3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4 - 201...

March 11, 2022 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download 3.5 Orange Handbook - Wireless Hardware Installation Key Points V1.4 - 201......

Description

Wireless hardware installation key point Orange Project_Jordan V1.4

This document including most frequently mistakes has made during site installation and swap. If you have any questions and suggestion regarding installation and swap,

please feedback: [email protected] [email protected]

HUAWEI TECHNOLOGIES CO., LTD.

Contents 1 1. Cabinet 1.1 Cabinet location 1.2 Equipment layout in BTS and TP cabinet of scenario 1

2. Main equipment 2.1 RRU Installation principle 2.2 MRFU Install Position Principle 2.3 The mounting ears and cable claw of DCDU -12B 2.4 Sensor installation in TP48200A power cabinet 2.5 AC input power cable installation 2.6 Battery installation in TP48200A power cabinet 2.7 TP48200A Power System Commissioning

3. Antenna&feeder system 3.1 Distinguish the right port of New antenna 3.2 Use double screws to fix Wireless ANT on mast/pole 3.4 Color ring principle for jumper 3.5 How to measure the azimuth of ANT 3.6 How to adjust the down-tilt of ANT

4. DC power distribution 4.1 The TP48200A MCB distribution for DCDU 4.2 The DCDU distribution for RRU

5. Cable installation 5.1 Cable route at outdoor cabinets 5.2 Monitor cable from TP to BBU 5.3 Transmission cable from MW IDU to BTS 5.4 Install AISG cable from ANT to RRU 5.5 Hoist RRU fiber

6. Grounding 6.1 cabinet & RRU grounding 6.2 RRU Power cable grounding 6.3 7/8’feeder grounding

7. Waterproof 7.1 The connector of jumper waterproofed 7.2 7/8’feeder grounding waterproofed

1

cabinet

2

1.1 The base &cabinet installation on concrete BTS3900A & TP48200A cabinet on concrete must be 40-150mm away from each other, make sure the door of cabinet can be opened normally. 2 cabinet at same level

BTS3900A

TP48200A

≥800mm BTS at Left

TP at Right

50mm

The cable between two cabinets need to use PVC Pipe, to protect cable from damage !!! BTS3900A

TP48200A

3

1.2 Equipment layout of scenario 1 (1/3) General view

4

1.2 Equipment layout of scenario 1 (2/3) The equipment layout in BTS3900A cabinet

DCDU-12A for BBU and Fan BBU3910 DCDU-12B for 3G and 4G RRU 1DCDU-12B maximum support 6 RRU, In case more than 6RRUs, must add another DCDU-12B here.

DCDU-12A for MRFU power M R F U d

5

1.2 Equipment layout of scenario 1 (3/3) The equipment layout in TP48200A cabinet

AC/DC Breaker

DDF for E1s

DCDU-12B for RTN power

RTN location

6

Main equipment

7

2.1 RRU Install Position Principle If have space on mast/ tower, each sector install 2 RRUs, one is 3G RRU, another is 4G RRU

4G

3G

One RRU is 1800M_4G,another is 2100M_3G

Using joint bar connect each RRU

If no enough space on mast/ tower, 3 RRUs can be combined, they are same frequency . the other 3RRUs also be combined.

4G

4G

4G

Same frequency 1800M_4G

3G

3G

3G

Same frequency 2100M_3G

8

Using joint bar connect each RRU

2.2 MRFU Install Position Principle MRFU module for 2G, install at the low rack of BTS3900A cabinet

If the sector of 2G is 1 ~ 3, MRFU install as below:

2

1

3

If the sector of 2G is 4 ~ 6, MRFU install as below:

1

2

3

4

5

6

9

2.3 The mounting ears and cable claw of DCDU -12B The material of DCDU-12B :

Mounting ear

Cable claw for DCDU-12B

Before install the DCDU-12B in BTS&TP cabinet, must adjust the mounting ear to move forward, and install cable claw at DCDU-12B right side

Move forward

Move forward

Mounting ear

Cable claw for DCDU-12B

10

2.4 Lamp & Sensor installation inTP48200A cabinet Sensor Installation Layout

Smoke Sensor

Sensor Cable Port

Lamp

Temperature and Humidity Sensor

Water Sensor

11

2.4 Lamp installation(1/4) Installing a lamp Procedure:  Install a lamp on the fastener on the right of the cabinet.  Connect the negative (-) lamp power cable for the lamp to the 10A (C10) load circuit breaker.  Connect the positive (+) lamp power cable to the RTN+ busbar.

Lamp Power Cable (-)

RTN+ busbar

Lamp Power Cable (+) Lamp

12

2.4 Smoke Sensor installation(2/4) Installing a Smoke Sensor Procedure:  Remove screws that secure the smoke sensor to the right of the cabinet top.  Dismantle smoke sensor base from the sensor, secure the smoke sensor base to the top of the cabinet by using the removed screws.  Secure the smoke sensor to the base.  Connect one end of the signal cable to the smoke sensor and the other end to the SMOKE port on the UIM panel.

2

1 Smoke Sensor Installation Location

Smoke Sensor Base

4

Smoke Sensor

3

Smoke Sensor Port

Smoke Sensor Port

13

2.4 Water Sensor installation (3/4) Installing a Water Sensor Procedure:  Put the water sensor in the cable strip in the right part of the cabinet bottom (ensure that the sensor is 5 mm to 10 mm away from the cabinet bottom), and secure the sensor with a cable tie.  Connect the water sensor signal cable to the WATER port on the UIM panel.

Water Sensor Port

Water Sensor Port

Water Sensor

14

2.4 Temperature & Humidity Sensor installation(4/4) Installing a Temperature and Humidity Sensor Procedure:  Remove the fastener for the temperature and humidity sensor from the left of the cabinet.  Open the cover of the temperature and humidity sensor, and install the sensor on the fastener.  Connect one end of the signal cable for the temperature and humidity sensor to the sensor.  Close the cover of the temperature and humidity sensor.  Reinstall the fastener for the temperature and humidity sensor on the cabinet.

T Cables

RH Cables

Temperature & Humidity Sensor Port 15

2.5 AC input power cable installation Installing AC Input Power Cables Procedure:  Lay out an AC input power cable, and route it into the cabinet through the cable hole in the left part of the cabinet bottom.  Find a spare(or new purchase and install) 3*25A(there-phase 25A) AC circuit breaker in AC box.  Secure the AC input power cable to the corresponding AC input circuit breakers and terminal.

AC INPUT Circuit Breaker in Power System

3*25A Circuit Breaker in AC box

Note: If the AC box can’t reuse or re-install 3*25A breaker, only allow to

use single-phase breaker(at least 1*10A) for temporary precommissioning of BTS/MW, But should turn off the existing power system before swapping, and relocate Huawei power system AC INPUT to three-phase circuit breaker(3*25A). 16

2.6 Battery installation Installing Batteries Procedure:  Install batteries into the battery compartment in the sequence.

 Remove the insulation cover from the batteries.  Install copper bars between batteries.  Reinstall the insulation covers onto the two batteries in the middle.

Insulation Cover

Copper Bar

 Take negative battery cables from the left side of the battery compartment, and connect the cables to negative battery terminals.  After you install all negative battery cables, take positive battery cables from the right side of the battery compartment, and connect the cables to positive battery terminals.  Reinstall the insulation covers onto the batteries on the left and right sides.

17

2.7 Power System Commissioning(1/2) 1. Connecting the AC Power Supply Procedure:  Measure the input voltage on the AC input circuit breaker. The value should range from 85 V AC to 300 V AC.  Switch on the AC input circuit breaker and measure the output voltage of the AC input circuit breaker. The value should range from 85 V AC to 300 V AC.  Check that the indicators on the rectifiers are steady on.  Measure the voltage between the -48 V busbar and the RTN+ busbar. The value should range from -42 V DC to -58 V DC. 2. Setting the Display Language Procedure:

3. Setting the Date and Time

Main Menu

Setting Wizard

Second-Level Menu

Third-Level Menu

Default Value

Setting

Date and Time

-

Set to the local date and time.

Time Zone

UTC +08:00 Beijing

Set to the local time zone. Yes/No

Date and Time NTP Enable

18

No

NOTE Set the parameter to Yes if you need to synchronize the SMU time and the site network server time.

2.7 Power System Commissioning (2/2) 4. Setting Battery Parameters Main Menu

SecondLevel Menu

Parameter s Settings

Battery

ThirdLevel Menu

FourthLevel Menu

Default Value

Battery 1 Connected

Yes

Battery 2 Connected

Yes

Basic Parameters

If 2 battery strings are connected, set Battery 1 Connected to Battery 2 Connected to Yes.

Rated capacity of the batteries in a battery string. Rated Capacity

Other Parameters

Setting Value

Installation Time

150 Ah NOTE The batteries controlled by one circuit breaker or fuse are called a battery string. -

Set to the current date

5. Setting Sensor Parameters Main Menu

Parameters Settings

SecondLevel Menu

ThirdLevel Menu

FourthLevel Menu

Default Value

Water Sensor

None

Smoke Sensor

None

Config. Ambient Temp. Power System Sensor Para. Sensor

None

Ambient Humi. Sensor

None

Setting

Set to Yes.

6. Connecting the Battery Supply Procedure:  Switch off AC input circuit breakers.  Switch on the battery circuit breaker, then switch on AC input circuit breakers.  Switch all the circuit breakers to the appropriate status based on site requirements.  Observe the power system for 15 minutes. If no alarm (excluding door alarms) is generated on the LCD during this period, the voltage and current for batteries and loads are normal. 19

Antenna&feeder system

20

3.1 Distinguish the right port of New antenna For this type antenna, the left port “yL” is defined 1800M, the right port “yyR” is defined 2100M. 900M 3G-2100M

4G-1800M

AISG Female

AISG Male

Left is 1800M, 4G

Right is 2100M, 3G

21

3.2 Use double screws to fix Wireless ANT

22

3.3 Color ring principle 900M_GSM TX RX 1

2

900M_GSM TX RX 1

2

Sector A Blue 2100M_3G TX RX 3

4

Sector C Yellow 2100M_3G TX RX 3

4

1800M_4G TX RX 5

900M_GSM TX RX

6

1

1800M_4G TX RX 5

2

900M_GSM TX RX

6

1

23

2

Sector B Red 2100M_3G TX RX 3

4

Sector D White 2100M_3G TX RX 3

4

1800M_4G TX RX 5

6

1800M_4G TX RX 5

6

3.4 How to measure the azimuth of ANT Be sure that the position of compass was put it correctly •Don’t test on the tower •Keep more than 2 meters from the tower •Keep the compass in horizontal •Make the compass in same direction with target antenna

horizontal

Step1: Make the mid-line of compass is same with the direction of Antenna Azimut h= the red value found on the compass via the observing hole Record the value.

Make the compass same direction with antenna

Read the Red number from the observe window (the first number)

Record and call OMC to confirm the azimuth value of all the sectors

24

3.5 How to adjust the down-tilt of ANT The HW Tri-band antenna length is 2.6 meters, should set mechanical tilt according to the marker of L=2.6

This small triangle using to define mechanical down tilt

Record and call OMC to confirm the M-tilt value of all the sectors

25

DC power distribution

26

4.1 The TP48200A MCB distribution for DCDU LLVD

BLVD

BAT

Note: IF RRU more than 6pcs, must add one new DCDU-12B_2. It is the red color in the BTS cabinet as picture.

27

4.2 The RRU Power distribution at DCDU-12B 1DCDU-12B maximum support 6RRU,iF RRU more than 6pcs, must add one new DCDU-12B. It is the red one DCDU-12B_2 in the picture.

28

Cable installation

29

5.1 Cable route at cabinet

30

5.2 Install Monitor cable from TP to BBU The blue cable is monitor cable from TP to BBU Note: For temporary scenario, BBU install at TP cabinet, the monitor cable from TP to BBU, BBU side is port “Monitor0”at UPEU board.

31

5.3 Transmission cable from MW IDU to BTS

Connect to RTN905 GE port3

NOTE: If use the RTN950, the transmission cable should connect to the GE electrical port 3 of EG4 board.

Connect to RTN950 EG4--GE port3

32

5.4 Install AISG cable from ANT to RRU AISG cable will be installed from 3G RRU 3839 to antenna

3G RRU

AISG cable input on the antenna

AISG cable input inside the RRU

AISG cable is waterproof, no need waterproof for connector.

33

5.5 Hoist RRU fiber

Do not remove the stretch sling and protection pipe when lifting RRU fiber !!!

Making a simple wire spool tools

3 fibers twist together

Using wire spool tools

34

Grounding

35

6.1 Cabinet & RRU grounding BTS3900A cabinet grounding

TP48200A cabinet grounding

RRU grounding

36

6.2 RRU power cable grounding (1/2) The shielding layer of RRU power cable need to grounding using clip in RRU

37

6.2 RRU power cable grounding(2/2) When RRU power cable through into BTS cabinet, must use 6 in 1 grounding clamp for shield layer grounding of RRU power cable !

6 in 1 grounding clamp, 1clamp can fix 6pcs RRU power cable. remove the black cover of power cable, and fix in clamp

38

6.3 7/8’feeder grounding 7/8’ feeder need to grounding at the bottom of tower/mast.

39

Waterproof

40

7.1 The connector of jumper waterproof

41

7.2 7/8’feeder waterproof The shielding layer of 7/8’ feeder need to grounding at the bottom of tower /mast !!!

42

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF