APPROVED
CUSTOMER DRAWING NUMBER
P01
16-FEB-2009
REV
DATE
Prepared
For SEC & Ma’aden Approval
-
DESCRIPTION
DRN
Based on : / Replaces :
02/16/2009
JCO
NA
CHK
ENG
Sep.PL same No.
JCO
Responsible department
02/16/2009
Without Separ.PL
NTS
DAS
Ma’aden 380/115kV Substations at Ras Az Zawr
FA
Order Name : 02/16/2009
Doc.Type
Site Inspection & Test Plan Meterings
Take Over department
A
P01
Order No :
CC
Document Designation
380/115kV GIS Substation at Ras Az Zawr
ABB Proj. No.: 06-856-084 Document Number :
ABB
ABB Switzerland Ltd.
Format
A4
Title
SAACE
NA
Approved
02/16/2009
Scale
Sep. PL Anoth. No.
Checked
Revision
REV
MD-403-4000-QD-EL-ITP-0024
MA’ADEN
Language
en No Sheets :
Sheet No :
-
1
ABB Contracting Co. Ltd. 380/115kV GIS Substation – Ma’aden
Contract No.: 06-856-BX-084
Site Inspection & Test Plan (ITP)
ABB Contracting Co. Ltd.
Meterings
Pages: 1 / 4
MD-403-4000-QD-EL-ITP-0024
Maaden 380/115kV Substations at Ras Az Zawr
Rev. P01 Feb. 15, 2009
Discipline: Electrical Works
Abbreviations: E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete. M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted. W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.
INSPECTION RESPONSIBILITY
Item Work Item and QC Activity
Document of Reference
Acceptance Criteria
Verifying Document
1
Ammeter
-
-
1. 1
Mechanical Check & Visual Inspection
-
-
Inspect for any physical damage, verify connections and tightness of connections
1. 2
ABB Sub-Contractor
ABB
MA'ADEN / WP
SEC
-
-
-
-
-
-
-
-
-
-
-
Manufacturer Manual
Visual Inspection
TR-3.27.1 (Page 1)
E
W/S
M/R
M/R
Electrical Test
-
-
-
-
-
-
-
-
Perform applicable functional test indicated on TR3.27.1, Item 3.1
Manufacturer Manual
Visual Inspection
TR-3.27.1 (Page 1)
E
W/S
M/R
M/R
-
Secondary Injection Test TR-3.27.1, Item 3.2
Manufacturer Manual
Visual Inspection
TR-3.27.1 (Page 1)
E
W/S
M/R
M/R
2
Voltmeter
-
-
-
-
-
-
-
2. 1
Mechanical Check & Visual Inspection
-
-
-
-
-
-
-
-
Inspect for any physical damage, verify connections and tightness of connections
Manufacturer Manual
Visual Inspection
TR-3.27.2 (Page 1)
E
W/S
M/R
M/R
2. 2
Electrical Test
-
-
-
-
-
-
-
-
Perform applicable functional test indicated on TR3.27.2, Item 3.1
Manufacturer Manual
Visual Inspection
TR-3.27.2 (Page 1)
E
W/S
M/R
M/R
-
Secondary Injection Test TR-3.27.2, Item 3.2
Manufacturer Manual
Visual Inspection
TR-3.27.2 (Page 1)
E
W/S
M/R
M/R
No.
ABB Contracting Co. Ltd. 380/115kV GIS Substation – Ma’aden
Contract No.: 06-856-BX-084
Site Inspection & Test Plan (ITP)
ABB Contracting Co. Ltd.
Meterings
Pages: 2 / 4
MD-403-4000-QD-EL-ITP-0024
Maaden 380/115kV Substations at Ras Az Zawr
Rev. P01 Feb. 15, 2009
Discipline: Electrical Works
Abbreviations: E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete. M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted. W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.
INSPECTION RESPONSIBILITY
Item Work Item and QC Activity
Document of Reference
Acceptance Criteria
Verifying Document
3
Frequency Meter
-
-
3. 1
Mechanical Check & Visual Inspection
-
-
Inspect for any physical damage, verify connections and tightness of connections
3. 2
ABB Sub-Contractor
ABB
MA'ADEN / WP
SEC
-
-
-
-
-
-
-
-
-
-
-
Manufacturer Manual
Visual Inspection
TR-3.27.5 (Page 1)
E
W/S
M/R
M/R
Electrical Test
-
-
-
-
-
-
-
-
Perform applicable functional test indicated on TR3.27.5, Item 3.1
Manufacturer Manual
Visual Inspection
TR-3.27.5 (Page 1)
E
W/S
M/R
M/R
-
Secondary Injection Test TR-3.27.5, Item 3.2
Manufacturer Manual
Visual Inspection
TR-3.27.5 (Page 1)
E
W/S
M/R
M/R
4
Power Meter
-
-
-
-
-
-
-
4. 1
Mechanical Check & Visual Inspection
-
-
-
-
-
-
-
-
Inspect for any physical damage, verify connections and tightness of connections
Manufacturer Manual
Visual Inspection
TR-3.27.3 (Page 1)
E
W/S
M/R
M/R
4. 2
Electrical Test
-
-
-
-
-
-
-
-
Perform applicable functional test indicated on TR3.27.3, Item 3.1
Manufacturer Manual
Visual Inspection
TR-3.27.3 (Page 1)
E
W/S
M/R
M/R
-
Secondary Injection Test TR-3.27.3, Item 3.2
Manufacturer Manual
Visual Inspection
TR-3.27.3 (Page 2)
E
W/S
M/R
M/R
No.
ABB Contracting Co. Ltd. 380/115kV GIS Substation – Ma’aden
Contract No.: 06-856-BX-084
Site Inspection & Test Plan (ITP)
ABB Contracting Co. Ltd.
Meterings
Pages: 3 / 4
MD-403-4000-QD-EL-ITP-0024
Maaden 380/115kV Substations at Ras Az Zawr
Rev. P01 Feb. 15, 2009
Discipline: Electrical Works
Abbreviations: E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete. M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted. W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.
INSPECTION RESPONSIBILITY
Item Work Item and QC Activity
Document of Reference
Acceptance Criteria
Verifying Document
5
Power Transducer
-
-
5. 1
Mechanical Check & Visual Inspection
-
-
Inspect for any physical damage, verify connections and tightness of connections
5. 2
ABB Sub-Contractor
ABB
MA'ADEN / WP
SEC
-
-
-
-
-
-
-
-
-
-
-
Manufacturer Manual
Visual Inspection
TR-3.27.3A (Page 1)
E
W/S
M/R
M/R
Electrical Test
-
-
-
-
-
-
-
-
Perform applicable functional test indicated on TR3.27.3A, Item 3.1
Manufacturer Manual
Visual Inspection
TR-3.27.3A (Page 1)
E
W/S
M/R
M/R
-
Secondary Injection Test TR-3.27.3A, Item 3.2
Manufacturer Manual
Visual Inspection
TR-3.27.3A (Page 2)
E
W/S
M/R
M/R
6
Current Transducer
-
-
-
-
-
-
-
6. 1
Mechanical Check & Visual Inspection
-
-
-
-
-
-
-
-
Inspect for any physical damage, verify connections and tightness of connections
Manufacturer Manual
Visual Inspection
TR-3.27.6 (Page 1)
E
W/S
M/R
M/R
6. 2
Electrical Test
-
-
-
-
-
-
-
-
Perform applicable functional test indicated on TR3.27.6, Item 3.1
Manufacturer Manual
Visual Inspection
TR-3.27.6 (Page 1)
E
W/S
M/R
M/R
7
Frequency Transducer
-
-
-
-
-
-
-
No.
ABB Contracting Co. Ltd. 380/115kV GIS Substation – Ma’aden
Contract No.: 06-856-BX-084
Site Inspection & Test Plan (ITP)
ABB Contracting Co. Ltd.
Meterings
Pages: 4 / 4
MD-403-4000-QD-EL-ITP-0024
Maaden 380/115kV Substations at Ras Az Zawr
Rev. P01 Feb. 15, 2009
Discipline: Electrical Works
Abbreviations: E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete. M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted. W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.
INSPECTION RESPONSIBILITY
Item Work Item and QC Activity
Document of Reference
Acceptance Criteria
Verifying Document
6. 1
Mechanical Check & Visual Inspection
-
-
-
Inspect for any physical damage, verify connections and tightness of connections
Manufacturer Manual
6. 2
Electrical Test
-
-
ABB Sub-Contractor
ABB
MA'ADEN / WP
SEC
-
-
-
-
-
Visual Inspection
TR-3.27.5 (Page 1)
E
W/S
M/R
M/R
-
-
-
-
-
-
-
Perform applicable functional test indicated on TR3.27.5, Item 3.1
Manufacturer Manual
Visual Inspection
TR-3.27.5 (Page 1)
E
W/S
M/R
M/R
Secondary Injection Test TR-3.27.5, Item 3.2
Manufacturer Manual
Visual Inspection
TR-3.27.3A (Page 1)
E
W/S
M/R
M/R
No.
Prepared by: J. Carlos Onofre B. ABB Head QAQC Coordinator / Ma'aden Project
Reviewed by: Nayeem Ahmed ABB Testing & Commissioning Manager
Approved by: Faheem Alam ABB Ma'aden Project Manager