Ar 263 Building Utilities 1

November 28, 2017 | Author: Ivan Gonzales | Category: Sanitation, Plumbing, Storm Drain, Design, Hydraulic Engineering
Share Embed Donate


Short Description

8798...

Description

TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES COURSE SYLLABUS COURSE CODE COURSE NAME

AR 263 BUILDING UTILITIES 1 (2007 Curriculum)

CREDIT UNITS CONTACT HOURS

3 units 1 hour lecture, 2 hours laboratory

INSTRUCTOR

Adrian R. Toisa Faculty Member, Architecture and Technical Drafting NCII

TEXTBOOK

National Plumbing Code of the Philippines National Building Code of the Philippines

Other Supplemental Materials SPECIFIC COURSE INFORMATION a. Course Description Principles and practices in plumbing and sanitary systems- its design, installation, operation and maintenance in buildings in relation to the immediate surroundings or environment b. Prerequisites Co-requisites c. Course Classification (Required/elective/ selected elective)

AR 211S2 (Architectural Design 3); PHYS 009L1 (Physics I) Required

SPECIFIC GOALS FOR THE COURSE a. Course Objective The course aims to acquire adequate understanding on the fundamental concepts and principles, general design and installation of water supply, sanitary drainage systems, storm drainage system, waste disposal systems, and fire protection systems in buildings consistent with trade practices and recommendations. It aims to inculcate in their minds the importance of sanitation as well as plumbing in the context of building structures as a component of the overall building services function. The course also aims to comprehend and apply pertinent code provisions relative to designing, installation, operation and maintenance of plumbing

TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES COURSE SYLLABUS systems and its components and to express common engineering language associated with plumbing, sanitary and fire protection systems b. Course Outcomes At the end of the course, the students will be able to: 1. Acquire adequate understanding on the fundamental concepts and principles, general design and installation of water supply, sanitary drainage systems, storm drainage system, waste disposal systems, and fire protection systems in buildings consistent with trade practices and recommendations. 2. Inculcate in their minds the importance of sanitation as well as plumbing in the context of building structures as a component of the overall building services function. 3. Comprehend and apply pertinent code provisions relative to designing, installation, operation and maintenance of plumbing systems and its components. 4. Express common engineering language associated with plumbing, sanitary and fire protection systems

c. Student Outcomes Addressed At the Course a. Apply fundamental concepts and principles, general design and installation of water supply, sanitary drainage systems, storm drainage system, waste disposal systems, and fire protection systems in buildings to design, install, operate and maintain of plumbing systems and its components b. Use pertinent code provisions relative to designing, installation, operation and maintenance of plumbing systems and its components necessary for architectural and mechanical practices and activities.

COURSE TOPICS

TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES COURSE SYLLABUS Prelim Period (Weeks 1–6) I. Introduction: TIP Vision and Mission; TIP Graduate Attributes/ Institutional Intended Learning Outcomes; Program Educational Objectives/Student Outcomes; Course Objectives/ Course Intended Learning Outcomes; Course Policies II.

Fundamentals of Water Supply System : Sources and uses of water; Physical, chemical and biological properties of water; Water treatment methods; Water storage and distribution systems (Hot and Cold Water);

III.

Sanitary Drainage Systems- Soil, waste (direct and indirect waste piping systems) and vent piping systems: Ventilation and Ventilation System; Plumbing traps

IV.

Storm Drainage Systems (Surface and subsurface storm water)

Midterm Period (Weeks 7-12) I. II.

Sewage Disposal Systems: Treatment and Recycling Plumbing Materials (Water supply, Sanitary and Storm Drainage) and Fittings: Valves and control devices; Types of joints, connections and supports) III. Plumbing Fixtures IV. Pumps and Pumping Systems V. Plumbing fixtures Final Period (Weeks 13–18) I. Pumps and Pumping Systems II. Plumbing and sanitary System Layout (Water supply piping, sanitary and vent piping layout, and storm drainage layout) III. Plumbing Symbols IV. General Notes and Specifications V. Fire Protection Systems: Wet, Dry, Combined and Fire Sprinkler Systems; Smoke and Fire Detection Systems.

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF