam pelatihan
TTD Gap analysis, program pelatihan dan menyetujui materi pelatihan, menyetujui pelatihan external
23
Safety Expert (Ahli K3)
12.2.2.
Manajer dan Spv menerima pelatihan yang sesuai dengan peran dan tanggung jawabnya
Program pelatihan K3 untuk Manajer dan Spv sesuai Gap analysis
24
Electrical Safety License
12.3.1.
Pelatihan kepada tenaga kerja baru dan yang dipindahkan
Safety Induction, Training khusus dan Training kepada tenaga kerja yang dipindahkan (training scaffolding dll)
25
Scaffolder competency
12.3.2.
26
Electrical safety
12.3.3.
27
Rigger & Lifting Competency
12.4.1.
28
First Aider Competency
Pelatihan kpd tenaga kerja bila ada perubahan sarana produksi Pelatihan penyegaran Prosedur Komunikasi / Briefing kepada Tamu dan Mitra kerja Prosedur kepatuhan terhadap persyaratan lisensi
29
Fire Fighting Competency Safety Awareness
31
Auditors competency (Certificate Internal Auditor)
RIS Ris HR HR Gp
12.1.8.
KI/FORM/OHS/005/066
30
NOK
Buat list personnel competency 2012 (incld. subkont ) DAN COPY SERTIFIKAT
12.5.1.
HR
Buat program saja Masukin program Visitor Safety Induction Prosedur Safety Inspection (SIO dan SILO)
OK
List of Operator License (SIO) - KI Belonging 32
Welder License
33
Excavator Lit of Equipment certificate - KI Belonging
34
Scaffolding
35
Tower crane
36
Excavator
37
Genset
38
Compressor
Sertifikat dari manufacture
RIS
Wire Rope
4.4.3. Komunikasi, Partisipasi dan Konsultasi
3.1.4. Konsultasi, Motivasi dan Kesadaran
1.4.1.
Keterlibatan dan Jadwal konsultasi dengan tenaga kerja di dokumentasikan dan disebarluaskan
Jadwal SSP, Minutes meeting dan daftar hadir SSP, Laporan SSP, Bukti kirim Minutes Meeting dan Ditempel di Papan Info
KI/OHS-P/006 : Communication, participation and Consultation procedure
(1. Pembangunan dan pemeliharaan Dokumen/ 1.4. Keterlibatan dan Konsultasi dengan Tenaga Kerja)
1.4.2.
Prosedur Konsultasi tersedia untuk memudahkan bila ada perubahan K3
Prosedur Konsultasi
1.4.7.
39 Safety Information board
Project
OK
OK
Bukti Kirim / email pengurus P2K3 dan Unit Susuan pengurus P2K3 didokumentasikan dan K3 kepada semua subkont dan ditempel di Project di informasikan kepada tenaga Kerja papan info MRM, bukti kirim MRM dan Schedule SSP, Rapat P2K3 dilaksanakan teratur dan minutes minutes meeting SSP dan bukti kirim SSP Ris dan Project meeting di sebarluaskan dan ditempel
OK
40 P2K3/ Safety committee report to Depnakertrans
Kirim report, Surat Revisi P2K3
1.4.8.
41 Laporan Unit K3 ke P2K3
Laporan triwulan P2k3 , maret 2012, Juni 2012 , October 2012 dan Deember 2012Ke Sudin Nakertrans
1.4.9.
P2K3 melaporkan kegiatannya kepada Disnaker
Laporan P2K3 ke DInasnakertrans dan Unit RIS K3 ke HQ (SK Unit K3 proyek)
OK
1.4.10.
Pembentukan kelompok kerja K3 ditempat kerja
SK Unit K3, Data Tim KY Meeting (Leader dan Anggotanya)
OK
Project
OK
NO
OHSAS 18001:2007
AKUNTABILITAS OHSAS
FORM
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN AKUNTABILITAS SMK3
PENJELASAN KRITERIA
RESPONSIBILITY
STATUS
3.2.1. Komunikasi
2.3.1.
Prosedur untuk mengidentifikasi, memperoleh, memelihara dan memahami UU, standard, pedoman teknis
Prosedur Legal
Ris
OK
(2.3. Peraturan Perundangan dan Persyaratan lain dibidang K3)
2.3.2.
Penanggung jawab untuk memelihara dan mendistribusikan peraturan terbaru telah ditetapkan
Job desc DC (ris)
HR
OK
12.4.2.
4.4.4. Dokumentasi
2.2.1.
Manual SMK3 meliputi Kebijakan, tujuan, rencana, prosedur K3, IK, Formulir, catatan dan Daftar Manual, Prosedur, IK, Job Desk tanggung jawab serta wewenang untuk semua tingkatan
Ris
OK
(2. Pembuatan dan Pendokumentasian Rencana K3)
2.2.2.
Manual khusus untuk produk, proses, dan tempat kerja tertentu
WI Confined space dll
Ris
OK
2.2.3.
Manual, prosedur, WI, form mudah di dapat
Katalog, daftar isi, Distribusi Hard Copy untuk Manual, prosedur dan WI dan akses Aksan/ Ris LAN untuk Manual, Prosedur, WI dan form2 (bukti notifikasi di email ke semua project)
OK
4.4.5. Pengendalian Dokumen
3.2.3. Pengendalian Dokumen
4.1.1.
Dokumen K3 mempunyai Identifikasi status, wewewnang, tanggal pengeluaran dan tanggal modifikasi
Status Master, Control Copy dll
Ris
OK
KI/OHS-P/007 : Control of document
(4. Pengendalian Dokumen)
4.1.2.
Penerima distribusi dokumen tercantum dalam dokumen tersebut
Dokumen Master List, Distribution List
RIS
OK
Document Master List up date 2013, WI terakhir sudah masuk
4.1.3.
Dokumen K3 edisi terbaru disimpan secara sistematis pada tempat khusus
Katalog, daftar isi, Distribusi Hard Copy untuk Manual, prosedur dan WI dan akses RIS LAN untuk Manual, Prosedur, WI dan form2 (bukti notifikasi di email ke semua project)
Distribution List, up date 2013, semua proyek yang ada sudah di distribusikan
4.1.4.
Dokumen usang disingkirkan dari penggunaannya, dokumen usang yang disimpan diberi tanda khusus
Berita Acara pemusnahan, Stempel Absolute (untuk yang disimpan)
RIS
OK
Bukti kirim Dokumen
4.2.1.
Sistem untuk membuat, menyetujui perubahan dokumen K3
Prosedur pengendalian Dokumen
RIS
OK
Cek ohs doc di komputer Site Office dan HO
4.2.2.
Alasan perubahan
Kronologi dokumen
RIS
OK
Dokumen Master - Ada Daftar isi dan di Stempel master
4.2.3.
Pengendalian dokumen
Master List Dokumen dan status
RIS
OK
42 Document masterlist - controller
43
3.2.3. Dokumentasi
KI/FORM/OHS/007//039
Distribution list of Document (Manual, Prosedur, Work KI/FORM/OHS/007//040 Instruction)
4.4.6. Pengendalian Operasional
3.3. Identifikasi Sumber Bahaya, Penilaian dan Pengendalian Resiko
6.1.3
Terdapat prosedur HIRADC
Prosedur HIRADC
KI/OHS-P/008 : Project safety plan procedure
(6.1. Sistem Kerja)
6.1.4.
Kepatuhan terhadap UU dan standard diperhatikan ketika membuat WI
WI
6.1.5.
Terdapat sistem izin kerja
PTW
OK
6.1.6.
APD disediakan dan dipelihara
Prosedur APD, Daftar dan Matrix APD dan schedule masa pakai (ada tgl pakai dan Project masa expired, tgl pengantian)
OK
6.1.7.
APD yang digunakan layak sesuai aturan UU
APD yang digunakan ber SNI (buat daftar APD dan SNI nya)
HQ dan Project
NOK
HIRADC di evaluasi berkala apabila terjadi perubahan atau ketidaksesuaian pada proses kerja
Revisi HIRADC
HQ dan Project
OK
Project dan Schedule OK patrol Gp
Senayan Apart, Hotel, UCI3rd, HPSI, NGK, Musashi dll
44 Project Safety Plan
KI/OHS-P/009 : Safety aspects in the project planning phase procedure 45 List of input document planning phase
KI/FORM/OHS/009//094
46 Planning phase checklist
KI/FORM/OHS/009//095
6.1.8.
47 Verifikasi form of safety aspect in planning phase
KI/FORM/OHS/009//096
6.1.9.
48 Preliminary risk assesment-Planning phase
KI/FORM/OHS/009//097
OK
Ris
(6.2. Pengawasan)
6.2.1.
Dilakukan pengawasan untuk menjamin kerja aman
Schedule, actual dan report Safety patrol
3.3.1. Identifikasi Sumber Bahaya
6.2.2.
Setiap orang diawasi sesuai dengan tingkat kemampuan dan tingkat resiko tugas
Buat daftar pekerjaan/ task, kompetensi kelompok, awarenessnya dan beri penilaian Project tingkat resikonya (link ke Hasil patrol dan HIRADC), dan level pengawasannya
Ada lampiran persyaratan safety dalam kontrak dengan vendor (PO/WO)
6.2.3.
Ada lampiran persyaratan safety dalam kontrak dengan vendor (PO/WO)
6.2.4.
List of Equipment KI-HQ (9 alat)
6.2.5.
Spv ikut serta dalam Identifikasi bahaya dan Daftar hadir pembuatan HIRADC HQ dan Project pengendaliannya Supervisor ikut dalam investigasi dan Buat daftar Tim Investigasi (Spv harus ikut) HQ dan Project pembuatan laporan accident dan menyerahkan dan lengkapi dengan daftar hadir laporan kepada pimpinan Daftar Hadir Konsultasi pembuatan : WI, Supervisor ikut dalam proses Konsultasi HQ dan Project Rapat P2K3, HIRADC dll
OK
KI/OHS-P/010 : Purchasing procedure
49 Subcontractors questioner/ assesment
KI/FORM/OHS/010//042
50 Clauses of safety req. in Vendors pre-qualification 51
Clauses of safety requirement in vendor contracts (in Work Order and PO)
Buat daftar Subkontraktor terpakai dan check yang sudah mengembalikan questionnaire (lihat data prosentase di MRM)
53 Vendor evaluation
KI/OHS-P/012 : Operational, maintenance & service of equipment procedure
KI/FORM/OHS/013//071
6.3.2.
Penugasan harus berdasarkan kemampuan dan List of Competence keterampilan serta kewenangan
HR
OK
3.3.2. Penilaian resiko
6.4.1.
Pengurus melakukan penilaian resiko untuk mengetahui area yang memerlukan izin masuk
Buat daftar area yang memerlukan izin masuk
Project
(6.4. Area Terbatas)
6.4.2.
Terdapat pengendalian atas area dengan pembatasan izin masuk
Input dalam HIRADC dan pasang rambu
Project
6.4.3.
Terdapat fasilitas dan layanan ditempat kerja sesuai dengan standard dan pedoman teknis
Input dalam Presentasi Safety Action
Ris
6.4.4.
Rambu-Rambu K3 harus dipasang sesuai dengan standard dan pedoman teknis
Rambu di HQ (Komputer dan Plotter)
Project dan HQ
Apabila ada pekerjaan perbaikan di dalam office harus membuat Work Permit kepada OHS Section
KI/OHS-P/014 : Lock out Tag out procedure
3.3.3. Tindakan Pengendalian
6.5.1.
Jadwal pemeriksaan dan pemeliharaan sarana produksi serta peralatan mencakup verifikasi alat-alat pengaman dan persyaratan sesuai standard
Buat jadwal inspeksi, Jadwal Maintenance Alat (kalau punya subkont, minta ke subkont) dan Jadwal Kalibrasi alat
Project
KI/OHS-P/015 : Housekeeping procedure
(6.5. Pemeliharaan, Perbaikan dan Perubahan sarana produksi)
6.5.2.
Semua catatan data kegiatan pemeriksaan, pemeliharaan, perbaikan dan perubahan yang dilakukan atas sarana dan peralatan harus disimpan
Data Safety Patrol, Data Inspection, Data Maintenance alat, Data perubahan perbaikan alat
Project
6.5.3.
Peralatan memiliki sertifikast yang masih berlaku
Daftar peralatan dan sertifikatnya (SILO dan Project dan Ris SIO)
6.5.4.
Pemeriksaan, pemeliharaan, perawatan, perbaikan serta perubahan dilakukan oleh petugas yang kompeten
Di dalam schedule Inspection dan Maintenance memuat nama badan pemeriksa/ PIC
6.5.5.
Terdapat prosedur apabila terjadi perubahan sarana produksi dan peralatan, perubahan tersebut harus sesuai dengan persyaratan peraturan perundangan, standard dan pedoman teknis
55 House keeping program
KI/FORM/OHS/015/077
Program house keeping area kantor (pembuangan sampah, cleaning telepon, cleaning kantor dll)
KI/OHS-P/016 : Health & hygiene procedure
56 Health & Hygiene facilities program
KI/FORM/OHS/016/088
NOK
NOK
KI/OHS-P/013 : Working permit procedure
54 Working permit
OK
6.3.1.
Coretan bahwa safety menjadi pertimbangan dalam comparison form
ISO form
OK
Tetapkan jenis penyakit berbahaya (minta data asuransi), Buat Persyaratan kesehatan untuk staff, DW dan Subkont (untuk staff Persyaratan tugas tertentu termasuk bila hasil MCU menunjukkan memiliki persyaratan kesehatan di identifikasi dan dipakai HQ dan Project penyakit yang berbahaya atau bawaan, untuk seleksi dan penempatan kerja maka kontrak kerja bisa putus, untuk DW dan subkont buat data Surat Keterangan sehat dokter/RS)
KI/OHS-P/011 : Control of subcontractors procedure
52 Vendor determination check list
NOK
3.3.4. Perancangan (design) dan Rekayasa
Project
Ris
OK
OHSAS 18001:2007
NO
AKUNTABILITAS OHSAS
FORM
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN AKUNTABILITAS SMK3
PENJELASAN KRITERIA
RESPONSIBILITY
KI/OHS-P/017 : PPE procedure
6.5.6.
Terdapat prosedur permintaan pemeliharaan sarana dan peralatan produksi dengan kondisi K3 yang tidak memenuhi syarat dan perlu segera diperbaiki
KI/OHS-P/018 : Safety meeting procedure
6.5.7.
Terdapat sistem penandaan bagi peralatan yang sudah tidak aman digunakan atau sudah tidak Prosedur Rambu digunakan
Project
Project
Form Premob
STATUS
Project
57 KIHQ Safety Committee Minutes Meeting
KI/FORM/OHS/018/023
Safety report - Monday meeting, data kecelakaan terakhir di Hitachi jgn dimasukkan
6.5.8.
Apabila diperlukan dapat diterapkan system Lock Out System
58 Communication list of emergency bodies concerning
KI/FORM/OHS/018//023
Bukti koordinasi ke Building Management, Dinas PMK, PMI, Kepolisian dll
6.5.9.
Terdapat prosedur yang dapat menjamin Keselamatan dan Kesehatan tenaga kerja dan orang lain pada saat proses pemeriksaan, pemeliharaan, perbaikan dan perubahan
Ris
6.6.1.
Apabila perusahaan di kontrak untuk penyediaan pelayanan yang tunduk pada standard dan perundangan mengenai K3, maka Dokumen Tender, Cek list persyaratan K3 perlu disusun prosedur untuk menjamin bahwa pelayanan memenuhi persyaratan
Ris
NOK
3.3.5. Pengendalian Administratif
6.6.2.
Apabila perusahaan diberi pelayanan melalui kontrak dan pelayanan tunduk pada standard dan peraturan perundangan K3, maka perlu disusun prosedur yang menjamin bahwa pelayanan memenuhi standard
Ris
NOK
(9. Pengelolaan material dan Perpindahannya)
9.1.3.
Pengusaha menerapkan dan meninjau cara pengendalian resiko yang berhubungan secara HIRADC manual dan mekanis
HQ dan Project
OK
9.1.4.
Terdapat prosedur untuk penanganan bahan meliputi metode pencegahan terhadap kerusakan, tumpahan dan kebocoran
WI
HQ dan Project
OK
Bulanan
9.2.1.
Terdapat prosedur yang menjamin bahwa bahan disimpan dan dipindahkan dengan cara yang WI aman sesuai dengan peraturan perundangan
HQ dan Project
OK
Bulanan (peralatan keselamatan : fire alarm, splingker, smoke detector, emergency lamp)
9.2.2.
Terdapat prosedur yang menjelaskan persyaratan pengendalian bahan yang dapat rusak dan kadaluarsa
WI
Ris
NOK
9.2.3.
Terdapat prsedur yang menjamin bahwa bahan dibuang dengan cara yang aman sesuai WI peraturan
RIS
NOK
3.3.6. Tinjauan Ulang Kontrak
9.3.1.
Penerapan prosedur penyimpanan, penangganan dan pemindahan BKB sesuai dengan standard
WI
(9.3. Bahan Kimia Berbahaya)
9.3.2.
Terdapat LDKB / MSDS yang mudah diperoleh
WI
Project
OK
9.3.3.
Terdapat sistem untuk mengidentifikasi dan pemberian label pada bahan
WI
Project
OK
9.3.4.
Rambu peringatan bahaya terpasang pada bahan
Pasang rambu
Project
OK
3.3.7. Pembelian
9.3.5.
Penanganan BKB/ B3 dilakukan oleh Petugas yang kompeten
Project
OK
(3.Pengendalian perancangan dan Peninjauan Kontrak)
9.3.6.
KI/OHS-P/019 : Safety promotion procedure
60 House keeping assesment report
KI/FORM/OHS/019/034
KI/OHS-P/020 : Safety inspection procedure
61 Safety assesment report
KI/FORM/OHS/020/002
62 Cek list ruangan
63 Fire extinguisher
KI/FORM/OHS/020/017
Cek list Bulanan
64 First aid box
KI/FORM/OHS/020/021
Cek list Daftar, kelengkapan, form penggunaan
(3.1. Pengendalian Perancangan)
(5.1. Spesifikasi pembelian Barang dan Jasa)
LOTO
Ceek list persyaratan K3
3.1.1.
Prosedur yang terdokumentasi mempertimbangkan identifikasi potensi bahaya, penilaian dan pengendalian resiko yang Prosedur Planning Phase dilakukan pada tahap perancangan dan modifikasi
3.1.2.
Prosedur, WI dalam penggunaan produk, pengoperasian mesin dan peralatan, instalasi, pesawat atau proses serta informasi terkait K3 telah dikembangkan selama perencanaan dan modifikasi
3.1.3.
Petugas yang kompeten melakukan verifikasi bahwa peraancangan dan modifikasi memenuhi Prosedur Planning Phase persyaratan K3 yang ditetapkan sebelum penggunaan hasil rancangan
3.1.4.
Semua perubahan dan modifikasi perancangan yang mempunyai implikasi terhadap K3 diidentifikasi, di dokumentasikan, di review dan Prosedur Planning Phase disetujui oleh petugas yang berwenang sebelum pelaksanaan
3.2.1.
Prosedur yang terdokumentasi harus mampu mengidentifikasi bahaya dan menilai resiko bagi tenaga kerja, lingkungan kerja dan masyarakat, dimana prosedur tsb digunakan pada saat memasok barang dan jasa dalam suatu kontrak
Prosedur pengendalian Subkontractor, Safety Plan subkont di verifikasi, Evaluasi Subkont/ Supplier, lampiran Kontrak Subkont/ Supplier
3.2.2.
Identifikasi bahaya dan penilaian resiko dilakukan pada tinjauan kontrak oleh petugas yang kompeten
Prosedur pengendalian Subkontractor, Safety Plan subkont di verifikasi, Evaluasi Subkont/ Supplier, lampiran Kontrak Subkont/ Supplier
3.2.3.
Kontrak di tinjau ulang untuk menjamin bahwa pemasok dapat memenuhi persyaratan K3 bagi pelanggan
3.2.4.
Catatan tinjauan kontrak di pelihara dan didokumentasikan
5.1.1.
Terdapat prosedur bahwa spesifikasi teknik dan info K3 yang relevan telah di periksa sebelum Purchasing Prosedur membeli
5.1.2.
Spesifikasi pembelian untuk sarana produksi, zat kimia atau jasa harus dilengkapi dengan spesifikasi yang sesuai dengan persyaratan
OK
Prosedur Planning Phase
Spesifikasi pada penawaran ditandai
Purchasing/ Logistik
OHSAS 18001:2007
NO
AKUNTABILITAS OHSAS
FORM
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN AKUNTABILITAS SMK3
PENJELASAN KRITERIA
RESPONSIBILITY
5.1.3.
Konsultasi dengan tenaga kerja yang kompeten pada saat keputusan pembelian dilakukan untuk menentapkan persyaratan K3 dicantumkan Purchasing Prosedur dalam spek pembelian barang dan tenaga kerja di informasikan
5.1.4.
Kebutuhan pelatihan, pasokan APD dan perubahan prosedur kerja harus dipertimbangkan sebelum pembelian dan penggunaan
Buat form ceklist pembelian material/ bahan Purchasing/ Logistik
5.2.1.
Barang dan jasa yang dibeli diperiksa kesesuaiannya dengan spesifikasi pembelian
Buat form ceklist verifikasi pembelian
5.3.1.
Barang dan Jasa yang dipasok pelanggan, Buat daftar barang dan jasa yang dipasok sebelum digunakan terlebih dahulu diidentifikasi owner, lakukan HIRADC khusus
Purchasing/ Logistik
Project
5.3.2. 4.4.7.Kesiagaan dan Tanggap Darurat
3.3.8. Prosedur Menghadapi Keadaan Darurat atau Bencana
6.7.1.
KI/OHS-P/021 : Emergency preparedness & response procedure
(6.7 Kesiapan untuk Menangani Keadaan Darurat)
8.1.1.
65 Emergency response plan
8.2.1.
KI/FORM/OHS/021/079
66 ER Organization chart & responsibility 67 Emergency drill program
KI/FORM/OHS/021/080
68 Flow chart emergency response
KI/FORM/OHS/021/081
New Organization
8.2.2.
Buat program tahun 2011 HO
6.7.2. 6.7.3.
69 Communication list of emergency bodies
KI/FORM/OHS/021/082
Daftar komunikasi / koordinasi ke badan terkait emergency (Building Management, Fire Brigade, kepolisian dll)
70 List of emergency facility
KI/FORM/OHS/021/083
Daftar perlengkapan emergency (Uniform floor warden, spanduk evakuasi, tas P3K, senter dll)
71 Emergency minutees drill
KI/FORM/OHS/021/084
Report Building managent dan report internal (jumlah peserta)
72 Emergency response handled report
KI/FORM/OHS/021/085
73 Emergency evaluation
KI/FORM/OHS/021/086
Evaluasi drill terakhir
74 Emergency facility check list
KI/FORM/OHS/021/087
Cek list kelengkapan semua peralatan
75 Refill programmes of Fire extinguisher 76 77 78 79
3.3.2. Pelaporan
6.7.4. 6.7.5. 6.7.6 6.7.7.
Keadaan darurat yang potensial telah di identifikasi dan prosedur sdh dibuat dan diinformasikan kesemua orang Terdapat prosedur pelaporan bahaya yang berhubungan dengan K3 dan diketahui oleh pekerja Terdapat prosedur bahwa semua kecelakaan kerja, penyakit akibat kerja, kebakaran atau peledakan serta kejadian berbahaya lainnya ditempat kerja di catat dan dilaporkan
HIRADC Emergency, Flow chart dan Prosedur
HQ dan Project
Safety Call Center, Anomaly form
Project
laporan kecelakaan
Ris dan Project
Penyediaan alat/ sarana dan prosedur keadaan Cek list Inspecksi alat emergency dan darurat berdasarkan hasil identifikasi dan diuji APAR serta ditinjau secara rutin oleh petugas Tenaga kerja mendapat pelatihan mengenai prosedur darurat Petugas TTD ditetapkan dan mendapat pelatihan khusus dan diinformasikan kepada semua orang Instruksi keadaan darurat diperlihatkan secara mencolok Peralatan dan sistem bahaya keadaan darurat disediakan, diperiksa, diuji dan dipelihara secara berkala Jenis, jumlah, penempatan dan kemudahan mendapatkan alat keadaan darurat tekah sesuai dengan persyaratan
Program dan actual Drill organisasi TTD Jalur evakusi, muster point dan flowchart keadaan darurat Daftar peralatan emergency, schedule drill, schedule pemeriksaan dll Pemasangan APAR dan alat emergency lainnya
3.3.9. Prosedur Menghadapi Insiden 3.3.10. Prosedur rencana pemulihan keadaan darurat
Buat program refill (per 2 tahun dari refill terakhir)
Put of the Fire Extinguisher, comply to regulation (1:200m2 atau distance 1:15m) Monthly/6th Month/ Annual checklist of Fire Extinguisher Check list kelengkapan Tas Besar First Aid Menimbang berat APAR
Bulanan Data berat APAR
4.5. PEMERIKSAAN
4. PENGUKURAN DAN EVALUASI
4.5.1. Pemantauan dan Pengukuran Kinerja
4.1. Inspeksi dan Pengujian
KI/OHS-P/022 : Measurement, monitoring and calibration procedure
7.1.1.
Inspeksi terhadap tempat kerja dilaksanakan secara teratur
7.1.2.
Pemeriksaan dilakukan oleh petugas yang telah mendapat pelatihan identifikasi bahaya
Safety inspection dan Safety patrol schedule and actual report
79 Safety performance
KI/FORM/OHS/022/053
Manhour, FR, SR, IR (MRM)
7.1.3.
Inspeksi juga mencari masukan dari tenaga kerja yang melakukan tugas ditempat kerja
80 Measurement & Monitoring workplace program
KI/FORM/OHS/022/054
Buat Program pengukuran faktor fisik, kimia dan biologi tahun 2011 external pada Oktober 2011
7.1.4.
Check list tempat kerja telah disusun untuk digunakan
Check list2
81 Analysis of measurement result
KI/FORM/OHS/022/055
Analisa dan rekomendasi
7.1.5.
Laporan inspkesi berisi rekomendasi untuk tindakan perbaikan dan ditujukan kepada pengurus dan P2k3 sesuai kebutuhan
PIC juga kepada CM dan anggota P2K3
82 Data of calibration measurement equipment
Data kalibrasi alat ukur internal maupun external
7.1.6.
Pimpinan menetapkan penanggung jawab tindakan perbaikan dari laporan inspeksi
PIC
83 External Measurements :
Buat program pengukuran tahun 2011 external
7.2.1.
Pemantauan/ pengukuran lingkungan kerja Buat program tahunan pemeriksaan dilaksanakan secara teratur dan hasilnya untuk Lingkungan Kerja HIRADC
84
workplace temperature
7.2.2.
Pemantauan meliputi : Faktor Fisik, kimia, biologi, ergonomi dan psikologi
85
Lumen/ lighting meausrement
7.3.1.
pemantauan dilakukan oleh petugas yang kompeten
86
Dust concentrate
7.3.2.
Alat dipelihara dan di kalibrasi oleh petugas yg kompeten
87
Workplace Humidity
7.4.1.
Dilakukan pemantauan kesehatan tenaga kerja Program MCU (HO dan Hotel) dan Data yang bekerja yg mengandung potensi bahaya Pemeriksaan Fisik proyek tinggi
88
Noise
7.4.2.
Identifikasi tempat pemeriksaan kesehatan
Klinik Cito
7.4.3.
Pemeriksaan kesehatan dilakukan oleh Dokter yang ditunjuk sesuai UU
Klinik Cito
7.4.4.
Perushaan menyediakan pelayanan kesehatan Klinik CITO, Bringin Life, Klinik project kerja sesuai aturan UU
7.4.5.
Catatan pemantauan kesehatan dilakukan
89 Monthly Activity report
KI/FORM/OHS/WI/107
90 Safety activity report
KI/FORM/OHS/WI/111
91 Report to KOA
KI/FORM/OHS/WI/117
Laporan bulanan safety department ke OHS Section HO
Laporan bulanan safety department ke KOA
Minta Kalibrasi alat dan alat internal di kalibrasi (buat shcedule)
Data MCU, Follow up MCU
project
STATUS
OHSAS 18001:2007
NO
FORM
AKUNTABILITAS OHSAS
ELEMEN SMK3 PP. No. 50 TAHUN 2012
KRITERIA
PENJELASAN PENJELASAN KRITERIA
AKUNTABILITAS SMK3
RESPONSIBILITY
KI/OHS-P/023 : Medical check up procedure 92 Medical check up program
KI/FORM/OHS/023/050
Disease history interview for new employee and 93 workers
KI/FORM/OHS/023/051
Actual program tahun 2011
HR/ ARIF HR/ ARIF
Surat Keterangan Sehat dari Dokter untuk Pegawai baru/ DW baru
94 Surat keterangan sehat dari dokter untuk Staff baru Surat keterangan sehat dari dokter untuk Daily Worker baru 96 Medical record hasil MCU
HR
95
HR
97 Rekomendasi hasil MCU
MCU Record Follow up MCU
HR HR
KI/OHS-P/024 : Evaluation of compliance procedure 98 Monitoring of Regulation (percentage of comply)
KI/FORM/OHS/024/038
Monitoring tahun 2012
RIS
99 Statistic data
KI/FORM/OHS/024/052
Data statistik incident, MCU, Percentage Comply dll
RIS
4.5.3. Penyelidikan Insiden, Ketidaksesuaian dan Tindakan Perbaikan dan Pencegahan
3.3.9. Prosedur Menghadapi Insiden
8.3.1.
Prosedur pemeriksaan dan pengkajian kecelakaan dan penyakit akibat kerja
8.3.2.
Pemeriksaan dan pengkajian kecelakaan kerja dilakukan oleh Ahli K3
Cek apakah semua Accident sudah dibuat reportnya
8.3.3.
Laporan pemeriksaan berisi sebab akibat serta Buat target tgl countermeasure (cocokan rekomendasi dan jadwal pelaksanaan perbaikan dengan CAR nya)
RIS
List Incident lengkap dengan Investigasi, CAR dan Alert
8.3.4.
Penanggung jawab tindakan perbaikan atau laporan pemeriksaan telah di tetapkan
Menetapkan PIC (dalam CAR)
RIS
Cek apakah semua Accident sudah dibuat alertnya
8.3.5.
Tindakan perbaikan di informasikan kepada tenaga kerja yang bekerja ditempat kerja
Catat dalam record TBM/ KY Meeting
Project
8.3.6.
Pelaksanaan tindakan perbaikan di pantau, di dokumentasikan dan diinformasikan
Safety Alert
Ris
8.1.1.
Terdapat prosedur pelaporan bahaya yang berhubungan dengan K3 dan prosedur ini diketahui oleh pekerja
Anomaly box dan Safety Call Center
Project
8.2.1.
Terdapat prosedur yang terdokumentasi yang Proesdur Pelaporan Kecelakaan & Incident menjamin semua kejadian kecelakaan, PAK dan Ris Investigation kebakaran dicatat dan dilaporkan
KI/OHS-P/025 : Incident & illhealth procedure 100 Incident report (Accident & Nearmiss)
KI/FORM/OHS/025/069
101 List of Incident
102 Safety alert
KI/FORM/OHS/025/061
KI/OHS-P/026 : Incident investigation procedure 103 Incident investigation (Accident & Nearmiss)
KI/FORM/OHS/026/067
Cek apakah semua Accident sudah di investigasi
4.3. Tindakan Perbaikan dan Pencegahan
KI/OHS-P/027 : NC, CA & PA procedure
104 Non conformity request
KI/FORM/OHS/027/059
Setiap ketidaksesuaian yang bersumber dari : Temuan audit, khusus temuan Joint safety patrol, SSP, KIHQ Site Patrol setelah 2x kegiatan namun belum close, keluhan/ komplain pelangan/lingkungan/pegawai, hasil pemantauan/ pengukuran, pemenuhan undang-undang
105 Corrective Action request
KI/FORM/OHS/027/068
Setiap NCR dan Incident harus dibuatkan CAR. Khusus Nearmiss tidak perlukan kecuali terjadi kejadian yang sama 3x atau ada permintaan khusus
8.2.2.
106 Preventive Action
KI/FORM/OHS/027/070
Potensial NC saat audit atau berdasarkan evaluasi 3 bulanan terhadap ketidaksesuaian dan insiden yang potensial
8.4.1.
107 Register of NCR/CAR/PAR
KI/FORM/OHS/027/104
Buat Daftar NC, CAR dan PAR
8.4.2.
Terdapat prosedur untuk menangani masalah keselamatan dan kesehatan kerja yang timbul
Ris
7.1.6.
Pengusaha telah menetapkan tanggung jawab untuk melaksanakan tindakan perbaikan hasil pemeriksaan dan inspeksi
Prosedur Inspeksi dan Prosedur Investigasi Ris
10.1.1.
Pengurus telah mendokumentasikan dan menerapkan prosedur pelaksanaan identifikasi, pengumpulan, arsip, pemeliharaan, penyimpanan dan pengantian catatan K3
10.1.3.
Terdapat prosedur yang menentukan persyaratan untuk menjaga kerahasiaan catatan
NAH
Buat data lifetime unruk dokumen dan record
10.1.4.
Catatan kompensasi kecelakaan dan rehabilitasi kersehatan tenaga kerja dipelihara
ALL
Memudahkan pencarian dokumen
10.1.5.
4.5.4. Rekaman dan Pengelolaan Rekaman
3.2.5. Pencatatan dan Manajemen Informasi
KI/OHS-P/028 : Record control procedure 108 Record keeping
KI/FORM/OHS/028/062
109 Label of ordner, Catalog and list of content
Prosedur investigasi
4.5.5. Internal Audit
4.2. Audit SMK3
KI/OHS-P/029 : Internal audit procedure
10.2.1.
Data K3 terbaru dikumpulkan dan dianalisa
10.2.2.
Laporan rutin kinerja K3 dibuat dan disebarluaskan didalam tempat kerja
11.1.1.
Audit internal SMK3 yang terjadwal dilaksanakan untuk memeriksa kesesuaian Schedule Internal Audit perencanaan dan untuk menentukan efektivitas
Ris
11.1.2.
Audit Internal SMK3 dilakukan oleh Petugas yang independent, kompeten dan berwenang
Ris
Laporan Audit di distribusikan kepada pengusaha atau pengurus dan petugas lain yang berkepentingan dan dipantau untuk menjamin tindakan perbaikan
Laporan MRM
Training Internal Auditor SMK3
110 Annual internal audit program
KI/FORM/OHS/029/098
11.1.3.
111 Audit check list
KI/FORM/OHS/029/100
11.1.4.
112 Detail Audit plan
KI/FORM/OHS/029/099
RIS
113 Audit report
KI/FORM/OHS/029/102
RIS
114 Audit notes/ observation
KI/FORM/OHS/029/101
RIS
115 Internal Audit report
KI/FORM/OHS/029/102
116 Status of follow up action
KI/FORM/OHS/029/103
RIS Follow up dari Auditee, mana yg sudah close mana yang belum, up date sampai kamis 14/7, push semua proyek untuk mengirimkan closingnya
KI/OHS-P/030 : Management review procedure 117 Management Review Schedule KI/FORM/OHS/030/049
1.3.1
Tinjauan penerapan SMK3 yang meliputi Kebijakan, Perencanaan, Pelaksanaan, Pemantauan dan Evaluasi telah dilakukan, dicatat dan didokumentasikan
Laporan MRM 2013 (Desember) & MOM
1.3.2
Hasil tinjauan dimasukkan dalam perencanaan tindakan manajemen
Status MOM MRM 2013 (Desember) & Program K3 tahun 2014
1.3.3
Pengurus harus meninjau ulang pelaksanaan SMK3 secara berkala
Pelaksanaan MRM 2013 (Desember)
OHS MR OHS MR
119 Management Review Minutees Meeting 120 Attended list, invite letter, distribution list
RIS
5. TINJAUAN ULANG DAN PENINGKATAN BERKELANJUTAN OLEH PIHAK MANAJEMEN
4.6. TINJAUAN MANAJEMEN
118 Management Review Agenda
RIS
OHS MR Distribution list MRM dan Minutess
OHS MR
STATUS
SOAL TEST TRAINING LIFTING DAN RIGGING Score
Hari/ Tgl Nama Jabatan Perusahaan
Status Pass
Soal No 1 PENGOPERASIAN CRANE YANG AMAN ADALAH SBB, KECUALI : A Posisi Outtrigger dalam keadaan maximal B Memasang baricade diarea pengangkatan C Memerhatikan distribusi tiang listrik dan kabel transmisi dari radius crane D Setelah material diikat dengan benar, material bisa langsung diangkat 2
PEMASANGAN SLING PADA HOOK YANG BENAR ADALAH :
1
3
2
A B C D 4
Jawaban
SAAT MELAKUKAN PENGANGKATAN MATERIAL DENGAN CRANE, URUTAN YANG BENAR ADALAH SBB : Taksir berat beban, ikat sesuai prosedur, angkat 60cm-1m, goyangkan material dengan menggunakan tambang atau kaso, bila material aman (tidak ada alat atau material yang lepas), A instruksikan operator untuk mengangkat, saat unloading gunakan tambang untuk menstabilkan dan mengarahkan material Taksir berat beban, ikat sesuai prosedur, angkat 60cm-1m, goyangkan material dengan menggunakan tangan langsung, bila material aman (tidak ada alat atau material yang lepas), B instruksikan operator untuk mengangkat, saat unloading gunakan tambang untuk menstabilkan dan mengarahkan material Taksir berat beban, ikat sesuai prosedur, angkat 60cm-1m, goyangkan material dengan menggunakan tambang atau kaso, bila material aman (tidak ada alat atau material yang lepas), C instruksikan operator untuk mengangkat, saat unloading gunakan tangan untuk menstabilkan dan mengarahkan material D Jawaban diatas salah semua
3
1&2 1&4 3&4 2&4
PADA GAMBAR DIBAWAH, MANA YANG BENAR?
1 A B C D
1 2 Salah semua 1 & 2 benar
2
Re-Tr
4
5
SALAH SATU PERSYARATAN WIRE ROPE DAPAT DINYATAKAN RUSAK ADALAH BERKURANG DIAMETER SEBANYAK……% A 5% B 10% C 15% D 20% PERHATIKAN GAMBAR DISAMPING
6
NO. 1 PADA GAMBAR ADALAH : A Core B Wire C Strand D Wire Rope
7
NO. 2 PADA GAMBAR ADALAH : A Core B Wire C Strand D Wire Rope
8
KODE KONSTRUKSI YANG BENAR PADA GAMBAR DISAMPING ADALAH : A 1x7 B 7x7 C 7x19 D 7x16
9
CARA PENGUKURAN DIAMETER YANG BENAR ADALAH : A No. 1 B No. 2 C Semua benar D Salah semua
1
2
10 PADA GAMBAR DIATAS, KERUSAKAN YANG TERJADI PADA NO. 1 ADALAH AKIBAT : A Deformation (Perubahan bentuk) B Corotion (Korosi) C Pengelasan D Retak 11 PADA GAMBAR DIATAS, KERUSAKAN YANG TERJADI PADA NO. 3 ADALAH AKIBAT : A Deformation (Perubahan bentuk) B Corotion (Korosi) C Pengelasan D Retak 12 PADA GAMBAR DIATAS, KERUSAKAN YANG TERJADI PADA NO. 2 ADALAH AKIBAT : A Deformation (Perubahan bentuk) B Corotion (Korosi) C Pengelasan D Retak untuk dapat Lulus (Ps), minimal harus mendapat Nilai 10 dan Soal No. 2 harus BENAR
Novan & is Lalu & Is Yudi Heri Rendi Ris Andi Adi & Is Gp
1
2
3 4