PRESUPUESTO ANALITICO PROYECT :"MEJORAMIENTO Y EQUIPAMIENTO DEL ESTABLECIMIENTO DE SALUD DEL C.P. DE CHUPACA - DISTRITO DE ACORIA - HUANCAVELICA ENT. EJEC. : MUNICIPALIDAD DISTRITAL DISTRITAL DE ACORIA DISTRITO: : ACORIA FINANCIA : MUNICIPALIDAD MUNICIPALIDAD DISTRITAL DISTRITAL DE DE ACORIA    M    S    I    N    A   O    G    R    O

   S    N    A    R    T  .    T

   N    E    G

   N    E    G    B    U    S

PRECIO ESPECIFICA

UNID

CANT

PERIO.

PARCIAL

SUB TOTAL

MDP

UNIT COSTO DIRECTO

295,579.24

EDIFICIOS O UNIDADES NO RESIDENCIALES 2.6.2.2 2. 6. ´2. ´2. ´3. INSTALACIONES MEDICAS 2. 6. ´2. ´2. ´3. ´3 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA PERSONAL

   D    A   E    D   D    I    L   L   A    I    A   A    T   R    P    I    I    O    C    C   R    I    T   A    N   S    I    U   D    M

TOTAL

OPERARIO OFICIAL PEON

HH HH HH

1,600.00 480.00 2,800.00

4.58 3.75 3.20

295,579.24

18,088.00

18,088.00

270,115.30

270,115.30

7,328.00 1,800.00 8,960.00

2. 6. ´2. ´2. ´3. ´4 COSTO DE CONSTRUCCION POR ADM DIRECTA - BIENES MATERIALES DE CONSTRUCCION ELEMENTOS DE ACERO

 ALAMBRE NEGRO RECOCIDO RECOCIDO # 16  ALAMBRE NEGRO NACIONAL NACIONAL # 8 CLAVOS PARA MADERA C/C 3"  ACERO CORRUGADO CORRUGADO fy=4200 kg/cm2 DE 3/8"  ACERO CORRUGADO CORRUGADO fy=4200 kg/cm2 DE 1/2"  ACERO CORRUGADO CORRUGADO fy=4200 kg/cm2 DE 1/4"

6,682.30

kg kg kg var. var. var.

100.00 200.00 60.00 65.00 62.00 150.00

4.20 4.20 4.20 21.68 37.80 9.45

420.00 840.00 252.00 1,409.20 2,343.60 1,417.50

m3 m3 m3 m3 m3

6.50 3.00 3.00 6.50 60.00

60.00 60.00 90.00 85.00 70.00

390.00 180.00 270.00 552.50 4,200.00

bls

405.00

23.50

9,517.50

u u u

133.00 55.00 55.00

21.00 14.00 19.00

2,793.00 770.00 1,045.00

6.00

24.00

144.00

1.00 230,500.00

230,500.00

AGREGADOS

PIEDRA GRANDE DE RIO DE 10" (PUESTO EN OBRA) PIEDRA GRANDE DE RIO DE 8" (PUESTO EN OBRA)  ARENA FINA (PUESTO EN OBRA)  ARENA GRUESA (PUESTO (PUESTO EN OBRA) HORMIGON (PUESTO EN OBRA)

5,592.50

CEMENTO

CEMENTO PORTLAND TIPO I (42.5 kg) (PUESTO EN OBRA)

9,517.50

MADERA PARA ENCOFRADO

MADERA MONTAÑA PARA ENCOFRADO DE 1"X8"X10' MADERA MONTAÑA PARA ENCOFRADO DE 2"X2"X10' MADERA MONTAÑA PARA ENCOFRADO DE 2"X3"X10'

4,608.00

PINTURAS

PINTURA LATEX COLOR A ELEGIR (BALDES X 4LT)

144.00

und

EQUIPOS ESPECIALES

230,500.00

 AMBULANCIA LADRILLOS

LADRILLO KK DE 18 HUECOS DE 9X13X24 CM HOFMAU. (PUESTO EN

8,250.00

u

8,250.00

1.00

8,250.00

4.00 25.00 4.00 10.00

7.50 2.00 12.00 15.00

30.00 50.00 48.00 150.00

10.00 3.00 12.00 11.00 11.00 2.00 11.00 6.00 6.00 2.00 4.00 2.00 3.00 2.00 2.00 1.00 4.00 2.00 100.00 6.00 3.00 1.00

8.50 80.00 10.00 24.00 20.00 420.00 10.00 25.00 30.00 115.00 16.00 50.00 185.00 50.00 20.00 100.00 35.00 10.00 5.00 40.00 15.00 200.00

85.00 240.00 120.00 264.00 220.00 840.00 110.00 150.00 180.00 230.00 64.00 100.00 555.00 100.00 40.00 100.00 140.00 20.00 500.00 240.00 45.00 200.00

OTROS

   A    I    R    O    C    A    E    D    L    A    T    I    R    T    S    I    D    D    A    D    I    L    A    P    I    C    I    N    U    M

YESO EN BOLSAS DE 25 kg LIJAS PARA CEMENTO N°40 BROCHAS N° 10 DISCOS PARA CORTADORAS DE FIERRO

278.00

bls u u u

HERRAMIENTAS PARA LA OBRA

GUANTES DE JEBE REGLAS DE ALUMINIO E=1" CASCOS (02 BL BLANCOS, 01 AZ AZUL, 06 06 AN ANARANJADOS, 03 AM AMARILLOS) CHALECOS CON FORRO Y BOLSILLOS BOTAS DE JEBE ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO CAT GUANTES DE CUERO REFORZADO TIPO MINERO LAMPAS TRAMONTINA C/MANGO PICOS TRAMONTINA C/MANGO BARRETAS TRAMONTINA 1 1/2" FLEXOMETRO DE 5 MTS STANLEY COMBAS DE 12 LB + MANGO CARRETILLAS TIPO BUGUIE C/LLANTA REFORZADA CILINDROS X 50 GLN NIVEL DE MANO CINTA DE SEGURIDAD X 50 m. MARTILLOS CORDEL X 100 m. MANGERA DE 3/4" LLANTAS PARA CARRETILLA TIPO BUGUIE PLOMADA  ALQUILER DE BRIQUETAS BRIQUETAS PARA PRUEBAS DE ROTURA ROTURA

4,543.00

PAR u u u PAR PAR PAR u u u u u u u u rl l u rl l m u u u

2. 6. ´2. ´2. ´3. ´5 COSTO DE CONSTRUCCION POR ADM DIRECTA - SERVICIOS

6,250.00

ALMACENAMIENTO ALMACENAMIENTO DE M ATERIALES

 ALQUILER DE LOCAL PARA ALMACEN

150.00

MES

1.50

100.00

150.00

glb

1.00

400.00

400.00

hm hm hm

80.00 80.00 50.00

25.00 10.00 10.00

2,000.00 800.00 500.00

est est

1.00 1.00

1,400.00 1,000.00

1,400.00 1,000.00

SERVICIOS DE TERCEROS

CARTEL DE OBRA DE DE 3.20 X 4.80 CON GIGANTOGRAFIA

400.00

ALQUILER DE EQUIPOS MENORES

 ALQUILER DE MEZCLADORA DE CONCRETO CONCRETO DE 9 p3  ALQUILER DE VIBRADOR DE CONCRETO CONCRETO 4 HP 1.35"  ALQUILER DE CORTADORAS CORTADORAS DE FIERRO

3,300.00

FLETE

MOVILIZACION Y DESMOVILIZACION DE EQUIPO FLETE TERRESTRE DE MATERIALES

2,400.00

6,250.00

PRESUPUESTO ANALITICO PROYECT :"MEJORAMIENTO Y EQUIPAMIENTO DEL ESTABLECIMIENTO DE SALUD DEL C.P. DE CHUPACA - DISTRITO DE ACORIA - HUANCAVELICA ENT. EJEC. : MUNICIPALIDAD DISTRITAL DE ACORIA DISTRITO: : ACORIA FINANCIA : MUNICIPALIDAD DISTRITAL DE ACORIA    M    S    I    N    A   O    G    R    O

   S    N    A    R    T  .    T

   N    E    G

   N    E    G    B    U    S

PRECIO ESPECIFICA

UNID

CANT

PERIO.

PARCIAL

SUB TOTAL

1,125.94

GLN

80.00

OTROS SERVICIOS

Glb

1.00

COSTO INDIRECTO GASTOS GENERALES

UND CANT.

13.00 85.94 P.UNIT

1,125.94

1,040.00 85.94 PERIO. P. PARCIAL SUB TOTAL

EDIFICIOS O UNIDADES NO RESIDENCIALES 2.6.2.2 2. 6. ´2. ´2. ´3. INSTALACIONES MEDICAS 2. 6. ´2. ´2. ´3. ´4 COSTO DE CONSTRUCCION POR ADM DIRECTA - BIENES

21,467.60

21,467.60

2,049.60

COMBUSTIBLE

1,250.00

PETROLEO 2D

gln

100.00

12.50

1,250.00

u plg u mll mll cja u u u u u cj cj cj u u u u doc. mll caja u

2.00 15.00 3.00 2.00 0.50 1.00 1.00 1.00 1.00 40.00 30.00 1.00 1.00 1.00 1.00 2.00 2.00 1.00 4.00 0.50 1.00 1.00

8.00 0.50 4.00 25.00 80.00 5.00 25.00 8.00 10.00 0.50 0.50 3.00 1.50 7.00 270.00 0.30 10.00 25.00 6.00 300.00 40.00 50.00

16.00 7.50 12.00 50.00 40.00 5.00 25.00 8.00 10.00 20.00 15.00 3.00 1.50 7.00 270.00 0.60 20.00 25.00 24.00 150.00 40.00 50.00

MES MES MES MES

2.00 1.50 1.50 1.50

4,500.00 2,500.00 800.00 900.00

9,000.00 3,750.00 1,200.00 1,350.00

u u

2.00 30.00

230.00 15.00

460.00 450.00

mes

1.50

1,500.00

2,250.00

MES u u Glb

2.00 2.00 1.00 1.00

200.00 100.00 200.00 158.00

400.00 200.00 200.00 158.00

MATERIALES DE ESCRITORIO

VINIFAN T/ OFICIO PAPEL LUSTRE ARCHIVADOR DE PALANCA HOJAS BOND A-4 DE 75 GR HOJAS BOND A-4 DE COLORES 80 GR FASTENER SELLO TRODAT TIPO LAPICERO CUADERNO ESPIRAL TAMAÑO OFICIO CUADERNO DE CARGOS FOLDER MANILA SOBRE MANILA GRAPAS X 5000 CLIPS CLIPS MARIPOSA TONER REGLA DE 30 CM   PORTAMINAS CUADERNO DE OBRA x 100 FOLIOS PAPEL CARBON KARDEX LAPICEROS TINTA SECA MARCA PILOT USB. 4GB

799.60

2. 6. ´2. ´2. ´3. ´5 COSTO DE CONSTRUCCION POR ADM DIRECTA - SERVICIOS RESIDENTE DE OBRA (1.00) MAESTRO DE OBRA (1.00)  ALMACENERO (1.00)  ADMINISTRADOR DE OBRA (1.00)

18,460.00

PRUEBAS DE CALIDAD

PRUEBA DE DISEÑO DE MEZCLA DE CONCRETO PRUEBA DE ROTURA DE PROBETA CILINDRICA DE CONCRETO

910.00

SERVICIO DE MOVILIDAD

 ALQUILER DE CAMIONETA PICK UP 4 X 4 2. 6. ´2. ´2. ´3. ´6 COSTO DE CONSTRUCCION POR ADM DIRECTA - OTROS  ALQUILER DE COMPUTADORA SILLAS DE MADERA CEDRO TAPIZADAS ESCRITORIO DE MADERA OTROS SERVICIOS

2,250.00

958.00

SUPERVISION

   A    I    R    O    C    A    E    D    L    A    T    I    R    T    S    I    D    D    A    D    I    L    A    P    I    C    I    N    U    M

MDP

UNIT

2. 6. ´2. ´2. ´3. ´6 COSTO DE CONSTRUCCION POR ADM DIRECTA - OTROS GASOLINA DE 90 OCT.

   A    I    R    O    C    A    E    D    L    A    T    I    R    T    S    I    D    D    A    D    I    L    A    P    I    C    I    N    U    M

TOTAL

EDIFICIOS O UNIDADES NO RESIDENCIALES 2.6.2.2 2. 6. ´2. ´2. ´3. INSTALACIONES MEDICAS 2. 6. ´2. ´2. ´3. ´4 COSTO DE CONSTRUCCION POR ADM DIRECTA - BIENES

CUADERNO ESPIRAL TAMAÑO OFICIO PAPEL BOND  ARCHIVADOR DE PALANCA SELLO TRODAT TIPO LAPICERO USB 4 GB

2. 6. ´2. ´2. ´3. ´6 COSTO DE CONSTRUCCION POR ADM DIRECTA - OTROS Otros

11,323.10

 32 8,3 69 .9 4

328,369.94

97.50

u mll u u u

         

1.00 0.50 1.00 1.00 1.00

         

8.00 20.00 4.50 25.00 50.00

8.00 10.00 4.50 25.00 50.00

mes glb Glb

     

1.50 1.00 1.00

  4,000.00   2,500.00   2,500.00

6,000.00 2,500.00 2,500.00

1.00

  225.60

225.60

2. 6. ´2. ´2. ´3. ´5 COSTO DE CONSTRUCCION POR ADM DIRECTA - SERVICIOS SUPERVISOR DE OBRA MEDICO TECNICO MECANICO

  11,323.10

11,000.00

225.60

Glb

MONTO TOTAL DE LA CONSTRUCCION DE LA OBRA

TOTAL S/.

COSTO DIRECTO

295,579.24

GASTOS GENERALES SUB TOTAL

317,046.84

SUPERVISION PRESUPUESTO TOTAL

328,369.94

21,467.60

11,323.10

465,452.45 169,873.21

64,952.90 -205,162.40

38.56

35.60 #REF!

#REF!

46,051.61

37,236.20 15,768.60

#REF!

14,000.00 -2,676.90

PRESUPUESTO ANALITICO PROYECT :"MEJORAMIENTO Y EQUIPAMIENTO DEL ESTABLECIMIENTO DE SALUD DEL C.P. DE CHUPACA - DISTRITO DE ACORIA - HUANCAVELICA ENT. EJEC. : MUNICIPALIDAD DISTRITAL DE ACORIA DISTRITO: : ACORIA FINANCIA : MUNICIPALIDAD DISTRITAL DE ACORIA    M    S    I    N    A   O    G    R    O

   S    N    A    R    T  .    T

   N    E    G

   N    E    G    B    U    S

PRECIO ESPECIFICA

UNID

CANT

PERIO.

PARCIAL

SUB TOTAL

MDP

UNIT COSTO DIRECTO

295,569.34

EDIFICIOS O UNIDADES NO RESIDENCIALES 2.6.2.2 2. 6. ´2. ´2. ´3. INSTALACIONES MEDICAS 2. 6. ´2. ´2. ´3. ´3 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA PERSONAL

   D    A   E    D    D    I    L   A    L    I    A   A    R    P   T    I    O    I    R   C    C   T    I    A    N   S    I    U   D    M

TOTAL

OPERARIO OFICIAL PEON

HH HH HH

1,600.00 480.00 2,468.00

4.58 3.75 3.20

295,569.34

17,025.60

17,025.60

272,177.80

272,177.80

7,328.00 1,800.00 7,897.60

2. 6. ´2. ´2. ´3. ´4 COSTO DE CONSTRUCCION POR ADM DIRECTA - BIENES MATERIALES DE CONSTRUCCION ELEMENTOS DE ACERO

 ALAMBRE NEGRO RECOCIDO # 16  ALAMBRE NEGRO NACIONAL # 8 CLAVOS PARA MADERA C/C 3"  ACERO CORRUGADO fy=4200 kg/cm2 DE 3/8"  ACERO CORRUGADO fy=4200 kg/cm2 DE 1/2"  ACERO CORRUGADO fy=4200 kg/cm2 DE 1/4"

6,682.30

kg kg kg var. var. var.

100.00 200.00 60.00 65.00 62.00 150.00

4.20 4.20 4.20 21.68 37.80 9.45

420.00 840.00 252.00 1,409.20 2,343.60 1,417.50

m3 m3 m3 m3 m3

6.50 3.00 3.00 6.50 60.00

60.00 60.00 90.00 85.00 70.00

390.00 180.00 270.00 552.50 4,200.00

bls

405.00

23.50

9,517.50

u u u

133.00 55.00 55.00

21.00 14.00 19.00

2,793.00 770.00 1,045.00

6.00

24.00

144.00

1.00 230,500.00

230,500.00

AGREGADOS

PIEDRA GRANDE DE RIO DE 10" (PUESTO EN OBRA) PIEDRA GRANDE DE RIO DE 8" (PUESTO EN OBRA)  ARENA FINA (PUESTO EN OBRA)  ARENA GRUESA (PUESTO EN OBRA) HORMIGON (PUESTO EN OBRA)

5,592.50

CEMENTO

CEMENTO PORTLAND TIPO I (42.5 kg) (PUESTO EN OBRA)

9,517.50

MADERA PARA ENCOFRADO

MADERA MONTAÑA PARA ENCOFRADO DE 1"X8"X10' MADERA MONTAÑA PARA ENCOFRADO DE 2"X2"X10' MADERA MONTAÑA PARA ENCOFRADO DE 2"X3"X10'

4,608.00

PINTURAS

PINTURA LATEX COLOR A ELEGIR (BALDES X 4LT)

144.00

und

EQUIPOS ESPECIALES

230,500.00

 AMBULANCIA LADRILLOS

LADRILLO KK DE 18 HUECOS DE 9X13X24 CM HOFMAU. (PUESTO EN

10,312.50

u

8,250.00

1.25

10,312.50

4.00 25.00 4.00 10.00

7.50 2.00 12.00 15.00

30.00 50.00 48.00 150.00

10.00 3.00 12.00 11.00 11.00 2.00 11.00 6.00 6.00 2.00 4.00 2.00 3.00 2.00 2.00 1.00 4.00 2.00 100.00 6.00 3.00 1.00

8.50 80.00 10.00 24.00 20.00 420.00 10.00 25.00 30.00 115.00 16.00 50.00 185.00 50.00 20.00 100.00 35.00 10.00 5.00 40.00 15.00 200.00

85.00 240.00 120.00 264.00 220.00 840.00 110.00 150.00 180.00 230.00 64.00 100.00 555.00 100.00 40.00 100.00 140.00 20.00 500.00 240.00 45.00 200.00

OTROS

   A    I    R    O    C    A    E    D    L    A    T    I    R    T    S    I    D    D    A    D    I    L    A    P    I    C    I    N    U    M

YESO EN BOLSAS DE 25 kg LIJAS PARA CEMENTO N°40 BROCHAS N° 10 DISCOS PARA CORTADORAS DE FIERRO

278.00

bls u u u

HERRAMIENTAS PARA LA OBRA

GUANTES DE JEBE REGLAS DE ALUMINIO E=1" CASCOS (02 BLANCOS, 01 AZUL, 06 ANARANJADOS, 03 AMARILLOS) CHALECOS CON FORRO Y BOLSILLOS BOTAS DE JEBE ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO CAT GUANTES DE CUERO REFORZADO TIPO MINERO LAMPAS TRAMONTINA C/MANGO PICOS TRAMONTINA C/MANGO BARRETAS TRAMONTINA 1 1/2" FLEXOMETRO DE 5 MTS STANLEY COMBAS DE 12 LB + MANGO CARRETILLAS TIPO BUGUIE C/LLANTA REFORZADA CILINDROS X 50 GLN NIVEL DE MANO CINTA DE SEGURIDAD X 50 m. MARTILLOS CORDEL X 100 m. MANGERA DE 3/4" LLANTAS PARA CARRETILLA TIPO BUGUIE PLOMADA  ALQUILER DE BRIQUETAS PARA PRUEBAS DE ROTURA

4,543.00

PAR u u u PAR PAR PAR u u u u u u u u rll u rll m u u u

2. 6. ´2. ´2. ´3. ´5 COSTO DE CONSTRUCCION POR ADM DIRECTA - SERVICIOS

4,850.00

ALMACENAMIENTO DE M ATERIALES

 ALQUILER DE LOCAL PARA ALMACEN

150.00

MES

1.50

100.00

150.00

glb

1.00

400.00

400.00

hm hm hm

80.00 80.00 50.00

25.00 10.00 10.00

2,000.00 800.00 500.00

est est

1.00 1.00

500.00 500.00

500.00 500.00

SERVICIOS DE TERCEROS

CARTEL DE OBRA DE 3.20 X 4.80 CON GIGANTOGRAFIA

400.00

ALQUILER DE EQUIPOS MENORES

 ALQUILER DE MEZCLADORA DE CONCRETO DE 9 p3  ALQUILER DE VIBRADOR DE CONCRETO 4 HP 1.35"  ALQUILER DE CORTADORAS DE FIERRO (cizalla)

3,300.00

FLETE

MOVILIZACION Y DESMOVILIZACION DE EQUIPO FLETE TERRESTRE DE MATERIALES

1,000.00

4,850.00

PRESUPUESTO ANALITICO PROYECT :"MEJORAMIENTO Y EQUIPAMIENTO DEL ESTABLECIMIENTO DE SALUD DEL C.P. DE CHUPACA - DISTRITO DE ACORIA - HUANCAVELICA ENT. EJEC. : MUNICIPALIDAD DISTRITAL DE ACORIA DISTRITO: : ACORIA FINANCIA : MUNICIPALIDAD DISTRITAL DE ACORIA    M    S    I    N    A   O    G    R    O

   S    N    A    R    T  .    T

   N    E    G

   N    E    G    B    U    S

PRECIO ESPECIFICA

UNID

CANT

PERIO.

PARCIAL

SUB TOTAL

1,515.94

GLN

110.00

OTROS SERVICIOS

Glb

1.00

COSTO INDIRECTO GASTOS GENERALES

UND CANT.

13.00 85.94 P.UNIT

1,515.94

1,430.00 85.94 PERIO. P. PARCIAL SUB TOTAL

EDIFICIOS O UNIDADES NO RESIDENCIALES 2.6.2.2 2. 6. ´2. ´2. ´3. INSTALACIONES MEDICAS 2. 6. ´2. ´2. ´3. ´4 COSTO DE CONSTRUCCION POR ADM DIRECTA - BIENES

21,486.80

21,486.80

3,299.60

COMBUSTIBLE

2,500.00

PETROLEO 2D

gln

200.00

12.50

2,500.00

u plg u mll mll cja u u u u u cj cj cj u u u u doc. mll caja u

2.00 15.00 3.00 2.00 0.50 1.00 1.00 1.00 1.00 40.00 30.00 1.00 1.00 1.00 1.00 2.00 2.00 1.00 4.00 0.50 1.00 1.00

8.00 0.50 4.00 25.00 80.00 5.00 25.00 8.00 10.00 0.50 0.50 3.00 1.50 7.00 270.00 0.30 10.00 25.00 6.00 300.00 40.00 50.00

16.00 7.50 12.00 50.00 40.00 5.00 25.00 8.00 10.00 20.00 15.00 3.00 1.50 7.00 270.00 0.60 20.00 25.00 24.00 150.00 40.00 50.00

MES MES MES MES

2.00 1.50 1.50 1.50

4,000.00 2,000.00 800.00 900.00

8,000.00 3,000.00 1,200.00 1,350.00

u u

2.00 30.00

230.00 15.00

460.00 450.00

mes mes

1.50 1.50

1,000.00 700.00

1,500.00 1,050.00

MES u u Glb

2.00 2.00 1.00 1.00

200.00 100.00 200.00 377.20

400.00 200.00 200.00 377.20

MATERIALES DE ESCRITORIO

VINIFAN T/ OFICIO PAPEL LUSTRE ARCHIVADOR DE PALANCA HOJAS BOND A-4 DE 75 GR HOJAS BOND A-4 DE COLORES 80 GR FASTENER SELLO TRODAT TIPO LAPICERO CUADERNO ESPIRAL TAMAÑO OFICIO CUADERNO DE CARGOS FOLDER MANILA SOBRE MANILA GRAPAS X 5000 CLIPS CLIPS MARIPOSA TONER REGLA DE 30 CM   PORTAMINAS CUADERNO DE OBRA x 100 FOLIOS PAPEL CARBON KARDEX LAPICEROS TINTA SECA MARCA PILOT USB. 4GB

799.60

2. 6. ´2. ´2. ´3. ´5 COSTO DE CONSTRUCCION POR ADM DIRECTA - SERVICIOS RESIDENTE DE OBRA (1.00) MAESTRO DE OBRA (1.00)  ALMACENERO (1.00)  ADMINISTRADOR DE OBRA (1.00)

17,010.00

PRUEBAS DE CALIDAD

PRUEBA DE DISEÑO DE MEZCLA DE CONCRETO PRUEBA DE ROTURA DE PROBETA CILINDRICA DE CONCRETO

910.00

SERVICIO DE MOVILIDAD

 ALQUILER DE CAMIONETA PICK UP 4 X 4 ALQUILER DE MOTOCICLETA 2. 6. ´2. ´2. ´3. ´6 COSTO DE CONSTRUCCION POR ADM DIRECTA - OTROS  ALQUILER DE COMPUTADORA SILLAS DE MADERA CEDRO TAPIZADAS ESCRITORIO DE MADERA OTROS SERVICIOS

2,550.00

1,177.20

SUPERVISION

   A    I    R    O    C    A    E    D    L    A    T    I    R    T    S    I    D    D    A    D    I    L    A    P    I    C    I    N    U    M

MDP

UNIT

2. 6. ´2. ´2. ´3. ´6 COSTO DE CONSTRUCCION POR ADM DIRECTA - OTROS GASOLINA DE 90 OCT.

   A    I    R    O    C    A    E    D    L    A    T    I    R    T    S    I    D    D    A    D    I    L    A    P    I    C    I    N    U    M

TOTAL

EDIFICIOS O UNIDADES NO RESIDENCIALES 2.6.2.2 2. 6. ´2. ´2. ´3. INSTALACIONES MEDICAS 2. 6. ´2. ´2. ´3. ´4 COSTO DE CONSTRUCCION POR ADM DIRECTA - BIENES

CUADERNO ESPIRAL TAMAÑO OFICIO PAPEL BOND  ARCHIVADOR DE PALANCA SELLO TRODAT TIPO LAPICERO USB 4 GB

2. 6. ´2. ´2. ´3. ´6 COSTO DE CONSTRUCCION POR ADM DIRECTA - OTROS Otros

11,313.10

 3 28 ,36 9.2 4

328,369.24

97.50

u mll u u u

         

1.00 0.50 1.00 1.00 1.00

         

8.00 20.00 4.50 25.00 50.00

8.00 10.00 4.50 25.00 50.00

mes glb Glb

     

1.50 1.00 1.00

  4,000.00   2,500.00   2,500.00

6,000.00 2,500.00 2,500.00

1.00

  215.60

215.60

2. 6. ´2. ´2. ´3. ´5 COSTO DE CONSTRUCCION POR ADM DIRECTA - SERVICIOS SUPERVISOR DE OBRA MEDICO TECNICO MECANICO

  11,313.10

11,000.00

215.60

Glb

MONTO TOTAL DE LA CONSTRUCCION DE LA OBRA

TOTAL S/.

COSTO DIRECTO

295,569.34

GASTOS GENERALES SUB TOTAL

317,056.14

SUPERVISION PRESUPUESTO TOTAL

328,369.24

21,486.80

11,313.10

465,452.45 169,883.11

64,952.90 -207,224.90

38.56

35.60 #REF!

#REF!

46,051.61

37,236.20 15,749.40

#REF!

14,000.00 -2,686.90

TOPOGRAFO TRAZO Y REPLANTEO INICIAL TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA

EXCAVACION DE ZANJA CON MAQUINARIA A TODO COSTO EXC. ZANJA. HASTA 2.00 MTS. EXC. ZANJA. HASTA 3.00 MTS. EXC. ZANJA. HASTA 4.00 MTS. EXC. ZANJA. HASTA 5.00 MTS. EXC. ZANJA. HASTA 6.00 MTS.

M.O.

EQUIPOS 93.204 497.024 310.68 699.03

253.008 162.918 245.43 165.6 530.496

4216.8 2713.7915 4090.5 2760 8841.6

CONSTRUCCION DE BUZON A TODO COSTOS EXC, BUZON HASTA 1.50 EXC, BUZON HASTA 2.00 EXC, BUZON HASTA 3.00 EXC, BUZON HASTA 4.00 EXC, BUZON HASTA 5.00 EXC, BUZON HASTA 6.00

179.2 64 42.67 98.46 256 426.66

8.96 3.2 2.13 4.92 12.8 21.34

BUZON HASTA 1.50 BUZON HASTA 2.00 BUZON HASTA 3.00 BUZON HASTA 4.00 BUZON HASTA 5.00 BUZON HASTA 6.00

644 216 184 613.34 896 1120

299.04 86.4 85.44 284.4 346.56 433.2

1188.351 497.088 1180.584 396 1553.4

62.136 15.534 38.835 11.88 46.602

REFINE, NIVE. CAMA APOYO, TEND. TUB. DADOS Y 1ER RELLENO REFINE Y NIVELACION TERR. NORMAL CAMA DE APOYO PARA TUBERIA 200 MM SUMINISTRO E INSTALACION DE TUBERIA 200 MM DADO DE CONCRETO PRIMER RELLENO SOBRE CLAVE DE TUBO H = 30CM

11317.089 6664.621

MATERIALESTOTAL 590.228 1009.71 1599.94

4469.808 2876.7095 4335.93 2925.6 9372.096 23980.14

188.16 67.2 44.8 103.38 268.8 448 943.04 302.4 269.44 897.74 1242.56 1553.2 6328.72

1250.487 512.622 1219.419 407.88 1600.002 4990.41

FEBRERO 2.6.2.3.5.3

MARZO ABRIL 0 11102.77

0

TOTAL 11102.77 22205.54

18885

11102.77 2.6.2.3.5.4

2.6.2.3.5.5

2.6.2.3.5.6

2383

44323.8

0

46706.8

93413.6

63546

800 1583

370.2 20246.1 283 6661 6880 8482.5 1401

1200

1200

41702.51

4061

42902.51

89866.02

69860

3500 1000 6083.51 21500 569 1600 7000 450

2231 450 300 1080

0

571.5

0

571.5

1143

4335

206628.16

156626

571.5

3583

97700.58

26453.24

54920.9

64098.83

5603.23 151076.2

ESPECIFICA 2.6.2.3.5.3 2.6.2.3.5.4 2.6.2.3.5.5 2.6.2.3.5.6

DENOMINACION

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA PERSONAL COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA BIENES COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA SERVICIOS COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA OTROS TOTAL

PIM

18,885.00 63,546.00 69,860.00 4,335.00 S/. 156,626.00

EJECUTADO AL 12/04/2010

SALDO AL 12/04/2010

ESPECIFICA HABILITADORA

11,102.77 45,305.80 46,963.51 571.50

7,782.23 18,240.20 22,896.49 3,763.50

8,625.00 5,761.00

S/. 103,943.58

S/. 52,682.42

S/. 14,386.00

ESPECIFICA HABILITADA

7,569.00 6,817.00

PIM MODIFICADO

26,454.00 54,921.00 64,099.00 11,152.00

S/. 14,386.00 S/. 156,626.00