Republic of the Philippines Department of Interior and Local Government NATIONAL POLICE COMMISSION PHILIPPINE NATIONAL POLICE REGIONAL MOBILE GROUP I Camp BGen Oscar M Florendo Parian, San Fernando City MEMORANDUM FOR
:
The Regional Director (Attn: CRPHRDD; ACROPD)
FROM
:
Group Director, RMG1
:
After
:
May 12, 2009
SUBJECT Operation DATE
Activity
Report
on
Disaster
I.
REFERENCES: a. PRO1 IMPLAN 16-2008 “SAKLOLO MILENYO”; and b. Weather Forecast re Tropical Storm “EMONG”
II.
MISSION:
Relief
RMG1, concurrent with its mission and functions, shall conduct disaster preparedness activities, provides security coverage in disaster areas, and assist in search and rescue, evacuation, relief operations and to undertake traffic control and direction in clearing the streets and highways from any congestion and other obstructions particularly in the provinces of La Union and Pangasinan. III.
PLACES COVERED:
La Union and Pangasinan.
IV.
PERIOD COVERED:
May 7 - 8, 2009
V.
PARTICIPATING ELEMENTS:
VI.
NARRATIVE:
Annex “A”
May 6, 2009 After the disaster that Tropical Storm Dante had brought to the Southern Luzon, another tropical storm is about to threaten the Northern and Central part of Luzon. Typhoon “Emong” (International Codename: ChanHom) was expected to smash into the northern half of the country on May 7, 2009. The storm was packing peak sustained winds of 140 kilometers (87 miles) per hour and with gusts of up to 170 kilometers (105 miles) per hour. It developed into a typhoon or super typhoon that hit the Region. In helping other government agencies such as DPWH, DSWD, other agencies and private entities, this unit alerted RMG1 personnel to provide security coverage in disaster areas and to conduct search and rescue, evacuation and relief operation within AOR in case of any eventuality.
May 7, 2009 Initially, PSSUPT ALEJANDRO M VALERIO JR, GD alerted sixty four (64) RMG1 personnel to compose SARO Team broken down to two (2) teams in every line companies and two (2) teams in Battalion Headquarters. Said personnel have been on a 24-hour alert over reports that Emong would make landfall in the region. That at about 10:00 am of May 7, 2009, PSUPT RHODE ALLAS ESPERO initiated to conduct simultaneous showdown inspection to this BnHQs to include all line companies of this unit in their operational readiness, capabilities and equipment of their respective SARO Teams. All teams were alerted and ready to provide security coverage in disaster areas and to conduct of search and rescue, evacuation and relief operation within AOR. Inspection ended with less defects noted. On 8:30 pm of same date, thirteen (13) RMG1 personnel led by PSSUPT VALERIO JR conducted road clearing operation in the street of Poro Point, San Fernando City which have been rendered impassable because of fallen trees. Activity partially ended at about 10:30 pm of same date. Likewise, the SARO Team of 2nd RMG1 Coy conducted the same operation along national highway in Brgy Sta. Rita, Agoo, La Union which was also declared impassable because of fallen trees. May 8, 2009 RMG1 BATTALION HEADQUARTERS That at about 6:00 am of May 8, 2009, the Camp premises and Eco Trail were devastated by several fallen trees brought by typhoon “EMONG”. As a result, all available personnel of this unit conducted clearing of fallen trees/debris inside Battalion headquarters surroundings and eco trail by cutting and removing fallen trees. At about 9:00 am of same date, a call was received by the Group Director from RDPRO1 that National Roads of La Union and Pangasinan have scattered fallen trees and electric posts. In response to this, at about 10:00 am of same date, fifteen (15) RMG1 personnel led by PSUPT ESPERO conducted road clearing operation in the streets of Bauang and Aringay, both in the province of La Union. At about 10:00 am of same date, a fallen big mango tree was cut off which was blocking the road in Barangay Calumbaya, Bauang, La Union. Thereafter, at about 1:00 pm of same date, the team proceeded to Brgy San Benito Norte, Aringay, La Union to help PMG LUPPO, BFP Aringay and residents in cutting a fallen mango tree that was blocking a portion of the National Road thereat. At about 4:00 pm of same date, clearing of roads was ended with no untoward incident happened. 2ND RMG1 COMPANY The 2nd RMG1 Coy based at Sta Rita, Agoo, La Union, at about 07:00 am of May 8, 2009, dispatched a team that conducted continued road clearing operation along the areas of Marcos Highway Bgy Bacsil, Agoo and Tubao, both in La Union. The local residents headed by Barangay Captain
Romeo Tavares provided a helping hand in clearing the streets from barriers and debris. Ended at about 10:00 am of same date. 3RD RMG1 COMPANY The 3rd RMG1 Coy based at SRPC Dam San Manuel, Pangasinan, OOA 5:00 am of May 8, 2009, joint elements of this company and Dasol MPS, Dasol, Pangasinan conducted road clearing operation along the provincial road in their AOR from fallen and uprooted trees. Ended at about 12:30 pm of same date after making all major roads passable to all types of vehicles. Likewise, other SARO Team conducted the same clearing at about 1:00 pm of same date to Guibel Bridge, Brgy Guibel, San Jacinto, Pangasinan from bamboo trunks obstructing traffic flow along Manaoag - Dagupan road. Thereafter, at about 2:30 pm of same date, same personnel conducted road clearing operation in Brgy Anonang, San Fabian, Pangasinan removing banana trunks and fallen trees obstructing traffic flow of traffic along San Jacinto to San Fabian road. As a result, SARO Team of 3rd RMG1 Coy had cleared the above stated areas from fallen trees which made passable to commuters the provincial roads going to the municipalities of San Manuel, Binalonan, Laoac, Manaoag, San Jacinto, San Fabian, Mangaldan, Calasiao, Santa Barbara, and Asingan; cities of Dagupan and Urdaneta; all in Pangasinan. VII.
RECOMMENDATION:
Recommend that the RMG1 SARO personnel be awarded “MEDALYA NG PAGTULONG SA NASALANTA” for their exemplary performance and dedication in helping the people. VIII. For information and favorable action.
ALEJANDRO VALERIO JR Police Superintendent Group Director
Incls: Participating Personnel : “Annex “A” Pictorials : “Annex “B”
M Senior
ANNEX “A” Participating Elements Battalion HQs PSSUPT ALEJANDRO M VALERIO JR PO1 Gilbert D Espiritu PSUPT RHODE ALLAS ESPERO PO1 Rodolfo U Mapalo Jr PINSP FLORANTE S RETES PO1 Ronald V Camat PINSP RAYMOND C NICOLAS PO1 Rollie Nest F Ducusin PINSP MICHAEL D BAUTISTA PO1 Anthony S Bustarde SPO1 Elvie R Dagan PO1 Virgo V Enrique PO3 Flordelino F Diaz PO1 Benedict J Gabino PO3 Bernardo J Bajog Jr PO1 Irvin M Galangco PO3 Dennis A Bajog PO1 Geoffrey D Garnace PO3 Alejo P Torrano PO1 Larry P Bondame PO2 Alejandro P Palaganas PO1 Carlos V Nastor PO2 Aristotle Rey V Bersamina PO1 Nestor G Mendoza PO2 Nario N Cahigas PO1 Leandro S Meneses Jr PO2 Ben Brigido B Munar PO1 Alejo M Geslani PO1 Ruel S Camarao PO1 Tranquilino P Aquino Jr PO1 Jeffrey Q Quinoñes PO1 Willy A Arzadon Jr 2nd RMG1 PCINSP EDUARDO L DANGUECAN JR PINSP RICHARD C VILLANUEVA PO3 Renato A Gacad PO3 Arman D Alcantara PO1 Jeffrey P Carbajosa
COMPANY PO1 Jimmy A Abubo PO1 Renan A Dela Cruz PO1 Jesse D Quilaton PO1 Teodorico B RemegioJr PO1 Severino R De Guzman
PO1 PO1 PO1 PO1 PO1 PO1 PO1
Clyde M Sindayen Ronando C Nasol Fuljencio SMayo Jr Ferdinand B Galera Edmund R Villanueva Bellie G Vicario Rodel F Gonzales
PO1 PO1 PO1 PO1 PO1 PO1
Norgil F Sabado Joemar A Borja Ben Johnlou M Trinidad Roger C Romero Rolando M Corpuz Edison M De Nieva
3rd RMG1 COMPANY PSINSP OLIVER A ABAYAN PO1 Daniel Iranio S Dizon PINSP EXZUR B RELATADO PO1 Ric B Valdez PO3 Harold A Noval PO1 Daniel S Penulliar PO2 Francis C Patungan PO1 Jeric C padilla PO1 Rolando F Aquino PO1 Ceazar A Sanicolas IV PO1 Michael T Dizon PO1 Rudrick E Cruz PO1 Rodel T Asunio PO1 Wendell M De Vera PO1 Genel V Dres PO1 Junjun C Corona PO1 Rodolfo d Patricio Jr PO1 Esteban C Fernandez III
ANNEX “B”
PICTORIALS
PHOTO SHOWS: PSUPT RHODE ALLAS ESPERO while conducting inspection of the operational readiness, capabilities and equipment of the SARO Team of this BnHQs.
PHOTO SHOWS: The 1st RMG1 Coy SARO Team during the inspection of the operational readiness, capabilities and SAR equipment.
PHOTO SHOWS: The 2nd RMG1 Coy SARO Team during the inspection of the operational readiness, capabilities and SAR equipment.
PHOTO SHOWS: The 3rd RMG1 Coy SARO Team during the inspection of the operational readiness, capabilities and SAR equipment.
PHOTO SHOWS: SARO Team of BnHQs while conducting road clearing operation at National Highway of Bauang, La Union.
PHOTO SHOWS: SARO Team of 2nd RMG1Coy while conducting road clearing operation at National Highway of Sta Rita, Agoo, La Union.
PHOTO SHOWS: SARO Team of 2nd RMG1Coy while conducting road clearing operation at National Highway of Sta Rita, Agoo, La Union..
PHOTO SHOWS: SARO Team of 3rd RMG1 Coy while conducting road clearing operation at Guibel Bridge, Brgy Guibel, San Jacinto, Pangasinan.
View more...
Comments