A320 Stall Recovery

May 20, 2018 | Author: ekan | Category: N/A
Share Embed Donate


Short Description

stall recovery...

Description

SEQUENCE

Resumin Normal Fli ht

1

DETECTION

Requires an immediate action

2

RECOVERY

Simultaneously:

TOGA

Bank

Wing level

Pitch

Reduce

pee

3

ra es

ec re rac e

RECOVERY

Simultaneously: Bank

Wing level

Pitch

Reduce

Speed Brakes

Check retracted

20 000 ft

 A/C is clean

 A/C is not clean Simultaneously:

TOGA

Bank

Wing level

Pitch

Reduce

pee

.

4

ra es

.

ec re rac e

ORDER FLAPS 1

 A/C is clean

Vsw

Flaps 1

5

Vsw

RECOVERY

 A/C is not clean

Prepare to counteract the pitch up effect induced by thrust increment

6

RESUMING NORMAL FLIGHT

When above Vls (Speed trend)

 Apply normal go around procedure.

7

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF