Arc All

April 27, 2017 | Author: kokuei | Category: N/A
Share Embed Donate


Short Description

Download Arc All...

Description

LEGENDS LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

PLAN A

DOWN CONDUCTOR

301 MK05-03247A

AIR TERMINATION ROD

305

BRIDGE

6

MK05-03251K

AVE

302

09M LINE

TI

5-049

MK0

UND AR Y

M EN

/ BO

C LE

LINE

304

309

MK05-08857K

MK05-03250A

MK05-03255C

FO

309A MSCP

4

OT PA

AV E

MK05-08724N

TH

310 MK05-03256M

4P

SCREED

3000

3000

3000

3000

3000

REFER TO WD/001/04

2207

2679

5-

LE M C



1679

Extg lamppost to be repositioned

2000

04

63

WALKWAY

K0

TI CEMENT

10

M

EN

COVERED

NEW

10 0°

FALL

Extg 3 palm trees to be fell

171° 2220

N 3000

EXTG SUBSTATION

EXTG DRIVEWAY

LOCATION PLAN

Extg footpath to be deleted

A'

SCALE 1:2000

F A LL

New 2.8m wide alum composite panel covered linkway to match extg

3000

New covered drain with gs flat gratings to match extg drain width and to be connected to extg drain

3000

A

PLAN A

2092

N

308 MK05-03254L

FALL

New covered drain with slabs to match extg drain width and to be connected to extg drain New covered linkway to detail

306A

AY LINKW 3000

EXTG

TG

3000

A TH FOOTP

ED COVER

TURF

307 MK05-03253X

303 MK05-03249N

RV E

B'

TOP SLOPE

306 MK05-03252N

D RE SE

TOP SLOPE

EX

B

PLAN B

MK05-08857K

R OA

BOTTOM SLOPE

600

E X TG

TOP SLOPE

OVERHEAD

BOTTOM SLOPE

EXTG

BOTTOM SLOPE

MK05-03248K

SCALE 1:200

500

2 3 00

BLK 301

New 4mm thk alum composite panel roof

Detail 1 2300

HEIGHT TO BE VERIFIED ON SITE

EXTG COVERED LINKWAY

New gs column to PE's detail

DL OVERE C G T X E

Y INKWA

SLOPE

NEW COVERED WALKWAY

4mm thk alum composite panel roof with protection system according to authorities requirement



SECTION B-B

SLOPE

5° FALL

EXTG OVERHEAD BRIDGE

500

EXTG DRIVEWAY

SCALE 1:50 S LO

N

PE

ROOF PLAN A SCALE 1:200

New 4mm thk alum composite panel covered linkway to match extg

New 4mm thk alum composite panel roof to match extg

2800 500

2300 5°

BLK 301

New gs C section to PE's detail

Gs tapered T-beam to PE's detail

MIN. 2400

New gs column to PE's detail

New gs C section to PE's detail

50

Gs tapered T-beam to PE's detail

NEW COVERED WALKWAY

400

5mm thk G.I flat bar bracket with 1.5mm thk color bond(bended)

Alum composite panel U channel

SECTION A-A SCALE 1:50

DETAIL 1 SCALE 1:10

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

FOR TENDER

LEGENDS LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

BOTTOM SLO PE

TOP SLOPE

18133 7 SPANS NEW GS COLUMNS @

BOTTOM SLOPE

BOTTOM SLOPE

3M C/C MAX

A NS

NEW

21

500

Extg palm tree to be fell TOP SLOPE

/C M

TOP SLOPE

AX

FOR TENDER TOP SLOPE

A FOOTP

646 GS C O LU MNS @3 MC

E X TG

8 SP

TH

A' 13 SPANS

NEW

CEMENT

SCREED

15941

C/C MAX

GS CO S NEW 6 S PA N

LUMNS

/C MA @ 3M C

X

405

2.6M

37282

NEW GS CO LUMNS @ 3M

C'

FOOTPATH

A

C EXTG

New wide covered drain with gs flat grating to match extg drain width and to be connected to extg drain

Extg tree to be fell

New 2.8m wide alum composite panel covered linkway to match extg

Extg footpath to be deleted Extg palm tree to be fell

AY LINKW

BLK 304

EXTG SUBSTATION

Extg tree to be fell

BLK 303

PLAN B

N

EXTG

BLK 303 N

ROOF PLAN B SCALE 1:200

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

AY LINKW

4mm thk alum composite panel roof with protection system according to authorities requirement

BLK 304

SLO PE

SLOPE

SLO

PE

SLOPE

SCALE 1:200

EXTG SUBSTATION

Extg linkway 500

LEGENDS

2300

LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR

DETAIL 2

4mm thk alum composite flashing

EXTG COVERED LINKWAY

NEW COVERED WALKWAY

SECTION C-C

DETAIL 2

SCALE 1:50

EXTG OVERHEAD BRIDGE

HEIGHT TO BE VERIFIED ON SITE

AIR TERMINATION ROD

SCALE 1:10 BOTTOM SLOPE

Y INKWA

3000

L VERED O C G T EX

600

TOP SLOPE

FOR TENDER

3000 2220

1679 2679

3000

3000

3000

3000

3000

2207

2000

3000 3000 3000

To install new DB to nearest HDB's switchroom (location to be verified on site)

2092

500

2 3 00

BLK 301

N

ELECTRICAL PLAN B SCALE 1:200

SINGLE LINE DIAGRAM (PLAN A)

SINGLE LINE DIAGRAM (PLAN B)

BOTTOM SLO PE

To install new DB to nearest HDB's switchroom (location to be verified on site) TOP SLOPE

18133 7 SPANS NEW GS COLUMNS @

BOTTOM SLOPE

BOTTOM SLOPE

3M C/C MAX

8 SP

A NS

NEW

With new light fittings mounted on each columns with alternate circuits

21

646 GS C O LU MNS @3 MC

TOP SLOPE

TOP SLOPE

/C M

TOP SLOPE

AX

13 SPANS

2.6M

37282

NEW GS CO LUMNS @ 3M

NEW

C/C MAX

15941 MN S COLU NEW G S N A P 6S

S @ 3M

C/C MA

X

FOOTPATH

EXTG SUBSTATION

BLK 304

BLK 303 N

ELECTRICAL PLAN A SCALE 1:200

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS LIGHTNING ALUMINUM TAPE

225

MM

DOWN CONDUCTOR C/W EARTHING POINT

DI A

.S

DOWN CONDUCTOR

EW

ER

L IN

AIR TERMINATION ROD

E

Extg road kerb to be realigned Extg reserved & NP lots to be relocated

5° 9546

2 extg loading/unloading lots to be relocated

Extg drain grating to be lowered and slab over(Hatched)

A'

SLOPE

TG

4800

EX

New 3.8m ht alum composite panel drop-off porch

SLOPE

SLOPE

CO VE RE

5000

New ramp (G 1:12)

1050

1050

4900

Extg signage to be repositioned

600

New 230mm wide covered drain with gs flat grating to be connected to extg drain

0

FALL

2500

30

EX TG

New 3.1m wide alum composite panel covered linkway Extg footpath to be deleted

FOR TENDER

D

FALL

'NP' LOT

0 00 R9

Extg tree to be fell

2 7°

1 new reserved & NP, 2 new loading/unloading lots to replace relocated lots

4mm thk alum composite panel roof with protection system according to authorities requirement

LIN KW AY

7000 Extg tree to be fell and 2 new trees to be replaced

1000

3200

3200

811

BLK 310

A New drain to be concealed

N

BLK 310 ROOF PLAN SCALE 1:100

BLK 310 N

BLK 310 PLAN

New 4mm thk alum composite panel drop-off porch

SCALE 1:100

4000

1000 New 4mm thk alum composite panel covered linkway to match extg



New gs C section to PE's detail



Extg covered linkway

New 3.8m ht alum composite panel drop-off porch

7000

5000

'NP' LOT

Extg drop to be topped up with rc

NEW DROP-OFF PORCH

2700

MIN 2000

3800

Gs tapered T-beam to PE's detail

New gs column to PE's detail

NEW COVERED WALKWAY FALL

2500

2600

New 3.1m wide alum composite panel covered linkway

SECTION A

600

To install new DB to nearest HDB's switchroom (location to be verified on site)

1000

3200

SCALE 1:50

3200

BLK 310 N

BLK 310 ELECTRICAL PLAN SCALE 1:100

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

SINGLE LINE DIAGRAM FOR BLK 310

BLK 310

LEGENDS LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

2478

873

PROPOSED LINKWAY

873

2478

New 230mm wide covered drain with gs flat grating to be connected to extg sump

300

FOR TENDER 2400

To install new DB to nearest HDB's switch room (location to be verified on site)

BLK 629 PLAN N

SCALE 1:100 N

LOCATION PLAN SCALE 1:2000

To install new DB to nearest HDB's switch room (location to be verified on site)

New 4mm thk alum composite drop panel flashing

BLK 629 ELECTRICAL PLAN SCALE 1:100 4mm thk alum composite panel roof with protection system according to authorities requirement

SLOPE

LIGHT FITTING SPECIFICATIONS SYMBOL

IMAGES

DIMENSION

DESCRIPTION 1 x 18W LED (MINIMUM 1,800 LUMENS) SURFACE MOUNTED 4' ALUMINIUM LIGHT FITTING WITH MIRROR LOUVRE C/W LAMP AND BUILT-IN DRIVER, SIMILAR TO AEROLITE ASP41LED OR APPROVED EQUIVALENT.

2700

BLK 629 ROOF PLAN N

SCALE 1:100

New 4mm thk alum composite drop panel flashing New 4mm thk alum composite panel covered linkway

2400

2400

2380

300

New gs column to PE's detail

NEW COVERED WALKWAY FINISHES TO BE MADE GOOD

New 230mm wide drain covered with slab to be connected to extg sump

SINGLE LINE DIAGRAM (AT BLK 629) SECTION A-A SCALE 1:50

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

230mm new covered drain with gs flat grating to be joined to ext'g drain

Extg tree to be fell

FOR TENDER

New 5m wide alum composite panel high link over new hump

New 3m wide alum composite panel covered linkway

New light fittings refer to WD/001/10

New 5m wide alum composite panel high link over new hump

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

FOR TENDER

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

FOR TENDER

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

FOR TENDER

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

FOR TENDER

Ext'g walkway to be extend to 3m width

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

Ext'g walkway to be extend to 3m width

Ext'g walkway to be extend to 3m width New gs column to PE's detail

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

SU NS

BL

P K

TENDER DRAWING BLK 115

11

4

CLEMENTI ARCADE

BL

K

11

3

SUNS

ET

P

WAY BL K

11

2

4

P PROPOSED ROOF CANOPY "3"

ME

C

BL K

BLK 103

Y

P BL

K

BLK 102 10

B 10 LK 7A

P

1

BL K

W

K

NS ET

VIE

SU NS ET

LK

BLK 116

BLK 111

RO

ET NS

TI EN

SU

K

BLK 115

11

K

11

2

K

10

4 P PROPOSED ROOF CANOPY "3"

BL

K

BLK 103

U

AD RO

B 10 LK 7A

B 10LK 8 K

10

9

BL

K

10 9A

C

TI

U E EN AV TI EN LE

M BL

K

37 4

M ULU

BL

K

CLEMENTI CC

PANDAN

34 1

BL K

RO

LE

4

C

AD

UE

P

34

0

SCALE:

1 : 5000

9A

SE

SITE PLAN N

LA N

E

0

10

30

40

50M

1 : 1000

D

ROA

SCALE:

20

AQUATIC SCIENCE CTR

I

LOCATION PLAN N

10

T MEN

D

EN

K

CLE

ROA

9

AV

AN

TI

2

TI

33

37 3

37

K BL

BL K

EN

ND

R

K

EM

R TO EC NN

TO

MEN

CLE

EC

NN

AN

CO

9

ND

RK

PA

PA

33

POLICE KINS TRAINING CAMP

BL

EAST LODGE CLEMENTI

CO

U

AN

UL

ND

K

BL

CL

9 33

PA

BL

AQUATIC SCIENCE CTR

EN

4

EI

U

EAST LODGE CLEMENTI

P

RK

K

NG

UL

8

LA N

E

SU

30

9

PA

ET

BL

NS

7

PA

SU 30

10

U

P BL

10 6

NEA SOUTH WEST REGIONAL OFFICE

AV

P K

K

BLK 110

TI

BLK 102 10 1

BL

BL

AD

EM EN

BL K

RO

UL

P

SUNSET WAY RESIDENCE SU NS ET 10 5 WA Y

CL

I NT ME

BL

TI

AN ND PA

E CL

14

T.

BLK 111

U

11

EN

E

BL K

S

EM

P

WAY

EN

ET

CL

UL

3

30

8

CL

BL

SUNS

K

EI NG

CLEMENTI ARCADE

EM

4

BL

SU

P

BL

4

TE R

AD

NS ET

K

T

BLK 118

WA

SU

BL K

30 7

P BL

SU N

NEIGHBOURHOOD

SU

DR IVE

BL 10 K 8

10 6

NEA SOUTH WEST REGIONAL OFFICE BL

BLK 110

AD

LE

RO

10

SUNSET WAY RESIDENCE SU NS ET 10 5 WA

TI

K

EN

BL

EM

. T S

CL

I T N

14

BLK 111

FEBRUARY 21, 2014

TENDER DRAWING FEBRUARY 21, 2014

BLK 104

BLK 104

A

A

A

A

PLAN OF ROOF CANOPY "3" N

0

1

2

3

4

SCALE:

Ext'g Linkway

B Ext'g Linkway

B

ROOF PLAN OF ROOF CANOPY "3" N

5M

1 : 100

0

1

2

3

4

SCALE:

5M

1 : 100

BLK 104

BLK 104

Ext'g Linkway

SECTION-ELEVATION A-A

SECTION-ELEVATION B-B

0

0

1

SCALE:

2

3

4

5M

1 : 100

1

SCALE:

2

3

4

5M

1 : 100

A J N

SE

612

611

WEST VIEW PRIMARY SCHOOL

P

SEN

610

611A MSCP

FEBRUARY 21, 2014

535

613A MSCP

TENDER DRAWING 53

6

P 537A MSCP

538

537

Y A W

613

P

BT. PANJANG RING ROA D

632 B

540

JA D ROA

BRIGHT HILL EVERGREEN HOME

539

609 608

SENJA (BP13)

P

AN-LE

541A MSCP 54 1

MEMORIAL HALL

7A 61

BT . 3 61

D

D

PANGSHAN GR

P 611A MSCP

P BT. PANJANG NEIGHBOURHOOD PARK 5

540

JA

AD

SEN

610

538

ROA

539

609

BRIGHT HILL EVERGREEN HOME

608

D

SENJA (BP13)

541A MSCP

3

54

AN

NJ

PA A

544

G

603

SENJACASHEW CC

NA

ANG ANJ

604

L

AD

RO

CA

AD

AH

RO

602

TIM

606

BT

605

JUNCTION 10

545

RIN

. BT

P

544

603A MSCP

G

R

PROPOSED SMALL P PAVILION "4"

JA

601

PE

UP

N SE

RO

L NA CA

ROAD

JUNCTION 10

L A N

CA

. P

BT. PANJANG PLAZA

LOCATION PLAN SCALE:

. T B

605

1

AD

.

607

BT

SENJA SO KA CTR

N

604

54

MEMORIAL HALL

P

54 2

P

AN-LE

L NA

WEST VIEW PRIMARY SCHOOL

537A MSCP

537

611

53 6

P

RO

BT. PANJANG RING

SE

612

535

ROA

613

613A MSCP

606

CA

P

Y

WA A NJ

4 53

614

B

3

AD

633 632

1 : 5000

545

53

616A MSCP

C

2

53

RD

P

615A MSCP

NG

P

533A MSCP

SITE PLAN N

0

RO

PA

P

616

P 529A MSCP

LA

P

628

G

1 53

G

P

8

SENJA CENTRE

633

AN

JE

61

626

J AN

9

52

602

7 61

RIN

RI

AH TIM

5

62

P 603

NG

619

0 62

G

622

603A MSCP

.

LK

621

629B

AD RO

A

P

623

624

JELAPANG (BP12)

651A MSCP

NJ

625A MSCP 625B

627

P

SE

P

AN

651

9

62

NJ

631

3

65

BT

630

A NJ SE

PA

R

0

65

AD RO

601

PE

PROPOSED SMALL P PAVILION "4"

A J N

R

D A O

.

SE

UP

P

607

BT

SENJA SO KA CTR

10

SCALE:

20

30

40

50M

1 : 1000

TENDER DRAWING FEBRUARY 21, 2014

A

A

B 11 1.7 3

B

BO

BO UN

DA

RY

UN DA RY

LIN

LIN

E/

E/

B

B

CANAL

CANAL

A

A

PLAN OF SMALL PAVILION "4" N

0

1

SCALE:

2

3

4

5M

1 : 100

N

0

1

2

3

SCALE:

111.73

SECTION-ELEVATION A-A SCALE:

ROOF PLAN OF SMALL PAVILION "4"

1:100

4

5M

1 : 100

111.73

SECTION-ELEVATION B-B SCALE:

1:100

622

G N I

619

61

5

62

N A P

SENJA CENTRE

P

61 3

615A MSCP

3 3 5

616A MSCP

633

A J N

SE

612

611

WEST VIEW PRIMARY SCHOOL

JA EN

631

651

LK

622

NG

619

RI

61

N PA

8

BT 615A MSCP

3

3

53

616A MSCP

633

C 633

D

A 612

611

WEST VIEW PRIMARY SCHOOL

SEN

611A MSCP

53 6

P 537A MSCP

538

AN-LE

P BT. PANJANG NEIGHBOURHOOD PARK 5

539

D

SENJA (BP13)

3

54

B

N

1 : 5000

0

10

30

40

50M

1 : 1000

G

.

RIN

BT

SCALE:

20

G

SITE PLAN

601

LOCATION PLAN

ER

BT. PANJANG PLAZA

A J N

AN

SE

P UP

L

AD

RO

NA CA

AD

AH

AD G RO

JAN PAN T.

604

CA

R

D A O

NJ PA

SENJACASHEW CC

L NA

SCALE:

607

P 541A MSCP

PROPOSED BFA RAMP "5"

RO

602

TIM

606

605

N

SENJA (BP13)

544 A

544

G

603

JUNCTION 10

545

RIN

.

BT

P

54

3

1

603A MSCP

G

601

R

PE

P

SENJA SO KA CTR

54

R

D OA

540

2

608

AN NJ PA

A NJ SE

UP

P

607

.

SENJA SO KA CTR

BT

MEMORIAL HALL

P 541A MSCP

PROPOSED BFA RAMP "5"

BT. PANJANG NEIGHBOURHOOD PARK 5

54

ROA

AN-LE

54 2

P

1

JA 608

538

. BT

MEMORIAL HALL

540

609

BRIGHT HILL EVERGREEN HOME

537A MSCP

6

54

P

610

535

613A MSCP

537

Y

WA

613

P

PANGSHAN GR

BT. PANJANG RING ROA D

B

4 53

614

632

2

53

RD

P

533A MSCP

61

P

616

P

NG

P

628

NJ SE

PA

SENJA CENTRE

BRIGHT HILL EVERGREEN HOME

P 529A MSCP

LA

.

626

1 53

JA

JE

61

P

609

9

D ROA

5

52

NG

7 61

7A

0 62

611A MSCP

53

539

621

629B

AD RO

A

P

623

624

JELAPANG (BP12)

651A MSCP

NJ

625A MSCP 625B

62

P

SE

P

627

3

65

S

9 62

JA SEN

630

P

610

535

613A MSCP

537

613

P

4

614

PANGSHAN GR

53

BT. PANJANG RING ROA D

D

Y A W

RD

P

NG

533A MSCP

P

616

0 65

G N JA

P

628

AD RO

1 53

BT .

626

7 1 6

FEBRUARY 21, 2014

PA LA JE

61 8

TENDER DRAWING

R 7A

0 62

AD

AH

RO

TIM AD RO

TENDER DRAWING FEBRUARY 21, 2014

SECTION A - A SCALE:

1:100

A

A

PLAN OF BFA RAMP '5' SCALE:

1 : 100

TENDER DRAWING FEBRUARY 21, 2014

COLUMN DETAIL

DETAIL "E" SCALE: 1 : 20

SEE DETAIL "E"

TYPICAL RAMP RAILING DETAIL BETWEEN HIGH & LOW WALL SCALE: 1 : 50

TYPICAL RAMP RAILING DETAIL FOR RAMPS WITH LEVEL MORE THAN 1.00m HEIGHT SCALE:

TYPICAL RAMP RAILING DETAIL FOR RAMPS WITH LEVEL LESS THAN 1.00m HEIGHT

1 : 50

SCALE:

1 : 50

TYPICAL DETAIL OF STAINLESS STEEL HANDRAIL TO RAMP ABUTTING A LOW WALL SCALE: 1 : 50

PLAN SCALE: 1 : 50

TYPICAL RAMP DETAIL TYPICAL LINKWAY RAMP FLOOR FINISH SCALE:

TYPICAL DETAIL OF STAINLESS STEEL HANDRAIL TO RAMP ABUTTING A HIGH WALL SCALE: 1 : 50

1 : 50

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF