AMSC Productivity Rate - Turner
Short Description
Download AMSC Productivity Rate - Turner...
Description
AMSC PRODUCTIVITY RATE I tem
Activity
Activity
SUB
ID
Description
ACTIVIT Y
Unit
Prod. Rate
QTY
Tot. Man
Days
Manpo Crew Tot. MOD (O) wer/da Desc. days y
(unit/day )
SITEWORKS Z0U34-0000
Site Clearing
Z0U34-0010
Setting-out / Layout
1,502.00
4,200.00
0.36
2.000
1 Operator 1 Helper
0.72
1
0.72
M
160.08
76.00
2.11
3.000
2 Carpenter 1 Helper
6.32
1
6.32
M3
953.00
409.50
2.33
2.000
1 Operator 1 Helper
4.65
2
2.33
1.61
0.75 Operator 8.250 6 Driver 1.5 Helper
13.25
3
4.42
M2
SUBSTRUCTURE Z0U34-0020
Excavation for footings + Disposal of Materials
For Excavation For Disposal
M3
555.00
345.60
5
Z0U34-0030
Formation Level & Compaction
M3
238
252.00
0.94
.75 Operator
6.250 4 Driver
5.90
2
2.95
1.5 Helper
Z0U34-0040
Anti-Termite Applications (Under PCC Footings)
M2
571
202.50
2.82
1.000
2 Technican
2.82
1
2.82
Z0U34-0050
Backfill & Compaction upto bot. of PCC Tie-Beam
M3
268
252.00
1.06
8.250
0.75 Operator 6 Driver 1.5 Helper
8.77
7
1.25
Z0U34-0060
Anti-Termite Applications (Under PCC Tie-Beam)
M2
37
202.50
0.18
1.000
2 Technican
0.18
1
0.18
Z0U34-0070
Backfill & Compaction up to bot of PCC Grd. Slab
M3
2,332.00
252.00
9.25
8.250
0.75 Operator 6 Driver 1.5 Helper
76.35
3
25.45
Z0U34-0080
Anti-Termite Applications (Under PCC Grade Slab)
M2
894
202.50
4.41
1.000
2 Technican
4.41
1
4.41
1 Mason 10 Helper 1 Mason 10 Helper
40.01
2
20.00
91.50
2
45.75
Z0U34-0090
Shutters + 50mm Thk. PCC Under Footings
M2
982
270.00
3.64
11.000
Z0U34-0100
50mm Protection Screed (Over W.P. Membrane-Ftg.)
M2
2,246.00
270.00
8.32
11.000
Z0U34-0110
RCC For Footings
Casting
M3
244
180.00
1.36
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
35.24
1
35.24
Formworks
M2
976.00
12.00
81.33
3.056
2 Carpenter 1 Helper .056 Operator
248.55
4
62.14
Rebars
kg
43,920.00
250.00
175.68
2.056
1 Steel Fixer 1 Helper .056 Operator
361.20
3
120.40
Page 1 of 63
Deshutterin g
M2
976.00
35.00
27.89
3.056
2 Carpenter 1 Helper .056 Operator
85.22
2
42.61
10 Z0U34-0120
RCC Necks Columns / Walls + MEP Sleeves
81.00
1.90
22.000
616.00
4.00
154.00
3.056
kg
27,720.00
200.00
138.60
M2
616.00
28.00
Casting
M3
Formworks
M2
Rebars
Deshutterin g
154
2 Carpenter 16 Helper 4 Mason
41.83
1
41.83
2 Carpenter 1 Helper .056 Operator
470.62
5
94.12
2.056
1 Steel Fixer 1 Helper .056 Operator
284.96
4
71.24
22.00
3.056
2 Carpenter 1 Helper .056 Operator
67.23
2
33.62
12 Z0U34-0130
Shutters + 50mm Thk. PCC Under Tie-Beams
M2
63
270.00
0.23
11.000
Z0U34-0140
50mm Screed (Over W.P. Membrane-T.B.)
M2
144
270.00
0.53
11.000
Z0U34-0150
RCC Tie Beams + MEP Sleeves
Casting
M3
Formworks
M2
33
132.00
1 Mason 10 Helper 1 Mason 10 Helper
2.57
2
1.28
5.87
2
2.93
4.03
1
4.03
180.00
0.18
22.000
1 Carpenter 16 Helper 4 Mason 1 Steel Fixer
4.00
33.00
3.056
2 Carpenter 1 Helper .056 Operator
100.85
4
25.21
48.85
3
16.28
14.41
2
7.20
Rebars
kg
5,940.00
250.00
23.76
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
132.00
28.00
4.71
3.056
2 Carpenter 1 Helper .056 Operator
0.12
1
0.12
10
Z0U34-0160
RCC Kickers Over Tie-Beam
Casting
M3
Formworks
M2
Rebars
kg
Page 2 of 63
1
4.00
180.00
180.00
0.01
22.000
1 Carpenter 16 Helper 4 Mason 1 Steel Fixer
4.00
1.00
3.056
2 Carpenter 1 Helper .056 Operator
3.06
1
3.06
2.056
1 Steel Fixer 1 Helper .056 Operator
1.48
1
1.48
250.00
0.72
Deshutterin g
M2
4.00
28.00
0.14
3.056
2 Carpenter 1 Helper .056 Operator
0.44
1
0.44
4 Z0U34-0170
50mm Thk. PCC Under Grade Slab
M2
1,537.00
270.00
5.69
11.000
1 Mason 10 Helper
62.62
2
31.31
Z0U34-0180
Mesh + Filler Board & RCC For Grade Slab
M3
208
180.00
1.16
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
30.04
3
10.01
Z0U34-0190
50mm Thk. PCC Steps & Ramps
M2
10
270.00
0.04
11.000
1 Mason 10 Helper
0.41
2
0.20
Z0U34-0200
Steps & Ramps Works + Place Conc.
M3
5
180.00
0.03
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
0.72
8
0.09
Z0U34-0210
Waterproofing Membrane (Over PCC Footings)
M2
1,047.00
152.00
6.89
6.000
4 Waterproofe r 2 Helper
41.33
2
20.66
Z0U34-0220
Water Proofing For Neck Column & Wall & Footing
M2
2,021.00
152.00
13.30
6.000
4 Waterproofe r 2 Helper
79.78
3
26.59
Z0U34-0230
Waterproofing Membrane (Over PCC Tie-beams)
M2
67
152.00
0.44
6.000
4 Waterproofe r 2 Helper
2.64
2
1.32
Z0U34-0240
Waterproofing Membrane For Tie Beams
M2
121
152.00
0.80
6.000
4 Waterproofe r 2 Helper
4.78
3
1.59
Z0U34-0250
50mm Thk. PCC Under Base of Tank
M2
77
270.00
0.29
11.000
1 Mason 10 Helper
3.14
1
3.14
Z0U34-0260
Waterproofing Membrane (Over PCC - Base)
M2
82
152.00
0.54
6.000
4 Waterproofe r 2 Helper
3.24
1
3.24
Z0U34-0270
50mm Protect'n Screed (Over W.P. Membrane-Base)
M2
176
270.00
0.65
11.000
1 Mason 10 Helper
7.17
1
7.17
5.49
1
5.49
Z0U34-0280
RCC Water Tank Base + Deshuttering
Casting
M3
Formworks
M2
38
152.00
180.00
0.21
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
12.00
12.67
3.056
2 Carpenter 1 Helper .056 Operator
38.71
1
38.71
56.25
1
56.25
13.27
1
13.27
Rebars
kg
6,840.00
250.00
27.36
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
152.00
35.00
4.34
3.056
2 Carpenter 1 Helper .056 Operator
4 Z0U34-0290
RCC Wall W/MEP Pipes & Water Stop + Deshuttering
Casting
M3
Page 3 of 63
34
81.00
0.42
22.000
2 Carpenter 16 Helper 4 Mason
9.23
1
9.23
Formworks
M2
136.00
4.00
34.00
3.056
2 Carpenter 1 Helper .056 Operator
103.90
2
51.95
62.91
1
62.91
14.84
1
14.84
Rebars
kg
6,120.00
200.00
30.60
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
136.00
28.00
4.86
3.056
2 Carpenter 1 Helper .056 Operator
1.16
1
1.16
5
Z0U34-0300
RCC Top Slab + Deshuttering for Water Tank
Casting
M3
8.00
180.00
0.04
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
Formworks
M2
40.00
16.00
2.50
3.056
2 Carpenter 1 Helper .056 Operator
7.64
2
3.82
14.80
1
14.80
3.82
1
3.82
Rebars
kg
1,440.00
200.00
7.20
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
40.00
32.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
6.79
2
3.39
5 Z0U34-0310
Water Proofing Membrane all around outside surfc
M2
172
152.00
1.13
6.000
4 Waterproofe r 2 Helper
Z0U34-0320
Protection Board all around outside surface
M2
172
152.00
1.13
6.000
4 Waterproofe r 2 Helper
6.79
2
3.39
Z0U34-0330
Backfill around Water tank walls
M3
6
252.00
0.02
8.250
0.75 Operator 6 Driver 1.5 Helper
0.20
3
0.07
Z0U34-0340
G.R.P. Lining around inside + S.S. Lader & Door
M2
221
20.00
11.05
2.000
22.10
3
7.37
Z0U34-0350
50mm Thk. PCC Under Base of Elevator Shaft
M2
14
270.00
0.05
11.000
0.57
1
0.57
Z0U34-0360
Waterproofing Membrane (Over PCC - Base)
M2
15
152.00
0.10
6.000
4 Waterproofe r 2 Helper
0.59
1
0.59
Z0U34-0370
50mm Protect'n Screed (Over W.P. Membrane-Base)
M2
32
270.00
0.12
11.000
1 Mason 10 Helper
1.30
1
1.30
Z0U34-0380
RCC Elevator Shaft Base + Deshuttering
Casting
M3
7
180.00
0.04
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
1.01
1
1.01
Formworks
M2
12.00
2.33
3.056
2 Carpenter 1 Helper .056 Operator
7.13
1
7.13
Page 4 of 63
28.00
1 Mason 1 Helper 1 Mason 10 Helper
Rebars
kg
1,260.00
250.00
5.04
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
28.00
35.00
0.80
3.056
2 Carpenter 1 Helper .056 Operator
10.36
1
10.36
2.44
1
2.44
4 Z0U34-0390
RCC Wall W/ MEP Cond. + Deshuttering
Casting
M3
Formworks
M2
4
16.00
81.00
0.05
22.000
4.00
4.00
3.056
2 Carpenter 16 Helper 4 Mason
1.09
1
1.09
2 Carpenter 1 Helper .056 Operator
12.22
2
6.11
7.40
1
7.40
1.75
1
1.75
Rebars
kg
720.00
200.00
3.60
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
16.00
28.00
0.57
3.056
2 Carpenter 1 Helper .056 Operator
2.37
3
0.79
5 Z0U34-0400
Water Proofing Membrane all around outside surfc
M2
60
152.00
0.39
6.000
4 Waterproofe r 2 Helper
Z0U34-0410
Protection Board all around outside surface
M2
216
152.00
1.42
6.000
4 Waterproofe r 2 Helper
8.53
2
4.26
Z0U34-0420
Backfill around the Lift's Pit wall
M3
9.89
252.00
0.04
8.250
0.75 Operator 6 Driver 1.5 Helper
0.32
3
0.11
Z0U34-0430
RCC For Wall/Col. From Top of Grade Slab-1L
Casting
M3
251
81.00
3.10
22.000
68.17
1
68.17
Formworks
M2
1,004.00
4.00
251.00
3.056
2 Carpenter 1 Helper .056 Operator
767.06
5
153.41
Rebars
kg
45,180.00
200.00
225.90
2.056
1 Steel Fixer 1 Helper .056 Operator
464.45
4
116.11
Deshutterin g
M2
1,004.00
28.00
35.86
3.056
2 Carpenter 1 Helper .056 Operator
109.58
2
54.79
2 Carpenter 16 Helper 4 Mason
12 Z0U34-0440
Columns From Top of Grade Slab-1L (Canopy)
Casting
M3
Page 5 of 63
1
81.00
0.01
22.000
2 Carpenter 16 Helper 4 Mason
0.27
1
0.27
Formworks
M2
4.00
4.00
1.00
3.056
2 Carpenter 1 Helper .056 Operator
3.06
2
1.53
1.85
2
0.93
0.44
1
0.44
Rebars
kg
180.00
200.00
0.90
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
4.00
28.00
0.14
3.056
2 Carpenter 1 Helper .056 Operator
33.37
1
33.37
6
Z0U34-0450
RCC Slab / Beam - 1L
Casting
M3
231.00
180.00
1.28
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
Formworks
M2
1,155.00
16.00
72.19
3.056
2 Carpenter 1 Helper .056 Operator
220.61
6
36.77
427.44
5
85.49
110.30
2
55.15
Rebars
kg
41,580.00
200.00
207.90
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
1,155.00
32.00
36.09
3.056
2 Carpenter 1 Helper .056 Operator
14 Z0U34-0460
RCC For Stair/Landings @ G.L. - 1L
81.00
0.10
22.000
40.00
4.00
10.00
3.056
kg
1,440.00
200.00
7.20
M2
40.00
28.00
1.43
Casting
M3
Formworks
M2
Rebars
Deshutterin g
8
2 Carpenter 16 Helper 4 Mason
2.17
1
2.17
2 Carpenter 1 Helper .056 Operator
30.56
4
7.64
2.056
1 Steel Fixer 1 Helper .056 Operator
14.80
3
4.93
3.056
2 Carpenter 1 Helper .056 Operator
4.37
2
2.18
1.16
1
1.16
7.64
4
1.91
10
Z0U34-0470
RCC Canopy
Casting
M3
8.00
180.00
0.04
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
Formworks
M2
40.00
16.00
2.50
3.056
2 Carpenter 1 Helper .056 Operator
Page 6 of 63
Rebars
kg
1,440.00
200.00
7.20
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
40.00
32.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
14.80
3
4.93
3.82
1
3.82
9 Z0U34-0480
RCC For Wall/Col. From Top of 1L-2L
Casting
M3
Formworks
M2
237
948.00
81.00
2.93
22.000
4.00
237.00
3.056
2 Carpenter 16 Helper 4 Mason
64.37
1
64.37
2 Carpenter 1 Helper .056 Operator
724.27
5
144.85
438.54
4
109.64
103.47
2
51.73
Rebars
kg
42,660.00
200.00
213.30
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
948.00
28.00
33.86
3.056
2 Carpenter 1 Helper .056 Operator
33.80
1
33.80
12
Z0U34-0490
RCC Slab / Beam - 2L
Casting
M3
234.00
180.00
1.30
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
Formworks
M2
1,170.00
16.00
73.13
3.056
2 Carpenter 1 Helper .056 Operator
223.47
6
37.25
Rebars
kg
42,120.00
200.00
210.60
2.056
1 Steel Fixer 1 Helper .056 Operator
432.99
5
86.60
Deshutterin g
M2
1,170.00
32.00
36.56
3.056
2 Carpenter 1 Helper .056 Operator
111.74
2
55.87
14 Z0U34-0500
RCC for Stair/Landings @ 1L-2L
Casting
M3
Formworks
M2
Rebars
kg
Page 7 of 63
7
81.00
0.09
22.000
35.00
4.00
8.75
3.056
1,260.00
200.00
6.30
2.056
2 Carpenter 16 Helper 4 Mason
1.90
1
1.90
2 Carpenter 1 Helper .056 Operator
26.74
4
6.69
1 Steel Fixer 1 Helper .056 Operator
12.95
3
4.32
Deshutterin g
M2
35.00
28.00
1.25
3.056
1,879.00
10.00
187.90
2.056
2 Carpenter 1 Helper .056 Operator
3.82
2
1.91
386.32
14
14.32
7
241.30
12
20.11
141.52
14
10.11
23.23
2
11.62
145.35
14
10.38
269.34
14
19.24
22.74
14
1.62
64.03
10
6.40
FINISHES 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator
Z0U34-2710
I. Hollow Block Works + Lintels @ Grnd Flr.
M2
Z0U34-2720
I. Internal Plaster Accessories & Rush @ GL
M2
347.00
48.46
7.16
2.000
Z0U34-2730
I. Internal Plaster Works @ GL
M2
2,413.00
20.00
120.65
2.000
Z0U34-2740
I. Glazed Ceramic Tile @ GL
M2
826
12.00
68.83
2.056
Z0U34-2750
I. Block Works For Ducts @ Grnd Flr.
M2
113
10.00
11.30
2.056
Z0U34-2760
I. Install False Ceiling (Susp. + Boarding) @ GL
M2
509
7.20
70.69
2.056
Z0U34-2770
I. Screed + Ceramic Tiles & Skirtings @ GL
M2
1572
12.00
131.00
2.056
Z0U34-2780
I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL
M2
354
32.00
11.06
2.056
Z0U34-2790
I. Water Proofing + Screed on Wet Areas - GL
M2
683
64.00
10.67
6.000
Z0U34-2800
I. Frames Installations @ GL
Nos.
59
4.80
12.29
2.056
1 Carpenter 1 Helper .056 Operator
25.27
14
1.81
Z0U34-2810
I. Doors w/ Ironmongery @ GL
Nos.
59
4.80
12.29
2.056
1 Carpenter 1 Helper .056 Operator
25.27
12
2.11
Z0U34-2820
I. Frames Installation Works @ GL
M2
108
4.80
22.50
2.056
1 Carpenter 1 Helper .056 Operator
46.26
14
3.30
138.78
12
11.57
1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper
27.59 2.05
108
1.60
67.50
2.056
1 Alum. Tech 1 Helper .056 Operator
Nos.
14
0.60
23.33
2.056
1 Carpenter 1 Helper .056 Operator
47.97
14
3.43
I. Wardrobes @ GL
Nos.
17
0.75
22.67
2.056
1 Carpenter 1 Helper .056 Operator
46.60
14
3.33
I. Primer Application Works @ GL I. Stucco Application Works @ GL
M2 M2
54.60 16.40
15.82 52.68
1.000 1.000
15.82 52.68
10 14
1.58 3.76
Z0U34-2830
I.Aluminum + Glass & Other Associated Works @ GL
M2
Z0U34-2840
I. Kitchen Cabinets @ GL
Z0U34-2850 Z0U34-2860 Z0U34-2870
Page 8 of 63
864.00 864.00
1 Painter 1 Painter
Z0U34-2880
I. Emulsion Paint Works @ GL
M2
1,626.00
32.20
50.50
1.000
Z0U34-2890
O. Plaster Accessories & Rush @ GL
M2
52
48.46
1.07
2.000
Z0U34-2900
O. Plaster Works @ GL
M2
316
20.00
15.80
2.000
Z0U34-2910
O. Polished Marble & Ceramic for Wall @ GL
M2
37
10.00
3.70
2.056
Z0U34-2920
O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.
M2
16
10.00
1.60
2.056
Z0U34-2930
O. Gypsum Board +Washable Paint @ GL
M2
66
16.00
4.13
2.056
Z0U34-2940
O. Semi Recessed G.R.G. Tiles @ GL
M2
36
16.00
2.25
2.056
Z0U34-2950
O. Sreed + Graniti Tiles & Skirtings @ GL
M2
514
12.00
42.83
2.056
Z0U34-2960
O. Screed + Polished Marble & Skirtings @ GL
M2
148
12.00
12.33
2.056
Z0U34-2970
O. G. Stl, Powdr coated Railin to Staircase @ GL
LM
24
20.00
1.20
2.056
Z0U34-2980 Z0U34-2990 Z0U34-3000
O. Primer ApplicationWorks @ GL. O. Stucco Application Works @ GL O. Emulsion Paint Works @ GL
M2 M2 M2
109 109 58
54.60 16.40 32.20
2.00 6.65 1.80
1.000 1.000 1.000
Z0U34-3010
I. Hollow Block Works + Lintels @ 1st Flr.
M2
1,950.00
10.00
195.00
2.056
Z0U34-3020
I. Internal Plaster Accessories & Rush @ 1L
M2
347.00
48.46
7.16
2.000
Z0U34-3030
I. Internal Plaster Works @ 1L
M2
2,581.00
20.00
129.05
2.000
Z0U34-3040
I. Glazed Ceramic Tile @ 1L
M2
735
12.00
61.25
2.056
Z0U34-3050
I. Block Works For Ducts @ 1st Flr.
M2
93
10.00
9.30
2.056
Z0U34-3060
I. Install False Ceiling (Susp. + Boarding) @ 1L
M2
476
7.20
66.11
2.056
Z0U34-3070
I. Screed + Ceramic Tiles & Skirtings @ 1L
M2
1746
12.00
145.50
2.056
Z0U34-3080
I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L
M2
269
32.00
8.41
2.056
Z0U34-3090
I. Water Proofing + Screed on Wet Areas - 1L
M2
683
64.00
10.67
6.000
Page 9 of 63
50.50
12
4.21
2.15
7
0.31
31.60
12
2.63
7.61
14
0.54
3.29
2
1.64
1 Carpenter 1 Helper .056 Operator
8.48
14
0.61
1 Carpenter 1 Helper .056 Operator
4.63
14
0.33
88.07
14
6.29
25.36
14
1.81
2.47
10
0.25
2.00 6.65 1.80
8 12 10
0.25 0.55 0.18
400.92
14
28.64
14.32
7
258.10
12
21.51
125.93
14
9.00
19.12
2
9.56
135.92
14
9.71
299.15
14
21.37
17.28
8
2.16
64.03
10
6.40
1 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper
2.05
Z0U34-3100
I. Frames Installations @ 1L
Nos.
72
4.80
15.00
2.056
1 Carpenter 1 Helper .056 Operator
30.84
14
2.20
Z0U34-3110
I. Doors w/ Ironmongery @ 1L
Nos.
72
4.80
15.00
2.056
1 Carpenter 1 Helper .056 Operator
30.84
12
2.57
Z0U34-3120
I. Frames Installation Works @ GL
M2
100
4.80
20.83
2.056
1 Carpenter 1 Helper .056 Operator
42.83
14
3.06
128.50
12
10.71
100
1.60
62.50
2.056
1 Alum. Tech 1 Helper .056 Operator
Nos.
17
0.75
22.67
2.056
1 Carpenter 1 Helper .056 Operator
46.60
14
3.33
I. Kitchen Cabinets @ 1L
Nos.
15
0.60
25.00
2.056
1 Carpenter 1 Helper .056 Operator
51.40
14
3.67
I. Primer Application Works @ 1L I. Stucco Application Works @ 1L I. Emulsion Paint Works @ 1L
M2 M2 M2
54.60 16.40 32.20
15.66 52.13 51.21
1.000 1.000 1.000
1 Painter
15.66 52.13 51.21
12 14 14
1.30 3.72 3.66
1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator
Z0U34-3130
I. Aluminum+Glass & Other Associated Works @ 1L
M2
Z0U34-3140
I. Wardrobes @ 1L
Z0U34-3150 Z0U34-3160 Z0U34-3170 Z0U34-3180
855.00 855.00 1,649.00
Z0U34-3190
O. Plaster Accessories & Rush @ 1L
M2
52
48.46
1.07
2.000
Z0U34-3200
O. Plaster Works @ 1L
M2
297
20.00
14.85
2.000
Z0U34-3210
O. Polished Marble & Ceramic for Wall @ 1L
M2
36
10.00
3.60
2.056
Z0U34-3220
O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.
M2
14
10.00
1.40
2.056
Z0U34-3230
O. Gypsum Board +Washable Paint @ 1L
M2
66
16.00
4.13
2.056
Z0U34-3240
O. Semi Recessed G.R.G. Tiles @ 1L
M2
36
16.00
2.25
2.056
Z0U34-3250
O. Sreed + Graniti Tiles & Skirtings @ 1L
M2
425
12.00
35.42
2.056
Z0U34-3260
O. Screed + Polished Marble & Skirtings @ 1L
M2
48
12.00
4.00
2.056
Z0U34-3270
O. G. Stl, Powdr coated Railin to Staircase @ 1L
LM
26
20.00
1.30
2.056
Z0U34-3280 Z0U34-3290 Z0U34-3300
O. Primer Application Works @ 1L O. Stucco Application Works @ 1L O. Emulsion Paint Works @ 1L
M2 M2 M2
103 103 58
54.60 16.40 32.20
1.89 6.28 1.80
1.000 1.000 1.000
Page 10 of 63
1 Painter 1 Painter
2.15
7
0.31
29.70
12
2.48
7.40
14
0.53
2.88
2
1.44
1 Carpenter 1 Helper .056 Operator
8.48
14
0.61
1 Carpenter 1 Helper .056 Operator
4.63
14
0.33
72.82
14
5.20
8.22
14
0.59
2.67
10
0.27
1.89 6.28 1.80
8 10 12
0.24 0.63 0.15
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter
Z0U34-4240 Z0U34-4250 Z0U34-4260 Z0U34-4270 Z0U34-4280 Z0U34-4290 Z0U34-4300 Z0U34-4310 Z0U34-4320 Z0U34-4330 Z0U34-4340 Z0U34-4350 Z0U34-4360 Z0U34-4370 Z0U34-4380 Z0U34-4390 Z0U34-4400 Z0U34-4410 Z0U34-4420 Z0U34-4430 Z0U34-4440 Z0U34-4450 Z0U34-4460 Z0U34-4470
Roof Drain & Access.+ Lightweight Concrete One Coat Cold Bituminous Primer 2 Layers of SBS W.P. Membrane + Water Test Alum. Foil Covering Fixed to Upstand w/ Sealant 50mm Thk. Extruded Polystyrene Insulation Protection Layer 18mm-25mm Round Aggregates (50mm Thk.) 1mm Thk. Alum. Flashing Fixed into Conc. Upstand Sealant Application Around top of Alum. Flashing Channel & Rails Installation for Lifts Cabin Assembly / Installation for lifts Machine Installation for lifts Doors Installation for lifts Connections To Ele + Finishing Touches for lifts Installation of Chute Tubes and Intake Throats Install Intake Doors, Chute Vent & Accessories Install Ground Floor Offset + Fire Shutter Door Install Compactor with MCP Installation of Garbage Container Final Test & Comm. Installation of Window Cleaning Eqmt. Primer Application Works @ Roof Deck Stucco Application Works @ Roof Deck Emulsion / Epoxy Paint Works @ Roof Deck
M2 M2 M2 LM M2 M2 M2 M2 M2 Items Items Items Items Items Item Item Item Item Item Item Item M2 M2 M2
281.00 13.00 268.00 107 268.00 268.00 268.00 107 107 2 2 2 2 2 1 1 1 1 1 1 1 50 50 55
7 2 6 3 2 2 4 3 2 14 10 7 10 12 8 4 2 1 1 3 14
54.60 16.40 32.20
0.92 3.05 1.71
1.000 1.000 1.000
1 Painter 1 Painter 1 Painter
315.00
22.66
2.000
1 Operator 1 Helper
5.63
9.60
5.000
2 Carpenter 1 Mason 1 Helper 1 Operator
91.07
76.00
1.20
6.000
M2
13.21
60.00
0.22
1.250
Backfilling Works
M3
7,125.36
601.00
11.86
7.500
Z0U34-4530 Z0U34-4540 Z0U34-4550 Z0U34-4560 Z0U34-4570 Z0U34-4580 Z0U34-4590 Z0U34-4600
Instl Drainage Pipes &Con. To Existing Chambers Instl Water Supply Pipes&Con. To Existg Chambers Instl Chilled Water Pipes&Con. To Existg Chamber Instl Central Gas Pipes &Con. To Existg Chambers Instl Telephone Ducts &Con. To Existing Chambers Laying of Power cables (By Others) Hardscaping Works Landscaping Works
Item Item Item Item Item Item Item Item
Z0U34-4610
Ext. Plaster Accessories & Rush on Front Elev.
M2
1,484.00
Z0U34-4620
Ext. Plaster Works on Front Elevation
M2
19.00
Z0U34-4630
Install Balcony Handrail on Front Elev.
Nos.
Z0U34-4640
Decorative GRC Panels W/ Epoxy Paint @ F. Elev.
Nos.
Z0U34-4480
Excavation Works External
M3
Z0U34-4490
RCC Manholes / Gully Traps
Nos.
Z0U34-4500
Water Proofing
M2
Z0U34-4510
Sand Bedding
Z0U34-4520
Page 11 of 63
7,137.50
54
4Waterproof er 2 Helper 1 Helper 0.25 Operator
1.5 Operator 3 Driver 3 Helper
0.92 3.05 1.71
8 10 12
0.11 0.30 0.14
45.32
5
9.06
48.00
14
3.43
7.19
12
0.60
0.28
10
0.03
88.92
14
6.35
1 1 1 1 1 1 1 1
14 12 14 12 10 7 14 12
48.46
30.62
2.000
8.00
2.38
2.000
35
15.00
2.33
2.250
17
2.00
8.50
2.500
1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator 1 Carpenter 1 Helper .5 Operator
61.25
2
30.62
4.75
4
1.19
5.25
12
0.44
21.25
10
2.13
Z0U34-4650
Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.
LM
5
Z0U34-4660
External Painting Works on Front Elevation
M2
1,503.00
1 Carpenter 1 Helper .5 Operator
1.56
12
0.13
3.000
3 Painter
140.03
14
10.00
1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator
25.01
2
12.51
4.75
4
1.19
-
10
0.00
-
8
0.00
8.00
0.63
2.500
32.20
46.68
48.46
12.51
2.000
19
8.00
2.38
2.000
Nos.
0
15.00
-
2.250
Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.
Nos.
0
2.00
-
2.500
Z0U34-4710
External Painting Works on Left Side Elevation
M2
625
32.20
19.41
3.000
Z0U34-4720
Ext. Plaster Accessories & Rush on Rear Elev.
M2
1,503.00
48.46
31.02
2.000
Z0U34-4730
Ext. Plaster Works on Rear Elevation
M2
19.00
8.00
2.38
2.000
Z0U34-4740
Install Balcony Handrail on Rear Elev.
Nos.
35
15.00
2.33
2.250
Z0U34-4750
Decorative GRC Panels W/ Epoxy Paint @ R. Elev.
Nos.
17
2.00
8.50
2.500
Z0U34-4760
Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.
LM
5
8.00
0.63
2.500
Z0U34-4770
External Painting Works on Rear Elevation
M2
1,503.00
32.20
46.68
Z0U34-4780
Ext. Plaster Access. & Rush on Rightside Elev.
M2
606
48.46
12.51
Z0U34-4790
Ext. Plaster Works on Right Side Elevation
M2
19
8.00
2.38
2.000
Z0U34-4800
Install Balcony Handrail on Rigthside Elev.
Nos.
0
15.00
-
2.250
Z0U34-4810
Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.
Nos.
0
2.00
-
2.500
1 Carpenter 1 Helper .5 Operator
Z0U34-4820 Z0U34-4830 Z0U34-4840 Z0U34-4850 Z0U34-4860 Z0U34-4870 Z0U34-4880 Z0U34-4890 Z0U34-4900 Z0U34-4910 Z0U34-4920 Z0U34-4930 Z0U34-4940 Z0U34-4950 Z0U34-4960 Z0U34-4970 Z0U34-4980 Z0U34-4990 Z0U34-5000 Z0U34-5010 Z0U34-5020 Z0U34-5030
External Painting Works on Right Side Elevation Snagging & Desnagging For Finishes @ GF Handing-Over For Finishes @ GF Snagging & Desnagging For Finishes @ 1F Handing-Over For Finishes @ 1F Snagging & Desnagging For Finishes @ 2F Handing-Over For Finishes @ 2F Snagging & Desnagging For Finishes @ 3F Handing-Over For Finishes @ 3F Snagging & Desnagging For Finishes @ 4F Handing-Over For Finishes @ 4F Snagging & Desnagging For Finishes @ Roof Floor Handing-Over For Finishes @ Roof Floor Power On (By DEWA) Precommissioning & Startup Availability of Chilled Water (By Others) Testing & Final Commissioning Snagging & Desnagging For External Finishes Handing-Over For External Finishes Completion of Fdn./Superstructure -Building # 34 Completion of External Works for Building # 34 Completion of MEP Works for Building # 34
M2 Item Item Item Item Item Item Item Item Item Item Item Item
625 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 1 1 1 1 0
3.000
3 Painter
Z0U34-4670
Ext. Plaster Access. & Rush on Leftside Elev.
M2
606
Z0U34-4680
Ext. Plaster Works on Left Side Elevation
M2
Z0U34-4690
Install Balcony Handrail on Leftside Elev.
Z0U34-4700
Item Item Item Item
Page 12 of 63
32.20
19.41
1 Carpenter 1 Helper .5 Operator
58.23
12
62.03
2
31.02
4.75
4
1.19
5.25
12
0.44
1 Carpenter 1 Helper .5 Operator
21.25
10
2.13
1 Carpenter 1 Helper .5 Operator
1.56
12
0.13
3.000
3 Painter
140.03
14
10.00
2.000
1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator
25.01
2
12.51
4.75
4
1.19
-
10
0.00
-
8
0.00
12
4.85
3 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator
58.23
30 10 30 10 30 10 30 10 30 10 30 10 1 21 1 35 12 2 1 1 1
4.85
Z0U34-5040 Z0U34-5050 Z0U34-5060 Z0U34-5070 Z0U34-5080 Z0U34-5090
Completion Completion Completion Completion Completion Completion
of Finishes for Building # 34 of Fdn./SuperStruc. for Phase-1 BLDG. of External Works for Phase-1 BLDG. of MEP Works for Phase-1 BLDG. of Finishes for Phase-1 BLDG. Milestone for Phase-1 Buildings
Item Item Item Item Item
1 1 1 0 1 1
1 0 0 0 0 0
54.60 16.40 32.20 48.46
Page 13 of 63
M
Carpenter
Mason
Steel Fixer
Helper
A
N - D
Operator
0.4 4.2
A
Y
Driver
Tot. Eqmt (X)
S Technicia n
Painter
Alum. Tech
Eqmt Desc.
Waterpro ofer
Tot. Edays (Z) (H x I)
E
Dozer
0.4
1.000 1 Dozer
0.36
0.36
0.5
0.5
1.000 1 Dozer
2.33
0.47
0.5
0.2
1.9
0.9
0.7
1.9
0.7
0.4
1.9
Shovel
Dump T.
B. Roller
Q
M
T - D
B. Cat
A
Y
S
S. Roller M. Crane
2.1
0.0
0.0
0.0
0.75 6.750 Shovel 6 D. Truck 0.0
0.0
0.0
10.84
0.0
0.47
4.750
0.5 Shovel 4 D. Truck .25 B. Roller
4.49
0.24
1.93
0.24
1.93
-
0.24
1.89
0.12
-
-
-
2.8
0.2
0.1
0.9
6.750
0.5 Shovel 6 D. Truck .25 B. Roller
7.18
0.11
0.86
0.05
6.750
0.5 Shovel 6 D. Truck .25 B. Roller
62.46
2.19
17.53
1.10
0.500
.5 Vibrator
0.68
0.2
4.6
2.3
18.5
4.4 1.8
18.2
4.2
41.6
16.3
17.6
8.1
0.5
0.056
.056 M. Crane
4.55
0.46
17.6
1.0
0.056
.056 M. Crane
9.84
0.98
Page 14 of 63
5.6 21.8
0.0
17.6
25.7
11.6
3.7 29.3
0.0
11.6
0.2
28.5
1.6
0.2
0.0
0.0
1.000
1 Vibrator
1.90
-
-
-
-
-
1.60
8.62
0.72
11.6
0.6
0.056
.056 M. Crane
7.76
0.65
1.8
0.1
0.056
.056 M. Crane
1.23
0.10
26.2
1.5
0.0
0.0
0.0
0.0
0.0
-
0.500
.5 Vibrator
0.09
-
-
-
-
-
1.47
3.3
0.2
0.056
.056 M. Crane
1.85
0.18
2.4
0.1
0.056
.056 M. Crane
1.33
0.13
0.5
0.0
0.056
.056 M. Crane
0.26
0.03
2.4
0.5
0.0
0.16
.056 M. Crane
2.7
0.0
0.0
1.56
0.056
0.3
0.9
0.0
.056 M. Crane
0.7
1.2
2.4
0.056
12.8
0.1
6.6
7.5
2.8
6.1
0.3
0.0
0.0
0.0
0.0
0.0
-
0.500
.5 Vibrator
0.00
-
-
-
-
-
0.34
0.3
0.0
0.056
.056 M. Crane
0.06
0.01
0.2
0.0
0.056
.056 M. Crane
0.04
0.01
Page 15 of 63
0.1
0.0 0.6
0.0
0.2
2.8
0.4
2.3
0.0
0.5
0.056
0.4
0.00
0.0
0.03
6.9
0.0
0.1
6.9
13.8
8.9
17.7
0.4
0.9
0.5
1.1
1.000
1 Vibrator
1.16
1.000
1 Vibrator
0.03
0.500
.5 Vibrator
0.11
2.9 1.1
0.7
2.2
6.5
6.3
6.8
2.2 0.0
0.01
0.2
0.3
8.5
.056 M. Crane
28.5
0.0
0.0
0.0
6.8
3.2
0.2
0.056
.056 M. Crane
0.71
0.18
6.8
0.4
0.056
.056 M. Crane
1.53
0.38
1.1
0.1
0.056
.056 M. Crane
0.24
0.06
11.1
0.6
0.0
0.0
0.0
0.0
0.0
1.000
Page 16 of 63
1 Vibrator
0.42
-
-
-
-
-
0.62
13.6
6.1
1.9 15.5
0.0
6.1
1.0
1.4
0.5 1.5
0.0
6.8
0.4
0.056
.056 M. Crane
1.90
0.38
6.1
0.3
0.056
.056 M. Crane
1.71
0.34
1.0
0.1
0.056
.056 M. Crane
0.27
0.05
13.9
0.8
0.0
0.0
0.0
-
1.000
1 Vibrator
0.04
-
-
-
-
-
0.78
0.0
0.056
.056 M. Crane
0.14
0.03
1.4
0.1
0.056
.056 M. Crane
0.40
0.08
0.3
0.0
0.056
.056 M. Crane
0.07
0.01
1.4
2.2
0.1
0.0
0.0
0.0
0.0
0.0
1.1
2.3
1.1
2.3
3.7
3.7
0.1
0.5
0.0
0.2
1.2
0.0
0.5
0.0
0.1
0.0
0.0
-
6.750
0.5 Shovel 6 D. Truck .25 B. Roller
0.16
0.500
.5 Vibrator
0.02
0.056
.056 M. Crane
0.13
-
0.01
-
0.05
-
-
-
0.12
0.00
0.4
1.2
0.6
0.0
Page 17 of 63
0.03
1.3
0.4 1.6
0.0
0.7
0.2 0.0
0.1
0.056
.056 M. Crane
0.28
0.07
0.2
0.0
0.056
.056 M. Crane
0.04
0.01
1.3
1.6
1.8
1.3
2.0
6.0 47.8
0.0
18.8
0.0
0.0
0.0
0.0
1.000
1 Vibrator
0.05
-
-
-
-
-
0.11
0.0
0.056
.056 M. Crane
0.22
0.04
0.7
0.0
0.056
.056 M. Crane
0.20
0.04
0.1
0.0
0.056
.056 M. Crane
0.03
0.01
1.6
0.1
0.0
0.0
0.0
0.0
0.0
0.3
0.5
1.4
2.8
0.0
18.8
0.0
0.8
0.7
41.8
0.1
0.0
0.1
-
6.750
0.5 Shovel 6 D. Truck .25 B. Roller
0.26
1.000
1 Vibrator
3.10
-
0.01
-
0.07
-
-
-
0.09
0.00
20.9
1.2
0.056
.056 M. Crane
14.06
1.17
18.8
1.1
0.056
.056 M. Crane
12.65
1.05
3.0
0.2
0.056
.056 M. Crane
2.01
0.17
42.7
2.4
0.0
0.0
0.0
0.0
0.0
1.000
Page 18 of 63
1 Vibrator
0.01
-
-
-
-
-
2.39
0.3
0.2
0.0 0.4
0.0
14.9
5.2 0.0
14.9
2.0
0.7
0.3 2.3
0.6
0.0
0.0
0.056
.056 M. Crane
0.06
0.01
0.2
0.0
0.056
.056 M. Crane
0.05
0.01
0.0
0.0
0.056
.056 M. Crane
0.01
0.00
0.2
10.3
15.5
0.2
0.3
0.0
0.0
0.0
0.0
0.0
0.0
-
1.000
1 Vibrator
1.28
-
-
-
-
-
0.02
5.2
0.3
0.056
.056 M. Crane
4.04
0.29
14.9
0.8
0.056
.056 M. Crane
11.64
0.83
2.6
0.1
0.056
.056 M. Crane
2.02
0.14
22.6
1.3
0.0
0.0
0.0
0.0
0.0
1.000
1 Vibrator
0.10
-
-
-
-
-
1.26
1.0
0.1
0.056
.056 M. Crane
0.56
0.06
0.7
0.0
0.056
.056 M. Crane
0.40
0.04
0.1
0.0
0.056
.056 M. Crane
0.08
0.01
0.7
1.9
0.3
0.1
0.0
0.0
0.0
0.0
0.0
0.0
-
1.000
1 Vibrator
0.04
0.056
.056 M. Crane
0.14
Page 19 of 63
-
-
-
-
-
0.10
0.02
0.8
0.3 0.8
0.0
17.8
5.6 0.0
17.8
10.4
15.0
5.2 15.7
0.0
0.0
0.056
.056 M. Crane
0.40
0.04
0.1
0.0
0.056
.056 M. Crane
0.07
0.01
0.8
39.5
45.1
0.8
15.0
1.8
0.6
1.2
0.1
0.0
0.0
0.0
0.0
0.0
1.000
1 Vibrator
-
-
-
-
-
0.07
2.93
19.8
1.1
0.056
.056 M. Crane
13.27
1.11
17.8
1.0
0.056
.056 M. Crane
11.94
1.00
2.8
0.2
0.056
.056 M. Crane
1.90
0.16
40.3
2.3
0.0
0.0
0.0
0.0
0.0
-
1.000
1 Vibrator
1.30
-
-
-
-
-
2.26
5.2
0.3
0.056
.056 M. Crane
4.10
0.29
15.0
0.8
0.056
.056 M. Crane
11.79
0.84
2.6
0.1
0.056
.056 M. Crane
2.05
0.15
22.9
1.3
0.0
0.0
0.0
0.0
0.0
1.000
1 Vibrator
0.09
-
-
-
-
-
1.28
0.9
0.0
0.056
.056 M. Crane
0.49
0.05
0.6
0.0
0.056
.056 M. Crane
0.35
0.04
Page 20 of 63
0.1
0.0
0.056
.056 M. Crane
0.07
13.4
13.4
0.8
0.056
.056 T. Crane
10.52
1.0
1.0
10.1
10.1
4.9
4.9
0.3
0.056
.056 T. Crane
3.85
5.7
5.7
0.3
0.056
.056 T. Crane
0.63
5.0
0.3
0.056
.056 T. Crane
3.96
9.4
9.4
0.5
0.056
.056 T. Crane
7.34
0.8
0.8
0.0
0.056
.056 T. Crane
0.62
0.3
5.0
2.1
4.3
0.9
0.9
0.0
0.056
.056 T. Crane
0.69
1.0
1.0
0.1
0.056
.056 T. Crane
0.69
1.6
1.6
0.1
0.056
.056 T. Crane
1.26
5.6
0.3
0.056
.056 T. Crane
3.78
1.7
1.7
0.1
0.056
.056 T. Crane
1.31
1.6
1.6
0.1
0.056
.056 T. Crane
1.27
5.6
1.6 3.8 Page 21 of 63
0.01
4.2 0.2
0.2
1.3
1.3
0.3
0.3
0.0
0.056
.056 T. Crane
0.21
0.8
0.8
0.0
0.056
.056 T. Crane
0.09
0.3
0.3
0.0
0.056
.056 T. Crane
0.23
0.2
0.2
0.0
0.056
.056 T. Crane
0.13
3.1
3.1
0.2
0.056
.056 T. Crane
2.40
0.9
0.9
0.0
0.056
.056 T. Crane
0.69
0.1
0.0
0.056
.056 T. Crane
0.07
0.8
0.056
.056 T. Crane
10.92
0.1 0.2 0.6 0.2
13.9
13.9
1.0
1.0
10.8
10.8
4.4
4.4
0.2
0.056
.056 T. Crane
3.43
4.7
4.7
0.3
0.056
.056 T. Crane
0.52
4.7
0.3
0.056
.056 T. Crane
3.70
10.4
10.4
0.6
0.056
.056 T. Crane
8.15
1.1
1.1
0.1
0.056
.056 T. Crane
0.47
4.7
2.1
4.3
Page 22 of 63
1.1
1.1
0.1
0.056
.056 T. Crane
0.84
1.3
1.3
0.1
0.056
.056 T. Crane
0.84
1.5
1.5
0.1
0.056
.056 T. Crane
1.17
5.2
0.3
0.056
.056 T. Crane
3.50
1.6
1.6
0.1
0.056
.056 T. Crane
1.27
1.8
1.8
0.1
0.056
.056 T. Crane
1.40
5.2
1.3 3.7 3.7 0.2
0.2
1.2
1.2
0.3
0.3
0.0
0.056
.056 T. Crane
0.20
0.7
0.7
0.0
0.056
.056 T. Crane
0.08
0.3
0.3
0.0
0.056
.056 T. Crane
0.23
0.2
0.2
0.0
0.056
.056 T. Crane
0.13
2.5
2.5
0.1
0.056
.056 T. Crane
1.98
0.3
0.3
0.0
0.056
.056 T. Crane
0.22
0.1
0.0
0.056
.056 T. Crane
0.07
0.1 0.2 0.6 0.2
Page 23 of 63
0.11 0.30 0.14
1.37
0.69
4.53
4.53
1.000
1 Excavato r
0.69
0.69
1.000
1 M. Crane
9.60
0.250
.25 Bob Cat
0.06
4.500
0.5 Shovel 3 Dump Truck .5 S. Roller .5 Bob Cat
0.20 0.02
2.54
0.85
22.66
0.69
0.40 0.01
1.27
2.54
53.35
0.01
0.42
2.54
0.42
0.42
15.31
15.31
0.59
0.59
0.19
0.19
0.05
0.250
.25 M. Crane
0.58
0.05
0.85
0.43
0.500
..5 M. Crane
4.25
0.43
Page 24 of 63
0.05
0.05
0.03
0.500
.5 M. Crane
0.31
0.03
10.00 6.25
6.25
0.59
0.59
-
-
-
-
0.250
.25 M. Crane
-
-
-
-
0.500
..5 M. Crane
-
-
4.85 15.51
15.51
0.59
0.59
0.19
0.19
0.05
0.250
.25 M. Crane
0.58
0.05
0.85
0.85
0.43
0.500
..5 M. Crane
4.25
0.43
0.05
0.05
0.03
0.500
.5 M. Crane
0.31
0.03
10.00 6.25
6.25
0.59
0.59
-
-
-
-
0.250
.25 M. Crane
-
-
-
-
0.500
..5 M. Crane
-
-
4.85
Page 25 of 63
Page 26 of 63
E
Q
M
T - D
A
Y
S
Vibrator Excavator
-
-
0.07
Page 27 of 63
Tower Crane
-
0.07
-
-
0.16
0.16
-
-
-
-
0.01
0.01
0.001
Page 28 of 63
0
0.39
0.01
-
-
-
-
0.03
0.03
-
0.08
Page 29 of 63
-
0.08
-
-
-
-
0.01
0.01
-
-
-
0.00
Page 30 of 63
0.00
-
-
-
-
0.01
0.01
-
-
0.26
0.26
-
0.00
Page 31 of 63
-
0.00
-
-
-
-
-
-
0.09
0.09 0.01
0.01
0.00
Page 32 of 63
0.00
-
-
-
-
-
-
0.24
0.24
0.09
0.09 0.01
Page 33 of 63
0.75
0.28
0.32
0.28
0.52
0.04
0.05
0.06
0.09
0.32
0.09
0.09
Page 34 of 63
0.01
0.04
0.02
0.01
0.17
0.05
0.01
0.78
0.25
0.26
0.26
0.58
0.06
Page 35 of 63
0.06
0.07
0.08
0.29
0.09
0.10
0.01
0.04
0.02
0.01
0.14
0.02
0.01
Page 36 of 63
4.53
Page 37 of 63
Page 38 of 63
Page 39 of 63
Activity
Activity
SUB
ID
Description
ACTIVITY
Unit
QTY (F)
Prod. Rate (G)
Days (H)
(unit/day)
(F/G)
Item
Tot. Man (I)
Crew Desc.
Tot. Mdays (K)
OD (O)
(H x I)
Manpower /day (N/O)
M Carpenter
Mason
Steel Fixer
Helper
A
N - D
Operator
A
Y
Driver
Tot. Eqmt (X)
S Technicia n
Painter
Alum. Tech
Eqmt Desc.
Waterpro ofer
Tot. Edays (Z) (H x I)
E Dozer
Shovel
Dump T.
B. Roller
Q
M
T - D
B. Cat
A
Y
S. Roller
S M. Crane
Vibrator Excavator
Tower Crane
SITEWORKS Z0U34-0000 Z0U34-0010
Site Clearing
M2
Setting-out / Layout
1,502.00
M
4,200.00
1 Operator
0.36
2.000 1 Helper
0.72
1
0.72
6.32
1
6.32
4.65
2
2.33
160.08
76.00
2.11
2 Carpenter 3.000 1 Helper
953.00
409.50
2.33
2.000 1 Helper
1.61
0.75 Operator 8.250 6 Driver 1.5 Helper
0.36 4.21
0.36
1.000 1 Dozer
0.36
0.36
0.47
1.000 1 Dozer
2.33
0.47
0.48
0.24
1.93
0.75 6.750 Shovel 6 D. Truck
0.95
0.71
1.93
2.11
SUBSTRUCTURE Z0U34-0020
Excavation for footings + Disposal of Materials
For M3 Excavation For Disposal
M3
555.00
345.60
1 Operator
13.25
3
0.47
4.42
5
Z0U34-0030
Formation Level & Compaction
M3
238
Z0U34-0040
Anti-Termite Applications (Under PCC Footings)
M2
571
252.00
202.50
0.94
2.82
.75 Operator 6.250 4 Driver 1.5 Helper
2.95
2 Technican
2.82
1
2.82
8.77
7
1.25
0.18
1
0.18
76.35
3
25.45
Z0U34-0050
Backfill & Compaction upto bot. of PCC Tie-Beam
M3
268
252.00
1.06
8.250
Z0U34-0060
Anti-Termite Applications (Under PCC Tie-Beam)
M2
37
202.50
0.18
1.000
2 Technican
8.250
0.75 Operator 6 Driver 1.5 Helper 2 Technican
Z0U34-0070
Backfill & Compaction up to bot of PCC Grd. Slab
M3
2,332.00
252.00
9.25
Z0U34-0080
Anti-Termite Applications (Under PCC Grade Slab)
M2
894
202.50
4.41
1.000
Z0U34-0090
Shutters + 50mm Thk. PCC Under Footings
M2
982
270.00
3.64
11.000
Z0U34-0100
50mm Protection Screed (Over W.P. Membrane-Ftg.)
M2
2,246.00
270.00
8.32
11.000
RCC For Footings
2
1.000
0.75 Operator 6 Driver 1.5 Helper
Z0U34-0110
5.90
-
1 Mason 10 Helper 1 Mason 10 Helper
1.82
18.19
4.16
41.59
45.75
35.24
1
35.24
976.00
12.00
81.33
3.056
2 Carpenter 1 Helper .056 Operator
248.55
4
62.14
kg
43,920.00
250.00
175.68
2.056
1 Steel Fixer 1 Helper .056 Operator
361.20
3
120.40
Deshutterin g
M2
976.00
35.00
27.89
3.056
2 Carpenter 1 Helper .056 Operator
85.22
2
42.61
Casting
M3
81.00
1.90
22.000
Formworks
M2
4.00
154.00
3.056
M2
Rebars
10 Z0U34-0120
RCC Necks Columns / Walls + MEP Sleeves
154
616.00
2 Carpenter 16 Helper 4 Mason
1
41.83
2 Carpenter 1 Helper .056 Operator
470.62
5
94.12
284.96
4
71.24
67.23
2
33.62
Rebars
kg
27,720.00
200.00
138.60
2.056
Deshutterin g
M2
616.00
28.00
22.00
3.056
2 Carpenter 1 Helper .056 Operator
12 Z0U34-0130
Shutters + 50mm Thk. PCC Under Tie-Beams
M2
63
270.00
0.23
11.000
Z0U34-0140
50mm Screed (Over W.P. Membrane-T.B.)
M2
144
270.00
0.53
11.000
Z0U34-0150
RCC Tie Beams + MEP Sleeves
1 Mason 10 Helper 1 Mason 10 Helper
1
4.03
100.85
4
25.21
132.00
4.00
33.00
3.056
2 Carpenter 1 Helper .056 Operator
kg
5,940.00
250.00
23.76
2.056
1 Steel Fixer 1 Helper .056 Operator
48.85
3
16.28
M2
132.00
28.00
4.71
3.056
2 Carpenter 1 Helper .056 Operator
14.41
2
7.20
0.12
1
0.12
Formworks
M2
Rebars
Deshutterin g
10
Z0U34-0160
RCC Kickers Over Tie-Beam
180.00
0.01
22.000
4.00
4.00
1.00
3.056
2 Carpenter 1 Helper .056 Operator
3.06
1
3.06
kg
180.00
250.00
0.72
2.056
1 Steel Fixer 1 Helper .056 Operator
1.48
1
1.48
M2
4.00
28.00
0.14
3.056
2 Carpenter 1 Helper .056 Operator
0.44
1
0.44
M3
Formworks
M2
Rebars
Deshutterin g
1
4 50mm Thk. PCC Under Grade Slab
M2
1,537.00
270.00
5.69
11.000
1 Mason 10 Helper
62.62
2
31.31
Z0U34-0180
Mesh + Filler Board & RCC For Grade Slab
M3
208
180.00
1.16
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
30.04
3
10.01
Z0U34-0190
50mm Thk. PCC Steps & Ramps
M2
10
270.00
0.04
11.000
1 Mason 10 Helper
0.41
2
0.20
0.72
8
0.09
41.33
2
20.66
Z0U34-0200
Steps & Ramps Works + Place Conc.
M3
5
180.00
0.03
26.000
Z0U34-0210
Waterproofing Membrane (Over PCC Footings)
M2
1,047.00
152.00
6.89
6.000
4 Waterproofe r 2 Helper
-
17.57
25.67
11.55
3.67 -
11.55
6.60
2.38
0.94 -
2.38
0.50
0.18
0.07 0.57
Z0U34-0170
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
5.58
7.54
1 Carpenter 16 Helper 4 Mason 1 Steel Fixer
Casting
17.57
0.24
1.89
0.12
-
-
-
0.11
0.91
6.750
0.5 Shovel 6 D. Truck .25 B. Roller
7.18
0.11
0.86
0.05
2.31
18.51
6.750
0.5 Shovel 6 D. Truck .25 B. Roller
62.46
2.19
17.53
1.10
0.500
.5 Vibrator
0.68
-
-
-
-
0.18
2.85
0.39
2.31
0.98
0.056
.056 M. Crane
9.84
0.98
2.79
0.16
0.056
.056 M. Crane
1.56
0.16
28.49
1.60
1.000
1 Vibrator
1.90
0.02
-
-
-
-
-
-
-
-
-
-
-
1.60
0.72
0.056
.056 M. Crane
8.62
0.72
11.55
0.65
0.056
.056 M. Crane
7.76
0.65
1.83
0.10
0.056
.056 M. Crane
1.23
1.47
-
-
-
-
-
.5 Vibrator
0.09
-
-
-
-
-
1.47
0.18
0.056
.056 M. Crane
1.85
0.18
2.38
0.13
0.056
.056 M. Crane
1.33
0.13
0.47
0.03
0.056
.056 M. Crane
0.26
0.03
0.34
-
-
-
-
-
-
0.500
.5 Vibrator
0.00
-
-
-
-
-
0.34
0.01
0.056
.056 M. Crane
0.06
0.01
0.18
0.01
0.056
.056 M. Crane
0.04
0.01
0.04
0.00
0.056
.056 M. Crane
0.01
0.00
0.03
-
-
0.01
-
-
0.001
0.25
0.47
0.16
0.01
3.30
6.15
-
0.10 -
0.500
-
0.16
12.83
26.22
0.07
0.03
0
28.46
0.39
0.02
0.01
0.07
17.57
2.67
4.03
-
0.46
0.27
22.000
33
4.49
1.93
4.55
1.17
0.18
M3
1.89
1.93
0.24
.056 M. Crane
0.12
2.93
0.5 Shovel 4 D. 4.750 Truck .25 B. Roller
0.24
0.056
1.28
2
0.47
0.46
2
5.87
10.84
-
8.13
2.57
180.00
Casting
16.27
29.33
1 Carpenter 16 Helper 4 Mason 1 Steel Fixer
-
4.41
21.84
41.83
1 Steel Fixer 1 Helper .056 Operator
4.63
4.41
2
-
0.18
20.00
26.000
Formworks
0.23
2
91.50
0.35
-
2.82
1
1.36
244
0.71
4.41
180.00
M3
-
40.01
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
Casting
-
6.93
1.000
1 Vibrator
1.16
0.39
1.000
1 Vibrator
0.03
0.01
0.19
0.00
0.06
6.89
Page 40 of 63
13.78
-
Z0U34-0220
Water Proofing For Neck Column & Wall & Footing
M2
2,021.00
152.00
13.30
6.000
4 Waterproofe r 2 Helper
79.78
3
26.59
8.86
17.73
-
Z0U34-0230
Waterproofing Membrane (Over PCC Tie-beams)
M2
67
152.00
0.44
6.000
4 Waterproofe r 2 Helper
2.64
2
1.32
0.44
0.88
-
Z0U34-0240
Waterproofing Membrane For Tie Beams
M2
121
152.00
0.80
6.000
4 Waterproofe r 2 Helper
4.78
3
1.59
0.53
1.06
-
1 Mason 10 Helper
3.14
1
3.14
4 Waterproofe r 2 Helper
3.24
1
3.24
Z0U34-0250
50mm Thk. PCC Under Base of Tank
M2
77
270.00
0.29
11.000
Z0U34-0260
Waterproofing Membrane (Over PCC - Base)
M2
82
152.00
0.54
6.000
Z0U34-0270
50mm Protect'n Screed (Over W.P. Membrane-Base)
M2
176
270.00
0.65
11.000
1 Mason 10 Helper
7.17
1
7.17
5.49
1
5.49
Z0U34-0280
RCC Water Tank Base + Deshuttering
Casting
M3
Formworks
M2
38
152.00
180.00
0.21
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
12.00
12.67
3.056
2 Carpenter 1 Helper .056 Operator
38.71
1
38.71
56.25
1
56.25
13.27
1
13.27
Rebars
kg
6,840.00
250.00
27.36
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
152.00
35.00
4.34
3.056
2 Carpenter 1 Helper .056 Operator
4 Z0U34-0290
RCC Wall W/MEP Pipes & Water Stop + Deshuttering
81.00
0.42
22.000
136.00
4.00
34.00
3.056
2 Carpenter 1 Helper .056 Operator
kg
6,120.00
200.00
30.60
2.056
M2
136.00
28.00
4.86
Casting
M3
Formworks
M2
Rebars
Deshutterin g
34
2 Carpenter 16 Helper 4 Mason
1
9.23
103.90
2
51.95
1 Steel Fixer 1 Helper .056 Operator
62.91
1
62.91
3.056
2 Carpenter 1 Helper .056 Operator
14.84
1
14.84
1.16
1
1.16
7.64
2
3.82
14.80
1
14.80
1
3.82
5
Z0U34-0300
RCC Top Slab + Deshuttering for Water Tank
Casting
M3
8.00
180.00
0.04
26.000
Formworks
M2
40.00
16.00
2.50
3.056
2 Carpenter 1 Helper .056 Operator
Rebars
kg
1,440.00
200.00
7.20
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
40.00
32.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
3.82
0.65
-
6.84
2.17 -
6.84
13.60
6.12
1.94 -
6.12
1.00
1.44
0.50 1.50
2.16
-
6.52
6.33
15.54
5
2.85 1.08
8.50
9.23
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
0.29
-
1.44
-
0.500
.5 Vibrator
0.11
0.03
3.17
0.18
0.056
.056 M. Crane
0.71
0.18
6.84
0.38
0.056
.056 M. Crane
1.53
0.38
1.09
0.06
0.056
.056 M. Crane
0.24
11.09
0.62
-
-
-
-
-
0.06 -
1.000
1 Vibrator
0.42
-
-
-
-
-
0.62
0.38
0.056
.056 M. Crane
1.90
0.38
6.12
0.34
0.056
.056 M. Crane
1.71
0.34
0.97
0.05
0.056
.056 M. Crane
0.27
0.05
0.78
-
-
-
-
-
-
1.000
1 Vibrator
0.04
-
-
-
-
-
0.78
0.03
0.056
.056 M. Crane
0.14
0.03
1.44
0.08
0.056
.056 M. Crane
0.40
0.08
0.25
0.01
0.056
.056 M. Crane
0.07
0.01
0.12
-
-
-
-
-
-
0.08
-
-
0.01
0.50
2.19
-
0.08
6.80
13.89
0.03
-
-
-
-
-
-
0.12
0.01
-
-
Z0U34-0310
Water Proofing Membrane all around outside surfc
M2
172
152.00
1.13
6.000
4 Waterproofe r 2 Helper
6.79
2
3.39
1.13
2.26
-
Z0U34-0320
Protection Board all around outside surface
M2
172
152.00
1.13
6.000
4 Waterproofe r 2 Helper
6.79
2
3.39
1.13
2.26
-
Z0U34-0330
Backfill around Water tank walls
M3
6
252.00
0.02
8.250
0.75 Operator 6 Driver 1.5 Helper
0.20
3
0.07
0.01
Z0U34-0340
G.R.P. Lining around inside + S.S. Lader & Door
M2
221
20.00
11.05
2.000
22.10
3
7.37
3.68
3.68
Z0U34-0350
50mm Thk. PCC Under Base of Elevator Shaft
M2
14
270.00
0.05
11.000
0.57
1
0.57
0.05
0.52
4 Waterproofe r 2 Helper
1 Mason 1 Helper 1 Mason 10 Helper
Z0U34-0360
Waterproofing Membrane (Over PCC - Base)
M2
15
152.00
0.10
6.000
0.59
1
0.59
Z0U34-0370
50mm Protect'n Screed (Over W.P. Membrane-Base)
M2
32
270.00
0.12
11.000
1 Mason 10 Helper
1.30
1
1.30
1.01
1
1.01
7.13
1
7.13
10.36
1
10.36
2.44
1
2.44
Z0U34-0380
RCC Elevator Shaft Base + Deshuttering
180.00
0.04
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
28.00
12.00
2.33
3.056
2 Carpenter 1 Helper .056 Operator
kg
1,260.00
250.00
5.04
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
28.00
35.00
0.80
3.056
2 Carpenter 1 Helper .056 Operator
Casting
M3
81.00
0.05
22.000
Formworks
M2
16.00
4.00
4.00
3.056
2 Carpenter 1 Helper .056 Operator
Rebars
kg
720.00
200.00
3.60
2.056
Deshutterin g
M2
16.00
28.00
0.57
3.056
Casting
M3
Formworks
M2
Rebars
7
4 Z0U34-0390
RCC Wall W/ MEP Cond. + Deshuttering
4
2 Carpenter 16 Helper 4 Mason
1
1.09
12.22
2
6.11
1 Steel Fixer 1 Helper .056 Operator
7.40
1
7.40
2 Carpenter 1 Helper .056 Operator
1.75
1
1.75
5
0.05
6.750
0.16
0.01
0.05
0.00
0.39
-
1.19
1.17
1.26
0.40 -
1.26
1.60
0.72
0.23 1.83
0.5 Shovel 6 D. Truck .25 B. Roller
-
0.20 0.12
1.57
1.09
0.01
-
0.72
-
0.500
.5 Vibrator
0.02
0.00
0.58
0.03
0.056
.056 M. Crane
0.13
0.03
1.26
0.07
0.056
.056 M. Crane
0.28
0.07
0.20
0.01
0.056
.056 M. Crane
0.04
0.01
1.000
1 Vibrator
0.05
2.04
0.11
-
-
-
-
-
-
-
-
-
-
-
0.11
0.80
0.04
0.056
.056 M. Crane
0.22
0.04
0.72
0.04
0.056
.056 M. Crane
0.20
0.04
0.11
0.01
0.056
.056 M. Crane
0.03
1.63
0.09
-
-
-
-
-
0.00
-
-
0.01
0.01 -
-
-
-
-
-
0.09
0.01
-
-
Z0U34-0400
Water Proofing Membrane all around outside surfc
M2
60
152.00
0.39
6.000
4 Waterproofe r 2 Helper
2.37
3
0.79
0.26
0.53
-
Z0U34-0410
Protection Board all around outside surface
M2
216
152.00
1.42
6.000
4 Waterproofe r 2 Helper
8.53
2
4.26
1.42
2.84
-
Page 41 of 63
Z0U34-0420
Backfill around the Lift's Pit wall
Z0U34-0430
RCC For Wall/Col. From Top of Grade Slab-1L
M3
9.89
252.00
0.04
8.250
251
81.00
3.10
22.000
0.75 Operator 6 Driver 1.5 Helper 2 Carpenter 16 Helper 4 Mason
0.32
3
0.11
68.17
1
68.17
Casting
M3
Formworks
M2
1,004.00
4.00
251.00
3.056
2 Carpenter 1 Helper .056 Operator
767.06
5
153.41
Rebars
kg
45,180.00
200.00
225.90
2.056
1 Steel Fixer 1 Helper .056 Operator
464.45
4
116.11
Deshutterin g
M2
1,004.00
28.00
35.86
3.056
2 Carpenter 1 Helper .056 Operator
109.58
2
54.79
Casting
M3
81.00
0.01
22.000
Formworks
M2
4.00
4.00
1.00
3.056
Rebars
kg
180.00
200.00
0.90
Deshutterin g
M2
4.00
28.00
0.14
12 Z0U34-0440
Columns From Top of Grade Slab-1L (Canopy)
1
2 Carpenter 16 Helper 4 Mason
RCC Slab / Beam - 1L
1
0.27
2 Carpenter 1 Helper .056 Operator
3.06
2
1.53
2.056
1 Steel Fixer 1 Helper .056 Operator
1.85
2
0.93
3.056
2 Carpenter 1 Helper .056 Operator
0.44
1
0.44
Casting
M3
231.00
180.00
1.28
26.000
Formworks
M2
1,155.00
16.00
72.19
3.056
2 Carpenter 1 Helper .056 Operator
220.61
6
36.77
Rebars
kg
41,580.00
200.00
207.90
2.056
1 Steel Fixer 1 Helper .056 Operator
427.44
5
85.49
Deshutterin g
M2
1,155.00
32.00
36.09
3.056
2 Carpenter 1 Helper .056 Operator
110.30
2
55.15
33.37
1
33.37
14 Z0U34-0460
RCC For Stair/Landings @ G.L. - 1L
Casting
M3
Formworks
M2
8
40.00
81.00
0.10
22.000
4.00
10.00
3.056
1
2.17
2 Carpenter 1 Helper .056 Operator
30.56
4
7.64
14.80
3
4.93
4.37
2
2.18
Rebars
kg
1,440.00
200.00
7.20
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
40.00
28.00
1.43
3.056
2 Carpenter 1 Helper .056 Operator
1.16
1
1.16
7.64
4
1.91
14.80
3
4.93
3.82
1
3.82
10
Z0U34-0470
RCC Canopy
Casting
M3
8.00
180.00
0.04
26.000
Formworks
M2
40.00
16.00
2.50
3.056
2 Carpenter 1 Helper .056 Operator
Rebars
kg
1,440.00
200.00
7.20
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
40.00
32.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
Z0U34-0480
RCC For Wall/Col. From Top of 1L-2L
Casting
M3
Formworks
M2
Rebars
Deshutterin g
237
1
64.37
2 Carpenter 1 Helper .056 Operator
724.27
5
144.85
2.056
1 Steel Fixer 1 Helper .056 Operator
438.54
4
109.64
3.056
2 Carpenter 1 Helper .056 Operator
103.47
2
51.73
33.80
1
33.80
2.93
22.000
948.00
4.00
237.00
3.056
kg
42,660.00
200.00
213.30
M2
948.00
28.00
33.86
12
Z0U34-0490
RCC Slab / Beam - 2L
Casting
M3
234.00
180.00
1.30
26.000
Formworks
M2
1,170.00
16.00
73.13
3.056
2 Carpenter 1 Helper .056 Operator
223.47
6
37.25
Rebars
kg
42,120.00
200.00
210.60
2.056
1 Steel Fixer 1 Helper .056 Operator
432.99
5
86.60
Deshutterin g
M2
1,170.00
32.00
36.56
3.056
2 Carpenter 1 Helper .056 Operator
111.74
2
55.87
Casting
M3
81.00
0.09
22.000
14 Z0U34-0500
RCC for Stair/Landings @ 1L-2L
7
2 Carpenter 16 Helper 4 Mason
1.90
1
0.05 -
0.15
10.31
14.85
5.16 -
14.85
2.00
0.72
0.29 -
0.72
0.56
0.80
0.28 -
0.80
39.50
17.78
5.64 45.14
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
18.83
0.15
0.83
64.37
81.00
-
0.33
2.29
9 2 Carpenter 16 Helper 4 Mason
5.98
15.47
2.17
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
18.83
0.38
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
2 Carpenter 16 Helper 4 Mason
41.83
47.81
0.27
6
Z0U34-0450
0.02
-
17.78
10.45
15.04
5.22 15.67
-
1.90
Page 42 of 63
15.04
0.01
0.08
6.750
0.5 Shovel 6 D. Truck .25 B. Roller
0.26
1.000
1 Vibrator
3.10
0.01
0.07
0.00
0.26
20.92
1.17
0.056
.056 M. Crane
14.06
1.17
18.83
1.05
0.056
.056 M. Crane
12.65
1.05
2.99
0.17
0.056
.056 M. Crane
2.01
0.17
1.000
1 Vibrator
0.01
42.73
2.39
-
-
-
-
-
-
-
-
-
-
-
2.39
0.17
0.01
0.056
.056 M. Crane
0.06
0.01
0.15
0.01
0.056
.056 M. Crane
0.05
0.01
0.02
0.00
0.056
.056 M. Crane
0.01
0.34
0.02
-
-
-
-
-
1 Vibrator
1.28
-
-
-
-
-
0.02
0.29
0.056
.056 M. Crane
4.04
0.29
14.85
0.83
0.056
.056 M. Crane
11.64
0.83
2.58
0.14
0.056
.056 M. Crane
2.02
0.14
1.26
-
-
-
-
-
1.000
1 Vibrator
0.10
-
-
-
-
-
1.26
0.06
0.056
.056 M. Crane
0.56
0.06
0.72
0.04
0.056
.056 M. Crane
0.40
0.04
0.14
0.01
0.056
.056 M. Crane
0.08
0.01
0.10
-
-
-
-
-
-
1.000
1 Vibrator
0.04
-
-
-
-
-
0.10
0.02
0.056
.056 M. Crane
0.14
0.02
0.80
0.04
0.056
.056 M. Crane
0.40
0.04
0.14
0.01
0.056
.056 M. Crane
0.07
0.07
-
-
-
-
1 Vibrator
-
-
-
-
-
0.07
2.93
1.11
0.056
.056 M. Crane
13.27
1.11
17.78
1.00
0.056
.056 M. Crane
11.94
1.00
2.82
0.16
0.056
.056 M. Crane
1.90
0.16
2.26
-
-
-
-
-
-
1.000
1 Vibrator
1.30
-
-
-
-
-
2.26
0.29
0.056
.056 M. Crane
4.10
0.29
15.04
0.84
0.056
.056 M. Crane
11.79
0.84
2.61
0.15
0.056
.056 M. Crane
2.05
0.15
1.000
1 Vibrator
0.09
1.28
-
-
-
-
-
-
-
0.01
-
-
0.00
-
-
0.24
-
-
-
-
0.09
5.22
22.88
0.09
0.24
19.75
40.35
-
0.01 -
1.000
-
0.00
0.28
1.22
0.00
0.01
1.00
1.86
-
0.09
5.16
22.58
-
0.00 -
1.000
0.26 0.00
-
-
-
-
-
-
1.28
0.09 0.01
Z0U34-0510 Z0U34-0520 Z0U34-0530
RCC For Wall/Col. From Top of 2L-3L RCC Slab / Beam - 3L RCC For Stair/Landings @ 2L-3L
Z0U34-0540
RCC For Wall/Col. From Top of 3L-4L
Formworks
M2
35.00
4.00
8.75
3.056
2 Carpenter 1 Helper .056 Operator
26.74
4
6.69
Rebars
kg
1,260.00
200.00
6.30
2.056
1 Steel Fixer 1 Helper .056 Operator
12.95
3
4.32
Deshutterin g
M2
35.00
28.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
3.82
2
1.91
M3 M3 M3
10 12 14 10
237 234 7
Casting
M3
Formworks
M2
236
944.00
81.00
2.91
22.000
4.00
236.00
3.056
2 Carpenter 16 Helper 4 Mason
1
64.10
2 Carpenter 1 Helper .056 Operator
721.22
5
144.24
436.69
4
109.17
103.03
2
51.52
Rebars
kg
42,480.00
200.00
212.40
2.056
Deshutterin g
M2
944.00
28.00
33.71
3.056
2 Carpenter 1 Helper .056 Operator
12
Z0U34-0550
RCC Slab / Beam - 4L
Z0U34-0560
RCC For Stair/Landings @ 3L-4L
Z0U34-0570
RCC For Wall/Col. From Top of 4L-RoofL
Casting
M3
237.00
180.00
1.32
26.000
Formworks
M2
1,185.00
16.00
74.06
3.056
2 Carpenter 1 Helper .056 Operator
226.34
6
37.72
Rebars
kg
42,660.00
200.00
213.30
2.056
1 Steel Fixer 1 Helper .056 Operator
438.54
5
87.71
Deshutterin g
M2
1,185.00
32.00
37.03
3.056
2 Carpenter 1 Helper .056 Operator
113.17
2
56.58
34.23
1
34.23
14 10
7
Casting
M3
Formworks
M2
Rebars
Deshutterin g
148
2 Carpenter 16 Helper 4 Mason
1
40.20
2 Carpenter 1 Helper .056 Operator
452.29
4
113.07
2.056
1 Steel Fixer 1 Helper .056 Operator
273.86
3
91.29
3.056
2 Carpenter 1 Helper .056 Operator
64.61
2
32.31
1.83
22.000
592.00
4.00
148.00
3.056
kg
26,640.00
200.00
133.20
M2
592.00
28.00
21.14
10
Z0U34-0580
RCC Wall/Col. For Staircase From Top of 4L-RoofL
Casting
M3
Formworks
M2
3
12.00
81.00
0.04
22.000
4.00
3.00
3.056
2 Carpenter 16 Helper 4 Mason
1
0.81
2 Carpenter 1 Helper .056 Operator
9.17
2
4.58
5.55
2
2.78
1.31
1
1.31
Rebars
kg
540.00
200.00
2.70
2.056
1 Steel Fixer 1 Helper .056 Operator
Deshutterin g
M2
12.00
28.00
0.43
3.056
2 Carpenter 1 Helper .056 Operator
6
Z0U34-0590
RCC Slab / Beam - RoofL
Casting
M3
152.00
180.00
0.84
26.000
Formworks
M2
760.00
16.00
47.50
3.056
2 Carpenter 1 Helper .056 Operator
145.16
5
29.03
Rebars
kg
27,360.00
200.00
136.80
2.056
1 Steel Fixer 1 Helper .056 Operator
281.26
4
70.32
Deshutterin g
M2
760.00
32.00
23.75
3.056
2 Carpenter 1 Helper .056 Operator
72.58
2
36.29
21.96
1
21.96
12 Z0U34-0600
RCC For Stair/Landings @ 4L-RoofL
81.00
0.04
22.000
15.00
4.00
3.75
3.056
2 Carpenter 1 Helper .056 Operator
kg
540.00
200.00
2.70
2.056
M2
15.00
28.00
0.54
Casting
M3
Formworks
M2
Rebars
Deshutterin g
3
2 Carpenter 16 Helper 4 Mason
0.81
1
0.81
11.46
3
3.82
1 Steel Fixer 1 Helper .056 Operator
5.55
3
1.85
3.056
2 Carpenter 1 Helper .056 Operator
1.64
1
1.64
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
RCC Slab / Beam for Staircase - RoofL
Casting
M3
4.00
180.00
0.02
0.58
1
-
17.70
10.58
15.24
5.29 -
15.24
29.60
13.32
4.23 -
13.32
1.00
0.45
0.14 -
0.45
7.92
11.40
3.96 11.88
8
Z0U34-0610
5.62
1.14
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
0.63
17.70
33.83
0.81
-
39.33
15.87
40.20
81.00
0.25
44.95
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
M3
0.63
2.00
64.10
1 Steel Fixer 1 Helper .056 Operator
1.75
-
11.40
0.94
0.34
0.13 1.07
-
0.58
0.34
0.88
0.05
0.056
.056 M. Crane
0.49
0.05
0.63
0.04
0.056
.056 M. Crane
0.35
0.04
0.13
0.01
0.056
.056 M. Crane
0.07
0.01
1.63
0.09
-
-
-
-
-
-
1.000
1 Vibrator
-
-
-
-
0.09
2.91
1.10
0.056
.056 M. Crane
13.22
1.10
17.70
0.99
0.056
.056 M. Crane
11.89
0.99
2.81
0.16
0.056
.056 M. Crane
1.89
40.18
2.25
-
-
-
-
-
1 Vibrator
1.32
-
-
-
-
-
2.25
0.30
0.056
.056 M. Crane
4.15
0.30
15.24
0.85
0.056
.056 M. Crane
11.94
0.85
2.65
0.15
0.056
.056 M. Crane
2.07
0.15
1.30
-
-
-
-
-
-
1.000
1 Vibrator
1.83
-
-
-
-
-
1.30
0.83
0.056
.056 M. Crane
8.29
0.83
13.32
0.75
0.056
.056 M. Crane
7.46
0.75
2.11
0.12
0.056
.056 M. Crane
1.18
0.12
1.69
-
-
-
-
-
-
1.000
1 Vibrator
0.04
-
-
-
-
-
1.69
0.03
0.056
.056 M. Crane
0.17
0.03
0.45
0.03
0.056
.056 M. Crane
0.15
0.03
0.07
0.00
0.056
.056 M. Crane
0.02
0.06
-
-
-
-
-
1 Vibrator
0.84
-
-
-
-
-
0.06
0.22
0.056
.056 M. Crane
2.66
0.22
11.40
0.64
0.056
.056 M. Crane
7.66
0.64
1.98
0.11
0.056
.056 M. Crane
1.33
0.11
0.97
-
-
-
-
-
1.000
1 Vibrator
0.04
-
-
-
-
-
0.97
0.03
0.056
.056 M. Crane
0.21
0.03
0.34
0.02
0.056
.056 M. Crane
0.15
0.02
0.07
0.00
0.056
.056 M. Crane
0.03
0.00
0.05
-
-
-
-
-
-
1 Vibrator
0.02
-
-
0.18
-
-
0.01
-
-
0.07
-
-
-
-
0.00
0.47
0.87
0.09
0.07
3.96
17.34
-
0.00 -
1.000
-
0.01
0.50
1.02
0.24
0.18
14.80
30.23
-
0.09
5.29
23.17
-
0.16 -
1.000
0.01
0.24
19.67
1.000
Page 43 of 63
-
-
-
-
-
-
0.05
0.00
0.00
Formworks
M2
20.00
16.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
3.82
3
1.27
Rebars
kg
720.00
200.00
3.60
2.056
1 Steel Fixer 1 Helper .056 Operator
7.40
2
3.70
Deshutterin g
M2
20.00
32.00
0.63
3.056
2 Carpenter 1 Helper .056 Operator
1.91
1
1.91
Casting
M3
81.00
0.30
22.000
Formworks
M2
96.00
4.00
24.00
3.056
Rebars
kg
4,320.00
200.00
21.60
Deshutterin g
M2
96.00
28.00
3.43
7 Z0U34-0620
RCC For Lower Parapet
24
2 Carpenter 16 Helper 4 Mason
1
6.52
2 Carpenter 1 Helper .056 Operator
73.34
4
18.34
2.056
1 Steel Fixer 1 Helper .056 Operator
44.41
3
14.80
3.056
2 Carpenter 1 Helper .056 Operator
10.48
2
5.24
10 Z0U34-0630
RCC For Wall/Col. From Roof L-Top of Roof L
Casting
M3
Formworks
M2
Rebars
Deshutterin g
10
1
2.72
2 Carpenter 1 Helper .056 Operator
30.56
2
15.28
2.056
1 Steel Fixer 1 Helper .056 Operator
18.50
2
9.25
3.056
2 Carpenter 1 Helper .056 Operator
4.37
1
4.37
2.46
1
2.46
0.12
22.000
40.00
4.00
10.00
3.056
kg
1,800.00
200.00
9.00
M2
40.00
28.00
1.43
6
Z0U34-0640
RCC Slab / Beam Top Roof Level
Casting
M3
17.00
180.00
0.09
26.000
Formworks
M2
85.00
16.00
5.31
3.056
2 Carpenter 1 Helper .056 Operator
16.24
3
5.41
31.46
2
15.73
8.12
1
8.12
Rebars
kg
3,060.00
200.00
15.30
2.056
Deshutterin g
M2
85.00
32.00
2.66
3.056
2 Carpenter 1 Helper .056 Operator
Casting
M3
81.00
0.19
22.000
Formworks
M2
60.00
4.00
15.00
3.056
Rebars
kg
2,700.00
200.00
13.50
Deshutterin g
M2
60.00
28.00
2.14
7 Z0U34-0650
RCC For Upper Parapet
15
2 Carpenter 16 Helper 4 Mason
1
4.07
2 Carpenter 1 Helper .056 Operator
45.84
3
15.28
2.056
1 Steel Fixer 1 Helper .056 Operator
27.76
3
9.25
3.056
2 Carpenter 1 Helper .056 Operator
6.55
1
6.55
RCC Eqmt. Pads + Railing
0.43
1
0.43
180.00
0.02
26.000
12.00
12.00
1.00
3.056
2 Carpenter 1 Helper .056 Operator
3.06
4
0.76
kg
540.00
250.00
2.16
2.056
1 Steel Fixer 1 Helper .056 Operator
4.44
3
1.48
M2
12.00
35.00
0.34
3.056
2 Carpenter 1 Helper .056 Operator
1.05
2
0.52
Casting
M3
Formworks
M2
Rebars
Deshutterin g
3
2.16
0.69 -
10
2.16
3.33
1.50
0.48 -
1.50
1.52
2.19
0.76 -
2.19
3.75
1.69
0.54 4.29
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
0.51
4.80
2.28
4.07
8
Z0U34-0660
-
3.81
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
1 Steel Fixer 1 Helper .056 Operator
0.18
5.49
2.72
81.00
0.51
0.54
6.52
2 Carpenter 16 Helper 4 Mason
0.36
-
1.69
0.20
0.22
0.07 0.27
-
0.22
0.18
0.01
0.056
.056 M. Crane
0.07
0.01
0.51
0.03
0.056
.056 M. Crane
0.20
0.03
0.09
0.00
0.056
.056 M. Crane
0.04
0.01
1.000
1 Vibrator
0.30
0.78
0.04
-
-
-
-
-
-
-
-
-
-
-
0.04
2.40
0.13
0.056
.056 M. Crane
1.34
0.13
2.16
0.12
0.056
.056 M. Crane
1.21
0.12
0.34
0.02
0.056
.056 M. Crane
0.19
4.90
0.27
-
-
-
-
1 Vibrator
0.12
-
-
-
-
-
0.27
0.09
0.056
.056 M. Crane
0.56
0.09
1.50
0.08
0.056
.056 M. Crane
0.50
0.08
0.24
0.01
0.056
.056 M. Crane
0.08
0.01
0.19
-
-
-
-
-
-
1.000
1 Vibrator
0.09
-
-
-
-
-
0.19
0.04
0.056
.056 M. Crane
0.30
0.04
2.19
0.12
0.056
.056 M. Crane
0.86
0.12
0.38
0.02
0.056
.056 M. Crane
0.15
0.02
1.000
1 Vibrator
0.19
0.19
-
-
-
-
-
-
-
-
-
-
-
0.19
0.11
0.056
.056 M. Crane
0.84
0.11
1.69
0.09
0.056
.056 M. Crane
0.76
0.09
0.27
0.02
0.056
.056 M. Crane
0.12
0.02
0.21
-
-
-
-
-
-
0.500
.5 Vibrator
0.01
-
-
-
-
-
0.21
0.01
0.056
.056 M. Crane
0.06
0.01
0.22
0.01
0.056
.056 M. Crane
0.12
0.01
0.03
0.00
0.056
.056 M. Crane
0.02
0.00
0.02
-
-
-
-
-
-
0.02
-
-
0.01
-
-
0.02
-
-
-
-
0.00
0.10
0.35
-
0.02
1.88
3.83
0.03
0.01
0.76
3.32
-
0.02
1.67
3.40
-
0.02 -
1.000
0.00 0.03
-
-
-
-
-
-
0.02
0.00
MEP FINISHES
M2
1,879.00
187.90
2.056
48.46
7.16
2.000
20.00
120.65
2.000
826
12.00
68.83
2.056
M2
113
10.00
11.30
2.056
I. Install False Ceiling (Susp. + Boarding) @ GL
M2
509
7.20
70.69
2.056
Z0U34-2770
I. Screed + Ceramic Tiles & Skirtings @ GL
M2
1572
12.00
131.00
2.056
Z0U34-2780
I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL
M2
354
32.00
11.06
2.056
Z0U34-2790
I. Water Proofing + Screed on Wet Areas - GL
M2
683
64.00
10.67
6.000
Z0U34-2710
I. Hollow Block Works + Lintels @ Grnd Flr.
Z0U34-2720
I. Internal Plaster Accessories & Rush @ GL
M2
347.00
Z0U34-2730
I. Internal Plaster Works @ GL
M2
2,413.00
Z0U34-2740
I. Glazed Ceramic Tile @ GL
M2
Z0U34-2750
I. Block Works For Ducts @ Grnd Flr.
Z0U34-2760
10.00
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper
386.32
14
27.59
13.42
2.05
13.42
0.75
0.056
.056 T. Crane
10.52
0.75
14.32
7
1.02
1.02
241.30
12
20.11
10.05
10.05
141.52
14
10.11
4.92
4.92
0.28
0.056
.056 T. Crane
3.85
0.28
23.23
2
11.62
5.65
5.65
0.32
0.056
.056 T. Crane
0.63
0.32
145.35
14
10.38
5.05
0.28
0.056
.056 T. Crane
3.96
0.28
269.34
14
19.24
9.36
9.36
0.52
0.056
.056 T. Crane
7.34
0.52
22.74
14
1.62
0.79
0.79
0.04
0.056
.056 T. Crane
0.62
0.04
64.03
10
6.40
5.05
2.13
Page 44 of 63
4.27
Z0U34-2800
I. Frames Installations @ GL
Nos.
59
4.80
12.29
2.056
1 Carpenter 1 Helper .056 Operator
25.27
14
1.81
0.88
0.88
0.05
0.056
.056 T. Crane
0.69
0.05
Z0U34-2810
I. Doors w/ Ironmongery @ GL
Nos.
59
4.80
12.29
2.056
1 Carpenter 1 Helper .056 Operator
25.27
12
2.11
1.02
1.02
0.06
0.056
.056 T. Crane
0.69
0.06
Z0U34-2820
I. Frames Installation Works @ GL
M2
108
4.80
22.50
2.056
1 Carpenter 1 Helper .056 Operator
46.26
14
3.30
1.61
1.61
0.09
0.056
.056 T. Crane
1.26
0.09
Z0U34-2830
I.Aluminum + Glass & Other Associated Works @ GL
M2
108
1.60
67.50
2.056
1 Alum. Tech 1 Helper .056 Operator
138.78
12
11.57
5.63
0.32
0.056
.056 T. Crane
3.78
0.32
Z0U34-2840
I. Kitchen Cabinets @ GL
Nos.
14
0.60
23.33
2.056
1 Carpenter 1 Helper .056 Operator
47.97
14
3.43
1.67
1.67
0.09
0.056
.056 T. Crane
1.31
0.09
Z0U34-2850
I. Wardrobes @ GL
Nos.
17
0.75
22.67
2.056
1 Carpenter 1 Helper .056 Operator
46.60
14
3.33
1.62
1.62
0.09
0.056
.056 T. Crane
1.27
0.09
Z0U34-2860 Z0U34-2870 Z0U34-2880
I. Primer Application Works @ GL I. Stucco Application Works @ GL I. Emulsion Paint Works @ GL
M2 M2 M2
864.00 864.00 1,626.00
54.60 16.40 32.20
15.82 52.68 50.50
1.000 1.000 1.000
15.82 52.68 50.50
10 14 12
1.58 3.76 4.21
Z0U34-2890
O. Plaster Accessories & Rush @ GL
M2
52
48.46
1.07
2.000
Z0U34-2900
O. Plaster Works @ GL
M2
316
20.00
15.80
2.000
Z0U34-2910
O. Polished Marble & Ceramic for Wall @ GL
M2
37
10.00
3.70
2.056
Z0U34-2920
O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.
M2
16
10.00
1.60
2.056
Z0U34-2930
O. Gypsum Board +Washable Paint @ GL
M2
66
16.00
4.13
2.056
Z0U34-2940
O. Semi Recessed G.R.G. Tiles @ GL
M2
36
16.00
2.25
2.056
Z0U34-2950
O. Sreed + Graniti Tiles & Skirtings @ GL
M2
514
12.00
42.83
2.056
Z0U34-2960
O. Screed + Polished Marble & Skirtings @ GL
M2
148
12.00
12.33
2.056
Z0U34-2970
O. G. Stl, Powdr coated Railin to Staircase @ GL
LM
24
20.00
1.20
2.056
Z0U34-2980 Z0U34-2990 Z0U34-3000
O. Primer ApplicationWorks @ GL. O. Stucco Application Works @ GL O. Emulsion Paint Works @ GL
M2 M2 M2
109 109 58
54.60 16.40 32.20
2.00 6.65 1.80
1.000 1.000 1.000
Z0U34-3010
I. Hollow Block Works + Lintels @ 1st Flr.
M2
1,950.00
10.00
195.00
2.056
Z0U34-3020
I. Internal Plaster Accessories & Rush @ 1L
M2
347.00
48.46
7.16
2.000
Z0U34-3030
I. Internal Plaster Works @ 1L
M2
2,581.00
20.00
129.05
2.000
Z0U34-3040
I. Glazed Ceramic Tile @ 1L
M2
735
12.00
61.25
2.056
Z0U34-3050
I. Block Works For Ducts @ 1st Flr.
M2
93
10.00
9.30
2.056
7.20
66.11
2.056
1746
12.00
145.50
2.056
M2
269
32.00
8.41
2.056
M2
683
64.00
10.67
6.000
Z0U34-3060
I. Install False Ceiling (Susp. + Boarding) @ 1L
M2
476
Z0U34-3070
I. Screed + Ceramic Tiles & Skirtings @ 1L
M2
Z0U34-3080
I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L
Z0U34-3090
I. Water Proofing + Screed on Wet Areas - 1L
1 Painter 1 Painter 1 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator
5.63
1.58 3.76 4.21
2.15
7
0.31
0.15
0.15
31.60
12
2.63
1.32
1.32
7.61
14
0.54
0.26
0.26
0.01
0.056
.056 T. Crane
0.21
0.01
3.29
2
1.64
0.80
0.80
0.04
0.056
.056 T. Crane
0.09
0.04
1 Carpenter 1 Helper .056 Operator
8.48
14
0.61
0.29
0.29
0.02
0.056
.056 T. Crane
0.23
0.02
1 Carpenter 1 Helper .056 Operator
4.63
14
0.33
0.16
0.16
0.01
0.056
.056 T. Crane
0.13
0.01
88.07
14
6.29
3.06
3.06
0.17
0.056
.056 T. Crane
2.40
0.17
25.36
14
1.81
0.88
0.88
0.05
0.056
.056 T. Crane
0.69
0.05
2.47
10
0.25
0.12
0.01
0.056
.056 T. Crane
0.07
0.01
2.00 6.65 1.80
8 12 10
0.25 0.55 0.18
400.92
14
28.64
0.78
0.056
.056 T. Crane
10.92
0.78
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper
14.32
7
258.10
12
21.51
125.93
14
19.12
0.12 0.25 0.55 0.18
13.93
2.05
13.93
1.02
1.02
10.75
10.75
9.00
4.38
4.38
0.25
0.056
.056 T. Crane
3.43
0.25
2
9.56
4.65
4.65
0.26
0.056
.056 T. Crane
0.52
0.26
135.92
14
9.71
4.72
0.26
0.056
.056 T. Crane
3.70
0.26
299.15
14
21.37
10.39
10.39
0.58
0.056
.056 T. Crane
8.15
0.58
17.28
8
2.16
1.05
1.05
0.06
0.056
.056 T. Crane
0.47
0.06
4.72
64.03
10
6.40
2.13
4.27
30.84
14
2.20
1.07
1.07
0.06
0.056
.056 T. Crane
0.84
0.06
Z0U34-3100
I. Frames Installations @ 1L
Nos.
72
4.80
15.00
2.056
1 Carpenter 1 Helper .056 Operator
Z0U34-3110
I. Doors w/ Ironmongery @ 1L
Nos.
72
4.80
15.00
2.056
1 Carpenter 1 Helper .056 Operator
30.84
12
2.57
1.25
1.25
0.07
0.056
.056 T. Crane
0.84
0.07
Z0U34-3120
I. Frames Installation Works @ GL
M2
100
4.80
20.83
2.056
1 Carpenter 1 Helper .056 Operator
42.83
14
3.06
1.49
1.49
0.08
0.056
.056 T. Crane
1.17
0.08
128.50
12
10.71
5.21
0.29
0.056
.056 T. Crane
3.50
0.29
100
1.60
62.50
2.056
1 Alum. Tech 1 Helper .056 Operator
Nos.
17
0.75
22.67
2.056
1 Carpenter 1 Helper .056 Operator
46.60
14
3.33
1.62
1.62
0.09
0.056
.056 T. Crane
1.27
0.09
I. Kitchen Cabinets @ 1L
Nos.
15
0.60
25.00
2.056
1 Carpenter 1 Helper .056 Operator
51.40
14
3.67
1.79
1.79
0.10
0.056
.056 T. Crane
1.40
0.10
Z0U34-3160 Z0U34-3170 Z0U34-3180
I. Primer Application Works @ 1L I. Stucco Application Works @ 1L I. Emulsion Paint Works @ 1L
M2 M2 M2
855.00 855.00 1,649.00
54.60 16.40 32.20
15.66 52.13 51.21
1.000 1.000 1.000
15.66 52.13 51.21
12 14 14
1.30 3.72 3.66
Z0U34-3190
O. Plaster Accessories & Rush @ 1L
M2
52
48.46
1.07
2.000
Z0U34-3200
O. Plaster Works @ 1L
M2
297
20.00
14.85
2.000
Z0U34-3210
O. Polished Marble & Ceramic for Wall @ 1L
M2
36
10.00
3.60
2.056
Z0U34-3220
O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.
M2
14
10.00
1.40
2.056
Z0U34-3230
O. Gypsum Board +Washable Paint @ 1L
M2
66
16.00
4.13
2.056
Z0U34-3240
O. Semi Recessed G.R.G. Tiles @ 1L
M2
36
16.00
2.25
2.056
Z0U34-3130
I. Aluminum+Glass & Other Associated Works @ 1L
M2
Z0U34-3140
I. Wardrobes @ 1L
Z0U34-3150
1 Painter 1 Painter 1 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator
5.21
1.30 3.72 3.66
2.15
7
0.31
0.15
0.15
29.70
12
2.48
1.24
1.24
7.40
14
0.53
0.26
0.26
0.01
0.056
.056 T. Crane
0.20
0.01
2.88
2
1.44
0.70
0.70
0.04
0.056
.056 T. Crane
0.08
0.04
1 Carpenter 1 Helper .056 Operator
8.48
14
0.61
0.29
0.29
0.02
0.056
.056 T. Crane
0.23
0.02
1 Carpenter 1 Helper .056 Operator
4.63
14
0.33
0.16
0.16
0.01
0.056
.056 T. Crane
0.13
0.01
Page 45 of 63
Z0U34-3250
O. Sreed + Graniti Tiles & Skirtings @ 1L
M2
425
12.00
35.42
2.056
Z0U34-3260
O. Screed + Polished Marble & Skirtings @ 1L
M2
48
12.00
4.00
2.056
Z0U34-3270
O. G. Stl, Powdr coated Railin to Staircase @ 1L
LM
26
20.00
1.30
2.056
Z0U34-3280 Z0U34-3290 Z0U34-3300
O. Primer Application Works @ 1L O. Stucco Application Works @ 1L O. Emulsion Paint Works @ 1L
M2 M2 M2
103 103 58
54.60 16.40 32.20
1.89 6.28 1.80
1.000 1.000 1.000
Z0U34-3310
I. Hollow Block Works + Lintels @ 2nd Flr.
M2
1,950.00
10.00
195.00
2.056
Z0U34-3320
I. Internal Plaster Accessories & Rush @ 2L
M2
347.00
48.46
7.16
2.000
Z0U34-3330
I. Internal Plaster Works @ 2L
M2
2,581.00
20.00
129.05
2.000
Z0U34-3340
I. Glazed Ceramic Tile @ 2L
M2
735
12.00
61.25
2.056
Z0U34-3350
I. Block Works For Ducts @ 2nd Flr.
M2
93
10.00
9.30
2.056
7.20
66.11
2.056
1746
12.00
145.50
2.056
M2
269
32.00
8.41
2.056
M2
683
64.00
10.67
6.000
Z0U34-3360
I. Install False Ceiling (Susp. + Boarding) @ 2L
M2
476
Z0U34-3370
I. Screed + Ceramic Tiles & Skirtings @ 2L
M2
Z0U34-3380
I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L
Z0U34-3390
I. Water Proofing + Screed on Wet Areas - 2L
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper
72.82
14
5.20
2.53
2.53
0.14
0.056
.056 T. Crane
1.98
0.14
8.22
14
0.59
0.29
0.29
0.02
0.056
.056 T. Crane
0.22
0.02
2.67
10
0.27
0.13
0.01
0.056
.056 T. Crane
0.07
0.01
1.89 6.28 1.80
8 10 12
0.24 0.63 0.15
400.92
14
28.64
0.78
0.056
.056 T. Crane
10.92
0.78
14.32
7
258.10
12
21.51
125.93
14
19.12
0.13 0.24 0.63 0.15
13.93
2.05
13.93
1.02
1.02
10.75
10.75
9.00
4.38
4.38
0.25
0.056
.056 T. Crane
3.43
0.25
2
9.56
4.65
4.65
0.26
0.056
.056 T. Crane
0.52
0.26
135.92
14
9.71
4.72
0.26
0.056
.056 T. Crane
3.70
0.26
299.15
14
21.37
10.39
10.39
0.58
0.056
.056 T. Crane
8.15
0.58
17.28
8
2.16
1.05
1.05
0.06
0.056
.056 T. Crane
0.47
0.06
4.72
64.03
10
6.40
2.13
4.27
30.84
14
2.20
1.07
1.07
0.06
0.056
.056 T. Crane
0.84
0.06
Z0U34-3400
I. Frames Installations @ 2L
Nos.
72
4.80
15.00
2.056
1 Carpenter 1 Helper .056 Operator
Z0U34-3410
I. Doors w/ Ironmongery @ 2L
Nos.
72
4.80
15.00
2.056
1 Carpenter 1 Helper .056 Operator
30.84
12
2.57
1.25
1.25
0.07
0.056
.056 T. Crane
0.84
0.07
Z0U34-3420
I. Frames Installation Works @ 2L
M2
100
4.80
20.83
2.056
1 Carpenter 1 Helper .056 Operator
42.83
14
3.06
1.49
1.49
0.08
0.056
.056 T. Crane
1.17
0.08
128.50
12
10.71
5.21
0.29
0.056
.056 T. Crane
3.50
0.29
100
1.60
62.50
2.056
1 Alum. Tech 1 Helper .056 Operator
Nos.
17
0.75
22.67
2.056
1 Carpenter 1 Helper .056 Operator
46.60
14
3.33
1.62
1.62
0.09
0.056
.056 T. Crane
1.27
0.09
I. Kitchen Cabinets @ 2L
Nos.
15
0.60
25.00
2.056
1 Carpenter 1 Helper .056 Operator
51.40
14
3.67
1.79
1.79
0.10
0.056
.056 T. Crane
1.40
0.10
Z0U34-3460 Z0U34-3470 Z0U34-3480
I. Primer Application Works @ 2L I. Stucco Application Works @ 2L I. Emulsion Paint Works @ 2L
M2 M2 M2
855.00 855.00 1,649.00
54.60 16.40 32.20
15.66 52.13 51.21
1.000 1.000 1.000
1 Painter
15.66 52.13 51.21
12 14 14
1.30 3.72 3.66
Z0U34-3490
O. Plaster Accessories & Rush @ 2L
M2
52
48.46
1.07
2.000
Z0U34-3500
O. Plaster Works @ 2L
M2
297
20.00
14.85
2.000
Z0U34-3510
O. Polished Marble & Ceramic for Wall @ 2L
M2
36
10.00
3.60
2.056
Z0U34-3520
O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr.
M2
17
10.00
1.70
2.056
1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator
Z0U34-3530
O. Gypsum Board +Washable Paint @ 2L
M2
66
16.00
4.13
2.056
Z0U34-3540
O. Semi Recessed G.R.G. Tiles @ 2L
M2
36
16.00
2.25
2.056
Z0U34-3430
I. Aluminum+Glass & Other Associated Works @ 2L
M2
Z0U34-3440
I. Wardrobes @ 2L
Z0U34-3450
Z0U34-3550
O. Sreed + Graniti Tiles & Skirtings @ 2L
M2
425
12.00
35.42
2.056
Z0U34-3560
O. Screed + Polished Marble & Skirtings @ 2L
M2
48
12.00
4.00
2.056
Z0U34-3570
O. G.Steel, Powder coated Railin to Staircase@2L
LM
26
20.00
1.30
2.056
Z0U34-3580 Z0U34-3590 Z0U34-3600
O. Primer Application Works @ 2L O. Stucco Application Works @ 2L O. Emulsion Paint Works @ 2L
M2 M2 M2
103 103 58
54.60 16.40 32.20
1.89 6.28 1.80
1.000 1.000 1.000
Z0U34-3610
I. Hollow Block Works + Lintels @ 3rd Flr.
M2
1,950.00
10.00
195.00
2.056
Z0U34-3620
I. Internal Plaster Accessories & Rush @ 3L
M2
347.00
48.46
7.16
2.000
Z0U34-3630
I. Internal Plaster Works @ 3L
M2
2,581.00
20.00
129.05
2.000
Z0U34-3640
I. Glazed Ceramic Tile @ 3L
M2
735
12.00
61.25
2.056
Z0U34-3650
I. Block Works For Ducts @ 3rd Flr.
M2
93
10.00
9.30
2.056
Z0U34-3660
I. Install False Ceiling (Susp. + Boarding) @ 3L
M2
476
7.20
66.11
2.056
Z0U34-3670
I. Screed + Ceramic Tiles & Skirtings @ 3L
M2
1746
12.00
145.50
2.056
Z0U34-3680
I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L
M2
269
32.00
8.41
2.056
Z0U34-3690
I. Water Proofing + Screed on Wet Areas - 3L
M2
683
64.00
10.67
6.000
Z0U34-3700
I. Frames Installations @ 3L
Nos.
72
4.80
15.00
2.056
1 Painter 1 Painter
5.21
1.30 3.72 3.66
2.15
7
0.31
0.15
0.15
29.70
12
2.48
1.24
1.24
7.40
14
0.53
0.26
0.26
0.01
0.056
.056 T. Crane
0.20
0.01
3.50
2
1.75
0.85
0.85
0.05
0.056
.056 T. Crane
0.10
0.05
1 Carpenter 1 Helper .056 Operator
8.48
14
0.61
0.29
0.29
0.02
0.056
.056 T. Crane
0.23
0.02
1 Carpenter 1 Helper .056 Operator
4.63
14
0.33
0.16
0.16
0.01
0.056
.056 T. Crane
0.13
0.01
72.82
14
5.20
2.53
2.53
0.14
0.056
.056 T. Crane
1.98
0.14
8.22
14
0.59
0.29
0.29
0.02
0.056
.056 T. Crane
0.22
0.02
2.67
10
0.27
0.13
0.01
0.056
.056 T. Crane
0.07
0.01
1.89 6.28 1.80
8 10 12
0.24 0.63 0.15
400.92
14
28.64
0.78
0.056
.056 T. Crane
10.92
0.78
14.32
7
258.10
12
21.51
125.93
14
19.12
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper 1 Carpenter 1 Helper .056 Operator
0.13 0.24 0.63 0.15
13.93
13.93
1.02
1.02
10.75
10.75
9.00
4.38
4.38
0.25
0.056
.056 T. Crane
3.43
0.25
2
9.56
4.65
4.65
0.26
0.056
.056 T. Crane
0.52
0.26
135.92
14
9.71
4.72
0.26
0.056
.056 T. Crane
3.70
0.26
299.15
14
21.37
10.39
10.39
0.58
0.056
.056 T. Crane
8.15
0.58
17.28
8
2.16
1.05
1.05
0.06
0.056
.056 T. Crane
0.47
0.06
64.03
10
6.40
30.84
14
2.20
0.056
.056 T. Crane
0.84
0.06
2.05
4.72
2.13
1.07
1.07
Page 46 of 63
4.27
0.06
72
4.80
15.00
2.056
1 Carpenter 1 Helper .056 Operator
30.84
12
2.57
1.25
1.25
0.07
0.056
.056 T. Crane
0.84
0.07
M2
100
4.80
20.83
2.056
1 Carpenter 1 Helper .056 Operator
42.83
14
3.06
1.49
1.49
0.08
0.056
.056 T. Crane
1.17
0.08
I. Aluminum+Glass & Other Associated Works @ 3L
M2
100
1.60
62.50
2.056
1 Alum. Tech 1 Helper .056 Operator
128.50
12
10.71
5.21
0.29
0.056
.056 T. Crane
3.50
0.29
Z0U34-3740
I. Wardrobes @ 3L
Nos.
17
0.75
22.67
2.056
1 Carpenter 1 Helper .056 Operator
46.60
14
3.33
1.62
1.62
0.09
0.056
.056 T. Crane
1.27
0.09
Z0U34-3750
I. Kitchen Cabinets @ 3L
Nos.
15
0.60
25.00
2.056
1 Carpenter 1 Helper .056 Operator
51.40
14
3.67
1.79
1.79
0.10
0.056
.056 T. Crane
1.40
0.10
Z0U34-3760 Z0U34-3770 Z0U34-3780
I. Primer Appilcation Works @ 3L I. Stucco Application Works @ 3L I. Emulsion Paint Works @ 3L
M2 M2 M2
855.00 855.00 1,649.00
54.60 16.40 32.20
15.66 52.13 51.21
1.000 1.000 1.000
15.66 52.13 51.21
12 14 14
1.30 3.72 3.66
Z0U34-3790
O. Plaster Accessories & Rush @ 3L
M2
52
48.46
1.07
2.000
Z0U34-3800
O. Plaster Works @ 3L
M2
297
20.00
14.85
2.000
Z0U34-3810
O. Polished Marble & Ceramic for Wall @ 3L
M2
36
10.00
3.60
2.056
Z0U34-3820
O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr.
M2
17
10.00
1.70
2.056
Z0U34-3830
O. Gypsum Board +Washable Paint @ 3L
M2
66
16.00
4.13
2.056
Z0U34-3840
O. Semi Recessed G.R.G. Tiles @ 3L
M2
36
16.00
2.25
2.056
Z0U34-3710
I. Doors w/ Ironmongery @ 3L
Nos.
Z0U34-3720
I. Frames Installation Works @ 3L
Z0U34-3730
Z0U34-3850
O. Screed + Polished Marble & Skirtings @ 3L
M2
48
12.00
4.00
2.056
Z0U34-3860
O. Sreed + Graniti Tiles & Skirtings @ 3L
M2
425
12.00
35.42
2.056
Z0U34-3870
O. G.Steel, Powder coated Railin to Staircase@3L
LM
26
20.00
1.30
2.056
Z0U34-3880 Z0U34-3890 Z0U34-3900
O. Primer Application Works @ 3L O. Stucco Application Works @ 3L O. Emulsion Paint Works @ 3L
M2 M2 M2
103 103 58
54.60 16.40 32.20
1.89 6.28 1.80
1.000 1.000 1.000
Z0U34-3910
I. Hollow Block Works + Lintels @ 4th Flr.
M2
1,188.00
10.00
118.80
2.056
Z0U34-3920
I. Internal Plaster Accessories & Rush @ 4L
M2
347.00
48.46
7.16
2.000
Z0U34-3930
I. Internal Plaster Works @ 4L
M2
1,252.00
20.00
62.60
2.000
Z0U34-3940
I. Glazed Ceramic Tile @ 4L
M2
808.00
12.00
67.33
2.056
Z0U34-3950
I. Block Works For Ducts @ 4th Flr.
M2
51
10.00
5.10
2.056
Z0U34-3960
I. Install False Ceiling (Susp. + Boarding) @ 4L
M2
303
7.20
42.08
2.056
Z0U34-3970
I. Screed + Ceramic Tiles & Skirtings @ 4L
M2
669
12.00
55.75
2.056
Z0U34-3980
I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L
M2
422
32.00
13.19
2.056
Z0U34-3990
I. Water Proofing + Screed on Wet Areas - 4L
M2
379
64.00
5.92
6.000
1 Painter 1 Painter 1 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator
5.21
1.30 3.72 3.66
2.15
7
0.31
0.15
0.15
29.70
12
2.48
1.24
1.24
7.40
14
0.53
0.26
0.26
0.01
0.056
.056 T. Crane
0.20
0.01
3.50
2
1.75
0.85
0.85
0.05
0.056
.056 T. Crane
0.10
0.05
1 Carpenter 1 Helper .056 Operator
8.48
14
0.61
0.29
0.29
0.02
0.056
.056 T. Crane
0.23
0.02
1 Carpenter 1 Helper .056 Operator
4.63
14
0.33
0.16
0.16
0.01
0.056
.056 T. Crane
0.13
0.01
8.22
14
0.59
0.29
0.29
0.02
0.056
.056 T. Crane
0.22
0.02
72.82
14
5.20
2.53
2.53
0.14
0.056
.056 T. Crane
1.98
0.14
2.67
10
0.27
0.13
0.01
0.056
.056 T. Crane
0.07
0.01
1.89 6.28 1.80
8 10 12
0.24 0.63 0.15
244.25
12
20.35
9.90
9.90
0.55
0.056
.056 T. Crane
6.65
0.55
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper
0.13 0.24 0.63 0.15
14.32
7
2.05
1.02
1.02
125.20
10
12.52
6.26
6.26
138.44
12
11.54
5.61
5.61
0.31
0.056
.056 T. Crane
3.77
0.31
10.49
2
5.24
2.55
2.55
0.14
0.056
.056 T. Crane
0.29
0.14
86.52
12
7.21
3.51
0.20
0.056
.056 T. Crane
2.36
0.20
114.62
12
9.55
4.65
4.65
0.26
0.056
.056 T. Crane
3.12
0.26
27.11
6
4.52
2.20
2.20
0.12
0.056
.056 T. Crane
0.74
0.12
3.51
35.53
8
4.44
1.48
2.96
19.28
10
1.93
0.94
0.94
0.05
0.056
.056 T. Crane
0.53
0.05
Z0U34-4000
I. Frames Installations @ 4L
Nos.
45
4.80
9.38
2.056
1 Carpenter 1 Helper .056 Operator
Z0U34-4010
I. Doors w/ Ironmongery @ 4L
Nos.
45
4.80
9.38
2.056
1 Carpenter 1 Helper .056 Operator
19.28
8
2.41
1.17
1.17
0.07
0.056
.056 T. Crane
0.53
0.07
Z0U34-4020
I. Frames Installation Works @ 4L
M2
61
4.80
12.71
2.056
1 Carpenter 1 Helper .056 Operator
26.13
12
2.18
1.06
1.06
0.06
0.056
.056 T. Crane
0.71
0.06
78.39
10
7.84
3.81
0.21
0.056
.056 T. Crane
2.14
0.21
61
1.60
38.13
2.056
1 Alum. Tech 1 Helper .056 Operator
Nos.
7
0.75
9.33
2.056
1 Carpenter 1 Helper .056 Operator
19.19
12
1.60
0.78
0.78
0.04
0.056
.056 T. Crane
0.52
0.04
I. Wardrobes @ 4L
Nos.
8
0.60
13.33
2.056
1 Carpenter 1 Helper .056 Operator
27.41
12
2.28
1.11
1.11
0.06
0.056
.056 T. Crane
0.75
0.06
Z0U34-4060 Z0U34-4070 Z0U34-4080
I. Primer Application Works @ 4L I. Stucco Installation Works @ 4L I. Emulsion Paint Works @ 4L
M2 M2 M2
387.00 387.00 876.00
54.60 16.40 32.20
7.09 23.60 27.20
1.000 1.000 1.000
7.09 23.60 27.20
10 12 12
0.71 1.97 2.27
Z0U34-4090
O. Plaster Accessories & Rush @ 4L
M2
1
48.46
0.02
2.000
0.04
7
0.01
0.003
0.003
Z0U34-4100
O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr.
M2
14
10.00
1.40
2.056
2.88
2
1.44
0.70
0.70
0.04
0.056
.056 T. Crane
0.08
0.04
Z0U34-4110
O. Plaster Works @ 4L
M2
114
20.00
5.70
2.000
11.40
10
1.14
0.57
0.57
Z0U34-4120
O. Polished Marble & Ceramic for Wall @ 4L
M2
42
10.00
4.20
2.056
8.64
12
0.72
0.35
0.35
0.02
0.056
.056 T. Crane
0.24
0.02
Z0U34-4130
O. Gypsum Board + Washable Paint @ 4L
M2
37
16.00
2.31
2.056
1 Carpenter 1 Helper .056 Operator
4.75
12
0.40
0.19
0.19
0.01
0.056
.056 T. Crane
0.13
0.01
Z0U34-4140
O. Semi Recessed G.R.G. Tiles @ 4L
M2
20
16.00
1.25
2.056
1 Carpenter 1 Helper .056 Operator
2.57
12
0.21
0.10
0.10
0.01
0.056
.056 T. Crane
0.07
0.01
2.056
1 Mason 1 Helper .056 Operator
7.20
12
0.60
0.29
0.02
0.056
.056 T. Crane
0.20
0.02
Z0U34-4030
I. Aluminum+Glass & Other Associated Works @ 4L
M2
Z0U34-4040
I. Kitchen Cabinets @ 4L
Z0U34-4050
Z0U34-4150
O. Screed + Polished Marble & Skirtings @ 4L
M2
42
12.00
3.50
1 Painter 1 Painter 1 Painter 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator
3.81
0.71 1.97 2.27
0.29
Page 47 of 63
Z0U34-4160
O. Sreed + Graniti Tiles & Skirtings @ 4L
M2
172
12.00
14.33
2.056
1 Mason 1 Helper .056 Operator
29.47
12
2.46
1 Alum. Tech 1 Helper .056 Operator
1.23
8
0.15
1.03 3.41 0.99
7 8 10
0.15 0.43 0.10
39.89
10
3.99
1.94
1.94
2.15
5
0.43
0.215
0.215
14.80
8
1.85
0.93
0.93
Z0U34-4170
O. G.Steel, Powder coated Railin to Staircase@4L
LM
12
20.00
0.60
2.056
Z0U34-4180 Z0U34-4190 Z0U34-4200
O. Primer Application Works @ 4L O. Stucco Application Works @ 4L O. Emulsion Paint Works @ 4L
M2 M2 M2
56 56 32
54.60 16.40 32.20
1.03 3.41 0.99
1.000 1.000 1.000
Z0U34-4210
Hollow Block Works + Lintels @ Roof Floor
M2
194
10.00
19.40
2.056
Z0U34-4220
Plaster Accessories & Rush @ Roof Floor
M2
52
48.46
1.07
2.000
Z0U34-4230
Plastering Works @ Roof Deck Floor
M2
148
20.00
7.40
2.000
Z0U34-4240 Z0U34-4250 Z0U34-4260 Z0U34-4270 Z0U34-4280 Z0U34-4290 Z0U34-4300 Z0U34-4310 Z0U34-4320 Z0U34-4330 Z0U34-4340 Z0U34-4350 Z0U34-4360 Z0U34-4370 Z0U34-4380 Z0U34-4390 Z0U34-4400 Z0U34-4410 Z0U34-4420 Z0U34-4430 Z0U34-4440 Z0U34-4450 Z0U34-4460 Z0U34-4470
Roof Drain & Access.+ Lightweight Concrete One Coat Cold Bituminous Primer 2 Layers of SBS W.P. Membrane + Water Test Alum. Foil Covering Fixed to Upstand w/ Sealant 50mm Thk. Extruded Polystyrene Insulation Protection Layer 18mm-25mm Round Aggregates (50mm Thk.) 1mm Thk. Alum. Flashing Fixed into Conc. Upstand Sealant Application Around top of Alum. Flashing Channel & Rails Installation for Lifts Cabin Assembly / Installation for lifts Machine Installation for lifts Doors Installation for lifts Connections To Ele + Finishing Touches for lifts Installation of Chute Tubes and Intake Throats Install Intake Doors, Chute Vent & Accessories Install Ground Floor Offset + Fire Shutter Door Install Compactor with MCP Installation of Garbage Container Final Test & Comm. Installation of Window Cleaning Eqmt. Primer Application Works @ Roof Deck Stucco Application Works @ Roof Deck Emulsion / Epoxy Paint Works @ Roof Deck
M2 M2 M2 LM M2 M2 M2 M2 M2 Items Items Items Items Items Item Item Item Item Item Item Item M2 M2 M2
Z0U34-4480
Excavation Works External
M3
Z0U34-4490
RCC Manholes / Gully Traps
Nos.
Z0U34-4500
Water Proofing
M2
Z0U34-4510
Sand Bedding
M2
281.00 13.00 268.00 107 268.00 268.00 268.00 107 107 2 2 2 2 2 1 1 1 1 1 1 1 50 50 55 7,137.50
1.000 1.000 1.000
1 Painter
315.00
22.66
2.000
91.07
76.00
1.20
6.000
13.21
60.00
0.22
1.250
M3
7,125.36
Z0U34-4530 Z0U34-4540 Z0U34-4550 Z0U34-4560 Z0U34-4570 Z0U34-4580 Z0U34-4590 Z0U34-4600
Instl Drainage Pipes &Con. To Existing Chambers Instl Water Supply Pipes&Con. To Existg Chambers Instl Chilled Water Pipes&Con. To Existg Chamber Instl Central Gas Pipes &Con. To Existg Chambers Instl Telephone Ducts &Con. To Existing Chambers Laying of Power cables (By Others) Hardscaping Works Landscaping Works
Item Item Item Item Item Item Item Item
Z0U34-4610
Ext. Plaster Accessories & Rush on Front Elev.
M2
1,484.00
Z0U34-4620
Ext. Plaster Works on Front Elevation
M2
19.00
Z0U34-4630
Install Balcony Handrail on Front Elev.
Nos.
Z0U34-4640
Decorative GRC Panels W/ Epoxy Paint @ F. Elev.
Nos.
Z0U34-4650
Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.
Z0U34-4660
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper
0.92 3.05 1.71
5.000
Backfilling Works
1 Painter
54.60 16.40 32.20
9.60
Z0U34-4520
1 Painter
601.00
11.86
7.500
0.08
0.00
0.08
0.056
.056 T. Crane
0.80
0.07
0.056
.056 T. Crane
0.03
0.00
0.056
.056 T. Crane
1.09
0.11
0.15 0.43 0.10 0.11
8 10 12
0.11 0.30 0.14
1 Operator 1 Helper
45.32
5
9.06
2 Carpenter 1 Mason 1 Helper 1 Operator
48.00
14
3.43
7.19
12
0.60
0.20
0.28
10
0.03
0.02
1 Painter
4Waterproof er 2 Helper 1 Helper 0.25 Operator
1.5 Operator 3 Driver 3 Helper
88.92
14
0.11 0.30 0.14
1.37
0.69
6.35
4.53
4.53
1.000
1 Excavato r
22.66
0.69
0.69
1.000
1 M. Crane
9.60
0.250
.25 Bob Cat
0.06
4.500
0.5 Shovel 3 Dump Truck .5 S. Roller .5 Bob Cat
53.35
2.54
4.53
0.69
0.40 0.01
1.27
2.54
0.01
0.42
2.54
0.42
0.42
14 12 14 12 10 7 14 12
48.46
30.62
2.000
8.00
2.38
2.000
35
15.00
2.33
2.250
17
2.00
8.50
2.500
LM
5
8.00
0.63
2.500
External Painting Works on Front Elevation
M2
1,503.00
32.20
46.68
3.000
Z0U34-4670
Ext. Plaster Access. & Rush on Leftside Elev.
M2
606
48.46
12.51
2.000
Z0U34-4680
Ext. Plaster Works on Left Side Elevation
M2
19
8.00
2.38
2.000
Z0U34-4690
Install Balcony Handrail on Leftside Elev.
Nos.
0
0.07
0.92 3.05 1.71
1 Painter
1 1 1 1 1 1 1 1
0
1.19
7 2 6 3 2 2 4 3 2 14 10 7 10 12 8 4 2 1 1 3 14
5.63
54
1 Painter
1.19
15.00
2.00
-
-
2.250
2.500
Z0U34-4700
Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.
Nos.
Z0U34-4710
External Painting Works on Left Side Elevation
M2
625
32.20
19.41
3.000
Z0U34-4720
Ext. Plaster Accessories & Rush on Rear Elev.
M2
1,503.00
48.46
31.02
2.000
Z0U34-4730
Ext. Plaster Works on Rear Elevation
M2
19.00
8.00
2.38
2.000
Z0U34-4740
Install Balcony Handrail on Rear Elev.
Nos.
35
15.00
2.33
2.250
Z0U34-4750
Decorative GRC Panels W/ Epoxy Paint @ R. Elev.
Nos.
17
2.00
8.50
2.500
8.00
0.63
2.500
1,503.00
32.20
46.68
3.000
M2
606
48.46
12.51
2.000
M2
19
8.00
2.38
2.000
1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator
61.25
2
30.62
15.31
15.31
4.75
4
1.19
0.59
0.59
5.25
12
0.44
0.19
0.19
0.05
0.250
.25 M. Crane
0.58
0.05
1 Carpenter 1 Helper .5 Operator
21.25
10
2.13
0.85
0.85
0.43
0.500
..5 M. Crane
4.25
0.43
1 Carpenter 1 Helper .5 Operator
1.56
12
0.13
0.05
0.05
0.03
0.500
.5 M. Crane
0.31
0.03
140.03
14
10.00
25.01
2
12.51
6.25
6.25
4.75
4
1.19
0.59
0.59
-
10
0.00
-
8
0.00
3 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator 1 Carpenter 1 Helper .5 Operator
58.23
12
62.03
2
31.02
4.75
4
5.25
1 Carpenter 1 Helper .5 Operator 1 Carpenter 1 Helper .5 Operator
3 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator
Z0U34-4760
Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.
LM
5
Z0U34-4770
External Painting Works on Rear Elevation
M2
Z0U34-4780
Ext. Plaster Access. & Rush on Rightside Elev.
Z0U34-4790
Ext. Plaster Works on Right Side Elevation
Z0U34-4800
Install Balcony Handrail on Rigthside Elev.
Nos.
0
15.00
-
2.250
Z0U34-4810
Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.
Nos.
0
2.00
-
2.500
1 Carpenter 1 Helper .5 Operator
Z0U34-4820 Z0U34-4830 Z0U34-4840 Z0U34-4850 Z0U34-4860 Z0U34-4870 Z0U34-4880 Z0U34-4890 Z0U34-4900 Z0U34-4910 Z0U34-4920 Z0U34-4930 Z0U34-4940 Z0U34-4950 Z0U34-4960 Z0U34-4970
External Painting Works on Right Side Elevation Snagging & Desnagging For Finishes @ GF Handing-Over For Finishes @ GF Snagging & Desnagging For Finishes @ 1F Handing-Over For Finishes @ 1F Snagging & Desnagging For Finishes @ 2F Handing-Over For Finishes @ 2F Snagging & Desnagging For Finishes @ 3F Handing-Over For Finishes @ 3F Snagging & Desnagging For Finishes @ 4F Handing-Over For Finishes @ 4F Snagging & Desnagging For Finishes @ Roof Floor Handing-Over For Finishes @ Roof Floor Power On (By DEWA) Precommissioning & Startup Availability of Chilled Water (By Others)
M2 Item Item Item Item Item Item Item Item Item Item Item Item
625 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
3.000
3 Painter
32.20
19.41
3 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator
10.00
-
-
-
-
0.250
.25 M. Crane
-
-
-
-
0.500
..5 M. Crane
-
-
4.85
4.85 15.51
15.51
1.19
0.59
0.59
12
0.44
0.19
0.19
0.05
0.250
.25 M. Crane
0.58
0.05
21.25
10
2.13
0.85
0.85
0.43
0.500
..5 M. Crane
4.25
0.43
1.56
12
0.13
0.05
0.05
0.03
0.500
.5 M. Crane
0.31
0.03
140.03
14
10.00
25.01
2
12.51
6.25
6.25
4.75
4
1.19
0.59
0.59
-
10
0.00
-
8
0.00
12
4.85
58.23
10.00
-
-
-
-
0.250
.25 M. Crane
-
-
-
-
0.500
..5 M. Crane
-
-
4.85
30 10 30 10 30 10 30 10 30 10 30 10 1 21 1
Page 48 of 63
Z0U34-4980 Z0U34-4990 Z0U34-5000 Z0U34-5010 Z0U34-5020 Z0U34-5030 Z0U34-5040 Z0U34-5050 Z0U34-5060 Z0U34-5070 Z0U34-5080 Z0U34-5090
Testing & Final Commissioning Snagging & Desnagging For External Finishes Handing-Over For External Finishes Completion of Fdn./Superstructure -Building # 34 Completion of External Works for Building # 34 Completion of MEP Works for Building # 34 Completion of Finishes for Building # 34 Completion of Fdn./SuperStruc. for Phase-1 BLDG. Completion of External Works for Phase-1 BLDG. Completion of MEP Works for Phase-1 BLDG. Completion of Finishes for Phase-1 BLDG. Completion Milestone for Phase-1 Buildings
Item Item Item Item Item Item Item Item Item
0 1 1 1 1 0 1 1 1 0 1 1
35 12 2 1 1 1 1 0 0 0 0 0
54.60 16.40 32.20 48.46
Page 49 of 63
Activity
Activity
SUB
ID
Description
ACTIVITY
Unit
QTY (F)
Prod. Rate (G)
Days (H)
(unit/day)
(F/G)
Item
Tot. Man (I)
Crew Desc.
Tot. Mdays (K)
OD (O)
(H x I)
Manpower /day (N/O)
M Carpenter
Mason
Steel Fixer
Helper
A
N - D
Operator
A
Y
Driver
Tot. Eqmt (X)
S Technicia n
Painter
Alum. Tech
Eqmt Desc.
Waterpro ofer
Tot. Edays (Z) (H x I)
E Dozer
Shovel
Dump T.
B. Roller
Q
M
T - D
B. Cat
A
Y
S. Roller
S M. Crane
Vibrator Excavator
Tower Crane
SITEWORKS Z2V33-0000
Site Clearing
M2
Z2V33-0010
Setting-out / Layout
M
Z2V33-0020
Excavation for footings + Disposal of Materials
1 Operator 1 Helper
1,597.00
4,200.00
0.38
2.000
0.76
1
0.76
163.88
76.00
2.16
2 3.000 Carpenter 1 Helper
6.47
1
6.47
576.00
409.50
1.41
2.000
1 Operator 1 Helper
2.81
2
1.41
0.83
0.75 Operator 8.250 6 Driver 1.5 Helper
6.88
3
2.29
0.77
.75 Operator 6.250 4 Driver 1.5 Helper
0.38
4.31
0.38
1.000 1 Dozer
0.38
0.38
0.28
0.28
1.000 1 Dozer
1.41
0.28
0.25
0.13
1.00
0.75 6.750 Shovel 6 D. Truck
5.63
0.53
0.41
1.00
2.16
SUBSTRUCTURE For Excavation M3
For Disposal
M3
288.00
345.60
5
Z2V33-0030
Formation Level & Compaction
M3
194
Z2V33-0040
Anti-Termite Applications (Under PCC Footings)
M2
629
202.50
3.11
1.000
2 Technican
Z2V33-0050
Backfill & Compaction upto bot. of PCC Tie-Beam
M3
286
252.00
1.13
8.250
Z2V33-0060
Anti-Termite Applications (Under PCC Tie-Beam)
M2
47
202.50
0.23
Z2V33-0070
Backfill & Compaction up to bot of PCC Grd. Slab
M3
1,431.00
252.00
Z2V33-0080
Anti-Termite Applications (Under PCC Grade Slab)
M2
921
202.50
Z2V33-0090
Shutters + 50mm Thk. PCC Under Footings
Z2V33-0100
50mm Protection Screed (Over W.P. Membrane-Ftg.)
Z2V33-0110
RCC For Footings
M2
711
M2
252.00
270.00
RCC Necks Columns / Walls + MEP Sleeves
3.11
1
3.11
0.75 Operator 6 Driver 1.5 Helper
9.36
7
1.34
1.000
2 Technican
0.23
1
0.23
5.68
8.250
0.75 Operator 6 Driver 1.5 Helper
46.85
3
15.62
4.55
1.000
2 Technican
4.55
1
4.55
11.000
1 Mason 10 Helper
28.97
2
14.48
1.32
13.17
90.00
2
45.00
4.09
40.91
2,209.00
270.00
8.18
11.000
1 Mason 10 Helper
296
180.00
1.64
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
42.76
1
42.76
Casting
M3
Formworks
M2
1,184.00
12.00
98.67
3.056
2 Carpenter 1 Helper .056 Operator
301.53
4
75.38
Rebars
kg
53,280.00
250.00
213.12
2.056
1 Steel Fixer 1 Helper .056 Operator
438.17
3
146.06
Deshuttering
M2
1,184.00
35.00
33.83
3.056
2 Carpenter 1 Helper .056 Operator
103.38
2
51.69
81.00
1.28
22.000
416.00
4.00
104.00
3.056
kg
18,720.00
200.00
93.60
M2
416.00
28.00
Casting
M3
Formworks
M2
Rebars
Deshuttering
104
-
2.41
10
Z2V33-0120
-
2
2.63
4.81
-
2 Carpenter 16 Helper 4 Mason
0.58
1
28.25
2 Carpenter 1 Helper .056 Operator
317.82
5
63.56
2.056
1 Steel Fixer 1 Helper .056 Operator
192.44
4
48.11
14.86
3.056
2 Carpenter 1 Helper .056 Operator
45.40
2
22.70
12
0.24
2.84
19.73
21.31
6.77
-
21.31
17.33
7.80
2.48
19.81
M2
128.00
28.00
4.57
3.056
2 Carpenter 1 Helper .056 Operator
13.97
2
6.99
Deshuttering
10
-
-
-
-
7.80
6.40
2.30
0.91
7.31
-
2.30
0.08
-
-
-
-
-
-
1.000
1 Vibrator
1.28
-
-
-
-
-
1.94
0.44
0.056
.056 M. Crane
5.24
0.44
1.24
0.07
0.056
.056 M. Crane
0.83
0.07
17.70
0.99
-
-
-
-
-
-
0.500
.5 Vibrator
0.09
-
-
-
-
-
0.99
0.18
0.056
.056 M. Crane
1.79
0.18
2.30
0.13
0.056
.056 M. Crane
1.29
0.13
0.46
0.03
0.056
.056 M. Crane
0.26
0.03
0.33
-
-
-
-
-
-
-
0.11
-
-
-
-
0.01
3.20
5.96
0.08
0.11
7.80
3.91
15.79
0.82
0.49
1
3
.5 Vibrator
5.82
3.91
47.37
0.500
.056 M. Crane
3.09
1 Steel Fixer 1 Helper .056 Operator
0.67
0.056
0.31
2.056
10.76
0.49
3.40
23.04
1.34
8.67
2
250.00
38.33
1.94
6.80
5,760.00
0.5 Shovel 6 D. Truck .25 B. Roller
34.56
1 Mason 10 Helper
kg
6.750
0.19
11.000
Rebars
11.36
1.89
0.62
24.45
1.42
.056 M. Crane
270.00
4
0.06
0.056
167
97.79
0.92
0.19
M2
2 Carpenter 1 Helper .056 Operator
0.12
3.38
50mm Screed (Over W.P. Membrane-T.B.)
3.056
7.66
1.19
Z2V33-0140
32.00
0.5 Shovel 6 D. Truck .25 B. Roller
11.93
1.00
4.00
6.750
.056 M. Crane
0.10
128.00
0.97
0.056
1.10
M2
0.12
1.19
2
Formworks
0.10
-
21.31
2.20
22.000
1.54
-
0.55
1 Mason 10 Helper
0.18
0.19
-
5.53
11.000
180.00
-
.056 M. Crane
0.20
32
3.66
1.00
0.056
270.00
M3
1.54
0.13
0.55
54
Casting
0.28 0.5 Shovel 4 D. 4.750 Truck .25 B. Roller
9.87
M2
RCC Tie Beams + MEP Sleeves
-
4.55
Shutters + 50mm Thk. PCC Under Tie-Beams
Z2V33-0150
-
0.23
Z2V33-0130
1 Carpenter 16 Helper 4 Mason 1 Steel Fixer
-
1.00
3.11
26.50
28.25
0.29
-
0.13
-
-
-
-
-
-
0.33
0.01
Z2V33-0160
RCC Kickers Over Tie-Beam
180.00
0.01
22.000
1 Carpenter 16 Helper 4 Mason 1 Steel Fixer
0.12
1
0.12
4.00
4.00
1.00
3.056
2 Carpenter 1 Helper .056 Operator
3.06
1
3.06
kg
180.00
250.00
0.72
2.056
1 Steel Fixer 1 Helper .056 Operator
1.48
1
1.48
M2
4.00
28.00
0.14
3.056
2 Carpenter 1 Helper .056 Operator
0.44
1
0.44
Casting
M3
Formworks
M2
Rebars
Deshuttering
1
4
0.50
0.18
0.07
0.57
-
0.18
0.500
.5 Vibrator
0.00
0.001
0.25
0.01
0.056
.056 M. Crane
0.06
0.01
0.18
0.01
0.056
.056 M. Crane
0.04
0.01
0.04
0.00
0.056
.056 M. Crane
0.01
0.00
0.47
0.03
0.03
0
Z2V33-0170
50mm Thk. PCC Under Grade Slab
M2
1,041.00
270.00
3.86
11.000
1 Mason 10 Helper
42.41
2
21.21
Z2V33-0180
Mesh + Filler Board & RCC For Grade Slab
M3
168
180.00
0.93
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
24.27
3
8.09
Z2V33-0190
50mm Thk. PCC Steps & Ramps
M2
17
270.00
0.06
11.000
1 Mason 10 Helper
0.69
2
0.35
Z2V33-0200
Steps & Ramps Works + Place Conc.
M3
7
180.00
0.04
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
1.01
8
0.13
Z2V33-0210
Waterproofing Membrane (Over PCC Footings)
M2
1,754.00
152.00
11.54
6.000
4 Waterproo fer 2 Helper
69.24
2
34.62
11.54
23.08
-
Z2V33-0220
Water Proofing For Neck Column & Wall & Footing
M2
2,639.00
152.00
17.36
6.000
4 Waterproo fer 2 Helper
104.17
3
34.72
11.57
23.15
-
5.17
2
2.59
0.86
1.72
-
0.59
1.18
-
Z2V33-0230
Waterproofing Membrane (Over PCC Tie-beams)
M2
131
152.00
0.86
6.000
4 Waterproo fer 2 Helper
Z2V33-0240
Waterproofing Membrane For Tie Beams
M2
134
152.00
0.88
6.000
4 Waterproo fer 2 Helper
5.29
3
1.76
Z2V33-0250
50mm Thk. PCC Under Base of Tank
M2
68
270.00
0.25
11.000
1 Mason 10 Helper
2.77
1
2.77
4.78
1
4.78
Z2V33-0260
Waterproofing Membrane (Over PCC - Base)
M2
121
152.00
0.80
6.000
4 Waterproo fer 2 Helper
Z2V33-0270
50mm Protect'n Screed (Over W.P. Membrane-Base)
M2
210
270.00
0.78
11.000
1 Mason 10 Helper
8.56
1
8.56
5.63
1
5.63
Z2V33-0280
RCC Water Tank Base + Deshuttering
180.00
0.22
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
156.00
12.00
13.00
3.056
2 Carpenter 1 Helper .056 Operator
39.73
1
39.73
kg
7,020.00
250.00
28.08
2.056
1 Steel Fixer 1 Helper .056 Operator
57.73
1
57.73
M2
156.00
35.00
4.46
3.056
2 Carpenter 1 Helper .056 Operator
13.62
1
13.62
Casting
M3
Formworks
M2
Rebars
Deshuttering
39
4
Z2V33-0290
RCC Wall W/MEP Pipes & Water Stop + Deshuttering
81.00
0.43
22.000
140.00
4.00
35.00
3.056
kg
6,300.00
200.00
31.50
M2
140.00
28.00
5.00
Casting
M3
Formworks
M2
Rebars
Deshuttering
35
2 Carpenter 16 Helper 4 Mason
RCC Top Slab + Deshuttering for Water Tank
0.31
9.51
1
9.51
2 Carpenter 1 Helper .056 Operator
106.96
2
53.48
2.056
1 Steel Fixer 1 Helper .056 Operator
64.76
1
64.76
3.056
2 Carpenter 1 Helper .056 Operator
15.28
1
15.28
0.01
1.16
1
1.16
Casting
M3
8.00
180.00
0.04
26.000
Formworks
M2
40.00
16.00
2.50
3.056
2 Carpenter 1 Helper .056 Operator
7.64
2
3.82
Rebars
kg
1,440.00
200.00
7.20
2.056
1 Steel Fixer 1 Helper .056 Operator
14.80
1
14.80
1.87
0.31
5.60
1.000
1 Vibrator
0.93
0.31
1.000
1 Vibrator
0.04
0.01
0.31
0.03
0.00
0.25
0.09
2.52
-
1.59
0.78
3.18
-
7.78
6.50
7.02
2.23
-
7.02
14.00
6.30
2.00
16.00
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
19.28
0.03
8.73
5
Z2V33-0300
1.93
-
6.30
1.00
1.44
-
0.500
.5 Vibrator
0.11
0.03
3.25
0.18
0.056
.056 M. Crane
0.73
0.18
7.02
0.39
0.056
.056 M. Crane
1.57
0.39
1.11
0.06
0.056
.056 M. Crane
0.25
0.06
11.38
0.64
-
-
-
-
-
-
1.000
1 Vibrator
0.43
-
-
-
-
-
0.64
0.39
0.056
.056 M. Crane
1.96
0.39
6.30
0.35
0.056
.056 M. Crane
1.76
0.35
1.00
0.06
0.056
.056 M. Crane
0.28
0.06
0.80
-
-
-
-
-
-
1.000
1 Vibrator
0.04
-
-
0.09
7.00
14.30
0.03
-
-
-
-
-
0.80
0.09
0.01
0.50
0.03
0.056
.056 M. Crane
0.14
0.03
1.44
0.08
0.056
.056 M. Crane
0.40
0.08
-
-
Deshuttering
M2
40.00
32.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
3.82
1
3.82
5
0.50
0.25
1.50
-
1.44
2.19
0.01
0.056
0.12
-
-
-
-
.056 M. Crane
0.07
-
0.01
-
-
-
-
-
-
0.12
0.01
-
-
Z2V33-0310
Water Proofing Membrane all around outside surfc
M2
235
152.00
1.55
6.000
4 Waterproo fer 2 Helper
9.28
2
4.64
1.55
3.09
-
Z2V33-0320
Protection Board all around outside surface
M2
350
152.00
2.30
6.000
4 Waterproo fer 2 Helper
13.82
2
6.91
2.30
4.61
-
Z2V33-0330
Backfill around Water tank walls
M3
7
252.00
0.03
8.250
0.75 Operator 6 Driver 1.5 Helper
0.23
3
0.08
0.01
Z2V33-0340
G.R.P. Lining around inside + S.S. Lader & Door
M2
252
20.00
12.60
2.000
1 Mason 1 Helper
Z2V33-0350
50mm Thk. PCC Under Base of Elevator Shaft
M2
30
270.00
0.11
25.20
3
8.40
4.20
4.20
11.000
1 Mason 10 Helper
1.22
1
1.22
0.11
1.11
2.13
1
2.13
Z2V33-0360
Waterproofing Membrane (Over PCC - Base)
M2
54
152.00
0.36
6.000
4 Waterproo fer 2 Helper
Z2V33-0370
50mm Protect'n Screed (Over W.P. Membrane-Base)
M2
94
270.00
0.35
11.000
1 Mason 10 Helper
3.83
1
3.83
Z2V33-0380
RCC Elevator Shaft Base + Deshuttering
14
180.00
0.08
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
2.02
1
2.02
Casting
M3
Formworks
M2
56.00
12.00
4.67
3.056
2 Carpenter 1 Helper .056 Operator
14.26
1
14.26
Rebars
kg
2,520.00
250.00
10.08
2.056
1 Steel Fixer 1 Helper .056 Operator
20.72
1
20.72
Deshuttering
M2
56.00
35.00
1.60
3.056
2 Carpenter 1 Helper .056 Operator
4.89
1
4.89
4
Z2V33-0390
RCC Wall W/ MEP Cond. + Deshuttering
Casting
M3
Formworks
M2
Rebars
Deshuttering
6
2 Carpenter 16 Helper 4 Mason
1
1.63
2 Carpenter 1 Helper .056 Operator
18.34
2
9.17
2.056
1 Steel Fixer 1 Helper .056 Operator
11.10
1
11.10
0.86
3.056
2 Carpenter 1 Helper .056 Operator
2.62
1
2.62
0.07
22.000
24.00
4.00
6.00
3.056
kg
1,080.00
200.00
5.40
M2
24.00
28.00
5
0.06
6.750
0.35
0.19
0.01
0.05
0.00
1.42
-
3.48
2.33
2.52
0.80
-
2.52
2.40
1.08
0.34
2.74
0.5 Shovel 6 D. Truck .25 B. Roller
-
0.71
3.13
1.63
81.00
0.01
-
1.08
-
0.500
.5 Vibrator
0.04
0.01
1.17
0.07
0.056
.056 M. Crane
0.26
0.07
2.52
0.14
0.056
.056 M. Crane
0.56
0.14
0.40
0.02
0.056
.056 M. Crane
0.09
0.02
4.09
0.23
-
-
-
-
-
-
1.000
1 Vibrator
0.07
-
-
-
-
-
0.23
0.07
0.056
.056 M. Crane
0.34
0.07
1.08
0.06
0.056
.056 M. Crane
0.30
0.06
0.17
0.01
0.056
.056 M. Crane
0.05
0.01
0.14
-
-
-
-
-
-
-
0.01
1.20
2.45
0.01
-
-
-
-
-
-
0.14
0.01
-
-
Z2V33-0400
Water Proofing Membrane all around outside surfc
M2
522
152.00
3.43
6.000
4 Waterproo fer 2 Helper
20.61
3
6.87
2.29
4.58
-
Z2V33-0410
Protection Board all around outside surface
M2
50
152.00
0.33
6.000
4 Waterproo fer 2 Helper
1.97
2
0.99
0.33
0.66
-
Z2V33-0420
Backfill around the Lift's Pit wall
M3
7
252.00
0.03
8.250
0.75 Operator 6 Driver 1.5 Helper
0.23
3
0.08
0.01
Z2V33-0430
RCC For Wall/Col. From Top of Grade Slab-1L
81.00
3.02
22.000
66.54
1
66.54
245
2 Carpenter 16 Helper 4 Mason
Casting
M3
Formworks
M2
980.00
4.00
245.00
3.056
2 Carpenter 1 Helper .056 Operator
748.72
5
149.74
Rebars
kg
44,100.00
200.00
220.50
2.056
1 Steel Fixer 1 Helper .056 Operator
453.35
4
113.34
Deshuttering
M2
980.00
28.00
35.00
3.056
2 Carpenter 1 Helper .056 Operator
106.96
2
53.48
12
Z2V33-0440
Columns From Top of Grade Slab-1L (Canopy)
Casting
M3
Formworks
M2
Rebars
kg
1
81.00
0.01
22.000
4.00
4.00
1.00
3.056
180.00
200.00
0.90
2.056
2 Carpenter 16 Helper 4 Mason
40.83
18.38
5.83
46.67
0.27
1
0.27
2 Carpenter 1 Helper .056 Operator
3.06
2
1.53
1 Steel Fixer 1 Helper .056 Operator
1.85
2
0.93
-
18.38
0.33
0.15
0.01
0.06
6.750
0.5 Shovel 6 D. Truck .25 B. Roller
0.19
1.000
1 Vibrator
3.02
0.01
0.05
0.00
0.25
20.42
1.14
0.056
.056 M. Crane
13.72
1.14
18.38
1.03
0.056
.056 M. Crane
12.35
1.03
2.92
0.16
0.056
.056 M. Crane
1.96
0.16
41.71
2.34
-
-
-
-
-
-
1.000
1 Vibrator
0.01
-
-
-
-
-
2.34
0.25
0.00
0.17
0.01
0.056
.056 M. Crane
0.06
0.01
0.15
0.01
0.056
.056 M. Crane
0.05
0.01
-
-
Deshuttering
M2
28.00
4.00
0.14
3.056
2 Carpenter 1 Helper .056 Operator
26.14
1
26.14
0.44
1
0.44
6
Z2V33-0450
RCC Slab / Beam - 1L
0.38
Casting
M3
181.00
180.00
1.01
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
Formworks
M2
905.00
16.00
56.56
3.056
2 Carpenter 1 Helper .056 Operator
172.86
6
28.81
Rebars
kg
32,580.00
200.00
162.90
2.056
1 Steel Fixer 1 Helper .056 Operator
334.92
5
66.98
Deshuttering
M2
905.00
32.00
28.28
3.056
2 Carpenter 1 Helper .056 Operator
86.43
2
43.21
14
Z2V33-0460
RCC For Stair/Landings @ G.L. - 1L
Casting
M3
Formworks
M2
Rebars
Deshuttering
9
2 Carpenter 16 Helper 4 Mason
1
2.44
2 Carpenter 1 Helper .056 Operator
34.38
4
8.60
2.056
1 Steel Fixer 1 Helper .056 Operator
16.65
3
5.55
3.056
2 Carpenter 1 Helper .056 Operator
4.91
2
2.46
1.16
1
1.16
0.11
22.000
45.00
4.00
11.25
3.056
kg
1,620.00
200.00
8.10
M2
45.00
28.00
1.61
10
Z2V33-0470
RCC Canopy
Casting
M3
8.00
180.00
0.04
26.000
Formworks
M2
40.00
16.00
2.50
3.056
2 Carpenter 1 Helper .056 Operator
7.64
4
1.91
Rebars
kg
1,440.00
200.00
7.20
2.056
1 Steel Fixer 1 Helper .056 Operator
14.80
3
4.93
Deshuttering
M2
40.00
32.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
3.82
1
3.82
9
Z2V33-0480
RCC For Wall/Col. From Top of 1L-2L
81.00
2.90
22.000
940.00
4.00
235.00
3.056
kg
42,300.00
200.00
211.50
M2
940.00
28.00
33.57
Casting
M3
Formworks
M2
Rebars
Deshuttering
235
2 Carpenter 16 Helper 4 Mason
1
63.83
2 Carpenter 1 Helper .056 Operator
718.16
5
143.63
2.056
1 Steel Fixer 1 Helper .056 Operator
434.84
4
108.71
3.056
2 Carpenter 1 Helper .056 Operator
102.59
2
51.30
25.71
1
25.71
12
Z2V33-0490
RCC Slab / Beam - 2L
Casting
M3
178.00
180.00
0.99
26.000
Formworks
M2
890.00
16.00
55.63
3.056
2 Carpenter 1 Helper .056 Operator
169.99
6
28.33
Rebars
kg
32,040.00
200.00
160.20
2.056
1 Steel Fixer 1 Helper .056 Operator
329.37
5
65.87
Deshuttering
M2
890.00
32.00
27.81
3.056
2 Carpenter 1 Helper .056 Operator
85.00
2
42.50
14
Z2V33-0500
RCC for Stair/Landings @ 1L-2L
Casting
M3
9
81.00
0.11
22.000
2 Carpenter 16 Helper 4 Mason
2.44
1
11.64
0.81
0.32
-
0.81
0.56
0.80
0.28
-
0.80
39.17
17.63
5.60
-
17.63
7.95
11.44
3.97
11.92
2.44
-
2.25
44.76
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
0.15
4.04
0.83
63.83
-
11.64
2.57
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
0.02
8.08
12.12
2.44
81.00
0.05
-
11.44
0.34
0.00
0.02
0.056
-
-
-
-
.056 M. Crane
0.01
-
0.00
-
1.000
1 Vibrator
1.01
-
-
-
-
-
0.02
0.23
0.056
.056 M. Crane
3.17
0.23
11.64
0.65
0.056
.056 M. Crane
9.12
0.65
2.02
0.11
0.056
.056 M. Crane
1.58
0.11
0.99
-
-
-
-
-
-
1.000
1 Vibrator
0.11
-
-
-
-
-
0.99
0.06
0.056
.056 M. Crane
0.63
0.06
0.81
0.05
0.056
.056 M. Crane
0.45
0.05
0.16
0.01
0.056
.056 M. Crane
0.09
0.01
0.12
-
-
-
-
-
-
1.000
1 Vibrator
0.04
-
-
-
-
-
0.12
0.02
0.056
.056 M. Crane
0.14
0.02
0.80
0.04
0.056
.056 M. Crane
0.40
0.04
0.14
0.01
0.056
.056 M. Crane
0.07
0.01
0.07
-
-
-
-
-
-
1.000
1 Vibrator
-
-
-
-
-
0.07
2.90
1.10
0.056
.056 M. Crane
13.16
1.10
17.63
0.99
0.056
.056 M. Crane
11.84
0.99
2.80
0.16
0.056
.056 M. Crane
1.88
0.16
2.24
-
-
-
-
-
-
1.000
1 Vibrator
0.99
-
-
-
-
-
2.24
0.22
0.056
.056 M. Crane
3.12
0.22
11.44
0.64
0.056
.056 M. Crane
8.97
0.64
1.99
0.11
0.056
.056 M. Crane
1.56
0.11
0.97
-
-
-
-
-
-
1.000
1 Vibrator
0.11
-
0.01
-
-
0.00
-
-
0.24
-
-
-
-
0.07
3.97
17.40
-
0.24
19.58
40.01
0.07
0.00
0.28
1.22
-
0.01
1.13
2.10
-
0.07
4.04
17.70
0.00
-
-
-
-
-
0.97
0.07
0.01
Z2V33-0510 Z2V33-0520 Z2V33-0530
RCC For Wall/Col. From Top of 2L-3L RCC Slab / Beam - 3L RCC For Stair/Landings @ 2L-3L
Z2V33-0540
RCC For Wall/Col. From Top of 3L-4L
Formworks
M2
45.00
4.00
11.25
3.056
2 Carpenter 1 Helper .056 Operator
34.38
4
8.60
Rebars
kg
1,620.00
200.00
8.10
2.056
1 Steel Fixer 1 Helper .056 Operator
16.65
3
5.55
Deshuttering
M2
45.00
28.00
1.61
3.056
2 Carpenter 1 Helper .056 Operator
4.91
2
2.46
M3 M3 M3
10 12 14 10
237 234 7
Casting
M3
Formworks
M2
Rebars
Deshuttering
237
2 Carpenter 16 Helper 4 Mason
1
64.37
2 Carpenter 1 Helper .056 Operator
724.27
5
144.85
2.056
1 Steel Fixer 1 Helper .056 Operator
438.54
4
109.64
3.056
2 Carpenter 1 Helper .056 Operator
103.47
2
51.73
25.71
1
25.71
2.93
22.000
948.00
4.00
237.00
3.056
kg
42,660.00
200.00
213.30
M2
948.00
28.00
33.86
12
Z2V33-0550
RCC Slab / Beam - 4L
Z2V33-0560
RCC For Stair/Landings @ 3L-4L
Z2V33-0570
RCC For Wall/Col. From Top of 4L-RoofL
Casting
M3
178.00
180.00
0.99
26.000
Formworks
M2
890.00
16.00
55.63
3.056
2 Carpenter 1 Helper .056 Operator
169.99
6
28.33
Rebars
kg
32,040.00
200.00
160.20
2.056
1 Steel Fixer 1 Helper .056 Operator
329.37
5
65.87
Deshuttering
M2
890.00
32.00
27.81
3.056
2 Carpenter 1 Helper .056 Operator
85.00
2
42.50
14 10
9
Casting
M3
Formworks
M2
Rebars
Deshuttering
235
2 Carpenter 16 Helper 4 Mason
1
63.83
2 Carpenter 1 Helper .056 Operator
718.16
4
179.54
2.056
1 Steel Fixer 1 Helper .056 Operator
434.84
3
144.95
3.056
2 Carpenter 1 Helper .056 Operator
102.59
2
51.30
2.90
22.000
940.00
4.00
235.00
3.056
kg
42,300.00
200.00
211.50
M2
940.00
28.00
33.57
10
Z2V33-0580
RCC Wall/Col. For Staircase From Top of 4L-RoofL
Casting
M3
Formworks
M2
Rebars
Deshuttering
2
2 Carpenter 16 Helper 4 Mason
1
0.54
2 Carpenter 1 Helper .056 Operator
6.11
2
3.06
2.056
1 Steel Fixer 1 Helper .056 Operator
3.70
2
1.85
3.056
2 Carpenter 1 Helper .056 Operator
0.87
1
0.87
25.42
1
25.42
168.08
5
33.62
0.02
22.000
8.00
4.00
2.00
3.056
kg
360.00
200.00
1.80
M2
8.00
28.00
0.29
6
Z2V33-0590
RCC Slab / Beam - RoofL
Casting
M3
176.00
180.00
0.98
26.000
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
Formworks
M2
880.00
16.00
55.00
3.056
2 Carpenter 1 Helper .056 Operator
0.81
17.78
5.64
-
17.78
7.95
11.44
3.97
-
11.44
47.00
21.15
6.71
53.71
0.54
81.00
-
39.50
11.92
63.83
81.00
0.32
45.14
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
M3
0.81
2.57
64.37
81.00
2.25
-
21.15
0.67
0.30
0.10
0.76
9.17
-
0.30
1.13
0.06
0.056
.056 M. Crane
0.63
0.06
0.81
0.05
0.056
.056 M. Crane
0.45
0.05
0.16
0.01
0.056
.056 M. Crane
0.09
0.01
2.10
0.12
-
-
-
-
-
-
1.000
1 Vibrator
-
-
-
-
-
0.12
2.93
1.11
0.056
.056 M. Crane
13.27
1.11
17.78
1.00
0.056
.056 M. Crane
11.94
1.00
2.82
0.16
0.056
.056 M. Crane
1.90
0.16
2.26
-
-
-
-
-
-
1.000
1 Vibrator
0.99
-
-
-
-
-
2.26
0.22
0.056
.056 M. Crane
3.12
0.22
11.44
0.64
0.056
.056 M. Crane
8.97
0.64
1.99
0.11
0.056
.056 M. Crane
1.56
0.11
0.97
-
-
-
-
-
-
1.000
1 Vibrator
-
-
-
-
-
0.97
2.90
1.32
0.056
.056 M. Crane
13.16
1.32
21.15
1.18
0.056
.056 M. Crane
11.84
1.18
3.36
0.19
0.056
.056 M. Crane
1.88
0.19
2.69
-
-
-
-
-
-
1.000
1 Vibrator
0.02
-
-
-
-
-
2.69
0.02
0.056
.056 M. Crane
0.11
0.02
0.30
0.02
0.056
.056 M. Crane
0.10
0.02
0.05
0.00
0.056
.056 M. Crane
0.02
0.00
4.58
0.04
0.26
-
-
-
-
-
-
1.000
1 Vibrator
0.98
0.056
.056 M. Crane
3.08
-
-
0.07
-
-
0.29
-
-
-
-
0.00
0.33
0.68
0.24
0.29
23.50
48.01
-
0.07
3.97
17.40
-
0.24
19.75
40.35
0.01
-
-
-
-
-
0.04
0.00
0.08
0.26
Rebars
kg
31,680.00
200.00
158.40
2.056
1 Steel Fixer 1 Helper .056 Operator
325.67
4
81.42
Deshuttering
M2
880.00
32.00
27.50
3.056
2 Carpenter 1 Helper .056 Operator
84.04
2
42.02
12
Z2V33-0600
RCC For Stair/Landings @ 4L-RoofL
81.00
0.11
22.000
45.00
4.00
11.25
3.056
kg
1,620.00
200.00
8.10
M2
45.00
28.00
1.61
Casting
M3
Formworks
M2
Rebars
Deshuttering
9
2 Carpenter 16 Helper 4 Mason
RCC Slab / Beam for Staircase - RoofL
2.44
1
2.44
2 Carpenter 1 Helper .056 Operator
34.38
3
11.46
2.056
1 Steel Fixer 1 Helper .056 Operator
16.65
3
5.55
3.056
2 Carpenter 1 Helper .056 Operator
4.91
1
4.91
0.58
1
0.58
Casting
M3
4.00
180.00
0.02
26.000
Formworks
M2
20.00
16.00
1.25
3.056
2 Carpenter 1 Helper .056 Operator
3.82
3
1.27
Rebars
kg
720.00
200.00
3.60
2.056
1 Steel Fixer 1 Helper .056 Operator
7.40
2
3.70
Deshuttering
M2
20.00
32.00
0.63
3.056
2 Carpenter 1 Helper .056 Operator
1.91
1
1.91
7
Z2V33-0620
RCC For Lower Parapet
81.00
0.23
22.000
76.00
4.00
19.00
3.056
kg
3,420.00
200.00
17.10
M2
76.00
28.00
2.71
Casting
M3
Formworks
M2
Rebars
Deshuttering
19
1
5.16
2 Carpenter 1 Helper .056 Operator
58.06
4
14.52
2.056
1 Steel Fixer 1 Helper .056 Operator
35.16
3
11.72
3.056
2 Carpenter 1 Helper .056 Operator
8.29
2
4.15
10
Z2V33-0630
RCC For Wall/Col. From Roof L-Top of Roof L
81.00
0.41
22.000
132.00
4.00
33.00
3.056
kg
5,940.00
200.00
29.70
M2
132.00
28.00
4.71
Casting
M3
Formworks
M2
Rebars
Deshuttering
33
2 Carpenter 16 Helper 4 Mason
1
8.96
2 Carpenter 1 Helper .056 Operator
100.85
2
50.42
2.056
1 Steel Fixer 1 Helper .056 Operator
61.06
2
30.53
3.056
2 Carpenter 1 Helper .056 Operator
14.41
1
14.41
5.49
1
5.49
6
Z2V33-0640
RCC Slab / Beam Top Roof Level
Casting
M3
38.00
180.00
0.21
26.000
Formworks
M2
190.00
16.00
11.88
3.056
2 Carpenter 1 Helper .056 Operator
36.29
3
12.10
Rebars
kg
6,840.00
200.00
34.20
2.056
1 Steel Fixer 1 Helper .056 Operator
70.32
2
35.16
Deshuttering
M2
190.00
32.00
5.94
3.056
2 Carpenter 1 Helper .056 Operator
18.15
1
18.15
-
1.01
0.36
0.51
0.18
-
0.51
3.80
1.71
0.54
-
1.71
11.00
4.95
1.57
12.57
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
7
0.40
4.34
8.96
13.20
1.01
0.54
5.16
-
2.81
3.21
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
2 Carpenter 16 Helper 4 Mason
4.58
13.75
8
Z2V33-0610
13.20
-
4.95
3.39
4.89
1.70
5.09
-
4.89
13.20
0.74
0.056
.056 M. Crane
8.87
0.74
2.29
0.13
0.056
.056 M. Crane
1.54
0.13
20.08
1.12
-
-
-
-
-
-
1.000
1 Vibrator
0.11
-
-
-
-
-
1.12
0.08
0.056
.056 M. Crane
0.63
0.08
1.01
0.06
0.056
.056 M. Crane
0.45
0.06
0.20
0.01
0.056
.056 M. Crane
0.09
0.01
0.15
-
-
-
-
-
-
1.000
1 Vibrator
0.02
-
-
-
-
-
0.15
0.01
0.056
.056 M. Crane
0.07
0.01
0.51
0.03
0.056
.056 M. Crane
0.20
0.03
0.09
0.00
0.056
.056 M. Crane
0.04
0.01
0.04
-
-
-
-
-
-
1.000
1 Vibrator
0.23
-
-
-
-
-
0.04
0.11
0.056
.056 M. Crane
1.06
0.11
1.71
0.10
0.056
.056 M. Crane
0.96
0.10
0.27
0.02
0.056
.056 M. Crane
0.15
0.02
0.22
-
-
-
-
-
-
1.000
1 Vibrator
0.41
-
-
-
-
-
0.22
0.31
0.056
.056 M. Crane
1.85
0.31
4.95
0.28
0.056
.056 M. Crane
1.66
0.28
0.79
0.04
0.056
.056 M. Crane
0.26
0.04
0.63
-
-
-
-
-
-
1.000
1 Vibrator
0.21
-
-
-
-
-
0.63
0.09
0.056
.056 M. Crane
0.67
0.10
4.89
0.27
0.056
.056 M. Crane
1.92
0.27
0.85
0.05
0.056
.056 M. Crane
0.33
0.05
0.42
-
-
-
-
-
-
0.00
-
-
0.02
-
-
0.07
-
-
-
-
0.03
1.70
7.43
-
0.07
5.50
11.24
0.01
0.02
1.90
3.88
-
0.00
0.18
0.78
-
0.01
1.41
2.62
0.08
-
-
-
-
-
-
0.42
0.03
Z2V33-0650
RCC For Upper Parapet
81.00
0.30
22.000
96.00
4.00
24.00
3.056
kg
4,320.00
200.00
21.60
M2
96.00
28.00
3.43
Casting
M3
Formworks
M2
Rebars
Deshuttering
24
2 Carpenter 16 Helper 4 Mason
6.52
1
6.52
2 Carpenter 1 Helper .056 Operator
73.34
3
24.45
2.056
1 Steel Fixer 1 Helper .056 Operator
44.41
3
14.80
3.056
2 Carpenter 1 Helper .056 Operator
10.48
1
10.48
0.14
1
0.14
8
Z2V33-0660
RCC Eqmt. Pads + Railing
180.00
0.01
26.000
4.00
12.00
0.33
3.056
2 Carpenter 1 Helper .056 Operator
1.02
4
0.25
kg
180.00
250.00
0.72
2.056
1 Steel Fixer 1 Helper .056 Operator
1.48
3
0.49
M2
4.00
35.00
0.11
3.056
2 Carpenter 1 Helper .056 Operator
0.35
2
0.17
M3
Formworks
M2
Rebars
Deshuttering
1
2.70
0.86
6.86
1 Carpenter 18 Helper 6 Mason 1 Steel Fixer
Casting
6.00
10
-
2.70
0.07
0.07
0.02
0.09
-
0.07
1.000
1 Vibrator
0.30
0.04
3.00
0.17
0.056
.056 M. Crane
1.34
0.17
2.70
0.15
0.056
.056 M. Crane
1.21
0.15
0.43
0.02
0.056
.056 M. Crane
0.19
0.02
6.13
0.34
-
-
-
-
-
-
0.500
.5 Vibrator
0.00
-
-
-
-
-
0.34
0.00
0.056
.056 M. Crane
0.02
0.00
0.07
0.00
0.056
.056 M. Crane
0.04
0.00
0.01
0.00
0.056
.056 M. Crane
0.01
0.00
0.01
-
-
-
-
-
-
-
-
-
0.00
0.03
0.12
0.04
-
-
-
-
-
-
0.01
0.00
MEP FINISHES
10.00
151.20
2.056
1 Mason 1 Helper .056 Operator
72.00
48.46
1.49
2.000
1 Mason 1 Helper
M2
2,436.00
20.00
121.80
2.000
I. Glazed Ceramic Tile @ GL
M2
712
12.00
59.33
2.056
Z2V33-3130
I. Block Works For Ducts @ Grnd Flr.
M2
54
10.00
5.40
2.056
Z2V33-3140
I. Install False Ceiling (Susp. + Boarding) @ GL
M2
373
7.20
51.81
2.056
Z2V33-3150
I. Screed + Ceramic Tiles & Skirtings @ GL
M2
1212
12.00
101.00
2.056
Z2V33-3160
I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL
M2
314
32.00
9.81
2.056
Z2V33-3170
I. Water Proofing + Screed on Wet Areas - GL
M2
683
64.00
10.67
6.000
Z2V33-3180
I. Frames Installations @ GL
Nos.
54
4.80
11.25
2.056
Z2V33-3190
I. Doors w/ Ironmongery @ GL
Nos.
54
4.80
11.25
2.056
Z2V33-3200
I. Frames Installation Works @ GL
M2
183
4.80
38.13
2.056
Z2V33-3210
I.Aluminum + Glass & Other Associated Works @ GL
M2
183
1.60
114.38
2.056
Z2V33-3220
I. Kitchen Cabinets @ GL
Nos.
11
0.60
18.33
2.056
Z2V33-3230
I. Wardrobes @ GL
Nos.
14
0.75
18.67
2.056
Z2V33-3240 Z2V33-3250 Z2V33-3260
I. Primer Application Works @ GL I. Stucco Application Works @ GL I. Emulsion Paint Works @ GL
M2 M2 M2
788.00 788.00 971.00
54.60 16.40 32.20
14.43 48.05 30.16
1.000 1.000 1.000
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter
Z2V33-3270
O. Plaster Accessories & Rush @ GL
M2
72
48.46
1.49
2.000
1 Mason 1 Helper
Z2V33-3090
I. Hollow Block Works + Lintels @ Grnd Flr.
M2
Z2V33-3100
I. Internal Plaster Accessories & Rush @ GL
M2
Z2V33-3110
I. Internal Plaster Works @ GL
Z2V33-3120
1,512.00
310.87
14
22.20
2.97
7
243.60
12
20.30
121.99
14
11.10
10.80
0.42
10.80
0.60
0.056
.056 T. Crane
8.47
0.60
0.21
0.21
10.15
10.15
8.71
4.24
4.24
0.24
0.056
.056 T. Crane
3.32
0.24
2
5.55
2.70
2.70
0.15
0.056
.056 T. Crane
0.30
0.15
106.51
14
7.61
3.70
0.21
0.056
.056 T. Crane
2.90
0.21
207.66
14
14.83
7.21
7.21
0.40
0.056
.056 T. Crane
5.66
0.40
20.17
14
1.44
0.70
0.70
0.04
0.056
.056 T. Crane
0.55
0.04
64.03
10
6.40
23.13
14
1.65
0.80
0.80
0.05
0.056
.056 T. Crane
0.63
0.05
23.13
12
1.93
0.94
0.94
0.05
0.056
.056 T. Crane
0.63
0.05
78.39
14
5.60
2.72
2.72
0.15
0.056
.056 T. Crane
2.14
0.15
235.16
12
19.60
9.53
0.53
0.056
.056 T. Crane
6.41
0.53
37.69
14
2.69
1.31
1.31
0.07
0.056
.056 T. Crane
1.03
0.07
38.38
14
2.74
1.33
1.33
0.07
0.056
.056 T. Crane
1.05
0.07
14.43 48.05 30.16
10 14 12
1.44 3.43 2.51
2.97
7
0.42
3.70
2.13
4.27
9.53
1.44 3.43 2.51 0.21
0.21
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator
Z2V33-3280
O. Plaster Works @ GL
M2
370
20.00
18.50
2.000
Z2V33-3290
O. Polished Marble & Ceramic for Wall @ GL
M2
351
10.00
35.10
2.056
Z2V33-3300
O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.
M2
27
10.00
2.70
2.056
Z2V33-3310
O. Gypsum Board +Washable Paint @ GL
M2
61
16.00
3.81
2.056
Z2V33-3320
O. Semi Recessed G.R.G. Tiles @ GL
M2
50
16.00
3.13
2.056
Z2V33-3330
O. Sreed + Graniti Tiles & Skirtings @ GL
M2
427
12.00
35.58
2.056
Z2V33-3340
O. Screed + Polished Marble & Skirtings @ GL
M2
196
12.00
16.33
2.056
Z2V33-3350
O. G. Stl, Powdr coated Railin to Staircase @ GL
LM
24
20.00
1.20
2.056
Z2V33-3360 Z2V33-3370 Z2V33-3380
O. Primer ApplicationWorks @ GL. O. Stucco Application Works @ GL O. Emulsion Paint Works @ GL
M2 M2 M2
111 111 49
54.60 16.40 32.20
2.03 6.77 1.52
1.000 1.000 1.000
Z2V33-3390
I. Hollow Block Works + Lintels @ 1st Flr.
M2
1,598.00
10.00
159.80
2.056
Z2V33-3400
I. Internal Plaster Accessories & Rush @ 1L
M2
72.00
48.46
1.49
2.000
Z2V33-3410
I. Internal Plaster Works @ 1L
M2
2,395.00
20.00
119.75
2.000
Z2V33-3420
I. Glazed Ceramic Tile @ 1L
M2
755
12.00
62.92
2.056
Z2V33-3430
I. Block Works For Ducts @ 1st Flr.
M2
60
10.00
6.00
2.056
Z2V33-3440
I. Install False Ceiling (Susp. + Boarding) @ 1L
M2
400
7.20
55.56
2.056
Z2V33-3450
I. Screed + Ceramic Tiles & Skirtings @ 1L
M2
1268
12.00
105.67
2.056
Z2V33-3460
I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L
M2
218
32.00
6.81
2.056
Z2V33-3470
I. Water Proofing + Screed on Wet Areas - 1L
M2
547
64.00
8.55
6.000
Z2V33-3480
I. Frames Installations @ 1L
Nos.
62
4.80
12.92
2.056
Z2V33-3490
I. Doors w/ Ironmongery @ 1L
Nos.
62
4.80
12.92
2.056
Z2V33-3500
I. Frames Installation Works @ GL
M2
119
4.80
24.79
2.056
Z2V33-3510
I. Aluminum+Glass & Other Associated Works @ 1L
M2
119
1.60
74.38
2.056
Z2V33-3520
I. Wardrobes @ 1L
Nos.
17
0.75
22.67
2.056
Z2V33-3530
I. Kitchen Cabinets @ 1L
Nos.
16
0.60
26.67
2.056
Z2V33-3540 Z2V33-3550 Z2V33-3560
I. Primer Application Works @ 1L I. Stucco Application Works @ 1L I. Emulsion Paint Works @ 1L
M2 M2 M2
758.00 758.00 1,356.00
54.60 16.40 32.20
13.88 46.22 42.11
1.000 1.000 1.000
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter
Z2V33-3570
O. Plaster Accessories & Rush @ 1L
M2
72
48.46
1.49
2.000
1 Mason 1 Helper
2.000
1 Mason 1 Helper
Z2V33-3580
O. Plaster Works @ 1L
M2
397
20.00
19.85
1 Mason 1 Helper
37.00
12
3.08
1.54
1.54
72.17
14
5.15
2.51
2.51
0.14
0.056
.056 T. Crane
1.97
0.14
5.55
2
2.78
1.35
1.35
0.08
0.056
.056 T. Crane
0.15
0.08
7.84
14
0.56
0.27
0.27
0.02
0.056
.056 T. Crane
0.21
0.02
6.43
14
0.46
0.22
0.22
0.01
0.056
.056 T. Crane
0.18
0.01
73.16
14
5.23
2.54
2.54
0.14
0.056
.056 T. Crane
1.99
0.14
33.58
14
2.40
1.17
1.17
0.07
0.056
.056 T. Crane
0.91
0.07
2.47
10
0.25
0.12
0.01
0.056
.056 T. Crane
0.07
0.01
2.03 6.77 1.52
8 12 10
0.25 0.56 0.15
328.55
14
23.47
0.64
0.056
.056 T. Crane
8.95
0.64
0.12 0.25 0.56 0.15
11.41
11.41
2.97
7
0.42
0.21
0.21
239.50
12
19.96
9.98
9.98
129.36
14
9.24
4.49
4.49
0.25
0.056
.056 T. Crane
3.52
0.25
12.34
2
6.17
3.00
3.00
0.17
0.056
.056 T. Crane
0.34
0.17
114.22
14
8.16
3.97
0.22
0.056
.056 T. Crane
3.11
0.22
217.25
14
15.52
7.55
7.55
0.42
0.056
.056 T. Crane
5.92
0.42
14.01
8
1.75
0.85
0.85
0.05
0.056
.056 T. Crane
0.38
0.05
51.28
10
5.13
26.56
14
1.90
0.92
0.92
0.05
0.056
.056 T. Crane
0.72
0.05
26.56
12
2.21
1.08
1.08
0.06
0.056
.056 T. Crane
0.72
0.06
50.97
14
3.64
1.77
1.77
0.10
0.056
.056 T. Crane
1.39
0.10
152.92
12
12.74
6.20
0.35
0.056
.056 T. Crane
4.17
0.35
46.60
14
3.33
1.62
1.62
0.09
0.056
.056 T. Crane
1.27
0.09
54.83
14
3.92
1.90
1.90
0.11
0.056
.056 T. Crane
1.49
0.11
13.88 46.22 42.11
12 14 14
1.16 3.30 3.01
2.97
7
0.42
0.21
0.21
39.70
12
3.31
1.65
1.65
3.97
1.71
3.42
6.20
1.16 3.30 3.01
Z2V33-3590
O. Polished Marble & Ceramic for Wall @ 1L
M2
56
10.00
5.60
2.056
Z2V33-3600
O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.
M2
14
10.00
1.40
2.056
Z2V33-3610
O. Gypsum Board +Washable Paint @ 1L
M2
68
16.00
4.25
2.056
Z2V33-3620
O. Semi Recessed G.R.G. Tiles @ 1L
M2
51
16.00
3.19
2.056
Z2V33-3630
O. Sreed + Graniti Tiles & Skirtings @ 1L
M2
453
12.00
37.75
2.056
Z2V33-3640
O. Screed + Polished Marble & Skirtings @ 1L
M2
50
12.00
4.17
2.056
Z2V33-3650
O. G. Stl, Powdr coated Railin to Staircase @ 1L
LM
26
20.00
1.30
2.056
Z2V33-3660 Z2V33-3670 Z2V33-3680
O. Primer Application Works @ 1L O. Stucco Application Works @ 1L O. Emulsion Paint Works @ 1L
M2 M2 M2
119 119 55
54.60 16.40 32.20
2.18 7.26 1.71
1.000 1.000 1.000
Z2V33-3690
I. Hollow Block Works + Lintels @ 2nd Flr.
1,598.00 M2
1,598.00
10.00
159.80
2.056
Z2V33-3700
I. Internal Plaster Accessories & Rush @ 2L
72.00 M2
72.00
48.46
1.49
2.000
758.00 M2 758.00 M2 1,356.00 M2
758.00 758.00 1,356.00
54.60 16.40 32.20
13.88 46.22 42.11
1.000 1.000 1.000
72 M2
72
48.46
1.49
2.000
1 Mason 1 Helper
397 M2
397
20.00
19.85
2.000
56 M2
56
10.00
5.60
2.056
2,395.00
20.00
119.75
2.000
755 M2
755
12.00
62.92
2.056
60 M2
60
10.00
6.00
2.056
400 M2
400
7.20
55.56
2.056
1268 M2
1268
12.00
105.67
2.056
I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L
218 M2
218
32.00
6.81
2.056
Z2V33-3770
I. Water Proofing + Screed on Wet Areas - 2L
547 M2
547
64.00
8.55
6.000
Z2V33-3780
I. Frames Installations @ 2L
62 Nos.
62
4.80
12.92
2.056
Z2V33-3790
I. Doors w/ Ironmongery @ 2L
62 Nos.
62
4.80
12.92
2.056
Z2V33-3800
I. Frames Installation Works @ 2L
119 M2
119
4.80
24.79
2.056
Z2V33-3810
I. Aluminum+Glass & Other Associated Works @ 2L
119 M2
119
1.60
74.38
2.056
Z2V33-3820
I. Wardrobes @ 2L
17 Nos.
17
0.75
22.67
2.056
Z2V33-3830
I. Kitchen Cabinets @ 2L
16 Nos.
16
0.60
26.67
2.056
Z2V33-3840 Z2V33-3850 Z2V33-3860
I. Primer Application Works @ 2L I. Stucco Application Works @ 2L I. Emulsion Paint Works @ 2L
Z2V33-3870
O. Plaster Accessories & Rush @ 2L
Z2V33-3880
O. Plaster Works @ 2L
Z2V33-3890
O. Polished Marble & Ceramic for Wall @ 2L
I. Internal Plaster Works @ 2L
Z2V33-3720
I. Glazed Ceramic Tile @ 2L
Z2V33-3730
I. Block Works For Ducts @ 2nd Flr.
Z2V33-3740
I. Install False Ceiling (Susp. + Boarding) @ 2L
Z2V33-3750
I. Screed + Ceramic Tiles & Skirtings @ 2L
Z2V33-3760
1 Mason 1 Helper
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter
2,395.00 M2
Z2V33-3710
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator
11.51
14
0.82
0.40
0.40
0.02
0.056
.056 T. Crane
0.31
0.02
2.88
2
1.44
0.70
0.70
0.04
0.056
.056 T. Crane
0.08
0.04
8.74
14
0.62
0.30
0.30
0.02
0.056
.056 T. Crane
0.24
0.02
6.55
14
0.47
0.23
0.23
0.01
0.056
.056 T. Crane
0.18
0.01
77.61
14
5.54
2.70
2.70
0.15
0.056
.056 T. Crane
2.11
0.15
8.57
14
0.61
0.30
0.30
0.02
0.056
.056 T. Crane
0.23
0.02
2.67
10
0.27
0.13
0.01
0.056
.056 T. Crane
0.07
0.01
2.18 7.26 1.71
8 10 12
0.27 0.73 0.14
328.55
14
23.47
0.64
0.056
.056 T. Crane
8.95
0.64
2.97
7
239.50
0.13 0.27 0.73 0.14
11.41
11.41
0.42
0.21
0.21
12
19.96
9.98
9.98
129.36
14
9.24
4.49
4.49
0.25
0.056
.056 T. Crane
3.52
0.25
12.34
2
6.17
3.00
3.00
0.17
0.056
.056 T. Crane
0.34
0.17
114.22
14
8.16
3.97
0.22
0.056
.056 T. Crane
3.11
0.22
217.25
14
15.52
7.55
7.55
0.42
0.056
.056 T. Crane
5.92
0.42
14.01
8
1.75
0.85
0.85
0.05
0.056
.056 T. Crane
0.38
0.05
51.28
10
5.13
26.56
14
1.90
0.92
0.92
0.05
0.056
.056 T. Crane
0.72
0.05
26.56
12
2.21
1.08
1.08
0.06
0.056
.056 T. Crane
0.72
0.06
50.97
14
3.64
1.77
1.77
0.10
0.056
.056 T. Crane
1.39
0.10
152.92
12
12.74
6.20
0.35
0.056
.056 T. Crane
4.17
0.35
46.60
14
3.33
1.62
1.62
0.09
0.056
.056 T. Crane
1.27
0.09
54.83
14
3.92
1.90
1.90
0.11
0.056
.056 T. Crane
1.49
0.11
13.88 46.22 42.11
12 14 14
1.16 3.30 3.01
0.056
.056 T. Crane
0.31
0.02
3.97
1.71
3.42
6.20
1.16 3.30 3.01
2.97
7
0.42
0.21
0.21
39.70
12
3.31
1.65
1.65
11.51
14
0.82
0.40
0.40
0.02
Z2V33-3900
O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr.
14 M2
14
10.00
1.40
2.056
Z2V33-3910
O. Gypsum Board +Washable Paint @ 2L
68 M2
68
16.00
4.25
2.056
Z2V33-3920
O. Semi Recessed G.R.G. Tiles @ 2L
51 M2
51
16.00
3.19
2.056
Z2V33-3930
O. Sreed + Graniti Tiles & Skirtings @ 2L
453 M2
453
12.00
37.75
2.056
Z2V33-3940
O. Screed + Polished Marble & Skirtings @ 2L
45 M2
50
12.00
4.17
2.056
Z2V33-3950
O. G.Steel, Powder coated Railin to Staircase@2L
26 LM
26
20.00
1.30
2.056
Z2V33-3960 Z2V33-3970 Z2V33-3980
O. Primer Application Works @ 2L O. Stucco Application Works @ 2L O. Emulsion Paint Works @ 2L
119 M2 119 M2 55 M2
119 119 55
54.60 16.40 32.20
2.18 7.26 1.71
1.000 1.000 1.000
Z2V33-3990
I. Hollow Block Works + Lintels @ 3rd Flr.
1,598.00 M2
1,598.00
10.00
159.80
2.056
Z2V33-4000
I. Internal Plaster Accessories & Rush @ 3L
72.00 M2
72.00
48.46
1.49
2.000
Z2V33-4010
I. Internal Plaster Works @ 3L
2,395.00 M2
2,395.00
20.00
119.75
2.000
Z2V33-4020
I. Glazed Ceramic Tile @ 3L
755 M2
735
12.00
61.25
2.056
Z2V33-4030
I. Block Works For Ducts @ 3rd Flr.
60 M2
60
10.00
6.00
2.056
Z2V33-4040
I. Install False Ceiling (Susp. + Boarding) @ 3L
400 M2
400
7.20
55.56
2.056
Z2V33-4050
I. Screed + Ceramic Tiles & Skirtings @ 3L
1268 M2
1268
12.00
105.67
2.056
Z2V33-4060
I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L
218 M2
218
32.00
6.81
2.056
Z2V33-4070
I. Water Proofing + Screed on Wet Areas - 3L
547 M2
547
64.00
8.55
6.000
Z2V33-4080
I. Frames Installations @ 3L
62 Nos.
62
4.80
12.92
2.056
Z2V33-4090
I. Doors w/ Ironmongery @ 3L
62 Nos.
62
4.80
12.92
2.056
Z2V33-4100
I. Frames Installation Works @ 3L
119 M2
119
4.80
24.79
2.056
Z2V33-4110
I. Aluminum+Glass & Other Associated Works @ 3L
119 M2
119
1.60
74.38
2.056
Z2V33-4120
I. Wardrobes @ 3L
17 Nos.
17
0.75
22.67
2.056
Z2V33-4130
I. Kitchen Cabinets @ 3L
16 Nos.
16
0.60
26.67
2.056
Z2V33-4140 Z2V33-4150 Z2V33-4160
I. Primer Appilcation Works @ 3L I. Stucco Application Works @ 3L I. Emulsion Paint Works @ 3L
Z2V33-4170
O. Plaster Accessories & Rush @ 3L
758.00 M2 758.00 M2 1,356.00 M2
758.00 758.00 1,356.00
54.60 16.40 32.20
13.88 46.22 42.11
1.000 1.000 1.000
72 M2
72
48.46
1.49
2.000
1 Mason 1 Helper
397
20.00
19.85
2.000
O. Polished Marble & Ceramic for Wall @ 3L
56 M2
56
10.00
5.60
2.056
O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr.
14 M2
14
10.00
1.40
2.056
O. Plaster Works @ 3L
Z2V33-4190
Z2V33-4200
1 Mason 1 Helper
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter
397 M2
Z2V33-4180
1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator
2.88
2
1.44
8.74
14
0.62
6.55
14
0.47
77.61
14
5.54
8.57
14
0.61
2.67
10
0.27
2.18 7.26 1.71
8 10 12
0.27 0.73 0.14
328.55
14
23.47
0.70
0.04
0.056
.056 T. Crane
0.08
0.04
0.30
0.30
0.02
0.056
.056 T. Crane
0.24
0.02
0.23
0.23
0.01
0.056
.056 T. Crane
0.18
0.01
2.70
2.70
0.15
0.056
.056 T. Crane
2.11
0.15
0.30
0.30
0.02
0.056
.056 T. Crane
0.23
0.02
0.13
0.01
0.056
.056 T. Crane
0.07
0.01
0.64
0.056
.056 T. Crane
8.95
0.64
0.70
0.13 0.27 0.73 0.14
11.41
11.41
2.97
7
0.42
0.21
0.21
239.50
12
19.96
9.98
9.98
125.93
14
9.00
4.38
4.38
0.25
0.056
.056 T. Crane
3.43
0.25
12.34
2
6.17
3.00
3.00
0.17
0.056
.056 T. Crane
0.34
0.17
114.22
14
8.16
3.97
0.22
0.056
.056 T. Crane
3.11
0.22
217.25
14
15.52
7.55
7.55
0.42
0.056
.056 T. Crane
5.92
0.42
14.01
8
1.75
0.85
0.85
0.05
0.056
.056 T. Crane
0.38
0.05
51.28
10
5.13
26.56
14
1.90
0.92
0.92
0.05
0.056
.056 T. Crane
0.72
0.05
26.56
12
2.21
1.08
1.08
0.06
0.056
.056 T. Crane
0.72
0.06
50.97
14
3.64
1.77
1.77
0.10
0.056
.056 T. Crane
1.39
0.10
152.92
12
12.74
6.20
0.35
0.056
.056 T. Crane
4.17
0.35
46.60
14
3.33
1.62
1.62
0.09
0.056
.056 T. Crane
1.27
0.09
54.83
14
3.92
1.90
1.90
0.11
0.056
.056 T. Crane
1.49
0.11
13.88 46.22 42.11
12 14 14
1.16 3.30 3.01
2.97
7
0.42
0.21
0.21
39.70
12
3.31
1.65
1.65
11.51
14
0.82
0.40
0.40
0.02
0.056
.056 T. Crane
0.31
0.02
2.88
2
1.44
0.70
0.70
0.04
0.056
.056 T. Crane
0.08
0.04
3.97
1.71
3.42
6.20
1.16 3.30 3.01
Z2V33-4210
O. Gypsum Board +Washable Paint @ 3L
68 M2
68
16.00
4.25
2.056
Z2V33-4220
O. Semi Recessed G.R.G. Tiles @ 3L
51 M2
51
16.00
3.19
2.056
Z2V33-4230
O. Screed + Polished Marble & Skirtings @ 3L
453 M2
453
12.00
37.75
2.056
Z2V33-4240
O. Sreed + Graniti Tiles & Skirtings @ 3L
45 M2
50
12.00
4.17
2.056
Z2V33-4250
O. G.Steel, Powder coated Railin to Staircase@3L
26 LM
26
20.00
1.30
2.056
Z2V33-4260 Z2V33-4270 Z2V33-4280
O. Primer Application Works @ 3L O. Stucco Application Works @ 3L O. Emulsion Paint Works @ 3L
119 M2 119 M2 55 M2
119 119 55
54.60 16.40 32.20
2.18 7.26 1.71
1.000 1.000 1.000
Z2V33-4290
I. Hollow Block Works + Lintels @ 4th Flr.
1,598.00 M2
1,598.00
10.00
159.80
2.056
Z2V33-4300
I. Internal Plaster Accessories & Rush @ 4L
72.00 M2
72.00
48.46
1.49
2.000
758.00 M2 758.00 M2 1,356.00 M2
758.00 758.00 1,356.00
54.60 16.40 32.20
13.88 46.22 42.11
1.000 1.000 1.000
72 M2
72
48.46
1.49
2.000
1 Mason 1 Helper
2,395.00
20.00
119.75
2.000
755 M2
755
12.00
62.92
2.056
60 M2
60
10.00
6.00
2.056
400 M2
400
7.20
55.56
2.056
1268 M2
1268
12.00
105.67
2.056
I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L
218 M2
218
32.00
6.81
2.056
Z2V33-4370
I. Water Proofing + Screed on Wet Areas - 4L
547 M2
547
64.00
8.55
6.000
Z2V33-4380
I. Frames Installations @ 4L
62 Nos.
62
4.80
12.92
2.056
Z2V33-4390
I. Doors w/ Ironmongery @ 4L
62 Nos.
62
4.80
12.92
2.056
Z2V33-4400
I. Frames Installation Works @ 4L
119 M2
119
4.80
24.79
2.056
Z2V33-4410
I. Aluminum+Glass & Other Associated Works @ 4L
119 M2
119
1.60
74.38
2.056
Z2V33-4420
I. Kitchen Cabinets @ 4L
17 Nos.
17
0.75
22.67
2.056
Z2V33-4430
I. Wardrobes @ 4L
16 Nos.
16
0.60
26.67
2.056
Z2V33-4440 Z2V33-4450 Z2V33-4460
I. Primer Application Works @ 4L I. Stucco Installation Works @ 4L I. Emulsion Paint Works @ 4L
Z2V33-4470
O. Plaster Accessories & Rush @ 4L
I. Internal Plaster Works @ 4L
Z2V33-4320
I. Glazed Ceramic Tile @ 4L
Z2V33-4330
I. Block Works For Ducts @ 4th Flr.
Z2V33-4340
I. Install False Ceiling (Susp. + Boarding) @ 4L
Z2V33-4350
I. Screed + Ceramic Tiles & Skirtings @ 4L
Z2V33-4360
397 M2
397
20.00
19.85
2.000
O. Polished Marble & Ceramic for Wall @ 4L
56 M2
56
10.00
5.60
2.056
Z2V33-4500
O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr.
14 M2
14
10.00
1.40
2.056
Z2V33-4510
O. Gypsum Board + Washable Paint @ 4L
68 M2
68
16.00
4.25
2.056
Z2V33-4480
O. Plaster Works @ 4L
Z2V33-4490
1 Mason 1 Helper
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter
2,395.00 M2
Z2V33-4310
1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator
8.74
14
0.62
0.30
0.30
0.02
0.056
.056 T. Crane
0.24
0.02
6.55
14
0.47
0.23
0.23
0.01
0.056
.056 T. Crane
0.18
0.01
77.61
14
5.54
2.70
2.70
0.15
0.056
.056 T. Crane
2.11
0.15
8.57
14
0.61
0.30
0.30
0.02
0.056
.056 T. Crane
0.23
0.02
2.67
10
0.27
0.13
0.01
0.056
.056 T. Crane
0.07
0.01
2.18 7.26 1.71
8 10 12
0.27 0.73 0.14
328.55
12
27.38
0.75
0.056
.056 T. Crane
8.95
0.75
2.97
7
239.50
10
129.36
12
12.34
0.13 0.27 0.73 0.14
13.32
13.32
0.21
0.21
23.95
11.98
11.98
10.78
5.24
5.24
0.29
0.056
.056 T. Crane
3.52
0.29
2
6.17
3.00
3.00
0.17
0.056
.056 T. Crane
0.34
0.17
114.22
12
9.52
4.63
0.26
0.056
.056 T. Crane
3.11
0.26
217.25
12
18.10
8.81
8.81
0.49
0.056
.056 T. Crane
5.92
0.49
14.01
6
2.33
1.14
1.14
0.06
0.056
.056 T. Crane
0.38
0.06
51.28
8
6.41
26.56
10
2.66
1.29
1.29
0.07
0.056
.056 T. Crane
0.72
0.07
26.56
8
3.32
1.61
1.61
0.09
0.056
.056 T. Crane
0.72
0.09
50.97
12
4.25
2.07
2.07
0.12
0.056
.056 T. Crane
1.39
0.12
152.92
10
15.29
7.44
0.42
0.056
.056 T. Crane
4.17
0.42
46.60
12
3.88
1.89
1.89
0.11
0.056
.056 T. Crane
1.27
0.11
54.83
12
4.57
2.22
2.22
0.12
0.056
.056 T. Crane
1.49
0.12
13.88 46.22 42.11
10 12 12
1.39 3.85 3.51
2.97
7
0.42
0.21
0.21
39.70
10
3.97
1.99
1.99
11.51
12
0.96
0.47
0.47
0.03
0.056
.056 T. Crane
0.31
0.03
2.88
2
1.44
0.70
0.70
0.04
0.056
.056 T. Crane
0.08
0.04
8.74
12
0.73
0.35
0.02
0.056
.056 T. Crane
0.24
0.02
0.42
4.63
2.14
4.27
7.44
1.39 3.85 3.51
0.35
51 M2
51
16.00
3.19
2.056
453 M2
453
12.00
37.75
2.056
O. Sreed + Graniti Tiles & Skirtings @ 4L
45 M2
50
12.00
4.17
2.056
Z2V33-4550
O. G.Steel, Powder coated Railin to Staircase@4L
26 LM
26
20.00
1.30
2.056
Z2V33-4560 Z2V33-4570 Z2V33-4580
O. Primer Application Works @ 4L O. Stucco Application Works @ 4L O. Emulsion Paint Works @ 4L
119 M2 119 M2 55 M2
119 119 55
54.60 16.40 32.20
2.18 7.26 1.71
1.000 1.000 1.000
Z2V33-4590
I. Hollow Block Works + Lintels @ 5th Flr.
M2
1,598.00
10.00
159.80
2.056
Z2V33-4600
I. Internal Plaster Accessories & Rush @ 5L
M2
72.00
48.46
1.49
2.000
Z2V33-4520
O. Semi Recessed G.R.G. Tiles @ 4L
Z2V33-4530
O. Screed + Polished Marble & Skirtings @ 4L
Z2V33-4540
1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper
Z2V33-4610
I. Internal Plaster Works @ 5L
M2
2,395.00
20.00
119.75
2.000
Z2V33-4620
I. Glazed Ceramic Tile @ 5L
M2
755
12.00
62.92
2.056
Z2V33-4630
I. Block Works For Ducts @ 5th Flr.
M2
60
10.00
6.00
2.056
Z2V33-4640
I. Install False Ceiling (Susp. + Boarding) @ 5L
M2
400
7.20
55.56
2.056
Z2V33-4650
I. Screed + Ceramic Tiles & Skirtings @ 5L
M2
1268
12.00
105.67
2.056
Z2V33-4660
I. Screed + Non-Slip Ceramic Tiles &Skirtings@5L
M2
218
32.00
6.81
2.056
Z2V33-4670
I. Water Proofing + Screed on Wet Areas - 5L
M2
547
64.00
8.55
6.000
Z2V33-4680
I. Frames Installations @ 5L
Nos.
62
4.80
12.92
2.056
Z2V33-4690
I. Doors w/ Ironmongery @ 5L
Nos.
62
4.80
12.92
2.056
Z2V33-4700
I. Frames Installation Works @ 5L
M2
119
4.80
24.79
2.056
Z2V33-4710
I. Aluminum+Glass & Other Associated Works @ 5L
M2
119
1.60
74.38
2.056
Z2V33-4720
I. Kitchen Cabinets @ 5L
Nos.
17
0.75
22.67
2.056
Z2V33-4730
I. Wardrobes @ 5L
Nos.
16
0.60
26.67
2.056
Z2V33-4740 Z2V33-4750 Z2V33-4760
I. Primer Application Works @ 5L I. Stucco Installation Works @ 5L I. Emulsion Paint Works @ 5L
M2 M2 M2
758.00 758.00 1,356.00
54.60 16.40 32.20
13.88 46.22 42.11
1.000 1.000 1.000
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter
Z2V33-4770
O. Plaster Accessories & Rush @ 5L
M2
72
48.46
1.49
2.000
1 Mason 1 Helper
Z2V33-4780
O. Plaster Works @ 5L
M2
397
20.00
19.85
2.000
Z2V33-4790
O. Polished Marble & Ceramic for Wall @ 5L
M2
56
10.00
5.60
2.056
Z2V33-4800
O. Blk Wks For Garbage Chutes+Plasters@ 5th Flr.
M2
14
10.00
1.40
2.056
Z2V33-4810
O. Gypsum Board + Washable Paint @ 5L
M2
68
16.00
4.25
2.056
Z2V33-4820
O. Semi Recessed G.R.G. Tiles @ 5L
M2
51
16.00
3.19
2.056
1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator
6.55
12
0.55
77.61
12
6.47
8.57
12
0.71
2.67
8
0.33
2.18 7.26 1.71
7 8 10
0.31 0.91 0.17
328.55
12
27.38
2.97
7
239.50
10
129.36
12
12.34
0.27
0.01
0.056
.056 T. Crane
0.18
0.01
3.15
3.15
0.18
0.056
.056 T. Crane
2.11
0.18
0.35
0.35
0.02
0.056
.056 T. Crane
0.23
0.02
0.16
0.01
0.056
.056 T. Crane
0.07
0.01
0.75
0.056
.056 T. Crane
8.95
0.75
0.27
0.16 0.31 0.91 0.17
13.32
13.32
0.21
0.21
23.95
11.98
11.98
10.78
5.24
5.24
0.29
0.056
.056 T. Crane
3.52
0.29
2
6.17
3.00
3.00
0.17
0.056
.056 T. Crane
0.34
0.17
114.22
12
9.52
4.63
0.26
0.056
.056 T. Crane
3.11
0.26
217.25
12
18.10
8.81
8.81
0.49
0.056
.056 T. Crane
5.92
0.49
14.01
6
2.33
1.14
1.14
0.06
0.056
.056 T. Crane
0.38
0.06
51.28
8
6.41
26.56
10
2.66
1.29
1.29
0.07
0.056
.056 T. Crane
0.72
0.07
26.56
8
3.32
1.61
1.61
0.09
0.056
.056 T. Crane
0.72
0.09
50.97
12
4.25
2.07
2.07
0.12
0.056
.056 T. Crane
1.39
0.12
152.92
10
15.29
7.44
0.42
0.056
.056 T. Crane
4.17
0.42
46.60
12
3.88
1.89
1.89
0.11
0.056
.056 T. Crane
1.27
0.11
54.83
12
4.57
2.22
2.22
0.12
0.056
.056 T. Crane
1.49
0.12
13.88 46.22 42.11
10 12 12
1.39 3.85 3.51
2.97
7
0.42
0.21
0.21
39.70
10
3.97
1.99
1.99
11.51
12
0.96
0.47
0.47
0.03
0.056
.056 T. Crane
0.31
0.03
2.88
2
1.44
0.70
0.70
0.04
0.056
.056 T. Crane
0.08
0.04
8.74
12
0.73
0.35
0.35
0.02
0.056
.056 T. Crane
0.24
0.02
6.55
12
0.55
0.27
0.27
0.01
0.056
.056 T. Crane
0.18
0.01
0.42
4.63
2.14
4.27
7.44
1.39 3.85 3.51
1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator
Z2V33-4830
O. Screed + Polished Marble & Skirtings @ 5L
M2
453
12.00
37.75
2.056
Z2V33-4840
O. Sreed + Graniti Tiles & Skirtings @ 5L
M2
50
12.00
4.17
2.056
Z2V33-4850
O. G.Steel, Powder coated Railin to Staircase@5L
LM
26
20.00
1.30
2.056
Z2V33-4860 Z2V33-4870 Z2V33-4880
O. Primer Application Works @ 5L O. Stucco Application Works @ 5L O. Emulsion Paint Works @ 5L
M2 M2 M2
119 119 55
54.60 16.40 32.20
2.18 7.26 1.71
1.000 1.000 1.000
Z2V33-4890
Hollow Block Works + Lintels @ Roof Floor
M2
307
10.00
30.70
2.056
Z2V33-4900
Plaster Accessories & Rush @ Roof Floor
M2
72
48.46
1.49
2.000
1 Mason 1 Helper
Z2V33-4910
Plastering Works @ Roof Deck Floor
M2
339
20.00
16.95
2.000
1 Mason 1 Helper
Z2V33-4920 Z2V33-4930 Z2V33-4940 Z2V33-4950 Z2V33-4960 Z2V33-4970 Z2V33-4980 Z2V33-4990 Z2V33-5000 Z2V33-5010 Z2V33-5020 Z2V33-5030 Z2V33-5040 Z2V33-5050 Z2V33-5060 Z2V33-5070 Z2V33-5080 Z2V33-5090 Z2V33-5100 Z2V33-5110 Z2V33-5120 Z2V33-5130 Z2V33-5140 Z2V33-5150
Roof Drain & Access.+ Lightweight Concrete One Coat Cold Bituminous Primer 2 Layers of SBS W.P. Membrane + Water Test Alum. Foil Covering Fixed to Upstand w/ Sealant 50mm Thk. Extruded Polystyrene Insulation Protection Layer 18mm-25mm Round Aggregates (50mm Thk.) 1mm Thk. Alum. Flashing Fixed into Conc. Upstand Sealant Application Around top of Alum. Flashing Channel & Rails Installation for Lifts Cabin Assembly / Installation for lifts Machine Installation for lifts Doors Installation for lifts Connections To Ele + Finishing Touches for lifts Installation of Chute Tubes and Intake Throats Install Intake Doors, Chute Vent & Accessories Install Ground Floor Offset + Fire Shutter Door Install Compactor with MCP Installation of Garbage Container Final Test & Comm. Installation of Window Cleaning Eqmt. Primer Application Works @ Roof Deck Stucco Application Works @ Roof Deck Emulsion / Epoxy Paint Works @ Roof Deck
M2 M2 M2 LM M2 M2 M2 M2 M2 Items Items Items Items Items Item Item Item Item Item Item Item M2 M2 M2
Z2V33-5160
Excavation Works External
M3
Z2V33-5170
RCC Manholes / Gully Traps
Nos.
Z2V33-5180
Water Proofing
M2
Z2V33-5190
Sand Bedding
M2
Z2V33-5200
Backfilling Works
M3
Z2V33-5210 Z2V33-5220 Z2V33-5230 Z2V33-5240 Z2V33-5250 Z2V33-5260 Z2V33-5270 Z2V33-5280
Instl Drainage Pipes &Con. To Existing Chambers Instl Water Supply Pipes&Con. To Existg Chambers Instl Chilled Water Pipes&Con. To Existg Chamber Instl Central Gas Pipes &Con. To Existg Chambers Instl Telephone Ducts &Con. To Existing Chambers Laying of Power cables (By Others) Hardscaping Works Landscaping Works
Item Item Item Item Item Item Item Item
Z2V33-5290
Ext. Plaster Accessories & Rush on Front Elev.
M2
Z2V33-5300
Ext. Plaster Works on Front Elevation
M2
Z2V33-5310
Install Balcony Handrail on Front Elev.
Nos.
Z2V33-5320
Decorative GRC Panels W/ Epoxy Paint @ F. Elev.
Nos.
365.00 106.00 259.00 83 259.00 259.00 259.00 83 83 2 2 2 2 2 1 1 1 1 1 1 1 69 69 203
1.26 4.21 6.30
1.000 1.000 1.000
315.00
21.87
2.000
5.63
12.27
5.000
124.30
76.00
1.64
6.000
52.67
60.00
0.88
1.250
69
6,834.67
12
6.47
3.15
3.15
0.18
0.056
.056 T. Crane
2.11
0.18
8.57
12
0.71
0.35
0.35
0.02
0.056
.056 T. Crane
0.23
0.02
2.67
8
0.33
0.16
0.01
0.056
.056 T. Crane
0.07
0.01
2.18 7.26 1.71
7 8 10
0.31 0.91 0.17
63.12
10
6.31
3.07
3.07
0.056
.056 T. Crane
1.72
0.17
2.97
5
0.59
0.30
0.30
33.90
8
4.24
2.12
2.12
601.00
11.37
7.500
1 Painter 1 Painter 1 Painter 1 Operator 1 Helper 2 Carpente r 1 Mason 1 Helper 1 Operator 4Waterpr oofer 2 Helper 1 Helper 0.25 Operator
48.46
38.49
2.000
2.25
2.000
19
15.00
1.27
2.250
10
2.00
5.00
2.500
1.5 Operator 3 Driver 3 Helper
8 10 12
0.16 0.42 0.53
43.73
5
8.75
61.33
14
4.38
9.81
12
0.82
0.27
1.10
10
0.11
0.09
85.29
14
1 Mason 1 Helper
1 Mason 1 Helper 1 Mason 1 Helper .25 Operator 1 Carpente r1 Helper .5 Operator
76.97
2
38.49
4.50
4
2.85
4.500
0.5 Shovel 3 Dump Truck .5 S. Roller .5 Bob Cat
2.44
0.02
1.22
2.44
0.22
51.17
0.02
0.41
2.44
0.41
0.41
0.32
0.03
12.50
10
1.25
0.50
0.50
0.25
0.500
..5 M. Crane
2.50
0.25
1.56
12
0.13
0.05
0.05
0.03
0.500
.5 M. Crane
0.31
0.03
175.43
14
12.53
28.39
2
14.20
7.10
7.10
4.50
4
1.13
0.56
0.56
2.25
10
0.23
0.10
0.10
0.03
0.250
.25 M. Crane
0.25
0.03
0.16
0.06
0.03
0.500
..5 M. Crane
0.25
0.03
18
8.00
2.25
2.000
Nos.
15
15.00
1.00
2.250
Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.
Nos.
1
2.00
0.50
2.500
1 Carpente r1 Helper .5 Operator
1.25
8
Z2V33-5390
External Painting Works on Left Side Elevation
M2
706
32.20
21.93
3.000
3 Painter
65.78
12
Z2V33-5400
Ext. Plaster Accessories & Rush on Rear Elev.
M2
1,417.00
48.46
29.24
2.000
1 Mason 1 Helper
58.48
2
29.24
Z2V33-5410
Ext. Plaster Works on Rear Elevation
M2
18.00
8.00
2.25
2.000
1 Mason 1 Helper
4.50
4
1.13
Z2V33-5380
.25 Bob Cat
0.55
.25 M. Crane
1 Mason 1 Helper
Install Balcony Handrail on Leftside Elev.
0.250
0.88
0.250
2.000
Z2V33-5370
12.27
0.03
3.000
M2
1 M. Crane
0.11
14.20
Ext. Plaster Works on Left Side Elevation
1.000
0.11
58.48
Z2V33-5360
0.88
0.24
48.46
M2
0.88
4.37
12
32.20
M2
Ext. Plaster Access. & Rush on Leftside Elev.
21.87
0.56
688
External Painting Works on Front Elevation
Z2V33-5350
1 Excavato r
0.56
1,883.00
Z2V33-5340
1.000
1.13
2.500
5
0.88
4.37
19.24
0.63
LM
1.75
4.37
19.24
8.00
Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.
0.16 0.42 0.53
6.09
1 Carpente r1 Helper .5 Operator 3 Painter
Z2V33-5330
0.17
14 12 14 12 10 7 14 12
8.00
18.00
0.31 0.91 0.17
1.26 4.21 6.30
1 1 1 1 1 1 1 1 1,865.00
0.16
7 2 6 3 2 2 4 3 2 14 10 7 10 12 8 4 2 1 1 3 14
54.60 16.40 32.20
6,887.67
77.61
1 Mason 1 Helper 1 Mason 1 Helper .25 Operator
12.53
0.06
5.48
5.48 14.62
14.62
0.56
0.56
Z2V33-5420
Install Balcony Handrail on Rear Elev.
Nos.
95
15.00
6.33
2.250
1 Mason 1 Helper .25 Operator
14.25
12
1.19
Z2V33-5430
Decorative GRC Panels W/ Epoxy Paint @ R. Elev.
Nos.
22
2.00
11.00
2.500
1 Carpente r1 Helper .5 Operator
27.50
10
2.75
1.56
12
0.13
133.70
14
28.39
2
14.20
7.10
7.10
4.50
4
1.13
0.56
0.56
2.25
10
0.23
0.10
0.10
0.06
8.00
0.63
2.500
1,435.00
32.20
44.57
3.000
1 Carpente r1 Helper .5 Operator 3 Painter
688
48.46
14.20
2.000
1 Mason 1 Helper
18
8.00
2.25
2.000
Nos.
15
15.00
1.00
2.250
Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.
Nos.
1
2.00
0.50
2.500
1 Carpente r1 Helper .5 Operator
1.25
8
0.16
External Painting Works on Right Side Elevation Snagging & Desnagging For Finishes @ GF Handing-Over For Finishes @ GF Snagging & Desnagging For Finishes @ 1F Handing-Over For Finishes @ 1F Snagging & Desnagging For Finishes @ 2F Handing-Over For Finishes @ 2F Snagging & Desnagging For Finishes @ 3F Handing-Over For Finishes @ 3F Snagging & Desnagging For Finishes @ 4F Handing-Over For Finishes @ 4F Snagging & Desnagging For Finishes @ 5F Handing-Over For Finishes @ 5F Snagging & Desnagging For Finishes @ Roof Floor Handing-Over For Finishes @ Roof Floor Power On (By DEWA) Precommissioning & Startup Availability of Chilled Water (By Others) Testing & Final Commissioning Snagging & Desnagging For External Finishes Handing-Over For External Finishes Completion of Fdn./Superstructure -Building # 33 Completion of External Works for Building # 33 Completion of MEP Works for Building # 33 Completion of Finishes for Building # 33 Completion of Fdn./SuperStruc. for Phase-2 BLDG. Completion of External Works for Phase-2 BLDG. Completion of MEP Works for Phase-2 BLDG. Completion of Finishes for Phase-2 BLDG. Completion Milestone for Phase-2 Buildings
M2 Item Item Item Item Item Item Item Item Item Item Item Item Item Item
32.20
21.93
3.000
3 Painter
65.78
12
5.48
Item Item Item Item
706 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 1 1 1 1
Item Item Item
1 1 1
Item Item
1 1
Z2V33-5440
Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.
LM
5
Z2V33-5450
External Painting Works on Rear Elevation
M2
Z2V33-5460
Ext. Plaster Access. & Rush on Rightside Elev.
M2
Z2V33-5470
Ext. Plaster Works on Right Side Elevation
M2
Z2V33-5480
Install Balcony Handrail on Rigthside Elev.
Z2V33-5490
Z2V33-5500 Z2V33-5510 Z2V33-5520 Z2V33-5530 Z2V33-5540 Z2V33-5550 Z2V33-5560 Z2V33-5570 Z2V33-5580 Z2V33-5590 Z2V33-5600 Z2V33-5610 Z2V33-5620 Z2V33-5630 Z2V33-5640 Z2V33-5650 Z2V33-5660 Z2V33-5670 Z2V33-5680 Z2V33-5690 Z2V33-5700 Z2V33-5710 Z2V33-5720 Z2V33-5730 Z2V33-5740 Z2V33-5750 Z2V33-5760 Z2V33-5770 Z2V33-5780 Z2V33-5790
1 Mason 1 Helper 1 Mason 1 Helper .25 Operator
30 10 30 10 30 10 30 10 30 10 30 10 1 21 1 35 12 2 1 1 1 1 0 0 0 0 0
54.60 16.40 32.20 48.46
0.53
0.13
0.250
.25 M. Crane
1.58
0.13
1.10
1.10
0.55
0.500
..5 M. Crane
5.50
0.55
0.05
0.05
0.03
0.500
.5 M. Crane
0.31
0.03
0.03
0.250
.25 M. Crane
0.25
0.03
0.03
0.500
..5 M. Crane
0.25
0.03
0.53
9.55
9.55
0.06
5.48