AMSC PRODUCTIVITY RATE I tem

Activity

Activity

SUB

ID

Description

ACTIVIT Y

Unit

Prod. Rate

QTY

Tot. Man

Days

Manpo Crew Tot. MOD (O) wer/da Desc. days y

(unit/day )

SITEWORKS Z0U34-0000

Site Clearing

Z0U34-0010

Setting-out / Layout

1,502.00

4,200.00

0.36

2.000

1 Operator 1 Helper

0.72

1

0.72

M

160.08

76.00

2.11

3.000

2 Carpenter 1 Helper

6.32

1

6.32

M3

953.00

409.50

2.33

2.000

1 Operator 1 Helper

4.65

2

2.33

1.61

0.75 Operator 8.250 6 Driver 1.5 Helper

13.25

3

4.42

M2

SUBSTRUCTURE Z0U34-0020

Excavation for footings + Disposal of Materials

For Excavation For Disposal

M3

555.00

345.60

5

Z0U34-0030

Formation Level & Compaction

M3

238

252.00

0.94

.75 Operator

6.250 4 Driver

5.90

2

2.95

1.5 Helper

Z0U34-0040

Anti-Termite Applications (Under PCC Footings)

M2

571

202.50

2.82

1.000

2 Technican

2.82

1

2.82

Z0U34-0050

Backfill & Compaction upto bot. of PCC Tie-Beam

M3

268

252.00

1.06

8.250

0.75 Operator 6 Driver 1.5 Helper

8.77

7

1.25

Z0U34-0060

Anti-Termite Applications (Under PCC Tie-Beam)

M2

37

202.50

0.18

1.000

2 Technican

0.18

1

0.18

Z0U34-0070

Backfill & Compaction up to bot of PCC Grd. Slab

M3

2,332.00

252.00

9.25

8.250

0.75 Operator 6 Driver 1.5 Helper

76.35

3

25.45

Z0U34-0080

Anti-Termite Applications (Under PCC Grade Slab)

M2

894

202.50

4.41

1.000

2 Technican

4.41

1

4.41

1 Mason 10 Helper 1 Mason 10 Helper

40.01

2

20.00

91.50

2

45.75

Z0U34-0090

Shutters + 50mm Thk. PCC Under Footings

M2

982

270.00

3.64

11.000

Z0U34-0100

50mm Protection Screed (Over W.P. Membrane-Ftg.)

M2

2,246.00

270.00

8.32

11.000

Z0U34-0110

RCC For Footings

Casting

M3

244

180.00

1.36

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

35.24

1

35.24

Formworks

M2

976.00

12.00

81.33

3.056

2 Carpenter 1 Helper .056 Operator

248.55

4

62.14

Rebars

kg

43,920.00

250.00

175.68

2.056

1 Steel Fixer 1 Helper .056 Operator

361.20

3

120.40

Page 1 of 63

Deshutterin g

M2

976.00

35.00

27.89

3.056

2 Carpenter 1 Helper .056 Operator

85.22

2

42.61

10 Z0U34-0120

RCC Necks Columns / Walls + MEP Sleeves

81.00

1.90

22.000

616.00

4.00

154.00

3.056

kg

27,720.00

200.00

138.60

M2

616.00

28.00

Casting

M3

Formworks

M2

Rebars

Deshutterin g

154

2 Carpenter 16 Helper 4 Mason

41.83

1

41.83

2 Carpenter 1 Helper .056 Operator

470.62

5

94.12

2.056

1 Steel Fixer 1 Helper .056 Operator

284.96

4

71.24

22.00

3.056

2 Carpenter 1 Helper .056 Operator

67.23

2

33.62

12 Z0U34-0130

Shutters + 50mm Thk. PCC Under Tie-Beams

M2

63

270.00

0.23

11.000

Z0U34-0140

50mm Screed (Over W.P. Membrane-T.B.)

M2

144

270.00

0.53

11.000

Z0U34-0150

RCC Tie Beams + MEP Sleeves

Casting

M3

Formworks

M2

33

132.00

1 Mason 10 Helper 1 Mason 10 Helper

2.57

2

1.28

5.87

2

2.93

4.03

1

4.03

180.00

0.18

22.000

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

4.00

33.00

3.056

2 Carpenter 1 Helper .056 Operator

100.85

4

25.21

48.85

3

16.28

14.41

2

7.20

Rebars

kg

5,940.00

250.00

23.76

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

132.00

28.00

4.71

3.056

2 Carpenter 1 Helper .056 Operator

0.12

1

0.12

10

Z0U34-0160

RCC Kickers Over Tie-Beam

Casting

M3

Formworks

M2

Rebars

kg

Page 2 of 63

1

4.00

180.00

180.00

0.01

22.000

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

4.00

1.00

3.056

2 Carpenter 1 Helper .056 Operator

3.06

1

3.06

2.056

1 Steel Fixer 1 Helper .056 Operator

1.48

1

1.48

250.00

0.72

Deshutterin g

M2

4.00

28.00

0.14

3.056

2 Carpenter 1 Helper .056 Operator

0.44

1

0.44

4 Z0U34-0170

50mm Thk. PCC Under Grade Slab

M2

1,537.00

270.00

5.69

11.000

1 Mason 10 Helper

62.62

2

31.31

Z0U34-0180

Mesh + Filler Board & RCC For Grade Slab

M3

208

180.00

1.16

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

30.04

3

10.01

Z0U34-0190

50mm Thk. PCC Steps & Ramps

M2

10

270.00

0.04

11.000

1 Mason 10 Helper

0.41

2

0.20

Z0U34-0200

Steps & Ramps Works + Place Conc.

M3

5

180.00

0.03

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

0.72

8

0.09

Z0U34-0210

Waterproofing Membrane (Over PCC Footings)

M2

1,047.00

152.00

6.89

6.000

4 Waterproofe r 2 Helper

41.33

2

20.66

Z0U34-0220

Water Proofing For Neck Column & Wall & Footing

M2

2,021.00

152.00

13.30

6.000

4 Waterproofe r 2 Helper

79.78

3

26.59

Z0U34-0230

Waterproofing Membrane (Over PCC Tie-beams)

M2

67

152.00

0.44

6.000

4 Waterproofe r 2 Helper

2.64

2

1.32

Z0U34-0240

Waterproofing Membrane For Tie Beams

M2

121

152.00

0.80

6.000

4 Waterproofe r 2 Helper

4.78

3

1.59

Z0U34-0250

50mm Thk. PCC Under Base of Tank

M2

77

270.00

0.29

11.000

1 Mason 10 Helper

3.14

1

3.14

Z0U34-0260

Waterproofing Membrane (Over PCC - Base)

M2

82

152.00

0.54

6.000

4 Waterproofe r 2 Helper

3.24

1

3.24

Z0U34-0270

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

176

270.00

0.65

11.000

1 Mason 10 Helper

7.17

1

7.17

5.49

1

5.49

Z0U34-0280

RCC Water Tank Base + Deshuttering

Casting

M3

Formworks

M2

38

152.00

180.00

0.21

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

12.00

12.67

3.056

2 Carpenter 1 Helper .056 Operator

38.71

1

38.71

56.25

1

56.25

13.27

1

13.27

Rebars

kg

6,840.00

250.00

27.36

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

152.00

35.00

4.34

3.056

2 Carpenter 1 Helper .056 Operator

4 Z0U34-0290

RCC Wall W/MEP Pipes & Water Stop + Deshuttering

Casting

M3

Page 3 of 63

34

81.00

0.42

22.000

2 Carpenter 16 Helper 4 Mason

9.23

1

9.23

Formworks

M2

136.00

4.00

34.00

3.056

2 Carpenter 1 Helper .056 Operator

103.90

2

51.95

62.91

1

62.91

14.84

1

14.84

Rebars

kg

6,120.00

200.00

30.60

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

136.00

28.00

4.86

3.056

2 Carpenter 1 Helper .056 Operator

1.16

1

1.16

5

Z0U34-0300

RCC Top Slab + Deshuttering for Water Tank

Casting

M3

8.00

180.00

0.04

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter 1 Helper .056 Operator

7.64

2

3.82

14.80

1

14.80

3.82

1

3.82

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

40.00

32.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

6.79

2

3.39

5 Z0U34-0310

Water Proofing Membrane all around outside surfc

M2

172

152.00

1.13

6.000

4 Waterproofe r 2 Helper

Z0U34-0320

Protection Board all around outside surface

M2

172

152.00

1.13

6.000

4 Waterproofe r 2 Helper

6.79

2

3.39

Z0U34-0330

Backfill around Water tank walls

M3

6

252.00

0.02

8.250

0.75 Operator 6 Driver 1.5 Helper

0.20

3

0.07

Z0U34-0340

G.R.P. Lining around inside + S.S. Lader & Door

M2

221

20.00

11.05

2.000

22.10

3

7.37

Z0U34-0350

50mm Thk. PCC Under Base of Elevator Shaft

M2

14

270.00

0.05

11.000

0.57

1

0.57

Z0U34-0360

Waterproofing Membrane (Over PCC - Base)

M2

15

152.00

0.10

6.000

4 Waterproofe r 2 Helper

0.59

1

0.59

Z0U34-0370

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

32

270.00

0.12

11.000

1 Mason 10 Helper

1.30

1

1.30

Z0U34-0380

RCC Elevator Shaft Base + Deshuttering

Casting

M3

7

180.00

0.04

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

1.01

1

1.01

Formworks

M2

12.00

2.33

3.056

2 Carpenter 1 Helper .056 Operator

7.13

1

7.13

Page 4 of 63

28.00

1 Mason 1 Helper 1 Mason 10 Helper

Rebars

kg

1,260.00

250.00

5.04

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

28.00

35.00

0.80

3.056

2 Carpenter 1 Helper .056 Operator

10.36

1

10.36

2.44

1

2.44

4 Z0U34-0390

RCC Wall W/ MEP Cond. + Deshuttering

Casting

M3

Formworks

M2

4

16.00

81.00

0.05

22.000

4.00

4.00

3.056

2 Carpenter 16 Helper 4 Mason

1.09

1

1.09

2 Carpenter 1 Helper .056 Operator

12.22

2

6.11

7.40

1

7.40

1.75

1

1.75

Rebars

kg

720.00

200.00

3.60

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

16.00

28.00

0.57

3.056

2 Carpenter 1 Helper .056 Operator

2.37

3

0.79

5 Z0U34-0400

Water Proofing Membrane all around outside surfc

M2

60

152.00

0.39

6.000

4 Waterproofe r 2 Helper

Z0U34-0410

Protection Board all around outside surface

M2

216

152.00

1.42

6.000

4 Waterproofe r 2 Helper

8.53

2

4.26

Z0U34-0420

Backfill around the Lift's Pit wall

M3

9.89

252.00

0.04

8.250

0.75 Operator 6 Driver 1.5 Helper

0.32

3

0.11

Z0U34-0430

RCC For Wall/Col. From Top of Grade Slab-1L

Casting

M3

251

81.00

3.10

22.000

68.17

1

68.17

Formworks

M2

1,004.00

4.00

251.00

3.056

2 Carpenter 1 Helper .056 Operator

767.06

5

153.41

Rebars

kg

45,180.00

200.00

225.90

2.056

1 Steel Fixer 1 Helper .056 Operator

464.45

4

116.11

Deshutterin g

M2

1,004.00

28.00

35.86

3.056

2 Carpenter 1 Helper .056 Operator

109.58

2

54.79

2 Carpenter 16 Helper 4 Mason

12 Z0U34-0440

Columns From Top of Grade Slab-1L (Canopy)

Casting

M3

Page 5 of 63

1

81.00

0.01

22.000

2 Carpenter 16 Helper 4 Mason

0.27

1

0.27

Formworks

M2

4.00

4.00

1.00

3.056

2 Carpenter 1 Helper .056 Operator

3.06

2

1.53

1.85

2

0.93

0.44

1

0.44

Rebars

kg

180.00

200.00

0.90

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

4.00

28.00

0.14

3.056

2 Carpenter 1 Helper .056 Operator

33.37

1

33.37

6

Z0U34-0450

RCC Slab / Beam - 1L

Casting

M3

231.00

180.00

1.28

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

Formworks

M2

1,155.00

16.00

72.19

3.056

2 Carpenter 1 Helper .056 Operator

220.61

6

36.77

427.44

5

85.49

110.30

2

55.15

Rebars

kg

41,580.00

200.00

207.90

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

1,155.00

32.00

36.09

3.056

2 Carpenter 1 Helper .056 Operator

14 Z0U34-0460

RCC For Stair/Landings @ G.L. - 1L

81.00

0.10

22.000

40.00

4.00

10.00

3.056

kg

1,440.00

200.00

7.20

M2

40.00

28.00

1.43

Casting

M3

Formworks

M2

Rebars

Deshutterin g

8

2 Carpenter 16 Helper 4 Mason

2.17

1

2.17

2 Carpenter 1 Helper .056 Operator

30.56

4

7.64

2.056

1 Steel Fixer 1 Helper .056 Operator

14.80

3

4.93

3.056

2 Carpenter 1 Helper .056 Operator

4.37

2

2.18

1.16

1

1.16

7.64

4

1.91

10

Z0U34-0470

RCC Canopy

Casting

M3

8.00

180.00

0.04

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter 1 Helper .056 Operator

Page 6 of 63

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

40.00

32.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

14.80

3

4.93

3.82

1

3.82

9 Z0U34-0480

RCC For Wall/Col. From Top of 1L-2L

Casting

M3

Formworks

M2

237

948.00

81.00

2.93

22.000

4.00

237.00

3.056

2 Carpenter 16 Helper 4 Mason

64.37

1

64.37

2 Carpenter 1 Helper .056 Operator

724.27

5

144.85

438.54

4

109.64

103.47

2

51.73

Rebars

kg

42,660.00

200.00

213.30

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

948.00

28.00

33.86

3.056

2 Carpenter 1 Helper .056 Operator

33.80

1

33.80

12

Z0U34-0490

RCC Slab / Beam - 2L

Casting

M3

234.00

180.00

1.30

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

Formworks

M2

1,170.00

16.00

73.13

3.056

2 Carpenter 1 Helper .056 Operator

223.47

6

37.25

Rebars

kg

42,120.00

200.00

210.60

2.056

1 Steel Fixer 1 Helper .056 Operator

432.99

5

86.60

Deshutterin g

M2

1,170.00

32.00

36.56

3.056

2 Carpenter 1 Helper .056 Operator

111.74

2

55.87

14 Z0U34-0500

RCC for Stair/Landings @ 1L-2L

Casting

M3

Formworks

M2

Rebars

kg

Page 7 of 63

7

81.00

0.09

22.000

35.00

4.00

8.75

3.056

1,260.00

200.00

6.30

2.056

2 Carpenter 16 Helper 4 Mason

1.90

1

1.90

2 Carpenter 1 Helper .056 Operator

26.74

4

6.69

1 Steel Fixer 1 Helper .056 Operator

12.95

3

4.32

Deshutterin g

M2

35.00

28.00

1.25

3.056

1,879.00

10.00

187.90

2.056

2 Carpenter 1 Helper .056 Operator

3.82

2

1.91

386.32

14

14.32

7

241.30

12

20.11

141.52

14

10.11

23.23

2

11.62

145.35

14

10.38

269.34

14

19.24

22.74

14

1.62

64.03

10

6.40

FINISHES 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator

Z0U34-2710

I. Hollow Block Works + Lintels @ Grnd Flr.

M2

Z0U34-2720

I. Internal Plaster Accessories & Rush @ GL

M2

347.00

48.46

7.16

2.000

Z0U34-2730

I. Internal Plaster Works @ GL

M2

2,413.00

20.00

120.65

2.000

Z0U34-2740

I. Glazed Ceramic Tile @ GL

M2

826

12.00

68.83

2.056

Z0U34-2750

I. Block Works For Ducts @ Grnd Flr.

M2

113

10.00

11.30

2.056

Z0U34-2760

I. Install False Ceiling (Susp. + Boarding) @ GL

M2

509

7.20

70.69

2.056

Z0U34-2770

I. Screed + Ceramic Tiles & Skirtings @ GL

M2

1572

12.00

131.00

2.056

Z0U34-2780

I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL

M2

354

32.00

11.06

2.056

Z0U34-2790

I. Water Proofing + Screed on Wet Areas - GL

M2

683

64.00

10.67

6.000

Z0U34-2800

I. Frames Installations @ GL

Nos.

59

4.80

12.29

2.056

1 Carpenter 1 Helper .056 Operator

25.27

14

1.81

Z0U34-2810

I. Doors w/ Ironmongery @ GL

Nos.

59

4.80

12.29

2.056

1 Carpenter 1 Helper .056 Operator

25.27

12

2.11

Z0U34-2820

I. Frames Installation Works @ GL

M2

108

4.80

22.50

2.056

1 Carpenter 1 Helper .056 Operator

46.26

14

3.30

138.78

12

11.57

1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper

27.59 2.05

108

1.60

67.50

2.056

1 Alum. Tech 1 Helper .056 Operator

Nos.

14

0.60

23.33

2.056

1 Carpenter 1 Helper .056 Operator

47.97

14

3.43

I. Wardrobes @ GL

Nos.

17

0.75

22.67

2.056

1 Carpenter 1 Helper .056 Operator

46.60

14

3.33

I. Primer Application Works @ GL I. Stucco Application Works @ GL

M2 M2

54.60 16.40

15.82 52.68

1.000 1.000

15.82 52.68

10 14

1.58 3.76

Z0U34-2830

I.Aluminum + Glass & Other Associated Works @ GL

M2

Z0U34-2840

I. Kitchen Cabinets @ GL

Z0U34-2850 Z0U34-2860 Z0U34-2870

Page 8 of 63

864.00 864.00

1 Painter 1 Painter

Z0U34-2880

I. Emulsion Paint Works @ GL

M2

1,626.00

32.20

50.50

1.000

Z0U34-2890

O. Plaster Accessories & Rush @ GL

M2

52

48.46

1.07

2.000

Z0U34-2900

O. Plaster Works @ GL

M2

316

20.00

15.80

2.000

Z0U34-2910

O. Polished Marble & Ceramic for Wall @ GL

M2

37

10.00

3.70

2.056

Z0U34-2920

O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.

M2

16

10.00

1.60

2.056

Z0U34-2930

O. Gypsum Board +Washable Paint @ GL

M2

66

16.00

4.13

2.056

Z0U34-2940

O. Semi Recessed G.R.G. Tiles @ GL

M2

36

16.00

2.25

2.056

Z0U34-2950

O. Sreed + Graniti Tiles & Skirtings @ GL

M2

514

12.00

42.83

2.056

Z0U34-2960

O. Screed + Polished Marble & Skirtings @ GL

M2

148

12.00

12.33

2.056

Z0U34-2970

O. G. Stl, Powdr coated Railin to Staircase @ GL

LM

24

20.00

1.20

2.056

Z0U34-2980 Z0U34-2990 Z0U34-3000

O. Primer ApplicationWorks @ GL. O. Stucco Application Works @ GL O. Emulsion Paint Works @ GL

M2 M2 M2

109 109 58

54.60 16.40 32.20

2.00 6.65 1.80

1.000 1.000 1.000

Z0U34-3010

I. Hollow Block Works + Lintels @ 1st Flr.

M2

1,950.00

10.00

195.00

2.056

Z0U34-3020

I. Internal Plaster Accessories & Rush @ 1L

M2

347.00

48.46

7.16

2.000

Z0U34-3030

I. Internal Plaster Works @ 1L

M2

2,581.00

20.00

129.05

2.000

Z0U34-3040

I. Glazed Ceramic Tile @ 1L

M2

735

12.00

61.25

2.056

Z0U34-3050

I. Block Works For Ducts @ 1st Flr.

M2

93

10.00

9.30

2.056

Z0U34-3060

I. Install False Ceiling (Susp. + Boarding) @ 1L

M2

476

7.20

66.11

2.056

Z0U34-3070

I. Screed + Ceramic Tiles & Skirtings @ 1L

M2

1746

12.00

145.50

2.056

Z0U34-3080

I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L

M2

269

32.00

8.41

2.056

Z0U34-3090

I. Water Proofing + Screed on Wet Areas - 1L

M2

683

64.00

10.67

6.000

Page 9 of 63

50.50

12

4.21

2.15

7

0.31

31.60

12

2.63

7.61

14

0.54

3.29

2

1.64

1 Carpenter 1 Helper .056 Operator

8.48

14

0.61

1 Carpenter 1 Helper .056 Operator

4.63

14

0.33

88.07

14

6.29

25.36

14

1.81

2.47

10

0.25

2.00 6.65 1.80

8 12 10

0.25 0.55 0.18

400.92

14

28.64

14.32

7

258.10

12

21.51

125.93

14

9.00

19.12

2

9.56

135.92

14

9.71

299.15

14

21.37

17.28

8

2.16

64.03

10

6.40

1 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper

2.05

Z0U34-3100

I. Frames Installations @ 1L

Nos.

72

4.80

15.00

2.056

1 Carpenter 1 Helper .056 Operator

30.84

14

2.20

Z0U34-3110

I. Doors w/ Ironmongery @ 1L

Nos.

72

4.80

15.00

2.056

1 Carpenter 1 Helper .056 Operator

30.84

12

2.57

Z0U34-3120

I. Frames Installation Works @ GL

M2

100

4.80

20.83

2.056

1 Carpenter 1 Helper .056 Operator

42.83

14

3.06

128.50

12

10.71

100

1.60

62.50

2.056

1 Alum. Tech 1 Helper .056 Operator

Nos.

17

0.75

22.67

2.056

1 Carpenter 1 Helper .056 Operator

46.60

14

3.33

I. Kitchen Cabinets @ 1L

Nos.

15

0.60

25.00

2.056

1 Carpenter 1 Helper .056 Operator

51.40

14

3.67

I. Primer Application Works @ 1L I. Stucco Application Works @ 1L I. Emulsion Paint Works @ 1L

M2 M2 M2

54.60 16.40 32.20

15.66 52.13 51.21

1.000 1.000 1.000

1 Painter

15.66 52.13 51.21

12 14 14

1.30 3.72 3.66

1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator

Z0U34-3130

I. Aluminum+Glass & Other Associated Works @ 1L

M2

Z0U34-3140

I. Wardrobes @ 1L

Z0U34-3150 Z0U34-3160 Z0U34-3170 Z0U34-3180

855.00 855.00 1,649.00

Z0U34-3190

O. Plaster Accessories & Rush @ 1L

M2

52

48.46

1.07

2.000

Z0U34-3200

O. Plaster Works @ 1L

M2

297

20.00

14.85

2.000

Z0U34-3210

O. Polished Marble & Ceramic for Wall @ 1L

M2

36

10.00

3.60

2.056

Z0U34-3220

O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.

M2

14

10.00

1.40

2.056

Z0U34-3230

O. Gypsum Board +Washable Paint @ 1L

M2

66

16.00

4.13

2.056

Z0U34-3240

O. Semi Recessed G.R.G. Tiles @ 1L

M2

36

16.00

2.25

2.056

Z0U34-3250

O. Sreed + Graniti Tiles & Skirtings @ 1L

M2

425

12.00

35.42

2.056

Z0U34-3260

O. Screed + Polished Marble & Skirtings @ 1L

M2

48

12.00

4.00

2.056

Z0U34-3270

O. G. Stl, Powdr coated Railin to Staircase @ 1L

LM

26

20.00

1.30

2.056

Z0U34-3280 Z0U34-3290 Z0U34-3300

O. Primer Application Works @ 1L O. Stucco Application Works @ 1L O. Emulsion Paint Works @ 1L

M2 M2 M2

103 103 58

54.60 16.40 32.20

1.89 6.28 1.80

1.000 1.000 1.000

Page 10 of 63

1 Painter 1 Painter

2.15

7

0.31

29.70

12

2.48

7.40

14

0.53

2.88

2

1.44

1 Carpenter 1 Helper .056 Operator

8.48

14

0.61

1 Carpenter 1 Helper .056 Operator

4.63

14

0.33

72.82

14

5.20

8.22

14

0.59

2.67

10

0.27

1.89 6.28 1.80

8 10 12

0.24 0.63 0.15

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter

Z0U34-4240 Z0U34-4250 Z0U34-4260 Z0U34-4270 Z0U34-4280 Z0U34-4290 Z0U34-4300 Z0U34-4310 Z0U34-4320 Z0U34-4330 Z0U34-4340 Z0U34-4350 Z0U34-4360 Z0U34-4370 Z0U34-4380 Z0U34-4390 Z0U34-4400 Z0U34-4410 Z0U34-4420 Z0U34-4430 Z0U34-4440 Z0U34-4450 Z0U34-4460 Z0U34-4470

Roof Drain & Access.+ Lightweight Concrete One Coat Cold Bituminous Primer 2 Layers of SBS W.P. Membrane + Water Test Alum. Foil Covering Fixed to Upstand w/ Sealant 50mm Thk. Extruded Polystyrene Insulation Protection Layer 18mm-25mm Round Aggregates (50mm Thk.) 1mm Thk. Alum. Flashing Fixed into Conc. Upstand Sealant Application Around top of Alum. Flashing Channel & Rails Installation for Lifts Cabin Assembly / Installation for lifts Machine Installation for lifts Doors Installation for lifts Connections To Ele + Finishing Touches for lifts Installation of Chute Tubes and Intake Throats Install Intake Doors, Chute Vent & Accessories Install Ground Floor Offset + Fire Shutter Door Install Compactor with MCP Installation of Garbage Container Final Test & Comm. Installation of Window Cleaning Eqmt. Primer Application Works @ Roof Deck Stucco Application Works @ Roof Deck Emulsion / Epoxy Paint Works @ Roof Deck

M2 M2 M2 LM M2 M2 M2 M2 M2 Items Items Items Items Items Item Item Item Item Item Item Item M2 M2 M2

281.00 13.00 268.00 107 268.00 268.00 268.00 107 107 2 2 2 2 2 1 1 1 1 1 1 1 50 50 55

7 2 6 3 2 2 4 3 2 14 10 7 10 12 8 4 2 1 1 3 14

54.60 16.40 32.20

0.92 3.05 1.71

1.000 1.000 1.000

1 Painter 1 Painter 1 Painter

315.00

22.66

2.000

1 Operator 1 Helper

5.63

9.60

5.000

2 Carpenter 1 Mason 1 Helper 1 Operator

91.07

76.00

1.20

6.000

M2

13.21

60.00

0.22

1.250

Backfilling Works

M3

7,125.36

601.00

11.86

7.500

Z0U34-4530 Z0U34-4540 Z0U34-4550 Z0U34-4560 Z0U34-4570 Z0U34-4580 Z0U34-4590 Z0U34-4600

Instl Drainage Pipes &Con. To Existing Chambers Instl Water Supply Pipes&Con. To Existg Chambers Instl Chilled Water Pipes&Con. To Existg Chamber Instl Central Gas Pipes &Con. To Existg Chambers Instl Telephone Ducts &Con. To Existing Chambers Laying of Power cables (By Others) Hardscaping Works Landscaping Works

Item Item Item Item Item Item Item Item

Z0U34-4610

Ext. Plaster Accessories & Rush on Front Elev.

M2

1,484.00

Z0U34-4620

Ext. Plaster Works on Front Elevation

M2

19.00

Z0U34-4630

Install Balcony Handrail on Front Elev.

Nos.

Z0U34-4640

Decorative GRC Panels W/ Epoxy Paint @ F. Elev.

Nos.

Z0U34-4480

Excavation Works External

M3

Z0U34-4490

RCC Manholes / Gully Traps

Nos.

Z0U34-4500

Water Proofing

M2

Z0U34-4510

Sand Bedding

Z0U34-4520

Page 11 of 63

7,137.50

54

4Waterproof er 2 Helper 1 Helper 0.25 Operator

1.5 Operator 3 Driver 3 Helper

0.92 3.05 1.71

8 10 12

0.11 0.30 0.14

45.32

5

9.06

48.00

14

3.43

7.19

12

0.60

0.28

10

0.03

88.92

14

6.35

1 1 1 1 1 1 1 1

14 12 14 12 10 7 14 12

48.46

30.62

2.000

8.00

2.38

2.000

35

15.00

2.33

2.250

17

2.00

8.50

2.500

1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator 1 Carpenter 1 Helper .5 Operator

61.25

2

30.62

4.75

4

1.19

5.25

12

0.44

21.25

10

2.13

Z0U34-4650

Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.

LM

5

Z0U34-4660

External Painting Works on Front Elevation

M2

1,503.00

1 Carpenter 1 Helper .5 Operator

1.56

12

0.13

3.000

3 Painter

140.03

14

10.00

1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator

25.01

2

12.51

4.75

4

1.19

-

10

0.00

-

8

0.00

8.00

0.63

2.500

32.20

46.68

48.46

12.51

2.000

19

8.00

2.38

2.000

Nos.

0

15.00

-

2.250

Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.

Nos.

0

2.00

-

2.500

Z0U34-4710

External Painting Works on Left Side Elevation

M2

625

32.20

19.41

3.000

Z0U34-4720

Ext. Plaster Accessories & Rush on Rear Elev.

M2

1,503.00

48.46

31.02

2.000

Z0U34-4730

Ext. Plaster Works on Rear Elevation

M2

19.00

8.00

2.38

2.000

Z0U34-4740

Install Balcony Handrail on Rear Elev.

Nos.

35

15.00

2.33

2.250

Z0U34-4750

Decorative GRC Panels W/ Epoxy Paint @ R. Elev.

Nos.

17

2.00

8.50

2.500

Z0U34-4760

Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.

LM

5

8.00

0.63

2.500

Z0U34-4770

External Painting Works on Rear Elevation

M2

1,503.00

32.20

46.68

Z0U34-4780

Ext. Plaster Access. & Rush on Rightside Elev.

M2

606

48.46

12.51

Z0U34-4790

Ext. Plaster Works on Right Side Elevation

M2

19

8.00

2.38

2.000

Z0U34-4800

Install Balcony Handrail on Rigthside Elev.

Nos.

0

15.00

-

2.250

Z0U34-4810

Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.

Nos.

0

2.00

-

2.500

1 Carpenter 1 Helper .5 Operator

Z0U34-4820 Z0U34-4830 Z0U34-4840 Z0U34-4850 Z0U34-4860 Z0U34-4870 Z0U34-4880 Z0U34-4890 Z0U34-4900 Z0U34-4910 Z0U34-4920 Z0U34-4930 Z0U34-4940 Z0U34-4950 Z0U34-4960 Z0U34-4970 Z0U34-4980 Z0U34-4990 Z0U34-5000 Z0U34-5010 Z0U34-5020 Z0U34-5030

External Painting Works on Right Side Elevation Snagging & Desnagging For Finishes @ GF Handing-Over For Finishes @ GF Snagging & Desnagging For Finishes @ 1F Handing-Over For Finishes @ 1F Snagging & Desnagging For Finishes @ 2F Handing-Over For Finishes @ 2F Snagging & Desnagging For Finishes @ 3F Handing-Over For Finishes @ 3F Snagging & Desnagging For Finishes @ 4F Handing-Over For Finishes @ 4F Snagging & Desnagging For Finishes @ Roof Floor Handing-Over For Finishes @ Roof Floor Power On (By DEWA) Precommissioning & Startup Availability of Chilled Water (By Others) Testing & Final Commissioning Snagging & Desnagging For External Finishes Handing-Over For External Finishes Completion of Fdn./Superstructure -Building # 34 Completion of External Works for Building # 34 Completion of MEP Works for Building # 34

M2 Item Item Item Item Item Item Item Item Item Item Item Item

625 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 1 1 1 1 0

3.000

3 Painter

Z0U34-4670

Ext. Plaster Access. & Rush on Leftside Elev.

M2

606

Z0U34-4680

Ext. Plaster Works on Left Side Elevation

M2

Z0U34-4690

Install Balcony Handrail on Leftside Elev.

Z0U34-4700

Item Item Item Item

Page 12 of 63

32.20

19.41

1 Carpenter 1 Helper .5 Operator

58.23

12

62.03

2

31.02

4.75

4

1.19

5.25

12

0.44

1 Carpenter 1 Helper .5 Operator

21.25

10

2.13

1 Carpenter 1 Helper .5 Operator

1.56

12

0.13

3.000

3 Painter

140.03

14

10.00

2.000

1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator

25.01

2

12.51

4.75

4

1.19

-

10

0.00

-

8

0.00

12

4.85

3 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator

58.23

30 10 30 10 30 10 30 10 30 10 30 10 1 21 1 35 12 2 1 1 1

4.85

Z0U34-5040 Z0U34-5050 Z0U34-5060 Z0U34-5070 Z0U34-5080 Z0U34-5090

Completion Completion Completion Completion Completion Completion

of Finishes for Building # 34 of Fdn./SuperStruc. for Phase-1 BLDG. of External Works for Phase-1 BLDG. of MEP Works for Phase-1 BLDG. of Finishes for Phase-1 BLDG. Milestone for Phase-1 Buildings

Item Item Item Item Item

1 1 1 0 1 1

1 0 0 0 0 0

54.60 16.40 32.20 48.46

Page 13 of 63

M

Carpenter

Mason

Steel Fixer

Helper

A

N - D

Operator

0.4 4.2

A

Y

Driver

Tot. Eqmt (X)

S Technicia n

Painter

Alum. Tech

Eqmt Desc.

Waterpro ofer

Tot. Edays (Z) (H x I)

E

Dozer

0.4

1.000 1 Dozer

0.36

0.36

0.5

0.5

1.000 1 Dozer

2.33

0.47

0.5

0.2

1.9

0.9

0.7

1.9

0.7

0.4

1.9

Shovel

Dump T.

B. Roller

Q

M

T - D

B. Cat

A

Y

S

S. Roller M. Crane

2.1

0.0

0.0

0.0

0.75 6.750 Shovel 6 D. Truck 0.0

0.0

0.0

10.84

0.0

0.47

4.750

0.5 Shovel 4 D. Truck .25 B. Roller

4.49

0.24

1.93

0.24

1.93

-

0.24

1.89

0.12

-

-

-

2.8

0.2

0.1

0.9

6.750

0.5 Shovel 6 D. Truck .25 B. Roller

7.18

0.11

0.86

0.05

6.750

0.5 Shovel 6 D. Truck .25 B. Roller

62.46

2.19

17.53

1.10

0.500

.5 Vibrator

0.68

0.2

4.6

2.3

18.5

4.4 1.8

18.2

4.2

41.6

16.3

17.6

8.1

0.5

0.056

.056 M. Crane

4.55

0.46

17.6

1.0

0.056

.056 M. Crane

9.84

0.98

Page 14 of 63

5.6 21.8

0.0

17.6

25.7

11.6

3.7 29.3

0.0

11.6

0.2

28.5

1.6

0.2

0.0

0.0

1.000

1 Vibrator

1.90

-

-

-

-

-

1.60

8.62

0.72

11.6

0.6

0.056

.056 M. Crane

7.76

0.65

1.8

0.1

0.056

.056 M. Crane

1.23

0.10

26.2

1.5

0.0

0.0

0.0

0.0

0.0

-

0.500

.5 Vibrator

0.09

-

-

-

-

-

1.47

3.3

0.2

0.056

.056 M. Crane

1.85

0.18

2.4

0.1

0.056

.056 M. Crane

1.33

0.13

0.5

0.0

0.056

.056 M. Crane

0.26

0.03

2.4

0.5

0.0

0.16

.056 M. Crane

2.7

0.0

0.0

1.56

0.056

0.3

0.9

0.0

.056 M. Crane

0.7

1.2

2.4

0.056

12.8

0.1

6.6

7.5

2.8

6.1

0.3

0.0

0.0

0.0

0.0

0.0

-

0.500

.5 Vibrator

0.00

-

-

-

-

-

0.34

0.3

0.0

0.056

.056 M. Crane

0.06

0.01

0.2

0.0

0.056

.056 M. Crane

0.04

0.01

Page 15 of 63

0.1

0.0 0.6

0.0

0.2

2.8

0.4

2.3

0.0

0.5

0.056

0.4

0.00

0.0

0.03

6.9

0.0

0.1

6.9

13.8

8.9

17.7

0.4

0.9

0.5

1.1

1.000

1 Vibrator

1.16

1.000

1 Vibrator

0.03

0.500

.5 Vibrator

0.11

2.9 1.1

0.7

2.2

6.5

6.3

6.8

2.2 0.0

0.01

0.2

0.3

8.5

.056 M. Crane

28.5

0.0

0.0

0.0

6.8

3.2

0.2

0.056

.056 M. Crane

0.71

0.18

6.8

0.4

0.056

.056 M. Crane

1.53

0.38

1.1

0.1

0.056

.056 M. Crane

0.24

0.06

11.1

0.6

0.0

0.0

0.0

0.0

0.0

1.000

Page 16 of 63

1 Vibrator

0.42

-

-

-

-

-

0.62

13.6

6.1

1.9 15.5

0.0

6.1

1.0

1.4

0.5 1.5

0.0

6.8

0.4

0.056

.056 M. Crane

1.90

0.38

6.1

0.3

0.056

.056 M. Crane

1.71

0.34

1.0

0.1

0.056

.056 M. Crane

0.27

0.05

13.9

0.8

0.0

0.0

0.0

-

1.000

1 Vibrator

0.04

-

-

-

-

-

0.78

0.0

0.056

.056 M. Crane

0.14

0.03

1.4

0.1

0.056

.056 M. Crane

0.40

0.08

0.3

0.0

0.056

.056 M. Crane

0.07

0.01

1.4

2.2

0.1

0.0

0.0

0.0

0.0

0.0

1.1

2.3

1.1

2.3

3.7

3.7

0.1

0.5

0.0

0.2

1.2

0.0

0.5

0.0

0.1

0.0

0.0

-

6.750

0.5 Shovel 6 D. Truck .25 B. Roller

0.16

0.500

.5 Vibrator

0.02

0.056

.056 M. Crane

0.13

-

0.01

-

0.05

-

-

-

0.12

0.00

0.4

1.2

0.6

0.0

Page 17 of 63

0.03

1.3

0.4 1.6

0.0

0.7

0.2 0.0

0.1

0.056

.056 M. Crane

0.28

0.07

0.2

0.0

0.056

.056 M. Crane

0.04

0.01

1.3

1.6

1.8

1.3

2.0

6.0 47.8

0.0

18.8

0.0

0.0

0.0

0.0

1.000

1 Vibrator

0.05

-

-

-

-

-

0.11

0.0

0.056

.056 M. Crane

0.22

0.04

0.7

0.0

0.056

.056 M. Crane

0.20

0.04

0.1

0.0

0.056

.056 M. Crane

0.03

0.01

1.6

0.1

0.0

0.0

0.0

0.0

0.0

0.3

0.5

1.4

2.8

0.0

18.8

0.0

0.8

0.7

41.8

0.1

0.0

0.1

-

6.750

0.5 Shovel 6 D. Truck .25 B. Roller

0.26

1.000

1 Vibrator

3.10

-

0.01

-

0.07

-

-

-

0.09

0.00

20.9

1.2

0.056

.056 M. Crane

14.06

1.17

18.8

1.1

0.056

.056 M. Crane

12.65

1.05

3.0

0.2

0.056

.056 M. Crane

2.01

0.17

42.7

2.4

0.0

0.0

0.0

0.0

0.0

1.000

Page 18 of 63

1 Vibrator

0.01

-

-

-

-

-

2.39

0.3

0.2

0.0 0.4

0.0

14.9

5.2 0.0

14.9

2.0

0.7

0.3 2.3

0.6

0.0

0.0

0.056

.056 M. Crane

0.06

0.01

0.2

0.0

0.056

.056 M. Crane

0.05

0.01

0.0

0.0

0.056

.056 M. Crane

0.01

0.00

0.2

10.3

15.5

0.2

0.3

0.0

0.0

0.0

0.0

0.0

0.0

-

1.000

1 Vibrator

1.28

-

-

-

-

-

0.02

5.2

0.3

0.056

.056 M. Crane

4.04

0.29

14.9

0.8

0.056

.056 M. Crane

11.64

0.83

2.6

0.1

0.056

.056 M. Crane

2.02

0.14

22.6

1.3

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

0.10

-

-

-

-

-

1.26

1.0

0.1

0.056

.056 M. Crane

0.56

0.06

0.7

0.0

0.056

.056 M. Crane

0.40

0.04

0.1

0.0

0.056

.056 M. Crane

0.08

0.01

0.7

1.9

0.3

0.1

0.0

0.0

0.0

0.0

0.0

0.0

-

1.000

1 Vibrator

0.04

0.056

.056 M. Crane

0.14

Page 19 of 63

-

-

-

-

-

0.10

0.02

0.8

0.3 0.8

0.0

17.8

5.6 0.0

17.8

10.4

15.0

5.2 15.7

0.0

0.0

0.056

.056 M. Crane

0.40

0.04

0.1

0.0

0.056

.056 M. Crane

0.07

0.01

0.8

39.5

45.1

0.8

15.0

1.8

0.6

1.2

0.1

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

-

-

-

-

-

0.07

2.93

19.8

1.1

0.056

.056 M. Crane

13.27

1.11

17.8

1.0

0.056

.056 M. Crane

11.94

1.00

2.8

0.2

0.056

.056 M. Crane

1.90

0.16

40.3

2.3

0.0

0.0

0.0

0.0

0.0

-

1.000

1 Vibrator

1.30

-

-

-

-

-

2.26

5.2

0.3

0.056

.056 M. Crane

4.10

0.29

15.0

0.8

0.056

.056 M. Crane

11.79

0.84

2.6

0.1

0.056

.056 M. Crane

2.05

0.15

22.9

1.3

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

0.09

-

-

-

-

-

1.28

0.9

0.0

0.056

.056 M. Crane

0.49

0.05

0.6

0.0

0.056

.056 M. Crane

0.35

0.04

Page 20 of 63

0.1

0.0

0.056

.056 M. Crane

0.07

13.4

13.4

0.8

0.056

.056 T. Crane

10.52

1.0

1.0

10.1

10.1

4.9

4.9

0.3

0.056

.056 T. Crane

3.85

5.7

5.7

0.3

0.056

.056 T. Crane

0.63

5.0

0.3

0.056

.056 T. Crane

3.96

9.4

9.4

0.5

0.056

.056 T. Crane

7.34

0.8

0.8

0.0

0.056

.056 T. Crane

0.62

0.3

5.0

2.1

4.3

0.9

0.9

0.0

0.056

.056 T. Crane

0.69

1.0

1.0

0.1

0.056

.056 T. Crane

0.69

1.6

1.6

0.1

0.056

.056 T. Crane

1.26

5.6

0.3

0.056

.056 T. Crane

3.78

1.7

1.7

0.1

0.056

.056 T. Crane

1.31

1.6

1.6

0.1

0.056

.056 T. Crane

1.27

5.6

1.6 3.8 Page 21 of 63

0.01

4.2 0.2

0.2

1.3

1.3

0.3

0.3

0.0

0.056

.056 T. Crane

0.21

0.8

0.8

0.0

0.056

.056 T. Crane

0.09

0.3

0.3

0.0

0.056

.056 T. Crane

0.23

0.2

0.2

0.0

0.056

.056 T. Crane

0.13

3.1

3.1

0.2

0.056

.056 T. Crane

2.40

0.9

0.9

0.0

0.056

.056 T. Crane

0.69

0.1

0.0

0.056

.056 T. Crane

0.07

0.8

0.056

.056 T. Crane

10.92

0.1 0.2 0.6 0.2

13.9

13.9

1.0

1.0

10.8

10.8

4.4

4.4

0.2

0.056

.056 T. Crane

3.43

4.7

4.7

0.3

0.056

.056 T. Crane

0.52

4.7

0.3

0.056

.056 T. Crane

3.70

10.4

10.4

0.6

0.056

.056 T. Crane

8.15

1.1

1.1

0.1

0.056

.056 T. Crane

0.47

4.7

2.1

4.3

Page 22 of 63

1.1

1.1

0.1

0.056

.056 T. Crane

0.84

1.3

1.3

0.1

0.056

.056 T. Crane

0.84

1.5

1.5

0.1

0.056

.056 T. Crane

1.17

5.2

0.3

0.056

.056 T. Crane

3.50

1.6

1.6

0.1

0.056

.056 T. Crane

1.27

1.8

1.8

0.1

0.056

.056 T. Crane

1.40

5.2

1.3 3.7 3.7 0.2

0.2

1.2

1.2

0.3

0.3

0.0

0.056

.056 T. Crane

0.20

0.7

0.7

0.0

0.056

.056 T. Crane

0.08

0.3

0.3

0.0

0.056

.056 T. Crane

0.23

0.2

0.2

0.0

0.056

.056 T. Crane

0.13

2.5

2.5

0.1

0.056

.056 T. Crane

1.98

0.3

0.3

0.0

0.056

.056 T. Crane

0.22

0.1

0.0

0.056

.056 T. Crane

0.07

0.1 0.2 0.6 0.2

Page 23 of 63

0.11 0.30 0.14

1.37

0.69

4.53

4.53

1.000

1 Excavato r

0.69

0.69

1.000

1 M. Crane

9.60

0.250

.25 Bob Cat

0.06

4.500

0.5 Shovel 3 Dump Truck .5 S. Roller .5 Bob Cat

0.20 0.02

2.54

0.85

22.66

0.69

0.40 0.01

1.27

2.54

53.35

0.01

0.42

2.54

0.42

0.42

15.31

15.31

0.59

0.59

0.19

0.19

0.05

0.250

.25 M. Crane

0.58

0.05

0.85

0.43

0.500

..5 M. Crane

4.25

0.43

Page 24 of 63

0.05

0.05

0.03

0.500

.5 M. Crane

0.31

0.03

10.00 6.25

6.25

0.59

0.59

-

-

-

-

0.250

.25 M. Crane

-

-

-

-

0.500

..5 M. Crane

-

-

4.85 15.51

15.51

0.59

0.59

0.19

0.19

0.05

0.250

.25 M. Crane

0.58

0.05

0.85

0.85

0.43

0.500

..5 M. Crane

4.25

0.43

0.05

0.05

0.03

0.500

.5 M. Crane

0.31

0.03

10.00 6.25

6.25

0.59

0.59

-

-

-

-

0.250

.25 M. Crane

-

-

-

-

0.500

..5 M. Crane

-

-

4.85

Page 25 of 63

Page 26 of 63

E

Q

M

T - D

A

Y

S

Vibrator Excavator

-

-

0.07

Page 27 of 63

Tower Crane

-

0.07

-

-

0.16

0.16

-

-

-

-

0.01

0.01

0.001

Page 28 of 63

0

0.39

0.01

-

-

-

-

0.03

0.03

-

0.08

Page 29 of 63

-

0.08

-

-

-

-

0.01

0.01

-

-

-

0.00

Page 30 of 63

0.00

-

-

-

-

0.01

0.01

-

-

0.26

0.26

-

0.00

Page 31 of 63

-

0.00

-

-

-

-

-

-

0.09

0.09 0.01

0.01

0.00

Page 32 of 63

0.00

-

-

-

-

-

-

0.24

0.24

0.09

0.09 0.01

Page 33 of 63

0.75

0.28

0.32

0.28

0.52

0.04

0.05

0.06

0.09

0.32

0.09

0.09

Page 34 of 63

0.01

0.04

0.02

0.01

0.17

0.05

0.01

0.78

0.25

0.26

0.26

0.58

0.06

Page 35 of 63

0.06

0.07

0.08

0.29

0.09

0.10

0.01

0.04

0.02

0.01

0.14

0.02

0.01

Page 36 of 63

4.53

Page 37 of 63

Page 38 of 63

Page 39 of 63

Activity

Activity

SUB

ID

Description

ACTIVITY

Unit

QTY (F)

Prod. Rate (G)

Days (H)

(unit/day)

(F/G)

Item

Tot. Man (I)

Crew Desc.

Tot. Mdays (K)

OD (O)

(H x I)

Manpower /day (N/O)

M Carpenter

Mason

Steel Fixer

Helper

A

N - D

Operator

A

Y

Driver

Tot. Eqmt (X)

S Technicia n

Painter

Alum. Tech

Eqmt Desc.

Waterpro ofer

Tot. Edays (Z) (H x I)

E Dozer

Shovel

Dump T.

B. Roller

Q

M

T - D

B. Cat

A

Y

S. Roller

S M. Crane

Vibrator Excavator

Tower Crane

SITEWORKS Z0U34-0000 Z0U34-0010

Site Clearing

M2

Setting-out / Layout

1,502.00

M

4,200.00

1 Operator

0.36

2.000 1 Helper

0.72

1

0.72

6.32

1

6.32

4.65

2

2.33

160.08

76.00

2.11

2 Carpenter 3.000 1 Helper

953.00

409.50

2.33

2.000 1 Helper

1.61

0.75 Operator 8.250 6 Driver 1.5 Helper

0.36 4.21

0.36

1.000 1 Dozer

0.36

0.36

0.47

1.000 1 Dozer

2.33

0.47

0.48

0.24

1.93

0.75 6.750 Shovel 6 D. Truck

0.95

0.71

1.93

2.11

SUBSTRUCTURE Z0U34-0020

Excavation for footings + Disposal of Materials

For M3 Excavation For Disposal

M3

555.00

345.60

1 Operator

13.25

3

0.47

4.42

5

Z0U34-0030

Formation Level & Compaction

M3

238

Z0U34-0040

Anti-Termite Applications (Under PCC Footings)

M2

571

252.00

202.50

0.94

2.82

.75 Operator 6.250 4 Driver 1.5 Helper

2.95

2 Technican

2.82

1

2.82

8.77

7

1.25

0.18

1

0.18

76.35

3

25.45

Z0U34-0050

Backfill & Compaction upto bot. of PCC Tie-Beam

M3

268

252.00

1.06

8.250

Z0U34-0060

Anti-Termite Applications (Under PCC Tie-Beam)

M2

37

202.50

0.18

1.000

2 Technican

8.250

0.75 Operator 6 Driver 1.5 Helper 2 Technican

Z0U34-0070

Backfill & Compaction up to bot of PCC Grd. Slab

M3

2,332.00

252.00

9.25

Z0U34-0080

Anti-Termite Applications (Under PCC Grade Slab)

M2

894

202.50

4.41

1.000

Z0U34-0090

Shutters + 50mm Thk. PCC Under Footings

M2

982

270.00

3.64

11.000

Z0U34-0100

50mm Protection Screed (Over W.P. Membrane-Ftg.)

M2

2,246.00

270.00

8.32

11.000

RCC For Footings

2

1.000

0.75 Operator 6 Driver 1.5 Helper

Z0U34-0110

5.90

-

1 Mason 10 Helper 1 Mason 10 Helper

1.82

18.19

4.16

41.59

45.75

35.24

1

35.24

976.00

12.00

81.33

3.056

2 Carpenter 1 Helper .056 Operator

248.55

4

62.14

kg

43,920.00

250.00

175.68

2.056

1 Steel Fixer 1 Helper .056 Operator

361.20

3

120.40

Deshutterin g

M2

976.00

35.00

27.89

3.056

2 Carpenter 1 Helper .056 Operator

85.22

2

42.61

Casting

M3

81.00

1.90

22.000

Formworks

M2

4.00

154.00

3.056

M2

Rebars

10 Z0U34-0120

RCC Necks Columns / Walls + MEP Sleeves

154

616.00

2 Carpenter 16 Helper 4 Mason

1

41.83

2 Carpenter 1 Helper .056 Operator

470.62

5

94.12

284.96

4

71.24

67.23

2

33.62

Rebars

kg

27,720.00

200.00

138.60

2.056

Deshutterin g

M2

616.00

28.00

22.00

3.056

2 Carpenter 1 Helper .056 Operator

12 Z0U34-0130

Shutters + 50mm Thk. PCC Under Tie-Beams

M2

63

270.00

0.23

11.000

Z0U34-0140

50mm Screed (Over W.P. Membrane-T.B.)

M2

144

270.00

0.53

11.000

Z0U34-0150

RCC Tie Beams + MEP Sleeves

1 Mason 10 Helper 1 Mason 10 Helper

1

4.03

100.85

4

25.21

132.00

4.00

33.00

3.056

2 Carpenter 1 Helper .056 Operator

kg

5,940.00

250.00

23.76

2.056

1 Steel Fixer 1 Helper .056 Operator

48.85

3

16.28

M2

132.00

28.00

4.71

3.056

2 Carpenter 1 Helper .056 Operator

14.41

2

7.20

0.12

1

0.12

Formworks

M2

Rebars

Deshutterin g

10

Z0U34-0160

RCC Kickers Over Tie-Beam

180.00

0.01

22.000

4.00

4.00

1.00

3.056

2 Carpenter 1 Helper .056 Operator

3.06

1

3.06

kg

180.00

250.00

0.72

2.056

1 Steel Fixer 1 Helper .056 Operator

1.48

1

1.48

M2

4.00

28.00

0.14

3.056

2 Carpenter 1 Helper .056 Operator

0.44

1

0.44

M3

Formworks

M2

Rebars

Deshutterin g

1

4 50mm Thk. PCC Under Grade Slab

M2

1,537.00

270.00

5.69

11.000

1 Mason 10 Helper

62.62

2

31.31

Z0U34-0180

Mesh + Filler Board & RCC For Grade Slab

M3

208

180.00

1.16

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

30.04

3

10.01

Z0U34-0190

50mm Thk. PCC Steps & Ramps

M2

10

270.00

0.04

11.000

1 Mason 10 Helper

0.41

2

0.20

0.72

8

0.09

41.33

2

20.66

Z0U34-0200

Steps & Ramps Works + Place Conc.

M3

5

180.00

0.03

26.000

Z0U34-0210

Waterproofing Membrane (Over PCC Footings)

M2

1,047.00

152.00

6.89

6.000

4 Waterproofe r 2 Helper

-

17.57

25.67

11.55

3.67 -

11.55

6.60

2.38

0.94 -

2.38

0.50

0.18

0.07 0.57

Z0U34-0170

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

5.58

7.54

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

Casting

17.57

0.24

1.89

0.12

-

-

-

0.11

0.91

6.750

0.5 Shovel 6 D. Truck .25 B. Roller

7.18

0.11

0.86

0.05

2.31

18.51

6.750

0.5 Shovel 6 D. Truck .25 B. Roller

62.46

2.19

17.53

1.10

0.500

.5 Vibrator

0.68

-

-

-

-

0.18

2.85

0.39

2.31

0.98

0.056

.056 M. Crane

9.84

0.98

2.79

0.16

0.056

.056 M. Crane

1.56

0.16

28.49

1.60

1.000

1 Vibrator

1.90

0.02

-

-

-

-

-

-

-

-

-

-

-

1.60

0.72

0.056

.056 M. Crane

8.62

0.72

11.55

0.65

0.056

.056 M. Crane

7.76

0.65

1.83

0.10

0.056

.056 M. Crane

1.23

1.47

-

-

-

-

-

.5 Vibrator

0.09

-

-

-

-

-

1.47

0.18

0.056

.056 M. Crane

1.85

0.18

2.38

0.13

0.056

.056 M. Crane

1.33

0.13

0.47

0.03

0.056

.056 M. Crane

0.26

0.03

0.34

-

-

-

-

-

-

0.500

.5 Vibrator

0.00

-

-

-

-

-

0.34

0.01

0.056

.056 M. Crane

0.06

0.01

0.18

0.01

0.056

.056 M. Crane

0.04

0.01

0.04

0.00

0.056

.056 M. Crane

0.01

0.00

0.03

-

-

0.01

-

-

0.001

0.25

0.47

0.16

0.01

3.30

6.15

-

0.10 -

0.500

-

0.16

12.83

26.22

0.07

0.03

0

28.46

0.39

0.02

0.01

0.07

17.57

2.67

4.03

-

0.46

0.27

22.000

33

4.49

1.93

4.55

1.17

0.18

M3

1.89

1.93

0.24

.056 M. Crane

0.12

2.93

0.5 Shovel 4 D. 4.750 Truck .25 B. Roller

0.24

0.056

1.28

2

0.47

0.46

2

5.87

10.84

-

8.13

2.57

180.00

Casting

16.27

29.33

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

-

4.41

21.84

41.83

1 Steel Fixer 1 Helper .056 Operator

4.63

4.41

2

-

0.18

20.00

26.000

Formworks

0.23

2

91.50

0.35

-

2.82

1

1.36

244

0.71

4.41

180.00

M3

-

40.01

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

Casting

-

6.93

1.000

1 Vibrator

1.16

0.39

1.000

1 Vibrator

0.03

0.01

0.19

0.00

0.06

6.89

Page 40 of 63

13.78

-

Z0U34-0220

Water Proofing For Neck Column & Wall & Footing

M2

2,021.00

152.00

13.30

6.000

4 Waterproofe r 2 Helper

79.78

3

26.59

8.86

17.73

-

Z0U34-0230

Waterproofing Membrane (Over PCC Tie-beams)

M2

67

152.00

0.44

6.000

4 Waterproofe r 2 Helper

2.64

2

1.32

0.44

0.88

-

Z0U34-0240

Waterproofing Membrane For Tie Beams

M2

121

152.00

0.80

6.000

4 Waterproofe r 2 Helper

4.78

3

1.59

0.53

1.06

-

1 Mason 10 Helper

3.14

1

3.14

4 Waterproofe r 2 Helper

3.24

1

3.24

Z0U34-0250

50mm Thk. PCC Under Base of Tank

M2

77

270.00

0.29

11.000

Z0U34-0260

Waterproofing Membrane (Over PCC - Base)

M2

82

152.00

0.54

6.000

Z0U34-0270

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

176

270.00

0.65

11.000

1 Mason 10 Helper

7.17

1

7.17

5.49

1

5.49

Z0U34-0280

RCC Water Tank Base + Deshuttering

Casting

M3

Formworks

M2

38

152.00

180.00

0.21

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

12.00

12.67

3.056

2 Carpenter 1 Helper .056 Operator

38.71

1

38.71

56.25

1

56.25

13.27

1

13.27

Rebars

kg

6,840.00

250.00

27.36

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

152.00

35.00

4.34

3.056

2 Carpenter 1 Helper .056 Operator

4 Z0U34-0290

RCC Wall W/MEP Pipes & Water Stop + Deshuttering

81.00

0.42

22.000

136.00

4.00

34.00

3.056

2 Carpenter 1 Helper .056 Operator

kg

6,120.00

200.00

30.60

2.056

M2

136.00

28.00

4.86

Casting

M3

Formworks

M2

Rebars

Deshutterin g

34

2 Carpenter 16 Helper 4 Mason

1

9.23

103.90

2

51.95

1 Steel Fixer 1 Helper .056 Operator

62.91

1

62.91

3.056

2 Carpenter 1 Helper .056 Operator

14.84

1

14.84

1.16

1

1.16

7.64

2

3.82

14.80

1

14.80

1

3.82

5

Z0U34-0300

RCC Top Slab + Deshuttering for Water Tank

Casting

M3

8.00

180.00

0.04

26.000

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter 1 Helper .056 Operator

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

40.00

32.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

3.82

0.65

-

6.84

2.17 -

6.84

13.60

6.12

1.94 -

6.12

1.00

1.44

0.50 1.50

2.16

-

6.52

6.33

15.54

5

2.85 1.08

8.50

9.23

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

0.29

-

1.44

-

0.500

.5 Vibrator

0.11

0.03

3.17

0.18

0.056

.056 M. Crane

0.71

0.18

6.84

0.38

0.056

.056 M. Crane

1.53

0.38

1.09

0.06

0.056

.056 M. Crane

0.24

11.09

0.62

-

-

-

-

-

0.06 -

1.000

1 Vibrator

0.42

-

-

-

-

-

0.62

0.38

0.056

.056 M. Crane

1.90

0.38

6.12

0.34

0.056

.056 M. Crane

1.71

0.34

0.97

0.05

0.056

.056 M. Crane

0.27

0.05

0.78

-

-

-

-

-

-

1.000

1 Vibrator

0.04

-

-

-

-

-

0.78

0.03

0.056

.056 M. Crane

0.14

0.03

1.44

0.08

0.056

.056 M. Crane

0.40

0.08

0.25

0.01

0.056

.056 M. Crane

0.07

0.01

0.12

-

-

-

-

-

-

0.08

-

-

0.01

0.50

2.19

-

0.08

6.80

13.89

0.03

-

-

-

-

-

-

0.12

0.01

-

-

Z0U34-0310

Water Proofing Membrane all around outside surfc

M2

172

152.00

1.13

6.000

4 Waterproofe r 2 Helper

6.79

2

3.39

1.13

2.26

-

Z0U34-0320

Protection Board all around outside surface

M2

172

152.00

1.13

6.000

4 Waterproofe r 2 Helper

6.79

2

3.39

1.13

2.26

-

Z0U34-0330

Backfill around Water tank walls

M3

6

252.00

0.02

8.250

0.75 Operator 6 Driver 1.5 Helper

0.20

3

0.07

0.01

Z0U34-0340

G.R.P. Lining around inside + S.S. Lader & Door

M2

221

20.00

11.05

2.000

22.10

3

7.37

3.68

3.68

Z0U34-0350

50mm Thk. PCC Under Base of Elevator Shaft

M2

14

270.00

0.05

11.000

0.57

1

0.57

0.05

0.52

4 Waterproofe r 2 Helper

1 Mason 1 Helper 1 Mason 10 Helper

Z0U34-0360

Waterproofing Membrane (Over PCC - Base)

M2

15

152.00

0.10

6.000

0.59

1

0.59

Z0U34-0370

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

32

270.00

0.12

11.000

1 Mason 10 Helper

1.30

1

1.30

1.01

1

1.01

7.13

1

7.13

10.36

1

10.36

2.44

1

2.44

Z0U34-0380

RCC Elevator Shaft Base + Deshuttering

180.00

0.04

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

28.00

12.00

2.33

3.056

2 Carpenter 1 Helper .056 Operator

kg

1,260.00

250.00

5.04

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

28.00

35.00

0.80

3.056

2 Carpenter 1 Helper .056 Operator

Casting

M3

81.00

0.05

22.000

Formworks

M2

16.00

4.00

4.00

3.056

2 Carpenter 1 Helper .056 Operator

Rebars

kg

720.00

200.00

3.60

2.056

Deshutterin g

M2

16.00

28.00

0.57

3.056

Casting

M3

Formworks

M2

Rebars

7

4 Z0U34-0390

RCC Wall W/ MEP Cond. + Deshuttering

4

2 Carpenter 16 Helper 4 Mason

1

1.09

12.22

2

6.11

1 Steel Fixer 1 Helper .056 Operator

7.40

1

7.40

2 Carpenter 1 Helper .056 Operator

1.75

1

1.75

5

0.05

6.750

0.16

0.01

0.05

0.00

0.39

-

1.19

1.17

1.26

0.40 -

1.26

1.60

0.72

0.23 1.83

0.5 Shovel 6 D. Truck .25 B. Roller

-

0.20 0.12

1.57

1.09

0.01

-

0.72

-

0.500

.5 Vibrator

0.02

0.00

0.58

0.03

0.056

.056 M. Crane

0.13

0.03

1.26

0.07

0.056

.056 M. Crane

0.28

0.07

0.20

0.01

0.056

.056 M. Crane

0.04

0.01

1.000

1 Vibrator

0.05

2.04

0.11

-

-

-

-

-

-

-

-

-

-

-

0.11

0.80

0.04

0.056

.056 M. Crane

0.22

0.04

0.72

0.04

0.056

.056 M. Crane

0.20

0.04

0.11

0.01

0.056

.056 M. Crane

0.03

1.63

0.09

-

-

-

-

-

0.00

-

-

0.01

0.01 -

-

-

-

-

-

0.09

0.01

-

-

Z0U34-0400

Water Proofing Membrane all around outside surfc

M2

60

152.00

0.39

6.000

4 Waterproofe r 2 Helper

2.37

3

0.79

0.26

0.53

-

Z0U34-0410

Protection Board all around outside surface

M2

216

152.00

1.42

6.000

4 Waterproofe r 2 Helper

8.53

2

4.26

1.42

2.84

-

Page 41 of 63

Z0U34-0420

Backfill around the Lift's Pit wall

Z0U34-0430

RCC For Wall/Col. From Top of Grade Slab-1L

M3

9.89

252.00

0.04

8.250

251

81.00

3.10

22.000

0.75 Operator 6 Driver 1.5 Helper 2 Carpenter 16 Helper 4 Mason

0.32

3

0.11

68.17

1

68.17

Casting

M3

Formworks

M2

1,004.00

4.00

251.00

3.056

2 Carpenter 1 Helper .056 Operator

767.06

5

153.41

Rebars

kg

45,180.00

200.00

225.90

2.056

1 Steel Fixer 1 Helper .056 Operator

464.45

4

116.11

Deshutterin g

M2

1,004.00

28.00

35.86

3.056

2 Carpenter 1 Helper .056 Operator

109.58

2

54.79

Casting

M3

81.00

0.01

22.000

Formworks

M2

4.00

4.00

1.00

3.056

Rebars

kg

180.00

200.00

0.90

Deshutterin g

M2

4.00

28.00

0.14

12 Z0U34-0440

Columns From Top of Grade Slab-1L (Canopy)

1

2 Carpenter 16 Helper 4 Mason

RCC Slab / Beam - 1L

1

0.27

2 Carpenter 1 Helper .056 Operator

3.06

2

1.53

2.056

1 Steel Fixer 1 Helper .056 Operator

1.85

2

0.93

3.056

2 Carpenter 1 Helper .056 Operator

0.44

1

0.44

Casting

M3

231.00

180.00

1.28

26.000

Formworks

M2

1,155.00

16.00

72.19

3.056

2 Carpenter 1 Helper .056 Operator

220.61

6

36.77

Rebars

kg

41,580.00

200.00

207.90

2.056

1 Steel Fixer 1 Helper .056 Operator

427.44

5

85.49

Deshutterin g

M2

1,155.00

32.00

36.09

3.056

2 Carpenter 1 Helper .056 Operator

110.30

2

55.15

33.37

1

33.37

14 Z0U34-0460

RCC For Stair/Landings @ G.L. - 1L

Casting

M3

Formworks

M2

8

40.00

81.00

0.10

22.000

4.00

10.00

3.056

1

2.17

2 Carpenter 1 Helper .056 Operator

30.56

4

7.64

14.80

3

4.93

4.37

2

2.18

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

40.00

28.00

1.43

3.056

2 Carpenter 1 Helper .056 Operator

1.16

1

1.16

7.64

4

1.91

14.80

3

4.93

3.82

1

3.82

10

Z0U34-0470

RCC Canopy

Casting

M3

8.00

180.00

0.04

26.000

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter 1 Helper .056 Operator

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

40.00

32.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

Z0U34-0480

RCC For Wall/Col. From Top of 1L-2L

Casting

M3

Formworks

M2

Rebars

Deshutterin g

237

1

64.37

2 Carpenter 1 Helper .056 Operator

724.27

5

144.85

2.056

1 Steel Fixer 1 Helper .056 Operator

438.54

4

109.64

3.056

2 Carpenter 1 Helper .056 Operator

103.47

2

51.73

33.80

1

33.80

2.93

22.000

948.00

4.00

237.00

3.056

kg

42,660.00

200.00

213.30

M2

948.00

28.00

33.86

12

Z0U34-0490

RCC Slab / Beam - 2L

Casting

M3

234.00

180.00

1.30

26.000

Formworks

M2

1,170.00

16.00

73.13

3.056

2 Carpenter 1 Helper .056 Operator

223.47

6

37.25

Rebars

kg

42,120.00

200.00

210.60

2.056

1 Steel Fixer 1 Helper .056 Operator

432.99

5

86.60

Deshutterin g

M2

1,170.00

32.00

36.56

3.056

2 Carpenter 1 Helper .056 Operator

111.74

2

55.87

Casting

M3

81.00

0.09

22.000

14 Z0U34-0500

RCC for Stair/Landings @ 1L-2L

7

2 Carpenter 16 Helper 4 Mason

1.90

1

0.05 -

0.15

10.31

14.85

5.16 -

14.85

2.00

0.72

0.29 -

0.72

0.56

0.80

0.28 -

0.80

39.50

17.78

5.64 45.14

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

18.83

0.15

0.83

64.37

81.00

-

0.33

2.29

9 2 Carpenter 16 Helper 4 Mason

5.98

15.47

2.17

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

18.83

0.38

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 16 Helper 4 Mason

41.83

47.81

0.27

6

Z0U34-0450

0.02

-

17.78

10.45

15.04

5.22 15.67

-

1.90

Page 42 of 63

15.04

0.01

0.08

6.750

0.5 Shovel 6 D. Truck .25 B. Roller

0.26

1.000

1 Vibrator

3.10

0.01

0.07

0.00

0.26

20.92

1.17

0.056

.056 M. Crane

14.06

1.17

18.83

1.05

0.056

.056 M. Crane

12.65

1.05

2.99

0.17

0.056

.056 M. Crane

2.01

0.17

1.000

1 Vibrator

0.01

42.73

2.39

-

-

-

-

-

-

-

-

-

-

-

2.39

0.17

0.01

0.056

.056 M. Crane

0.06

0.01

0.15

0.01

0.056

.056 M. Crane

0.05

0.01

0.02

0.00

0.056

.056 M. Crane

0.01

0.34

0.02

-

-

-

-

-

1 Vibrator

1.28

-

-

-

-

-

0.02

0.29

0.056

.056 M. Crane

4.04

0.29

14.85

0.83

0.056

.056 M. Crane

11.64

0.83

2.58

0.14

0.056

.056 M. Crane

2.02

0.14

1.26

-

-

-

-

-

1.000

1 Vibrator

0.10

-

-

-

-

-

1.26

0.06

0.056

.056 M. Crane

0.56

0.06

0.72

0.04

0.056

.056 M. Crane

0.40

0.04

0.14

0.01

0.056

.056 M. Crane

0.08

0.01

0.10

-

-

-

-

-

-

1.000

1 Vibrator

0.04

-

-

-

-

-

0.10

0.02

0.056

.056 M. Crane

0.14

0.02

0.80

0.04

0.056

.056 M. Crane

0.40

0.04

0.14

0.01

0.056

.056 M. Crane

0.07

0.07

-

-

-

-

1 Vibrator

-

-

-

-

-

0.07

2.93

1.11

0.056

.056 M. Crane

13.27

1.11

17.78

1.00

0.056

.056 M. Crane

11.94

1.00

2.82

0.16

0.056

.056 M. Crane

1.90

0.16

2.26

-

-

-

-

-

-

1.000

1 Vibrator

1.30

-

-

-

-

-

2.26

0.29

0.056

.056 M. Crane

4.10

0.29

15.04

0.84

0.056

.056 M. Crane

11.79

0.84

2.61

0.15

0.056

.056 M. Crane

2.05

0.15

1.000

1 Vibrator

0.09

1.28

-

-

-

-

-

-

-

0.01

-

-

0.00

-

-

0.24

-

-

-

-

0.09

5.22

22.88

0.09

0.24

19.75

40.35

-

0.01 -

1.000

-

0.00

0.28

1.22

0.00

0.01

1.00

1.86

-

0.09

5.16

22.58

-

0.00 -

1.000

0.26 0.00

-

-

-

-

-

-

1.28

0.09 0.01

Z0U34-0510 Z0U34-0520 Z0U34-0530

RCC For Wall/Col. From Top of 2L-3L RCC Slab / Beam - 3L RCC For Stair/Landings @ 2L-3L

Z0U34-0540

RCC For Wall/Col. From Top of 3L-4L

Formworks

M2

35.00

4.00

8.75

3.056

2 Carpenter 1 Helper .056 Operator

26.74

4

6.69

Rebars

kg

1,260.00

200.00

6.30

2.056

1 Steel Fixer 1 Helper .056 Operator

12.95

3

4.32

Deshutterin g

M2

35.00

28.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

3.82

2

1.91

M3 M3 M3

10 12 14 10

237 234 7

Casting

M3

Formworks

M2

236

944.00

81.00

2.91

22.000

4.00

236.00

3.056

2 Carpenter 16 Helper 4 Mason

1

64.10

2 Carpenter 1 Helper .056 Operator

721.22

5

144.24

436.69

4

109.17

103.03

2

51.52

Rebars

kg

42,480.00

200.00

212.40

2.056

Deshutterin g

M2

944.00

28.00

33.71

3.056

2 Carpenter 1 Helper .056 Operator

12

Z0U34-0550

RCC Slab / Beam - 4L

Z0U34-0560

RCC For Stair/Landings @ 3L-4L

Z0U34-0570

RCC For Wall/Col. From Top of 4L-RoofL

Casting

M3

237.00

180.00

1.32

26.000

Formworks

M2

1,185.00

16.00

74.06

3.056

2 Carpenter 1 Helper .056 Operator

226.34

6

37.72

Rebars

kg

42,660.00

200.00

213.30

2.056

1 Steel Fixer 1 Helper .056 Operator

438.54

5

87.71

Deshutterin g

M2

1,185.00

32.00

37.03

3.056

2 Carpenter 1 Helper .056 Operator

113.17

2

56.58

34.23

1

34.23

14 10

7

Casting

M3

Formworks

M2

Rebars

Deshutterin g

148

2 Carpenter 16 Helper 4 Mason

1

40.20

2 Carpenter 1 Helper .056 Operator

452.29

4

113.07

2.056

1 Steel Fixer 1 Helper .056 Operator

273.86

3

91.29

3.056

2 Carpenter 1 Helper .056 Operator

64.61

2

32.31

1.83

22.000

592.00

4.00

148.00

3.056

kg

26,640.00

200.00

133.20

M2

592.00

28.00

21.14

10

Z0U34-0580

RCC Wall/Col. For Staircase From Top of 4L-RoofL

Casting

M3

Formworks

M2

3

12.00

81.00

0.04

22.000

4.00

3.00

3.056

2 Carpenter 16 Helper 4 Mason

1

0.81

2 Carpenter 1 Helper .056 Operator

9.17

2

4.58

5.55

2

2.78

1.31

1

1.31

Rebars

kg

540.00

200.00

2.70

2.056

1 Steel Fixer 1 Helper .056 Operator

Deshutterin g

M2

12.00

28.00

0.43

3.056

2 Carpenter 1 Helper .056 Operator

6

Z0U34-0590

RCC Slab / Beam - RoofL

Casting

M3

152.00

180.00

0.84

26.000

Formworks

M2

760.00

16.00

47.50

3.056

2 Carpenter 1 Helper .056 Operator

145.16

5

29.03

Rebars

kg

27,360.00

200.00

136.80

2.056

1 Steel Fixer 1 Helper .056 Operator

281.26

4

70.32

Deshutterin g

M2

760.00

32.00

23.75

3.056

2 Carpenter 1 Helper .056 Operator

72.58

2

36.29

21.96

1

21.96

12 Z0U34-0600

RCC For Stair/Landings @ 4L-RoofL

81.00

0.04

22.000

15.00

4.00

3.75

3.056

2 Carpenter 1 Helper .056 Operator

kg

540.00

200.00

2.70

2.056

M2

15.00

28.00

0.54

Casting

M3

Formworks

M2

Rebars

Deshutterin g

3

2 Carpenter 16 Helper 4 Mason

0.81

1

0.81

11.46

3

3.82

1 Steel Fixer 1 Helper .056 Operator

5.55

3

1.85

3.056

2 Carpenter 1 Helper .056 Operator

1.64

1

1.64

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

RCC Slab / Beam for Staircase - RoofL

Casting

M3

4.00

180.00

0.02

0.58

1

-

17.70

10.58

15.24

5.29 -

15.24

29.60

13.32

4.23 -

13.32

1.00

0.45

0.14 -

0.45

7.92

11.40

3.96 11.88

8

Z0U34-0610

5.62

1.14

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

0.63

17.70

33.83

0.81

-

39.33

15.87

40.20

81.00

0.25

44.95

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

M3

0.63

2.00

64.10

1 Steel Fixer 1 Helper .056 Operator

1.75

-

11.40

0.94

0.34

0.13 1.07

-

0.58

0.34

0.88

0.05

0.056

.056 M. Crane

0.49

0.05

0.63

0.04

0.056

.056 M. Crane

0.35

0.04

0.13

0.01

0.056

.056 M. Crane

0.07

0.01

1.63

0.09

-

-

-

-

-

-

1.000

1 Vibrator

-

-

-

-

0.09

2.91

1.10

0.056

.056 M. Crane

13.22

1.10

17.70

0.99

0.056

.056 M. Crane

11.89

0.99

2.81

0.16

0.056

.056 M. Crane

1.89

40.18

2.25

-

-

-

-

-

1 Vibrator

1.32

-

-

-

-

-

2.25

0.30

0.056

.056 M. Crane

4.15

0.30

15.24

0.85

0.056

.056 M. Crane

11.94

0.85

2.65

0.15

0.056

.056 M. Crane

2.07

0.15

1.30

-

-

-

-

-

-

1.000

1 Vibrator

1.83

-

-

-

-

-

1.30

0.83

0.056

.056 M. Crane

8.29

0.83

13.32

0.75

0.056

.056 M. Crane

7.46

0.75

2.11

0.12

0.056

.056 M. Crane

1.18

0.12

1.69

-

-

-

-

-

-

1.000

1 Vibrator

0.04

-

-

-

-

-

1.69

0.03

0.056

.056 M. Crane

0.17

0.03

0.45

0.03

0.056

.056 M. Crane

0.15

0.03

0.07

0.00

0.056

.056 M. Crane

0.02

0.06

-

-

-

-

-

1 Vibrator

0.84

-

-

-

-

-

0.06

0.22

0.056

.056 M. Crane

2.66

0.22

11.40

0.64

0.056

.056 M. Crane

7.66

0.64

1.98

0.11

0.056

.056 M. Crane

1.33

0.11

0.97

-

-

-

-

-

1.000

1 Vibrator

0.04

-

-

-

-

-

0.97

0.03

0.056

.056 M. Crane

0.21

0.03

0.34

0.02

0.056

.056 M. Crane

0.15

0.02

0.07

0.00

0.056

.056 M. Crane

0.03

0.00

0.05

-

-

-

-

-

-

1 Vibrator

0.02

-

-

0.18

-

-

0.01

-

-

0.07

-

-

-

-

0.00

0.47

0.87

0.09

0.07

3.96

17.34

-

0.00 -

1.000

-

0.01

0.50

1.02

0.24

0.18

14.80

30.23

-

0.09

5.29

23.17

-

0.16 -

1.000

0.01

0.24

19.67

1.000

Page 43 of 63

-

-

-

-

-

-

0.05

0.00

0.00

Formworks

M2

20.00

16.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

3.82

3

1.27

Rebars

kg

720.00

200.00

3.60

2.056

1 Steel Fixer 1 Helper .056 Operator

7.40

2

3.70

Deshutterin g

M2

20.00

32.00

0.63

3.056

2 Carpenter 1 Helper .056 Operator

1.91

1

1.91

Casting

M3

81.00

0.30

22.000

Formworks

M2

96.00

4.00

24.00

3.056

Rebars

kg

4,320.00

200.00

21.60

Deshutterin g

M2

96.00

28.00

3.43

7 Z0U34-0620

RCC For Lower Parapet

24

2 Carpenter 16 Helper 4 Mason

1

6.52

2 Carpenter 1 Helper .056 Operator

73.34

4

18.34

2.056

1 Steel Fixer 1 Helper .056 Operator

44.41

3

14.80

3.056

2 Carpenter 1 Helper .056 Operator

10.48

2

5.24

10 Z0U34-0630

RCC For Wall/Col. From Roof L-Top of Roof L

Casting

M3

Formworks

M2

Rebars

Deshutterin g

10

1

2.72

2 Carpenter 1 Helper .056 Operator

30.56

2

15.28

2.056

1 Steel Fixer 1 Helper .056 Operator

18.50

2

9.25

3.056

2 Carpenter 1 Helper .056 Operator

4.37

1

4.37

2.46

1

2.46

0.12

22.000

40.00

4.00

10.00

3.056

kg

1,800.00

200.00

9.00

M2

40.00

28.00

1.43

6

Z0U34-0640

RCC Slab / Beam Top Roof Level

Casting

M3

17.00

180.00

0.09

26.000

Formworks

M2

85.00

16.00

5.31

3.056

2 Carpenter 1 Helper .056 Operator

16.24

3

5.41

31.46

2

15.73

8.12

1

8.12

Rebars

kg

3,060.00

200.00

15.30

2.056

Deshutterin g

M2

85.00

32.00

2.66

3.056

2 Carpenter 1 Helper .056 Operator

Casting

M3

81.00

0.19

22.000

Formworks

M2

60.00

4.00

15.00

3.056

Rebars

kg

2,700.00

200.00

13.50

Deshutterin g

M2

60.00

28.00

2.14

7 Z0U34-0650

RCC For Upper Parapet

15

2 Carpenter 16 Helper 4 Mason

1

4.07

2 Carpenter 1 Helper .056 Operator

45.84

3

15.28

2.056

1 Steel Fixer 1 Helper .056 Operator

27.76

3

9.25

3.056

2 Carpenter 1 Helper .056 Operator

6.55

1

6.55

RCC Eqmt. Pads + Railing

0.43

1

0.43

180.00

0.02

26.000

12.00

12.00

1.00

3.056

2 Carpenter 1 Helper .056 Operator

3.06

4

0.76

kg

540.00

250.00

2.16

2.056

1 Steel Fixer 1 Helper .056 Operator

4.44

3

1.48

M2

12.00

35.00

0.34

3.056

2 Carpenter 1 Helper .056 Operator

1.05

2

0.52

Casting

M3

Formworks

M2

Rebars

Deshutterin g

3

2.16

0.69 -

10

2.16

3.33

1.50

0.48 -

1.50

1.52

2.19

0.76 -

2.19

3.75

1.69

0.54 4.29

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

0.51

4.80

2.28

4.07

8

Z0U34-0660

-

3.81

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

1 Steel Fixer 1 Helper .056 Operator

0.18

5.49

2.72

81.00

0.51

0.54

6.52

2 Carpenter 16 Helper 4 Mason

0.36

-

1.69

0.20

0.22

0.07 0.27

-

0.22

0.18

0.01

0.056

.056 M. Crane

0.07

0.01

0.51

0.03

0.056

.056 M. Crane

0.20

0.03

0.09

0.00

0.056

.056 M. Crane

0.04

0.01

1.000

1 Vibrator

0.30

0.78

0.04

-

-

-

-

-

-

-

-

-

-

-

0.04

2.40

0.13

0.056

.056 M. Crane

1.34

0.13

2.16

0.12

0.056

.056 M. Crane

1.21

0.12

0.34

0.02

0.056

.056 M. Crane

0.19

4.90

0.27

-

-

-

-

1 Vibrator

0.12

-

-

-

-

-

0.27

0.09

0.056

.056 M. Crane

0.56

0.09

1.50

0.08

0.056

.056 M. Crane

0.50

0.08

0.24

0.01

0.056

.056 M. Crane

0.08

0.01

0.19

-

-

-

-

-

-

1.000

1 Vibrator

0.09

-

-

-

-

-

0.19

0.04

0.056

.056 M. Crane

0.30

0.04

2.19

0.12

0.056

.056 M. Crane

0.86

0.12

0.38

0.02

0.056

.056 M. Crane

0.15

0.02

1.000

1 Vibrator

0.19

0.19

-

-

-

-

-

-

-

-

-

-

-

0.19

0.11

0.056

.056 M. Crane

0.84

0.11

1.69

0.09

0.056

.056 M. Crane

0.76

0.09

0.27

0.02

0.056

.056 M. Crane

0.12

0.02

0.21

-

-

-

-

-

-

0.500

.5 Vibrator

0.01

-

-

-

-

-

0.21

0.01

0.056

.056 M. Crane

0.06

0.01

0.22

0.01

0.056

.056 M. Crane

0.12

0.01

0.03

0.00

0.056

.056 M. Crane

0.02

0.00

0.02

-

-

-

-

-

-

0.02

-

-

0.01

-

-

0.02

-

-

-

-

0.00

0.10

0.35

-

0.02

1.88

3.83

0.03

0.01

0.76

3.32

-

0.02

1.67

3.40

-

0.02 -

1.000

0.00 0.03

-

-

-

-

-

-

0.02

0.00

MEP FINISHES

M2

1,879.00

187.90

2.056

48.46

7.16

2.000

20.00

120.65

2.000

826

12.00

68.83

2.056

M2

113

10.00

11.30

2.056

I. Install False Ceiling (Susp. + Boarding) @ GL

M2

509

7.20

70.69

2.056

Z0U34-2770

I. Screed + Ceramic Tiles & Skirtings @ GL

M2

1572

12.00

131.00

2.056

Z0U34-2780

I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL

M2

354

32.00

11.06

2.056

Z0U34-2790

I. Water Proofing + Screed on Wet Areas - GL

M2

683

64.00

10.67

6.000

Z0U34-2710

I. Hollow Block Works + Lintels @ Grnd Flr.

Z0U34-2720

I. Internal Plaster Accessories & Rush @ GL

M2

347.00

Z0U34-2730

I. Internal Plaster Works @ GL

M2

2,413.00

Z0U34-2740

I. Glazed Ceramic Tile @ GL

M2

Z0U34-2750

I. Block Works For Ducts @ Grnd Flr.

Z0U34-2760

10.00

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper

386.32

14

27.59

13.42

2.05

13.42

0.75

0.056

.056 T. Crane

10.52

0.75

14.32

7

1.02

1.02

241.30

12

20.11

10.05

10.05

141.52

14

10.11

4.92

4.92

0.28

0.056

.056 T. Crane

3.85

0.28

23.23

2

11.62

5.65

5.65

0.32

0.056

.056 T. Crane

0.63

0.32

145.35

14

10.38

5.05

0.28

0.056

.056 T. Crane

3.96

0.28

269.34

14

19.24

9.36

9.36

0.52

0.056

.056 T. Crane

7.34

0.52

22.74

14

1.62

0.79

0.79

0.04

0.056

.056 T. Crane

0.62

0.04

64.03

10

6.40

5.05

2.13

Page 44 of 63

4.27

Z0U34-2800

I. Frames Installations @ GL

Nos.

59

4.80

12.29

2.056

1 Carpenter 1 Helper .056 Operator

25.27

14

1.81

0.88

0.88

0.05

0.056

.056 T. Crane

0.69

0.05

Z0U34-2810

I. Doors w/ Ironmongery @ GL

Nos.

59

4.80

12.29

2.056

1 Carpenter 1 Helper .056 Operator

25.27

12

2.11

1.02

1.02

0.06

0.056

.056 T. Crane

0.69

0.06

Z0U34-2820

I. Frames Installation Works @ GL

M2

108

4.80

22.50

2.056

1 Carpenter 1 Helper .056 Operator

46.26

14

3.30

1.61

1.61

0.09

0.056

.056 T. Crane

1.26

0.09

Z0U34-2830

I.Aluminum + Glass & Other Associated Works @ GL

M2

108

1.60

67.50

2.056

1 Alum. Tech 1 Helper .056 Operator

138.78

12

11.57

5.63

0.32

0.056

.056 T. Crane

3.78

0.32

Z0U34-2840

I. Kitchen Cabinets @ GL

Nos.

14

0.60

23.33

2.056

1 Carpenter 1 Helper .056 Operator

47.97

14

3.43

1.67

1.67

0.09

0.056

.056 T. Crane

1.31

0.09

Z0U34-2850

I. Wardrobes @ GL

Nos.

17

0.75

22.67

2.056

1 Carpenter 1 Helper .056 Operator

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T. Crane

1.27

0.09

Z0U34-2860 Z0U34-2870 Z0U34-2880

I. Primer Application Works @ GL I. Stucco Application Works @ GL I. Emulsion Paint Works @ GL

M2 M2 M2

864.00 864.00 1,626.00

54.60 16.40 32.20

15.82 52.68 50.50

1.000 1.000 1.000

15.82 52.68 50.50

10 14 12

1.58 3.76 4.21

Z0U34-2890

O. Plaster Accessories & Rush @ GL

M2

52

48.46

1.07

2.000

Z0U34-2900

O. Plaster Works @ GL

M2

316

20.00

15.80

2.000

Z0U34-2910

O. Polished Marble & Ceramic for Wall @ GL

M2

37

10.00

3.70

2.056

Z0U34-2920

O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.

M2

16

10.00

1.60

2.056

Z0U34-2930

O. Gypsum Board +Washable Paint @ GL

M2

66

16.00

4.13

2.056

Z0U34-2940

O. Semi Recessed G.R.G. Tiles @ GL

M2

36

16.00

2.25

2.056

Z0U34-2950

O. Sreed + Graniti Tiles & Skirtings @ GL

M2

514

12.00

42.83

2.056

Z0U34-2960

O. Screed + Polished Marble & Skirtings @ GL

M2

148

12.00

12.33

2.056

Z0U34-2970

O. G. Stl, Powdr coated Railin to Staircase @ GL

LM

24

20.00

1.20

2.056

Z0U34-2980 Z0U34-2990 Z0U34-3000

O. Primer ApplicationWorks @ GL. O. Stucco Application Works @ GL O. Emulsion Paint Works @ GL

M2 M2 M2

109 109 58

54.60 16.40 32.20

2.00 6.65 1.80

1.000 1.000 1.000

Z0U34-3010

I. Hollow Block Works + Lintels @ 1st Flr.

M2

1,950.00

10.00

195.00

2.056

Z0U34-3020

I. Internal Plaster Accessories & Rush @ 1L

M2

347.00

48.46

7.16

2.000

Z0U34-3030

I. Internal Plaster Works @ 1L

M2

2,581.00

20.00

129.05

2.000

Z0U34-3040

I. Glazed Ceramic Tile @ 1L

M2

735

12.00

61.25

2.056

Z0U34-3050

I. Block Works For Ducts @ 1st Flr.

M2

93

10.00

9.30

2.056

7.20

66.11

2.056

1746

12.00

145.50

2.056

M2

269

32.00

8.41

2.056

M2

683

64.00

10.67

6.000

Z0U34-3060

I. Install False Ceiling (Susp. + Boarding) @ 1L

M2

476

Z0U34-3070

I. Screed + Ceramic Tiles & Skirtings @ 1L

M2

Z0U34-3080

I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L

Z0U34-3090

I. Water Proofing + Screed on Wet Areas - 1L

1 Painter 1 Painter 1 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator

5.63

1.58 3.76 4.21

2.15

7

0.31

0.15

0.15

31.60

12

2.63

1.32

1.32

7.61

14

0.54

0.26

0.26

0.01

0.056

.056 T. Crane

0.21

0.01

3.29

2

1.64

0.80

0.80

0.04

0.056

.056 T. Crane

0.09

0.04

1 Carpenter 1 Helper .056 Operator

8.48

14

0.61

0.29

0.29

0.02

0.056

.056 T. Crane

0.23

0.02

1 Carpenter 1 Helper .056 Operator

4.63

14

0.33

0.16

0.16

0.01

0.056

.056 T. Crane

0.13

0.01

88.07

14

6.29

3.06

3.06

0.17

0.056

.056 T. Crane

2.40

0.17

25.36

14

1.81

0.88

0.88

0.05

0.056

.056 T. Crane

0.69

0.05

2.47

10

0.25

0.12

0.01

0.056

.056 T. Crane

0.07

0.01

2.00 6.65 1.80

8 12 10

0.25 0.55 0.18

400.92

14

28.64

0.78

0.056

.056 T. Crane

10.92

0.78

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper

14.32

7

258.10

12

21.51

125.93

14

19.12

0.12 0.25 0.55 0.18

13.93

2.05

13.93

1.02

1.02

10.75

10.75

9.00

4.38

4.38

0.25

0.056

.056 T. Crane

3.43

0.25

2

9.56

4.65

4.65

0.26

0.056

.056 T. Crane

0.52

0.26

135.92

14

9.71

4.72

0.26

0.056

.056 T. Crane

3.70

0.26

299.15

14

21.37

10.39

10.39

0.58

0.056

.056 T. Crane

8.15

0.58

17.28

8

2.16

1.05

1.05

0.06

0.056

.056 T. Crane

0.47

0.06

4.72

64.03

10

6.40

2.13

4.27

30.84

14

2.20

1.07

1.07

0.06

0.056

.056 T. Crane

0.84

0.06

Z0U34-3100

I. Frames Installations @ 1L

Nos.

72

4.80

15.00

2.056

1 Carpenter 1 Helper .056 Operator

Z0U34-3110

I. Doors w/ Ironmongery @ 1L

Nos.

72

4.80

15.00

2.056

1 Carpenter 1 Helper .056 Operator

30.84

12

2.57

1.25

1.25

0.07

0.056

.056 T. Crane

0.84

0.07

Z0U34-3120

I. Frames Installation Works @ GL

M2

100

4.80

20.83

2.056

1 Carpenter 1 Helper .056 Operator

42.83

14

3.06

1.49

1.49

0.08

0.056

.056 T. Crane

1.17

0.08

128.50

12

10.71

5.21

0.29

0.056

.056 T. Crane

3.50

0.29

100

1.60

62.50

2.056

1 Alum. Tech 1 Helper .056 Operator

Nos.

17

0.75

22.67

2.056

1 Carpenter 1 Helper .056 Operator

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T. Crane

1.27

0.09

I. Kitchen Cabinets @ 1L

Nos.

15

0.60

25.00

2.056

1 Carpenter 1 Helper .056 Operator

51.40

14

3.67

1.79

1.79

0.10

0.056

.056 T. Crane

1.40

0.10

Z0U34-3160 Z0U34-3170 Z0U34-3180

I. Primer Application Works @ 1L I. Stucco Application Works @ 1L I. Emulsion Paint Works @ 1L

M2 M2 M2

855.00 855.00 1,649.00

54.60 16.40 32.20

15.66 52.13 51.21

1.000 1.000 1.000

15.66 52.13 51.21

12 14 14

1.30 3.72 3.66

Z0U34-3190

O. Plaster Accessories & Rush @ 1L

M2

52

48.46

1.07

2.000

Z0U34-3200

O. Plaster Works @ 1L

M2

297

20.00

14.85

2.000

Z0U34-3210

O. Polished Marble & Ceramic for Wall @ 1L

M2

36

10.00

3.60

2.056

Z0U34-3220

O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.

M2

14

10.00

1.40

2.056

Z0U34-3230

O. Gypsum Board +Washable Paint @ 1L

M2

66

16.00

4.13

2.056

Z0U34-3240

O. Semi Recessed G.R.G. Tiles @ 1L

M2

36

16.00

2.25

2.056

Z0U34-3130

I. Aluminum+Glass & Other Associated Works @ 1L

M2

Z0U34-3140

I. Wardrobes @ 1L

Z0U34-3150

1 Painter 1 Painter 1 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator

5.21

1.30 3.72 3.66

2.15

7

0.31

0.15

0.15

29.70

12

2.48

1.24

1.24

7.40

14

0.53

0.26

0.26

0.01

0.056

.056 T. Crane

0.20

0.01

2.88

2

1.44

0.70

0.70

0.04

0.056

.056 T. Crane

0.08

0.04

1 Carpenter 1 Helper .056 Operator

8.48

14

0.61

0.29

0.29

0.02

0.056

.056 T. Crane

0.23

0.02

1 Carpenter 1 Helper .056 Operator

4.63

14

0.33

0.16

0.16

0.01

0.056

.056 T. Crane

0.13

0.01

Page 45 of 63

Z0U34-3250

O. Sreed + Graniti Tiles & Skirtings @ 1L

M2

425

12.00

35.42

2.056

Z0U34-3260

O. Screed + Polished Marble & Skirtings @ 1L

M2

48

12.00

4.00

2.056

Z0U34-3270

O. G. Stl, Powdr coated Railin to Staircase @ 1L

LM

26

20.00

1.30

2.056

Z0U34-3280 Z0U34-3290 Z0U34-3300

O. Primer Application Works @ 1L O. Stucco Application Works @ 1L O. Emulsion Paint Works @ 1L

M2 M2 M2

103 103 58

54.60 16.40 32.20

1.89 6.28 1.80

1.000 1.000 1.000

Z0U34-3310

I. Hollow Block Works + Lintels @ 2nd Flr.

M2

1,950.00

10.00

195.00

2.056

Z0U34-3320

I. Internal Plaster Accessories & Rush @ 2L

M2

347.00

48.46

7.16

2.000

Z0U34-3330

I. Internal Plaster Works @ 2L

M2

2,581.00

20.00

129.05

2.000

Z0U34-3340

I. Glazed Ceramic Tile @ 2L

M2

735

12.00

61.25

2.056

Z0U34-3350

I. Block Works For Ducts @ 2nd Flr.

M2

93

10.00

9.30

2.056

7.20

66.11

2.056

1746

12.00

145.50

2.056

M2

269

32.00

8.41

2.056

M2

683

64.00

10.67

6.000

Z0U34-3360

I. Install False Ceiling (Susp. + Boarding) @ 2L

M2

476

Z0U34-3370

I. Screed + Ceramic Tiles & Skirtings @ 2L

M2

Z0U34-3380

I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L

Z0U34-3390

I. Water Proofing + Screed on Wet Areas - 2L

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper

72.82

14

5.20

2.53

2.53

0.14

0.056

.056 T. Crane

1.98

0.14

8.22

14

0.59

0.29

0.29

0.02

0.056

.056 T. Crane

0.22

0.02

2.67

10

0.27

0.13

0.01

0.056

.056 T. Crane

0.07

0.01

1.89 6.28 1.80

8 10 12

0.24 0.63 0.15

400.92

14

28.64

0.78

0.056

.056 T. Crane

10.92

0.78

14.32

7

258.10

12

21.51

125.93

14

19.12

0.13 0.24 0.63 0.15

13.93

2.05

13.93

1.02

1.02

10.75

10.75

9.00

4.38

4.38

0.25

0.056

.056 T. Crane

3.43

0.25

2

9.56

4.65

4.65

0.26

0.056

.056 T. Crane

0.52

0.26

135.92

14

9.71

4.72

0.26

0.056

.056 T. Crane

3.70

0.26

299.15

14

21.37

10.39

10.39

0.58

0.056

.056 T. Crane

8.15

0.58

17.28

8

2.16

1.05

1.05

0.06

0.056

.056 T. Crane

0.47

0.06

4.72

64.03

10

6.40

2.13

4.27

30.84

14

2.20

1.07

1.07

0.06

0.056

.056 T. Crane

0.84

0.06

Z0U34-3400

I. Frames Installations @ 2L

Nos.

72

4.80

15.00

2.056

1 Carpenter 1 Helper .056 Operator

Z0U34-3410

I. Doors w/ Ironmongery @ 2L

Nos.

72

4.80

15.00

2.056

1 Carpenter 1 Helper .056 Operator

30.84

12

2.57

1.25

1.25

0.07

0.056

.056 T. Crane

0.84

0.07

Z0U34-3420

I. Frames Installation Works @ 2L

M2

100

4.80

20.83

2.056

1 Carpenter 1 Helper .056 Operator

42.83

14

3.06

1.49

1.49

0.08

0.056

.056 T. Crane

1.17

0.08

128.50

12

10.71

5.21

0.29

0.056

.056 T. Crane

3.50

0.29

100

1.60

62.50

2.056

1 Alum. Tech 1 Helper .056 Operator

Nos.

17

0.75

22.67

2.056

1 Carpenter 1 Helper .056 Operator

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T. Crane

1.27

0.09

I. Kitchen Cabinets @ 2L

Nos.

15

0.60

25.00

2.056

1 Carpenter 1 Helper .056 Operator

51.40

14

3.67

1.79

1.79

0.10

0.056

.056 T. Crane

1.40

0.10

Z0U34-3460 Z0U34-3470 Z0U34-3480

I. Primer Application Works @ 2L I. Stucco Application Works @ 2L I. Emulsion Paint Works @ 2L

M2 M2 M2

855.00 855.00 1,649.00

54.60 16.40 32.20

15.66 52.13 51.21

1.000 1.000 1.000

1 Painter

15.66 52.13 51.21

12 14 14

1.30 3.72 3.66

Z0U34-3490

O. Plaster Accessories & Rush @ 2L

M2

52

48.46

1.07

2.000

Z0U34-3500

O. Plaster Works @ 2L

M2

297

20.00

14.85

2.000

Z0U34-3510

O. Polished Marble & Ceramic for Wall @ 2L

M2

36

10.00

3.60

2.056

Z0U34-3520

O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr.

M2

17

10.00

1.70

2.056

1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator

Z0U34-3530

O. Gypsum Board +Washable Paint @ 2L

M2

66

16.00

4.13

2.056

Z0U34-3540

O. Semi Recessed G.R.G. Tiles @ 2L

M2

36

16.00

2.25

2.056

Z0U34-3430

I. Aluminum+Glass & Other Associated Works @ 2L

M2

Z0U34-3440

I. Wardrobes @ 2L

Z0U34-3450

Z0U34-3550

O. Sreed + Graniti Tiles & Skirtings @ 2L

M2

425

12.00

35.42

2.056

Z0U34-3560

O. Screed + Polished Marble & Skirtings @ 2L

M2

48

12.00

4.00

2.056

Z0U34-3570

O. G.Steel, Powder coated Railin to Staircase@2L

LM

26

20.00

1.30

2.056

Z0U34-3580 Z0U34-3590 Z0U34-3600

O. Primer Application Works @ 2L O. Stucco Application Works @ 2L O. Emulsion Paint Works @ 2L

M2 M2 M2

103 103 58

54.60 16.40 32.20

1.89 6.28 1.80

1.000 1.000 1.000

Z0U34-3610

I. Hollow Block Works + Lintels @ 3rd Flr.

M2

1,950.00

10.00

195.00

2.056

Z0U34-3620

I. Internal Plaster Accessories & Rush @ 3L

M2

347.00

48.46

7.16

2.000

Z0U34-3630

I. Internal Plaster Works @ 3L

M2

2,581.00

20.00

129.05

2.000

Z0U34-3640

I. Glazed Ceramic Tile @ 3L

M2

735

12.00

61.25

2.056

Z0U34-3650

I. Block Works For Ducts @ 3rd Flr.

M2

93

10.00

9.30

2.056

Z0U34-3660

I. Install False Ceiling (Susp. + Boarding) @ 3L

M2

476

7.20

66.11

2.056

Z0U34-3670

I. Screed + Ceramic Tiles & Skirtings @ 3L

M2

1746

12.00

145.50

2.056

Z0U34-3680

I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L

M2

269

32.00

8.41

2.056

Z0U34-3690

I. Water Proofing + Screed on Wet Areas - 3L

M2

683

64.00

10.67

6.000

Z0U34-3700

I. Frames Installations @ 3L

Nos.

72

4.80

15.00

2.056

1 Painter 1 Painter

5.21

1.30 3.72 3.66

2.15

7

0.31

0.15

0.15

29.70

12

2.48

1.24

1.24

7.40

14

0.53

0.26

0.26

0.01

0.056

.056 T. Crane

0.20

0.01

3.50

2

1.75

0.85

0.85

0.05

0.056

.056 T. Crane

0.10

0.05

1 Carpenter 1 Helper .056 Operator

8.48

14

0.61

0.29

0.29

0.02

0.056

.056 T. Crane

0.23

0.02

1 Carpenter 1 Helper .056 Operator

4.63

14

0.33

0.16

0.16

0.01

0.056

.056 T. Crane

0.13

0.01

72.82

14

5.20

2.53

2.53

0.14

0.056

.056 T. Crane

1.98

0.14

8.22

14

0.59

0.29

0.29

0.02

0.056

.056 T. Crane

0.22

0.02

2.67

10

0.27

0.13

0.01

0.056

.056 T. Crane

0.07

0.01

1.89 6.28 1.80

8 10 12

0.24 0.63 0.15

400.92

14

28.64

0.78

0.056

.056 T. Crane

10.92

0.78

14.32

7

258.10

12

21.51

125.93

14

19.12

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper 1 Carpenter 1 Helper .056 Operator

0.13 0.24 0.63 0.15

13.93

13.93

1.02

1.02

10.75

10.75

9.00

4.38

4.38

0.25

0.056

.056 T. Crane

3.43

0.25

2

9.56

4.65

4.65

0.26

0.056

.056 T. Crane

0.52

0.26

135.92

14

9.71

4.72

0.26

0.056

.056 T. Crane

3.70

0.26

299.15

14

21.37

10.39

10.39

0.58

0.056

.056 T. Crane

8.15

0.58

17.28

8

2.16

1.05

1.05

0.06

0.056

.056 T. Crane

0.47

0.06

64.03

10

6.40

30.84

14

2.20

0.056

.056 T. Crane

0.84

0.06

2.05

4.72

2.13

1.07

1.07

Page 46 of 63

4.27

0.06

72

4.80

15.00

2.056

1 Carpenter 1 Helper .056 Operator

30.84

12

2.57

1.25

1.25

0.07

0.056

.056 T. Crane

0.84

0.07

M2

100

4.80

20.83

2.056

1 Carpenter 1 Helper .056 Operator

42.83

14

3.06

1.49

1.49

0.08

0.056

.056 T. Crane

1.17

0.08

I. Aluminum+Glass & Other Associated Works @ 3L

M2

100

1.60

62.50

2.056

1 Alum. Tech 1 Helper .056 Operator

128.50

12

10.71

5.21

0.29

0.056

.056 T. Crane

3.50

0.29

Z0U34-3740

I. Wardrobes @ 3L

Nos.

17

0.75

22.67

2.056

1 Carpenter 1 Helper .056 Operator

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T. Crane

1.27

0.09

Z0U34-3750

I. Kitchen Cabinets @ 3L

Nos.

15

0.60

25.00

2.056

1 Carpenter 1 Helper .056 Operator

51.40

14

3.67

1.79

1.79

0.10

0.056

.056 T. Crane

1.40

0.10

Z0U34-3760 Z0U34-3770 Z0U34-3780

I. Primer Appilcation Works @ 3L I. Stucco Application Works @ 3L I. Emulsion Paint Works @ 3L

M2 M2 M2

855.00 855.00 1,649.00

54.60 16.40 32.20

15.66 52.13 51.21

1.000 1.000 1.000

15.66 52.13 51.21

12 14 14

1.30 3.72 3.66

Z0U34-3790

O. Plaster Accessories & Rush @ 3L

M2

52

48.46

1.07

2.000

Z0U34-3800

O. Plaster Works @ 3L

M2

297

20.00

14.85

2.000

Z0U34-3810

O. Polished Marble & Ceramic for Wall @ 3L

M2

36

10.00

3.60

2.056

Z0U34-3820

O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr.

M2

17

10.00

1.70

2.056

Z0U34-3830

O. Gypsum Board +Washable Paint @ 3L

M2

66

16.00

4.13

2.056

Z0U34-3840

O. Semi Recessed G.R.G. Tiles @ 3L

M2

36

16.00

2.25

2.056

Z0U34-3710

I. Doors w/ Ironmongery @ 3L

Nos.

Z0U34-3720

I. Frames Installation Works @ 3L

Z0U34-3730

Z0U34-3850

O. Screed + Polished Marble & Skirtings @ 3L

M2

48

12.00

4.00

2.056

Z0U34-3860

O. Sreed + Graniti Tiles & Skirtings @ 3L

M2

425

12.00

35.42

2.056

Z0U34-3870

O. G.Steel, Powder coated Railin to Staircase@3L

LM

26

20.00

1.30

2.056

Z0U34-3880 Z0U34-3890 Z0U34-3900

O. Primer Application Works @ 3L O. Stucco Application Works @ 3L O. Emulsion Paint Works @ 3L

M2 M2 M2

103 103 58

54.60 16.40 32.20

1.89 6.28 1.80

1.000 1.000 1.000

Z0U34-3910

I. Hollow Block Works + Lintels @ 4th Flr.

M2

1,188.00

10.00

118.80

2.056

Z0U34-3920

I. Internal Plaster Accessories & Rush @ 4L

M2

347.00

48.46

7.16

2.000

Z0U34-3930

I. Internal Plaster Works @ 4L

M2

1,252.00

20.00

62.60

2.000

Z0U34-3940

I. Glazed Ceramic Tile @ 4L

M2

808.00

12.00

67.33

2.056

Z0U34-3950

I. Block Works For Ducts @ 4th Flr.

M2

51

10.00

5.10

2.056

Z0U34-3960

I. Install False Ceiling (Susp. + Boarding) @ 4L

M2

303

7.20

42.08

2.056

Z0U34-3970

I. Screed + Ceramic Tiles & Skirtings @ 4L

M2

669

12.00

55.75

2.056

Z0U34-3980

I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L

M2

422

32.00

13.19

2.056

Z0U34-3990

I. Water Proofing + Screed on Wet Areas - 4L

M2

379

64.00

5.92

6.000

1 Painter 1 Painter 1 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator

5.21

1.30 3.72 3.66

2.15

7

0.31

0.15

0.15

29.70

12

2.48

1.24

1.24

7.40

14

0.53

0.26

0.26

0.01

0.056

.056 T. Crane

0.20

0.01

3.50

2

1.75

0.85

0.85

0.05

0.056

.056 T. Crane

0.10

0.05

1 Carpenter 1 Helper .056 Operator

8.48

14

0.61

0.29

0.29

0.02

0.056

.056 T. Crane

0.23

0.02

1 Carpenter 1 Helper .056 Operator

4.63

14

0.33

0.16

0.16

0.01

0.056

.056 T. Crane

0.13

0.01

8.22

14

0.59

0.29

0.29

0.02

0.056

.056 T. Crane

0.22

0.02

72.82

14

5.20

2.53

2.53

0.14

0.056

.056 T. Crane

1.98

0.14

2.67

10

0.27

0.13

0.01

0.056

.056 T. Crane

0.07

0.01

1.89 6.28 1.80

8 10 12

0.24 0.63 0.15

244.25

12

20.35

9.90

9.90

0.55

0.056

.056 T. Crane

6.65

0.55

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpenter 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterproof er 2 Helper

0.13 0.24 0.63 0.15

14.32

7

2.05

1.02

1.02

125.20

10

12.52

6.26

6.26

138.44

12

11.54

5.61

5.61

0.31

0.056

.056 T. Crane

3.77

0.31

10.49

2

5.24

2.55

2.55

0.14

0.056

.056 T. Crane

0.29

0.14

86.52

12

7.21

3.51

0.20

0.056

.056 T. Crane

2.36

0.20

114.62

12

9.55

4.65

4.65

0.26

0.056

.056 T. Crane

3.12

0.26

27.11

6

4.52

2.20

2.20

0.12

0.056

.056 T. Crane

0.74

0.12

3.51

35.53

8

4.44

1.48

2.96

19.28

10

1.93

0.94

0.94

0.05

0.056

.056 T. Crane

0.53

0.05

Z0U34-4000

I. Frames Installations @ 4L

Nos.

45

4.80

9.38

2.056

1 Carpenter 1 Helper .056 Operator

Z0U34-4010

I. Doors w/ Ironmongery @ 4L

Nos.

45

4.80

9.38

2.056

1 Carpenter 1 Helper .056 Operator

19.28

8

2.41

1.17

1.17

0.07

0.056

.056 T. Crane

0.53

0.07

Z0U34-4020

I. Frames Installation Works @ 4L

M2

61

4.80

12.71

2.056

1 Carpenter 1 Helper .056 Operator

26.13

12

2.18

1.06

1.06

0.06

0.056

.056 T. Crane

0.71

0.06

78.39

10

7.84

3.81

0.21

0.056

.056 T. Crane

2.14

0.21

61

1.60

38.13

2.056

1 Alum. Tech 1 Helper .056 Operator

Nos.

7

0.75

9.33

2.056

1 Carpenter 1 Helper .056 Operator

19.19

12

1.60

0.78

0.78

0.04

0.056

.056 T. Crane

0.52

0.04

I. Wardrobes @ 4L

Nos.

8

0.60

13.33

2.056

1 Carpenter 1 Helper .056 Operator

27.41

12

2.28

1.11

1.11

0.06

0.056

.056 T. Crane

0.75

0.06

Z0U34-4060 Z0U34-4070 Z0U34-4080

I. Primer Application Works @ 4L I. Stucco Installation Works @ 4L I. Emulsion Paint Works @ 4L

M2 M2 M2

387.00 387.00 876.00

54.60 16.40 32.20

7.09 23.60 27.20

1.000 1.000 1.000

7.09 23.60 27.20

10 12 12

0.71 1.97 2.27

Z0U34-4090

O. Plaster Accessories & Rush @ 4L

M2

1

48.46

0.02

2.000

0.04

7

0.01

0.003

0.003

Z0U34-4100

O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr.

M2

14

10.00

1.40

2.056

2.88

2

1.44

0.70

0.70

0.04

0.056

.056 T. Crane

0.08

0.04

Z0U34-4110

O. Plaster Works @ 4L

M2

114

20.00

5.70

2.000

11.40

10

1.14

0.57

0.57

Z0U34-4120

O. Polished Marble & Ceramic for Wall @ 4L

M2

42

10.00

4.20

2.056

8.64

12

0.72

0.35

0.35

0.02

0.056

.056 T. Crane

0.24

0.02

Z0U34-4130

O. Gypsum Board + Washable Paint @ 4L

M2

37

16.00

2.31

2.056

1 Carpenter 1 Helper .056 Operator

4.75

12

0.40

0.19

0.19

0.01

0.056

.056 T. Crane

0.13

0.01

Z0U34-4140

O. Semi Recessed G.R.G. Tiles @ 4L

M2

20

16.00

1.25

2.056

1 Carpenter 1 Helper .056 Operator

2.57

12

0.21

0.10

0.10

0.01

0.056

.056 T. Crane

0.07

0.01

2.056

1 Mason 1 Helper .056 Operator

7.20

12

0.60

0.29

0.02

0.056

.056 T. Crane

0.20

0.02

Z0U34-4030

I. Aluminum+Glass & Other Associated Works @ 4L

M2

Z0U34-4040

I. Kitchen Cabinets @ 4L

Z0U34-4050

Z0U34-4150

O. Screed + Polished Marble & Skirtings @ 4L

M2

42

12.00

3.50

1 Painter 1 Painter 1 Painter 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper .056 Operator

3.81

0.71 1.97 2.27

0.29

Page 47 of 63

Z0U34-4160

O. Sreed + Graniti Tiles & Skirtings @ 4L

M2

172

12.00

14.33

2.056

1 Mason 1 Helper .056 Operator

29.47

12

2.46

1 Alum. Tech 1 Helper .056 Operator

1.23

8

0.15

1.03 3.41 0.99

7 8 10

0.15 0.43 0.10

39.89

10

3.99

1.94

1.94

2.15

5

0.43

0.215

0.215

14.80

8

1.85

0.93

0.93

Z0U34-4170

O. G.Steel, Powder coated Railin to Staircase@4L

LM

12

20.00

0.60

2.056

Z0U34-4180 Z0U34-4190 Z0U34-4200

O. Primer Application Works @ 4L O. Stucco Application Works @ 4L O. Emulsion Paint Works @ 4L

M2 M2 M2

56 56 32

54.60 16.40 32.20

1.03 3.41 0.99

1.000 1.000 1.000

Z0U34-4210

Hollow Block Works + Lintels @ Roof Floor

M2

194

10.00

19.40

2.056

Z0U34-4220

Plaster Accessories & Rush @ Roof Floor

M2

52

48.46

1.07

2.000

Z0U34-4230

Plastering Works @ Roof Deck Floor

M2

148

20.00

7.40

2.000

Z0U34-4240 Z0U34-4250 Z0U34-4260 Z0U34-4270 Z0U34-4280 Z0U34-4290 Z0U34-4300 Z0U34-4310 Z0U34-4320 Z0U34-4330 Z0U34-4340 Z0U34-4350 Z0U34-4360 Z0U34-4370 Z0U34-4380 Z0U34-4390 Z0U34-4400 Z0U34-4410 Z0U34-4420 Z0U34-4430 Z0U34-4440 Z0U34-4450 Z0U34-4460 Z0U34-4470

Roof Drain & Access.+ Lightweight Concrete One Coat Cold Bituminous Primer 2 Layers of SBS W.P. Membrane + Water Test Alum. Foil Covering Fixed to Upstand w/ Sealant 50mm Thk. Extruded Polystyrene Insulation Protection Layer 18mm-25mm Round Aggregates (50mm Thk.) 1mm Thk. Alum. Flashing Fixed into Conc. Upstand Sealant Application Around top of Alum. Flashing Channel & Rails Installation for Lifts Cabin Assembly / Installation for lifts Machine Installation for lifts Doors Installation for lifts Connections To Ele + Finishing Touches for lifts Installation of Chute Tubes and Intake Throats Install Intake Doors, Chute Vent & Accessories Install Ground Floor Offset + Fire Shutter Door Install Compactor with MCP Installation of Garbage Container Final Test & Comm. Installation of Window Cleaning Eqmt. Primer Application Works @ Roof Deck Stucco Application Works @ Roof Deck Emulsion / Epoxy Paint Works @ Roof Deck

M2 M2 M2 LM M2 M2 M2 M2 M2 Items Items Items Items Items Item Item Item Item Item Item Item M2 M2 M2

Z0U34-4480

Excavation Works External

M3

Z0U34-4490

RCC Manholes / Gully Traps

Nos.

Z0U34-4500

Water Proofing

M2

Z0U34-4510

Sand Bedding

M2

281.00 13.00 268.00 107 268.00 268.00 268.00 107 107 2 2 2 2 2 1 1 1 1 1 1 1 50 50 55 7,137.50

1.000 1.000 1.000

1 Painter

315.00

22.66

2.000

91.07

76.00

1.20

6.000

13.21

60.00

0.22

1.250

M3

7,125.36

Z0U34-4530 Z0U34-4540 Z0U34-4550 Z0U34-4560 Z0U34-4570 Z0U34-4580 Z0U34-4590 Z0U34-4600

Instl Drainage Pipes &Con. To Existing Chambers Instl Water Supply Pipes&Con. To Existg Chambers Instl Chilled Water Pipes&Con. To Existg Chamber Instl Central Gas Pipes &Con. To Existg Chambers Instl Telephone Ducts &Con. To Existing Chambers Laying of Power cables (By Others) Hardscaping Works Landscaping Works

Item Item Item Item Item Item Item Item

Z0U34-4610

Ext. Plaster Accessories & Rush on Front Elev.

M2

1,484.00

Z0U34-4620

Ext. Plaster Works on Front Elevation

M2

19.00

Z0U34-4630

Install Balcony Handrail on Front Elev.

Nos.

Z0U34-4640

Decorative GRC Panels W/ Epoxy Paint @ F. Elev.

Nos.

Z0U34-4650

Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.

Z0U34-4660

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper 1 Mason 1 Helper

0.92 3.05 1.71

5.000

Backfilling Works

1 Painter

54.60 16.40 32.20

9.60

Z0U34-4520

1 Painter

601.00

11.86

7.500

0.08

0.00

0.08

0.056

.056 T. Crane

0.80

0.07

0.056

.056 T. Crane

0.03

0.00

0.056

.056 T. Crane

1.09

0.11

0.15 0.43 0.10 0.11

8 10 12

0.11 0.30 0.14

1 Operator 1 Helper

45.32

5

9.06

2 Carpenter 1 Mason 1 Helper 1 Operator

48.00

14

3.43

7.19

12

0.60

0.20

0.28

10

0.03

0.02

1 Painter

4Waterproof er 2 Helper 1 Helper 0.25 Operator

1.5 Operator 3 Driver 3 Helper

88.92

14

0.11 0.30 0.14

1.37

0.69

6.35

4.53

4.53

1.000

1 Excavato r

22.66

0.69

0.69

1.000

1 M. Crane

9.60

0.250

.25 Bob Cat

0.06

4.500

0.5 Shovel 3 Dump Truck .5 S. Roller .5 Bob Cat

53.35

2.54

4.53

0.69

0.40 0.01

1.27

2.54

0.01

0.42

2.54

0.42

0.42

14 12 14 12 10 7 14 12

48.46

30.62

2.000

8.00

2.38

2.000

35

15.00

2.33

2.250

17

2.00

8.50

2.500

LM

5

8.00

0.63

2.500

External Painting Works on Front Elevation

M2

1,503.00

32.20

46.68

3.000

Z0U34-4670

Ext. Plaster Access. & Rush on Leftside Elev.

M2

606

48.46

12.51

2.000

Z0U34-4680

Ext. Plaster Works on Left Side Elevation

M2

19

8.00

2.38

2.000

Z0U34-4690

Install Balcony Handrail on Leftside Elev.

Nos.

0

0.07

0.92 3.05 1.71

1 Painter

1 1 1 1 1 1 1 1

0

1.19

7 2 6 3 2 2 4 3 2 14 10 7 10 12 8 4 2 1 1 3 14

5.63

54

1 Painter

1.19

15.00

2.00

-

-

2.250

2.500

Z0U34-4700

Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.

Nos.

Z0U34-4710

External Painting Works on Left Side Elevation

M2

625

32.20

19.41

3.000

Z0U34-4720

Ext. Plaster Accessories & Rush on Rear Elev.

M2

1,503.00

48.46

31.02

2.000

Z0U34-4730

Ext. Plaster Works on Rear Elevation

M2

19.00

8.00

2.38

2.000

Z0U34-4740

Install Balcony Handrail on Rear Elev.

Nos.

35

15.00

2.33

2.250

Z0U34-4750

Decorative GRC Panels W/ Epoxy Paint @ R. Elev.

Nos.

17

2.00

8.50

2.500

8.00

0.63

2.500

1,503.00

32.20

46.68

3.000

M2

606

48.46

12.51

2.000

M2

19

8.00

2.38

2.000

1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator

61.25

2

30.62

15.31

15.31

4.75

4

1.19

0.59

0.59

5.25

12

0.44

0.19

0.19

0.05

0.250

.25 M. Crane

0.58

0.05

1 Carpenter 1 Helper .5 Operator

21.25

10

2.13

0.85

0.85

0.43

0.500

..5 M. Crane

4.25

0.43

1 Carpenter 1 Helper .5 Operator

1.56

12

0.13

0.05

0.05

0.03

0.500

.5 M. Crane

0.31

0.03

140.03

14

10.00

25.01

2

12.51

6.25

6.25

4.75

4

1.19

0.59

0.59

-

10

0.00

-

8

0.00

3 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator 1 Carpenter 1 Helper .5 Operator

58.23

12

62.03

2

31.02

4.75

4

5.25

1 Carpenter 1 Helper .5 Operator 1 Carpenter 1 Helper .5 Operator

3 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator

Z0U34-4760

Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.

LM

5

Z0U34-4770

External Painting Works on Rear Elevation

M2

Z0U34-4780

Ext. Plaster Access. & Rush on Rightside Elev.

Z0U34-4790

Ext. Plaster Works on Right Side Elevation

Z0U34-4800

Install Balcony Handrail on Rigthside Elev.

Nos.

0

15.00

-

2.250

Z0U34-4810

Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.

Nos.

0

2.00

-

2.500

1 Carpenter 1 Helper .5 Operator

Z0U34-4820 Z0U34-4830 Z0U34-4840 Z0U34-4850 Z0U34-4860 Z0U34-4870 Z0U34-4880 Z0U34-4890 Z0U34-4900 Z0U34-4910 Z0U34-4920 Z0U34-4930 Z0U34-4940 Z0U34-4950 Z0U34-4960 Z0U34-4970

External Painting Works on Right Side Elevation Snagging & Desnagging For Finishes @ GF Handing-Over For Finishes @ GF Snagging & Desnagging For Finishes @ 1F Handing-Over For Finishes @ 1F Snagging & Desnagging For Finishes @ 2F Handing-Over For Finishes @ 2F Snagging & Desnagging For Finishes @ 3F Handing-Over For Finishes @ 3F Snagging & Desnagging For Finishes @ 4F Handing-Over For Finishes @ 4F Snagging & Desnagging For Finishes @ Roof Floor Handing-Over For Finishes @ Roof Floor Power On (By DEWA) Precommissioning & Startup Availability of Chilled Water (By Others)

M2 Item Item Item Item Item Item Item Item Item Item Item Item

625 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0

3.000

3 Painter

32.20

19.41

3 Painter 1 Mason 1 Helper 1 Mason 1 Helper 1 Mason 1 Helper .25 Operator

10.00

-

-

-

-

0.250

.25 M. Crane

-

-

-

-

0.500

..5 M. Crane

-

-

4.85

4.85 15.51

15.51

1.19

0.59

0.59

12

0.44

0.19

0.19

0.05

0.250

.25 M. Crane

0.58

0.05

21.25

10

2.13

0.85

0.85

0.43

0.500

..5 M. Crane

4.25

0.43

1.56

12

0.13

0.05

0.05

0.03

0.500

.5 M. Crane

0.31

0.03

140.03

14

10.00

25.01

2

12.51

6.25

6.25

4.75

4

1.19

0.59

0.59

-

10

0.00

-

8

0.00

12

4.85

58.23

10.00

-

-

-

-

0.250

.25 M. Crane

-

-

-

-

0.500

..5 M. Crane

-

-

4.85

30 10 30 10 30 10 30 10 30 10 30 10 1 21 1

Page 48 of 63

Z0U34-4980 Z0U34-4990 Z0U34-5000 Z0U34-5010 Z0U34-5020 Z0U34-5030 Z0U34-5040 Z0U34-5050 Z0U34-5060 Z0U34-5070 Z0U34-5080 Z0U34-5090

Testing & Final Commissioning Snagging & Desnagging For External Finishes Handing-Over For External Finishes Completion of Fdn./Superstructure -Building # 34 Completion of External Works for Building # 34 Completion of MEP Works for Building # 34 Completion of Finishes for Building # 34 Completion of Fdn./SuperStruc. for Phase-1 BLDG. Completion of External Works for Phase-1 BLDG. Completion of MEP Works for Phase-1 BLDG. Completion of Finishes for Phase-1 BLDG. Completion Milestone for Phase-1 Buildings

Item Item Item Item Item Item Item Item Item

0 1 1 1 1 0 1 1 1 0 1 1

35 12 2 1 1 1 1 0 0 0 0 0

54.60 16.40 32.20 48.46

Page 49 of 63

Activity

Activity

SUB

ID

Description

ACTIVITY

Unit

QTY (F)

Prod. Rate (G)

Days (H)

(unit/day)

(F/G)

Item

Tot. Man (I)

Crew Desc.

Tot. Mdays (K)

OD (O)

(H x I)

Manpower /day (N/O)

M Carpenter

Mason

Steel Fixer

Helper

A

N - D

Operator

A

Y

Driver

Tot. Eqmt (X)

S Technicia n

Painter

Alum. Tech

Eqmt Desc.

Waterpro ofer

Tot. Edays (Z) (H x I)

E Dozer

Shovel

Dump T.

B. Roller

Q

M

T - D

B. Cat

A

Y

S. Roller

S M. Crane

Vibrator Excavator

Tower Crane

SITEWORKS Z2V33-0000

Site Clearing

M2

Z2V33-0010

Setting-out / Layout

M

Z2V33-0020

Excavation for footings + Disposal of Materials

1 Operator 1 Helper

1,597.00

4,200.00

0.38

2.000

0.76

1

0.76

163.88

76.00

2.16

2 3.000 Carpenter 1 Helper

6.47

1

6.47

576.00

409.50

1.41

2.000

1 Operator 1 Helper

2.81

2

1.41

0.83

0.75 Operator 8.250 6 Driver 1.5 Helper

6.88

3

2.29

0.77

.75 Operator 6.250 4 Driver 1.5 Helper

0.38

4.31

0.38

1.000 1 Dozer

0.38

0.38

0.28

0.28

1.000 1 Dozer

1.41

0.28

0.25

0.13

1.00

0.75 6.750 Shovel 6 D. Truck

5.63

0.53

0.41

1.00

2.16

SUBSTRUCTURE For Excavation M3

For Disposal

M3

288.00

345.60

5

Z2V33-0030

Formation Level & Compaction

M3

194

Z2V33-0040

Anti-Termite Applications (Under PCC Footings)

M2

629

202.50

3.11

1.000

2 Technican

Z2V33-0050

Backfill & Compaction upto bot. of PCC Tie-Beam

M3

286

252.00

1.13

8.250

Z2V33-0060

Anti-Termite Applications (Under PCC Tie-Beam)

M2

47

202.50

0.23

Z2V33-0070

Backfill & Compaction up to bot of PCC Grd. Slab

M3

1,431.00

252.00

Z2V33-0080

Anti-Termite Applications (Under PCC Grade Slab)

M2

921

202.50

Z2V33-0090

Shutters + 50mm Thk. PCC Under Footings

Z2V33-0100

50mm Protection Screed (Over W.P. Membrane-Ftg.)

Z2V33-0110

RCC For Footings

M2

711

M2

252.00

270.00

RCC Necks Columns / Walls + MEP Sleeves

3.11

1

3.11

0.75 Operator 6 Driver 1.5 Helper

9.36

7

1.34

1.000

2 Technican

0.23

1

0.23

5.68

8.250

0.75 Operator 6 Driver 1.5 Helper

46.85

3

15.62

4.55

1.000

2 Technican

4.55

1

4.55

11.000

1 Mason 10 Helper

28.97

2

14.48

1.32

13.17

90.00

2

45.00

4.09

40.91

2,209.00

270.00

8.18

11.000

1 Mason 10 Helper

296

180.00

1.64

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

42.76

1

42.76

Casting

M3

Formworks

M2

1,184.00

12.00

98.67

3.056

2 Carpenter 1 Helper .056 Operator

301.53

4

75.38

Rebars

kg

53,280.00

250.00

213.12

2.056

1 Steel Fixer 1 Helper .056 Operator

438.17

3

146.06

Deshuttering

M2

1,184.00

35.00

33.83

3.056

2 Carpenter 1 Helper .056 Operator

103.38

2

51.69

81.00

1.28

22.000

416.00

4.00

104.00

3.056

kg

18,720.00

200.00

93.60

M2

416.00

28.00

Casting

M3

Formworks

M2

Rebars

Deshuttering

104

-

2.41

10

Z2V33-0120

-

2

2.63

4.81

-

2 Carpenter 16 Helper 4 Mason

0.58

1

28.25

2 Carpenter 1 Helper .056 Operator

317.82

5

63.56

2.056

1 Steel Fixer 1 Helper .056 Operator

192.44

4

48.11

14.86

3.056

2 Carpenter 1 Helper .056 Operator

45.40

2

22.70

12

0.24

2.84

19.73

21.31

6.77

-

21.31

17.33

7.80

2.48

19.81

M2

128.00

28.00

4.57

3.056

2 Carpenter 1 Helper .056 Operator

13.97

2

6.99

Deshuttering

10

-

-

-

-

7.80

6.40

2.30

0.91

7.31

-

2.30

0.08

-

-

-

-

-

-

1.000

1 Vibrator

1.28

-

-

-

-

-

1.94

0.44

0.056

.056 M. Crane

5.24

0.44

1.24

0.07

0.056

.056 M. Crane

0.83

0.07

17.70

0.99

-

-

-

-

-

-

0.500

.5 Vibrator

0.09

-

-

-

-

-

0.99

0.18

0.056

.056 M. Crane

1.79

0.18

2.30

0.13

0.056

.056 M. Crane

1.29

0.13

0.46

0.03

0.056

.056 M. Crane

0.26

0.03

0.33

-

-

-

-

-

-

-

0.11

-

-

-

-

0.01

3.20

5.96

0.08

0.11

7.80

3.91

15.79

0.82

0.49

1

3

.5 Vibrator

5.82

3.91

47.37

0.500

.056 M. Crane

3.09

1 Steel Fixer 1 Helper .056 Operator

0.67

0.056

0.31

2.056

10.76

0.49

3.40

23.04

1.34

8.67

2

250.00

38.33

1.94

6.80

5,760.00

0.5 Shovel 6 D. Truck .25 B. Roller

34.56

1 Mason 10 Helper

kg

6.750

0.19

11.000

Rebars

11.36

1.89

0.62

24.45

1.42

.056 M. Crane

270.00

4

0.06

0.056

167

97.79

0.92

0.19

M2

2 Carpenter 1 Helper .056 Operator

0.12

3.38

50mm Screed (Over W.P. Membrane-T.B.)

3.056

7.66

1.19

Z2V33-0140

32.00

0.5 Shovel 6 D. Truck .25 B. Roller

11.93

1.00

4.00

6.750

.056 M. Crane

0.10

128.00

0.97

0.056

1.10

M2

0.12

1.19

2

Formworks

0.10

-

21.31

2.20

22.000

1.54

-

0.55

1 Mason 10 Helper

0.18

0.19

-

5.53

11.000

180.00

-

.056 M. Crane

0.20

32

3.66

1.00

0.056

270.00

M3

1.54

0.13

0.55

54

Casting

0.28 0.5 Shovel 4 D. 4.750 Truck .25 B. Roller

9.87

M2

RCC Tie Beams + MEP Sleeves

-

4.55

Shutters + 50mm Thk. PCC Under Tie-Beams

Z2V33-0150

-

0.23

Z2V33-0130

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

-

1.00

3.11

26.50

28.25

0.29

-

0.13

-

-

-

-

-

-

0.33

0.01

Z2V33-0160

RCC Kickers Over Tie-Beam

180.00

0.01

22.000

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

0.12

1

0.12

4.00

4.00

1.00

3.056

2 Carpenter 1 Helper .056 Operator

3.06

1

3.06

kg

180.00

250.00

0.72

2.056

1 Steel Fixer 1 Helper .056 Operator

1.48

1

1.48

M2

4.00

28.00

0.14

3.056

2 Carpenter 1 Helper .056 Operator

0.44

1

0.44

Casting

M3

Formworks

M2

Rebars

Deshuttering

1

4

0.50

0.18

0.07

0.57

-

0.18

0.500

.5 Vibrator

0.00

0.001

0.25

0.01

0.056

.056 M. Crane

0.06

0.01

0.18

0.01

0.056

.056 M. Crane

0.04

0.01

0.04

0.00

0.056

.056 M. Crane

0.01

0.00

0.47

0.03

0.03

0

Z2V33-0170

50mm Thk. PCC Under Grade Slab

M2

1,041.00

270.00

3.86

11.000

1 Mason 10 Helper

42.41

2

21.21

Z2V33-0180

Mesh + Filler Board & RCC For Grade Slab

M3

168

180.00

0.93

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

24.27

3

8.09

Z2V33-0190

50mm Thk. PCC Steps & Ramps

M2

17

270.00

0.06

11.000

1 Mason 10 Helper

0.69

2

0.35

Z2V33-0200

Steps & Ramps Works + Place Conc.

M3

7

180.00

0.04

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

1.01

8

0.13

Z2V33-0210

Waterproofing Membrane (Over PCC Footings)

M2

1,754.00

152.00

11.54

6.000

4 Waterproo fer 2 Helper

69.24

2

34.62

11.54

23.08

-

Z2V33-0220

Water Proofing For Neck Column & Wall & Footing

M2

2,639.00

152.00

17.36

6.000

4 Waterproo fer 2 Helper

104.17

3

34.72

11.57

23.15

-

5.17

2

2.59

0.86

1.72

-

0.59

1.18

-

Z2V33-0230

Waterproofing Membrane (Over PCC Tie-beams)

M2

131

152.00

0.86

6.000

4 Waterproo fer 2 Helper

Z2V33-0240

Waterproofing Membrane For Tie Beams

M2

134

152.00

0.88

6.000

4 Waterproo fer 2 Helper

5.29

3

1.76

Z2V33-0250

50mm Thk. PCC Under Base of Tank

M2

68

270.00

0.25

11.000

1 Mason 10 Helper

2.77

1

2.77

4.78

1

4.78

Z2V33-0260

Waterproofing Membrane (Over PCC - Base)

M2

121

152.00

0.80

6.000

4 Waterproo fer 2 Helper

Z2V33-0270

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

210

270.00

0.78

11.000

1 Mason 10 Helper

8.56

1

8.56

5.63

1

5.63

Z2V33-0280

RCC Water Tank Base + Deshuttering

180.00

0.22

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

156.00

12.00

13.00

3.056

2 Carpenter 1 Helper .056 Operator

39.73

1

39.73

kg

7,020.00

250.00

28.08

2.056

1 Steel Fixer 1 Helper .056 Operator

57.73

1

57.73

M2

156.00

35.00

4.46

3.056

2 Carpenter 1 Helper .056 Operator

13.62

1

13.62

Casting

M3

Formworks

M2

Rebars

Deshuttering

39

4

Z2V33-0290

RCC Wall W/MEP Pipes & Water Stop + Deshuttering

81.00

0.43

22.000

140.00

4.00

35.00

3.056

kg

6,300.00

200.00

31.50

M2

140.00

28.00

5.00

Casting

M3

Formworks

M2

Rebars

Deshuttering

35

2 Carpenter 16 Helper 4 Mason

RCC Top Slab + Deshuttering for Water Tank

0.31

9.51

1

9.51

2 Carpenter 1 Helper .056 Operator

106.96

2

53.48

2.056

1 Steel Fixer 1 Helper .056 Operator

64.76

1

64.76

3.056

2 Carpenter 1 Helper .056 Operator

15.28

1

15.28

0.01

1.16

1

1.16

Casting

M3

8.00

180.00

0.04

26.000

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter 1 Helper .056 Operator

7.64

2

3.82

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel Fixer 1 Helper .056 Operator

14.80

1

14.80

1.87

0.31

5.60

1.000

1 Vibrator

0.93

0.31

1.000

1 Vibrator

0.04

0.01

0.31

0.03

0.00

0.25

0.09

2.52

-

1.59

0.78

3.18

-

7.78

6.50

7.02

2.23

-

7.02

14.00

6.30

2.00

16.00

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

19.28

0.03

8.73

5

Z2V33-0300

1.93

-

6.30

1.00

1.44

-

0.500

.5 Vibrator

0.11

0.03

3.25

0.18

0.056

.056 M. Crane

0.73

0.18

7.02

0.39

0.056

.056 M. Crane

1.57

0.39

1.11

0.06

0.056

.056 M. Crane

0.25

0.06

11.38

0.64

-

-

-

-

-

-

1.000

1 Vibrator

0.43

-

-

-

-

-

0.64

0.39

0.056

.056 M. Crane

1.96

0.39

6.30

0.35

0.056

.056 M. Crane

1.76

0.35

1.00

0.06

0.056

.056 M. Crane

0.28

0.06

0.80

-

-

-

-

-

-

1.000

1 Vibrator

0.04

-

-

0.09

7.00

14.30

0.03

-

-

-

-

-

0.80

0.09

0.01

0.50

0.03

0.056

.056 M. Crane

0.14

0.03

1.44

0.08

0.056

.056 M. Crane

0.40

0.08

-

-

Deshuttering

M2

40.00

32.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

3.82

1

3.82

5

0.50

0.25

1.50

-

1.44

2.19

0.01

0.056

0.12

-

-

-

-

.056 M. Crane

0.07

-

0.01

-

-

-

-

-

-

0.12

0.01

-

-

Z2V33-0310

Water Proofing Membrane all around outside surfc

M2

235

152.00

1.55

6.000

4 Waterproo fer 2 Helper

9.28

2

4.64

1.55

3.09

-

Z2V33-0320

Protection Board all around outside surface

M2

350

152.00

2.30

6.000

4 Waterproo fer 2 Helper

13.82

2

6.91

2.30

4.61

-

Z2V33-0330

Backfill around Water tank walls

M3

7

252.00

0.03

8.250

0.75 Operator 6 Driver 1.5 Helper

0.23

3

0.08

0.01

Z2V33-0340

G.R.P. Lining around inside + S.S. Lader & Door

M2

252

20.00

12.60

2.000

1 Mason 1 Helper

Z2V33-0350

50mm Thk. PCC Under Base of Elevator Shaft

M2

30

270.00

0.11

25.20

3

8.40

4.20

4.20

11.000

1 Mason 10 Helper

1.22

1

1.22

0.11

1.11

2.13

1

2.13

Z2V33-0360

Waterproofing Membrane (Over PCC - Base)

M2

54

152.00

0.36

6.000

4 Waterproo fer 2 Helper

Z2V33-0370

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

94

270.00

0.35

11.000

1 Mason 10 Helper

3.83

1

3.83

Z2V33-0380

RCC Elevator Shaft Base + Deshuttering

14

180.00

0.08

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2.02

1

2.02

Casting

M3

Formworks

M2

56.00

12.00

4.67

3.056

2 Carpenter 1 Helper .056 Operator

14.26

1

14.26

Rebars

kg

2,520.00

250.00

10.08

2.056

1 Steel Fixer 1 Helper .056 Operator

20.72

1

20.72

Deshuttering

M2

56.00

35.00

1.60

3.056

2 Carpenter 1 Helper .056 Operator

4.89

1

4.89

4

Z2V33-0390

RCC Wall W/ MEP Cond. + Deshuttering

Casting

M3

Formworks

M2

Rebars

Deshuttering

6

2 Carpenter 16 Helper 4 Mason

1

1.63

2 Carpenter 1 Helper .056 Operator

18.34

2

9.17

2.056

1 Steel Fixer 1 Helper .056 Operator

11.10

1

11.10

0.86

3.056

2 Carpenter 1 Helper .056 Operator

2.62

1

2.62

0.07

22.000

24.00

4.00

6.00

3.056

kg

1,080.00

200.00

5.40

M2

24.00

28.00

5

0.06

6.750

0.35

0.19

0.01

0.05

0.00

1.42

-

3.48

2.33

2.52

0.80

-

2.52

2.40

1.08

0.34

2.74

0.5 Shovel 6 D. Truck .25 B. Roller

-

0.71

3.13

1.63

81.00

0.01

-

1.08

-

0.500

.5 Vibrator

0.04

0.01

1.17

0.07

0.056

.056 M. Crane

0.26

0.07

2.52

0.14

0.056

.056 M. Crane

0.56

0.14

0.40

0.02

0.056

.056 M. Crane

0.09

0.02

4.09

0.23

-

-

-

-

-

-

1.000

1 Vibrator

0.07

-

-

-

-

-

0.23

0.07

0.056

.056 M. Crane

0.34

0.07

1.08

0.06

0.056

.056 M. Crane

0.30

0.06

0.17

0.01

0.056

.056 M. Crane

0.05

0.01

0.14

-

-

-

-

-

-

-

0.01

1.20

2.45

0.01

-

-

-

-

-

-

0.14

0.01

-

-

Z2V33-0400

Water Proofing Membrane all around outside surfc

M2

522

152.00

3.43

6.000

4 Waterproo fer 2 Helper

20.61

3

6.87

2.29

4.58

-

Z2V33-0410

Protection Board all around outside surface

M2

50

152.00

0.33

6.000

4 Waterproo fer 2 Helper

1.97

2

0.99

0.33

0.66

-

Z2V33-0420

Backfill around the Lift's Pit wall

M3

7

252.00

0.03

8.250

0.75 Operator 6 Driver 1.5 Helper

0.23

3

0.08

0.01

Z2V33-0430

RCC For Wall/Col. From Top of Grade Slab-1L

81.00

3.02

22.000

66.54

1

66.54

245

2 Carpenter 16 Helper 4 Mason

Casting

M3

Formworks

M2

980.00

4.00

245.00

3.056

2 Carpenter 1 Helper .056 Operator

748.72

5

149.74

Rebars

kg

44,100.00

200.00

220.50

2.056

1 Steel Fixer 1 Helper .056 Operator

453.35

4

113.34

Deshuttering

M2

980.00

28.00

35.00

3.056

2 Carpenter 1 Helper .056 Operator

106.96

2

53.48

12

Z2V33-0440

Columns From Top of Grade Slab-1L (Canopy)

Casting

M3

Formworks

M2

Rebars

kg

1

81.00

0.01

22.000

4.00

4.00

1.00

3.056

180.00

200.00

0.90

2.056

2 Carpenter 16 Helper 4 Mason

40.83

18.38

5.83

46.67

0.27

1

0.27

2 Carpenter 1 Helper .056 Operator

3.06

2

1.53

1 Steel Fixer 1 Helper .056 Operator

1.85

2

0.93

-

18.38

0.33

0.15

0.01

0.06

6.750

0.5 Shovel 6 D. Truck .25 B. Roller

0.19

1.000

1 Vibrator

3.02

0.01

0.05

0.00

0.25

20.42

1.14

0.056

.056 M. Crane

13.72

1.14

18.38

1.03

0.056

.056 M. Crane

12.35

1.03

2.92

0.16

0.056

.056 M. Crane

1.96

0.16

41.71

2.34

-

-

-

-

-

-

1.000

1 Vibrator

0.01

-

-

-

-

-

2.34

0.25

0.00

0.17

0.01

0.056

.056 M. Crane

0.06

0.01

0.15

0.01

0.056

.056 M. Crane

0.05

0.01

-

-

Deshuttering

M2

28.00

4.00

0.14

3.056

2 Carpenter 1 Helper .056 Operator

26.14

1

26.14

0.44

1

0.44

6

Z2V33-0450

RCC Slab / Beam - 1L

0.38

Casting

M3

181.00

180.00

1.01

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

Formworks

M2

905.00

16.00

56.56

3.056

2 Carpenter 1 Helper .056 Operator

172.86

6

28.81

Rebars

kg

32,580.00

200.00

162.90

2.056

1 Steel Fixer 1 Helper .056 Operator

334.92

5

66.98

Deshuttering

M2

905.00

32.00

28.28

3.056

2 Carpenter 1 Helper .056 Operator

86.43

2

43.21

14

Z2V33-0460

RCC For Stair/Landings @ G.L. - 1L

Casting

M3

Formworks

M2

Rebars

Deshuttering

9

2 Carpenter 16 Helper 4 Mason

1

2.44

2 Carpenter 1 Helper .056 Operator

34.38

4

8.60

2.056

1 Steel Fixer 1 Helper .056 Operator

16.65

3

5.55

3.056

2 Carpenter 1 Helper .056 Operator

4.91

2

2.46

1.16

1

1.16

0.11

22.000

45.00

4.00

11.25

3.056

kg

1,620.00

200.00

8.10

M2

45.00

28.00

1.61

10

Z2V33-0470

RCC Canopy

Casting

M3

8.00

180.00

0.04

26.000

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter 1 Helper .056 Operator

7.64

4

1.91

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel Fixer 1 Helper .056 Operator

14.80

3

4.93

Deshuttering

M2

40.00

32.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

3.82

1

3.82

9

Z2V33-0480

RCC For Wall/Col. From Top of 1L-2L

81.00

2.90

22.000

940.00

4.00

235.00

3.056

kg

42,300.00

200.00

211.50

M2

940.00

28.00

33.57

Casting

M3

Formworks

M2

Rebars

Deshuttering

235

2 Carpenter 16 Helper 4 Mason

1

63.83

2 Carpenter 1 Helper .056 Operator

718.16

5

143.63

2.056

1 Steel Fixer 1 Helper .056 Operator

434.84

4

108.71

3.056

2 Carpenter 1 Helper .056 Operator

102.59

2

51.30

25.71

1

25.71

12

Z2V33-0490

RCC Slab / Beam - 2L

Casting

M3

178.00

180.00

0.99

26.000

Formworks

M2

890.00

16.00

55.63

3.056

2 Carpenter 1 Helper .056 Operator

169.99

6

28.33

Rebars

kg

32,040.00

200.00

160.20

2.056

1 Steel Fixer 1 Helper .056 Operator

329.37

5

65.87

Deshuttering

M2

890.00

32.00

27.81

3.056

2 Carpenter 1 Helper .056 Operator

85.00

2

42.50

14

Z2V33-0500

RCC for Stair/Landings @ 1L-2L

Casting

M3

9

81.00

0.11

22.000

2 Carpenter 16 Helper 4 Mason

2.44

1

11.64

0.81

0.32

-

0.81

0.56

0.80

0.28

-

0.80

39.17

17.63

5.60

-

17.63

7.95

11.44

3.97

11.92

2.44

-

2.25

44.76

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

0.15

4.04

0.83

63.83

-

11.64

2.57

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

0.02

8.08

12.12

2.44

81.00

0.05

-

11.44

0.34

0.00

0.02

0.056

-

-

-

-

.056 M. Crane

0.01

-

0.00

-

1.000

1 Vibrator

1.01

-

-

-

-

-

0.02

0.23

0.056

.056 M. Crane

3.17

0.23

11.64

0.65

0.056

.056 M. Crane

9.12

0.65

2.02

0.11

0.056

.056 M. Crane

1.58

0.11

0.99

-

-

-

-

-

-

1.000

1 Vibrator

0.11

-

-

-

-

-

0.99

0.06

0.056

.056 M. Crane

0.63

0.06

0.81

0.05

0.056

.056 M. Crane

0.45

0.05

0.16

0.01

0.056

.056 M. Crane

0.09

0.01

0.12

-

-

-

-

-

-

1.000

1 Vibrator

0.04

-

-

-

-

-

0.12

0.02

0.056

.056 M. Crane

0.14

0.02

0.80

0.04

0.056

.056 M. Crane

0.40

0.04

0.14

0.01

0.056

.056 M. Crane

0.07

0.01

0.07

-

-

-

-

-

-

1.000

1 Vibrator

-

-

-

-

-

0.07

2.90

1.10

0.056

.056 M. Crane

13.16

1.10

17.63

0.99

0.056

.056 M. Crane

11.84

0.99

2.80

0.16

0.056

.056 M. Crane

1.88

0.16

2.24

-

-

-

-

-

-

1.000

1 Vibrator

0.99

-

-

-

-

-

2.24

0.22

0.056

.056 M. Crane

3.12

0.22

11.44

0.64

0.056

.056 M. Crane

8.97

0.64

1.99

0.11

0.056

.056 M. Crane

1.56

0.11

0.97

-

-

-

-

-

-

1.000

1 Vibrator

0.11

-

0.01

-

-

0.00

-

-

0.24

-

-

-

-

0.07

3.97

17.40

-

0.24

19.58

40.01

0.07

0.00

0.28

1.22

-

0.01

1.13

2.10

-

0.07

4.04

17.70

0.00

-

-

-

-

-

0.97

0.07

0.01

Z2V33-0510 Z2V33-0520 Z2V33-0530

RCC For Wall/Col. From Top of 2L-3L RCC Slab / Beam - 3L RCC For Stair/Landings @ 2L-3L

Z2V33-0540

RCC For Wall/Col. From Top of 3L-4L

Formworks

M2

45.00

4.00

11.25

3.056

2 Carpenter 1 Helper .056 Operator

34.38

4

8.60

Rebars

kg

1,620.00

200.00

8.10

2.056

1 Steel Fixer 1 Helper .056 Operator

16.65

3

5.55

Deshuttering

M2

45.00

28.00

1.61

3.056

2 Carpenter 1 Helper .056 Operator

4.91

2

2.46

M3 M3 M3

10 12 14 10

237 234 7

Casting

M3

Formworks

M2

Rebars

Deshuttering

237

2 Carpenter 16 Helper 4 Mason

1

64.37

2 Carpenter 1 Helper .056 Operator

724.27

5

144.85

2.056

1 Steel Fixer 1 Helper .056 Operator

438.54

4

109.64

3.056

2 Carpenter 1 Helper .056 Operator

103.47

2

51.73

25.71

1

25.71

2.93

22.000

948.00

4.00

237.00

3.056

kg

42,660.00

200.00

213.30

M2

948.00

28.00

33.86

12

Z2V33-0550

RCC Slab / Beam - 4L

Z2V33-0560

RCC For Stair/Landings @ 3L-4L

Z2V33-0570

RCC For Wall/Col. From Top of 4L-RoofL

Casting

M3

178.00

180.00

0.99

26.000

Formworks

M2

890.00

16.00

55.63

3.056

2 Carpenter 1 Helper .056 Operator

169.99

6

28.33

Rebars

kg

32,040.00

200.00

160.20

2.056

1 Steel Fixer 1 Helper .056 Operator

329.37

5

65.87

Deshuttering

M2

890.00

32.00

27.81

3.056

2 Carpenter 1 Helper .056 Operator

85.00

2

42.50

14 10

9

Casting

M3

Formworks

M2

Rebars

Deshuttering

235

2 Carpenter 16 Helper 4 Mason

1

63.83

2 Carpenter 1 Helper .056 Operator

718.16

4

179.54

2.056

1 Steel Fixer 1 Helper .056 Operator

434.84

3

144.95

3.056

2 Carpenter 1 Helper .056 Operator

102.59

2

51.30

2.90

22.000

940.00

4.00

235.00

3.056

kg

42,300.00

200.00

211.50

M2

940.00

28.00

33.57

10

Z2V33-0580

RCC Wall/Col. For Staircase From Top of 4L-RoofL

Casting

M3

Formworks

M2

Rebars

Deshuttering

2

2 Carpenter 16 Helper 4 Mason

1

0.54

2 Carpenter 1 Helper .056 Operator

6.11

2

3.06

2.056

1 Steel Fixer 1 Helper .056 Operator

3.70

2

1.85

3.056

2 Carpenter 1 Helper .056 Operator

0.87

1

0.87

25.42

1

25.42

168.08

5

33.62

0.02

22.000

8.00

4.00

2.00

3.056

kg

360.00

200.00

1.80

M2

8.00

28.00

0.29

6

Z2V33-0590

RCC Slab / Beam - RoofL

Casting

M3

176.00

180.00

0.98

26.000

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

Formworks

M2

880.00

16.00

55.00

3.056

2 Carpenter 1 Helper .056 Operator

0.81

17.78

5.64

-

17.78

7.95

11.44

3.97

-

11.44

47.00

21.15

6.71

53.71

0.54

81.00

-

39.50

11.92

63.83

81.00

0.32

45.14

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

M3

0.81

2.57

64.37

81.00

2.25

-

21.15

0.67

0.30

0.10

0.76

9.17

-

0.30

1.13

0.06

0.056

.056 M. Crane

0.63

0.06

0.81

0.05

0.056

.056 M. Crane

0.45

0.05

0.16

0.01

0.056

.056 M. Crane

0.09

0.01

2.10

0.12

-

-

-

-

-

-

1.000

1 Vibrator

-

-

-

-

-

0.12

2.93

1.11

0.056

.056 M. Crane

13.27

1.11

17.78

1.00

0.056

.056 M. Crane

11.94

1.00

2.82

0.16

0.056

.056 M. Crane

1.90

0.16

2.26

-

-

-

-

-

-

1.000

1 Vibrator

0.99

-

-

-

-

-

2.26

0.22

0.056

.056 M. Crane

3.12

0.22

11.44

0.64

0.056

.056 M. Crane

8.97

0.64

1.99

0.11

0.056

.056 M. Crane

1.56

0.11

0.97

-

-

-

-

-

-

1.000

1 Vibrator

-

-

-

-

-

0.97

2.90

1.32

0.056

.056 M. Crane

13.16

1.32

21.15

1.18

0.056

.056 M. Crane

11.84

1.18

3.36

0.19

0.056

.056 M. Crane

1.88

0.19

2.69

-

-

-

-

-

-

1.000

1 Vibrator

0.02

-

-

-

-

-

2.69

0.02

0.056

.056 M. Crane

0.11

0.02

0.30

0.02

0.056

.056 M. Crane

0.10

0.02

0.05

0.00

0.056

.056 M. Crane

0.02

0.00

4.58

0.04

0.26

-

-

-

-

-

-

1.000

1 Vibrator

0.98

0.056

.056 M. Crane

3.08

-

-

0.07

-

-

0.29

-

-

-

-

0.00

0.33

0.68

0.24

0.29

23.50

48.01

-

0.07

3.97

17.40

-

0.24

19.75

40.35

0.01

-

-

-

-

-

0.04

0.00

0.08

0.26

Rebars

kg

31,680.00

200.00

158.40

2.056

1 Steel Fixer 1 Helper .056 Operator

325.67

4

81.42

Deshuttering

M2

880.00

32.00

27.50

3.056

2 Carpenter 1 Helper .056 Operator

84.04

2

42.02

12

Z2V33-0600

RCC For Stair/Landings @ 4L-RoofL

81.00

0.11

22.000

45.00

4.00

11.25

3.056

kg

1,620.00

200.00

8.10

M2

45.00

28.00

1.61

Casting

M3

Formworks

M2

Rebars

Deshuttering

9

2 Carpenter 16 Helper 4 Mason

RCC Slab / Beam for Staircase - RoofL

2.44

1

2.44

2 Carpenter 1 Helper .056 Operator

34.38

3

11.46

2.056

1 Steel Fixer 1 Helper .056 Operator

16.65

3

5.55

3.056

2 Carpenter 1 Helper .056 Operator

4.91

1

4.91

0.58

1

0.58

Casting

M3

4.00

180.00

0.02

26.000

Formworks

M2

20.00

16.00

1.25

3.056

2 Carpenter 1 Helper .056 Operator

3.82

3

1.27

Rebars

kg

720.00

200.00

3.60

2.056

1 Steel Fixer 1 Helper .056 Operator

7.40

2

3.70

Deshuttering

M2

20.00

32.00

0.63

3.056

2 Carpenter 1 Helper .056 Operator

1.91

1

1.91

7

Z2V33-0620

RCC For Lower Parapet

81.00

0.23

22.000

76.00

4.00

19.00

3.056

kg

3,420.00

200.00

17.10

M2

76.00

28.00

2.71

Casting

M3

Formworks

M2

Rebars

Deshuttering

19

1

5.16

2 Carpenter 1 Helper .056 Operator

58.06

4

14.52

2.056

1 Steel Fixer 1 Helper .056 Operator

35.16

3

11.72

3.056

2 Carpenter 1 Helper .056 Operator

8.29

2

4.15

10

Z2V33-0630

RCC For Wall/Col. From Roof L-Top of Roof L

81.00

0.41

22.000

132.00

4.00

33.00

3.056

kg

5,940.00

200.00

29.70

M2

132.00

28.00

4.71

Casting

M3

Formworks

M2

Rebars

Deshuttering

33

2 Carpenter 16 Helper 4 Mason

1

8.96

2 Carpenter 1 Helper .056 Operator

100.85

2

50.42

2.056

1 Steel Fixer 1 Helper .056 Operator

61.06

2

30.53

3.056

2 Carpenter 1 Helper .056 Operator

14.41

1

14.41

5.49

1

5.49

6

Z2V33-0640

RCC Slab / Beam Top Roof Level

Casting

M3

38.00

180.00

0.21

26.000

Formworks

M2

190.00

16.00

11.88

3.056

2 Carpenter 1 Helper .056 Operator

36.29

3

12.10

Rebars

kg

6,840.00

200.00

34.20

2.056

1 Steel Fixer 1 Helper .056 Operator

70.32

2

35.16

Deshuttering

M2

190.00

32.00

5.94

3.056

2 Carpenter 1 Helper .056 Operator

18.15

1

18.15

-

1.01

0.36

0.51

0.18

-

0.51

3.80

1.71

0.54

-

1.71

11.00

4.95

1.57

12.57

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

7

0.40

4.34

8.96

13.20

1.01

0.54

5.16

-

2.81

3.21

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 16 Helper 4 Mason

4.58

13.75

8

Z2V33-0610

13.20

-

4.95

3.39

4.89

1.70

5.09

-

4.89

13.20

0.74

0.056

.056 M. Crane

8.87

0.74

2.29

0.13

0.056

.056 M. Crane

1.54

0.13

20.08

1.12

-

-

-

-

-

-

1.000

1 Vibrator

0.11

-

-

-

-

-

1.12

0.08

0.056

.056 M. Crane

0.63

0.08

1.01

0.06

0.056

.056 M. Crane

0.45

0.06

0.20

0.01

0.056

.056 M. Crane

0.09

0.01

0.15

-

-

-

-

-

-

1.000

1 Vibrator

0.02

-

-

-

-

-

0.15

0.01

0.056

.056 M. Crane

0.07

0.01

0.51

0.03

0.056

.056 M. Crane

0.20

0.03

0.09

0.00

0.056

.056 M. Crane

0.04

0.01

0.04

-

-

-

-

-

-

1.000

1 Vibrator

0.23

-

-

-

-

-

0.04

0.11

0.056

.056 M. Crane

1.06

0.11

1.71

0.10

0.056

.056 M. Crane

0.96

0.10

0.27

0.02

0.056

.056 M. Crane

0.15

0.02

0.22

-

-

-

-

-

-

1.000

1 Vibrator

0.41

-

-

-

-

-

0.22

0.31

0.056

.056 M. Crane

1.85

0.31

4.95

0.28

0.056

.056 M. Crane

1.66

0.28

0.79

0.04

0.056

.056 M. Crane

0.26

0.04

0.63

-

-

-

-

-

-

1.000

1 Vibrator

0.21

-

-

-

-

-

0.63

0.09

0.056

.056 M. Crane

0.67

0.10

4.89

0.27

0.056

.056 M. Crane

1.92

0.27

0.85

0.05

0.056

.056 M. Crane

0.33

0.05

0.42

-

-

-

-

-

-

0.00

-

-

0.02

-

-

0.07

-

-

-

-

0.03

1.70

7.43

-

0.07

5.50

11.24

0.01

0.02

1.90

3.88

-

0.00

0.18

0.78

-

0.01

1.41

2.62

0.08

-

-

-

-

-

-

0.42

0.03

Z2V33-0650

RCC For Upper Parapet

81.00

0.30

22.000

96.00

4.00

24.00

3.056

kg

4,320.00

200.00

21.60

M2

96.00

28.00

3.43

Casting

M3

Formworks

M2

Rebars

Deshuttering

24

2 Carpenter 16 Helper 4 Mason

6.52

1

6.52

2 Carpenter 1 Helper .056 Operator

73.34

3

24.45

2.056

1 Steel Fixer 1 Helper .056 Operator

44.41

3

14.80

3.056

2 Carpenter 1 Helper .056 Operator

10.48

1

10.48

0.14

1

0.14

8

Z2V33-0660

RCC Eqmt. Pads + Railing

180.00

0.01

26.000

4.00

12.00

0.33

3.056

2 Carpenter 1 Helper .056 Operator

1.02

4

0.25

kg

180.00

250.00

0.72

2.056

1 Steel Fixer 1 Helper .056 Operator

1.48

3

0.49

M2

4.00

35.00

0.11

3.056

2 Carpenter 1 Helper .056 Operator

0.35

2

0.17

M3

Formworks

M2

Rebars

Deshuttering

1

2.70

0.86

6.86

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

Casting

6.00

10

-

2.70

0.07

0.07

0.02

0.09

-

0.07

1.000

1 Vibrator

0.30

0.04

3.00

0.17

0.056

.056 M. Crane

1.34

0.17

2.70

0.15

0.056

.056 M. Crane

1.21

0.15

0.43

0.02

0.056

.056 M. Crane

0.19

0.02

6.13

0.34

-

-

-

-

-

-

0.500

.5 Vibrator

0.00

-

-

-

-

-

0.34

0.00

0.056

.056 M. Crane

0.02

0.00

0.07

0.00

0.056

.056 M. Crane

0.04

0.00

0.01

0.00

0.056

.056 M. Crane

0.01

0.00

0.01

-

-

-

-

-

-

-

-

-

0.00

0.03

0.12

0.04

-

-

-

-

-

-

0.01

0.00

MEP FINISHES

10.00

151.20

2.056

1 Mason 1 Helper .056 Operator

72.00

48.46

1.49

2.000

1 Mason 1 Helper

M2

2,436.00

20.00

121.80

2.000

I. Glazed Ceramic Tile @ GL

M2

712

12.00

59.33

2.056

Z2V33-3130

I. Block Works For Ducts @ Grnd Flr.

M2

54

10.00

5.40

2.056

Z2V33-3140

I. Install False Ceiling (Susp. + Boarding) @ GL

M2

373

7.20

51.81

2.056

Z2V33-3150

I. Screed + Ceramic Tiles & Skirtings @ GL

M2

1212

12.00

101.00

2.056

Z2V33-3160

I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL

M2

314

32.00

9.81

2.056

Z2V33-3170

I. Water Proofing + Screed on Wet Areas - GL

M2

683

64.00

10.67

6.000

Z2V33-3180

I. Frames Installations @ GL

Nos.

54

4.80

11.25

2.056

Z2V33-3190

I. Doors w/ Ironmongery @ GL

Nos.

54

4.80

11.25

2.056

Z2V33-3200

I. Frames Installation Works @ GL

M2

183

4.80

38.13

2.056

Z2V33-3210

I.Aluminum + Glass & Other Associated Works @ GL

M2

183

1.60

114.38

2.056

Z2V33-3220

I. Kitchen Cabinets @ GL

Nos.

11

0.60

18.33

2.056

Z2V33-3230

I. Wardrobes @ GL

Nos.

14

0.75

18.67

2.056

Z2V33-3240 Z2V33-3250 Z2V33-3260

I. Primer Application Works @ GL I. Stucco Application Works @ GL I. Emulsion Paint Works @ GL

M2 M2 M2

788.00 788.00 971.00

54.60 16.40 32.20

14.43 48.05 30.16

1.000 1.000 1.000

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter

Z2V33-3270

O. Plaster Accessories & Rush @ GL

M2

72

48.46

1.49

2.000

1 Mason 1 Helper

Z2V33-3090

I. Hollow Block Works + Lintels @ Grnd Flr.

M2

Z2V33-3100

I. Internal Plaster Accessories & Rush @ GL

M2

Z2V33-3110

I. Internal Plaster Works @ GL

Z2V33-3120

1,512.00

310.87

14

22.20

2.97

7

243.60

12

20.30

121.99

14

11.10

10.80

0.42

10.80

0.60

0.056

.056 T. Crane

8.47

0.60

0.21

0.21

10.15

10.15

8.71

4.24

4.24

0.24

0.056

.056 T. Crane

3.32

0.24

2

5.55

2.70

2.70

0.15

0.056

.056 T. Crane

0.30

0.15

106.51

14

7.61

3.70

0.21

0.056

.056 T. Crane

2.90

0.21

207.66

14

14.83

7.21

7.21

0.40

0.056

.056 T. Crane

5.66

0.40

20.17

14

1.44

0.70

0.70

0.04

0.056

.056 T. Crane

0.55

0.04

64.03

10

6.40

23.13

14

1.65

0.80

0.80

0.05

0.056

.056 T. Crane

0.63

0.05

23.13

12

1.93

0.94

0.94

0.05

0.056

.056 T. Crane

0.63

0.05

78.39

14

5.60

2.72

2.72

0.15

0.056

.056 T. Crane

2.14

0.15

235.16

12

19.60

9.53

0.53

0.056

.056 T. Crane

6.41

0.53

37.69

14

2.69

1.31

1.31

0.07

0.056

.056 T. Crane

1.03

0.07

38.38

14

2.74

1.33

1.33

0.07

0.056

.056 T. Crane

1.05

0.07

14.43 48.05 30.16

10 14 12

1.44 3.43 2.51

2.97

7

0.42

3.70

2.13

4.27

9.53

1.44 3.43 2.51 0.21

0.21

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator

Z2V33-3280

O. Plaster Works @ GL

M2

370

20.00

18.50

2.000

Z2V33-3290

O. Polished Marble & Ceramic for Wall @ GL

M2

351

10.00

35.10

2.056

Z2V33-3300

O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.

M2

27

10.00

2.70

2.056

Z2V33-3310

O. Gypsum Board +Washable Paint @ GL

M2

61

16.00

3.81

2.056

Z2V33-3320

O. Semi Recessed G.R.G. Tiles @ GL

M2

50

16.00

3.13

2.056

Z2V33-3330

O. Sreed + Graniti Tiles & Skirtings @ GL

M2

427

12.00

35.58

2.056

Z2V33-3340

O. Screed + Polished Marble & Skirtings @ GL

M2

196

12.00

16.33

2.056

Z2V33-3350

O. G. Stl, Powdr coated Railin to Staircase @ GL

LM

24

20.00

1.20

2.056

Z2V33-3360 Z2V33-3370 Z2V33-3380

O. Primer ApplicationWorks @ GL. O. Stucco Application Works @ GL O. Emulsion Paint Works @ GL

M2 M2 M2

111 111 49

54.60 16.40 32.20

2.03 6.77 1.52

1.000 1.000 1.000

Z2V33-3390

I. Hollow Block Works + Lintels @ 1st Flr.

M2

1,598.00

10.00

159.80

2.056

Z2V33-3400

I. Internal Plaster Accessories & Rush @ 1L

M2

72.00

48.46

1.49

2.000

Z2V33-3410

I. Internal Plaster Works @ 1L

M2

2,395.00

20.00

119.75

2.000

Z2V33-3420

I. Glazed Ceramic Tile @ 1L

M2

755

12.00

62.92

2.056

Z2V33-3430

I. Block Works For Ducts @ 1st Flr.

M2

60

10.00

6.00

2.056

Z2V33-3440

I. Install False Ceiling (Susp. + Boarding) @ 1L

M2

400

7.20

55.56

2.056

Z2V33-3450

I. Screed + Ceramic Tiles & Skirtings @ 1L

M2

1268

12.00

105.67

2.056

Z2V33-3460

I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L

M2

218

32.00

6.81

2.056

Z2V33-3470

I. Water Proofing + Screed on Wet Areas - 1L

M2

547

64.00

8.55

6.000

Z2V33-3480

I. Frames Installations @ 1L

Nos.

62

4.80

12.92

2.056

Z2V33-3490

I. Doors w/ Ironmongery @ 1L

Nos.

62

4.80

12.92

2.056

Z2V33-3500

I. Frames Installation Works @ GL

M2

119

4.80

24.79

2.056

Z2V33-3510

I. Aluminum+Glass & Other Associated Works @ 1L

M2

119

1.60

74.38

2.056

Z2V33-3520

I. Wardrobes @ 1L

Nos.

17

0.75

22.67

2.056

Z2V33-3530

I. Kitchen Cabinets @ 1L

Nos.

16

0.60

26.67

2.056

Z2V33-3540 Z2V33-3550 Z2V33-3560

I. Primer Application Works @ 1L I. Stucco Application Works @ 1L I. Emulsion Paint Works @ 1L

M2 M2 M2

758.00 758.00 1,356.00

54.60 16.40 32.20

13.88 46.22 42.11

1.000 1.000 1.000

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter

Z2V33-3570

O. Plaster Accessories & Rush @ 1L

M2

72

48.46

1.49

2.000

1 Mason 1 Helper

2.000

1 Mason 1 Helper

Z2V33-3580

O. Plaster Works @ 1L

M2

397

20.00

19.85

1 Mason 1 Helper

37.00

12

3.08

1.54

1.54

72.17

14

5.15

2.51

2.51

0.14

0.056

.056 T. Crane

1.97

0.14

5.55

2

2.78

1.35

1.35

0.08

0.056

.056 T. Crane

0.15

0.08

7.84

14

0.56

0.27

0.27

0.02

0.056

.056 T. Crane

0.21

0.02

6.43

14

0.46

0.22

0.22

0.01

0.056

.056 T. Crane

0.18

0.01

73.16

14

5.23

2.54

2.54

0.14

0.056

.056 T. Crane

1.99

0.14

33.58

14

2.40

1.17

1.17

0.07

0.056

.056 T. Crane

0.91

0.07

2.47

10

0.25

0.12

0.01

0.056

.056 T. Crane

0.07

0.01

2.03 6.77 1.52

8 12 10

0.25 0.56 0.15

328.55

14

23.47

0.64

0.056

.056 T. Crane

8.95

0.64

0.12 0.25 0.56 0.15

11.41

11.41

2.97

7

0.42

0.21

0.21

239.50

12

19.96

9.98

9.98

129.36

14

9.24

4.49

4.49

0.25

0.056

.056 T. Crane

3.52

0.25

12.34

2

6.17

3.00

3.00

0.17

0.056

.056 T. Crane

0.34

0.17

114.22

14

8.16

3.97

0.22

0.056

.056 T. Crane

3.11

0.22

217.25

14

15.52

7.55

7.55

0.42

0.056

.056 T. Crane

5.92

0.42

14.01

8

1.75

0.85

0.85

0.05

0.056

.056 T. Crane

0.38

0.05

51.28

10

5.13

26.56

14

1.90

0.92

0.92

0.05

0.056

.056 T. Crane

0.72

0.05

26.56

12

2.21

1.08

1.08

0.06

0.056

.056 T. Crane

0.72

0.06

50.97

14

3.64

1.77

1.77

0.10

0.056

.056 T. Crane

1.39

0.10

152.92

12

12.74

6.20

0.35

0.056

.056 T. Crane

4.17

0.35

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T. Crane

1.27

0.09

54.83

14

3.92

1.90

1.90

0.11

0.056

.056 T. Crane

1.49

0.11

13.88 46.22 42.11

12 14 14

1.16 3.30 3.01

2.97

7

0.42

0.21

0.21

39.70

12

3.31

1.65

1.65

3.97

1.71

3.42

6.20

1.16 3.30 3.01

Z2V33-3590

O. Polished Marble & Ceramic for Wall @ 1L

M2

56

10.00

5.60

2.056

Z2V33-3600

O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.

M2

14

10.00

1.40

2.056

Z2V33-3610

O. Gypsum Board +Washable Paint @ 1L

M2

68

16.00

4.25

2.056

Z2V33-3620

O. Semi Recessed G.R.G. Tiles @ 1L

M2

51

16.00

3.19

2.056

Z2V33-3630

O. Sreed + Graniti Tiles & Skirtings @ 1L

M2

453

12.00

37.75

2.056

Z2V33-3640

O. Screed + Polished Marble & Skirtings @ 1L

M2

50

12.00

4.17

2.056

Z2V33-3650

O. G. Stl, Powdr coated Railin to Staircase @ 1L

LM

26

20.00

1.30

2.056

Z2V33-3660 Z2V33-3670 Z2V33-3680

O. Primer Application Works @ 1L O. Stucco Application Works @ 1L O. Emulsion Paint Works @ 1L

M2 M2 M2

119 119 55

54.60 16.40 32.20

2.18 7.26 1.71

1.000 1.000 1.000

Z2V33-3690

I. Hollow Block Works + Lintels @ 2nd Flr.

1,598.00 M2

1,598.00

10.00

159.80

2.056

Z2V33-3700

I. Internal Plaster Accessories & Rush @ 2L

72.00 M2

72.00

48.46

1.49

2.000

758.00 M2 758.00 M2 1,356.00 M2

758.00 758.00 1,356.00

54.60 16.40 32.20

13.88 46.22 42.11

1.000 1.000 1.000

72 M2

72

48.46

1.49

2.000

1 Mason 1 Helper

397 M2

397

20.00

19.85

2.000

56 M2

56

10.00

5.60

2.056

2,395.00

20.00

119.75

2.000

755 M2

755

12.00

62.92

2.056

60 M2

60

10.00

6.00

2.056

400 M2

400

7.20

55.56

2.056

1268 M2

1268

12.00

105.67

2.056

I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L

218 M2

218

32.00

6.81

2.056

Z2V33-3770

I. Water Proofing + Screed on Wet Areas - 2L

547 M2

547

64.00

8.55

6.000

Z2V33-3780

I. Frames Installations @ 2L

62 Nos.

62

4.80

12.92

2.056

Z2V33-3790

I. Doors w/ Ironmongery @ 2L

62 Nos.

62

4.80

12.92

2.056

Z2V33-3800

I. Frames Installation Works @ 2L

119 M2

119

4.80

24.79

2.056

Z2V33-3810

I. Aluminum+Glass & Other Associated Works @ 2L

119 M2

119

1.60

74.38

2.056

Z2V33-3820

I. Wardrobes @ 2L

17 Nos.

17

0.75

22.67

2.056

Z2V33-3830

I. Kitchen Cabinets @ 2L

16 Nos.

16

0.60

26.67

2.056

Z2V33-3840 Z2V33-3850 Z2V33-3860

I. Primer Application Works @ 2L I. Stucco Application Works @ 2L I. Emulsion Paint Works @ 2L

Z2V33-3870

O. Plaster Accessories & Rush @ 2L

Z2V33-3880

O. Plaster Works @ 2L

Z2V33-3890

O. Polished Marble & Ceramic for Wall @ 2L

I. Internal Plaster Works @ 2L

Z2V33-3720

I. Glazed Ceramic Tile @ 2L

Z2V33-3730

I. Block Works For Ducts @ 2nd Flr.

Z2V33-3740

I. Install False Ceiling (Susp. + Boarding) @ 2L

Z2V33-3750

I. Screed + Ceramic Tiles & Skirtings @ 2L

Z2V33-3760

1 Mason 1 Helper

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter

2,395.00 M2

Z2V33-3710

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator

11.51

14

0.82

0.40

0.40

0.02

0.056

.056 T. Crane

0.31

0.02

2.88

2

1.44

0.70

0.70

0.04

0.056

.056 T. Crane

0.08

0.04

8.74

14

0.62

0.30

0.30

0.02

0.056

.056 T. Crane

0.24

0.02

6.55

14

0.47

0.23

0.23

0.01

0.056

.056 T. Crane

0.18

0.01

77.61

14

5.54

2.70

2.70

0.15

0.056

.056 T. Crane

2.11

0.15

8.57

14

0.61

0.30

0.30

0.02

0.056

.056 T. Crane

0.23

0.02

2.67

10

0.27

0.13

0.01

0.056

.056 T. Crane

0.07

0.01

2.18 7.26 1.71

8 10 12

0.27 0.73 0.14

328.55

14

23.47

0.64

0.056

.056 T. Crane

8.95

0.64

2.97

7

239.50

0.13 0.27 0.73 0.14

11.41

11.41

0.42

0.21

0.21

12

19.96

9.98

9.98

129.36

14

9.24

4.49

4.49

0.25

0.056

.056 T. Crane

3.52

0.25

12.34

2

6.17

3.00

3.00

0.17

0.056

.056 T. Crane

0.34

0.17

114.22

14

8.16

3.97

0.22

0.056

.056 T. Crane

3.11

0.22

217.25

14

15.52

7.55

7.55

0.42

0.056

.056 T. Crane

5.92

0.42

14.01

8

1.75

0.85

0.85

0.05

0.056

.056 T. Crane

0.38

0.05

51.28

10

5.13

26.56

14

1.90

0.92

0.92

0.05

0.056

.056 T. Crane

0.72

0.05

26.56

12

2.21

1.08

1.08

0.06

0.056

.056 T. Crane

0.72

0.06

50.97

14

3.64

1.77

1.77

0.10

0.056

.056 T. Crane

1.39

0.10

152.92

12

12.74

6.20

0.35

0.056

.056 T. Crane

4.17

0.35

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T. Crane

1.27

0.09

54.83

14

3.92

1.90

1.90

0.11

0.056

.056 T. Crane

1.49

0.11

13.88 46.22 42.11

12 14 14

1.16 3.30 3.01

0.056

.056 T. Crane

0.31

0.02

3.97

1.71

3.42

6.20

1.16 3.30 3.01

2.97

7

0.42

0.21

0.21

39.70

12

3.31

1.65

1.65

11.51

14

0.82

0.40

0.40

0.02

Z2V33-3900

O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr.

14 M2

14

10.00

1.40

2.056

Z2V33-3910

O. Gypsum Board +Washable Paint @ 2L

68 M2

68

16.00

4.25

2.056

Z2V33-3920

O. Semi Recessed G.R.G. Tiles @ 2L

51 M2

51

16.00

3.19

2.056

Z2V33-3930

O. Sreed + Graniti Tiles & Skirtings @ 2L

453 M2

453

12.00

37.75

2.056

Z2V33-3940

O. Screed + Polished Marble & Skirtings @ 2L

45 M2

50

12.00

4.17

2.056

Z2V33-3950

O. G.Steel, Powder coated Railin to Staircase@2L

26 LM

26

20.00

1.30

2.056

Z2V33-3960 Z2V33-3970 Z2V33-3980

O. Primer Application Works @ 2L O. Stucco Application Works @ 2L O. Emulsion Paint Works @ 2L

119 M2 119 M2 55 M2

119 119 55

54.60 16.40 32.20

2.18 7.26 1.71

1.000 1.000 1.000

Z2V33-3990

I. Hollow Block Works + Lintels @ 3rd Flr.

1,598.00 M2

1,598.00

10.00

159.80

2.056

Z2V33-4000

I. Internal Plaster Accessories & Rush @ 3L

72.00 M2

72.00

48.46

1.49

2.000

Z2V33-4010

I. Internal Plaster Works @ 3L

2,395.00 M2

2,395.00

20.00

119.75

2.000

Z2V33-4020

I. Glazed Ceramic Tile @ 3L

755 M2

735

12.00

61.25

2.056

Z2V33-4030

I. Block Works For Ducts @ 3rd Flr.

60 M2

60

10.00

6.00

2.056

Z2V33-4040

I. Install False Ceiling (Susp. + Boarding) @ 3L

400 M2

400

7.20

55.56

2.056

Z2V33-4050

I. Screed + Ceramic Tiles & Skirtings @ 3L

1268 M2

1268

12.00

105.67

2.056

Z2V33-4060

I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L

218 M2

218

32.00

6.81

2.056

Z2V33-4070

I. Water Proofing + Screed on Wet Areas - 3L

547 M2

547

64.00

8.55

6.000

Z2V33-4080

I. Frames Installations @ 3L

62 Nos.

62

4.80

12.92

2.056

Z2V33-4090

I. Doors w/ Ironmongery @ 3L

62 Nos.

62

4.80

12.92

2.056

Z2V33-4100

I. Frames Installation Works @ 3L

119 M2

119

4.80

24.79

2.056

Z2V33-4110

I. Aluminum+Glass & Other Associated Works @ 3L

119 M2

119

1.60

74.38

2.056

Z2V33-4120

I. Wardrobes @ 3L

17 Nos.

17

0.75

22.67

2.056

Z2V33-4130

I. Kitchen Cabinets @ 3L

16 Nos.

16

0.60

26.67

2.056

Z2V33-4140 Z2V33-4150 Z2V33-4160

I. Primer Appilcation Works @ 3L I. Stucco Application Works @ 3L I. Emulsion Paint Works @ 3L

Z2V33-4170

O. Plaster Accessories & Rush @ 3L

758.00 M2 758.00 M2 1,356.00 M2

758.00 758.00 1,356.00

54.60 16.40 32.20

13.88 46.22 42.11

1.000 1.000 1.000

72 M2

72

48.46

1.49

2.000

1 Mason 1 Helper

397

20.00

19.85

2.000

O. Polished Marble & Ceramic for Wall @ 3L

56 M2

56

10.00

5.60

2.056

O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr.

14 M2

14

10.00

1.40

2.056

O. Plaster Works @ 3L

Z2V33-4190

Z2V33-4200

1 Mason 1 Helper

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter

397 M2

Z2V33-4180

1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator

2.88

2

1.44

8.74

14

0.62

6.55

14

0.47

77.61

14

5.54

8.57

14

0.61

2.67

10

0.27

2.18 7.26 1.71

8 10 12

0.27 0.73 0.14

328.55

14

23.47

0.70

0.04

0.056

.056 T. Crane

0.08

0.04

0.30

0.30

0.02

0.056

.056 T. Crane

0.24

0.02

0.23

0.23

0.01

0.056

.056 T. Crane

0.18

0.01

2.70

2.70

0.15

0.056

.056 T. Crane

2.11

0.15

0.30

0.30

0.02

0.056

.056 T. Crane

0.23

0.02

0.13

0.01

0.056

.056 T. Crane

0.07

0.01

0.64

0.056

.056 T. Crane

8.95

0.64

0.70

0.13 0.27 0.73 0.14

11.41

11.41

2.97

7

0.42

0.21

0.21

239.50

12

19.96

9.98

9.98

125.93

14

9.00

4.38

4.38

0.25

0.056

.056 T. Crane

3.43

0.25

12.34

2

6.17

3.00

3.00

0.17

0.056

.056 T. Crane

0.34

0.17

114.22

14

8.16

3.97

0.22

0.056

.056 T. Crane

3.11

0.22

217.25

14

15.52

7.55

7.55

0.42

0.056

.056 T. Crane

5.92

0.42

14.01

8

1.75

0.85

0.85

0.05

0.056

.056 T. Crane

0.38

0.05

51.28

10

5.13

26.56

14

1.90

0.92

0.92

0.05

0.056

.056 T. Crane

0.72

0.05

26.56

12

2.21

1.08

1.08

0.06

0.056

.056 T. Crane

0.72

0.06

50.97

14

3.64

1.77

1.77

0.10

0.056

.056 T. Crane

1.39

0.10

152.92

12

12.74

6.20

0.35

0.056

.056 T. Crane

4.17

0.35

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T. Crane

1.27

0.09

54.83

14

3.92

1.90

1.90

0.11

0.056

.056 T. Crane

1.49

0.11

13.88 46.22 42.11

12 14 14

1.16 3.30 3.01

2.97

7

0.42

0.21

0.21

39.70

12

3.31

1.65

1.65

11.51

14

0.82

0.40

0.40

0.02

0.056

.056 T. Crane

0.31

0.02

2.88

2

1.44

0.70

0.70

0.04

0.056

.056 T. Crane

0.08

0.04

3.97

1.71

3.42

6.20

1.16 3.30 3.01

Z2V33-4210

O. Gypsum Board +Washable Paint @ 3L

68 M2

68

16.00

4.25

2.056

Z2V33-4220

O. Semi Recessed G.R.G. Tiles @ 3L

51 M2

51

16.00

3.19

2.056

Z2V33-4230

O. Screed + Polished Marble & Skirtings @ 3L

453 M2

453

12.00

37.75

2.056

Z2V33-4240

O. Sreed + Graniti Tiles & Skirtings @ 3L

45 M2

50

12.00

4.17

2.056

Z2V33-4250

O. G.Steel, Powder coated Railin to Staircase@3L

26 LM

26

20.00

1.30

2.056

Z2V33-4260 Z2V33-4270 Z2V33-4280

O. Primer Application Works @ 3L O. Stucco Application Works @ 3L O. Emulsion Paint Works @ 3L

119 M2 119 M2 55 M2

119 119 55

54.60 16.40 32.20

2.18 7.26 1.71

1.000 1.000 1.000

Z2V33-4290

I. Hollow Block Works + Lintels @ 4th Flr.

1,598.00 M2

1,598.00

10.00

159.80

2.056

Z2V33-4300

I. Internal Plaster Accessories & Rush @ 4L

72.00 M2

72.00

48.46

1.49

2.000

758.00 M2 758.00 M2 1,356.00 M2

758.00 758.00 1,356.00

54.60 16.40 32.20

13.88 46.22 42.11

1.000 1.000 1.000

72 M2

72

48.46

1.49

2.000

1 Mason 1 Helper

2,395.00

20.00

119.75

2.000

755 M2

755

12.00

62.92

2.056

60 M2

60

10.00

6.00

2.056

400 M2

400

7.20

55.56

2.056

1268 M2

1268

12.00

105.67

2.056

I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L

218 M2

218

32.00

6.81

2.056

Z2V33-4370

I. Water Proofing + Screed on Wet Areas - 4L

547 M2

547

64.00

8.55

6.000

Z2V33-4380

I. Frames Installations @ 4L

62 Nos.

62

4.80

12.92

2.056

Z2V33-4390

I. Doors w/ Ironmongery @ 4L

62 Nos.

62

4.80

12.92

2.056

Z2V33-4400

I. Frames Installation Works @ 4L

119 M2

119

4.80

24.79

2.056

Z2V33-4410

I. Aluminum+Glass & Other Associated Works @ 4L

119 M2

119

1.60

74.38

2.056

Z2V33-4420

I. Kitchen Cabinets @ 4L

17 Nos.

17

0.75

22.67

2.056

Z2V33-4430

I. Wardrobes @ 4L

16 Nos.

16

0.60

26.67

2.056

Z2V33-4440 Z2V33-4450 Z2V33-4460

I. Primer Application Works @ 4L I. Stucco Installation Works @ 4L I. Emulsion Paint Works @ 4L

Z2V33-4470

O. Plaster Accessories & Rush @ 4L

I. Internal Plaster Works @ 4L

Z2V33-4320

I. Glazed Ceramic Tile @ 4L

Z2V33-4330

I. Block Works For Ducts @ 4th Flr.

Z2V33-4340

I. Install False Ceiling (Susp. + Boarding) @ 4L

Z2V33-4350

I. Screed + Ceramic Tiles & Skirtings @ 4L

Z2V33-4360

397 M2

397

20.00

19.85

2.000

O. Polished Marble & Ceramic for Wall @ 4L

56 M2

56

10.00

5.60

2.056

Z2V33-4500

O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr.

14 M2

14

10.00

1.40

2.056

Z2V33-4510

O. Gypsum Board + Washable Paint @ 4L

68 M2

68

16.00

4.25

2.056

Z2V33-4480

O. Plaster Works @ 4L

Z2V33-4490

1 Mason 1 Helper

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter

2,395.00 M2

Z2V33-4310

1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator

8.74

14

0.62

0.30

0.30

0.02

0.056

.056 T. Crane

0.24

0.02

6.55

14

0.47

0.23

0.23

0.01

0.056

.056 T. Crane

0.18

0.01

77.61

14

5.54

2.70

2.70

0.15

0.056

.056 T. Crane

2.11

0.15

8.57

14

0.61

0.30

0.30

0.02

0.056

.056 T. Crane

0.23

0.02

2.67

10

0.27

0.13

0.01

0.056

.056 T. Crane

0.07

0.01

2.18 7.26 1.71

8 10 12

0.27 0.73 0.14

328.55

12

27.38

0.75

0.056

.056 T. Crane

8.95

0.75

2.97

7

239.50

10

129.36

12

12.34

0.13 0.27 0.73 0.14

13.32

13.32

0.21

0.21

23.95

11.98

11.98

10.78

5.24

5.24

0.29

0.056

.056 T. Crane

3.52

0.29

2

6.17

3.00

3.00

0.17

0.056

.056 T. Crane

0.34

0.17

114.22

12

9.52

4.63

0.26

0.056

.056 T. Crane

3.11

0.26

217.25

12

18.10

8.81

8.81

0.49

0.056

.056 T. Crane

5.92

0.49

14.01

6

2.33

1.14

1.14

0.06

0.056

.056 T. Crane

0.38

0.06

51.28

8

6.41

26.56

10

2.66

1.29

1.29

0.07

0.056

.056 T. Crane

0.72

0.07

26.56

8

3.32

1.61

1.61

0.09

0.056

.056 T. Crane

0.72

0.09

50.97

12

4.25

2.07

2.07

0.12

0.056

.056 T. Crane

1.39

0.12

152.92

10

15.29

7.44

0.42

0.056

.056 T. Crane

4.17

0.42

46.60

12

3.88

1.89

1.89

0.11

0.056

.056 T. Crane

1.27

0.11

54.83

12

4.57

2.22

2.22

0.12

0.056

.056 T. Crane

1.49

0.12

13.88 46.22 42.11

10 12 12

1.39 3.85 3.51

2.97

7

0.42

0.21

0.21

39.70

10

3.97

1.99

1.99

11.51

12

0.96

0.47

0.47

0.03

0.056

.056 T. Crane

0.31

0.03

2.88

2

1.44

0.70

0.70

0.04

0.056

.056 T. Crane

0.08

0.04

8.74

12

0.73

0.35

0.02

0.056

.056 T. Crane

0.24

0.02

0.42

4.63

2.14

4.27

7.44

1.39 3.85 3.51

0.35

51 M2

51

16.00

3.19

2.056

453 M2

453

12.00

37.75

2.056

O. Sreed + Graniti Tiles & Skirtings @ 4L

45 M2

50

12.00

4.17

2.056

Z2V33-4550

O. G.Steel, Powder coated Railin to Staircase@4L

26 LM

26

20.00

1.30

2.056

Z2V33-4560 Z2V33-4570 Z2V33-4580

O. Primer Application Works @ 4L O. Stucco Application Works @ 4L O. Emulsion Paint Works @ 4L

119 M2 119 M2 55 M2

119 119 55

54.60 16.40 32.20

2.18 7.26 1.71

1.000 1.000 1.000

Z2V33-4590

I. Hollow Block Works + Lintels @ 5th Flr.

M2

1,598.00

10.00

159.80

2.056

Z2V33-4600

I. Internal Plaster Accessories & Rush @ 5L

M2

72.00

48.46

1.49

2.000

Z2V33-4520

O. Semi Recessed G.R.G. Tiles @ 4L

Z2V33-4530

O. Screed + Polished Marble & Skirtings @ 4L

Z2V33-4540

1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper

Z2V33-4610

I. Internal Plaster Works @ 5L

M2

2,395.00

20.00

119.75

2.000

Z2V33-4620

I. Glazed Ceramic Tile @ 5L

M2

755

12.00

62.92

2.056

Z2V33-4630

I. Block Works For Ducts @ 5th Flr.

M2

60

10.00

6.00

2.056

Z2V33-4640

I. Install False Ceiling (Susp. + Boarding) @ 5L

M2

400

7.20

55.56

2.056

Z2V33-4650

I. Screed + Ceramic Tiles & Skirtings @ 5L

M2

1268

12.00

105.67

2.056

Z2V33-4660

I. Screed + Non-Slip Ceramic Tiles &Skirtings@5L

M2

218

32.00

6.81

2.056

Z2V33-4670

I. Water Proofing + Screed on Wet Areas - 5L

M2

547

64.00

8.55

6.000

Z2V33-4680

I. Frames Installations @ 5L

Nos.

62

4.80

12.92

2.056

Z2V33-4690

I. Doors w/ Ironmongery @ 5L

Nos.

62

4.80

12.92

2.056

Z2V33-4700

I. Frames Installation Works @ 5L

M2

119

4.80

24.79

2.056

Z2V33-4710

I. Aluminum+Glass & Other Associated Works @ 5L

M2

119

1.60

74.38

2.056

Z2V33-4720

I. Kitchen Cabinets @ 5L

Nos.

17

0.75

22.67

2.056

Z2V33-4730

I. Wardrobes @ 5L

Nos.

16

0.60

26.67

2.056

Z2V33-4740 Z2V33-4750 Z2V33-4760

I. Primer Application Works @ 5L I. Stucco Installation Works @ 5L I. Emulsion Paint Works @ 5L

M2 M2 M2

758.00 758.00 1,356.00

54.60 16.40 32.20

13.88 46.22 42.11

1.000 1.000 1.000

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 4Waterpr oofer 2 Helper 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Painter 1 Painter 1 Painter

Z2V33-4770

O. Plaster Accessories & Rush @ 5L

M2

72

48.46

1.49

2.000

1 Mason 1 Helper

Z2V33-4780

O. Plaster Works @ 5L

M2

397

20.00

19.85

2.000

Z2V33-4790

O. Polished Marble & Ceramic for Wall @ 5L

M2

56

10.00

5.60

2.056

Z2V33-4800

O. Blk Wks For Garbage Chutes+Plasters@ 5th Flr.

M2

14

10.00

1.40

2.056

Z2V33-4810

O. Gypsum Board + Washable Paint @ 5L

M2

68

16.00

4.25

2.056

Z2V33-4820

O. Semi Recessed G.R.G. Tiles @ 5L

M2

51

16.00

3.19

2.056

1 Mason 1 Helper 1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator 1 Carpente r1 Helper .056 Operator

6.55

12

0.55

77.61

12

6.47

8.57

12

0.71

2.67

8

0.33

2.18 7.26 1.71

7 8 10

0.31 0.91 0.17

328.55

12

27.38

2.97

7

239.50

10

129.36

12

12.34

0.27

0.01

0.056

.056 T. Crane

0.18

0.01

3.15

3.15

0.18

0.056

.056 T. Crane

2.11

0.18

0.35

0.35

0.02

0.056

.056 T. Crane

0.23

0.02

0.16

0.01

0.056

.056 T. Crane

0.07

0.01

0.75

0.056

.056 T. Crane

8.95

0.75

0.27

0.16 0.31 0.91 0.17

13.32

13.32

0.21

0.21

23.95

11.98

11.98

10.78

5.24

5.24

0.29

0.056

.056 T. Crane

3.52

0.29

2

6.17

3.00

3.00

0.17

0.056

.056 T. Crane

0.34

0.17

114.22

12

9.52

4.63

0.26

0.056

.056 T. Crane

3.11

0.26

217.25

12

18.10

8.81

8.81

0.49

0.056

.056 T. Crane

5.92

0.49

14.01

6

2.33

1.14

1.14

0.06

0.056

.056 T. Crane

0.38

0.06

51.28

8

6.41

26.56

10

2.66

1.29

1.29

0.07

0.056

.056 T. Crane

0.72

0.07

26.56

8

3.32

1.61

1.61

0.09

0.056

.056 T. Crane

0.72

0.09

50.97

12

4.25

2.07

2.07

0.12

0.056

.056 T. Crane

1.39

0.12

152.92

10

15.29

7.44

0.42

0.056

.056 T. Crane

4.17

0.42

46.60

12

3.88

1.89

1.89

0.11

0.056

.056 T. Crane

1.27

0.11

54.83

12

4.57

2.22

2.22

0.12

0.056

.056 T. Crane

1.49

0.12

13.88 46.22 42.11

10 12 12

1.39 3.85 3.51

2.97

7

0.42

0.21

0.21

39.70

10

3.97

1.99

1.99

11.51

12

0.96

0.47

0.47

0.03

0.056

.056 T. Crane

0.31

0.03

2.88

2

1.44

0.70

0.70

0.04

0.056

.056 T. Crane

0.08

0.04

8.74

12

0.73

0.35

0.35

0.02

0.056

.056 T. Crane

0.24

0.02

6.55

12

0.55

0.27

0.27

0.01

0.056

.056 T. Crane

0.18

0.01

0.42

4.63

2.14

4.27

7.44

1.39 3.85 3.51

1 Mason 1 Helper .056 Operator 1 Mason 1 Helper .056 Operator 1 Alum. Tech 1 Helper .056 Operator 1 Painter 1 Painter 1 Painter 1 Mason 1 Helper .056 Operator

Z2V33-4830

O. Screed + Polished Marble & Skirtings @ 5L

M2

453

12.00

37.75

2.056

Z2V33-4840

O. Sreed + Graniti Tiles & Skirtings @ 5L

M2

50

12.00

4.17

2.056

Z2V33-4850

O. G.Steel, Powder coated Railin to Staircase@5L

LM

26

20.00

1.30

2.056

Z2V33-4860 Z2V33-4870 Z2V33-4880

O. Primer Application Works @ 5L O. Stucco Application Works @ 5L O. Emulsion Paint Works @ 5L

M2 M2 M2

119 119 55

54.60 16.40 32.20

2.18 7.26 1.71

1.000 1.000 1.000

Z2V33-4890

Hollow Block Works + Lintels @ Roof Floor

M2

307

10.00

30.70

2.056

Z2V33-4900

Plaster Accessories & Rush @ Roof Floor

M2

72

48.46

1.49

2.000

1 Mason 1 Helper

Z2V33-4910

Plastering Works @ Roof Deck Floor

M2

339

20.00

16.95

2.000

1 Mason 1 Helper

Z2V33-4920 Z2V33-4930 Z2V33-4940 Z2V33-4950 Z2V33-4960 Z2V33-4970 Z2V33-4980 Z2V33-4990 Z2V33-5000 Z2V33-5010 Z2V33-5020 Z2V33-5030 Z2V33-5040 Z2V33-5050 Z2V33-5060 Z2V33-5070 Z2V33-5080 Z2V33-5090 Z2V33-5100 Z2V33-5110 Z2V33-5120 Z2V33-5130 Z2V33-5140 Z2V33-5150

Roof Drain & Access.+ Lightweight Concrete One Coat Cold Bituminous Primer 2 Layers of SBS W.P. Membrane + Water Test Alum. Foil Covering Fixed to Upstand w/ Sealant 50mm Thk. Extruded Polystyrene Insulation Protection Layer 18mm-25mm Round Aggregates (50mm Thk.) 1mm Thk. Alum. Flashing Fixed into Conc. Upstand Sealant Application Around top of Alum. Flashing Channel & Rails Installation for Lifts Cabin Assembly / Installation for lifts Machine Installation for lifts Doors Installation for lifts Connections To Ele + Finishing Touches for lifts Installation of Chute Tubes and Intake Throats Install Intake Doors, Chute Vent & Accessories Install Ground Floor Offset + Fire Shutter Door Install Compactor with MCP Installation of Garbage Container Final Test & Comm. Installation of Window Cleaning Eqmt. Primer Application Works @ Roof Deck Stucco Application Works @ Roof Deck Emulsion / Epoxy Paint Works @ Roof Deck

M2 M2 M2 LM M2 M2 M2 M2 M2 Items Items Items Items Items Item Item Item Item Item Item Item M2 M2 M2

Z2V33-5160

Excavation Works External

M3

Z2V33-5170

RCC Manholes / Gully Traps

Nos.

Z2V33-5180

Water Proofing

M2

Z2V33-5190

Sand Bedding

M2

Z2V33-5200

Backfilling Works

M3

Z2V33-5210 Z2V33-5220 Z2V33-5230 Z2V33-5240 Z2V33-5250 Z2V33-5260 Z2V33-5270 Z2V33-5280

Instl Drainage Pipes &Con. To Existing Chambers Instl Water Supply Pipes&Con. To Existg Chambers Instl Chilled Water Pipes&Con. To Existg Chamber Instl Central Gas Pipes &Con. To Existg Chambers Instl Telephone Ducts &Con. To Existing Chambers Laying of Power cables (By Others) Hardscaping Works Landscaping Works

Item Item Item Item Item Item Item Item

Z2V33-5290

Ext. Plaster Accessories & Rush on Front Elev.

M2

Z2V33-5300

Ext. Plaster Works on Front Elevation

M2

Z2V33-5310

Install Balcony Handrail on Front Elev.

Nos.

Z2V33-5320

Decorative GRC Panels W/ Epoxy Paint @ F. Elev.

Nos.

365.00 106.00 259.00 83 259.00 259.00 259.00 83 83 2 2 2 2 2 1 1 1 1 1 1 1 69 69 203

1.26 4.21 6.30

1.000 1.000 1.000

315.00

21.87

2.000

5.63

12.27

5.000

124.30

76.00

1.64

6.000

52.67

60.00

0.88

1.250

69

6,834.67

12

6.47

3.15

3.15

0.18

0.056

.056 T. Crane

2.11

0.18

8.57

12

0.71

0.35

0.35

0.02

0.056

.056 T. Crane

0.23

0.02

2.67

8

0.33

0.16

0.01

0.056

.056 T. Crane

0.07

0.01

2.18 7.26 1.71

7 8 10

0.31 0.91 0.17

63.12

10

6.31

3.07

3.07

0.056

.056 T. Crane

1.72

0.17

2.97

5

0.59

0.30

0.30

33.90

8

4.24

2.12

2.12

601.00

11.37

7.500

1 Painter 1 Painter 1 Painter 1 Operator 1 Helper 2 Carpente r 1 Mason 1 Helper 1 Operator 4Waterpr oofer 2 Helper 1 Helper 0.25 Operator

48.46

38.49

2.000

2.25

2.000

19

15.00

1.27

2.250

10

2.00

5.00

2.500

1.5 Operator 3 Driver 3 Helper

8 10 12

0.16 0.42 0.53

43.73

5

8.75

61.33

14

4.38

9.81

12

0.82

0.27

1.10

10

0.11

0.09

85.29

14

1 Mason 1 Helper

1 Mason 1 Helper 1 Mason 1 Helper .25 Operator 1 Carpente r1 Helper .5 Operator

76.97

2

38.49

4.50

4

2.85

4.500

0.5 Shovel 3 Dump Truck .5 S. Roller .5 Bob Cat

2.44

0.02

1.22

2.44

0.22

51.17

0.02

0.41

2.44

0.41

0.41

0.32

0.03

12.50

10

1.25

0.50

0.50

0.25

0.500

..5 M. Crane

2.50

0.25

1.56

12

0.13

0.05

0.05

0.03

0.500

.5 M. Crane

0.31

0.03

175.43

14

12.53

28.39

2

14.20

7.10

7.10

4.50

4

1.13

0.56

0.56

2.25

10

0.23

0.10

0.10

0.03

0.250

.25 M. Crane

0.25

0.03

0.16

0.06

0.03

0.500

..5 M. Crane

0.25

0.03

18

8.00

2.25

2.000

Nos.

15

15.00

1.00

2.250

Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.

Nos.

1

2.00

0.50

2.500

1 Carpente r1 Helper .5 Operator

1.25

8

Z2V33-5390

External Painting Works on Left Side Elevation

M2

706

32.20

21.93

3.000

3 Painter

65.78

12

Z2V33-5400

Ext. Plaster Accessories & Rush on Rear Elev.

M2

1,417.00

48.46

29.24

2.000

1 Mason 1 Helper

58.48

2

29.24

Z2V33-5410

Ext. Plaster Works on Rear Elevation

M2

18.00

8.00

2.25

2.000

1 Mason 1 Helper

4.50

4

1.13

Z2V33-5380

.25 Bob Cat

0.55

.25 M. Crane

1 Mason 1 Helper

Install Balcony Handrail on Leftside Elev.

0.250

0.88

0.250

2.000

Z2V33-5370

12.27

0.03

3.000

M2

1 M. Crane

0.11

14.20

Ext. Plaster Works on Left Side Elevation

1.000

0.11

58.48

Z2V33-5360

0.88

0.24

48.46

M2

0.88

4.37

12

32.20

M2

Ext. Plaster Access. & Rush on Leftside Elev.

21.87

0.56

688

External Painting Works on Front Elevation

Z2V33-5350

1 Excavato r

0.56

1,883.00

Z2V33-5340

1.000

1.13

2.500

5

0.88

4.37

19.24

0.63

LM

1.75

4.37

19.24

8.00

Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.

0.16 0.42 0.53

6.09

1 Carpente r1 Helper .5 Operator 3 Painter

Z2V33-5330

0.17

14 12 14 12 10 7 14 12

8.00

18.00

0.31 0.91 0.17

1.26 4.21 6.30

1 1 1 1 1 1 1 1 1,865.00

0.16

7 2 6 3 2 2 4 3 2 14 10 7 10 12 8 4 2 1 1 3 14

54.60 16.40 32.20

6,887.67

77.61

1 Mason 1 Helper 1 Mason 1 Helper .25 Operator

12.53

0.06

5.48

5.48 14.62

14.62

0.56

0.56

Z2V33-5420

Install Balcony Handrail on Rear Elev.

Nos.

95

15.00

6.33

2.250

1 Mason 1 Helper .25 Operator

14.25

12

1.19

Z2V33-5430

Decorative GRC Panels W/ Epoxy Paint @ R. Elev.

Nos.

22

2.00

11.00

2.500

1 Carpente r1 Helper .5 Operator

27.50

10

2.75

1.56

12

0.13

133.70

14

28.39

2

14.20

7.10

7.10

4.50

4

1.13

0.56

0.56

2.25

10

0.23

0.10

0.10

0.06

8.00

0.63

2.500

1,435.00

32.20

44.57

3.000

1 Carpente r1 Helper .5 Operator 3 Painter

688

48.46

14.20

2.000

1 Mason 1 Helper

18

8.00

2.25

2.000

Nos.

15

15.00

1.00

2.250

Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.

Nos.

1

2.00

0.50

2.500

1 Carpente r1 Helper .5 Operator

1.25

8

0.16

External Painting Works on Right Side Elevation Snagging & Desnagging For Finishes @ GF Handing-Over For Finishes @ GF Snagging & Desnagging For Finishes @ 1F Handing-Over For Finishes @ 1F Snagging & Desnagging For Finishes @ 2F Handing-Over For Finishes @ 2F Snagging & Desnagging For Finishes @ 3F Handing-Over For Finishes @ 3F Snagging & Desnagging For Finishes @ 4F Handing-Over For Finishes @ 4F Snagging & Desnagging For Finishes @ 5F Handing-Over For Finishes @ 5F Snagging & Desnagging For Finishes @ Roof Floor Handing-Over For Finishes @ Roof Floor Power On (By DEWA) Precommissioning & Startup Availability of Chilled Water (By Others) Testing & Final Commissioning Snagging & Desnagging For External Finishes Handing-Over For External Finishes Completion of Fdn./Superstructure -Building # 33 Completion of External Works for Building # 33 Completion of MEP Works for Building # 33 Completion of Finishes for Building # 33 Completion of Fdn./SuperStruc. for Phase-2 BLDG. Completion of External Works for Phase-2 BLDG. Completion of MEP Works for Phase-2 BLDG. Completion of Finishes for Phase-2 BLDG. Completion Milestone for Phase-2 Buildings

M2 Item Item Item Item Item Item Item Item Item Item Item Item Item Item

32.20

21.93

3.000

3 Painter

65.78

12

5.48

Item Item Item Item

706 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 1 1 1 1

Item Item Item

1 1 1

Item Item

1 1

Z2V33-5440

Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.

LM

5

Z2V33-5450

External Painting Works on Rear Elevation

M2

Z2V33-5460

Ext. Plaster Access. & Rush on Rightside Elev.

M2

Z2V33-5470

Ext. Plaster Works on Right Side Elevation

M2

Z2V33-5480

Install Balcony Handrail on Rigthside Elev.

Z2V33-5490

Z2V33-5500 Z2V33-5510 Z2V33-5520 Z2V33-5530 Z2V33-5540 Z2V33-5550 Z2V33-5560 Z2V33-5570 Z2V33-5580 Z2V33-5590 Z2V33-5600 Z2V33-5610 Z2V33-5620 Z2V33-5630 Z2V33-5640 Z2V33-5650 Z2V33-5660 Z2V33-5670 Z2V33-5680 Z2V33-5690 Z2V33-5700 Z2V33-5710 Z2V33-5720 Z2V33-5730 Z2V33-5740 Z2V33-5750 Z2V33-5760 Z2V33-5770 Z2V33-5780 Z2V33-5790

1 Mason 1 Helper 1 Mason 1 Helper .25 Operator

30 10 30 10 30 10 30 10 30 10 30 10 1 21 1 35 12 2 1 1 1 1 0 0 0 0 0

54.60 16.40 32.20 48.46

0.53

0.13

0.250

.25 M. Crane

1.58

0.13

1.10

1.10

0.55

0.500

..5 M. Crane

5.50

0.55

0.05

0.05

0.03

0.500

.5 M. Crane

0.31

0.03

0.03

0.250

.25 M. Crane

0.25

0.03

0.03

0.500

..5 M. Crane

0.25

0.03

0.53

9.55

9.55

0.06

5.48