226_BPP_EN_FR
Short Description
Handling Unit Management (HUM) for Production (226)...
Description
EHP3 for SAP ERP 6.0 December 2008 English
Handling Unit Management (HUM) for Production (226) Business Process Documentation
SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf Germany
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Copyright © Copyright 2008 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation. IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400, iSeries, pSeries, xSeries, zSeries, System i, System i5, System p, System p5, System x, System z, System z9, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, Informix, i5/OS, POWER, POWER5, POWER5+, OpenPower and PowerPC are trademarks or registered trademarks of IBM Corporation. Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries. Oracle is a registered trademark of Oracle Corporation. UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc. HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology. Java is a registered trademark of Sun Microsystems, Inc. JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. MaxDB is a trademark of MySQL AB, Sweden. SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAP NetWeaver, Duet, PartnerEdge, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary. These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
© SAP AG
Page 2 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Icons Icon
Meaning Caution Example Note Recommendation Syntax External Process Business Process Alternative/Decision Choice
Typographic Conventions Type Style
Description
Example text
Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options. Cross-references to other documentation.
Example text
Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT
Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example text
Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.
EXAMPLE TEXT
Keys on the keyboard, for example, function keys (such as ENTER key.
Example text
Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
© SAP AG
F2)
or the
Page 3 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Contents 1
Purpose........................................................................................................................................ 6
2
Prerequisites................................................................................................................................ 6 2.1
Master Data and Organizational Data...................................................................................6
2.2
Business Conditions.............................................................................................................. 8
2.3
Preliminary Steps.................................................................................................................. 8
2.3.1 Optional: Remove Batch Management Requirement for Finished Product.........................8 2.3.2 2.4
Assigning User Parameter “CORUPROF” to User Master Record...............................10
Roles................................................................................................................................... 10
3
Process Overview Table............................................................................................................. 12
4
Process Steps............................................................................................................................ 14 4.1
Anonymous Forecast and MRP........................................................................................... 14
4.2
Procurement of Stock Material............................................................................................15
4.3
Production Order Processing..............................................................................................17
4.3.1
Create Production Order for Handling Unit Production.................................................17
4.3.2
Release Production Order for Handling Unit................................................................18
4.3.3
Material Staging for Production Order..........................................................................19
4.3.4
Optional: Printing Shop Floor Papers (Finished Good)................................................21
4.3.5
HU-Packaging in Production Order (Finished Good)...................................................22
4.3.6
Goods Receipt for Handling Units................................................................................22
4.3.7
Monitor Handling Units.................................................................................................24
4.3.8
Confirming Production for Handling Unit production....................................................25
4.3.9
Create transfer order from stock list for putaway (option 1: Full WM)..........................26
4.3.10
Confirm stock transfer order for putaway (option 1: Full WM)......................................27
4.3.11
Check WM Stock of handling units (option 1: Full WM)................................................28
4.4
5
4.4.1
Enter Sales Order (option 1: Full WM and option 2: without WM)................................29
4.4.2
Create Outbound Delivery with Order Reference (option 1: Full WM)..........................30
4.4.3
Confirm stock transfer order for delivery picking (option 1: Full WM)...........................32
4.4.4
Change Outbound Delivery (option 1: Full WM)...........................................................33
4.4.5
Create Outbound Delivery with Order Reference (option 2: without WM)....................33
Follow-Up Processes.................................................................................................................. 36 5.1
6
Sales Order Processing...................................................................................................... 29
Period end closing............................................................................................................... 36
Appendix.................................................................................................................................... 37
© SAP AG
Page 4 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
6.1
Reversal of Process Steps.................................................................................................. 37
6.2
SAP ERP Reporting............................................................................................................ 38
© SAP AG
Page 5 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Handling Unit Management (HUM) for Production 1
Purpose
Handling units can be created at the end of production (packing of finished goods) or at a later stage after creating outbound deliveries. This depends on the packing process in your company. In this scenario, you execute packing and goods receipt posting at the end of a production order. The stock is posted directly into storage and is available for picking. Now there are two options for how to further process handling units: -
if the handling units are posted onto a storage location with Warehouse management, stock transfer orders are used for putaway and picking. Within picking, the stock transfer order allows you to specifically select the handling units to be picked from the stock overview list.
-
If the handling units are posted onto a standard inventory managed storage location without warehouse management and storage bin management, putaway does not require a stock transfer order. However, due to missing storage bin management, at picking of the handling units for the delivery the handling units have to be selected one by one, or (in practice) the number is scanned from the label.
2
Prerequisites
2.1 Master Data and Organizational Data The packing instructions with packaging material for finished goods as well as the packing instruction determination records are maintained. The production order for F226-1 has been totally confirmed (CO11N). The goods receipt for the production order is outstanding. The storage location 1090 for goods receipt is maintained in the material master (MRP 2 view) or in the production order. This master data usually consists of standardized SAP Best Practices default values and enables you to go through the process steps of this scenario. Use the following master data in the process steps described in this document:
Manufacturing Production Plant Master / Org. data
Value
Master / Org. data details
Material
F226-1
Finished Good, MTS-DI,Batch-FIFO
R124
Raw Material (ROH-PD)
V226-1
Packaging Material
V226-R
Packaging Reference Material
Plant
1000
Plant 1 - Production Plant
Storage Location
1080
Full Warehouse Management
© SAP AG
Comments
Page 6 of 39
SAP Best Practices
Master / Org. data
© SAP AG
Handling Unit Management (HUM) for Production (226): BBP
Value
Master / Org. data details
1090
Handling units w/o warehouse management
Comments
Page 7 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Bill of Material Structure This overview shows the bill of material structure and the usage of each component in case you have activated all optional enhancements. Material F226-1 R124
Level 0 1
Material type FERT RAW
Unit Characteristic of material Optional Enhancements PC PC
Finished Good for HUM Raw Material
2.2 Business Conditions The business process described in this Business Process Documentation is part of a bigger chain of integrated business processes or scenarios. As a consequence, you must have completed the following processes and fulfilled the following business conditions before you can start going through this scenario: Business condition
Scenario
To run through this scenario, some prerequisite process steps have to be done.
Prerequisite Process Steps (BB - 154)
To Execute this activity, run the Business Process Documentation for Prerequisite Process Steps (BB 154) scenario. The following steps are required:
Product Costing: Costing Run
2.3 Preliminary Steps This Business Process Documentation (BPD) contains process steps that have to be done as prerequisite before you can start to work through the standard Business Process Documentation of selected logistics scenarios.
2.3.1 Optional: Remove Batch Management Requirement for Finished Product The idea is that the process runs with batch management (default) but that batch management can be deactivated for this process.
Use Batch management requirement for the finished product is optional in this scenario. If you do not want to execute Batch management requirement for the finished product, you have to carry out the following steps.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
© SAP AG
Logistics Materials Management Material Master Material
Page 8 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Create (General) Immediately Transaction code
MM02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Engineering Specialist (SAP_BPR_ENG_SPECIALIST_EX-S)
Business role menu
Engineering Material Master Change Material
2. On the Change Material (Initial Screen), make the following entries and choose Enter: Field name
Description
Material
User action and values
Comment
F226-1
Finished Good, MTSDI,Batch-FIFO
3. On the Select View(s) Screen, select the Work scheduling and the MRP3 view and choose Enter. 4. On the Organizational Levels screen, make the following entries and choose Enter. Field name
Description
Plant
User action and values
Comment
1000
5. Select the Work scheduling – Tab page, make the following entries: Field name
Description
User action and values
Comment
(remove indicator)
remove existing value
Work scheduling – Tab page Batch management indicator
The batch management requirement cannot be removed for the following reasons:
Stocks with batches already exist at plant level
SD documents exist (orders or deliveries) that have not yet been processed or that have been processed only in part.
6. Save your entries and go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The batch management requirement is removed.
© SAP AG
Page 9 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
2.3.2 Assigning User Parameter “CORUPROF” to User Master Record Use In this step you assign a profile to your user, which defines the layout for the confirmation screen for single screen entry.
Procedure 1. Access the activity using one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Tools Administration User Maintenance Users
Transaction code
SU01
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Administrator (Professional User) SAP_BPR_CUSTOMER_IT_ADMIN-S
Business role menu
Administration User Management User Maintenance
2. On the Chang Material: initial screen, make the following entries and choose Change Button: Field name
Description
User
User action and values
Comment
Enter your SAP-User
3. On the Maintain User screen, choose the Parameters tab and make the following entries: Field name
Description
User action and values
Parameter ID
CORUPROF
Parameter Value
YBDI02
Comment
4. Save your entries and go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The confirmation profile YBDI02 is assigned to your user.
2.4 Roles Use The following roles must have been installed to test this scenario in the SAP Netweaver Business Client (NWBC). You do not need these roles if you are using the standard SAP GUI.
© SAP AG
Page 10 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Prerequisites The business roles have been assigned to the user who is testing this scenario. Business role
Technical name
Process step
Production Planner
SAP_BPR_PRODUCTIONPLA NNER_EX-S
Stock/Requirements List – Individual Display (MD04) Release Production Orders CO05N) Monitoring (CO02) Monitoring (CO11N)
Warehouse Clerk
SAP_BPR_WAREHOUSESPE CIALIST-S
Initial Stock Posting (MB1C) Display Transfer Order / Material (LT24)
Create Outbound Dlv. With Order Ref. (VL01N) Change Outbound Delivery (VL02N) Warehouse Clerk
SAP_BPR_WAREHOUSES PECIA-DIFM-K
Create Transfer Order from List (LT10) Transfer Order (LT15)
Manufacturing
SAP_BPR_SHOPFLOORS PECIALIST-S
Material Staging (MF60) Pack Material (COWBPACK)
Shop Floor Specialist
SAP_BPR_SHOPFLOORS PECIA_DIFM-K
Goods Receipt HU for Production Order (COWBHUWE) Handling Unit Monitor (HUMO)
Warehouse Monitoring
SAP_BPR_WAREHOUSES PECIALIST-K
Display Quants for Material (LS24)
Sales Administration SAP_BPR_SALESPERSON Create Sales Order (VA01) -S
Result You can now process the scenario Handling Unit Management (HUM) for Production.
© SAP AG
Page 11 of 39
SAP Best Practices
3
Handling Unit Management (HUM) for Production (226): BBP
Process Overview Table Process step
External process reference
Business condition
Business role
Trans-action code
Expected results
Creating Planned Independent Requirements
Make-to-Stock Production Discrete Industry (MTS) (145)
Planned Idependent requirements for finished product have to be created
Independent Requirements for finished product are created.
Material Requirements Planning at Plant Level
Make-to-Stock Production Discrete Industry (MTS) (145)
MRP at plant level have to be done for finished product
Independent requirements for finished product were planned.
Evaluation of the Stock/Requirement List
Make-to-Stock Production Discrete Industry (MTS) (145)
Stock requirement situation has to be analyzed
Stock/requirement s situation for the planned materials is analyzed
Procurement of Stock
Procurement of Stock Material w/o QM (130)
Materials to produce the finished good have to be procured
Sufficient stock for all raw materials in this scenario is available
Create Production Order for Handling Unit Production
Production Planner
MD04
Production order for Finished Good is created
Releasing Production Order for Handling Unit
Production Planner
CO05N
Production order has been released
Material Staging for production order
Manufacturing
MF60
Material has been staged to production storage location
Optional: Printing Shop Floor Papers (Finished Good)
Production Planner
CO02
Shop floor papers have been printed
HU-Packaging in Production Order (Finished Good)
Manufacturing
COWBPACK
Finished Good will be packed automatically on a pallet, an HUnumber is created
HU- Entering Goods Receipt for
Shop Floor Specialist
COWBHUWE
HU will be posted in storage
© SAP AG
Page 12 of 39
SAP Best Practices
Process step
Handling Unit Management (HUM) for Production (226): BBP
External process reference
Business condition
Business role
Trans-action code
Production Order (Finished Good)
Expected results location
Monitor Handling Units
Shop Floor Specialist
HUMO
HU situation is displayed
Confirming Production for Handling Unit Production
Production Planner
CO11N
Production order for Handling unit is confirmed, goods issue for component is posted.
Full Warehouse Management (WM) processing (option 1) Create Transfer order from stock list
Warhouse Clerk
LT10
Transfer order is created from transfer request
Confirm TO
Warehouse Clerk
LT24
Transfer order is confirmed, HU is stored
Check WM stock for handling units
Warehouse Monitoring
LS24
Handling units are checked for pallet storage
Create Sales Order (full WM)
Sales Administration
VA01
Sales order is created
Create outbound delivery with order reference (full WM)
Warehouse Clerk
VL01N, LT03
HU is picked from stock overview screen
Confirm stock transfer order for delivery picking (full WM)
Warehouse Clerk
LT24
Transfer order confirmed
Post goods issue for delivery (full WM)
Warehouse Clerk
VL02N
Goods issue for delivery is posted
Create Sales Order (Lean WM)
Sales Administration
VA01
Sales order is created
Create outbound delivery with order reference (Lean WM)
Warehouse Clerk
VL01N
delivery created, TR created
Lean Warehouse Management (WM) (option 2)
Billing of Sales Order
© SAP AG
Order Processing: Sales from
Sales order has to be
Finished product is billed
Page 13 of 39
SAP Best Practices
Process step
Period End Closing (only once a month)
4
Handling Unit Management (HUM) for Production (226): BBP
External process reference
Business condition
stock (109)
billed
Period end closing “general” Plant (181)
Period End Closing has to be done
Business role
Trans-action code
Expected results
Period End closing is done
Process Steps
4.1 Anonymous Forecast and MRP Use Planned independent requirements are used to perform demand management functions. A planned independent requirement contains one planned quantity and one date, or a number of planned independent requirements schedule lines, that is, one planned quantity split over time according to dates.
Instead of creating single requirement, sometimes a requirements plan that includes one or more planned independent requirements can be maintained for mass processing. In this case, the requirements are grouped and maintained under a requirement plan number.
Anonymous Forecast and MRP (145) Procedure To execute this activity, process the following steps using the master data from this document (see also table below): Steps to process from scenario Make-to-Stock Production - Discrete Industry (MTS) (145) -
Step Creating Planned Independent Requirements
-
Step Material Requirements Planning at Plant Level
-
Step Evaluation of the Stock/Requirement List
Master data
Value
Material
F226-1
Finished Good, MTS-DI,Batch-FIFO
Plant
1000
Production Plant
Version
00
© SAP AG
Other mat.
Bus. cond.
Comments
Page 14 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Master data
Value
Other mat.
Bus. cond.
Comments
Planning period
W
Amount
100
For each time interval
Material
R124
Only relevant for the evaluation step
Result The BOM explosion during the MRP run has generated dependent requirements for the demanddriven planned components. If sufficient stock is available no purchase requisitions have been generated (proceed with 4.3 from this BPD). If additionally by the MRP run purchase requisitions were created according to the requirements, proceed with step the next step4.2 in this BPD.
4.2 Procurement of Stock Material In the real business case, the raw materials are usually purchased from external vendors, which can be covered by the standard purchasing processing.
You have the option either to post initial stock directly to the storage location or reference to the sub process listed above
First check in previous step (MD04), whether purchase requisition is generated for the material. If not, then there is sufficient stock available.
Procurement w/o QM (130) Use In this scenario, we have several materials (raw or semifinished) to be procured.
Procedure To execute this activity, process the following steps using the master data from this document (see also table below): Steps to process from scenario Procurement to Stock - 130 - Display List of Purchase Requisitions to be assigned - Convert Assigned Requisitions to Purchase Orders - Approval of Purchase Order - Print Purchase Order - Receive Goods from Vendor to the Purchase Order
© SAP AG
Page 15 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Master data
Value
Comments
Material:
R124
Raw Material
V226-1
Packaging Material
300000
For Raw Material R124
300000
For Packaging Material V226-1
Vendor
Purchasing org.
1000
Purchasing group
100
Quantity
1000
Storage location
1020
R124
1030
V226-1
Optional: Initial Stock Posting 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Materials Management Inventory Management Goods Movement Goods Receipt Other
Transaction code
MB1C
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIALIST-S)
Business role menu
Warehouse Management Consumption and Transfers Other Goods Receipts
2. On the Enter Other Goods Receipts: Initial Screen, enter the following data: Field name
User action and values
Movement Type
561
Plant
1000
Document date
Posting date
3. Choose Enter. 4. On the Enter Other Goods Receipts: New Items screen, enter the following data according to the table below: To enter more than nine items, choose
Create to open a blank page.
Material
Quantity
Storage location
R124
1020
V226-1
1000
1030
© SAP AG
Page 16 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
5. Choose Enter. 6. Choose Save. 7. Choose Back to return to the SAP Easy Access screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result Initial stock for the material was posted. Make a note of the material document number.
4.3 Production Order Processing 4.3.1 Create Production Order for Handling Unit Production Use Create production order for your handling unit production via MRP requirements list.
Prerequisites Planned orders for handling unit production have been generated via MRP planning.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Materials Management Inventory Management Environment Stock Stock/Requirement Situation
Transaction code
MD04
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Production Planner (SAP_BPR_PRODUCTIONPLANNER_EX-S)
Business role menu
Production Planning MRP Stock/Requirements List – Individual Display
2. On the Stock/Requirement List: Initial Screen, make the following entries: Field name
Description
User Action and Values
Material
F226-1
Plant
1000
Comment
3. Confirm your entries with Enter. 4. Select the MRP element PldOrd and double-click this line or choose Add. data for element.
The planned order contains three dates: The order finish and order start dates, and the planned opening date. If the planned opening date has been reached, the planned order
© SAP AG
Page 17 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
is converted to a production order. The planned opening date is determined using the scheduling margin key of the material master. 5. Choose Convert planned order to production order. You now branch to the production order. The system explodes the routing and the BOM. The production order type is YBM1. 6. Save the production order and make a note of the production order number: Production order number: ________________. 7. This takes you back to the Stock/Requirements List as of Hrs screen. Choose Refresh (F6). Instead of PldOrd, PrdOrd (production order) is now displayed in the MRP element column. 8. Choose Back to return to the SAP Easy Access screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result A production order for the handling unit production (F226-1) has been created.
4.3.2 Release Production Order for Handling Unit Use Release at order header level releases the order and all its operations. The order and the operations receive the status REL (released). You can release a production order in create and change modes.
Prerequisites The production order created by the MRP controller has been assigned a release date in accordance with the scheduling margin key. The production scheduler selects all the created production orders with a release date and releases all relevant production orders by means of mass processing.
Procedure 1. Access the activity using one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics → Production → Capacity Planning → Requirements → Production Order → Control → Collective Release
Transaction code
CO05N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Production Planner (SAP_BPR_PRODUCTIONPLANNER_EX-S)
Business role menu
Production Planning → Monitoring → Release Production Orders
2. On the Release Production Orders screen, enter the following data: Field name List
Description
User Action and Values
Comment
Order Headers
Selection
© SAP AG
Page 18 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Material
F226-1
Order type
YBM1
Select. at operation level Plant
1000
Production Plant
3. On the Mass processing -Release tab page, in the Function parameter area, select Order release. 4. Confirm your entries with Enter and choose Execute (F8) to execute the report. 5. Make a note of the total order quantity ________________________. 6. Select the production orders and choose Mass Processing (Ctrl to execute Mass processing.
+ F8)
→ Execute (F8)
7. The system status of the order has changed from CRTD (created) to REL (released). 8. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The production order has been released.
4.3.3 Material Staging for Production Order Use This activity pulls the materials required for the Production Order from various storage locations to the production storage location. The materials required are located in the available stock of the supplying storage location. This activity pulls the materials required for the Production Order from various storage locations, for example Stores (1050) to the production storage location Shop Floor (1020). On the Enter Other Goods Receipt: new items screen, enter the required materials and the quantities. Save your entries. Enter the sales order number / item if you are using materials for sales order dependent requirements. In case that there is enough material in the production storage location Shop Floor (1020) or if the requirement date is not yet reached, material staging is not possible.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
© SAP AG
Logistics Production Shop Floor Control Goods Movements Material Staging Pull List
Page 19 of 39
SAP Best Practices
Transaction code
Handling Unit Management (HUM) for Production (226): BBP
MF60
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Manufacturing (SAP_BPR_SHOPFLOORSPECIALIST-S)
Business role menu
Shop Floor Discrete Material Staging
2. On the Material Staging for Planned Orders screen make the following entries: Field name
Description
User action and values
Comment
Stor.loc.level
X
select
Plant
1000
Selection period for reqmts
< enter a date >
Todays Date
3. Choose the Production/process orders tab and make the following entries: Field name
Description
User action and values
Comment
MRP Controller
< MRP controller >
Optional
Order
< order number >
Optional
Selection period for reqmts.
Leave blank if necessary
4. Choose Execute. 5. On the Pull List: Storage location level screen, choose Select all (at the bottom of the screen). 6. Choose Create Replenish. Proposals. 7. At the top of the screen, choose Replenishment Elements. 8. For each replenishment element, enter a storage location in field RepLoc (Replenishment storage location).
The Replenishment storage location is the storage location for external procurement as specified in the material master MRP2 view. This should be the same storage location used on the Purchase Order. 9. At the bottom of the screen, choose Select all. 10. Choose Stage. 11. Choose Save.
© SAP AG
Page 20 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
12. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The system transfers the materials (material document) from the component storage location to the manufacturing storage location. To view a pick list, use transaction code CO27.
4.3.4 Optional: Printing Shop Floor Papers (Finished Good) Use If you want to print the shop floor papers of your production order carry out the following steps.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics → Production → Shop Floor Control→ Order → Change
Transaction code
CO02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Production Planner (SAP_BPR_PRODUCTIONPLANNER_EX-S)
Business role menu
Production Planning Monitoring
2. On the Production Order Display: Initial Screen (SAP GUI) make the following entries: or on the Monitoring Screen choose the tab page All Production Orders (x) mark >your production order number< (noted before) and choose Process Order Change Order (SAP NetWeaver Business Client). On the Production order Change: Header screen make the following entries: Field name
Description
User Action and Values
Production order
Order number of the Finished Good order
Enter the number of your Finished Good order you noted down before
Comment
3. Confirm your entries with Enter. 4. On the Production Order Change: Header screen, choose from the menu, Functions Print (SAP GUI) or choose More Functions Print (SAP NetWeaver Business Client). 5. Choose Save. 6. In the Print dialog box, make the following entries and continue with Print. Field name
User action and values
Comment
Output Device
LOCL
For output with Windows default printer
Print immediately
(set indicator)
© SAP AG
Description
Page 21 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
7. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The shop floor papers were printed on the Windows default printer.
4.3.5 HU-Packaging in Production Order (Finished Good) Use You prepare the handling units required for packaging of your finished product. You may use the numbers of the handling units for pallet labels (label printing not part of this scenario).
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Central Functions Handling Unit Managementl Processing Handling Units Work Order – Finished Order
Transaction code
COWBPACK
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Manufacturing (SAP_BPR_SHOPFLOORSPECIA_DIFM-K)
Business role menu
Shop Floor Discrete Packing in Production Orders
2. On the Pack for Order screen, in the Process order field, enter your order number (noted from step before). 3. Choose Enter. 4. Choose Save. 5. Choose the Display Saved HUs button to display the detailed data for the handling units from the process order. 6. On the Ttl content tab check if each 20 pieces have been packed into one HU. 7. From the Pack HUs tab page, take a note of the handling unit numbers:__________________., __________________. 8. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result Material F226-1 will be automatically packed on pallets. Handling unit numbers for the pallets have been created.
4.3.6 Goods Receipt for Handling Units Use © SAP AG
Page 22 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
After filling the pallets, they have to be received into storage.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Production Shop Floor Control Goods Movements Goods Receipt with HU
Transaction code
COWBHUWE
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Shop Floor Specialist (SAP_BPR_SHOPFLOORSPECIA_DIFM-K)
Business role menu
Shop Floor Discrete GR HU for Production Order
2. On the Enter Goods Receipt: New Item screen, in the Order field, enter your order number, and choose Enter. 3. Choose Propose HU. 4. In the Selection from Order screen area, set the Deliv. Compl. Indicator. 5. Dependent on the processing option for further sales, maintain the storage location for each Handling Unit within the table
Option 1: storage location 1080 (Full Warehouse Management)
Option 2: storage location 1090 (Handling unit storage location without warehouse management)
6. Choose the Post icon. The system displays the message „Goods receipt for handling units was posted successfully”. 7. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The handling units of process order have been posted to a storage location (for example, 1090).
© SAP AG
Page 23 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
4.3.7 Monitor Handling Units Use You can check the handling unit status and contents with the handling unit monitor.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Central Functions Handling Unit Management Handling Unit Monitor
Transaction code
HUMO
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Shop Floor Specialist (SAP_BPR_SHOPFLOORSPECIA_DIFM-K)
Business role menu
Shop Floor Discrete HU Monitor
2. On the Selection of Handling Units screen, enter the following values on the HU-general data tab: Field name
Description
Warehouse number
User Action and Values Y01
Comment option 1 (full WM) : Y01 option 2 (lean WM): leave blank
3. On the Selection of Handling Units screen, enter the following value on the Contents tab: Field name
Description
User Action and Values
Material
F226-1
Plant
1000
Storage Location
1080
Comment
4. Choose Execute. 5. On the HU Monitor: Selected Handling Units screen, click your handling unit. 6. On the Detailed Data for Handling Unit screen, choose the Status tab to check that the status is PHEX WHSE (= physically exists in warehouse) 7. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The handling unit status and contents have been checked.
© SAP AG
Page 24 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
4.3.8 Confirming Production for Handling Unit production Use The confirmation documents the processing status of orders and their operations. Additionally, backflushed components are issued.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics → Production → Shop Floor Control → Confirmation → Enter → For Operation → Time ticket
Transaction code
CO11N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Production Planner (SAP_BPR_PRODUCTIONPLANNER_EX-S)
Business role menu
Production Planning Monitoring
On the All Production Orders tab page, select your production order and choose Confirm Confirm Order Operation. 2. On the Enter time ticket for production order screen, make the following entries: Field name
Description
User Action and Values
Order
< your previous order number >
Confirm. type
Final confirmation
Comment
3. Confirm your entries with Enter. 4. In the Yield field, enter your produced quantity. 5. In the To confirm-Labor field, enter a value (for example, 40 min) for machine time and 440 min for labor time and confirm with Enter. 6. Choose Goods movements. The system shows you an overview table of all materials for which the withdrawing is done automatically with the confirmation of the operation.
The material R124 is set for backflush (in material master) so that the withdrawing is done automatically after you confirm the operation. 7. Save your entries. 8. Choose Back to return to the SAP Easy Access screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result
© SAP AG
Page 25 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
You have confirmed the production for handling unit production.
4.3.9 Create transfer order from stock list for putaway (option 1: Full WM) Use After production of a handling unit the pallets have to be moved from the production goods-receipt area into the central storage area. You inform the forklift driver using a stock transfer order.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Logistics Execution Internal Whse Processes Stock transfer Create transfer order From Stock List
Transaction code
LT10
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIA-DIFM-K)
Business role menu
Warehouse Management Consumption and Transfers Create Transfer Order from List
2. On the Stock Transfer: Start screen, make the following entries: Field name
Description
User Action and Values
Warehouse number
Y01
Storage Type
D21
Comment
3. Choose Execute. 4. On the Stock Transfer: Overview screen, select your storage bins: ST
StorageBin
Plnt
X
< Storage bin number equal to your production order number >
1000
X
< Storage bin number equal to your production order number >
1000
……
5. Choose Stock Transf Frgrnd. 6. On the Specify Destination Data dialog box, make the following entries Field name
Description
User Action and Values
Storage Type
D07
Stor. Unit Type
E1
Comment
7. Choose Copy. 8. On the Stock Transfer: Overview screen choose Back to return to the SAP Easy Access screen (SAP GUI) or
© SAP AG
Page 26 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result You have created the stock transfer order for putaway of the produced handling units.
4.3.10 Confirm stock transfer order for putaway (option 1: Full WM) Use After physical putaway the forklift driver confirms the putaway via stock transfer confirmation.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Logistics Execution Internal Whse Processes Stock Transfer Display Transfer Order For Material
Transaction code
LT24
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIALIST-S)
Business role menu
Warhouse Management Consumption and Transfers Display Transfer Order / Material
2. On the Stock Transfer Ordes for Material screen, make the following entries: Field name
Description
User Action and Values
Warhouse number
Y01
Material
F226-1
Only open TO items
X
Comment
3. Choose Execute. 4. On the Transfer Orders: List for Material screen click the red button of your Handling Unit. Each Handling unit is divided in 20 pieces. 5. Choose Confirmation in Foreground. 6. On the Confirm Transfer Order: Overview of Transfer Order Items screen choose Save. 7. Go back to the Transfer Orders: List for Material screen. 8. Repeat step 4 to 7 for all your transfer orders. 9. On the Transfer Orders: List of Material screen the red button changed into green. Your handling units have been posted to the goods-receipt area within production and now have been moved into the central storage area, using a stock transfer order.
© SAP AG
Page 27 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
10. Choose Back to return to the SAP Easy Access screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result You have moved the handling units into the central storage area. The stock transfer orders are confirmed.
4.3.11
Check WM Stock of handling units (option 1: Full WM)
Use You can check your WM storage informations for your handling units
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Logistics Execution Internal Whse Processes Bins and Stock Display Bin Stock per Material
Transaction code
LS24
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Warehouse Monitoring (SAP_BPR_WAREHOUSESPECIALIST-K)
Business role menu
Warehouse Management Inventory Control Display Quants for Material
2. On the Stock per Material screen make the following entries: Field Name
User action and values
Warehouse Number
Y01
Material
F226-1
Plant
1000
Storage Location
1080
Stock Category
*
Special Stock
*
Comment
3. Choose Enter. 4. On the Stock per Material screen you can see the stock for your material. 5. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result
© SAP AG
Page 28 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Your finished product was initially received into the goods-receipt area for production (storage type D21). With the stock transfer order it is then moved into the central storage area of the warehouse (storage type D07). Process step
Storage type
Storage bin
Goods receipt for production order
D21
storage bin # identical to production order #
Central storage
D07
dynamic storage bin #, beginning with 01-01-01.
Shipping Area Deliveries
D51
storage bin # identical to delivery #
4.4 Sales Order Processing 4.4.1 Enter Sales Order (option 1: Full WM and option 2: without WM) Use You now create a sales order for the goods that are packed in the handling unit.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Sales and Distribution Sales Order Create
Transaction code
VA01
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Sales Administration (SAP_BPR_SALESPERSON-S) Sales Sales Orders Create Sales Order
Business role menu
2. Enter the following data, and choose Enter: Field name
User action and values
Order Type
OR
Sales Organization
1000
Distribution Channel
10
Division
10
Comment
3. On the Create Standard Order: Overview screen, enter the following data:
© SAP AG
Page 29 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Field name
User action and values
Sold-to party
100000
PO number
PO date
Material
F226-1
Order Quantity
< material quantity >
Un
PC
Comment
Enter a customer purchase order number as reference
choose quantity as a multiple quantity of 20, in accordance to the earlier produced quantity (such as 20, 40, 60..)
4. Choose the Shipping tab, and select your line item. 5. Choose the Display item details icon at the bottom of the screen. 6. Select the Shipping tab. 7. Enter the following value, dependent on the storage location chosen in the step HU- Entering Goods Receipt for Production Order (Finished Good): Field name
User action and values
Comment
Stor. Location 1080 1090
Option 1: Full WM processing Option 2: Handling units w/o warehouse management
Option 1: storage location 1080 (Full Warehouse Management)
Option 2: storage location 1090 (Handling unit storage location without warehouse management)
8. Choose Save. 9. Take a note of the order number:_____________________. 10. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The sales order has been created.
© SAP AG
Page 30 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
4.4.2 Create Outbound Delivery with Order Reference (option 1: Full WM) Use For shipment, the outbound delivery is created with reference to the prior sales order.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Sales and Distribution Sales Order Subsequent functions Outbound Delivery)
Transaction code
VL01N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIALIST-S)
Business role menu
Warehouse Management Shipping Create Outbound Dlv. With Order Ref.
2. On the Create Outbound Delivery with Order Reference screen, make the following entries: Field name
Description
User Action and Values
Shipping point
1000
Selection date
Order
Comment
Sales order number noted in previous step
3. Choose Enter. 4. On the Delivery Create: Overview screen, go to the menu and choose for SAP GUI Subsequent Functions Create Transfer Order, for NWBC choose More… Subsequent Functions Create Transfer Order. 5. Confirm the End Document Processing dialog box with Yes. 6. On the Create Transfer Order for Delivery Note: Initial Screen, make a note of your delivery number _______________. 7. Confirm with enter. 8. Choose Stock figures. 9. On the Create Transfer Order for Delivery: Stock Overview screen choose the Stock that can be removed from storage tap page. The handling units are proposed. Maintain the selected quantity (20 PCs for each HU). 10. Choose Save 11. Make a note of transfer order number __________________ .
© SAP AG
Page 31 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
12. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The outbound delivery is created, together with the stock transfer order for picking from the warehouse.
4.4.3 Confirm stock transfer order for delivery picking (option 1: Full WM) Use After physical putaway the forklift driver confirms the delivery picking via stock transfer confirmation. 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Logistics Execution Internal Whse Processes Stock Transfer Display Transfer Order For Material
Transaction code
LT24
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIALIST-S)
Business role menu
Warehouse Management Consumption and Transfers Display Transfer Order / Material
2. On the Stock Transfer Ordes for Material screen, make the following entries: Field name
Description
User Action and Values
Warhouse number
Y01
Material
F226-1
Only open TO items
X
Comment
3. Choose Execute. 4. On the Transfer Orders: List for Material screen click the red button of your Handling Unit. Each Handling unit is divided in 20 pieces. 5. Choose Confirmation in Foreground. 6. On the Confirm Transfer Order: Overview of Transfer Order Items screen choose Save. 7. Go back to the Transfer Orders: List for Material screen. 8. Repeat step 4 to 7 for all your transfer orders. 9. On the Transfer Orders: List of Material screen the red button changed into green. Your handling units have been posted to the goods-receipt area within production and now have been moved into the central storage area, using a stock transfer order.
© SAP AG
Page 32 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
10. Choose Back to return to the SAP Easy Access screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result You have moved the handling units into the central storage area. The stock transfer orders are confirmed.
4.4.4 Change Outbound Delivery (option 1: Full WM) Use You can change the outbound delivery to directly post goods issue from within the delivery.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Sales and Distribution Shipping and Transportation Outbound Delivery Change Single Document
Transaction code
VL02N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIALIST-S)
Business role menu
Warehouse Management Shipping Change Outbound Delivery
2. On the Change Outbound Delivery screen, make the following entries: Field name Outbound Delivery
Description
User Action and Values
Comment
Delivery number noted in previous step
3. Choose Enter. 4. On the Delivery Change: Overview screen, choose Post Goods Issue. 5. Choose Save. 6. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result The outbound delivery is changed and goods issue posted.
4.4.5 Create Outbound Delivery with Order Reference (option 2: without WM) Use
© SAP AG
Page 33 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
For shipment, the outbound delivery is created with reference to the prior sales order. Handling units are assigned, goods issue is posted for the handling units.
Procedure 1. Access the transaction choosing one of the following navigation options: Option 1: SAP Graphical User Interface (SAP GUI) SAP ECC menu
Logistics Sales and Distribution Sales Order Subsequent functions Outbound Delivery)
Transaction code
VL01N
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIALIST-S)
Business role menu
Warehouse Management Shipping Create Outbound Dlv. With Order Ref.
2. On the Create Outbound Delivery with Order Reference screen, make the following entries: Field name
Description
User Action and Values
Shipping point
1000
Order
Comment
Sales order number noted in previous step
3. Choose Enter. 4. On the Delivery Create Overview screen, mark the line item 10 and choose Pack. 5. On the Processing of Handling Units for Outbound Delivery screen choose the tap page Single Entry. 6. In the Handling unit field, choose the F4 help. 7. On the next Selection of Handling Units screen choose the Contens tap page and make the following entries: Field name
Description
User Action and Values
Material
F226-1
Storage Location
1090
Comment
8. Choose Execute (F8). Select one of the proposed handling unit lines. 9. Choose Enter. 10. Execute selection again (step 8 and 9) for each HU required. 11. Choose tab page Pack material. Check that all of your selected handling units now are listed in the upper table section. 12. Choose Back. 13. On the Delivery: Overview screen, choose tab page Picking. 14. Maintain Picked quantity identical with the Handling unit quantities. 15. Choose Post Goods issue.
© SAP AG
Page 34 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
16. Go Back (F3) to the SAP Easy Access Screen (SAP GUI) or choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).
Result You have posted goods issue for the handling units of your delivery.
© SAP AG
Page 35 of 39
SAP Best Practices
5
Handling Unit Management (HUM) for Production (226): BBP
Follow-Up Processes
You have finished all activities that are part of the business process described in this document. To accomplish subsequent activities of this business process, carry out the process steps described in one or more of the following scenarios, using the master data from this document.
5.1 Period end closing Period end closing “General” Plant (181) Use In this activity, you perform the period end financial accounting activities for the plant. These are executed collectively as a part of month-end closing. For more information about the month-end closing procedure, see the Business Process Documentation for period end closing "General" Plant.
Note that month-end closing can only be executed once a month.
Accounts Receivable (157) Use In this activity you post the incoming payment.
Procedure Complete all activities described in the Business Process Documentation of the scenario: Accounts Receivable (157) (Sections Post Payments using Automatic Payments Program, Post Incoming Payment from Customer Manually, Automatic Clearing of open items in customer accounts, Manual Clearing of Open items in customer accounts) using the master data from this document.
Closing Operations SD (203) (optional) Use This scenario describes the collection of periodic activities such as day ending activities or legal requirements like Intrastat and Extrastat reporting.
© SAP AG
Page 36 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Procedure Complete all activities described in the Business Process Documentation of the scenario: Closing Operations SD (203) (Sections Review Incomplete Sales Orders, Review Incomplete SD Documents (deliveries), Review Outbound Deliveries for Goods Issue, and Review List Blocked (for accounting) Billing Documents) using the master data from this document.
6
Appendix 6.1 Reversal of Process Steps
In the following section, you can find the most common reversal steps, which you can take to reverse some of the activities described in this document.
Stock transfer order Transaction code ( SAP GUI)
LT10, LT03
Reversal:
Cancel transfer order
Transaction code (SAP GUI)
LT15
Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIA-DIFM-K)
Business role menu
Warehouse Management Consumption and Transfers Create Transfer Order from List
Comment
Cancellation is only possible for stock transfer orders which have not yet been confirmed
Confirmation for production order Transaction code ( SAP GUI)
CO11N
Reversal:
cancel confirmation
Transaction code ( SAP GUI)
CO13
Business role
Shopfloor Specialist (SAP_BPR_SHOPFLOORSPECIALIST-S)
Business role menu
Shop Floor Discrete Cancel Confirmation of Production Order
Comment
Cancel confirmation for production order
© SAP AG
Page 37 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Change outbound delivery Transaction code ( SAP GUI)
VL01N
Reversal:
change outbound delivery
Transaction code ( SAP GUI)
VL02N
Business role
Warehouse Clerk (SAP_BPR_WAREHOUSESPECIALIST-S)
Business role menu
Warehouse Management Shipping Change Outbound Delivery
Comment
If handling units have already been assigned to the delivery, these assignments have first to be deleted before deleting the delivery. If transfer orders have been created with reference to the delivery (and are not yet confirmed), the transfer orders have to be deleted first. If transfer orders already have been confirmed, it is not possible to delete the delivery.
6.2 SAP ERP Reporting Use The table below lists the reports that you can use to obtain additional information on this business process.
You can find detailed descriptions of the individual reports in the following BPD documents, which provide a comprehensive compilation of all important reports:
Financial Accounting: SAP ERP Reports for Accounting (221)
Logistics Processes: SAP ERP Reports for Logistics (222)
Note that the descriptions of some reports that are an indispensable part of the process flow may be located directly in the section where they belong.
Reports Report title
Transaction code
Comment
Missing Parts Info System
CO24
A list of missing parts.
Production Order Information System
COOIS
A list of all production orders.
MRP List
MD05
The stock/requirements situation at the time of the last planning run.
Stock Overview
MMBE
A list of stock is displayed.
© SAP AG
Page 38 of 39
SAP Best Practices
Handling Unit Management (HUM) for Production (226): BBP
Display of HUs
HU03
HUs for identification
Display HU for SD Shipment
HUCOWE
HUs with Finished Goods for work order
Handling Unit Monitor
HUMO
WM stock overview
LS24
Bin Stock per material
Transfer order list
LS23
Transfer order list
© SAP AG
Page 39 of 39
View more...
Comments