API Standard 660.pdf

July 16, 2018 | Author: Joko Kumboro | Category: Heat Exchanger, Materials, Building Engineering, Mechanical Engineering, Nature
Share Embed Donate


Short Description

Download API Standard 660.pdf...

Description

 AP  API Standard 660 Shell-and-Tube Heat Exchangers NINTH EDITION | MARCH 2015 2015 | 62 PAGES | $185.00 $185.00 | PRODUCT PRODUCT NO. C6600 C66009 9

This standard specifies requirements and gives recommendations for the mechanical design, material selection, fabrication, inspection, testing, and preparation for shipment of shell-and-tube heat exchangers for the petroleum, petrochemical, and natural gas industries.

For ordering information: Online: www.api.org/pubs Phone: 1-800-854-7179 (Toll-free in the U.S. and Canada)

This standard is applicable to the following types of shelland-tube heat exchangers: heaters, condensers, coolers, and reboilers. This standard is not applicable to vacuum-operated steam surface condensers and feed-water heaters.

(+1) 303-397-7056 (Local and International) Fax:

(+1) 303-397-2740

API members receive a 30% discount where applicable.

www.api.org

Contents Page

1

Scope Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

2

Normati Normative ve Refere References nces.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

3

Terms and Defin Definition itions s. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

4

General General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

5

Proposa Proposall Informat Information ion Required Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

6 6.1 6.2 6.3

Drawing Drawings s and Other Other Requir Required ed Data. Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Outline Outline Drawin Drawings gs and and Other Other Suppor Supporting ting Data Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Information Information Required Required After Outline Outline Drawings Drawings Are Reviewed. Reviewed. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Report Reports s and Recor Records ds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

7 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.11 7.11 7.12

Design. Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Design Design Tempe Temperatu rature re . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Cladding Cladding for for Corro Corrosion sion Allowanc Allowance e . . . . . . . . . . .. . . . . . . . . . .. . . . . . . . . . . .. . . . . . . . . . . .. . . . . . . . . . . . 8 Shell Supports Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Stationary Stationary and Floating Heads. Heads. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Tube Bundl Bundle e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Nozzles Nozzles and Other Other Conne Connection ctions s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Flanged Flanged Exter External nal Girth Girth Joint Joints s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 Girth Flange Flange Joint Supplement Supplementary ary Design Design Requirements Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Expans Expansion ion Joint Joints s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Gaskets Gaskets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Handling Devices. Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Requirements Requirements for Hydrogen Hydrogen Service. Service. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

8 8.1 8.2 8.3 8.4

Material Materials s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 General General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Requirements Requirements for Carbon Carbon Steel Steel in Sour Sour or Wet Hydrogen Hydrogen Sulfide Service Service . . . . . . . . . . . . . . . . . . . . . . . . 24 Gaskets. Gaskets. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Tubes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

9 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9 9.10 9.11 9.11

Fabrica Fabrication tion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Shells Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Pass-p Pass-parti artition tion Plate Plates s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Connect Connection ion Juncti Junctions. ons. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Tubes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Welding. Welding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Heat Heat Treat Treatment. ment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Dimensio Dimensional nal Toler Tolerance ances s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Gasket Contact Contact Surfaces Surfaces Other Other Than Nozzle Flange Flange Facings Facings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Tube Holes Holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 Tube-to-Tubesheet ube-to-Tubesheet Joints Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

v

Contents Page

10 10.1 10.2 10.3

Inspecti Inspection on and and Testi Testing ng . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Quality Control. Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Pressure Pressure Testing Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Nameplates Nameplates and Stampings Stampings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

11 Preparat Preparation ion for for Shipmen Shipmentt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 11.1 11.1 Protection. Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 11.2 11.2 Identification. Identification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 12 12.1 12.2 12.3

Suppleme Supplementa ntall Require Requirement ments s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 Examination Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

Annex A (informative) A (informative) Recommended Recommended Practices Practices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Annex B (informative) (informative) Shell-and-Tube  Shell-and-Tube Heat Exchanger Exchanger Checklist. Checklist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Annex C (informative) (informative) Shell-and-Tube  Shell-and-Tube Heat Exchanger Exchanger Datasheets Datasheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 Bibliography Bibliography . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 Figures 1 Minimum Minimum Thick Thicknes ness s of Tube Tubes s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 2 Clearan Clearance ce Betwee Between n Tube Tube Holes Holes and Trans Transver verse se Baffle Baffle Edge Edge with with Longit Longitudin udinal al Baffle Baffle . . . . . . . . . . . . . . 12 3 Typical ypical CrossCross-sect sections ions of Tube Tube Bundle Bundle Showin Showing g Locatio Locations ns of Bypass Bypass Sealing Sealing Devic Devices es . . . . . . . . . . . . 14 4 Directio Directions ns of Moments Moments and Force Forces s on Nozzles Nozzles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Tables 1 Typical ypical Design Designs s for Floating Floating-hea -head d Covers Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 2 Nozzle Nozzle Allow Allowable able Forces Forces and and Moment Moments s at the the Nozz Nozzle le Neck Neck to Shell/Ch Shell/Channe annell Interfa Interface. ce. . . . . . . . . . . . . . 16 3 Assembl Assembly y Gasket Gasket Stress Stress.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 4 Gasket Gasket Cont Contact act Surface Surface Finishe Finishes s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 5 Flatness Flatness Toleranc olerance e on Periph Periphera erall Gasket Gasket Conta Contact ct Surfac Surfaces es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 6 Maximum Maximum Allowa Allowable ble Tube Tube Wall Wall Thick Thickness ness Reductio Reduction n for Roller-ex Roller-expa panded nded Tube-to-T ube-to-Tubes ubesheet heet Joints Joints . 30 7 Hardnes Hardness s Limits. Limits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 B.1 Checklist for Shell-and-T Shell-and-Tube ube Heat Exchangers Exchangers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46

vi

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF