Generator Protection Relays Site Test Report Manufacturer
ALSTOM
Consultant
SEC-SOA
Equipment
MiCOM P345
Contract #
41021031/00
Designation
MAIN-1
Contractor
ALSTOM
Test date Name of Bay
16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 1. RELAY DATA RATINGS: Current
1/5 A
Model No.
P345311K3N0360K
Voltage
100-120VAC
S. No.
965449T
Frequency
60Hz
Software Ref.
360K
2. CHECKS S. No. on module, case and cover are identical Relay case connected to a local earth bar
3. WATCHDOG RELAY CHECK Check status of watchdog contacts as below Contact Status
Terminals
Remarks
Relay De- energized
Relay Energized
M11-M12
Closed
Open
OK
M13-M14
Open
Closed
OK
4. FIELD VOLTAGE Measure the field voltage across M7 (+) and M9 (-)…… .49.19VDC.……… (Check that the voltage is about 48V DC) Repeat the test for terminals M8 (+) and M10 (-) …………49.21VDC………..
INSTRUMENT NAME: CMC-256 SERIAL NO: CD749G CALIBRATION DATE: 07-03-13
ALSTOM Grid
Najran Power Plant –SEC-SOA
Signature Name Date
LAKSHMANAN PAULRAJ 16-10-12
ENGR. MOHAMMED A. ALMAKRAMI 16-10-12
1 of 16
ALSTOM/PRT/RELAYS/P345_Final Setting
REV-00
Page
2 of 16
Generator Protection Relays Site Test Report Manufacturer
ALSTOM
Consultant
SEC-SOA
Equipment
MiCOM P345
Contract #
41021031/00
Designation
MAIN-1
Contractor
ALSTOM
Test date Name of Bay
16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 5. MECHANICAL CHECKS AND VISUAL INSPECTION: Result Ok (Y/N) Y
Sl.no
General checks
1.
Inspect for no physical damage.
2.
Verify the wiring connection as per approved drawing.
Y
3.
Relay case connected to a local earth bar.
Y
4.
Confirm ring type lugs are used for CT/VT and DC circuits.
Y
5.
Power up the relay circuit and check relay is healthy. Send the relay setting configuration file to relay through Front RS232 communication Port. Relay Test ID on front label and the serial number in the display match.
Y
6. 7.
Y Y
6. OPTO-COUPLER STATUS This is to verify the healthiness of the DC Opto inputs. - Apply a rated voltage at each spare binary input and verify the status of the input at Front panel. - Opto Inputs status can be monitored using front LCD “System Data “.
-
Scroll down “System Data “ to Opto input status , using the correlates to under test.
Key. Use
key to identify which bit
Note: Only spare inputs shall be checked with external voltage initiation and other inputs shall be checked during respective functional test. OPTO Input No.
Result OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
Najran Power Plant –SEC-SOA
Signature Name Date
LAKSHMANAN PAULRAJ 16-10-12
ENGR. MOHAMMED A. ALMAKRAMI 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting
REV-00
Page
3 of 16
Generator Protection Relays Site Test Report Manufacturer
ALSTOM
Consultant
SEC-SOA
Equipment
MiCOM P345
Contract #
41021031/00
Designation
MAIN-1
Contractor
ALSTOM
Test date Name of Bay
16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 7. LED CHECK Check the operation of all LED’s on the relay front panel LED No.
Allocation
Result
LED 01
REVERSE POWER
LED 02
FIELD FAILURE
LED 03
NPS THERMAL
LED 04
GEN. DIFFERENTIAL
LED 05
ROTOR EARTH FAULT
LED 06
100% STATOR EARTH FAULT
LED 07
UNDER VOLTAGE
LED 08
OVER VOLTAGE
OK OK OK OK OK OK OK OK
Function Keys LEDS check: LED No.
Allocation
FN LED 01
UNDER FREQUENCY
FN LED 02
CBF TRIP
FN LED 03
VOLTAGE BALANCE
FN LED 04
Vdep OVER CURRENT
FN LED 05
OVER FLUX(V/Hz)
FN LED 06
DEAD MACHINE 52G CB OPEN SPARE 52G CB CLOSE ANY START
FN LED 07 FN LED 08 FN LED 09 FN LED 10
Result
OK OK OK OK OK OK OK OK OK OK
8. OUTPUT RELAY CHECKS This is to verify the healthiness of the Control output relay healthiness. Operate each Spare output through “ Commissioning Test “ on front LCD, Check continuity of the contact that closes. -
Scroll to “Commissioning Test “, use to test mode. Change “Test Mode“ to Contact Blocked. Under Test pattern identify the output to close. “Apply Test” using the “ Contact test” option. Reset the output relays by setting cell [COMMISSIONING TESTS, Contact Test] to “Remove Test”.
Note: Only spare outputs shall be checked using above procedure and other Outputs shall be checked during respective functional test. ALSTOM Grid
Najran Power Plant –SEC-SOA
Signature Name Date
LAKSHMANAN PAULRAJ 16-10-12
ENGR. MOHAMMED A. ALMAKRAMI 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting
REV-00
Page
Generator Protection Relays Site Test Report Manufacturer
ALSTOM
Consultant
SEC-SOA
Equipment
MiCOM P345
Contract #
41021031/00
Designation
MAIN-1
Contractor
ALSTOM
Test date Name of Bay
16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
Najran Power Plant –SEC-SOA
Signature Name Date
LAKSHMANAN PAULRAJ 16-10-12
ENGR. MOHAMMED A. ALMAKRAMI 16-10-12
4 of 16
ALSTOM/PRT/RELAYS/P345_Final Setting
REV-00
Page
5 of 16
Generator Protection Relays Site Test Report Manufacturer
ALSTOM
Consultant
SEC-SOA
Equipment
MiCOM P345
Contract #
41021031/00
Designation
MAIN-1
Contractor
ALSTOM
Test date Name of Bay
16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 9. MEASUREMENT CHECK Note: - This test is intended to verify the CT/VT inputs and CT Ratio, VT Ratio setting in the local relay. - During the injection on one phase, the LCD will show that the angle of that phase changing randomly but angle measurement is not required. When inject 3ph current, the LCD will display correct angles. VTR:
14.4kV/120V
//
CTR:
2000/1 A
APPLIED & MEASURED CURRENT: , Current Applied: 1.0 A, Tolerance +5% Applied Ph-Current
Expected Current
Measured Current
Result Ok (Y/N)
IA-1
2000 A
2005 A
Y
IB-1
2000 A
2005 A
Y
IC-1
2000 A
2005 A
Y
IA-2
2000 A
2006 A
Y
IB-2
2000 A
2005 A
Y
IC-2
2000 A
2005 A
Y
IN-1
IN-2
2000 A
2004 A
2006 A
Y
APPLIED & MEASURED VOLTAGE: Voltage Applied: V ( Ph-N) AC, Tolerance +5% Applied Ph-Voltage
Result Ok (Y/N)
Measured Values (Applicable only for 230kV) PHASE AN MAG Ιs2
PHASE
I1
I2
IRESTRAIN
Expected IDIFF
Measured IDIFF
A
1.0
1.411
1.205
0.408
0.413
B
2.0
8.416
5.231
6.446
6.447
C
3.0
1.22
2.11
1.77
1.78
10.4 Operating Time Test With DT Characteristic: Operating Time at I = 1A T = 0 Sec Phase A B Operating Time 21.2 mSec 18.6 mSec