Analisa Grill Penutup

July 25, 2018 | Author: Andi Aprizon | Category: N/A
Share Embed Donate


Short Description

ANALISA GRIL TUTUP...

Description

PEK. GRILL PENUTUP SALURAN TERBUKA / M1 4.4940 m2 0.1620 bh 0.8230 Oh 0.0550 Oh 0.0140 Oh 0.0030 Oh

PEK. KANSTEEN / M1 2.0000 bh 0.2400 zak 0.0160 zak 0.1500 Oh 0.2000 Oh 0.0200 Oh 0.0100 Oh

TERBUKA / M1 Bahan Besi C Lip Chanel Besi Beton Upah Pekerja Tukang Gypsum Kepala Tukang Mandor

Bahan Kanstin Semen Pasir Pasang Upah Pekerja Tukang Batu Kepala Tukang Mandor

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp

- Rp 15,000.00 Rp 85,000.00 100,000.00 130,000.00 130,000.00 Jumlah Overheat 10% Jumlah + Overheat

Rp Rp Rp Rp Rp Rp Rp

69,955.00 5,500.00 1,820.00 390.00 80,095.00 8,009.50 88,104.50

70,000.00 Rp 1,450.00 Rp 205,000.00 Rp

140,000.00 348.00 3,280.00

85,000.00 100,000.00 130,000.00 130,000.00 Jumlah Overheat 10% Jumlah + Overheat

Rp Rp Rp Rp Rp Rp Rp

UPAH Rp Rp

2,430.00

36,650.00 3,665.00

12,750.00 20,000.00 2,600.00 1,300.00 180,278.00 18,027.80 198,305.80

BAHAN Rp Rp

143,628.00 14,362.80

Rp

40,315.00

21,592,714.00

Rp

157,990.80

84,619,872.48 106,212,586.48

Median Jalan lebar tinggi panjang luas area

0.18 0.30 0.50 0.05 m2

panjang

535.60 m

26.78 m3

50,000.00 1 Buah Kanstin 7,500.00 2,500.00 OH 60,000.00

1m

150,000.00 80,340,000.00

25,872,586.48

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF