Design procedure The ribs are placed at a clear spacing of 400mm. The Depth of the topping is 60mm and the concrete strength shall be of the same class as that of the ribs.
Loading The function of the building is for office and shop(Mixed use). Therefore the live loading depends on the specific use of the floors. Shop Department sores Offices Restaurants and dining rooms Structural analysis and design
5.00 KN/m2 5.00 KN/m2 3.00 KN/m2 3.00 KN/m2
Shop and office
Wzr Sewunet
References: EBCS 1, 2, 3 ,& 8 Slab Analysis Solid slabs are preferable in areas where soil waste pipes pass. Slabs for first floor and second floor
Panel Type Case No2.= Fck Fyk
20.00
Fcd
300.00
Fyd
11.33
Fck
1
Fyk
260.87 0
S-1
1
βa for 2:1
βa for 1:1
Ratio calc.
βa calc
1
βa for 2:1
30.00
40.00
1.14
38.57
1 -Continuous
30.00
Lx/4
0.88
Lx [m]
Ly [m]
βa calc
3.50
4.00
38.57
Floor finish
5cm Screed
0.06
1.15
L(in)
L(out)
1.70
1.70
Panel Name Depth D-Load Wall Load
0 -Discontinous
S-1
D [mm]
Panel Name
d [mm]
60.00
Depth
36.30
200.00
Weight Ceiling Plaster Other.D.Load 5.00
0.46
Wall Height Wall unit weight 2.70
3.30
q
9.17
Cover [mm]
Live Load
5.00
15.00
r values
0.88 r1
Alpha values
0.00 αxs 0.05
Moment
Wall Load
2.50
Total dead load Design load
D-Load
0.00
r2
19.93 r3
r4
nd
1.33 α ys
1.33 α xf
1.33 α yf
1.00
0.04
0.03
0.03
0.32
Total dead load Live Load Design load
Mxs
Mys
Mxf
Myf
10.98
9.03
8.30
6.83
β
r values Alpha values Moment
k-value
340
280
260
220
ρ
0.13
0.11
0.10
0.08
ρ
Amin[sq.mm]
300
300
300
300
Amin
Ascal [sq.mm]
238
195
179
147
Ascal
Asfinal [sq.mm]
300
300
300
300
Asfinal
# of bars
# of bars
# of bars
# of bars
φ
k-value
φ
10.00
5
5
5
5
10.00
S.max [mm]
400
400
400
400
S.max [mm]
S.calc[mm]
260.00
260.00
260.00
260.00
S.calc [mm]
S.final [mm]
260.00
260.00
260.00
260.00
S.final [mm]
Load Transfer on Beams Shear coeffcient Load on Beams
βvcx
#DIV/0! #VALUE!
βvdx
βvcy
Ly/Lx= 1.14 βvdy
Shear coeffcient
0.00 Rdx
0.36 Rcy
0.24 Rdy
Load on Beams
Total design load
#DIV/0!
N.A.
25.11
16.74
Live Load
#DIV/0!
N.A.
6.30
4.20
Live Load
Dead Load
#DIV/0!
N.A.
11.56
7.71
Dead Load
Note:-
N.A.-Means Not Applicable Fck for C25 is 20Mpa
Structural analysis and design
Total design load
Shop and office
Wzr Sewunet
Analysis and design of staircase Depth determination d= D= Use D= d= θ= Dead load Inclined part
133.52 mm 164.52 mm 200.00 mm 169.00 mm 29.74 o 0.52 rad
Concrete Screeed Marble tread + riser
4.8 0.69 0.54 0.54 6.57 Kn/m2
Total
5 Kn/m2
Live load Pdead=
7.57
Plive=
5.00
Pd=
17.84
Landing part Concrete Screeed Marble Total
Pd=
4.8 0.69 0.54 6.03 Kn/m 3 Kn/m2
Live load 12.64
17.84 12.64
12.64
a
b 1.25
2.52
Reaction determination Taking moment about b) Ra= Rb= Mmax= Mmax=
1) Design of Ribbed slabs / With Hollow concrete slabs/ Design Date Concrete class- C-25 fck=
20 MPa
fcd=
11.33 MPa
Steel grade S-300 f y=
300 Mpa
fyd=
260.87 Mpa
Use Class I Workmanship HCB size 40x24x20cm γ= Concrete γ= Floor finish
14 KN/m3
γ=
23 KN/m3
(Cement screed
γ=
23 KN/m3
(Terrazzo tiles)
γ=
16 KN/m
( PVC tiles)
γ=
27 KN/m
(Marle )
24 KN/m3
3 3
2) Design procedure The ribs are placed at a clear spacing of 400mm. The Depth of the topping is 60mm and the concrete strength shall be of the same class as that of the ribs.
Structural analysis and design
Shop and office
Wzr Sewunet
2.1 Loading The function of the building is for hospital. Therefore the live loading depends on the specific use of the floors. Offices
3.00 KN/m2
Wards
3.00 KN/m2
Rib slab Topping 60mm use f 8 c/c200mm
Each rib carry half of the load b/n the ribs Loading Dead load HCB 1.34 KN/m Conc. Topping 0.58 KN/m Plastering 0.29 KN/m PVC tiles 0.02 KN/m Light wt. conc 0.92 KN/m Total 3.14 KN/m Live Load 1.50 KN/m Load carried by end rib Dead load
1.57 KN/m
Live Load
0.75 KN/m
Load carried by intermidiate rib Dead load
3.14 KN/m
Live Load
1.50 KN/m
Analyze and design the rib beams as per the AR requirment