Professional Training and Consultation
SET – J API 510 Preparatory Course 1. A filmside penetrameter can be used for: a. inaccessible welds (unable to hand place a source penetrameter) b. all welds c. all castings at any time d. an alternative to a source-side wire penetrameter 2. A dark image of the "B" on a lighter background is: a. b. c. d.
Acceptable Rejectable Sometimes rejectable None of the above
3. One of the procedural requirements for conducting PT is to address the processing details for: a. b. c. d.
Post-examination cleaning Pre-examination cleaning Apply the penetrant All of the above
4. Non-aqueous developer may be applied to a wet surface. True
or
False
(circle one)
5. The accuracy of a piece of magnetizing equipment that is equipped with an ammeter shall be verified: a. b. c. d.
Each year Each two years When possible Every 6 months
P.O. Box No. 7274, Dammam 31462, Saudi Arabia ● TEL (966) 3 857 0006 ● FAX (966) 3 857 5255 ●
[email protected] ● www.gotoITC.com
91
Professional Training and Consultation
6. When using fluorescent particles, the examiner shall be in a darkened area for at least ________ minutes prior to performing the examination. a. b. c. d.
7 10 9 1
7. A wire IQI shall be placed adjacent to the weld, with the wires parallel to the weld. True
of
False (circle one)
8. A field indicator is composed of _______low carbon steel pie sections, furnace brazed together. a. b. c. d.
2 6 10 8
9. The type and amperage of magnetizing current must be identified on the written MT procedure. True of 10.
False (circle one)
Certification of contaminants shall be obtained for all PT materials used on:
a. Carbon steels b. Ferritic stainless steels c. Austenitic stainless steels d. None of the above 11. Black light intensity shall be measured with a _______ when conducting fluorescent PT. a. Dark room meter b. Photo-meter c. Black light meter d. None of the above P.O. Box No. 7274, Dammam 31462, Saudi Arabia ● TEL (966) 3 857 0006 ● FAX (966) 3 857 5255 ●
[email protected] ● www.gotoITC.com
92
Professional Training and Consultation
12.
When should a densitometer be calibrated as a minimum? a. b. c. d.
13.
Annually Every 90 days Whenever it is turned on As required by the Examiner
The location markers required by ASME V are required to appear as radiographic images. True or
14.
False
(circle one)
When coatings are applied to enhance contrast, the procedure must be demonstrated that indications can be detected through the coating. True or
16.
(circle one)
D.C.yokers may be used for detecting subsurface discontinuities, per ASME V? True or
15.
False
False (circle one)
How many total liquid penetrant techniques are listed in ASME V? a. b. c. d.
4 6 2 1
17.
Prior to examinations, each adjacent surface shall be cleaned within at least _____" of the area to be examined. a. 1 b. 1.5 c. 2 d. 3
18.
Water washable penetrant shall be removed with a water spray not exceeding 60 psi and 1000F.
P.O. Box No. 7274, Dammam 31462, Saudi Arabia ● TEL (966) 3 857 0006 ● FAX (966) 3 857 5255 ●
[email protected] ● www.gotoITC.com
93
Professional Training and Consultation
True or 19.
The maximum emulsification time shall be : a. b. c. d.
20.
pre-flooding with emulisifier pre-cleaning with solvent pre-rinsing with water pre-washing with detergent
A welded part is to be radiographed and is 1" thick, with 1/8" reinforcement. What ASTM wire set IQI should be used on these radiographs if a source side technique is used : a. b. c. d.
23.
Densitometer Step Wedge Comparison Strip Light Meter Transmission monitor
When using a hydrophillic emulsifier versus a lipophilic emulsifier and intermediate step that must be taken is: a. b. c. d.
22.
5 minutes 10 minutes 15 minutes none of the above
Densitometers shall be calibrated by verification with a calibrated: a. b. c. d.
21.
False (circle one)
Set Set Set Set
A B C D
When a PT test cannot be conducted between 5001250F, what must be done, per ASME V? a. The procedure must be qualified.
P.O. Box No. 7274, Dammam 31462, Saudi Arabia ● TEL (966) 3 857 0006 ● FAX (966) 3 857 5255 ●
[email protected] ● www.gotoITC.com
94
Professional Training and Consultation
b. The surface must be re-cleaned c. The test cannot be conducted d. None of the above 24.
The sulphur content of a penetrant is measured to be less than 0.0025g. This material is acceptable for use on: a. b. c. d.
25.
All indications are to be evaluated in accordance with: a. b. c. d.
26.
Nickel-base alloys Carbon steel Ferritic steel All of the above
ASME VIII ASME V The referencing Code section The written procedure
The scope of the ASME Boiler and Pressure Vessel, Code, Section V includes: a. b. c. d.
NDE acceptance crtieria How to perform NDE to achieve a desired result Where to do NDE (i.e. what welds to examine) Who can be the Authorised Inspector
27.
UT equipment is calibrated? a. Before heat-treatment b. AFter completing the examination c. Prior to visual examination d. Prior to PT examination
28.
What finished surface is required of butt welds for PT examination? a. Smooth surface prepared by grinding b. Cosmetically clean acid etched surface
P.O. Box No. 7274, Dammam 31462, Saudi Arabia ● TEL (966) 3 857 0006 ● FAX (966) 3 857 5255 ●
[email protected] ● www.gotoITC.com
95
Professional Training and Consultation
c. A near white blast surface d. None of the above 29.
A penetrameter is used on a DWE/DWV. The penetrameter selection is based on: a. b. c. d.
30.
A suitable means for applying penetrant. a. b. c. d.
31.
The single wall thickness and weld reinforcement Both wall thicknesses The single wall thickness for Sch 80 pipe None of the above
Dipping Brushing Spraying Any or all of the above
What materials require the use of tested and certified liquid penetrants as to the contaminants in the penetrant? a. b. c. d.
Nickel alloys Austenitic stainless steel alloys Ferritic / martensific stainless steel Both a and b, above
32.
How shall indications be evaluated, i.e. acceptance standards for RT? a. To ASME V b. To ASME VIII c. To B31.3 d. To the referencing Code section
33.
Thickness readings may be displayed on? a. b. c. d.
SRT PRT CRT Strip chart recorder
P.O. Box No. 7274, Dammam 31462, Saudi Arabia ● TEL (966) 3 857 0006 ● FAX (966) 3 857 5255 ●
[email protected] ● www.gotoITC.com
96
Professional Training and Consultation
34.
How many copies of a procedure must be available to the Manufacturers NDE Personnel? a. b. c. d.
35.
How shall Non-destructive Examination Personnel be qualified? a. b. c. d.
36.
To To To To
SNT-TC 1A CP-189 referencing code requirements ACCP rules
Which NDE methods? a. b. c. d.
37.
1 2 3 4
methods
are
considered
"surface"
PT RT MT Both A & C above
What designation is used to indicate the penetrameter is on the film side? a. b. c. d.
An "F" An " E" A " D" An "FS"
P.O. Box No. 7274, Dammam 31462, Saudi Arabia ● TEL (966) 3 857 0006 ● FAX (966) 3 857 5255 ●
[email protected] ● www.gotoITC.com
97