Application Modrob

November 3, 2018 | Author: harimadhavareddy | Category: Power Electronics, Laboratories, Power Inverter, Vocational Education, Engineering
Share Embed Donate


Short Description

Modrob...

Description

 All India Council Council for Technical Technical Education (A Statutory body under Ministry of HRD, Govt. of India)

Proforma for submission of proposal under the scheme

MODERNISATION & REMOVAL OF OBSOLESCENCE The scheme aims to modernize and remove obsolescence in the Laboratories / Workshops/ Computing facilities (Libraries are excluded), so as to enhance the functional efficiency of Technical Institutions for Teaching, Training and experimenting purposes. It also supports new innovations in Class Room and Laboratory / Teaching Technology, development of Lab Instructional Material and appropriate Technology to ensure that the practical work and project work to be carried out by students is contemporary and suit ed to the needs of the Industry. The equipment financed under the scheme up to a limit of Rs 20 lakhs /- could be ideally used for upgradation of equipment in existing laboratories, enhancement of performance parameter specification of existing equipment, incorporation of latest development in the field and replacement of old depreciated equipment by modern equipment. In addition to above major objectives, the equipment installed through MODROBS can be used for indirect benefit to Faculty / Students through Continuing Education programs, Training programs for local industry and consultancy work.

Name of the Institute

Guntur Engineering College NH-5, YENAMADALA, Guntur-522019

Address Contact details

Email:[email protected]

Permanent Id of the Institute

1-4418451

Application Id

1-1484655212

Lab to be funded

Strength & Weakness of lab

Total cost of equipment in lab

Application Id -

Telephone :08632288888

Electrical & Electronics Engineering

Department

Current lab utilization

FAX : 08632288886

“ Power Electronics & Drives lab”

The Department is started in the year 2008. The lab is established in the year of2009. Current Utilization Level of Lab is 06 Hrs/week with batch size is 03 members. Total number of batches is 10. The total number of hrs per year the utilization of the lab is 96hrs. 

According to JNTUK syllabus all the power electronics and drives lab experiments are performing in our college lab.  For R/D work, there is no further extension of devices in PE&D lab.

Rs 9,55,292/-

Page x/y

 All India Council for Technical Education (A Statutory body under Ministry of HRD, Govt. of India)

Major equipment available in the lab

Name of equipment

Make and model

Cost in Rs.

Year purchased

Add rows as required

Technical Field of proposal The latest trends of operating the power electronic circuits with the application of appropriate software  are studied and are confirmed with the results obtained. Also the various units such as UJT, MOSFET, IGBT& SCR are subjected to actual characteristics and their  performance are verified & tested.

Title of proposal

“Modernization of Power Electronics & Driv es Laboratory” Add rows as required

Abstract

To develop the Lab Instructional Material and appropriate Technology to ensure that the practical work and project work to be carried out by students is contemporary and suited to the needs of the Industry. To enhance the performance parameter specification of existing equipment incorporation of latest development in the field and replacement of old depreciated equipment by modern equipment, Used for indirect benefit to Faculty or Students through Continuing Education programs. To organize training programs for local industry and consultancy work. Add rows as required

Objective In field of Power Electronics & Drives, to keep pace with the latest state of the art, it is necessary to update and upgrade current level of power electronic devices. For engineering fields, advances in power electronics offers rich possibilities of research.



To analyze the performance of full bridge converter. To analyze the performance of PWM Inverter. To analyze the performance& Operation of a four quadrant Chopper on D.C. Drive. To control the speed of DC motor drive using thyristor circuit.



To control the speed of slip ring Induction motor by Static Rotor Resistance controller.

  

Add rows as required

Project Impact -Expected outcome 



To enhance the performance parameter specification of existing equipment incorporation of latest development in the field and replacement of old depreciated equipment by modern equipment. Used for indirect benefit to Faculty / Students through Continuing Education programme. Add rows as required

Application Id -

Page x/y

 All India Council for Technical Education (A Statutory body under Ministry of HRD, Govt. of India)

Technical Consultancy / Revenue generation  To develop the Lab Instructional Material and appropriate Technology to ensure that the practical work and project work to be carried out by students is contemporary and suited to the needs of the Industry.  To enhance the performance parameter specification of existing equipment incorporation of la test development in the field and replacement of old depreciated equipment by modern equipment.  Used for indirect benefit to Faculty / Students through Continuing Education programmes. To organize training programmes for local industry and consultancy work.  Add rows as required

Budget Estimates  – Non Recurring

Proposed equipment/s

Specifications

No of units

Cost in Rs.

Justification

Three phase SCR power Circuit

50,329.125

Chopper/Inverter PWM Controller Three phase loading rheostat

1KW rating

Three phase inductive load

5Amp

3-Ø Inductive load

3-Ø, 415V, (0-5A each phase) (variable type)

61,938.45

3-Ø Resistive load

3-Ø, 415V, (0-5A each phase)

30,980.25

1Hp DC motor Spring Balance load setup

1 hp(0.75KW) 180VDC, 5.1Amp 220VDC, 0.3Amp 1500 rpm

55,314.00

Three phase IGBT based Power module Four Quadrant chopper PWM Control module 1Hp DC motor Spring Balance load setup

30,980.25 55,314.00

1,00,661.25

Single phase IGBT module Single phase PWM Inverter control module

33,912.90

R, L Load

Three phase IGBT based Power module Chopper/Inverter PWM Controller

Application Id -

230vac / 300vdc @ 4amp Suitable for 1HP Ac/Dc motor. 6 Numbers of PWM – 5VDC level

54,970.65

6 number of PWM’s for

 Armature & Field

Page x/y

 All India Council for Technical Education (A Statutory body under Ministry of HRD, Govt. of India)

30,980.25

Three phase loading rheostat VISSIM software(latest version)/PC

01

94,500.00 55,314.00

Three phase inductive load 3-Ø Inductive load

3-Phase, 415V, 10A (each phase), 6KW, star/Delta connection

3-Ø Resistive load

3-Phase, 415V, 10A (each phase), star/Delta connection

77,450.625

Speed control of Slip ring Induction motor using IGBT Chopper dsPIC 30F4011 based PWM Controller Three phase IGBT module

43,360.825

1,23,876.90

1,01,424.45

1HP 3 AC Induction Motor with Load setup TMS320F2407A based DSP controller

1,18,463.625

Three phase IGBT module 1HP 3 AC Induction Motor with Load setup

NR 11,19,771.55/-

Total(NR)

Add rows as required

Budget Estimates  –Recurring

Estimate for Year 1 (R1) Consumables & Contingencies Other Total Add rows as required

Payment disbursement schedule

Advance installment

NR

Application Id -

Total (Max 20 Lakhs)

R1

R=NR+R1

Page x/y

 All India Council for Technical Education (A Statutory body under Ministry of HRD, Govt. of India)

Details of Project Coordinator

Name Exact designation Appointment Type

Mr.V.JoshiManohar Associate Professor Permanent

Department Qualifications

B.Tech(EEE)

Experience in years Relevant experience Other information Cell number Email Signature

Teaching- 12

Scheme

28-06-2011 15,600-39,100-with AGP Scale of Appointment of Rs-8,000 Electrical and Electronics Engineering PhD pursuing under M.Tech (Power Electronics) JNTUA Anantapur Industry- Nil Research

03 Nil +91-9912376009 [email protected]

Details of earlier grants awarded to the Institute

Name of the coordinator

Date of joining

Amt sanctioned NR

R

(Give details of grants received in last three years)

Sanctioned letter details

Funds Utilisation position as on today

UtilisationCertificate details/ Reason for non- submission of UtilisationCertificate

Nil Add rows as required

By signing this certificate, I/We undertake to    

Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute. Submit timely progress reportsabout grant utilization. Submit utilization certificate duly authenticated by CA on/before project period is o ver. Return full/partial unutilized grant amount to the Council.

Project forwarded to AICTE

Signature of Head of the Institution

Date :

Institute Seal

Application Id -

Page x/y

 All India Council for Technical Education (A Statutory body under Ministry of HRD, Govt. of India)

Important : You need to apply on web portal using your Institute login and password. Select tab “ AQIS application”. Press “New” to create new application. Your application is assigned unique application Id . Fill all the details over there. Prepare application in this proforma also . Attach PDF of it to the application on web portal. Now press “submit” on web portal to submit application. Pay processing fees on web portal using appropriate payment option.

Application Id -

Page x/y

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF