Academic Building
Short Description
Download Academic Building...
Description
L 7-Education, Cultural, Scientific Buildinqs
ELEMENTAL COST ANALYSIS - Form 1
I JOB TITLE LOCATION
A-2-4950
I CLIENT:
Academic Building Shah Alam , Selangor
Private TENDER DATE: Oct -93
INFORMATION ON TOTAL PROJECT Project and Contract information Contract:
I Project Details and Site Condition:
Standard PWD Form of Contract (Rev. 10/63) With Quantities
The project comprises the construction and completion of 2Storey Academic Building which sits on an existing slope and related external and infrastructure works. The site is situated within the existing campus and is accessible from the existing road network within the campus.
Market condition: Competitive Comgetitive Tender List
Contract Particulars: Type of Contract: PWD Form 203A (Rev.10/63) With Quantities
Cost Fluctuation:
Yes
No
0
Basis Of Tender Bills Of Quantities
Open/Selected Competition
Sched. Of Rate/ Spec. &. Drawings
D
Negotiated
Serial
52 Weeks
Contract Period Stipulated by Client:
D
Private
D
[J
D
Government
D D
Bills Of Appr. Quant.
[2]
RM
D
Provisional Sums
RM
100,000.00
Prime Cost Sums
RM
568,000.00
Preliminaries
RM
141,000.00
Contingencies
RM
-
Contract Sum
RM 3,182,599.30
I
INT/(JV)/L
3,336,875.76
L
3,288,665.15
L
3,244,913.68
L
3,203,743.60
L
3,182,599.30
L
52 Weeks
Contract Period Offered by Builders:
23 21
Number Of Tenders Issued: Number Of Tenders Received:
ANALYSIS OF SINGLE BUILDING Design/Shape Information Accommodation and Design Features:
I The building accommodates admin office, workshop, seminar room and lecture hall. ~s: _m2
Lower Ground Floor Ground Floor Upper Floor GROSS FLOOR AREA
I
Functional Unit: 3,645.00 m2
r
2,420 m 2 2,530 m 2 / '
= =
External Wall Area Gross Floor Area
4,950 m 2 / 2
Usable Area Circulation Area Ancillary Area Internal division GROSS FLOOR AREA
3,645 m 2 905 m 2 400 m
Storey Heights Av. Below Grd. Level At. Grd. Floor Above Grd. Floor
Percentage of Gross Floor Area
3,504.00 4,950.00 0.7079
-m 4.80 m 3.60 m
a) b) c) d) e)
Below Grd. Floor Single-storey 2-storey 3-storey 4-storey
2
4,950 m
2
2
Floor Space NOT Enclosed Roof Area (Structural & Plant Rooms)
600 m . ' " 2 2,559 m 1" Brief Cost Information:
Contract Sum Provisional Sums Prime Cost Sums Preliminaries Contingencies
RM RM RM RM RM
3,182,599.30 90,000.00 568,000.00 141,000.00
Contract Sum less Contingencies
ECA f1 shah Alam
RM
Functional Unit Cost excluding external works: being being
4.64 %) of reminder - %)of Contract Sum
3,182,599.30
--
Design/ShaQe:
RM 788.11 perm
2
0% 0% 100 % 0% 0%
"
.
ELEMENTAL COST ANALYSIS-Form 2 7-Educational, Cultural, Scientific Buildings A-2-4950
GROSS FLOOR AREA
4,950 m2
/
SUMMARY OF ELEMENT COST TENDER DATE: October - 93 Preliminaries Shown Separately Total Cost Of
Cost per m2
Element
Element
Element
Reinforced
Reinforcement
Formwork
Element
GFA
Unit
Unit Rate
Ratio per
Concrete
Kg
m2
RM
RM
Quantity
RM
m2GFA
m3
1 Substructure lA Piling
324,023.00
65.46
8,140 m
39.81
1.644
1B Work Below Lowest Floor Finish
483,052.25
97.59
2,863 m2
168.72
0.578
807,075.25
163.05
436,532.50
88.19
4,950 m2
88.19
88,537.00
17.89
2,400 m2
2C Roof
195,288.80
39.45
2,559 m2
20 Stairs
35,566.20
7.19
m2
2E External Walls
66,770.60
13.49
3,504 m2
19.06
0.708
2F Windows & External Doors
51,445.60
10.39
53 m2
970.67
0.011
2G Internal Walls & Partitions
45,614.80
9.22
1,939 m2
23.52
0.392
2H Internal Doors
23,616.70
4.77
213 m2
110.88
0.043
Group Element Total:
127,778
7,643
932
127,778
7,643
1.000
721
105,404
10,002
36.89
0.485
244
14,738
2,309
76.31
0.517
152
8,695
1,373
47
6,508
292
1,164
135,345
13,976
2 Superstructure 2A Frame 2B Upper Floors
Group Element Total:
943,372.20
-
932
-
190.58
-
3 Finishes 3A Internal Wall Finishes
99,104.70
20.02
8,115 m2
12.21
1.639
3B Internal Floor Finishes
53,578,00
10.82
5,480 m2
9.78
1.107
3,570 m2
11.23
3C Internal Ceiling Finishes
40,085.00
8.10
100,821.00
38.94
Group Element Total:
293,588.70
59.31
4 Fittings and Furnis~
60,000.00
12.12
5A Sanitary Appliances
10,408.00
2.10
5B Plumbing Installation
8,000.00
1.62
3D External Finishes
0.721
P.e.Sums Allowed
Tendergd Sum
5 Services
•
1,301.00
0.002 8,000.00
35,029.00
-
5C Refuse Disposal 50 Air-Conditioning & Ventilating System
104,000.00
21.01
5E Electrical Installation
368,000.00
74.34
88,000.00
17.78
5F Fire Protection Installation
8 No
2480 Tm~
41.94
0.501
V
-
-
-
104,000.00
105,210.00
368,000.00
373,775.00
88,000.00
45,822.00
5G Lift & Conveyor Installation 5H Communication Installation 5J Special Installation
included in Element5E
-
-
5K Builders Profit & Attendance On Services
22,720.00
4.59
5L Builder's Work In Connection With services
26,493.00
5.35
627,621.00
126.79
2,731,657.15
551.85
6A Site Work
202,470.80
40.90
6B Drainage
53,181.00
10.74
6C External Services
44,290.35
8.95
Group Element Total: Sub-Total excluding External Works, Preliminaries and Contingencies 6 External Works
60 Ancillary Buildings 6E Recreational Facilities
10,000.00
2.02
Group Element Total:
309,942.15
62.61
141,000.00
28.48
3,182,599.30
642.94
Preliminaries TOTAL (Less Contingencies)
ECA- F1 Shah Alam
-
568,000.00
559,836.00
I
ELEMENT COST ANALYSIS-Form 3
I
7 - Educational, Cultural, Scientific Building A-2-4950
BRIEF SPECIFICATION GROSS FLOOR AREA:._4-!..!,,:::.95::::0::..:mc.,:2_--,-_ _ _ _ _ _ _ _ _..:..T:::.EN'-'-=-D:::.E:,:R-:::D::,A,:,:T-:=;E:::-:.,::O:;.::C=,lo::::b e,:-r-~9::::3'--___________---1 7 ELEMENT SPECIFICATION 1 Substructure 1A Piling
150mm x 150mm and 200mm x 200mm PC (Grade 45) SIRIM approved piles average 12m depth.
1 B Work Below Lowest Floor Finish
Reinforced concrete pilecap, ground beams, columns stilts, tie beam, suspended slab and ground floor slab.
2 Superstructure 2A Frame
Reinforced concrete columns, beams and roof beams.
2B Upper Floors
Reinforced concrete suspended slabs.
2C Roof
RC flat roof, metal roofling sheet on steel roof trusses,UPVC rainwater down pipe with accessories.
20 Stairs
Reinforced concrete staircase, cement and sand paving with non-slip nosing tiles and MS
2E External Walls
Half brickwall in common bricks, 900mm high parapet walls to corridor.
handraling.
2F Window & External Doors
Natural anodized alum composite windows with clear float glass, alum louvred door, timtler flush doors.
2G Internal Walls & Partitions
Half brickwall in common bricks, and full height gypsum board portion.
2H Internal Doors
Timber flush door and fire doors.
3A Internal Wall Finishes
Cement & sand plastering and emulsion paint generally 2.1M high glazed ceramic tiles to toilet.
3B Internal Floor Finishes
Cement and sand paving generally, ceramic tiles to toile,t vinyl flooring, carpet and floor hardener to workshop.
3C Internal Ceiling Finishes 3D External Finishes
4 Fittings and Furnishings
Plaster and paint,'UAC Superfiex' asbestos free ceiling board. Cement and sand plastering and weathershield paint to walls, cement and sand paving to floors and 'UAC' Superfiex' asbestos free ceiling board. Provision of Provisional Sum for pentas and furniture and fitting.
~~,-~--------------------~----------------------------------------------------------------
5 Servises
SA Sanitary Appliances
Water closet, urinals, wash hand basin, bib tap, soap & toilet roll holder, mirror and robe hook ..
58 Plumbing Installation
Provision of P.C. Sum
5C Refuse Disposal
Not applicable
50 Air-Condition & Ventilating System
Provision of P.C. Sum
5E Electrical Installation
Provision of P .C. Sum
5F Fire Protection Installation
Provision of P.C. Sum
5G Lift & Conveyor Installation
Not applicable
5H Communication Installation
Included in 5E
5J Special Installation
Not applicable
5K Builder's Profit & Attendance On
Builder's profit and attendance in connection with M&E services.
Services 5L Builder's Work In Connection With
Builder's works in connection with M&E services.
Services 6 External Works 6A Site Work
Site clearance, earthworks, roadwork crib retaining wall and turfing.
6B Drainage
300mm Dia half round sail glazed ware drain, precast conc cover slab, MS grating, sumps and
6C External Services
Sewerage pipe and brick manhole with cast iron heavy duty manhole cover and provision of
60 Ancillary Buildings
Nil
6E Recreational Facilities
Provision of provisional sum of RM 10,000.00 for landscaping.
750mm dia PC culverts.
provisional sum of RM 20,000.00 water reticulation
ECA Shah Alam spec
,f "
INSTITUTION OF SURVEYORS MALAYSIA l3UlLDING COST INFORMATION CENTRE
6 EXTERNAL WORKS 6A
Site work
6B
Drainage
6C
External services
6D
Ancillary buildings
6E
Recreational facilities Element Total TOTAL ( less Contingencies)
LKS
',f
INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTRE
19 -BUILDINGS, SPACES IN GENERAL
IA -1 - 106 '
ELEMENTAL COST ANALYSIS - Form 3 GROSS FLOOR AREA: ELEMENT 1 SUBSTRUCTURE lA Work Below Lowest Floor Finish /
106 m2
TENDER DATE SPECIFICATION
15-Nov-99
Reinforced concrete column stump, ground beam, floor bed comprising hardcore, lean concrete,reinfored concrete bed.
2 2A
SUPERSTRUCTURE Frame
Reinforced concrete column, beam and roof beam "
2B
Upper floor /
Not Applicable
2C
Roof
Structural timber members with cement rooftiles,GI rain water drainage
2D
Stairs
Not Applicable
2E
External wall
2F
Windows & External Doors
/
Generally halfbrickwall in cement & sand brick
/
r
Timber frame adjustable louvres windows and fixed louvres windows w;~w with clear sheet glass; Timber flush door & MS roller shutter
//""
,
~
2G
Internal Wall & partition
One brickwal and halfbrickwall in cement and sand brick
2H
Internal doors
Timber frame waterproofed plywood flush door
3 3A
FINISHES Internal wall finishes
Plastering & paint generally with glazed wall tiles to toilet area
3B
Internal floor finishes
/'
Cement rendering generally. Ceramic tiles to toilet
/
3C
Internal ceiling finishes
v
Asbestos-free cement ceiling board /'
3D
External finishes
/
Plaster and fungus
~sistant paint to wall and column.
INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTRE
19 -BUILDINGS, SPACES IN GENERAL ELEMENTAL COST ANAL YSIS - Form 3 106 m2
GROSS FLOOR AREA: ELEMENT 4
5 5A
FITTINGS & FURNISHINGS
SERVICES Sanitary appliances
•
TENDER DATE .SPECIFICATlON
15-Nov-99
Not Applicable
Diamond -Bengal squat W.C. suite, 420mm x 575mm Diamond Trend II wash basin Diamond-C59 soap holder, Diamond - C60 paper holder, TML aluminium sink
£.
It
IA-I-I06
5B
Plumbing installation
GI & UPVC pipe generally
5C
Refuse disposal
Not Applicable
5D
Air-con & Ventilating system
Not Applicable
5E
Electrical installation
Lighting and power point
5F
Fire-protection installation
Not Applicable
5G
Lift & Conveyor installation
Not Applicable
5H
Communication installation /
Not Applicable
5J
Special installation
Not Applicable
5K
Builder's Profit & Attendance On
Not Applicable
/
Services 5L
Builder's Work In Connection With Services
6A
EXTERNAL WORKS Site work
6B 6C
Drainage External services
6D 6E
Ancillary buildings Recreational facilities
6
Not Applicable
./
Not Applicable
Surface water drainage and entrance culvert Sewerage main & water main recticulation are let out under separate contract. Not Applicable Not Applicable /
/
View more...