4.3. Jam Kerja Lasan Dinding, Din-Dasar Tangki

March 20, 2019 | Author: sarimanisti | Category: N/A
Share Embed Donate


Short Description

Download 4.3. Jam Kerja Lasan Dinding, Din-Dasar Tangki...

Description

Jam Kerja - Lasan Dinding Tangki & Lasan Dinding-Dasar Tangki No

16

Kapasitas Diameter (m^3) ( m) 20000

48.51

Catatan Lebar Pelat = 1.8288

No umlah Lapi

1

Tinggi (m)

LF Lasan Jumlah LF Lasan Jumlah pelat Dinding-Dasar Course Horizontal tiap Course

10.97

6

2

500

6

feet

2500

1m=

3

Tebal Setiap Lapis [mm] 4 5

LF Lasan Vertikal

25

3.28084

6

900

umlah Jam(2sisi Jumlah Jam Lasan Din-Dasar Lasan Horizontal 1380

4030.00

feet

7

Ereksi Pelat Dindi uran asan nc

3/16 1/4 5/16 3/8 ½ 3/4 1

16

6

20

16

13

10

8

8

-

Ereksi Pelat Dindi Tebal Pelat ⅛”  3/16”  ¼”  5/16”  3/8”  ½ ¾”  1” 

Jumlah Jam Lasan Vertikal

Total Hari Lasan Dinding

Total Hari Lasan Dinding-Dasar  

1125.00

645

173

g - Dasar uran asan mm 4.76 6.35 7.94 9.53 12.70 19.05 25.40

Ereksi Pelat Dinding

Waktu per linear feet [jam] 0.25 0.3 0.33 0.47 0.7 1.38 1.6

g Las Horizontal 0.35 0.47 0.58 0.7 1.25 1.38

Las Vertikal 0.37 0.42 0.49 0.62 1 1.13

2.26 2.47

1.87 2.26