PARADEEP REFINERY PROJECT A Sunrise Project for a Sunshine Future
CONTENTS •
Introduction
•
Compressor Compres sor Takeover Takeover From Maintenance Maintena nce
•
Start!p
•
Normal Runnin" And Monitorin"
•
Trip#Emer"ency S$utdo%n
•
&ot#Cold Start !p
•
S$utdo%n And &andover To Maintenance
CONTENTS •
Introduction
•
Compressor Compres sor Takeover Takeover From Maintenance Maintena nce
•
Start!p
•
Normal Runnin" And Monitorin"
•
Trip#Emer"ency S$utdo%n
•
&ot#Cold Start !p
•
S$utdo%n And &andover To Maintenance
INTRO'!CTION •
•
•
•
•
Compressors are comple( mac$ines) Comple(ity lies in t$e *orces+t$ermal, mec$anical mec$anical stresses etc- t$at are actin" on t$e mac$ine components) Operatin" personnel s$ould understand t$e systems and procedures t$orou"$ly) SOPs on various operational procedures s$ould be available $andy $andy)) Operatin" personnel s$ould be very attentive and *ollo% all t$e sa*ety norms %$ile in t$e vicinity or %orkin" %it$ compressor)
COMPRESSOR COMPONENTS
$ T
J $
J $
T $
COMPRESSOR COMPONENTS •
•
•
•
•
•
•
•
•
•
Compressor Turbine 'rive .overnor Antisur"e System /earin"s +Temp, 0ibration, a(ial displacement1O System +cooler, Filter, accumulators, mist eliminator/arrin" System .land System Condensate System Rundo%n Tank
COMPRESSOR 2 TA3EO0ER FROM MAINTENANCE 4) Ensure t$at all t$e 5obs are completed as per t$e 6ob list) 7) .et t$e clearance *rom maintenance departments +mec$anical # electrical # inst-) 8) Ensure t$at blindin" 9 deblindin" is done *or Normal Runnin" condition) :) P$ysically look around t$e compressor to c$eck i* t$ere are any incomplete 5obs) ;) Ensure removal o* debris, tools and tackle, sca) Ensure proper li"$tin")
COMPRESSOR START!P 'ependin" on t$e Compressor vendor and type t$ere %ill be minor variations in t$e compressor operatin" procedures) T$e procedure presented in t$e *ollo%in" slides "ives "eneral idea %$ic$ %ill be common *or all t$e centri*u"al steam driven compressors)
STEPS '!RIN. START!P 4) Preparation) 7) Establis$ coolin" %ater) 8) Establis$ separation seal bu) Start live steam pipin" %armup &P side and 1P side) ?) Steam turbine c$est valve Initial %armup) @) 1ineup t$e "land steam condenser) 4)1ineup vacuum condenser in line) 44)Preparation o* compressor) 47)Startin" steam turbine) 48)Compressor loadin" and stabiliBin")
STEPS '!RIN. START!P PREPARATION •
•
•
•
•
•
•
Ensure all t$e utilities are commissioned namely Coolin" ater, Plant air, Nitro"en, &&P#&P#MP#1P Steam .et t$e clearance *rom maintenance departments+ mec$anical#electrical #instrumentation +i* maintenance 5ob is carried out Ensure t$at blindin" 9 deblindin" is done *or Normal Runnin" condition) Take Clearance *or Steam *rom TPS) Ensure &&P steam main valves, bypass valves, control valve and trip valve are closed Ensure backpressure 1P Steam line main valves 9 bypass valves are closed) Open condensate drain valve in S&& line and dry t$e steam upto main /#0 Open condensate drain valve in S1 line and dry t$e steam upto main /#0
STEPS '!RIN. START!P ESTA/1IS& COO1IN. ATER Commission coolin" %ater in *ollo%in" systems E5ector condenser o* .land System 1O cooler) Turbine steam condenser 1O pump bearin" $ouse •
•
•
•
PrecautionsD Remove air pockets) Ensure TS0#PS0s are in line Ensure T., P. are %orkin" •
1ine up t$e Nitro"en supply Filter) Ensure 'P across lter is in normal ran"e, Service t$e lter i* P'. s$o%s $i"$) Set pressure o* separation seal buK 47; QC) Rise t$e deep casin" metal temperatures to 4; QC at +TI:87#:- at end o* lo% idle7 4; rpm)
.radually open T9T valve *ully) T$en "overnor %ill control train speed a Iittle bit above lo% Idle speed7 o* 4;) Conrm t$at "overnor is controllin" speed +once t$e speed e(ceeds re*erence speed +SI:84#8- a No% press acceleration start +&S:874-, t$e train %ill be brou"$t to $i"$ Idle speed o* 7: rpm by Auto Acceleration 1o"ic) and t$en back to re*erence speed-) T$ere is a critical speed band +4=74-, in t$is band t$e acceleration %ill be 7 rpm#sec Allo% t$e deep casin" temperatures to rise above 4; QC Increase t$e speed to minimum "overnin" speed)
C$eck t$e process readiness Put antisur"e controllers in auto) Slo%ly increase t$e load and allo% t$e antisur"e to close) Put t$e speed controller in auto cascade) $ile loadin" %atc$ *or level increase in compressor 3O's and turbine condensate %ell)
NORMA1 R!NNIN. AN' MONITORIN. •
•
'urin" normal runnin" condition t$e operatin" parameter o* bot$ process and mac$ine are to be monitored) T$e monitorin" inter*aces are 'CS panel, SRR, 1CP)
Parameters to monitor Process P#T#F Antisur"e controller deviation Compressor disc$ar"e pressure controller) Compressor 3O' levels and Auto Run o* condensate pumps) 1O system lter 'P# Temp, 1O uality level 0ibration#compressor temp# a(ial displacement readin"s) Seal system $ealt$+'P, Nitro"en pressure, seal "as leak o%)Coolin" %ater o% .land leak and .land system •
•
•
•
•
•
•
•
•
TRIP # EMER.ENCG S&!T'ON •
•
Trip is e(ecuted by ES' system %$en any o* t$e process# mac$ine parameters crosses $ealt$y values and brin" t$e mac$ine to sa*e s$utdo%n 1O TOis /EARIN.S &'R PRESS!RE TO TRIP .C 7#8.C /elo% t$e Typical o* FCCIN'MA
TRIP # EMER.ENCG S&!T'ON !sual Trip conditions Process side &i"$ 3O' level &i"$ disc$ar"e temperature Inventory valve accidental closure •
•
•
Mac$ine side &i"$ vibrations &i"$ a(ial displacement &i"$ temperature in bearin"s 1O pressure lo% 1o% control oil pressure E(cessive sur"e Seal *ailure detected by $i"$ seal "as o% Over speed trip Emer"ency stop •