A252.pdf
April 20, 2017 | Author: Rodrigo Pereira | Category: N/A
Short Description
Download A252.pdf...
Description
ASTM A252 Pipe Piling may be a commodity, but now Independence Tube is producing this product with the sizes, short rolling cycles, and service our customers have come to expect. Independence Tube is now manufacturing ERW Pipe Piling to ASTM A252 in Grades 1, 2, and 3. Pipe Piling is produced from 6.625" O.D. to 16" O.D. in walls from .188" to .625" up to 78 feet long. High Strength Low Alloy (HSLA), Copper Bearing (CU) and other steel grades are also available. The most popular Pipe Piling sizes of 10.75" OD and 12.75" OD are produced in our Decatur, Alabama and Marsielles, Illinois locations every 4 weeks. Our 14" OD and 16" OD pipe piling sizes are produced in Decatur every 4 weeks as well. When it comes to the versatility of designing with tube and pipe products, designers, architects, and engineers specify Independence Tube. We have expanded our product line to expand your possibilities.
Grade 1
Grade 2
Grade 3
Tensile strength, min. psi
50,000
60,000
66,000
Yield strength, min. psi.
30,000
35,000
45,000
Elongation in 2 in. %
30
25
20
WEIGHT Each length of pipe shall not vary more than 15% over or 5% under its theoretical weight, calculated using its length and its weight per unit length.
WALL THICKNESS TOLERANCE Wall thickness at any point shall not be more than 12.5% under the specified nominal wall thickness.
OUTSIDE DIMENSION TOLERANCES Outside diameter shall not vary more than ±1% From the specified outside diameter.
Call your Account Representative for floor stock availability or go on-line at www.independencetube.com. 6226 West 74th Street Chicago, IL 60638 1-800-376-6000 1-708-563-1950 (FAX) www.independencetube.com
ITC50 A500 Rounds / Pipe Size OD
Pipe Size Schedule 1-1/4"
10
1-1/4" 1-1/2"
40 10
1-1/2" 2"
40 10
2"
40
1.660"
1.900"
2.375"
2" 2-1/2" 2.875"
2-1/2" 2-1/2" 3"
3.500"
3" 3" 3-1/2"
4.000"
3-1/2"
3-1/2" 4"
4.500"
4"
4"
80 10
40 80 10
40 80 10
40
80 10
40
80
5.000"
5.500"
100 TON MINIMUM PER O. D.
Wall
Wgt per ft
Mill
0.109 0.125 0.140 0.109 0.125 0.145 0.109 0.125 0.154 0.188 0.218 0.120 0.125 0.188 0.203 0.250 0.276 0.120 0.125 0.188 0.216 0.250 0.300 0.312 0.120 0.125 0.188 0.226 0.250 0.312 0.318 0.375 0.120 0.125 0.188 0.237 0.250 0.312 0.337 0.375 0.125 0.188 0.250 0.312 0.375 0.125 0.188 0.250 0.312 0.375
1.81 2.05 2.27 2.09 2.37 2.72 2.64 3.00 3.65 4.39 5.02 3.53 3.67 5.40 5.79 7.01 7.66 4.34 4.51 6.65 7.58 8.68 10.25 10.64 4.97 5.18 7.66 9.11 10.02 12.33 12.51 14.53 5.61 5.84 8.66 10.79 11.35 13.96 14.98 16.52 6.51 9.67 12.68 15.67 18.52 7.18 10.67 14.02 17.34 20.53
M M M M M M M M M M M M M M M M M M M M M M M M C/M C/M C/M C/M C/M C/M C/M C/M M M M M M M M M C C C C C C C C C C
20 FT
Pcs
Bdl Wgt
61
2,501
61
37 37
21 FT
Pcs 61
Bdl Wgt 2,319
61 61
2,908 2,677
61 37
3,484 2,051
37
2,836
2,891
3,249 37 24 1,762 2,592
24
3,365
24 24 19 19 19
1,714 2,527
19
3,298
19
4,043
10 10
1,036 1,532
10 10
2,004 2,466
10
2,906
10 10
1,168 1,732
10 10
2,270 2,792
10 10 10 10 10 10 10 10 10 10 10
3,304 1,302 1,934 2,536 3,134 3,704 1,436 2,134 2,804 3,468 4,106
19 19 10
10
10 10
10
10
C = CHICAGO DIV - GAUGE MIN 10 TON
40 FT
Bdl Wgt
Pcs
Bdl Wgt
61
3,001
61
5,002
61
2,220
24 24
24 FT
Pcs
3,470
61
Bdl Wgt 5,300
61 61
6,647 6,120
61 37
7,964 4,689
37
6,482
37 24
8,916 4,067
24
6,670
24 19
8,824 3,958
19
6,913
19
9,348
10
2,386
10
4,373
10
6,005
10
2,693
10
5,179
10
7,190
5,783
37
2,664
37
4,440
37
3,898
37
6,497
3,901 1,779 24 24
2,114 3,110
29 29
4,257 6,264
24
4,038
29
8,132
2,918 3,861 1,732 19 19
2,057 3,032
19 19
3,428 5,054
19
3,958
19
6,597
19
4,852
19
8,086
10 10
1,243 1,838
10 10
2,072 3,064
10 10
2,405 2,959
10 10
4,008 4,932
10
3,487
10
5,812
10 10
1,402 2,078
10 10
2,336 3,464
10 10
2,724 3,350
10 10
4,540 5,584
10 10 10 10 10 10 10 10 10 10 10
7,533 1,562 2,321 3,043 3,761 4,445 1,723 2,561 3,365 4,162 4,927
10 10 10 10 10 10 10 10 10 10 10
6,608 2,604 3,868 5,072 6,268 7,408 2,872 4,268 5,608 6,936 8,212
3,024 4,090 1,044
1,913
2,627 1,178
2,266
3,146
M = MARSEILLES DIV - GAUGE MIN 20 TON
42 FT
Pcs 61
D = DECATUR DIV - GAUGE MIN 20 TON
6226 West 74th Street Chicago, IL 60638 1-800-376-6000 1-708-563-1950 (FAX) www.independencetube.com
ITC50 A500 Rounds / Pipe Size OD
Pipe Size Schedule 5"
5.563"
5" 5"
10 40 80
6.000"
6"
40
6.625" 6"
80
7.000"
8.625"
8"
20
8"
40
8"
9.625"
9" 9" 10"
10.750"
10" 10" 10"
80
STD EXH 20 40 60 80
12"
12.750"
14"
12"
20
12" 12" 12" 12"
STD 40 EXH 60
14"
10
14" 14"
STD 40
14"
60
Wall 0.125 0.188 0.250 0.258 0.312 0.375 0.125 0.188 0.250 0.312 0.375 0.188 0.250 0.280 0.313 0.375 0.432 0.500 0.215 0.250 0.313 0.375 0.500 0.188 0.250 0.313 0.322 0.375 0.500 0.188 0.250 0.313 0.342 0.375 0.500 0.250 0.313 0.365 0.375 0.500 0.593 0.625 0.250 0.375 0.500 0.250 0.313 0.375 0.406 0.500 0.562 0.625 0.250 0.313 0.375 0.437 0.500 50.593 60.625 70.250 80.313 90.375 80.438 70.500 0.625
Wgt per ft
Mill
7.26 C 10.79 C 14.19 C 14.62 C 17.55 C 20.78 C 7.85 C 11.68 C 15.35 C 19.02 C 22.53 C 12.92 C/M/D 17.02 C/M/D 18.99 C/M/D 21.04 C/M/D 25.03 C/M/D 28.57 C/M/D 32.71 C/M/D 15.59 M 18.04 M 22.35 M 26.53 M 34.71 M 16.94 M/D 22.36 M/D 27.73 M/D 28.55 M/D 33.04 M/D 43.39 M/D 18.95 M 25.05 M 31.13 M 33.94 M 37.05 M 48.77 M 28.04 M/D 34.89 M/D 40.52 M/D 41.59 M/D 54.79 M/D 64.43 M/D 67.65 M 31.40 M 46.60 M 61.47 M 33.41 M/D 41.48 M/D 49.61 M/D 53.58 M/D 65.48 M/D 73.22 M/D 81.01 M/D 36.71 D 45.61 D 54.57 D 63.36 D 61 Piece Bundle 72.09 D 84.91 D 89.36 D 42.05 D 52.28 D 62.58 D 72.80 D 82.77 D 102.72 D
20 FT
Pcs
Bdl Wgt
10 10
2,158 2,980
10
3,510
10 10 10 10 10 7 7
1,570 2,336 3,070 3,804 4,506 1,809 2,383
7 7
2,946 3,504
7 7 7 7 7 7 7
4,579 2,183 2,526 3,129 3,714 4,859 2,372
7
3,882
7
4,626
2 2 2
758 1,002 1,245
2
1,482
21 FT
Pcs
Bdl Wgt
10
1,525
10 10
7 7
7 7 7
2 2 2 2 2 2 2 2 2 2
5 5 6 6 7 7 8 8 9 29 8 8 2 7 7 6 6 5 25
10 10
2,590 3,406
10 10
4,316 5,676
10
4,212
10
7,020
10 10 10 10 10 7 7
1,884 2,803 3,684 4,565 5,407 2,171 2,859
10 10 10 10 10 7 7
2,140 4,672 6,140 7,608 9,012 3,616 4,766
7 7
3,535 4,205
7 7
5,891 7,008
7 7 7 7 7 7 7
5,495 2,619 3,031 3,755 4,457 5,831 2,846
7 7 7 7 7 7 7
159 4,365 5,051 6,258 7,428 9,719 5 4,743 6
7
4,659
7
5,551
2 2 2
910 5 1,202 6 1,494
10
3,287 4,197 6,378
1,425 2,048 1,178 1,702
2,250 2,750 4 3,075 4
5 1,762 5 1,824 6 6 2 7 2,619 7 2 3,041 6 6 2,884 5 4,076 5 2 37 37 Piece Piece Bundle Bundle 2 4 4,289 4
5 6 7 7 8 8 2 1,778 9 9 8 8 2 1,675 7 7 61 Piece 61 Piece Bundle Bundle 6 6 2 1,996 5 5 2 2 2 2
3,247 4 1,507 5 2,237 2,951 6
4 5 6 7 7 2 1,991 6 6 5 5 37 Piece 37 Piece Bundle Bundle 4 4 2
3,888
2
4 2,189
2
5 6 3,460 5 4
2
37 Piece Bundle
5 6 7 8 9 8 7 6 5 37 Piece Bundle
4 5
24 24 Piece Piece Bundle Bundle
4 5 6 7 6 5 4
4 5 6 5 4
4 5 6 5 4
3 4
Bdl Wgt
10
3,049
10
6,140
10
8,728
5
3 3 4 4 5 5 4 4
8,294 12,757
2
2
2,964
4
5 26 6 2 3,327 7 7 2 6 6 37 Piece 37 Piece Bundle Bundle2 2 5,412 5 5 2 2,512 4 4 2
2 2
2
2,791 5
2,851 37 Piece37Bundle Piece Bundle 2 4,097 4 2 2,355
3,728 4,917
3,318 4 5 6 5 6,481 4
2
4 25 26 2 5 2 4
3,404 4,602 5,412
24 Piece24Bundle Piece Bundle 2,806
4,167 4,501 5,500 6,150
224 Piece 24 Piece Bundle Bundle 2 3,524 19 Piece19Bundle Piece Bundle 2 3,649 2 5,239 3 3 2 6,083 4 2 5,767 4 25 8,151 5 2 8,579 4 24 4,037 219 Piece 194,182 Piece Bundle 3Bundle3 2 6,008 2 5,824 10 Piece10Bundle Piece Bundle 2 7,946 23 9,861 3
3
3
3
10 Piece 10 Piece Bundle Bundle
3
3
2
2
4
4
3
3
3
3
2
2
7 Piece 7 Piece Bundle Bundle 10 Piece 10 Piece Bundle Bundle 2
6,574
4
3 3
3 3
61 Piece61Bundle Piece Bundle
5 6 7 7 7 7 7,764 8 78 9 7 9,251 9 8Bundle78 61 Piece 61 Piece Bundle 7 2 1,516 7 2 2,004 6 6 2 2,490 5 5
D = DECATUR DIV 4 - GAUGE 4 MIN 20 TON
19 Piece 19 Piece Bundle Bundle
19 19 Piece Piece Bundle Bundle 24 Piece Bundle
4 5
4 5 6 5 4
42 FT
Pcs
4,200
4 4 2 2,018 2,091 2 Piece 2,509 24 Piece 24 Bundle Bundle 5 25 16" STD 2 2,628 16" 4 4 6 26 3 2,912 2 3,494 5 3,476 5 7 7 16" 40 2 4 2 6 4,314 6 6 6 5 6 100 TON MINIMUM PER O. D. 5C = CHICAGO DIV - GAUGE MIN5 10 5 - GAUGE MIN 20 TON 5 TON M = MARSEILLES5 DIV 4 4 4 4 4 61 Piece Bundle 3 16"
Bdl Wgt
2,792
5 5 2 6 2,301 6 2 7 2,706 7 2,706 8 8 1,256 9 9 1,864 8 8 2,459 7 1,403 7 2 61 61 Piece Piece Bundle Bundle 6 6 1,659 2 5 2,084 5
3,240
40 FT
Pcs
4,364
1,664
2 2 2
Bdl Wgt
3,070
1,396 2
24 FT
Pcs
2
4 4
3 3
3
3
5 5
4 4
2
2
7 Piece 7Bundle Piece Bundle
Independence Tube Master Rolling Schedule
M
M
2.875"
2-1/2"
M M
M
M
3"
M
M
4.000"
3-1/2"
M
4.500"
4"
M
5.000"
4-1/2"
C
C
M
C
M
D
M
M
8.625"
8"
M
9.625"
9"
M
10.750"
10"
C
D
M
M D
M
M
M
D
D
M
M
D
M
12.750"
12"
14.000"
14"
D
D
D
16.000"
16"
D
D
D
1.750"
D
M
M
2.875"
2-1/2"
M
M M
M
M
3"
M
M
4.000"
3-1/2"
M
4.500"
4"
M
5.000"
4-1/2"
C
C C
C
C
M
C
C M
C
C
D
M
8.625"
8"
M
9.625"
9"
M
10.750"
10"
M
C
M
D
M
M
D
M
M
D
M D
M M
D
M
M
D
M D
M
M
C
C D
C
M
C M
7.000"
12.000"
M
M
C
C
DECATUR
M
M
C 6.625"
M
M
3.500"
6.625"
MARSEILLES
M
2"
6.000"
CHICAGO
M
2.375"
5"
DECATUR
M
M M
C
DECEMBER
M
M
5.563"
NOVEMBER
M 1-1/2"
5.500"
D
M
1.900"
3.000"
M
OCTOBER CHICAGO
DECATUR
MARSEILLES
CHICAGO
SEPTEMBER DECATUR
1-1/4"
CHICAGO
1.660"
AUGUST DECATUR
Pipe Size (inches)
MARSEILLES
Outer Dimension
CHICAGO
JULY
M
MARSEILLES
D
D
M
M
M M
M
M D
DECATUR
C
C
CHICAGO
7.000"
M
C
C D
MARSEILLES
C
C C
C
C
M
C M
C
12.000"
M
M
C 6.625"
M
M
DECATUR
C
M
M
MARSEILLES
M
3.500"
6.625"
CHICAGO
M
2"
5"
DECATUR
M
2.375"
C
MARSEILLES
M
M M
5.563"
CHICAGO
M
M
5.500"
DECEMBER
M 1-1/2"
3.000"
NOVEMBER DECATUR
MARSEILLES
CHICAGO
DECATUR
MARSEILLES
CHICAGO
DECATUR
OCTOBER
1.900"
6.000"
Rounds
SEPTEMBER
M
MARSEILLES
Rounds
1.750"
MARSEILLES
1-1/4"
CHICAGO
1.660"
AUGUST DECATUR
Pipe Size (inches)
MARSEILLES
Outer Dimension
CHICAGO
JULY
M
D
M
12.750"
12"
14.000"
14"
D
M D
D
M D
D
16.000"
16"
D
D
D
July 2011
View more...
Comments