Ooredoo - CME Site Installation Solution (3G Project ) V1.4

HUAWEI TECHNOLOGIES CO., LTD.

 

Revision History Ver.. Ver

Date

Author

1.0

Aug 22, 2013

Fan Yunpeng Yunpeng

1.1

Sep 25, 2013

Fan Yunpeng Yunpeng

1.2

Sep 28, 2013

Fan Yunpeng Yunpeng

1.3

Oct 6, 2013

Fan Yunpeng Yunpeng

1.4

Oct 6, 2013

Fan Yunpeng Yunpeng

Review

Change Description

Huawei HQ & ME First Release CME Technical Team 1. Update “Tie back” and “Dead man” description;  2. Update Update the length length of Commsco Commscope pe jumpers jumpers and hybrid tail description; 3. Update “Tilt arm” description for antenna part –  Page Huawei HQ & Team ME 72 CME Technical 4. Update Update filter filter installatio installation n scenarios scenarios introd introductio uction n –  Page 75-77 5. Update Update Installation Installation Position Position Layout Layout – Page 15&21 6. Update Update the cable cable routin routing g – Page 81-83 1. Update Update the length length of jumper jumper from from 2100M 2100M RRU to to Huawei HQ & ME 2100M filter in old CME standard  – Page 75 CME Technical Team 2. Update Update the the 2G transmission transmission connection connection – Page 45 1. Update Update new 2100M 2100M filter filter installa installation tion method method in Eirbe Eirbe Huawei HQ & ME only – Page 82; CME Technical Team 2. Update Update Tiebac Tieback k and Dead Dead man clamp clamp introduc introduction tion –  Page 18-19 Huawei HQ & Team ME 1. Update Updat e Alarm cable connection conne ction sequence nce in CME Technical HUAWEI Mini-shelter  – Page 49seque

HUAWEI TECHNOLOGIES CO., LTD.

Page 2

 

Content 1. Sit Site e Moder Moderniz nizati ation on Scena Scenario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Modernizat Modernization ion Refere Reference nce Design Design I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on same same po pole le

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndiing 6. Colo Colorr ring ing 7. Labeling 8. Ante Antenn nna a conn connec ecti tion on 9. Fi Filt lter er Inst Instal alla lati tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 3

 

1.1 Main Scenario 1 – GF Tower

HUAWEI Mini-shelter + Tower 

Swap Huawei indoor/outdoor cabinet by HUAWEI Mini-shelter , Swap existing 2G antenna by Triple Band antenna, Antenna and HUAWEI RRUs installing on the tower HUAWEI TECHNOLOGIES CO., LTD.

Page 4

 

1.2 Main Scenario 2 – RT Pole

HUAWEI Mini-shelter + RT Pole 

Mi ni-shelter , Swap existing 2G antenna by Triple Band antenna, Antenna Swap Huawei indoor/outdoor cabinet by HUAWEI HUAWEI Mini-shelter  and HUAWEI RRUs installing on the rooftop pole. HUAWEI TECHNOLOGIES CO., LTD.

Page 5

 

1.3 Main Scenario 3 – RT SST

HUAWEI Mini-shelter + RT SST 

Mi ni-shelter , Swap existing 2G antenna by Triple Band antenna, Antenna Swap Huawei indoor/outdoor cabinet by HUAWEI HUAWEI Mini-shelter  and HUAWEI RRUs installing on the rooftop Self-support Tower. HUAWEI TECHNOLOGIES CO., LTD.

Page 6

 

1.4 Main Scenario 4 – Can not follow CME Site

HUAWEI Mini-shelter + RT Pole 

Antenna/RRU/Junction BOX installing on site, and installing on different pole.

HUAWEI TECHNOLOGIES CO., LTD.

Page 7

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio vendorr material material list list for 1 standa standard rd sector  sector  2. Third vendo 3. Site Modernizat Modernization ion Refer Reference ence Design Design I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on on same same pole pole

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndin ing g 6. Colo Colorr ring ing 7. Labeling 8. Ante Antenn nna a conn connec ecti tion on 9. Fi Filt lter er Inst Instal alla lati tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 8

 

2.1 Commscope Material Overview Key Points: Triple band antenna RF 1/2 Jumper  cable  cable

I.

HUAW HUAWEI EI RRU RRU ins insta tall ll out outsi side de,, Commscope supply all of third vender

HUAWEI RRU

material(include

 Antenna/Cable/Connector…);  Standard hybrid tails 1 for each RRU

II. One tru trunk nk cabl cable e pe perr sector sector,, Suppl Supplies ies 4 Protective enclosure for connections

Standard hybrid trunk cable RTF-16SM-812-SPE 16 single mode fibers 8 x 12 AWG power conductors

III. Hybrid Hybrid tr trunk unk Cable Cable Asse Assembl mblies ies available in 5 M increments. IV. Iraq select select triple-b triple-band and antenna antenna,, so there there

Fiber patch panel

HUAWEI TECHNOLOGIES CO., LTD.

RRUs with separate power circuits;

are maximum three RRUs in per sector.

Page 9

 

2.2 Material List with Commscope Remote Fiber Feeder Material List Calculated Quantity

U of M

Part Number

Description

3

30 METERS RT RTA812-16S06-30M A812-16S06-30M Remote Fiber Feeder 16 SM Fibers, 8 x 12 AWG power conductors

3

EACH

FE-12104-G-R4

Fiber and power cable connection enclosure, manages 1 810/812 hybrid trunk, 4 hybrid jumpers, IP67

9

EACH

RTA212-4S091.5/2.0M

Hybrid jumper, 4 fibers terminated DLC, breakout A for junction box, breakout B for Huawei with flush cut power cord.

3

EACH

29958

Hoisting grip, RTA RTA812 812 series hybrid cables

9

KIT OF 10

SHK-19-1-P-10

Hybrid cable hanger, supports RTA RTA812 812 series cable, stainless hardware, 1 run stack, kit of 10

3

EACH

GND-1M

Grounding lead for junction box, 1M

1

EACH

RTF-SMPK-24

Patch Panel kit includes: Fixed Shelf, Single mode Panel, Qty 24 -SM fiber LC cords, 3ft

6

EACH

OG3LX6-S-CS1-HC Fiber loopback connector, single mode, use one per unused fiber pair

Other Material List Calculated Quantity

U of M

Part Number

Description

3 18

EACH EACH

RVVPX310B1Q F4A-DMDM-2M-P

790-960 / 1710-2690 / 1710 1710 –  – 2690/1710-2690  2690/1710-2690 / 1710 - 2690MHz Penta Band Remote Tilt Panel Antenna, Internal Bias-T FSJ4-50B SureFlex SureFlex™ ™ Jumper with straight body style interface type 7-16 7-16 DIN Male and 7-16 DIN Male 2 meter

3

EACH

QSIK-1S-U

Sector installation kit. Includes hangers, grounding wire and lugs, buss bar, weatherproofing tape, cable ties

6

KIT

RRM-6

Mounts 2 Huawei RRU's

Points:   Key Points: This material list only for Standard site(3 sectors and 3 RRUs in per-sector), the length/type/amount that all of cables(RF jumper cable/Hybrid tail/Hybrid trunk cable) is sample. We need to follow the actually survey data.

HUAWEI TECHNOLOGIES CO., LTD.

Page 10

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Moder Modernizat nization ion Refer Reference ence Desig Design n I.

Scenar Sce nario1 io1:: RRU and Ant Antenn enna a insta installll on on same same pole pole

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndin ing g 6. Colo Colorr ring ing 7. Labeling 8. Ante Antenn nna a conn connec ecti tion on 9. Filt Filter er Inst Instal alla lati tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 11

 

Same Pole  Pole – GF Site 3.1.1.1 RRU and Antenna Install on Same

4-legs GF tower

HUAWEI TECHNOLOGIES CO., LTD.

3-legs GF tower

Mast in the yard  yard 

Page 12

 

Same Pole  Pole – RT Site 3.1.1.2 RRU and Antenna Install on Same

Self-supported Mast

Self-supported Pole on Self-supported Pole on rooftop rooftop (Two Sector in same level) (Two Sector in different level)

HUAWEI TECHNOLOGIES CO., LTD.

Page 13

Self-supported Pole on rooftop (Each sector in one pole)

 

3.1.2.1 RRU and Antenna Install on Same Pole Same Pole Triple-band ANT

3M Pole

Expansion RRU

Expansion RRU

Key Points: I.

Triple Band  Antenna/RRUs/Filter/Junction BOX install on same 3M pole, and assembled

900MHz RRU

2100MHz RRU

in warehouse; II.

All All of eq equi uipm pmen ents ts ins instal talla lati tion on loc locat atio ion n follow this design:

1800MHz RRU

900MHz& 2100MHz Filter

a)

Each Each sect sector or inst instal alls ls 3pc 3pcs s RR RRM6 M6;;

b)

900/ 900/21 2100 00M M RRUs RRUs ins insta tall ll seco second nd level, 1800M RRU and filters install third level,

JUNCTION BOX

CME Antenna Design (S ide view) 

CME RRU Location

HUAWEI TECHNOLOGIES CO., LTD.

(B ack Vi ew ew)) Page 14

 

3.1.2.2 Installation Position Layout Unit: mm 3000 2800 2700 2620 2548 2140 1880 1840 1100 1060 740 320 120

Antenna

Clamp

Top

Reserved

Dead Man Clamp

RRM6

900M RRU 2100M RRU

Reserved

Future Band Bracket

HUAWEI TECHNOLOGIES CO., LTD.

80 900M&2100M Filter

900M Filter

1800M RRU

1800M Filter Mini Bus Bar

Page 15

Junction Box

 

Same Pole  Pole 3.1.2.3 RRU and Antenna Install on Same Lengths – 3m RF 1/2 Jumper Lengths –  3m Pole HUAWEI RRU (900)

Band   Band

Filter (900)

   l    i   a    t   r   e    b    i    f    d    i   r    b   y    H   z    H    M    0    0    9

  a   n   n   e    t   n    A    d   n   a    b     e    l   p    i   r    T  

HUAWEI

   l    i   a    t   r   e    b    i    f    d    i   r    b   y    H   z    H    M    0    0    8    1

RRU (1800)

Filter

Junction BOX

   l    i   a    t   r   e    b    i    f    d    i   r    b   y    H   z    H    M    0    0    1    2

HUAWEI RRU (2100)

Mini bus bar

(2100)

  e    l    b   a   c   r   e   p   m   u    j    F    R   z    H    M    0    0    1    2

  e    l    b   a   c   r   e   p   m    j   u    F    R   z    H    M    0    0    8    1

  e    l    b   a   c   r   e   p   m   u    j    R    F   z    H    M    0    0    9

Position   Position

ANT.   ANT.

Qty

900 MHz(2G) 900MHz Filter

MIDDLE BOTTOM

1.0m 1.5m

2 2

1800 MHz(2G)

BOTTOM

1.5m

2

2100 MHz(3G)

MIDDLE

1.0m

2

2100MHz Filter

BOTTOM

1.5m

2

Company

Commscope

Lengths –  – 3m  3m Pole Hybrid fiber tail Lengths Band   Band

Position   Position

Jun.BOX   Jun.BOX

Qty

900 MHz(2G)

MIDDLE

2.0m

1

1800 MHz(2G)

BOTTOM

1.5m

1

2100 MHz(3G)

MIDDLE

2.0m

1

Company

Commscope

Grounding cable –  3m Pole cable – 3m Equipment   Equipment

Position   Position

Mini-bus bar  

Qty

Type

900 MHz(2G)

MIDDLE

2.0m

1

16mm2

900MHz Filter

BOTTOM

1.0m

1

16mm2

1800 MHz(2G)

BOTTOM

1.0m

1

16mm2

2100 MHz(3G)

MIDDLE

2.0m

1

16mm2

2100MHz Filter

BOTTOM

1.0m

1

16mm2

Hybrid fiber Tail

Junction BOX

BOTTOM

1.0m

1

16mm2

Grounding cable

Main-bus bar

On Tower

It depends

1

16mm2

RF 1/2 Jumper cable

HUAWEI TECHNOLOGIES CO., LTD.

Page 16

Company

Commscope

 

3.1.3.1 Antenna Antenna system members – Tie Back & Dead Man Tie Back:

Dead Man:

1. Fixing Fixing and suppor supportin ting g

1. In Inst stal alli ling ng 2pcs Dead

 Antenna system on the

Man clamps on 3m pole,

tower,, prevent swaying; tower

above Antenna support (Arm);

2. One sector sector need need to instal installl

2. When When adju adjusti sting ng Antenn Antenna a

2pcs;; installation position 2pcs is both ends of 3m pole;

azimuth, lose Antenna

3. One side side inst install alls s on the

support (near 3m pole

3m pole, other side

side), then adjusting

installs on the tower;

azimuth by hand; 3. Exce Except pt can can n not ot ffoll ollow ow

4. Ex Exce cept pt RT RT Pole Pole and and can can not follow CME site,

CME site, other sites

other sites need to

need to install Dead

install Tie Back on site

man in warehouse

HUAWEI TECHNOLOGIES CO., LTD.

Page 17

 

3.1.3.2 Antenna Antenna system members – Tie Back introduction For GF tower

For RF tower

This side fix on 3m pole (antenna side)

Key Points:

This side fix on tower

1. Insta Installati llation on method method of GF and RF are are sa same; me; 2. Onl Only y ttwo wo park park is dif differ ferent ent:: I.

Th The e len lengt gth ho off G GF F is is lon longe gerr R RF F

II II..

Part Part N No. o.1 1 of GF GF is big bigge gerr than than RF RF

HUAWEI TECHNOLOGIES CO., LTD.

Part No.1

Page 18

 

3.1.3.3 Antenna Antenna system members – Dead man clamp introduction RT site Dead man clamp

Spacer There have one spacer,, so dead spacer man clamp should be install this side

√ 

HUAWEI TECHNOLOGIES CO., LTD.

GF site

X

Dead man clamp

√  Page 19

RF antenna support

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Moder Modernizat nization ion Refer Reference ence Desig Design n I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on on same same pole pole

II. Scena Scenario2: rio2: RRU and and Anten Antenna na install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndin ing g 6. Colo Colorr ring ing 7. Labeling 8. Ante Antenn nna a conn connec ecti tion on 9. Fi Filt lter er Inst Instal alla lati tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 20

 

3.2.1 RRU and Antenna Install on Different Pole Different Pole

Mobile Site and Guyed Mast Site, Antenna and RRU install Different pole, RRU assembly install on the top of bottom section  section 

HUAWEI TECHNOLOGIES CO., LTD.

Page 21

 

3.2.2.1 RRU and Antenna Install on Different Pole Different Pole 3M Pole

Key Points: Expansion RRU

Expansion RRU

I.

Mobile Site and Guyed Mast Site, Site,  Antenna and RRU install Different pole, RRU assembly install on the top of

900MHz RRU

2100MHz RRU

bottom section II.

All All of eq equi uipm pmen ents ts ins instal talla lati tion on loc locat atio ion n follow this design:

1800MHz RRU

900MHz& 2100MHz Filter

a)

Each Each sect sector or inst instal alls ls 3pc 3pcs s RR RRM6 M6;;

b)

900/ 900/21 2100 00M M RRUs RRUs ins insta tall ll seco second nd level, 1800M RRU and filters install third level,

JUNCTION BOX

CME Antenna Design (S ide view) 

c)

Ante Antenn nna a iins nsta tall lls s on th the e sep separ arat ate e pole or reuse existing pole

CME RRU Location

HUAWEI TECHNOLOGIES CO., LTD.

(B ack Vi ew ew)) Page 22

 

3.2.2.2 Installation Position Layout (RRU and Junction Box) Unit: mm 3000 2800 2700 2620 2548

1880 1840 1100 1060 320 120

Clamp

Top

Reserved

Dead Man Clamp

RRM6

900M RRU

Bracket

HUAWEI TECHNOLOGIES CO., LTD.

1800M RRU

2100M RRU

Reserved

Future Band

80 900M&2100M Filter

900M Filter

1800M Filter Mini Bus Bar

Page 23

Junction Box

 

3.2.2.3 Installation Position Layout (Antenna)

Unit: mm 3000

2140 740

120

Antenna

Top

Dead Man Clamp

Bracket

HUAWEI TECHNOLOGIES CO., LTD.

Page 24

 

Different Pole  Pole 3.2.2.4 RRU and Antenna Install on Different RF 1/2 Jumper Length Band   Band HUAWEI RRU

Filter (900)

(900)

   l    i   a    t   r   e    b    i    f    d    i   r    b   y    H   z    H    M    0    0    9

  a   n   n   e    t   n    A    d   n   a    b   e      l   p    i   r    T  

HUAWEI

   l    i   a    t   r   e    b    i    f    d    i   r    b   y    H   z    H    M    0    0    8    1

Junction BOX

   l    i   a    t   r   e    b    i    f    d    i   r    b   y    H   z    H    M    0    0    1    2

RRU (1800)

Position   Position

ANT.   ANT.

Qty

900 MHz(2G)

MIDDLE

1.0m

2

900MHz Filter 1800 MHz(2G) 2100 MHz(3G) 2100MHz Filter

BOTTOM BOTTOM MIDDLE BOTTOM

? ? 1.0m ?

2 2 2 2

Commscope

Company

7/8 Feeder cable Length Band  Band 

Position   Position

Jun.BOX   Jun.BOX

Qty

900 MHz(2G)

MIDDLE

It depends

2

1800 MHz(2G) 2100 MHz(3G)

BOTTOM MIDDLE

It depends It depends

2 2

Reuse

Hybrid fiber tail Length Band   Band

HUAWEI RRU (2100)

900 MHz(2G) 1800 MHz(2G) 2100 MHz(3G)

Filter (2100)

Position   Position

Jun.BOX   Jun.BOX

Qty

Company

MIDDLE BOTTOM MIDDLE

2.0m 1.5m 2.0m

1 1 1

Commscope

Grounding cable Length Equipment   Equipment

Hybrid fiber Tail Mini bus bar

Company

Grounding cable RF 1/2 Jumper cable 7/8 Feeder cable

HUAWEI TECHNOLOGIES CO., LTD.

Position   Position

Mini-bus bar  

Qty

Type

900 MHz(2G) 900MHz Filter 1800 MHz(2G) 2100 MHz(3G) 2100MHz Filter

TOP TOP MIDDLE BOTTOM BOTTOM

2.0m 1.0m 1.0m 2.0m 1.0m

1 1 1 1 1

16mm 16mm2 16mm2 16mm2 16mm2

Junction BOX Main-bus bar

BOTTOM On Tower

1.0m It depends

1 1

16mm22 16mm

Page 25

Company

2

Commscope

 

3.3.1 Cable Routing in Junction Box Power Installation (fiber cables removed for clarification)

Fiber Installation (power cables removed for clarification)

Be sure that 1/4" (.64cm) of outer jacket is inside of the Fiber Enclosure for proper weather seal.

Be sure that 1/4" (.64cm) of outer jacket is inside of the Fiber Enclosure for proper weather seal. All Fiber bends minimum 1.18" (30mm) radius inside of the Fiber Enclosure.

E

A

E - Hybrid trunk cable

B

C

D A - GU900 RRU

HUAWEI TECHNOLOGIES CO., LTD.

E

A

B

C

B - G1800 RRU

Completed Installation

D

E C –  – U2100  U2100 RRU Page 26

A

B

C

D

D - EXP

 

3.3.2 Cable Connection in Junction Box 900MHz RRU 1800MHz RRU 2100MHz RRU

900MHz RRU

1800MHz RRU

2100MHz RRU

 #   C  P  R I   1 

 #   #   C   C  P  # P  R 2 # R I   1 I   1   0 

 #   #   C   C  P  # P  R 2 # R I   1 I   1   0 

 #   C  # P  # R 2 1 I    0 

EXP

Key Points: I.

All All of fi fibe berr ta tail il and and power cable should be connected on the connector;

+0V

-48V

Fiber connection

II. The un unus used ed po port rts s iin n the junction box on upside should be install fiber loopback connector or protector by oneself.

Power connection Hybrid trunk cable (8pcs Power lines) HUAWEI TECHNOLOGIES CO., LTD.

Hybrid trunk cable (8pcs Fiber tails) Page 27

 

3.4.1 Install Hybrid Tru Trunk nk Cable Material

Hybrid trunk cable Hanger

Qty

Hybrid trunk cable

3

Hanger

\

Steel tie

4

Bolt/Nut

\

Company

Remark One sector by one Hybrid trunk cable

Commscope

Fix 3-Hybrid trunk cables by 3-run hanger every 1-meter, Carry excess Hybrid trunk cable by 4-bolts Fix excess Hybrid trunk cable by steel tie,

HUAWEI PVC Pipe

4

Cover it on bolt, protect Hybrid trunk cable

Fix excess Hybrid trunk cable solution summary

Solution_1

I.

The d dista istance nce tthat hat betw between een e exis xisting ting ladder ladder tto o Gro Ground und is not available. available.

II.

Install new Ve Vertical rtical ladder ladder up ex existing isting cab cable le ladde ladder, r, th then en install install 4 hangers o on n it

and fix excess Hybrid trunk cable on it(Near tower)

Solution_2

I. II.

The d dista istance nce tthat hat betw between een e exis xisting ting ladder ladder tto o Gro Ground und is available. available. Install new V Vertical ertical ladder or steel beam on ex existing isting v vertical ertical steel steel bea beam m under existing cable ladder, then install 4 hangers on it and fix excess Hybrid trunk cable on it(Near tower)

Solution_3

I.

Cable tray for Hybrid cable on site;

II.

Install new V Vertical ertical ladder on grou ground, nd, ins install tall 4 bol bolts ts on it and fi fix x excess Hybrid Hybrid trunk cable on it(Near tower)

HUAWEI TECHNOLOGIES CO., LTD.

Page 28

 

3.4.2 Fix Excess Hybrid Trunk Cable – Solution_1 Key Points:  Points:  I.

Th The ed dis ista tanc nce e ttha hatt b bet etwe ween en existing ladder to Ground is not available. available.

II. Ins Instal talll new Vert Vertica icall lad ladder der up

Hybrid trunk cable

existing cable ladder, then install 4 bolts on it and fix excess Hybrid trunk cable on New Vertical ladder

it(Near tower)

Bolt/Nut

III. Accor According ding left c chart hart to rou route te Hybrid trunk cable

HUAWEI Existing cable ladder

IV. Exces Excess s cable cable should should be coiled at the base of the

Minishelter

tower min 152.4mm / 6” bend radius

HUAWEI TECHNOLOGIES CO., LTD.

Page 29

 

3.4.3 Fix Excess Hybrid Trunk Cable – Solution_2 Key Points:  Points:  I.

Th The ed dis ista tanc nce e ttha hatt b bet etwe ween en existing ladder to Ground is available.. available

II. Ins Instal talll new Ve Verti rtical cal ladd ladder er or  steel beam on existing vertical steel beam under  existing cable ladder, then install 4 bolts on it and fix Steel beam or Vertical ladder

excess Hybrid trunk cable on Bolt/Nut

it(Near tower) III. Accor According ding left chart to ro route ute Hybrid trunk cable IV. Exces Excess s cable cable should should be coiled at the base of the

tower min 152.4mm / 6” bend radius HUAWEI TECHNOLOGIES CO., LTD.

Page 30

 

3.4.4 Fix Excess Hybrid Trunk Cable – Solution_3 Points:   Key Points: I.

Cable tray for Hybrid cable on site;

II. Insta Installll ne new wV Vertica erticall lad ladder der o on n ground, ground, instal installl 4 bolts on it and fix excess Hybrid trunk cable on it(Near tower) III. Accor According ding left left chart chart to route route Hybr Hybrid id trunk trunk cable Bolt and PVC pipe

IV. Exces Excess s cable should should b be e coiled at at the base

of the tower min 152.4mm / 6” bend radius  

HUAWEI TECHNOLOGIES CO., LTD.

Page 31

 

3.4.5 Fix Excess Hybrid Trun Trunk k Cable  S   e  c  t    o r  r   _ 1 

 S   e  c  t    o r r    _ 2 

 S   e  c  t    o r  r   _  3 

Coiled Hybrid Trunk

Points:   Key Points: I.

Ex Exce cess ss cab cable le sho shoul uld d be co coil iled ed at the base of the tower min

(R)

152.4mm / 6” bend radius (R)   II. Fir First, st, H Hyb ybrid rid tr trunk unk ca cable ble shou should ld be fixed by cable tie for each sector;

Color rings for three sectors

then fix three sectors Hybrid trunk cables together; III. Take col color or rings rings on both e end nd of coiled Hybrid trunk cable, such as left chart.

Coiled Hybrid Trunk

IV. This chart chart only only descript descript that that how to coiled three Hybrid trunk cables, according to different

Color rings for three sectors

HUAWEI TECHNOLOGIES CO., LTD.

scenario follow different fixed position

Page 32

 

3.4.6 Install Hybrid Trunk Cable(Fix hybrid cable near antenna side)

Hoisting grip

Hybrid trunk cable fixed on the bracket by

Hoisting grip

hanger

Material

Qty

Hoisting grip

3pcs

Company

Remark

I. II.

Lift Lift Hybr Hybrid id tr trun unk kc cab able le Fix Hyb Hybrid rid tru trunk nk cab cable le on bracket near antenna side

Hoisting grip

While Hoisting I. Lace up grips installed every 200’ (60m) intervals on cable and attached to tower vertical cable support

Commscope

II. Hanger

3-6pcs

I.

Hybr Hybrid id ttru runk nk cab cable le fix fixed ed o on n the bracket by hanger

Ensur Ensure e the there re is a free pa path th so the the cab cable le end does not not get snagg snagged ed to obstacles

III III.. Attach Attach prot protect ective ive tube tube tto o rope rope HUAWEI TECHNOLOGIES CO., LTD.

Page 33

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Modernizat Modernization ion Refer Reference ence Design Design I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on on same same pole pole

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUA HUAWEI WEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndin ing g 6. Colo Colorr ring ing 7. Labeling 8. Ante Antenn nna a conn connec ecti tion on 9. Fi Filt lter er Inst Instal alla lati tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 34

 

4.1.1 HUAWEI Mini-shelter Installation Solution

Swap existing outdoor cabinet by HUAWEI Minishelter

HUAWEI Mini-shelter 800 mm (W) x800 mm (D) x 2030 mm (H) (including plinth)

Huawei BTS3900A H1600 x 600 x 480 mm (overall with plinth)

Before swap

Huawei Mini Shelter H1900*940*780 mm (overall with plinth)

After swap

Shelter

Installation solution Install new concrete slab, Delta outdoor cabinet install on it

HUAWEI Mini-shelter Outdoor cabinet HUAWEI TECHNOLOGIES CO., LTD.

Reuse existing bracket(Beam channel) or install rooftop  rooftop  Page 35

 

4.1.2 HUAWEI Mini-shelter introduction Fan assembly

Air conditioner Bracket for converting 21 inch wide into 19 inch wide

Temperature and humidity sensor

Space for customer  

Power subrack  

Space for battery 

Computer tray and folder  

Air filter   Battery rack  

Cable hole 

HUAWEI TECHNOLOGIES CO., LTD.

Page 36

 

4.2.1 HUAWEI Mini-shelter Installation Solution – New Concrete Slab

Key Points:

I. At gre green en fi fiel eld d sit sites es, cabinets should be installed on a concrete slab and this slab should be big enough to accommodate 2 cabinets to allow for future expansion; II. A key conside consideratio ration n in the location location of the cabinet cabinet is to install the the cabinet as clo close se as possible possible

to the vertical feeder runway on the tower so as to minimize the volt drop to the RRU’s   HUAWEI TECHNOLOGIES CO., LTD.

Page 37

 

4.2.2 HUAWEI Mini-shelter Installation Solution – On Rooftop Key Points:

I. At ro roof of to top p sit sites es, cabinets can directly install on the roof top(no need foundation or beam channel);

HUAWEI TECHNOLOGIES CO., LTD.

Page 38

 

4.2.3 HUAWEI Mini-shelter Installation Solution – On Beam channel Beam channel site

Key Points:

1. At ro roof of top top sit sites es, cabinets can install on existing beam channel: I. Directly Directly fix fix HU HUAWE AWEII Mini-she Mini-shelter lter on the the beam beam channe channel; l; II. Add new new bracket, bracket, then fix fix HUAWEI HUAWEI Mini-shel Mini-shelter ter on it

 Add a new

Base of HUAWEI MiniExisting beam shelter channel

HUAWEI TECHNOLOGIES CO., LTD.

HUAWEI Minishelter directly install on the beam channel  channel 

New bracket

Existing Beam channel

Page 39

bracket, then HUAWEI Mini-shelter install on it (No final solution)   solution)

 

4.3 HUAWEI Mini-shelter Cable Type cable –  – HUAWEI  HUAWEI CDUD To Rectifier -48V power cable No

From

To

Type

Length

Qty

Remark

1

GU BBU

DC breaker

3V3 power cable 

2.5m

1 or 2

HUAWEI supply

2

MW IDU

DC breaker

\

\

\

Reuse the existing MW power cable

3

DC Breaker

RRU

12/10/08AWG

\

\

This -48V power cable include in Hybrid trunk cable, Commscope supply

cable – HUAWEI AC power cable –  HUAWEI Mini-shelter No 1

To

From HUAWEI Mini-shelter

Type 16mm2(4 wires)

ACDB

Qty 1

Remark HUAWEI Supply

Grounding cable cable   From

To

Type

Qty

Remark

Hybrid trunk cable

Plinth Mini bus bar / Inside Mini bus bar

16mm 2

3

Commscope

No 1

2

2 3

BBU IDU

Inside Grounding points Inside Grounding points

6mm 6mm2

1 1

4

DDF

Inside Grounding points

6mm2

1

5

SLPU

Inside Grounding points

6mm2

1

6

Base grounding points

Plinth ground bar

6mm2

1

7

Indoor ground bar

Plinth ground bar

16mm 2

1

8

Plinth ground bar

Main bus bar

16mm 2

1

HUAWEI

Transmission cable No

From

To

Type

Qty

1

GU BBU

MW IDU

75 ΩE1(For  2G)

1

2

GU BBU

MW IDU

LAN(For 3G)

1

Remark HUAWEI Supply

1m fiber tail tail –  – HUAWEI  HUAWEI BBU To Patch Panel  Panel  Name

Position

Length

Mode

Connector

Qty

G900

1m

SM

LC-LC

3pcs

U900

1m

SM

LC-LC

3pcs

1m

SM

LC-LC

3pcs

1m 1m

SM \

LC-LC \

3pcs 1pcs

G1800 U2100 Wrap pipe

From HUAWEI BBU to Patch Panel

From HUAWEI BBU to Patch Panel, protect outside 1m fibre tail

HUAWEI TECHNOLOGIES CO., LTD.

Page 40

Remark I.

There There are 24pcs 24pcs fiber fiber tai taill in in Patch Panel kits, SM and LC-LC, The length is 1M;

II.

Fiber Fib er tail tail pipe wil willl be p prot rotect ected ed by Wrap

 

4.4.1 HUAWEI Mini-shelter Layout for User Equipments Equipments   1U

Spare space

2U

SLPU

3U 4U

I. Scen Scenar ario io1: 1: The he heig ight ht of

5U 6U

Key Points:

Spare space

IDU is 1U, follow left

7U 8U 9U 10U 11U 12U 13U 14U

layout;

DDF Spare space

II. Scenar Scenario2 io2:: There There are

GU BBU

15U

Patch Panel IDU

16U

Spare space

more than 1pcs IDU(1U) or the height of IDU is more than 1U in site,

17U 18U 19U

move up Patch Panel/GU

Power System

20U

BBU/DDU. Make sure

21U

that “Spare space” BAT_2

between DDF and GU BBU is 2U; IDU & Power System is 1U

BAT_1

HUAWEI TECHNOLOGIES CO., LTD.

Page 41

 

4.4.2 HUAWEI Mini-shelter Power Overview

HUAWEI Mini-shelter power switch LLVD BLVD Sector1

Sector2

Sector3

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

25A

25A

40A

40A

16A

16A

16A

25A

25A

25A

16A

16A

16A

16A

16A

16A

16A

16A

16 A

16A

16A

16A

Exp

Exp

Exp

Exp

GU BBU_1

GU BBU_2

Exp

MW IDU_1

MW IDU_2

Exp

2G_900 RRU

2G_1800 RRU

3G_2100 RRU

Exp

2G_900 RRU

2G_1800 RRU

3G_2100 RRU

Exp

2G_900 RRU

2G_1800 RRU

3G_2100 RRU

Exp

I.

As shown th the e picture picture,, all of power cables cables wher where e include in Hy Hybrid brid trunk ca cable ble of 3-sectors 3-sectors should should be connect connect to LLVD b breaker reaker;;

II.

All of cable cables s where con connect nect to the bre breaker aker should should be remain remain proper llength, ength, so as to take ou outt the power system system in future future..

III.

If this is 3G site, 2pcs 2pcs UPEU boards installed in GU BBU, so breaker 8 and 9 are for GU BBU. If this is 2G site, only breaker 8 is for GU BBU.

HUAWEI TECHNOLOGIES CO., LTD.

Page 42

 

4.4.3.1 BBU connection – Board card and SFP in only 2G Site Connection for G900

Configuration

GTMU/PCS

UMPT/PCS

WBBP/PCS

WBBP/PCS

(For G900/1800)

(For W2100)

(For W2100)

(For U900)

Connection for G1800

WBBP/PCS ( Expansion) Expansion)

Remark I. II. II.

900/1800

1

X

X

X

X

Sho houl uld db be ea acc ccor ord din ing g to to configuration to insert board card; If so some me c car ards ds ins inser erte ted d in in BB BBU, U, SFP module should be install and fiber cables also connect from BBU to Patch Panel (Please 4.4.4 &  & 4.4.5 4.4.5,, according to Chart 4.4.4 checking connection)

HUAWEI TECHNOLOGIES CO., LTD.

Page 43

 

4.4.3.2 BBU connection – Board card and SFP in 3G Site Connection for U900

Connection for G900

Connection for G1800

Connection for W2100

Configuration

GTMU/PCS

UMPT/PCS

WBBP/PCS

WBBP/PCS

WBBP/PCS

(For G900/1800)

(For W2100)

(For W2100)

(For U900)

(Expansion)

900/1800/2100

1

1

1

1

1

1800/2100

1

1

1

1

1

900/2100

1

1

1

1

1

HUAWEI TECHNOLOGIES CO., LTD.

Remark I. II. II.

Sho houl uld db be ea acc ccor ord din ing g to to configuration to insert board card; If s som ome e ca card rds s in inse sert rted ed iin n BBU, BBU, SFP module should be install and fiber cables also connect from BBU to Patch Panel (Please 4.4.4 .4 &  & 4.4.5 4.4.5,, according to Chart 4.4 checking connection)  connection) 

Page 44

 

4.4.4 HUAWEI HUAWEI Mini-shelter Fiber Connection (BBU to RRU) Example: (config C) G900/G1800/U900/U2100 G900/G1800/U900/U2100 - 333/666/111/222 333/666/111/222 Sector_1 RRU

Sector_1 RRU

Sector_1 RRU

Sector_2 RRU

Sector_2 RRU

Sector_2 RRU

Sector_3 RRU

Sector_3 RRU

Sector_3 RRU

900MHz

1800MHz

2100MHz

900MHz

1800MHz

2100MHz

900MHz

1800MHz

2100MHz

CPRI0 G900M

1

CPRI0 G900M

CPRI1 U900M

7

4

2

10

CPRI1 U900M

8

CPRI0 G900M

5

1 7

8

3

11

2

3

4

5

6

9

10 11 12 I.

All o off fib fiber er po ports rts tthat hat on BBU a and nd RR RRU U side shoul should d be insert SFP m module; odule;

II.

All o off RRU`s RRU`s CPPI CPPI po ports rts should should be co connecte nnected d fi fiber ber ttail. ail.

HUAWEI TECHNOLOGIES CO., LTD.

Page 45

CPRI1 U900M

9

6

12

 

4.4.5 HUAWEI Mini-shelter Patch Panel #1

CPRI 0

Hybrid Tail RRU #1

Top Junction Box

Huawei 3929 RRU #2

900 MHz

CPRI 1

Duplex LC Patch Array Top

#1

1

#2

2

1

#1

1 2

#2

#1

Huawei 3929 RRU

Top

#3

3

#4

4

#5

5

#6

6

2

CPRI 0

Hybrid Tail RRU #2

Bottom

3 4

1800 MHz

#1 #2

#2

CPRI 1

#1

CPRI 0

Bottom Top

3

5

#1

6

#2

7

#1

Hybrid Tail RRU #3

Bottom

Huawei 3829 RRU

Top

7

#7 #8

4

8

8

#2

#2

CPRI 1

#1

CPRI 0

2100 MHz

Bottom

Hybrid Tail RRU #4

#2

Hybrid Cable Sector 1

Hy yb b rrii d C a ab b le le S ec ec tto or 2

Huawei RRU (Future)

Future

CPRI 1

Hy yb b rrii d C ab ab le le S e ec c to to r 3

Patch Panel(24 fiber ports) Sector1

1

2

3

4

5

6

7

8

9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Repeat for Sector 2

Fibre Patch Panel

Repeat for Sector 3

Sector2

Sector3

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

G 9 0 0

U 9 0 0

G 1 8 0 0

E x p

U 2 1 0 0

E x p

E x p

E x p

G 9 0 0

U 9 0 0

G 1 8 0 0

E x p

U 2 1 0 0

E x p

E x p

E x p

G 9 0 0

U 9 0 0

G 1 8 0 0

E x p

U 2 1 0 0

E x p

E x p

E x p

1 7 4

 \

10

\

\

\

2 8 5

\

11

\

\

\

3 9

6

\

12

\

\

\

Future use RRU#4/spare (S1) Future use RRU#4/spare (S1) Future 2100 MHz use/spare (S1) 2100 MHz UMTS (S1) 1800 MHz LTE (S1)

I.

As shown shown the picture, picture, 24-por 24-ports ts of Pat Patch ch Pane Panell div divide ide 3 par parts ts for 3 s sectors ectors(face (face to Patc Patch h Panel, from left to right);

II. III.

All of fiber tails which inclu include de in Hybri Hybrid d trunk cable must b be e conne connected; cted; Unused Unused fibe fiberr connector connector ``s s protec protector tor sho should uld be reserv reserved ed

1800 MHz GSM (S1) 900 MHz UMTS (S1) 900 MHz GSM (S1)

HUAWEI TECHNOLOGIES CO., LTD.

Page 46

 

4.4.6.1 HUAWEI Mini-shelter Transmission Cable Connection - 2G FE port For 2G IP transmission (in future)

E1 port For 2G E1 transmission

2G(/9001800) E1 Transmission

3G(2100) IP Transmission BBU

IDU LAN cable

BBU

SLPU E1 cable

DDF E1 cable

IDU E1 cable

Key Points: I.

E1 ttra rans nsmi miss ssio ion n fo forr 2G 2G;;

II. E1 transmission, e existing xisting DDF and E1 cable wher where e is near IDU side will be reused, reused, and BBU side reuse or new connect; connect; III. Conne Connect ct E1 cable on DDF DDF,, follow existing existing conne connection ction;; IV. About the FE ca cable, ble, all of sites should be connect for in future IP transmission HUAWEI TECHNOLOGIES CO., LTD.

Page 47

 

4.4.6.2 HUAWEI Mini-shelter Transmission Cable Connection - 3G FE port For 3G IP transmission

3G(2100) IP Transmission BBU

IDU LAN cable

Key Points: I.

IP ttran ransmi smissi ssion on fo forr 3G, F FE E cab cable le will will be be use used; d;

II. If this sit site e is 3G site, FE cable cable sho should uld be connecte connected d from BBU FE po port rt to IDU, sho show w as upper fi figure gurer; r; III. Please confirm confirm by transmission d department epartment which port will be used in IDU side. HUAWEI TECHNOLOGIES CO., LTD.

Page 48

 

4.4.7 HUAWEI Mini-shelter External Alarm Cable Connection Alarm DDF_1

EXT-ALM1

EXT-ALM0

Key Points: I.

Connec Connectt alarm alarm cable from BBU BBU UPEU ports(EXT ports(EXT_ALM0 _ALM0/EXT_A /EXT_ALM1) LM1) to Alar Alarm m modul module e in De Delta lta by

Alarm DDF_2

2pcs LAN cables; Signal resource

POWER

Alarm name

HUAWEI Minishelter port

Cable color DDF side

 AC power failure alarm

1

White/Orange+, Orange-

LLVD1 disconnection alarm

2

White/Green+, Green, 

BBU port

Cable color BBU side White/Orange+, OrangeWhite/Green+, Blue-

Single module or multiple modules faults alarms

3

White/Blue+, Blue-

SPD failure alarm

4

White/Brown , Brown-

White/Brown , Brown-

Load or battery fuse burn-out alarm

5

White/Orange+, Orange-

White/Orange+, Orange-

Battery temperature alarms or environment temperature alarms

6

White/Green+, Green, 

Door alarms

7

White/Blue+, Blue-

 Aviation light failure /Air conditioner fault or fan fault alarms

8

White/Brown , Brown-

HUAWEI TECHNOLOGIES CO., LTD.

Remark

UPEU EXT-ALM0

UPEU EXT-ALM1

White/Blue+, Green, 

White/Green+, BlueWhite/Blue+, Green,  White/Brown , Brown-

Page 49

BBU and Alarm module side, the LAN cable sequence are same

BBU and Alarm module si side de the LAN cable sequence are same

 

4.5.1 Routing Hybrid Trunk Cable in HUAWEI Mini-shelter

MBHS78-1-F MBHS78-1-F

MBHS78-3-F

HUAWEI TECHNOLOGIES CO., LTD.

Page 50

 

4.5.2 Routing Hybrid Trunk Cable in HUAWEI Mini-shelter

Wrong example

Right example

Key Points: 1. There is no need to apply silicone sea sealant lant at this point. The supplied gland entries entries are sufficient for sealing.

HUAWEI TECHNOLOGIES CO., LTD.

Page 51

 

4.5.3 HUAWEI Mini-shelter Glanding Arrangement

Sector_3

Sector_2

Sector_1

HUAWEI TECHNOLOGIES CO., LTD.

Page 52

 

4.5.4 Seal inside cable hole  hole  Before   Before

After   Rubber circle

2

1

Cable size is less than cable

Use rubber circle/black tape/waterproof

Ensure that cable hole

hole in HUAWEI Mini-shelter

tape to wrap cable

sealed off completely

HUAWEI TECHNOLOGIES CO., LTD.

Page 53

 

4.6 Battery Sensor  

Battery Sensor

New Version HUAWEI Mini-shelter: 1. Insert the the Battery sensor( sensor(Left Left picture) picture) into the foam foam block by pushing pushing it to the hole in the middle; middle; 2. Sensor Sensor must must be be fully fully c covere overed d in foam; 3. Place/squeeze the Temperature sensor b between etween the middle batteries in the highest row of battery shelves. HUAWEI TECHNOLOGIES CO., LTD.

Page 54

 

4.7 Key Points for HUAWEI Mini-shelter

Key Points: I. If MW MW IDU IDU inst instal alll in HUA HUAWE WEII Mini Mini-shelter,, cut E1 cable total shelter t otal length remains 2m; If MW IDU NOT install in HUAWEI Mini-shelter, Mini-shelter, keep all the E1 cable

E1 cable and coil on right side II. Excess Excess LAN cable( cable(3G 3G transmis transmissio sion) n) need to cut it and remain enough is

LAN cable 

HUAWEI TECHNOLOGIES CO., LTD.

ok.

Page 55

 

4.8 Commissioning  Commissioning  Setting the Date and Time Main Menu

Setting Wizard

Second-Level Menu

Date and Time

Third-Level Menu

Default Value

Setting Value

Data and time

-

Set to the local date and time.

Time zone

UTC +08:00 Beijing

Set to the local time zone.

NTP Enable

No

No/Yes

Setting Battery Parameters Main Menu

Second-Level Menu

Third-Level Menu

FourthLevel Menu

Default Value

Setting Value Set to actual condition.

Basic Parameters

Battery1-2 Connected

Yes

Rated Capacity

170 Ah

NOTE If only one battery string is connected, set Battery 2 Connected  Connected  to No. No.

Parameters Settings Battery Parameters

Other Parameters HUAWEI TECHNOLOGIES CO., LTD.

Installation time 2010 –01 –01 Page 56

Capacity of one battery string Set to the current date

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Modernizat Modernization ion Refer Reference ence Design Design I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on on same same pole pole

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on rou und ndin ing g 5. Gro 6. Colo Colorr ring ing 7. Labeling 8. Ante Antenn nna a Conn Connec ecti tion on 9. Fi Filt lter er Inst Instal alla lati tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 57

 

5.1.1 Power/Grounding Cable Connection Solution Cable Type

Cable Demission

Position

PGND (From RRU and Junction Box to Mini bus bar)

16mm2

Mini bus bar (In warehouse operation)

PGND (From HUAWEI Mini-shelter AC power system to bus bar)

16mm2

HUAWEI Mini-shelter power system (On site operation)

 AC Power cable (From HUAWEI HUAWEI Mini-shelter power system to ACDB)

16mm2 

HUAWEI Mini-shelter and ACDB(On Site Operation)

DC Power (Hybrid trunk cable, from Junction Box to HUAWEI Mini-shelter)

3.5mm2 

HUAWEI Mini-shelter (On Site Operation)

DC Power (BBU DC Power cable, f rom BBU to HUAWEI Mini-shelter power system)

3.5mm2 

HUAWEI Mini-shelter (On Site Operation)

DC Power (IDU DC Power cable, f rom BBU to HUAWEI Mini-shelter power system)

3.5mm2 

HUAWEI Mini-shelter (On Site Operation)

DC Box)Power (Hybrid tail, from RRU to Junction

3.5mm2 

Junction Box (In warehouse operation)

DC Power (Hybrid Trunk cable, from Junction Box to HUAWEI Mini-shelter)

3.5mm2 

HUAWEI Mini-shelter (On Site Operation)

Terminal Size

16mm2

4mm2

Key Points: 1. All of cables cables connector connector should should be use use bootless bootless before before connection connection HUAWEI TECHNOLOGIES CO., LTD.

Page 58

Picture

 

5.1.2 Power/Grounding Cable Connection Solution _ Example Mini bus bar on the

ACDB Side

Junction Box

bracket of 3m Pole

Key Points: 1. All of cables cables connecto connectorr should be be use bootless bootless before before connectio connection n

HUAWEI TECHNOLOGIES CO., LTD.

Page 59

 

5.2.1 Grounding – RRU Power Cable

√  Ensure that the exposed shield layer of the power cable is properly tightened using the clip. HUAWEI TECHNOLOGIES CO., LTD.

Page 60

 

5.2.2 Grounding – Mini Bus Bar Near Antenna

Points:   Key Points: I. Each Each RRU RRU & Jun Juncti ction on Box Box con conne nect ct one one PGND  PGND cable to Mini Bus Bar; II. Mini Mini Bus Bus Bar Bar con conne nect ct one one PGND  PGND cable to the main Bus Bar  on Tower or Rooftop III. All of grounding grounding cable cable should be use use terminal terminal HUAWEI TECHNOLOGIES CO., LTD.

Page 61

 

5.2.3 Grounding – In Junction Box for Hybrid Trunk Cable Key Points: Points:   I. Ensu Ensure re th that at th the e exp expos osed ed shield layer of the hybrid cable is properly tightened using the clamp; Outside PGND Port

II. Connec Connectt to Mini Mini bus bus bar

Junction BOX PGDN Kits

from outside PGDN port on Junction BOX

Inside HUAWEI TECHNOLOGIES CO., LTD.

Outside Page 62

 

5.2.4 Grounding - HUAWEI Mini-shelter Installing the main ground cable

Connecting the base ground cable

Indoor ground bar

Plinth ground bar

Key Points:

1. Mai Main n grou groundi nding ng cab cable le is is 1 16mm 6mm2, from plinth ground bar to outdoor ground bar (grounding cable is in accessory box); 2. Bas Base eg grou roundi nding ng cab cable le is is 6 6mm mm2, from base of cabinet to plinth ground bar

Outdoor ground bar

3. Ind Indoor oor gro ground unding ing cable cable iis s 16mm 16mm2, from indoor ground bar to plinth ground bar (only connect to plinth ground bar side, other side already connected) HUAWEI TECHNOLOGIES CO., LTD.

Page 63

 

5.2.5 Grounding – Equipments in HUAWEI Mini-shelter   Plinth ground bar Grounding points for Inside user equipments

 S  S  S  n I   B M  e  e  e  d  a  a  c  c  c  o  s i    t   o  e n  t   o  t   o  o r  r   g  g r  r   _  _  _  g r  r   o 1  2  3  r   o H H H  o  u  u n n  y  y  y  u  d   d   b  b  b  n i   r  r  r   d  i   n n i   i   i   d   d  i   d  n  g  g  g  c  c  c  a  a  a  b  b  l   l   e  b  e l    e

Key Points: 1. Insid Inside e user equipm equipments ents connect connect tto o inside groun grounding ding points; points; 2. Hybr Hybrid id grounding grounding an and d other others s cables co connect nnect to pl plinth inth groundi grounding ng bar; HUAWEI TECHNOLOGIES CO., LTD.

Page 64

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Modernizat Modernization ion Refer Reference ence Design Design I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on on same same pole pole

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndin ing g 6. Co Colo lorr rin ing g 7. Labeling 8. Ante Antenn nna a Conn Connec ecti tion on 9. Fi Filt lter er Inst Instal alla lati tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 65

 

6.1 Color ring – Hybrid Trunk Cable cable(Junction (Junction BOX to Patch Panel)  Panel)   Color ring for Hybrid trunk cable Sector  

Position   Position

Color ring  ring 

1 Near Junction BOX

1Yellow

3 2

Color ring for Hybrid trunk cable

1Blue Both end of coiled Hybrid trunk

1Red 1Yellow

cable

3 1

Near HUAWEI Minishelter(outside)

2 3

1Blue 1Red

Each of color ring keep 10mm distance

1Yellow 1Blue

1 2

Remark

1Red

2 1

Sector_1

1Red Inside HUAWEI Mini-shelter

1Yellow

3

1Blue

Points:   Key Points: I.

Different Different co color lor ring descri descript pt diff different erent se sector; ctor; Red/Y Red/Yellow/ ellow/Blue Blue c color olor ring ring descript Sector1/2/3  Sector1/2/3 

HUAWEI TECHNOLOGIES CO., LTD.

Page 66

Sector_2

Sector_3

 

6.2 Color ring – RF Jumper Cable and Hybrid Tail ring –  – Hybrid  Hybrid tail/RF jumper cable(Both ends of cable) Color ring Sector  

1

2

3

Band   Band

ANT-TX/RXA +45 (Main)   (Main)

 

ANT-TX/RXA -45 (Diversity)

GU900 MHz(2G)

1White

1Red

1Red

G1800 MHz(2G)

1White

2Red

2Red

U2100 MHz(3G)

1White

3Red

3Red

GU900 MHz(2G)

1White

1Yellow

1Yellow

G1800 MHz(2G)

1White

2Yellow

2Yellow

U2100 MHz(3G)

1White

3Yellow

3Yellow

GU900 MHz(2G)

1White

1Blue

1Blue

G1800 MHz(2G)

1White

2Blue

2Blue

U2100 MHz(3G)

1White

3Blue

3Blue

GU900

G1800

U2100

GU900

G1800

U2100

Sector_2

Differe Different nt c color olor rin ring g descript descript di different fferent secto sector; r; Red/Ye Red/Yellow/Blue llow/Blue color rring ing descript descript

The cou count nt of color color ring descript different different fre frequency quency band, ffor or examp example: le: on one e color

Sector_3

ring is GU900;two color ring is G1800; three color ring is U2100; III. 1 White coloring tag to Main RF jumper jumper cabl cable e and Hybrid Hybrid ta tail il HUAWEI TECHNOLOGIES CO., LTD.

U2100

Sector_1

Sector1/Sector2/Sector3; II.

G1800

 

Key Points:  Points:  I.

GU900

Page 67

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Modernizat Modernization ion Refer Reference ence Design Design I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on on same same pole pole

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndin ing g 6. Colo Colorr ring ing 7. Labeling 8. Ante Antenn nna a Conn Connec ecti tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 68

 

7.1 Labeling Information in HUAWEI Mini-shelter Power label Delta DC Switch

Fiber label ACDB

Patch Panel

BBU

Alarm label

Grounding label Inside mini bus bar

Alarm moudule

Transmission label

BBU UPEU

B B U GT M U

SLPU

DDF

M W IDU

GU900_Sector1

DBS3900 RECT 220Vac L1

G900_Sector1

G900_Sector1

Sector1 PGND

TO UPEU EXP _ALM0

TO Alarm module No.1-4

TO SLPU E1_2G

TO DBS 3900 E1_2G

TO SLPU E1_2G

TO DDF E1_2G

G1800_Sector1

DBS3900 RECT 220Vac L2

U900_Sector1

U900_Sector1

Sector2 PGND

TO UPEU EXP _ALM1

TO Alarm module No.5-8

\

TO DDF E1_2G

TO MW IDU E 1_2G

\

U2100_Sector1

DBS3900 RECT 220Vac L3

G1800_Sector1

G1800_Sector1

Sector3 PGND

GU900_Sector2

DBS3900 RECT Neutral

U2100_Sector1

U2100_Sector1

MW IDU PGND

G1800_Sector2

OR:

G900_Sector2

G900_Sector2

DDF PG PGND

U2100_Sector2

HUAWEI DBS3900

U900_Sector2

U900_Sector2

GU BBU PGND

GU900_Sector3

G1800_Sector2

G1800_Sector2

SLPU PGND

G1800_Sector3

U2100_Sector2

U2100_Sector2

U2100_Sector3

G900_Sector3

G900_Sector3

MW IDU_1

U900_Sector3

U900_Sector3

MW IDU_2

G1800_Sector3

G1800_Sector3

GU BBU

U2100_Sector3

U2100_Sector3

DB S3900 Si ngleRAN_3G

Key Points:  Points:  I.

Upper Upper are all o off labe labels ls fo forr cabl cables es in HUAWEI HUAWEI Mini-s Mini-shelte helter; r;

II. Each both end o off cabl cable e sh should ould be sli slicked cked label III. Each subcon subcon makes s sure ure that all of operation sites select the same labels HUAWEI TECHNOLOGIES CO., LTD.

Page 69

DBS3900 SingleRAN_3G

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Modernizat Modernization ion Refer Reference ence Design Design I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on on same same pole pole

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndin ing g 6. Colo Colorr ring ing 7. Labeling Ante tenn nna a Conn Connec ecti tion on 8. An 9. Filt Filter er Inst Instal alla lati tion on

HUAWEI TECHNOLOGIES CO., LTD.

Page 70

 

8.1.1 Triple-band Antenna Connection Key Points: I. AISG AISG cabl cable e does does not not use use whe when n this site 900MHz low frequency ports will be utilized; otherwise need to connect AISG cable

2G_1800MHz

3G_2100MHz

from Antenna to RRU; II. Go throug through h 900M 900MHz Hz low frequency ports transfer AISG 2G_900MHz

information, so as to adjust different frequency electronic tilt;

Relation of ports between betw een RRU and Antenna Band   Band

ANT-TX/RXA +45 (Main)   (Main)

 

ANT-TX/RXA -45 (Diversity)

GU900 MHz(2G)

TX/RX A

TX/RX B

G1800 MHz(2G)

TX/RX A

TX/RX B

U2100 MHz(3G)

TX/RX A

TX/RX B

HUAWEI TECHNOLOGIES CO., LTD.

III. If some some ports ports do not use, use,  

reserve it and tighten protector what attach the ports

Page 71

 

8.1.2 Penta-band Antenna Connection 2G_900MHz

Key Points: I. AISG AISG cabl cable e does does not not use use whe when n this site 900MHz low frequency ports will be utilized; otherwise

2G_1800MHz

3G_2100MHz

need to connect AISG cable from Antenna to RRU; II. Go thr throu ough gh 900 900MH MHz z low frequency ports transfer AISG information, so as to adjust different frequency electronic Relation of ports betw between een RRU and Antenna No.

Band  Band 

1-2 3-4 5-6

GU900 MHz(2G) G1800 MHz(2G) U2100 MHz(3G)

ANT-TX/RXA +45 (Main)   (Main) TX/RX A TX/RX A TX/RX A

7-8 9-10

 

ANT-TX/RXA -45 (Diversity) TX/RX B TX/RX B TX/RX B

tilt;  

III. If some some ports ports do not use, use, reserve it and tighten protector what attach the ports

EXP EXP HUAWEI TECHNOLOGIES CO., LTD.

Page 72

 

8.2 E-Tilt(AISG) AISG Cable

T  r  i    p l l       e  b   a n  d  A n  t    e n n  a

1800MHz RRU

AISG Port

RET Port

Key Points: I. Connect Connect AISG cable cable from 1800MHz 1800MHz RRU to TripleTriple-band band Antenna Antenna by by AISG cable, cable, We can use use E_Tilt.

HUAWEI TECHNOLOGIES CO., LTD.

Page 73

 

8.3 Multi-band Antenna Bracket U-Bolt for Antenna

Key Points: 1. If mechanical tilt is “0”, the “Tilt arm” of upper  mounting bracket no need installation; Tilt arm

2. If mechanical tilt is more than “0”, it should be according to RF team feedback, installing it to change the mechanical tilt;  tilt;  P   o l    e

3. Mechan Mechanica icall ti tilt lt angl angles es of of 0°through to 8°in 1°increments can be obtained with the correct c orrect adjustment of the tilt arm bracket, as below figure

HUAWEI TECHNOLOGIES CO., LTD.

Page 74

 

8.4 Waterproof for RF Jumper Cable Key Points: 3

1. First First,, wrap wa waterpr terproof oof tape tape 1 llayer ayer;; then warp warp PVC tape

1

3 layers; last, take a black cable tie near connector side; 2. Befor Before e wrapping wrapping waterproof waterproof tape, tape, str stretch etch th the e tape evenly evenly

m 1

until the length of the tape becomes twice its original length. 3. Do no nott stretch stretch the P PVC VC insulat insulation ion tape tape wh when en wrappin wrapping g the PVC insulation tape. 1

1. W Wa aterproof Tape

4. Wrap each llayer ayer of of tape a around round the connect connector or tig tightly htly a and nd 2. P PV VC Tape

3. Ca C able Tie

neatly,, and ensure that each layer of tape overlaps. neatly 5. More tthan han 50 50% % of the the prec preceding eding layer. layer. Ensure Ensure that neighboring layers are stuck to each other. 6. Ensur Ensure e tha thatt the adhesive adhesive surface surface of the the tap tape e overlaps overlaps tthe he

Example Figure

lower layer. 7. The wa waterpr terproof oof tape llength ength is around around 110~12 110~120mm 0mm as shown shown

110-120mm

left figure; 8. Cable Cables s shall shall go straight straight to tthe he antenna antenna without without any any bending bending on antenna and RRU site.

HUAWEI TECHNOLOGIES CO., LTD.

Page 75

 

Content 1. Site Site Moder Moderniz nizati ation on Sc Scena enario rio 2. Third vendor vendor material material list list for 1 standard standard sector  sector  3. Site Modernizat Modernization ion Refer Reference ence Design Design I.

Scenar Scenario1 io1:: RRU and Antenn Antenna a insta installll on on same same pole pole

II. Scenario2: Scenario2: RRU and and Antenna Antenna install install on differe different nt pole pole 4. HUAWEI HUAWEI Mini-s Mini-shel helter ter Install Installati ation on 5. Gro rou und ndin ing g 6. Colo Colorr ring ing 7. Labeling 8. Ante Antenn nna a Conn Connec ecti tion on Filt lter er Inst Instal alla lati tion on 9. Fi

HUAWEI TECHNOLOGIES CO., LTD.

Page 76

 

9.1.1 900MHz&2100MHz Filter installation – Scenario 1 Scenario 1

CME standard Old standard (900M RRU install in the first level, 1800M install in the second level, and 2100M install in the bottom level)

3G site, only install New Standard (900M and 2100M 900/2100M RRU install in second filters on level and 1800M RRU site

From

To

Jumper cable Length

RRU

Filter

2.0m

 All the existing 3M jumpers replaced by 2M

Filter

Antenna

1.5m

New one

2100MHz

RRU

Filter

1.5m

New one

2100MHz

Filter

Antenna

1.5m

Reuse

900MHz

RRU

Filter

1.0m

New one

900MHz

Filter

Antenna

2.0m

if existing jumpers are 2M, we can keep it. if it is 3M jumper, need to change to 1.5M jumper

RRU

Filter

1.0m

New one

Filter

Antenna

2.0m

if existing jumpers are 2M, we can keep it. if it is 3M jumper, need to change to 1.5M jumper



Reuse existing jumper for RRU and filter connection, According actually status to select length of jumper cable for filter and antenna connection  connection 

Band

Filter installation position

900MHz 900MHz

2100MHz

Third Level

Third Level

install in bottom level) 2100MHz

Can not follow CME site

900/2100M Hz

HUAWEI TECHNOLOGIES CO., LTD.

On the Pole

\

\

Page 77

Remark

 

9.1.2 900MHz&2100MHz Filter installation – Scenario 2 Scenario 2

CME standard Old standard (900M RRU install in the first level, 1800M install in the second level, and 2100M install in the bottom level)

3G expansion site in phase2, install 2100M RRU and 900/2100M filters on site

New Standard (900M and 2100M RRU install in second level and 1800M RRU install in bottom level)

Can not follow CME site

From

To

Jumper cable Length

RRU

Filter

2.0m

 All the existing 3M jumpers replaced by 2M

Filter

Antenna

1.5m

New one

RRU

Filter

1.5m

New one

2100MHz

Filter

Antenna

1.5m

New one

900MHz

RRU

Filter

1.0m

New one

Band

Filter installation position

900MHz 900MHz 2100MHz

900MHz

Third Level

Third Level

2100MHz 2100MHz

900/2100 MHz

HUAWEI TECHNOLOGIES CO., LTD.

On the Pole

Remark

Filter

Antenna

2.0m

if existing jumpers are 2M, we can keep it. if it is 3M jumper, need to change to 1.5M  jumper

RRU Filter

Filter Antenna

1.0m 1.5m

New one New one

\

\



Page 78

Reuse existing jumper for RRU and filter connection,  According actually status to select length of jumper cable for filter and antenna connection   connection

 

9.1.3 900MHz&2100MHz Filter installation – Scenario 3 Scenario 3

CME standard

Filter installati

From

To

Jumper cable Length

900MHz

RRU

Filter

1.0m

New one

900MHz

Filter

Antenna

1.5m

New one

RRU

Filter

1.0m

New one

Filter

Antenna

1.5m

New one

Band

on position

Follow CME site in phase2, assembly in WH

New Standard (900M and 2100M RRU install in second level and 1800M RRU

2100MHz

install in bottom level)

2100MHz

Can not follow CME site

900/2100MH z

HUAWEI TECHNOLOGIES CO., LTD.

Third Level

On the Pole

\



\

Page 79

Remark

 According actually status to select length of jumper cable   cable

 

9.2 900MHz&2100MHz Filter installation method New Standard

Old Standard I.

900M 900M RR RRU U ins insta tall ll in the the first level, 1800M install in the second level, and

3M Pole

900MHz RRU

Triple-band ANT

I.

bottom level; 900M 900MHz Hz&2 &210 100M 0MHz Hz

3M Pole

install in second level

Expansion RRU

and 1800M RRU install

2100M install in the

II II..

900M an and 21 2100M RR RRU

Expansion RRU

Triple-band ANT Expansion RRU

in bottom level;

1800MHz RRU

Expansion RRU

Filter install in the

II II..

90 900 0MHz& MHz&21 210 00MH 0MHz Filter install in bottom

2100MHz RRU

900MHz RRU

1800MHz RRU

900MHz&2

level.

bottom level 2100MHz RRU

900MHz&2

100MHz Filter

100MHz Filter

JUNCTION BOX

JUNCTION BOX

HUAWEI TECHNOLOGIES CO., LTD.

Page 80

 

9.3 900MHz&2100MHz Filter installation method Can not follow CME

900M filter

New 2100M filter (only for Eirbe), other province use old 2100M filter, installation same as 900M filter

900/2100MHz filter directly install on the pole. According actually status to select length of  jumper cable  cable  HUAWEI TECHNOLOGIES CO., LTD.

Page 81

 

9.4 New 2100MHz Filter installation method Key Points: 1. New 2100M 2100M filte filterr on only ly inst install all in

900M filter 900M filter

Eirbe; 2. Dis Disman mantle tle brac bracket ket of 9 900M 00M ffilt ilter er,, then install 900M filter on new 2100M filter by bracket belong with 2100M filter; 3. Con Connec nectt only only 1pc 1pcs s groun groundin ding g cable on 900M grounding point to grounding bar

Grounding point

900M filter

900M filter Bracket

New 2100M filter New 2100M filter

HUAWEI TECHNOLOGIES CO., LTD.

Page 82

 

Than Thank k You www.huawei.com

 

 Appendix 1: Cable Routing for RF Cable ((In In W Warehouse) arehouse)

RF jumper cable

Antenna

Top

Reserved Reserved

900M RRU 2100M RRU

900M&2100M 1m RF jumper cables

HUAWEI TECHNOLOGIES CO., LTD.

900M&2100M Filter 1800M RRU

900/2100M Filters and 1800M RRU 1.5m RF jumper cables

Page 84

Junction Box

 

 Appendix 2: Cable Routing for Hybrid Tail (In Warehouse) Warehouse)

Hybrid Tail

Antenna

Top Junction Box

1800M RRU 900M&2100M Filter

1800M 1.5m Hybrid Tail

HUAWEI TECHNOLOGIES CO., LTD.

2100M RRU 900M RRU

Reserved

Reserved

900M&2100M 2.0m Hybrid Tail

Page 85

 

 Appendix 3: Cable Routing for Grounding Cable (In W Warehouse) arehouse)

Junction BOX PGDN cable

Antenna

Top Junction Box

1800M RRU 900M&2100M Filter

1800M PGND cable

HUAWEI TECHNOLOGIES CO., LTD.

2100M RRU 900M RRU

Reserved

Reserved

900M&2100M PGDN cable

Page 86

 

 Appendix 4: Fixing Bracket Layout (In W Warehouse) arehouse) Unit: mm 2620 1825 120

Top

Fixing Bracket Upper Bracket

HUAWEI TECHNOLOGIES CO., LTD.

Lower Bracket

Page 87

 

 Appendix 5: Cable Clamp La Layout yout (In W Warehouse) arehouse)

Unit: mm 3000 2800 2560 1840 1060

Top

Clamp

HUAWEI TECHNOLOGIES CO., LTD.

Page 88

View more...