Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

C#EC$ED

!"#

I"$#%D&C$I%" $% $'( SP#()DS'(($ *%# D(SI+" %* #(C$)"+&L)# #(C$)"+&L)# PIL( C)P. n this se%tion& the 'eneral (eat)res o( the spreadsheet are e*plained +rie(l,. +rie(l,. This spreadsheet %an +e )sed (or the desi'n ;as per /S 110-1.11 110-1.11 o(  re%tan')lar pile %aps ith  or /ore piles. 1,0 )SS&!P$I%"S  LI!I$)$I%"S %* $'( SP#()DS'(($. 01 The pile %ap is ass)/ed to +e ri'id. 1 This spreadsheet is /eant onl3 for rectangular pile caps. caps . O%ta'onal or  irre')lar shaped pile %aps are o)tside the p)r2ie o( this spreadsheet. 31 This spreadsheet is /eant onl3 for pile caps 4ith single pedestal5column, Pile %aps (or /)lti-pedestals%ol)/ns are o)tside the p)r2ie o( this spreadsheet. 1 !inimum numer of piles shall e 7,  ;Separate spreadsheets are /ade

11-11-2006 S#EET

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

C#EC$ED

!"#

41 E((e%t o( ater ta+le is %onsidered in the spreadsheet. #oe2er& the loss in self 4eight of pile d)e pile  d)e to ater ta+le shall +e a%%o)nted in the tension %apa%it, o( pile. =,0 P#%C(D&#( *%# &SI"+ $'( SP#()DS'(($. SP#()DS'(($. The pro%ed)re (or )sin' the spreadsheet is +rie(l, e*plained +elo. ;Input; Sheet. 01 The o)tp)t ;)n(a%tored s)pport rea%tions1 (ro/ STAAD (or the re?)ired pedestal%ol)/n alon' ith the load %ase n)/+er shall +e pasted )nder @!oads (ro/ STAAD STAAD O)tp)t@. Care shall +e ta9en to ens)re that the )nits are in ;>";  ;m; and proper direction of co-ordinate a8es is selected, 1 Sele%t @es@ @es@ or @No@ (or @Bhether load at +otto/ o( pile %ap is a2aila+le or not@

11-11-2006 S#EET

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

C#EC$ED

!"#

11-11-2006 S#EET

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

C#EC$ED

!"#

11-11-2006 S#EET

Petrofac

 

Petrofac International Limited

 

Bhether the load at the +otto/ o( pile %ap is a2aila+le or not Total n)/+er o( load %ases



Total hei'ht (ro/ the top o( pedestal to the +otto/ o( pile %ap



PROJECT

Validation of Spreadsheet

ITEM

Design Calculation for 6-Pile Cap

No

JOB No.

> nos

JI-1=

3.4 /

DOC. No.

P REPARED JJX

CHECKED

APPROVED

DATE

SHEET

11-11-2006

MNR

Spreadsheet-Validation-=

 

REVISION

0

)ppendi8 1. Load Input for the Design of Pile Cap

* ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

Load *actor for Pile Cap Design

30

-5.7

->.50

-.5







0.

0.4

-5.7

0>5.3>>

-.5

-.



>.47

3

3.=43

04.=

-.0







0.

0.4

3.=43

3=.=

-.0

-.3



-00.7=

33

.=7

=.5>

-0.73







0.

0.4

.=7

5=.5>

-0.73

-5.0>4



-03.7=

3

.

=0.35=

0.>75







0.

0.4

.

55.35=

0.>75

5.05



-0.3

34

-00.3

05.744

-.0=



.0



0.

0.4

-00.3

347.744

-.0=

-5.>>

.0

3=.04

35

50.57

343.4>7

-.0



.0



0.

0.4

50.57

4>.4>7

-.0

-5.>3

.0

-077.0

3=

0>.>>4

4.534

-.



.



0.

0.4

0>.>>4

.534

-.

-03.03

.

-50.3=5

3>

0>.74=

.=>

-.4



.0



0.

0.4

0>.74=

37.=>

-.4

-.=30

.0

-50.50

37

-.>=0

35.05

0.>>4



-.0



0.

0.4

-.>=0

30.05

0.>>4

5.05

-.0

=.330

30

7.>

.=5

0.>7



-.0



0.

0.4

7.>

507.=5

0.>7

5.03

-.0

-050.7

300

=.3=

305.>5

-.00



-.0



0.

0.4

=.3=

400.>5

-.00

-.35

-.0

-.0=

30

=.47

304.>=>

3.=5>



-.0



0.

0.4

=.47

40.>=>

3.=5>

0.5

-.0

-.

303

03.47

30.00

-.74



.0



0.5

0

03.47

5.00

-.74

-5.>7

.0

-.

30

4.5

3=3.40

0.>7



-.0



0.5

0

4.5

45>.40

0.>7

5.03

-.0

-0>.54

30

-33.434

03.0>

-.00







0.

0.4

-33.434

>.0>

-.00

-.35



0>.7>7

3

=.43

4.=4>

-.







0.

0.4

=.43

=.=4>

-.

-.03



->>.4=

33

-3.

03.=3=

-.







0.

0.4

-3.

3=.=3=

-.

-5.4=



0.=>

3

-3 47

033 37

 =







0

0 4

-3 47

3> 37

 =

5 43



7 7

Load Case

Support #eactions from S$))D %utput

Increase *actor for Pile Capacit3

* ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

Loads at the ottom of the pile cap

)ppendi8 1. Load Input for the Design of Pile Cap

* ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

Load *actor for Pile Cap Design

34

-4=.7>

4=.>3

-.7



-.54



0.

0.4

-4=.7>

=.>3

-.7

-5.>5

-.54

0>5.>57

35

04.0

34>.>>

-.>4



-.54



0.

0.4

04.0

443.>>

-.>4

-5.==5

-.54

-7.3

3=

-=.0>5

55.>

-.04



-.54



0.

0.4

-=.0>5

550.>

-.04

-03.30

-.54

>>.344

3>

-=.00

5=.=3

-.7=



-.54



0.

0.4

-=.00

55.=3

-.7=

-.304

-.54

>>.00

37

-.5>

5=4.7=

0.>0=



-.0>



0.

0.4

-.5>

>=.7=

0.>0=

4.74

-.0>

0.40

30

>.30

>=.7

0.>5



-.0>



0.

0.4

>.30

5>.7

0.>5

4.734

-.0>

-70.=40

300

-0.04=

474.5

-.07



-.0>



0.

0.4

-0.04=

=7.5

-.07

-.530

-.0>

5.0

30

-0.>4

475.0=

3.>0



-.0>



0.

0.4

-0.>4

=70.0=

3.>0

0.375

-.0>

4.==5

303

-33.0

>0.5

-.>0



-.54



0.5

0

-33.0

5=5.5

-.>0

-5.=53

-.54

0=.>7

30

-.=74

=3>.05

0.>0



-.07



0.5

0

-.=74

733.05

0.>0

4.>>7

-.07

=.>

Load Case

Support #eactions from S$))D %utput

Increase *actor for Pile Capacit3

* ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

Loads at the ottom of the pile cap

)ppendi8 1. Load Input for the Design of Pile Cap Load Case

Support #eactions from S$))D %utput * ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

Load *actor for Pile Cap Design

Increase *actor for Pile Capacit3

Loads at the ottom of the pile cap * ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

)ppendi8 1. Load Input for the Design of Pile Cap Load Case

Support #eactions from S$))D %utput * ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

Load *actor for Pile Cap Design

Increase *actor for Pile Capacit3

Loads at the ottom of the pile cap * ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

)ppendi8 1. Load Input for the Design of Pile Cap Load Case

Support #eactions from S$))D %utput * ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

!a8imum

61,2

=,1B

=,1

0

0

!inimum

-B,B

-,61

-7,11

0

-0,1B

Load *actor for Pile Cap Design

Increase *actor for Pile Capacit3

Loads at the ottom of the pile cap * ?>"@

* "@

*A ?>"@

! ?>"-m@

! "-m@

!A ?>"-m@

0

61,2

==,1B

=,1

12,7

0

16,

0

-B,B

16,=

-7,11

-1=,=7

-0,1B

-1,12

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

/,7 D(SI+" %* PIL( C)P PC-6. ?as per /S 110.Part 1 - 1@ 1,0 +("(#)L D)$). Na/e o( the pile %ap



PC

T,pe o( pile

 Dri2en %ast in-sit)

Shape o( pile



Si6e o( pile



4

No. o( piles





nos

Depth o( desi'n ater ta+le +elo 8"!



3

//

a1 in %o/pression



3

9N

+1 in tension



=4

9N

%1 in shear



3

9N

Cir%)lar   // dia

Capacit3 of Pile ?unfactored@.

C#EC$ED

!"#

11-11-2006 S#EET

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

11-11-2006

C#EC$ED

!"#

eight of Pile Cap  Pedestal  Soil  Surcharge. Sel( ei'ht o( pile %ap

 H.0 * .0 * 0I 4 

Bei'ht o( pedestal

ei'ht

9N

45.4

9N

 H.0 * .0 - .= * .=I  

∴ Total

=.45

 H.0 * .0 - .= * .=I .> * 0> 

!oad d)e to s)r%har'e& i( an,

9N

 .= * .= H0.4  0.> - 0I 4 

Bei'ht o( soil a+o2e pile %ap

00.4



9N

 00.4  =.45  45.4   

074

9N

;No s)r%har'e1

S#EET

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

Spreadsheet-Validation-3 DES"NED

JJ

!pF !peF

   G   p

   !

DATE

   G    d   e   p



   !

   i

  6

C#EC$ED

!"#

11-11-2006 S#EET

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

Spreadsheet-Validation-3 DES"NED

JJ

;onl, to indi%ate the lo%ation o( %riti%al se%tions1

2,0 )##)"+(!("$ %* PIL(S  P#%P(#$I(S %* PIL( +#%&P. "ote. $he centre of pedestal is ta>en as the origin, Co-ordinatesE m Pile "o,

DATE

!oment of InertiaE m 7

8i

Fi

I88i

IFFi

P0

-.5=4

-.5=4

.45

.45

P

.5=4

-.5=4

.45

.45

P3

-.5=4

.5=4

.45

.45

P

.5=4

.5=4

.45

.45

C#EC$ED

!"#

11-11-2006 S#EET

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

Spreadsheet-Validation-3 DES"NED

$otal

DATE

JJ

1,27

C#EC$ED

11-11-2006 S#EET

!"#

1,27

Critical Sections for /ending  Shear ?distances from the C+ of pile cap@. a1 (or +endin' a+o)t F a*is



34

//

;at the pedestal (a%e1

+1 (or +endin' a+o)t G a*is



34

//

;at the pedestal (a%e1

%1 (or shear in plane parallel to F a*is



4

//

Re(er 3.00..3 o( KS >00:

d1 (or shear in plane parallel to G a*is



4

//

Part 0 - 077=



3

// ;at lo%ation o( %riti%al se%tion1

Perimeter for Punching Shear. a1 aro)nd pedestal

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

C#EC$ED

11-11-2006 S#EET

!"#

7,0 D(SI+" %* PIL( C)P. Desi'n (or%es (or the pile %ap

 A%t)al pile rea%tions

Dia/eter o( rein(or%e/ent





7,1 Design for /ending !oment. a@ Calculation of reinforcement at the ottom of pile cap. i1 a+o)t F a*is:

//

;onl, (or the %al%)lation o( initial e((e%ti2e depth1

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

$L 

.045

+

0

//

d

>74

//

$

M)+d ( %)



S#EET

!"# Re(er 3... o( KS >00: Part 0 - 077=

.

6  d H.4  s?rt;.4 - $.71I 

C#EC$ED

11-11-2006

>4.4

;6/a*  .74d1

//

 Ast  M);.74 ( , 61

∴ Area

o( rein(or%e/ent re?)ired



350

//

 Ast/in 

=3

//

;.03& Re(er Ta+le 3.4

 Astre? 

=3

//

o( KS >00:Part 0 - 077=1

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

Dia/eter o( rein(or%e/ent





//

Re?)ired spa%in' o( rein(or%e/ent



0

//

Spa%in' o( rein(or%e/ent pro2ided



4

//

 Astpro2ided 

733

//

C#EC$ED

11-11-2006 S#EET

!"#

Pro2ide  T  4 // %% ;at the top o( pile %ap alon' G dire%tion1. Per%enta'e o( rein(or%e/ent pro2ided



.07



M)G t 

>.45

9N-/

$L 

.045

+

0

//

d

7

//

ii1 a+o)t G a*is: Ma*i/)/ (a%tored +endin' /o/ent

Re(er 3... o( KS >00: Part 0 - 077=

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

C#EC$ED

11-11-2006 S#EET

!"#

7,2 Chec> for %ne-4a3 Shear. Ma*i/)/ desi'n shear stress&  ν/a*

.4   .> ;( %)1  or 4 N// & hi%he2er is less ;Re(er 3.5..5

 i@ in plane parallel to  a8is.

.=3

N//

o( KS >00:Part 0 - 077=1

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

Spreadsheet-Validation-3 DES"NED

∴ Shear

DATE

JJ

stress&  ν

+

0

//

d

>74

//



V)G+ d



.00

C#EC$ED

11-11-2006 S#EET

!"#

N//

Re(er Ta+le 3.> o( KS >00: Part 0 - 077=. Desi'n %on%rete shear stress&  ν%

03 0  .=7 H0 As;+2 d1I  HdI  γ /

8a%tor (or %hara%teristi% stren'th o( %on%rete



0.007

0 As+2 d 

.045

HdI0 

.>0>

γ / 

0.4

∴ ν% 

.300

;itho)t shear rein(or%e/ent1

N//

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

Spreadsheet-Validation-3 DES"NED

JJ

Ma*i/)/ p)n%hin' load (ro/ pedest



=54.=0

!oad (a%tor



0.4



00>.4=

9N

Peri/eter alon' the %riti%al se%tion& ) o



>

//

E((e%ti2e depth& d



74

//

∴ Shear



.43

∴ 8a%tored

p)n%hin' load& P)

stress&  ν

 Alloa+le shear stress

DATE

C#EC$ED

11-11-2006 S#EET

!"#

9N ;/a*. pedestal load  ei'ht o( pedestal1

N//

.4   .> ;( %)1  or 4 N// & hi%he2er is less ;Re(er 3.5..5



.=3

N//

o( KS >00:Part 0 - 077=1

P)n%hin' stress is less than the alloa+le shear stress& hen%e O9.

iii@ Chec> for punching stress at ;1,Bd; distance from the pedestal face.

Re(er 3.=.=. o( KS >00:

E((e%ti2e depth& d

Part 0 - 077=



74

//

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

Spreadsheet-Validation-3 DES"NED

JJ

9@ Chec> for punching stress at ;1,Bd; distance from the pile face. Ma*i/)/ p)n%hin' load& Ppile



=3.

!oad (a%tor



0.4



0.0

9N

Peri/eter& )o



3

//

E((e%ti2e depth& d



74

//

∴ P)n%hin'



.00

N//



.30

N//

∴ 8a%tored

DATE

p)n%hin' load& P)

shear stress&  ν

 Alloa+le p)n%hin' stress

P)n%hin' stress is less than the alloa+le stress& hen%e O9.

C%"$("$S

9N

C#EC$ED

!"#

11-11-2006 S#EET

Petrofac Petrofac International Limited DOCUMENT No. PROJECT:

Validation of Spreadsheet

TT!E :

Design Calculation for 6-Pile Cap

DATE

Spreadsheet-Validation-3 DES"NED

JJ

C#EC$ED

!"#

11-11-2006 S#EET

Petrofac

JOB No.

Petrofac International Limited

JI-1=

PROJECT

Validation of Spreadsheet

ITEM

Design Calculation for 6-Pile Cap

PREPARED JJX

CHECKED

APPROVED

Spreadsheet-Validation-=

DOC. No.

DATE

SHEET

11-11-2006

MNR

 

REVISION

0

)ppendi8-2. Load in Piles  Chec> for Pile Capacit3 !a8, Pile Load

H !in, Pile Load

Shear per Pile

04.>

==.70

04.>

5.40

0.4

Sa(e

Sa(e

0>.45

0>.45

.75

>.57

0.4

Sa(e

Sa(e

Sa(e

=.

47.33

0.0=

0.4

Sa(e

Sa(e

Sa(e

=.

=.

4>.7=

0.0

0.4

Sa(e

Sa(e

Sa(e

=3.=

05.5

=3.=

.7

0.4

Sa(e

Sa(e

Sa(e

5.73

>.30

03.35

5.73

04.33

0.4

Sa(e

Sa(e

Sa(e

>.53

0>.5

03=.57

>.53

.>3

0.4

Sa(e

Sa(e

Sa(e

Load on Piles - >" ?4ithout the effect of design 4ater tale@

Load Case

P1

30 3 33

P2

P=

P7

==.70

04.3

==.>7

.7=

0>.45

.75

53.70

=.

47.33

57.5

3

4>.7=

57.55

53.43

34

05.5

=>.=>

00.07

35

54.77

03.35

3=

7.5

03=.57

 *actor for Chec> for Pile Capacit3 Pile $ension Shear   Capacit3 Compression

Sa(e

3>

>=.

033

>5.>5

03.5

033

>5.>5

.=

0.4

Sa(e

Sa(e

Sa(e

37

033.

=>.0

03=.45

>.4

03=.45

=>.0

4.=

0.4

Sa(e

Sa(e

Sa(e

30

7.=

0.47

7=.7

0=.0

0=.0

7.=

0.5

0.4

Sa(e

Sa(e

Sa(e

300

007.

035.70

00>.77

035.>>

035.70

00>.77

0.>5

0.4

Sa(e

Sa(e

Sa(e

30

00.05

03.

03.

00.>

00.>

00.05

.0

0.4

Sa(e

Sa(e

Sa(e

303

73.

0.>3

>>.3>

007.=7

0.>3

>>.3>

3.30

0

Sa(e

Sa(e

Sa(e

30

033.0

05.5

03=.5

040.05

040.05

033.0

0.>

0

Sa(e

Sa(e

Sa(e

30

0.4

50.=>

0.

50.=5

0.4

50.=5

>.3>

0.4

Sa(e

Sa(e

Sa(e

3

7.0=

7.=

7.05

7.=0

7.=

7.05

5.>0

0.4

Sa(e

Sa(e

Sa(e

33

>>.

>.7

>3.3>

=4.5

>>.

=4.5

.74

0.4

Sa(e

Sa(e

Sa(e

3

>3.3>

=5.

>>.

>.>

>>.

=5.

.70

0.4

Sa(e

Sa(e

Sa(e

34

4=.7

00>.77

4.5

003.74

4=.7

003.74

0.3>

0.4

Sa(e

Sa(e

Sa(e

35

0.57

047.4

00=.5=

04.

047.4

00=.5=

3.>

0.4

Sa(e

Sa(e

Sa(e

3=

3.>

03=.57

073.0

0=.>

3.>

0=.>

5.>=

0.4

Sa(e

Sa(e

Sa(e

3>

07>.0

033.07

07>.0>

03.75

07>.0

03.75

5.=>

0.4

Sa(e

Sa(e

Sa(e

37

57.3

05.5

=3.

055.3

=3.

05.5

00.03

0.4

Sa(e

Sa(e

Sa(e

30

03.

.33

03>.>

5.=

5.=

03.

=.=

0.4

Sa(e

Sa(e

Sa(e

300

0.>

0>.==

0.34

0>.3

0.>

0>.3

3.4

0.4

Sa(e

Sa(e

Sa(e

30

0.04

0=5.=

07.3

0>4.

07.3

0=5.=

3.54

0.4

Sa(e

Sa(e

Sa(e

303

00.0

030.>0

5.0

05.>

00.0

05.>

>.=

0

Sa(e

Sa(e

Sa(e

30

4>.4

3.57

5.>>

>.4

5.>>

3.57

4.=

0

Sa(e

Sa(e

Sa(e

Load on Piles - >" ?4ithout the effect of design 4ater tale@

Load Case

P1

P2

P=

P7

!a8,

26,0=

21=,=6

2=,7

21,17

!e'end: ; - 1 indi%ates tensile load in pile

!a8, Pile Load

H !in, Pile Load

Shear per Pile

 *actor for Chec> for Pile Capacit3 Pile $ension Shear   Capacit3 Compression

Load Case

Load on Piles - >" ?4ithout the effect of design 4ater tale@ P1

P2

P=

P7

 8or %he%9in' the sa(et, o( piles& in%rease (a%tors (or pile %apa%ities are %onsidered ;here2er appli%a+le1. Critical Loads in Pile. Ma*i/)/ 2erti%al load in pile



Mini/)/ 2erti%al load in pile 



=3. 9N ;)n(a%tored1 04.> 9N ;)n(a%tored1

Ma*i/)/ shear in pile



04.33 9N ;)n(a%tored1

!a8, Pile Load

H !in, Pile Load

Shear per Pile

 *actor for Chec> for Pile Capacit3 Pile $ension Shear   Capacit3 Compression

Petrofac

JOB No.

Petrofac International Limited

JI-1=

PROJECT

Validation of Spreadsheet

ITEM

Design Calculation for 6-Pile Cap

DOC. No.

PREPARED JJX

CHECKED

APPROVED

DATE

SHEET

11-11-2006

MNR

Spreadsheet-Validation-=

 

REVISION

0

)ppendi8-=. Critical /ending !oments  Shear *orces ?*actored@

Load Case

Load *actor for Design

*actored /ending !oment aout  a8is at Pedestal *ace 4ithout the effect of design 4ater tale !u1

4ith the effect of design 4ater tale

*actored /ending !oment aout A a8is at Pedestal *ace 4ithout the effect of design 4ater tale

!u2

!u14

!u24

!uA1

4ith the effect of design 4ater tale

!uA2

!uA14

!uA24

*actored Shear *orce ?%ne-4a3@ for Critical Section Parallel to  a8is

*actored Shear *orce ?%ne-4a3@ for Critical Section parallel to A a8is

4ithout the effect of design 4ater tale

4ithout the effect of design 4ater tale

S*u1

S*u2

4ith the effect of design 4ater tale S*u14

S*u24

S*uA1

S*uA2

4ith the effect of design 4ater tale S*uA14

S*uA24

30

0.

-0.54

05.

-.5

-0=.47

-0.>

>.30

->.45

00.>3

37.=>

55.5

4.7=

3.>3

7.3

033.43

-0.>

>.>0

3

0.

00.7=

>0.=>

>>.05

=.7=

>0.7=

3.>>

54.7

0.

0=.

03.0

03>.47

7>.

7>.50

00.

=.7

7.=0

33

0.

-=.07

>.>

->0.

0.=

7.>

.3

-5.55

-0.5

3.

7>.=

-3.4=

5.>7

=5.5

47.0

4.7

>.57

3

0.

04>.43

7.=

0.=

04.70

5.5

4.7=

3.4>

3>.7

>.74

0.04

0=4.0

55.3

30.

04.44

0>.4

05.>

34

0.

-04.==

43.7

-7.4>

07.>

3.=4

=.75

-0.=3

00.>

3.54

03.4

.>

57.=0

4=.74

03.3

=.

>0.=

35

0.

0.3>

0.7

>>.4=

>>.5>

03.>7

7.

>=.0

0.40

0=.>0

0=.7

037.

037.00

355.>

034.53

304.35

>.70

3=

0.

-4.30

>4.0=

->5.0

40.35

4.54

3.>>

7.0=

-0.5

-0.>7

034.47

-34.=

00.=>

04.3

4>.34

=.5

=.53

3>

0.

75.>3

>4.

53.

40.3

003.4

>5.

7=.4

57.=5

3=.5

034.55

303.4

00.>4

374.=4

300.=5

34.3

50.

37

0.

-0=.=3

=.=

-40.4

.>7

.=3

3>.45

-03.=5

.>

3.57

04.0

-0.0

70.30

4.=7

054.4

.=

00.3

30

0.

0.3

0.7

>5.5

00.>

0.>>

37.5

>5.37

3.0

0=.>5

07.4

03=.4

05.=0

35.7

05>.4

30.3

00=.43

300

0.

-4.=

05.=5

->>.>

=.74

.5

0.>

>.0

-.

-3.>4

04=.0>

-3=.55

03.3=

0.0=

7.74

=0.5

.

30

0.

7.>=

05.>4

50.5

=3.

00.40

75.>

75.3

>.35

34.3

04=.>

300.7

03.=

37.5

3.3>

30.>>

73.55

303

0.5

-=.3=

75.=5

-55.0

4>.0

33.

05.3

0.

-.5

3.5

04.37

->.3>

004.=4

04.=

0.77

75.=

4.3

30

0.5

-.=5

0.0

-3.

03.3=

4.4

3=.00

5.0

0>.>

4.>=

077.5

0.3

050.

07.4

05=.3

03.7

07.=

30

0.

3

0.

33

0.

3

0.

34

0.

35

0.

3=

0.

3>

0.

)ppendi8-=. Critical /ending !oments  Shear *orces ?*actored@

Load Case

Load *actor for Design

37

0.

30

0.

300

0.

30

0.

303

0.5

30

0.5

*actored /ending !oment aout  a8is at Pedestal *ace 4ithout the effect of design 4ater tale !u1

!u2

4ith the effect of design 4ater tale !u14

!u24

*actored /ending !oment aout A a8is at Pedestal *ace 4ithout the effect of design 4ater tale !uA1

!uA2

4ith the effect of design 4ater tale !uA14

!uA24

*actored Shear *orce ?%ne-4a3@ for Critical Section Parallel to  a8is

*actored Shear *orce ?%ne-4a3@ for Critical Section parallel to A a8is

4ithout the effect of design 4ater tale

4ithout the effect of design 4ater tale

S*u1

S*u2

4ith the effect of design 4ater tale S*u14

S*u24

S*uA1

S*uA2

4ith the effect of design 4ater tale S*uA14

S*uA24

)ppendi8-=. Critical /ending !oments  Shear *orces ?*actored@

Load Case

Load *actor for Design

*actored /ending !oment aout  a8is at Pedestal *ace 4ithout the effect of design 4ater tale !u1

!u2

4ith the effect of design 4ater tale !u14

!u24

*actored /ending !oment aout A a8is at Pedestal *ace 4ithout the effect of design 4ater tale !uA1

!uA2

4ith the effect of design 4ater tale !uA14

!uA24

*actored Shear *orce ?%ne-4a3@ for Critical Section Parallel to  a8is

*actored Shear *orce ?%ne-4a3@ for Critical Section parallel to A a8is

4ithout the effect of design 4ater tale

4ithout the effect of design 4ater tale

S*u1

S*u2

4ith the effect of design 4ater tale S*u14

S*u24

S*uA1

S*uA2

4ith the effect of design 4ater tale S*uA14

S*uA24

)ppendi8-=. Critical /ending !oments  Shear *orces ?*actored@

Load Case

Load *actor for Design

*actored /ending !oment aout  a8is at Pedestal *ace 4ithout the effect of design 4ater tale

4ith the effect of design 4ater tale

*actored /ending !oment aout A a8is at Pedestal *ace 4ithout the effect of design 4ater tale

!u1

!u2

!u14

!u24

!uA1

!uA2

!a8imum

26,=

177,0

26=,02

110,2

11=,B7

6,7

!inimum

-B7,2

16,22

-,0

-1,B

-12,0

=,

01 (or tension at +otto/



26,=

9N-/

1 (or tension at top



,0

9N-/

for design 4ith )ctual Pile Loads. a1 Ma*i/)/ (a%tored KM& M )F

4ith the effect of design 4ater tale !uA14

*actored Shear *orce ?%ne-4a3@ for Critical Section Parallel to  a8is

*actored Shear *orce ?%ne-4a3@ for Critical Section parallel to A a8is

4ithout the effect of design 4ater tale

4ithout the effect of design 4ater tale

4ith the effect of design 4ater tale

4ith the effect of design 4ater tale

!uA24

S*u1

S*u2

S*u14

S*u24

S*uA1

S*uA2

S*uA14

S*uA24

,0B

0,=6

=7,26

1,67

=1=,7B

161,00

=B,B

=77,=

=7B,0=

2=,66

-2,B6

-12,60

-=,B

66,67

-=,66

=2,=

,2=

B,=B

-71,7

,6=

)ppendi8-=. Critical /ending !oments  Shear *orces ?*actored@

Load Case

Load *actor for Design

*actored /ending !oment aout  a8is at Pedestal *ace 4ithout the effect of design 4ater tale !u1

!u2

4ith the effect of design 4ater tale

*actored /ending !oment aout A a8is at Pedestal *ace 4ithout the effect of design 4ater tale

!u14

!u24

!uA1

01 (or tension at +otto/



11=,B7

9N-/

1 (or tension at top

!uA2

4ith the effect of design 4ater tale !uA14

!uA24

+1 Ma*i/)/ (a%tored KM& M )G



2,B6

9N-/

%1 Ma*i/)/ (a%tored shear (or%e& V )F



=7,26

9N

d1 Ma*i/)/ (a%tored shear (or%e& V )G



=B,B

9N

)ppendi8-=. Critical /ending !oments  Shear *orces ?*actored@ for *ull Capacit3 of Piles

Load Case

Load *actor for Design

*actored /ending !oment aout  a8is at Pedestal *ace

*actored /ending !oment aout A a8is at Pedestal *ace

*actored Shear *orce ?%ne-4a3@ for Critical Section Parallel to  a8is

*actored Shear *orce ?%ne-4a3@ for Critical Section parallel to A a8is

!u1

!u2

!uA1

!uA2

S*u1

S*u2

S*uA1

S*uA2

(or Kotto/ Tension

0.4

=>.5>

=>.5>

3>>.>

3>>.>

>35.=

>35.=

05.0

05.0

(or Top Tension

0.4

-3.3

-3.3

-047.5

-047.5

->>.3

->>.3

-0.7

-0.7

i1 (or tension at +otto/



2,6

9N-/

ii1 (or tension at top



=72,=2

9N-/

for design 4ith *ull Capacit3 of Piles. a1 Ma*i/)/ (a%tored KM& M )F

+1 Ma*i/)/ (a%tored KM& M )G i1 (or tension at +otto/



=,

9N-/

ii1 (or tension at top



1B,67

9N-/

%1 Ma*i/)/ (a%tored shear (or%e& V )F



=6,

9N

d1 Ma*i/)/ (a%tored shear (or%e& V )G



1276,01

9N

*actored Shear *orce ?%ne-4a3@ for Critical Section Parallel to  a8is

*actored Shear *orce ?%ne-4a3@ for Critical Section parallel to A a8is

4ithout the effect of design 4ater tale

4ithout the effect of design 4ater tale

S*u1

S*u2

4ith the effect of design 4ater tale S*u14

S*u24

S*uA1

S*uA2

4ith the effect of design 4ater tale S*uA14

S*uA24

L%)D I" PIL(S  C'(CG *%# PIL( C)P)CI$<

Load Case

Load on Piles - >" ?4ithout the effect of design 4ater tale@ P1

P2

P=

P7

!a8, Pile Load

H !in, Pile Load

 Shear *actor for Chec> for Pile Capacit3 per Pile Pile Capacit3 Compression $ension Shear  

30

==.70

04.3

==.>7

04.>

==.70

04.>

5.40

0.4

Sa(e

Sa(e

Sa(e

3

.7=

0>.45

.75

0>.45

0>.45

.75

>.57

0.4

Sa(e

Sa(e

Sa(e

33

53.70

=.

47.33

57.5

=.

47.33

0.0=

0.4

Sa(e

Sa(e

Sa(e

3

4>.7=

57.55

53.43

=.

=.

4>.7=

0.0

0.4

Sa(e

Sa(e

Sa(e

34

05.5

=>.=>

00.07

=3.=

05.5

=3.=

.7

0.4

Sa(e

Sa(e

Sa(e

35

54.77

03.35

5.73

>.30

03.35

5.73

04.33

0.4

Sa(e

Sa(e

Sa(e

3=

7.5

03=.57

>.53

0>.5

03=.57

>.53

.>3

0.4

Sa(e

Sa(e

Sa(e

3>

>=.

033

>5.>5

03.5

033

>5.>5

.=

0.4

Sa(e

Sa(e

Sa(e

37

033.

=>.0

03=.45

>.4

03=.45

=>.0

4.=

0.4

Sa(e

Sa(e

Sa(e

30

7.=

0.47

7=.7

0=.0

0=.0

7.=

0.5

0.4

Sa(e

Sa(e

Sa(e

300

007. 035.70 00>.77 035.>>

035.70 00>.77

0.>5

0.4

Sa(e

Sa(e

Sa(e

30

00.05 03. 03. 00.>

00.> 00.05

.0

0.4

Sa(e

Sa(e

Sa(e

303

73.

0.>3

007.=7

0.>3

>>.3>

3.30

0

Sa(e

Sa(e

Sa(e

30

033.0

05.5 03=.5 040.05

040.05

033.0

0.>

0

Sa(e

Sa(e

Sa(e

30

0.4

50.=>

0.

50.=5

0.4

50.=5

>.3>

0.4

Sa(e

Sa(e

Sa(e

3

7.0=

7.=

7.05

7.=0

7.=

7.05

5.>0

0.4

Sa(e

Sa(e

Sa(e

33

>>.

>.7

>3.3>

=4.5

>>.

=4.5

.74

0.4

Sa(e

Sa(e

Sa(e

3

>3.3>

=5.

>>.

>.>

>>.

=5.

.70

0.4

Sa(e

Sa(e

Sa(e

34

4=.7 00>.77 4.5 003.74

4=.7 003.74

0.3>

0.4

Sa(e

Sa(e

Sa(e

35

0.57 047.4 00=.5= 04.

047.4 00=.5=

3.>

0.4

Sa(e

Sa(e

Sa(e

3=

3.> 03=.57 073.0 0=.>

3.> 0=.>

5.>=

0.4

Sa(e

Sa(e

Sa(e

3>

07>.0 033.07 07>.0> 03.75

07>.0 03.75

5.=>

0.4

Sa(e

Sa(e

Sa(e

37

57.3 05.5

=3.

05.5

00.03

0.4

Sa(e

Sa(e

Sa(e

30

03. .33 03>.> 5.=

5.= 03.

=.=

0.4

Sa(e

Sa(e

Sa(e

300

0.> 0>.== 0.34

30

0.04 0=5.= 07.3 0>4.

>>.3>

=3.

055.3

0>.3

303

00.0 030.>0 5.0

30

4>.4 3.57 5.>> >.4

05.>

0>.3

3.4

0.4

Sa(e

Sa(e

Sa(e

07.3 0=5.=

0.>

3.54

0.4

Sa(e

Sa(e

Sa(e

05.>

>.=

0

Sa(e

Sa(e

Sa(e

5.>> 3.57

00.0

4.=

0

Sa(e

Sa(e

Sa(e

L%)D I" PIL(S  C'(CG *%# PIL( C)P)CI$<

Load Case

Load on Piles - >" ?4ithout the effect of design 4ater tale@ P1

P2

P=

P7

!a8, Pile Load

H !in, Pile Load

 Shear *actor for Chec> for Pile Capacit3 per Pile Pile Capacit3 Compression $ension Shear  