5. Maximizing Value Through Detailed Sandface Completion Selection

February 9, 2018 | Author: ali | Category: Reliability Engineering, Energy And Resource, Nature, Science, Engineering
Share Embed Donate


Short Description

sandface...

Description

Sand Management Services

Maximizing Asset Value

through Detailed Sandface Completion Selection

Bryan Stamm

Introduction 

Every sand prone field (or well) has its optimum sandface completion from a commercial standpoint.



As a completion engineer, you have many options: – Managed sand production •

Separation and Disposal

– Sanding prevention •

Selective and orient perforating, managed drawdown, etc.

– Sand Control •



Cased hole gravel pack, fracpack, SAS, ESS, OHGP + intelligent completion, etc…

Your job is to investigate the technical and financial aspects of each, and determine which one provides the best value for your company

Sand Management Services

2 June 13th, 2011

Agenda 

Geomechanics and Sanding Prediction



Sandface completion options and screening – Technical Qualification (FEED)



Capex, Production, Opex, Recovery…speaking a common language and quantifying $



Conclusions / Example



Technology advancements



Questions

Sand Management Services

3 June 13th, 2011

Geomechanics and Sanding Prediction 

Onset of sanding can be modeled – Some wells will sand immediately – Some may never produce sand – Some may sand later in the well / field life



The degree of certainty in sanding prediction is dictated by the quality of the “inputs”…rock strength, drawdown, completion type, wellbore inclination, etc. – Dipole Sonic, Sonic Scanners, Cores, Tectonics, etc



Previous “similar” field experiences or rock mechanics studies should not be used in isolation.

Sand Management Services

4 June 13th, 2011

Very very weak damp sand (UCS < 200 psi)

E < 300,000 psi

Porosity < 30%

Very weak weaklycemented (UCS
View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF