Aircraft Go Bag

July 20, 2017 | Author: Christian Lowe | Category: Industries, Armed Conflict, Business
Share Embed Donate


Short Description

The official Army description of its Aircrew Survival Go-Bag...

Description

Air Warrior Survival Kit, Ready Access & Modular (SKRAM) Go Bags and Straps US Army Aviation and Missile Command (AMCOM) Solicitation W58RGZ-10-R-0160 Pre-Proposal Conference - May 13, 2010 at the Madison (AL) Radisson AGENDA 12:30 START 1. INTRODUCTION OF PARTICIPANTS & A FEW CONFERENCE RULES 2. AIR WARRIOR PRODUCTS /PROGRAM OVERVIEW – Jim Isaacs, AW Program Integrator 3. SKRAM SYNTHESIS (BRIEF) NOTES – Anne Baune, AMCOM Contracting Officer 4. SKRAM TECHNICAL REQUIREMENTS OVERVIEW – Andrea Lavoie, AW SKRAM Project Lead BREAK - 15 MINUTES 5. SOLICITATION REQUIREMENTS OVERVIEW – Anne Baune, AMCOM Contracting Officer 6. Q & A – SESSION #1 – Frencetta Morgan, AMCOM Contracting Officer BREAK – 15 MINUTES 7. Q&A – SESSION #2 – Frencetta Morgan, AMCOM Contracting Officer 8. ADJOURNMENT W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Air Warrior SKRAM 5/13/10 Madison Radisson

1.

(A) At this meeting: * Leave your brochures, descriptive literature and business cards in your brief cases. This is not a marketing opportunity – that was in an earlier phase. * Attempt to make appointments to meet/greet any Air Warrior personnel and “discuss” the requirement – here or back on post * Ask for individualized assistance or help in completing or reviewing a section of your proposal.

(B) For the Duration: Until award is made, the ONLY allowed government person that can be contacted is the Contracting Officer.

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Section 2. Air Warrior Products Clothing and Individual Equipment

Primary Survival Gear Carrier

Aircrew Survival Egress Knife

Electronic Data Manager

Dual Net-Ready EDM Flotation Collar

Single place Life Raft

Aircraft Wireless Intercom System Holster Helmet Hear-Through System

HGU-56/P Helmet System

Body Armor

Microclimate Cooling System

? Go-Bag w/integrated Hydration System

Portable Helicopter Oxygen Delivery System

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01 Microclimate Cooling Garment (MCG)

Microclimate Cooling Unit (MCU)

Air Warrior Products- in use DoD-Wide W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Leveraged MCS Technology

Leveraged MCS Technology

Microclimate Cooling Clothing and Individual Equipment

US and Foreign Nation Air and Ground Vehicle Applications

4

Air Warrior SKRAM 5/13/10 Madison Radisson 3. 100% Small Business Set Aside – 51% of the work must be performed by the small business or small business lead Berry Amendment applies – domestic material and domestic production Firm Fixed Price Range quantities – alternate ranges, if beneficial to your business model and the government, may be offered – make sure you are responsive to the government’s ranges first, then make the alternate offer in Section B and the Attachment 003 Pricing Sheets (Volume II). A Pre-Award Survey, conducted by AMCOM and DCMA personnel, may be required. This can delay award for 30-60 days First Articles will be required. FAT is NOT to be confused with the demo models submitted with your proposal – it is an post award milestone. This means that authorization to begin production and acquire the material necessary for production will not be given until there is successful FAT. To do otherwise is at the contractor’s own risk. First billings and payments can be delayed many months. Do NOT include transportation or shipping expense – GBL/FOB Origin. W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Program Executive Office Soldier

SECTION 4 TECHNICAL REQUIREMENTS PRE-PROPOSAL CONFERENCE FOR W58RGZ-10-R-0160

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Andrea Lavoie PM-AW May 2010

Survival Kit, Ready Access, Modular Configuration Breakdown Survival Kit, Ready Access, Modular AVNS-DTL-10836

Go Bag DTL-10836-1

Hydration Carrier DTL-10836-2 (as required by Configuration)

Gear Insert DTL-10836-12

M-4 Magazine Pouches (QTY 2) P/N 1005945-1

No GOVT drawings Built IAW AVNS-DTL-10836

GOVT Owned Technical Data Package – Drawings & Purchase Description W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Straps

• Straps built in accordance with GOVT owned Technical Data Package (Drawings and Purchase Description) • Straps provide interface with the approved aircraft locations

Cargo Tie Down Strap 1005980

Double Loop Strap 1005978

Shackle Strap 1005979

PD 1006008 Purchase Description for the Tie-Downs, Lanyards, and Tethers for Air Warrior – Governs Quality Inspections

Straps  Double Loop Strap

 Shackle Strap

• Cargo Tie-Down W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Not to Scale

Repair Items • Repair Items are provided to the Aviation Unit to make simple repairs in the field. ALSE Tech has sewing machine, grommet press, & scissors available in ALSE shop for repairs. • No repairs are made to load bearing straps on the SKRAM or the Double Loop, Cargo Tie-Down, or Shackle Strap.

• Push Pack is provided to unit when the SKRAM is fielded. Push Pack includes small quantities of repair items to stock ALSE shop for repairs. • Repair items must be in quantity as specified in RFP. Items must be bagged and tagged (labeled). • Provide price for any unique items that bidder’s design may include beyond items listed in CLIN 1008.

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Integration History Combat Requirements Directorate (Ft Rucker) defined requirements for Go Bag and Hydration system in Concept Production Document The system provides carriage for mandatory ALSE gear, additional mission-specific gear and ammunition magazines. The SKRAM is configured specifically per platform. Features of the SKRAM include: • Flame Retartdant • Configurable as an escape and evasion or “Grab and Go” bag • Capable of being worn like an assault pack • Capable of additional equipment carriage. Requirements include: – Up to 6 magazines of 5.56 ammunition – Insertable “on the go” hydration system – MOLLE individual sleep system bag and carrier. – Additional environmental gear and 72 hours worth of caloric intake • Provides secure carriage up to a 40G crash load

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Go-Bag Mandatory Items Product

Weight, lbs

NSN

Survival blanket, 1

0.155

7120-00-935-6667

Datrex 4 oz water bags, 10

0.290

na

Datrex emergency rations, 3

2.985

na

Blastmatch fire starter, 1

0.160

1WG0415-BX

Green chemlight, 2

0.110

6260-01-074-4229

IR chemlight, 2

0.110

6260-01-396-1704

Hydration bladder 100 oz, 1

0.580

8465-01-527-6371

Survival manual (small tan), 1

0.395

AFM 64-5

Muslin bandage, 1

0.130

6510-00-201-1755

Blade surgical, 5

0.030

6850-00-985-7166

50 ft 550 cord, 1

0.100

4020-00-240-2146

In-line filter

0.155

8465-01-517-4770

Water purification tablets, 1 sht

0.025

COTS: Micropur

TOTAL WEIGHT:

5.225

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Go-Bag Additional Items W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Additional Items Gerber folding E-tool Magnesium fire starter Illuminating candle prosthesis (zip-lock bag) aluminum foil, 5' length trioxane poncho signal, smoke, & illumination, 1 carabiner speed hook snare (for fishing) non-magnetic steel snare wire tarp snowshoes (MSR Denali Ascent) snowshoe extension tails, 4" saber cut saw (survival inc) desalter kit #4 goggles, sun, wind & dust insect head net hat, reversible sun sleeping bag with carrier GP knife sharpener Multi-tool, Gerber Matches in water-proof container emergency fishing kit

Weight, lbs 2.545 0.100 0.255 0.000 0.045 0.000 1.555 0.285 0.145 0.045 0.040 3.800 3.750 0.710 0.375 1.625 0.255 0.255 0.210 9.320 0.090 0.495 0.320 0.375

NSN 4240-01-160-5618 6260-00-840-5578 6520-00-926-9041 9110-00-263-9865 8405-01-100-0976 1370-00-309-5028 4220-01-379-5598 9525-00-596-3498 8340-00-485-3012

4610-00-372-0592 8465-01-328-8268 8415-00-935-3130 8415-00-270-0229 5110-00-162-2205 5110-01-346-5341 9920-01-154-7199 4220-00-244-0764

SKRAM Prototypes Used for Integration Efforts Gear Insert

SKRAM interfaces with: a) Go Bag attaches with Hydration Carrier b) Gear Insert carries mandatory survival Aviation Life Support Equipment (ALSE) gear

Go Bag Module

c) RFI Sleep System attaches to Go Bag or Hydration Carrier Hydration Carrier d) GOVT provided Interface Control Drawings

RFI Sleep System

M-4 Magazine Pouch

e) M-4 Magazine Pouch interfaces via PALS to Go Bag or Hydration Carrier

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01 •Items not to scale •Specific features shown in these photos may not represent actual specification requirements

UH-60 A/L •

Gear Carrier – Go Bag filled with ALSE Mandatory – Go Bag filled with mission-specific gear – 2 Magazine pouches with 4 M-4 magazines



Tie-down Assembly – Double Loop Strap, 1005978-3 – Shackle Strap, 1005979-1



Anchorage – Aircraft Cargo Rings

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

CH-47 D/F •

Gear Carrier – – – –



Go Bag filled with ALSE Mandatory Go Bag filled with mission-specific gear Magazine pouches Can accommodate RFI Modular Sleep System

Tie-Down Assembly – Cargo Tie-Down Strap 1005980-1



Anchorage – Shackle on seat bar – Choice of lower attachment point include 10K ring on floor or seat belt attachment ring – Alternate location is between floor cargo rings, 36 inches apart

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

OH-58D •

Gear Carrier – Go Bag filled with ALSE Mandatory – Go Bag filled with mission-specific gear – Magazine pouches



Tie-down Assembly – Double Loop Strap, 1005978-3 – Shackle Strap, 1005979-1

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

AH-64 A/D •

Hydration System – Hydration Carrier in right-hand bay, outboard of seat, inside of adjustable armor plate – 3 L MOLLE Hydration Reservoir – One M-4 magazine pouch and 2 magazines



Tie-down Assembly – Double Loop Strap, 1005978-3 – Shackle Strap, 1005979-1



Anchorage – New brackets provided by Air Warrior

Go Bag with Mandatory ALSE fits in the exterior stowage bays (EFAB, FABs or Survival Kit Bay optional).

Right-hand bay, outboard of seat, inside of armor plate W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Acquisition of Items W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01



SKRAM – Indefinite Delivery/Indefinite Quantity (IDIQ) Production Contract – Procure to Detail Specification with defined interface requirements (DWG 1005972) for Go Bag, Hydration Carrier, and Gear Insert – Have materials defined by specification (Fabric, webbing, zippers) – CLINS • SKRAM Go Bag DTL-10836-1 • Hydration Carrier DTL 10836-2 • Gear Insert DTL-10836-12

– Procure to Drawing and Purchase Description • M-4 Magazine Pouch 1005945-1 (NSN ) • Cargo Tie- Down Strap P/N 1005980-1 • Double Loop Strap P/N 1005978-3 • Shackle Strap P/N 1005979-1

– CONSIDERATIONS: - GOVT control of Detail Specification AVNS-DTL-10836, Interface Control Drawings (ICDs), and M-4 Magazine Pouch TDP

Scope of Work • Meetings & Reviews: – Start of Work – Bi-weekly telecon assess progress toward production and delivery – Program Review once per year at contractor facilities assess program accomplishments

• Minutes required for Start of Work and Program Reviews W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Production • Pilot Line Validation – Government team visits manufacturing facility for each product – Assessing readiness for production that tooling is in place – Review Work Instructions – Review of Process Control & documentation – Review of receiving and inspection – Supplier Control – Shipping W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Quality Management System • Established, documented, implemented, and maintained quality management system – Quality policy and objectives – Quality manual – Controlled procedures and records – Management committed to quality objectives – Competence, Training and awareness W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Quality Management System • Consistency of processes with the quality management system – – – –

Design and development Product realization Purchasing Production

• Control of products and processes – Identification and Traceability – Control of Measuring Equipment – Internal Auditing – Control of Nonconforming product

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Quality Management System • Corrective and Preventive Action • ANSI/ISO/ASQ 9001 or AS9100 certification or compliancy • Certification not required, but should meet the requirements of one of the listed standards. • At Start of Work meeting • provide a matrix of compliance status to either of the standards. • define path (task and timeline) to achieve compliancy on any requirements not already met. W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Inspection and Test Requirements •

First Article Test (FAT) required on the Go Bag, Hydration Carrier, Gear Insert, M-4 Pouch, Double Loop Strap, Shackle Strap, and Cargo Tie-Down Strap prior to approval to go into production. • Plan must be submitted and approved by the Government. • FAT will be performed by the contractor. The Government may choose to witness all or part of the FAT and review any of the build and FAT documentation. • Report must be submitted and approved by the Government.



Conformance Inspection (or Lot Acceptance) Test required during production. • Plan must be submitted and approved by the Government.



Required to meet material certifications, in-process inspection, visual inspection, dimensional inspection, and performance requirements IAW PD1006008, PD1006006, AVNS-DTL-10836, and drawings supplied with the RFP. • Tensile Tests required for Double Loop Strap and Cargo Tie-Down Strap IAW PD. • Proof Load required for Go Bag and Hydration carrier handles, tie-down channels, and interface to sleep system IAW Specification.

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Inspection and Test Requirements • Proof load test required on some parts of the system IAW the AVNS during either FAT or Conformance Inspection and sometimes both. • Demonstrations required on some parts of the system IAW the AVNS during either FAT or Conformance Inspection and sometimes both. • Standard Color samples must be established. • Spectral Reflectance must be tested by a Government approved lab.

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Configuration Management • If changes occur, Contractor required to submit Engineering Change Proposals (ECPs) for Class I and Class II changes on their products (Go Bag, Hydration Carrier, and Gear Insert) • GOVT will provide ECPs for GOVT controlled drawings, specifications, and purchase descriptions • Configuration Status Accounting System – Tells what was built: Documentation Revision Level; Parts List; etc. – Allows for tracking of items to production lot and configuration if a problem occurs

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Configuration Management • Physical Configuration Audit: – Confirms Item configuration and drawing/patterns are in agreement. – Establishes baseline of items from which ECPs required to make changes. – Conducted by Contractor with GOVT participation

• Section H-3 –Clause 52.243-4000 Describes process for ECP and Request for Variances submittal

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Integrated Logistics Support • Provisioning Data – Basically Bill of Material • Supplemental Data for Provisioning – Top Level Drawing submitted to Army for establishing National Stock Number (NSN) • Only for Go Bag, Hydration Carrier, and Gear Insert W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Packaging and Shipping • Packaging is IAW Commercial Practices but must meet MIL-STD-129 for shipping marking and MIL-STD-130 for item marking. Specification and drawing package also provide requirements for marking (label) for individual items. • Contractor to present packaging concepts to the GOVT prior to first shipment • No RFID is required • Quality Level for inspection of packaging is in Scope of Work for Go Bag, Hydration Carrier and Gear Insert and in Purchase Descriptions for M-4 magazine pouch and Straps. • Provide shipping/delivery status report to PM AW W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

SECTION 5 SOLICITATION REQUIREMENTS OVERVIEW 5. In your proposals: * Do not forget to: ~ Sign the Solicitation/Request for Proposal (RFP), all amendments and include them in the Administrative Matters tab of Volume II. ~ Fill out both the Section B pricing lines AND the Attachment 003 Pricing Sheets, place in Volume II “Price or Pricing”. ~ Give consideration to H-8, wherein the offeror is to keep its proposal validity open for 120 days after either proposal or final proposal submission . ~ Price any indirect expense, such as warranty or not separately priced (NSP) data item in your unit prices. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ * Or forget from the synthesizing notes earlier: ~ 100% Small Business Set Aside – 51% of the work must be performed by the small business or small business lead ~ Berry Amendment applies – domestic material and domestic production ~ Fixed Price Range quantities – alternate ranges, if beneficial to your business model and the government, may be offered – make sure you are responsive to the government’s ranges first, then make the alternate offer in Section B and the Attachment 003 Pricing Sheets (Volume II). W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5. In your proposals / synthesizing notes (CONTINUED)

~ Pre-Award Survey, conducted by AMCOM and DCMA personnel, may be required. This can delay award for 30-60 days ~ First Articles will be required. FAT is NOT to be confused with the demo models submitted with your proposal – it is an post award milestone. This means that authorization to begin production and acquire the material necessary for production will not be given until there is successful FAT. To do otherwise is at the contractor’s own risk. First billings and payments can be delayed many months. ~ Do NOT include transportation or shipping expense – GBL/FOB Origin.

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5. SOLICITATION OVERVIEW – The Request for Proposal (RFP) is divided into Sections A-M. Our greatest attention today needs to be on Sections B, H, J, L, and M: Section A - Narrative – contains overview and highlights B - Schedule pages with Contract Line Item Numbers (CLINs) that provide for nomenclature, funding at time of award, delivery schedules, inspection and acceptance – it is the “nuts and bolts” of a buy. Your pricing is entered here and on the Attachment 003 Pricing Sheets C, D, E and F – Include the SOW, which Ms. Lavoie has discussed, and data on quality, packaging, inspection, delivery and shipping. G - Pertains to award funding and later financial obligations H – Special Provisions – such as Engineering Change Proposals, warranties, ordering provisions, proposal validity time frame, etc. I - General Provisions contain clauses that are either statutory or regulatory - EEO, labor laws, criminal conduct, Buy American, etc. J – Lists and links Exhibits and Attachments K - Contractor Certification and Representations – if your firm has not registered in ORCA for annualized certs/reps, then this section must be completed. Note that there is a place to check If you have a current ORCA file and then you can over skip to Section L. L - Instructions to Offerors – Explains how to prepare and submit your proposal M - Evaluation Criteria – Details how the Government will evaluate your proposal and make award. W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5. W8RGZ-10-R-0160 Overview

Section B

Section B Hardware W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5.

Section B Repair Material

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5.

Attachment 003Pricing Sheet W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5.

Section H – Special Provisions

H-4 Warranty – Standard Federal Acquisition Regulation (FAR) Non-Complex Items coverage per clause 52.246-2. H-5 Min/Max Quantities – Reflected at each CLIN in Section B H-6 Ordering – Note C – 30 Day Rule for economy of pricing, when possible. H-7 Consideration of the Handicapped in Subcontracting H-8 Proposal Validity – 120 days after proposal, or final proposal, submission.

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5.

Section L – Instructions to Offerors Follow the instructions – it takes two proposal volumes (tabbed and labeled) that contain what is required in Section L and your demo models, submitted within the time frame required to be in the competition. The Technical Volume, or Volume I – supporting raw test data referencing the specification or purchase description paragraph. Product Demonstration Models (bid samples) are discussed at length beginning on Section L, page 100.

The Price, Administrative Matters and Past Performance Volume or Volume II – PRICE TAB: The Section B and Attachment 003 Pricing data for all 5 years, ADM MATTERS TAB: Signed pages one from the RFP and any amendments, completed certifications and representations from the solicitation’s Section K if not current in the ORCA database PAST PERFORMANCE TAB: Provide the information described in Section L for 3 relevant contracts you have performed in the last 3 years.

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5.

Section M – Evaluation Factors for Award

A Technical Evaluation Committee (TEC) made of government experts and consultants will evaluate each proposal and all demo models. The TEC is sequestered during this process and the evaluators for one factor do not have access to the evaluators, or their findings, of another factor. Ratings are discussed in Section M as Go/No Go and or Acceptable. This is the lowest level of the Best Value Evaluation continuum and results in a “technically acceptable, lowest price” determination. In our case, “technically acceptable” cannot be determined without government review of the apparent successful offeror’s production capabilities – capabilities that are not part of the written proposal. To accomplish this, the government will visit the apparent successful offeror’s facility during an abbreviated or full scale Pre-Award Survey. The same event may be used to review the apparent’s financial soundness in maintaining its business during the many months that may be required between contract award and first billing/payment.

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

5. Section J Exhibits and Attachments

Attachment 002 Checklist

Attachment 003 Pricing Sheet W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Pre-proposal Conference Section 5. Solicitation Requirements Overview Amendment will Remove the following drawings From RFP  A-Kit for SKRAM, CH-47D/F Drawing # 1005962  B-Kit for SKRAM, CH-47D/F Drawing # 1005970  B-Kit for SKRAM, UH-60 A/L Drawing # 1005968  B- Kit for SKRAM, OH-58D Drawing # 1005969  B- Kit for SKRAM, AH-64A/D Drawing # 1005971 Amendment will Provide Instruction for receiving/downloading Pre-Proposal Conference W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01 Briefings

Pre-proposal Conference Section 5. Solicitation Requirements Overview Gauges and Sleep system will be available for requirements verification at 6726 Odyssey Dr., Huntsville AL Amendment will Provide Instruction for reserving time to use gauges & Sleep System W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Product Demonstration Models

 Delivered with Proposal and include one each of:  Go Bag DTL-10836-1 Built IAW AVNS-DTL-10836  Gear Insert DTL-10836-12 Built IAW AVNS-DTL10836  Cargo Tie- Down Strap P/N 1005980-1 Built IAW Drawing 1005980 and Purchase Description 1006008

 Exceptions: PDMs do not have to meet Flame Retardant treatment, color, spectral reflectance, visual shade matching, Water repellent treatment for zippers  Substitutions allowed for FR Textured Nylon Cloth(1005936) and Raschel Knit  Do not provide the Three Carabiners P/N 1005974-1 W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Narrative for PDM and Test Data W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

PDM Narrative  Discuss compliance/non-compliance of PDMs with requirements documents. Narrative shall be in Tabular Format per the specification for Go Bag and Gear Insert and per the drawing for the Cargo Tie Down Strap.  Describe features that are not self-evident. Test Data  Specific requirements must be verified by Offeror and results presented in proposal  Volume, Weight, and Loads for Go Bag  Tensile Test for Cargo Tie- Down Strap

Schedule  Provide manufacturing strategy for determining sites of PreAward, if necessary  Provide Master Program Schedule detailing activities and events to get to first production lot of each item  Provide Production Rates to meet Delivery requirements in RFP (Section L)  Each Item has a minimum delivery rate per month and a potential higher delivery rate per month (Section L)  Each Item has Production Lead Time but GOVT will always take early delivery (Section L)  Offeror must demonstrate in proposal that delivery rates and times can be met  Do not address Repair Items CLIN 0108  Maximum Delivery Quantity for each item per Ordering Period is provided in Section B W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Evaluation of Volume I W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

 PDMs will be evaluated to the AVNS-DTL-10836, drawings, and Purchase Description. (See Attachment 2)  Gauge tools will be used to measure Item size. (See DWG 1005977 to manufacture own set of gauges. Sample of gauges shown below).

Gauge Box with Go Bag Gauge Middle Gauge for Gear Insert

Cylinder Gauge for Gear Insert

Evaluation of Volume I Technical  All sections rated as Acceptable or Unacceptable to give Go/No Go for Technical section  PDMs must meet majority of requirements at a minimum. Workmanship weaknesses may be easily remediated.  Test data will be evaluated to determine if proof load was met. Other requirements will be verified by the evaluators.  Plans and schedules will be evaluated to determine ability to meet rates and delivery schedule. W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

Repair Items Pricing Pricing Sheet – Provide pricing for each quantity range Prices will NOT be evaluated. Will be used for contract pricing only. Sample of Repair Pricing Sheet W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01 CLIN 0108

Repair Parts/Material

Item

Part Number

Fabric

105936-3

Unit of Measur e

Package

3 YD Cut

Plastic Bag

Packaged Pricing Range 1-49 50 - 100

Webbing (SKRAM Go-Bag and Hydration Carrier)

A-A-55301, Type III

Hook and Loop fastener Tape

A-A-55126

3 YDS

Plastic Bag

1-49 50 - 100

One YD

Plastic Bag

1-49 50 - 100

Thread Snap Fasteners NASM27980, Style 2

A-A-59826

STUD

Cone(1/2 pound)

Plastic Bag

HUNDRED

Bag/box of 100

HUNDRED

Bag/box of 100

1-50

SOCKET

1-50

HUNDRED

Bag/box of 100

BUTTON

1-50

HUNDRED Eyelets

1-50

Bag/box of 100 1-50

Price Per Bag/Box

Pricing Worksheets Sample of Pricing Worksheet

W58RGZ-10-R-0160/Amdt 001 SKRAM Attachment 01

UNIT

CLIN

DESCRIPTION

0101 AA

Go Bag with First Article Test

Required Pricing Range

DTL-10836-1

500-1500 1501-5000 5001-8500 8501-10000 10,001+

Total CLIN Price (for evaluation purposes only)

0101 AB

Go Bag without First Article Test

DTL-10836-1

500-1500 1501-5000 5001-8500 8501-10000 10,001+

Total CLIN Price (for evaluation purposes only)

P R I C E

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF