5 TC Update by S Koblenz PDF

July 16, 2022 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download 5 TC Update by S Koblenz PDF...

Description

 

MAN Te Tech chni nical cal Symposi Sympo sium um 2016 2016 MAN Turbochargers – Ready for tomorrow  Sephardim Koblenz

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

07.12.2016

 

MAN Turboc Turbochargers hargers Product Portfolio

More than 250 Millions of operating hours

TCA

 Almost 7500 deliveries deliveries

ECOCHARGE

TCR

ETB

 Almost 10500 deliveries deliveries

<

1

>

MAN Diesel & Turbo

Sephardim Koblenz

 

Looki ng B ack to t o Symposi um 2015

MAN Technical Symposium 2016

 

07.12.2016

<

2

>

MAN Diesel & Turbo

Sephardim Koblenz

 

Looki ng B ack to t o Symposi um 2015

MAN Technical Symposium 2016

 

07.12.2016

<

3

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

Service Experience Condition Based Maintenance (CBM)  (CBM)  General approach Parts to be exchanged according to running hours   Service warranty is only given when all parts  are exchanged  

Wear cannot be verified by the crew  

MAN approach Parts to be exchanged according to wear limits   limits

Service warranty is given despite the fact of parts being re-use re-used d 

 All wear values are clearly stated and the crew can verify them

Purchase

Purchase   Purchase

unnecessary   unnecessary  parts   parts

only what is needed

 

07.12.2016

<

4

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

Service Experience CBM - Evaluation of the Parts  Parts  Components are exchanged only when necessary. Wear is checked and compared to informed criteria for condition evaluation. Example: TCA66 Bearing bush

The bearing bush will be only exchanged if l ≥ 25 mm 

 

07.12.2016

<

5

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

 

Service Experience CBM - Evaluation of Parts (example) 

3xTCA77, 9K90MC-C 3xTCA77, 57.710 OH

Expected Service Life

Exceeded! Exceeded!

Parts Reused:  Reused:   • Shroud ring • Nozzle rings • Se Sea ali ling ng Cov over ers s • Turbine • Co Comp mpre res sso sorr wh whee eell

More than € 60.000 savings!

07.12.2016

<

6

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

Evoluti on of Turboc Turbocharging harging 19 1950 50 - 202 2020 0 Efficiency & Charge Air Pressure

 

07.12.2016

<

7

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

 

TCT T – The The New New Two-S Two -Str trok oke e Tur Turbo boch charger arger TC

Change of

Market Requirements  Requirements 



Project requirements :  Focus on Pscav of 3.5 – 4.7 (Trend towards lower scav. pressures)  Higher specific volume flows for consequent “Downsizing” “Downsizing”  Weight optimisation and cost reduction  Tier III capability highest priority

Wide compressor map for Tier III EGR flexibility High Efficiency High compressor stability

07.12.2016

<

8

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

TC TCT T – The new Two-Str Two-Strok oke e Tur Turbo boch charger arger Consequent Downsizing 

TCA / TCT TCT Comp Comp ariso n Mod el Mass Flow [kg/s] Weight [kg] Length [mm] Width [mm] Height [mm]

TCA55

TCT40

19.8

19.7

3,500

2,000

- 43%

2,568

2,300

- 10%

1,371

1,250

- 9%

1,864

1,660

- 11%

 

07.12.2016

<

9

>

MAN Diesel & Turbo

Sephardim Koblenz

 

MAN Technical Symposium 2016

 

TCT T – The The New New Two-S Two -Str trok oke e Tur Turbo boch charger arger TC Design Highlights  Highlights 

New Silencer Concept

Proven Emergency Lube Oil Tank Design New Casing Topology

New Turbine Design

Maximum Flow Compressor Wheel

Bearing Casing with Integrated Foot, Oil Inlet and Venting Proven TCA Bearing Concept

07.12.2016

<

10

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

 

TC TCT T – The The New New Two-S Two -Str trok oke e Tur Turbo boch charger arger Summary of Main Main Benefits

CAPEX

OPEX



Increased competitiveness through downsizin downsizing g



Lower operational costs due to smaller components Extended component life times

 

Major overhaul only after 36,000 operating hours without intermediate inspection (dock-to-dock)

 

Reliabilty

Noise Emissions

Condition Based Maintenance Concept Proven design concepts like bearing design or emergency lube oil tank  Extensive validation programme

 New air intake silencer   Air outlet silencer silencer available

as an option

07.12.2016

<

11

>

MAN Diesel & Turbo

Sephardim Koblenz

 

Me Measures asures to Re Reduc duce e Nois Noise e Emis Emissio sions ns

MAN Technical Symposium 2016

 

07.12.2016

<

12

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

MAN Strategy of o f Noise Nois e Reducti Reduction on Three development steps  steps 

Improved Materials

 Air Intake Silencer

 Air Outlet Silencer

Improvement of standard silencer with optimis ed noise absorbing material material  

Further improvement with new air intake silencer design

Development of silencer after after compressor  

 

07.12.2016

<

13

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

o f Noise Nois e Reducti Reduction on MAN Strategy of Three development steps  steps 



Improved Materials

  

 Air Intake Silencer

 Air Outlet Silencer

Improved noise absorbing materials 50% weight reduction Reduced aerodynamic losses Long term durability tested in field test with 8,000 operating hours and good results

 

07.12.2016

<

14

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

MAN Strategy of o f Noise Nois e Reducti Reduction on  Air intake silencer  

Improved Materials

New generation of intake silencers for entire portfolio from small TCR up to large TCT Development focus on  Noise reduction  

 Air Intake Silencer

 Air Outlet Silencer

Increased stiffness Weight reduction by >25%

Current Design

New Design

 

07.12.2016

<

15

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

o f Noise Nois e Reducti Reduction on MAN Strategy of  Air outlet silencer  

Improved Materials Status: 

 Air Intake Silencer

Development project started

Target:  Reduction of tonal TC noise components on two-stroke > 5dB in the area of TC outlet / scavengingengines air receiver 

 Air Outlet Silencer

Included in TCT design as an option

Verification: 

Hardware for engine / field test on TCA scheduled for end of 2016

 

07.12.2016

<

16

>

MAN Diesel & Turbo

MAN Technical Symposium 2016

Sephardim Koblenz

 

07.12.2016

<

 

III Leading to Tier III t o New New Tech Techno nolo logi gies es New Requirements 

NOx Tier III rules decided at MEPC66 in April 2014 and applicable for ships with keel laying after 2016 operating in emission control area’s (ECA)



Significant Reduction of the emission of nitrogen oxides (NOx) mandatory in ECA’s



New Technologies required to comply with the new regulations



SCR and EGR are the selected options for MAN Diesel & Turbo’s two-stroke engines



MAN Diesel & Turbo has developed solutions for f or both directions

17

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

 

Development Steps   Overview   Overview   

Technology was developed for in-house four-stroke engines Technology is now transferred two two-stroke engines Result of extensive research and development leading to a cost and space optimized SCR reactor

Four-Stroke Technology

Four-Stroke Technology

Two-Stroke Technology

07.12.2016

<

18

>

MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

07.12.2016

<

 

MD MDT T Augsb Aug sbur urg g HP SC SCR R  



Compact design for easy integration Few framesizes will cover the entire two-stroke portfolio up to  3  .  5  m  –  5  .  5  m  

25MW per SCR reactor Integrated Mixing unit reduces the overall length and volume



Specifically designed honeycombs allow compact design



Reactor can be mounted lying / standing 2.5 – 4.5 m

 Already over 900 MW and over 600 600.00 .000 0 oh SCR exp experi erience ence on land & at sea

19

>

MAN Diesel & Turbo

 

MAN Technical Symposium 2016

Sephardim Koblenz

 

MD MDT T Augsb Aug sbur urg g HP SC SCR R SCR-R SC R-Reactor eactor incl . Mixing Unit MDT -SCR honeycombs

s oot blowers

Urea Injection Lance SCR SC R Contr Contr ol Unit

ERCS

Media Me dia supply systems

+ Interface cabinet

Display

Compressed Urea Pump  Air Reser vo voir ir Module

Urea Dosin Dosin g Unit

07.12.2016

<

20

>

MAN Diesel & Turbo

MAN Technical Symposium 2016

Sephardim Koblenz

 

MD MDT T Augsb Aug sbur urg g HP SC SCR R

First Deliveries

2017 Q4

Q1

Provisional Approval 

Engine Test with Mitsui

2018 Q2

Q3

Q4

Q1

Field Test Start

Q2

 

07.12.2016

<

21

>

MAN Diesel & Turbo

MAN Technical Symposium 2016

Sephardim Koblenz

 

 

MAN Turboc Turbochargers hargers Benefits at a Glance

Latest Late st tu rbocharger technology 

Full Tier 3 compliance



High efficiency turbocharging Most competitive service concept  concept   

Open maintenance concept



Dry-dock to dry-dock operation



Competitive total cost of ownership

Largest service experience experience:: 

More than 16.000 TCA & TCR delivered



Millions of operating hours

Best service provider :   

Service out of one hand 24/7 availability (>100 hubs) High Training availability

07.12.2016

<

22

>

MAN Diesel & Turbo

Sephardim Koblenz

 

Do you have any questions? q uestions? Sephardim Koblenz Head He ad of Ma Marketing rketing MAN Diesel & Turbo SE Turbocharger Promotion MDT-AUG / TSP Stadtbachstr. 1 86153 Augsburg, Germany Phone Cell

+49 821 322-6351 +49 151 5283 8412

Fax

+49 821 322-3299

[email protected]   [email protected]

MAN Technical Symposium 2016

 

07.12.2016

<

23

>

www.mandieselturbo.com   www.mandieselturbo.com MAN Diesel & Turbo

Sephardim Koblenz

MAN Technical Symposium 2016

 

Disclaimer  All data provided in this document document is non-binding. non-binding. This data serves informational purposes only and is especially not guaranteed in any way. Depending on the subsequent specific individual projects, the relevant data may befor subject to changes be assessed and determined individually each project. Thisand will will depend on the particular characteristics of each individual project, especially specific site and operational conditions.

 

07.12.2016

<

24

>

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF