8_Production logging in highly deviated and horizontal wells_Cassone_21_Ottobre.pdf...
Description
Master in Petroleum Engineering 2009-2010
Production Logging in Highly Deviated and Horizontal Wells - Eni Experience www.eni.it
Author Roberto
Cassone
Master in Petroleum Engineering Engineering 2009-2010
Production Logging in Highly Deviated and Horizontal Wells Eni experience Author Author
Company Tutors Giuseppe Angelo Galli
Roberto Cassone
Andrea Guglielmelli Guglielmelli Division
Exploration & Production
University Tutor
Dept.
IPET/RESM
Francesca Verga
San Donato Milanese
20-21 October 2010
2
Master in Petroleum Engineering Engineering 2009-2010
Production Logging in Highly Deviated and Horizontal Wells Eni experience Author Author
Company Tutors Giuseppe Angelo Galli
Roberto Cassone
Andrea Guglielmelli Guglielmelli Division
Exploration & Production
University Tutor
Dept.
IPET/RESM
Francesca Verga
San Donato Milanese
20-21 October 2010
2
List of contents Production Logging in Highly Deviated and Horizontal Wells Eni experience
Internship Internshi p workflow
Fluids behaviour in deviated wells
PLT State of Art
Eni experience – analysis
3
List of contents Production Logging in Highly Deviated and Horizontal Wells Eni experience
INTERNSHIP WORKFLOW
Fluids behaviour in deviated wells
PLT State of Art
Eni experience – analysis
4
Internship workflow
Production Logging in Highly Deviated and Horizontal Wells - Eni experience
How fluids behave in deviated and horizontal wells influencing PLT tools
Market research of available tools for PLT in highly deviated and horizontal wells
Know how, specifications, applications and limitations
Eni Experience:
-PLT analysis & interpretation -Data integration
5
List of contents Production Logging in Highly Deviated and Horizontal Wells Eni experience
Internship workflow
FLUIDS BEHAVIOUR IN DEVIATED WELLS
PLT State of Art
Eni experience
6
Fluids behaviour in deviated wells Heavy phase recirculation
45°
Water fall back
Yw = > 80%
CONSTANT FLOW RATE
Light phase
Heavy phase
88°
90°
92°
Vwater < Vhydrocarbons
Vwater = Vhydrocarbons
Vwater > Vhydrocarbons
Yw = 80%
Yw = 50%
Yw = 20%
7
List of contents Production Logging in Highly Deviated and Horizontal Wells Eni experience
Internship workflow
Fluids behaviour in deviated wells
PLT State of Art
Eni experience
8
Who & How to make PLT Eni’s contractors – PLT in highly deviated wells Latest technology available
FSI, RST POLARIS® CAT, RAT, SAT Modified
PNN, AFL 9
Who & How to make PLT: FloScan Imager - FSI
Include: - Flowmeter: 5 – mini spinners provides fluids velocity along vertical section
- Hold up from: 6 electric probes DEFT (for Yw) 6 optical probes GHOST
10
Who & How to make PLT: WFL Water Flow Log
RPM Reservoir Performance Monitor
PNHI Pulsed Neutron Holdup Imager
Velocity Holdup
POS Positive Orientation System Positive Orientation Section
MCFM Multi Capacitance Flow Meter
28 sensors
11
Who & How make PLT: SAT - Spinner Array Tool
CAT - Capacitance Array Tool Capacitance is a measure of the amount of electrical energy stored for a given electric potential.
6 mini – spinners mounted on 6 collapsable arms SAT
Oil Water & Gas have different dielectric response. CAT
Phases velocity
Water fraction in the mixture
RAT - Resistivity Array Tool 12 sensors measure fluids conductivity
RAT
Water Hold Up
12
Who & How make PLT: INNOVATION TOOLS:
AFL - Activation Flow Log Operating like WFL application but with 4 GAMMA RAY DETECTORS PRO:
- C, O & H spike detection based on decay time - Discriminate Water from Hydrocarbons Communication Temperature CCL GR detector @ 1600mm GR detectors @: 200mm 400mm 800mm Neutron generator
m m 0 m 0 m 6 1 m 0 0 m 8 m 0 0 m 4 0 0 2
Neutron Generator
13
List of contents Production Logging in Highly Deviated and Horizontal Wells – Eni experience
Internship workflow
Fluids behaviour in deviated wells
PLT State of Art?
Eni experience
14
eni experience – WELL “A” FSI Acquisition Dec 2008 Qoil 676 m3 /d Qgas: 97900 Sm3 /d m3 /d Qwater: 33 WC:
Horizontal section completed with 4 1/2 in. liner and perforated @:
4.6 % 3885m MD 3930m MD
3790m MD
FSI
3880m MD
3938m MD
3980m MD
4035m MD
3944m MD
- 6 runs (3 up & 3 down) - 7 stations
16
eni experience – WELL “A” FSI Acquisition Well “A” raw data in flowing conditions WELL PRESSURE
WELL TEMPERATURE
WELL FLUID DENSITY
0.93 g/cc WATER & OIL MIXTURE
17
eni experience – WELL “A” FSI Acquisition Well “A” raw data in flowing conditions: GHOST
•FSI raw data from:
Spinners GHOST DEFT NO GAS
FLOWING CONDITIONS
SPINNER ROTATION
3860 m MD
DEFT 18
Well “A” – GHOST & DEFT
Yw decrease due to lower deviation
Yw ~ 30% & V w ≈ Vo
Water accumulates at the bottom 4000 m MD of the wellbore Yw ~ 30% & Vw < Vo
Residual gas (N) from Clean Up
19
eni experience – WELL “B” Survey SLOTTED 3935-4486
BLANK 3832-3935 (85°)
SLOTTED 4815-4968
BLANK 4486-4815 (84°)
BLANK 4968-5017 (84°)
Slant profile
Max deviation: 85° @ 3134 m MD Pay Slotted liner: 3832 - 5017 m MD OH: 5017 - 5368 m MD
OPEN HOLE 5017-5369 (TVD 3150 m)
Feb 2010 Qoil
360
m3/d
Qgas: Qwater :
23000 270
Sm3/d
WC:
m3/d
43%
2005
20
eni experience – WELL “B” FSI Acquisition MARCH 2010
1st Acquisition failed (asphaltene)
21
eni experience – WELL “B” Sondex & Hotwell Acquisition JULY 2010 - Copgo, through SONDEX & HOTWELL, provides tools for the new acquisition
tractors
PNN modified
RAT
GEOLOGICAL SECTION
Temp & Press gauge
NO SPINNER - Shut in run, failed due to excessive amperage required by tractors to move down the string – operation stopped and string move out - Only flowing test available
22
eni experience – WELL “B” Sondex & Hotwell Acquisition Well “B” JULY 2010
Down
Up
23
eni experience – WELL “B” Sondex & Hotwell Acquisition Well “B” JULY 2010
Modified PNN provides: water velocity & hydrocarbons velocity
Under tool resolution
Hydrocarbons velocity not available 24
From Well “D” PVT ρo = 0.6744 g/cc ρw = 1.028 g/cc
Pseudo density corrected for well deviation Pressure from run
Pseudo Density
25
eni experience – WELL “B” Sondex & Hotwell Acquisition
Depth
Flow rate
Water Holdup
Water Flow
Flow rate
m MD
m3/d
from Press
rate m 3/d
m3/d
3848
299.80
0.90
270
4048
299.23
4148
266.06
4248
231.90
4348
210.96
4698
218.84
4848
226.03
4898
207.06
4948
138.60
4988
0
SLOTTED LINER
0.90
73
30%
197
70%
197
SLOTTED LINER
0.90
%
0
26
eni experience – WELL “B” Sondex & Hotwell Acquisition
Water 30%
OIL
Water 70%
27
eni experience – WELL “B” remedies effects SLOTTED 3935-4486
SLOTTED 4815-4968
4500 mMD
BLANK 4968-5017 (84°)
BLANK 3832-3935 (85°) BLANK 4486-4815(84°) OPEN HOLE 5017-5369 (TVD 3150 m)
Sep. Test Feb. 2010
Sep. Test Sept. 2010
Sep. Test Oct. 2010
(choke 5/8”)
(choke 5/8”)
(choke 5/8”)
FTHP = 66 bar
FTHP = 72 bar
FTHP = 72 bar
Qoil = 360 m3/d
Qoil = 480 m3/d
Qoil = 390 m3/d
Qwater= 270 m 3 /d
Qwater=0 m3 /d
Qwater=134 m3 /d
WC = 43 %
WC = 0 %
WC = 25 % 28
CONCLUSIONS Fluids behaviour in deviated wells suggests to:
Study, develop & choose the best tools/string for the best acquisition
Data integration for the best interpretation PLT data + Drilling data + Completion data + Reservoir data = Reliable interpretation
29
Acknowledgements
I would thank Eni E&P Division Management for permission to present this work and related results and
RESM
colleagues (in particular Giuseppe Galli, Andrea
Guglielmelli & Carmela Vecera) for the technical support and needed assistance.
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.