APPROVED

CUSTOMER DRAWING NUMBER

P01

16-FEB-2009

REV

DATE

Prepared

For SEC & Ma’aden Approval

-

DESCRIPTION

DRN

Based on : / Replaces :

02/16/2009

JCO

NA

CHK

ENG

Sep.PL same No.

JCO

Responsible department

02/16/2009

Without Separ.PL

NTS

DAS

Ma’aden 380/115kV Substations at Ras Az Zawr

FA

Order Name : 02/16/2009

Doc.Type

Site Inspection & Test Plan Meterings

Take Over department

A

P01

Order No :

CC

Document Designation

380/115kV GIS Substation at Ras Az Zawr

ABB Proj. No.: 06-856-084 Document Number :

ABB

ABB Switzerland Ltd.

Format

A4

Title

SAACE

NA

Approved

02/16/2009

Scale

Sep. PL Anoth. No.

Checked

Revision

REV

MD-403-4000-QD-EL-ITP-0024

MA’ADEN

Language

en No Sheets :

Sheet No :

-

1

ABB Contracting Co. Ltd. 380/115kV GIS Substation – Ma’aden

Contract No.: 06-856-BX-084

Site Inspection & Test Plan (ITP)

ABB Contracting Co. Ltd.

Meterings

Pages: 1 / 4

MD-403-4000-QD-EL-ITP-0024

Maaden 380/115kV Substations at Ras Az Zawr

Rev. P01 Feb. 15, 2009

Discipline: Electrical Works

Abbreviations: E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete. M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted. W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.

INSPECTION RESPONSIBILITY

Item Work Item and QC Activity

Document of Reference

Acceptance Criteria

Verifying Document

1

Ammeter

-

-

1. 1

Mechanical Check & Visual Inspection

-

-

Inspect for any physical damage, verify connections and tightness of connections

1. 2

ABB Sub-Contractor

ABB

MA'ADEN / WP

SEC

-

-

-

-

-

-

-

-

-

-

-

Manufacturer Manual

Visual Inspection

TR-3.27.1 (Page 1)

E

W/S

M/R

M/R

Electrical Test

-

-

-

-

-

-

-

-

Perform applicable functional test indicated on TR3.27.1, Item 3.1

Manufacturer Manual

Visual Inspection

TR-3.27.1 (Page 1)

E

W/S

M/R

M/R

-

Secondary Injection Test TR-3.27.1, Item 3.2

Manufacturer Manual

Visual Inspection

TR-3.27.1 (Page 1)

E

W/S

M/R

M/R

2

Voltmeter

-

-

-

-

-

-

-

2. 1

Mechanical Check & Visual Inspection

-

-

-

-

-

-

-

-

Inspect for any physical damage, verify connections and tightness of connections

Manufacturer Manual

Visual Inspection

TR-3.27.2 (Page 1)

E

W/S

M/R

M/R

2. 2

Electrical Test

-

-

-

-

-

-

-

-

Perform applicable functional test indicated on TR3.27.2, Item 3.1

Manufacturer Manual

Visual Inspection

TR-3.27.2 (Page 1)

E

W/S

M/R

M/R

-

Secondary Injection Test TR-3.27.2, Item 3.2

Manufacturer Manual

Visual Inspection

TR-3.27.2 (Page 1)

E

W/S

M/R

M/R

No.

ABB Contracting Co. Ltd. 380/115kV GIS Substation – Ma’aden

Contract No.: 06-856-BX-084

Site Inspection & Test Plan (ITP)

ABB Contracting Co. Ltd.

Meterings

Pages: 2 / 4

MD-403-4000-QD-EL-ITP-0024

Maaden 380/115kV Substations at Ras Az Zawr

Rev. P01 Feb. 15, 2009

Discipline: Electrical Works

Abbreviations: E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete. M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted. W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.

INSPECTION RESPONSIBILITY

Item Work Item and QC Activity

Document of Reference

Acceptance Criteria

Verifying Document

3

Frequency Meter

-

-

3. 1

Mechanical Check & Visual Inspection

-

-

Inspect for any physical damage, verify connections and tightness of connections

3. 2

ABB Sub-Contractor

ABB

MA'ADEN / WP

SEC

-

-

-

-

-

-

-

-

-

-

-

Manufacturer Manual

Visual Inspection

TR-3.27.5 (Page 1)

E

W/S

M/R

M/R

Electrical Test

-

-

-

-

-

-

-

-

Perform applicable functional test indicated on TR3.27.5, Item 3.1

Manufacturer Manual

Visual Inspection

TR-3.27.5 (Page 1)

E

W/S

M/R

M/R

-

Secondary Injection Test TR-3.27.5, Item 3.2

Manufacturer Manual

Visual Inspection

TR-3.27.5 (Page 1)

E

W/S

M/R

M/R

4

Power Meter

-

-

-

-

-

-

-

4. 1

Mechanical Check & Visual Inspection

-

-

-

-

-

-

-

-

Inspect for any physical damage, verify connections and tightness of connections

Manufacturer Manual

Visual Inspection

TR-3.27.3 (Page 1)

E

W/S

M/R

M/R

4. 2

Electrical Test

-

-

-

-

-

-

-

-

Perform applicable functional test indicated on TR3.27.3, Item 3.1

Manufacturer Manual

Visual Inspection

TR-3.27.3 (Page 1)

E

W/S

M/R

M/R

-

Secondary Injection Test TR-3.27.3, Item 3.2

Manufacturer Manual

Visual Inspection

TR-3.27.3 (Page 2)

E

W/S

M/R

M/R

No.

ABB Contracting Co. Ltd. 380/115kV GIS Substation – Ma’aden

Contract No.: 06-856-BX-084

Site Inspection & Test Plan (ITP)

ABB Contracting Co. Ltd.

Meterings

Pages: 3 / 4

MD-403-4000-QD-EL-ITP-0024

Maaden 380/115kV Substations at Ras Az Zawr

Rev. P01 Feb. 15, 2009

Discipline: Electrical Works

Abbreviations: E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete. M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted. W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.

INSPECTION RESPONSIBILITY

Item Work Item and QC Activity

Document of Reference

Acceptance Criteria

Verifying Document

5

Power Transducer

-

-

5. 1

Mechanical Check & Visual Inspection

-

-

Inspect for any physical damage, verify connections and tightness of connections

5. 2

ABB Sub-Contractor

ABB

MA'ADEN / WP

SEC

-

-

-

-

-

-

-

-

-

-

-

Manufacturer Manual

Visual Inspection

TR-3.27.3A (Page 1)

E

W/S

M/R

M/R

Electrical Test

-

-

-

-

-

-

-

-

Perform applicable functional test indicated on TR3.27.3A, Item 3.1

Manufacturer Manual

Visual Inspection

TR-3.27.3A (Page 1)

E

W/S

M/R

M/R

-

Secondary Injection Test TR-3.27.3A, Item 3.2

Manufacturer Manual

Visual Inspection

TR-3.27.3A (Page 2)

E

W/S

M/R

M/R

6

Current Transducer

-

-

-

-

-

-

-

6. 1

Mechanical Check & Visual Inspection

-

-

-

-

-

-

-

-

Inspect for any physical damage, verify connections and tightness of connections

Manufacturer Manual

Visual Inspection

TR-3.27.6 (Page 1)

E

W/S

M/R

M/R

6. 2

Electrical Test

-

-

-

-

-

-

-

-

Perform applicable functional test indicated on TR3.27.6, Item 3.1

Manufacturer Manual

Visual Inspection

TR-3.27.6 (Page 1)

E

W/S

M/R

M/R

7

Frequency Transducer

-

-

-

-

-

-

-

No.

ABB Contracting Co. Ltd. 380/115kV GIS Substation – Ma’aden

Contract No.: 06-856-BX-084

Site Inspection & Test Plan (ITP)

ABB Contracting Co. Ltd.

Meterings

Pages: 4 / 4

MD-403-4000-QD-EL-ITP-0024

Maaden 380/115kV Substations at Ras Az Zawr

Rev. P01 Feb. 15, 2009

Discipline: Electrical Works

Abbreviations: E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete. M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted. W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.

INSPECTION RESPONSIBILITY

Item Work Item and QC Activity

Document of Reference

Acceptance Criteria

Verifying Document

6. 1

Mechanical Check & Visual Inspection

-

-

-

Inspect for any physical damage, verify connections and tightness of connections

Manufacturer Manual

6. 2

Electrical Test

-

-

ABB Sub-Contractor

ABB

MA'ADEN / WP

SEC

-

-

-

-

-

Visual Inspection

TR-3.27.5 (Page 1)

E

W/S

M/R

M/R

-

-

-

-

-

-

-

Perform applicable functional test indicated on TR3.27.5, Item 3.1

Manufacturer Manual

Visual Inspection

TR-3.27.5 (Page 1)

E

W/S

M/R

M/R

Secondary Injection Test TR-3.27.5, Item 3.2

Manufacturer Manual

Visual Inspection

TR-3.27.3A (Page 1)

E

W/S

M/R

M/R

No.

Prepared by: J. Carlos Onofre B. ABB Head QAQC Coordinator / Ma'aden Project

Reviewed by: Nayeem Ahmed ABB Testing & Commissioning Manager

Approved by: Faheem Alam ABB Ma'aden Project Manager