SPARK SP ARK-EASTERN -EASTERN PERIPHERAL PE RIPHERAL ROAD PROJECT (Contract # 6600044021) Minutes of Meeting (Weekly Progress Report) 21 DA DATE TE OF OF MEET MEETIN ING G HE HELD LD :
Oct/ Oct/07 07/2 /201 019 9
NEXT NEXT MEET MEETIN ING G ON :
Oct/ Oct/14 14/2 /201 019 9
21 21
Report No. Week No.
Oct/05/2019
Report Period
Oct/11/2019
1-SAFETY 1.A-Safety Manpower Safety Manager
Safety Supervisor
Safety Ocer
Planned
1
3 (Peak Time)
13 (Peak Time)
Actual
1
2
6
Remarks 1 Safety Engineer
Remarks: 1 Safety Ocer Assigned for Each 50 Personnel.
1.B-Project Safety Index (MAJOR PSI) Prev. Month (Aug 2019)
This Month (Sep 2019)
Remarks
Upto Prev. Month (Sep 2019)
This Month (Oct 2019)
11
0
Remarks CCCC to provide the Risk Register Status based on look ahead schedule and attached in this meeting.
87%
1.C-High Risk Register
Remarks: HRR will update as of Mobilization and attached the register
1.D-Safety Reports Incidents
# of Incidents This Week
# of Incidents This Month
Total # of Incidents YTD
Total # of Incidents PTD
Fatality (FA (FAT) T)
-
-
-
-
Lost Time Injury (LTI)
-
-
-
-
Restricted Duty Injury (RDI)
-
-
-
-
Medical Treatment Case (MTC)
-
-
-
-
First Aid I ncident (FAI)
-
-
-
-
Motor Vehicle Accident (MVA)
-
-
-
-
MVA FAT
-
-
-
-
Fires
-
-
-
-
Near Miss (NM)
1
1
9
9
Environmental Incident (EI)
-
-
-
-
Non S.A. Property Damage
-
-
-
-
Notable Incident Category
Near Miss Details:
1. D - A. -Jobsite Safety Logbook Observation Main Oce # Open # Closed 0
3 3
Site-1 # Open # Closed 7
# Open
63
Site-2 # Closed
5
70
14
# Open
Site-3 # Closed
12
19
26 38
1-E Overview Safety MOMENTS: by Muzahir Hussain Speed Limit SAFETY CONCERNS
STATUS
DUE DATE
ACTION BY
Closed
Oct-02-2019
CCCC / SAPMT
SAPMT reminded CCCC all the Equipment and Operators should be certied. certied . * SAPMT reminded CCCC to provide the list of Equipment with the status of certications i.e. Third 1.E.2 Party Certication, SA Certication, Required / Not Required Required,, etc. before 08-Sep-2019 * SAPMT reminded CCCC to get all the Equipment and Operators certied before Sep-302019
Action
Sep-30-2019
CCCC
SAPMT advised CCCC to provide the dedicated vehicle for contractor Safety Personnel for full area coverage. 1.E.3 * CCCC stated the dedicated vehicles for Safety Safe ty Personnel will be provided on Thursday i.e. 05-Sep. * SAPMT advised CCCC to Dedicated Vehicle for Safety Personnel must be assigned.
Action
Sep-15-2019
CCCC
Action
Oct-08-2019
CCCC
Action
Oct-13-2019
CCCC
Camp Accommodation Accommodation - CCCC stated that Camp rental is not yet nalized, once nalized, information will be shared with Saudi Aramco. SAPMT advised CCCC to ensure that the Camp 1.E.1 Accommodation is the complying withLayout the safety requirementsSAPMT such as re alarm system, re exits, etc. * CCCC submitted nal CAMP on 18-Sep-2019; reviewed & Approved * SAPMT advised CCCC to provide accommodation details of all the labors including subcontractors i.e. location.
1.E.4
SAPMT advised CCCC to provide PPE PPE to to all the labor s including labors from Subcontractor CCCC will provide PPEs' for subcontractor labors and backcharge
CCCC toto assign Logobyand 1.E.5 SAPMT SAPMT advised reminded CCCC complete thisSticker week. IDs' for all the vehicles. Saudi Aramco: Company General Use
Page 1 of 9
Minutes of Meeting (Weekly Progress Report) 21 SAPMT advised CCCC to submit Night Work Plan including areas, activities, manpower, equipment, 1.E.6 etc. * CCCC submitted the Night Work Plan on 08-Oct-2019 thru CCCC-EPR-T-0084-1
Action
Oct-08-2019
CCCC
Action
Oct-09-2019
CCCC
SAPMT reminded CCCC about 1. Equipment without license plate are not allowed on site 1.E.8 2. Breakdown equipment must be shifted to dedicated workshop/maintenance area or removed from site 3. Provide documents of certied Mechanic i.e. Iqama, ID, any certication
Action
Oct-13-2019
CCCC
1.E.9 SAPMT advised CCCC to submit Critical Lifting Plan.
Action Oct-14-2019
CCCC
1.E.7
SAPMT advised CCCC to install WindSock for for each site to monitor wind directions for the safety purpose in the upcoming weather situations.
Personnel as per requirement to cover all the areas. 1.E.10 SAPMT advised CCCC to add more Safety Pe
Action
SUMMARY SUMMAR Y SITE EQUIPMENT REGISTER S/N
EQUIPMENT TYPE
ACTUAL ON SITE
Operator's S. ARAMCO Certied
Equipment Equipments s 3rd party Inspection
SAG License
YES
NO
N/A
Yes
NO
N/A
YES
NO
1
Bull Dozer
22
2
20
0
18
4
0
15
7
2
Wheel Loader
23
9
14
0
19
4
0
21
2
3
Fork Lift
0
0
0
0
0
0
0
0
0
4
Excavator / Hammer
12
7
5
0
10
2
0
12
0
5
Crane
5
4
1
0
4
1
0
5
0
6 7
Backhoe Loader Skid Loader
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
8
Grader
8
3
5
0
7
1
0
8
0
9
Boom Truck
0
0
0
0
0
0
0
0
0
70
25
45
0
58
12
0
61
9
Total
Saudi Aramco: Company General Use
Page 2 of 9
Minutes of Meeting (Weekly Progress Report) 21
2-QUALITY 2.A-Quality Manpower Discipline
QA Manager
QC Mana er
Quality Supervisor
Inspector
Required
1
1
1
According to Schedule-Q Requirement
Actual
1
1
1
7
Remarks
2.B-Project Quality Index (PQI) Prev. Month (Aug 2019)
This Month (Sep 2019)
94.10%
94.90%
Remarks
2.C-Request for Inspection (RFI's): RFI This Week
Sr.
Discipline
1)
Earthworks / Civil
RFI Acceptance Rate (%)
RFI Rejection Rate (%)
0
#DIV/0!
#DIV/0!
Rejected RFI
Issued
Accepted
Cancelled
0
0
0
Job not Ready Standard Violation
0
2)
Total This week
0
0
0
0
0
#DIV/0!
#DIV/0!
3)
Previous Week Total
471
433
35
3
0
99.36%
0.64%
Total
471
433
35
3
0
99.36%
0.64%
2.D-Logbook Entries Proactive Notication Issued Closed Open
Discipline Earthworks / Civil
0
T Total otal This Cycle
0
0
Issued
Standards Violation Closed Open
0
0
0
Issued 0
General Comments Closed Open 0
0
0
0
0
0
0
0
0
0
0
Previous Cycle Total
36
32
4
7
2
5
4
3
1
Total
36
32
4
7
2
5
4
3
1
Overdue
Total Ratio SA - Cont.
* Open LBE (Standard Violations) to be attached.
2.E-Overall Non-Conformance Report (NCR) Status This Cycle Issued Closed
Issued By
Total Issued
Open
Saudi Aramco
0
0
0
0
0
Contractor (INCR)
3
0
6
4
0
Remarks
2.F-Quality Issues ITEM # No. of Days till
Ave. RFIs Raised per Day
Total Approximate RFIs till
Total Approximat e RFIs till
Ave. No. of RFIs per day to be uploaded
0
0
0
0
0
0
0
0
STATUS
DUE DATE
SAPMT a and nd SAP SAPID ID stated stated that contractor contractor shall s submit ubmit c concret oncrete e mix design/asphalt mix design ASAP for company review, as it will take 2 months for approval.(See the attached List of Mixes with status) *Pre-approved Mix Design has been approved for EPR Project. HACO conducted the T Trial rial Mix for 40 Mpa for C1, C0 & S2 exposure and 32 Mpa for C1 and S2 exposure. Waiting for test results. Concrete Mix Design
1)
HACO BP-2 (Primary) 2nd Industrial City
C0, C1 & S2 35Mpa,40Mpa
2)
HACO BP-3 (Secondary) 2nd Industrial City
C0, C1 & S2 35Mpa,40Mpa
Saudi Ready Mix (Back up) 2nd Industrial City
C0, C1 & S2 35Mpa,40Mpa
ETE (Back up) 2nd Industrial City
C0, C1 & S2 35Mpa,40Mpa
2.F.2
SR.#
ACTION BY
Balance for Uploading
Batch Plants
3)
FORECAST DATE
No. Of RFIs Uploaded
SR.#
3)
DUE DATE
Total RFIs R FIs
QUALITY CONCERNED 2.F.1 2.F.1
STATUS
Strength
Action
FORECAST DATE
ACTION BY
Refer to the attachment
CCCC
Remarks
14Mpa,32Mpa,
14Mpa,32Mpa, See the Attachment-1 for
Status
14Mpa,32Mpa, 14Mpa,32Mpa,
Ready for Submission
SAPMT and SAPID stated that following are only approved asphalt plant as plant as of now in this area, and CCCC shall submit required documentation for approval of the Asphalt Batch plant selected by CCCC. Batch Plants
Location
1)
Bin Ajinan Asphalt Plant
Qurrayah
2)
Bin Zumaan
Qurrayah
3)
Al Shalawi
-
4)
Barrak Al Dossary
-
ARAMCO Approval Status Temporary Temporary Approved for Binder Course onl One Time Approval in progress One Time Approved for both Courses Permanent Approval in Progress
Remarks
Documents under review
Action
Sep-25-2019
CCCC
Waiting for Requested Documents for Review Waiting for Requested Documents for Review Documents under review Saudi Aramco: Company General Use
Page 3 of 9
Minutes of Meeting (Weekly Progress Report) 21 SAPID reminded the Contractor to Ensure that the Proposed 3rd Party Labs Labs having proper Equipments to Conduct the Superpave Testing esting,, and testing shall be mentioned in their ISO/IEC 17025:2005 accreditation scope of testing. Otherwise they need to obtain 1 time approval by fullling the SAPID requirements. requirements. * CCCC conrmed with Aces, thay have facilities to perform the testing, but CCCC need to submit their d ocuments for securing 1 time approval for our Projec Project. t. 2.F.2. (Waiting for some Calibration Reports) 1 * CCCC to furnish missing equipment for lab as per contract requirement. requirement. * SAPID advised CCCC to submit the plan for using equipments from Asphalt Batch Plant Al-Shalawi ocially to SAPMT for review and approval. * CCCC withdrawn the package & resubmitted on 30-Sep-2019 thru Letter# L-048
2.F.3
2.F.4 2.F.5
2.F.6
2.F.7
SAPMT and SAPID advised CCCC to use nearby batch plants for plants for site #1 for bridge works to save transportation and time i.e. from 2nd industrial city. SAPMT asked CCCC to provide updates regarding Batch Plants from 2nd Industrial City. * CCCC submitted Saudi Ready Mix documents thru CCCC-EPR-T-0170 on 22-Aug-19 * CCCC retrieved the transmittal due to some advance comments received from BP&CTU for Saudi Ready Mix batch plant submitted by SAJCO.; CCCC will resubmit the package after rectifying comments. * CCCC submitted two Pack Packages ages for Concrete Batch Plants on 18-Sep-19 (Saudi Ready Mix and HACO Dammam) * HACO Dammam Trial Batches for mix designs completed on 29-Sep-2019 SAPMT infomed CCCC that MOT approval needs to be obtain for Superpave Mix Design, Lighting poles (with all associated work, LV ,RMU …etc..) and bridges shop dra rawi win n s. SAPID & SAPMT advised CCCC to make sure about Testing of Pil Pile e Load Load with with Third Party Accreditation Accreditation and their schedules not overlaping with other Contractors. CCCC informed that another technician is submitted to avoid such overlapping. pers s en u e requ remen s o execu e ac a e e a s ss s oncre ng Activity. * SAPID advised CCCC to submit Mass Concrete Pouring Plans * CC CCCC CC ha has s arra arran n ed with with 3r 3rd d art art lab lab Fu ro Suha Suhaim imii fo for r te tem m erat eratur ure e SAPMT reminded CCCC to take care of exposed uncoated rebars of Piles. * CCCC informed SAPMT about pouring of concrete concrete by end of this week to avoid exposure / protect uncoated rebars.
Submitted
Sep-30-2019
CCCC / SAPID / SAPMT
Action
Sep-18-2019
CCCC / SAPID / SAPMT
Action
Ongoing
CCCC
Info
/
CCCC
Action
Oct-14-2019
CCCC
Info
Oct-14-2019
CCCC
2.F.8
SAPID advised CCCC to verify any congestion of rebar of girder and submit TQ if required.
Action
Oct-14-2019
CCCC
2.F.9
SAPID & SAPMT reminded CCCC that proceeding with construction of working piles without pile load test shall be completely on risk of CCCC. * CCCC has accepted this risk through letter # L-040 on 05-Sep-2019
Action
Oct-14-2019
CCCC
Info
Oct-11-2019
CCCC
CCCC informed SAPMT & SAPID about QA Manager, Tahir Munir is on vacation till 2.F.10 11-Oct-2019 & QC Manager, Shabbar Abbas is covering for him. * QA Manager has returned back and joined duty on 12-Oct-2019.
3-PROCUREMENT 3-A Procurement Materials Statistic Total Number of PO's
39
Week Ending October 11, 2019 Progress Milestones (Schedule B) Weights
Plan
%
Actual
%
Variance
Last Week
Issuance of RFQ's
10%
30
7.69%
39
10.00%
2.31%
10.00%
Receipt of Bids
15%
28
10.77%
35
13.46%
2.69%
13.46%
PO Placement
15%
27
10.38%
24
9.23%
-1.15%
9.23%
Approval of Fabrication Drawings
10%
24
6.15%
23
5.90%
-0.26%
5.90%
Recei eceipt pt of Cert Certi ied ed Fabri abrica cati tion on Dr Draw awii
10% 10%
22
5.64%
23
5.90%
0.26%
5.90%
Material Delivery @ Site
30%
9
6.92%
14
10.77%
3.85%
10.77%
Documentation Total Progress
10%
5
1.28% 48.85%
14
3.59% 58.85%
2.31% 10.00%
3.59% 58.85%
STATUS
DUE DATE
SAPMT advised CCCC to submit CV for Procurement for Procurement Manager. Manager. 3.B.1 * CCCC submitted the CV of Procurement Manager on 24-Sep * Under review of SAPMT.
Action
Sep-24-2019
CCCC / SAPMT
SAPMT advised CCCC provide MRR (Material (Material Receiving Report) Report) for verication. *CCCC will prepare MRR as required. 3.B.2 * SAPMT advised CCCC to clear the backlog of MRRs' and submit the routine MRRs on time i.e. max next day/ following day of actual material delivery. delivery.
Action
Sep-17-2019
CCCC
3.B.4 SAPMT asked CCCC to submit SubContracting Plan
Action
Oct-07-2019
CCCC
3-B Procurement Materials ITEM #
Saudi Aramco: Company General Use
BY
Remarks
Page 4 of 9
Minutes of Meeting (Weekly Progress Report) 21
4-CONSTRUCTION 4.A - General Progress : n o t a r
Column C
u D
561 159 720
0
50
100
150
200
250
300
350
22.08%
400
450
500
550
600
650
700
750
800
Duraton %
Duraton %
0.0%
10.0%
20.0%
30.0%
40.0%
Previous Week Description
50.0%
60.0%
70.0%
80.0%
This Week
90.0%
100.0%
Cumulative
Plan Pl anne ned d
Actu Ac tual al
Var aria ianc nce e
Plan Pl anne ned d
Actu Ac tual al
Var aria ianc nce e
Plan Pl anne ned d
Actu Ac tual al
Var aria ianc nce e
100.00%
98.00%
-2.00%
0.00%
0.00%
0.00%
100.00%
98.00%
-2.00%
46.41%
56.79%
10.38%
1.54%
1.92%
0.38%
48.85%
58.85%
10.00%
Construction
17.53%
6.06%
-11.47%
1.58%
0.80%
-0.78%
19.11%
6.86%
-12.25%
Project Overall Progress (%)
19.30%
21.63%
2.33%
1.27%
1.74%
0.47%
20.76%
23.37%
2.61%
Planned
Actual
48
61
13
590
442
-148
Mobilization Schedule Progress Procurement
4.B-Quantity Calculations: Please see attachment.
4.C-Manpower: Description Indirect Manpower Direct Manpower
Total Manpower Direct Man-hours (This Week) Direct Man-hours (To-Date) (To-Date)
V Var aria ianc nce e Re Rema mark rks s
638
503
-135
35,400
26,520
-8,880
340,180
225,430
-114,750
4.D - Equipment Dozer
Grader
Loader
Excavator
Trucks
Crane
Roller Compactor
Tanker (Water & Diesel)
Others
Total
Planned
16
18
25
27
75
2
33
40
0
236
Actual
22
8
23
12
66
5
14
28
3
181
Equipment
4.F- Summary Progress: Description
Plan % Actual % This Week To date (A) This Week To date (B)
1)
PROCUREMENT
2)
MOBILIZATION
100%
3)
EPR ROAD WORK
1.62%
4)
BRIDGES & INRERCHANGES
0.86%
5)
SPARK ACCCESS ROAD
0.68%
6)
INTERFACE WORK
1.57%
15.14%
7)
MODON LINK-3 ROAD
1.48%
1.64%
8)
BRIDGE EPR - 4 SPARK ACCESS ROAD
3.35%
12.14%
9)
DEMOBILIZATION
0.00%
0.00%
Overall Progress
1.54%
48.85%
= (B-A)
1.92%
58.85%
100%
0.00%
98.00%
-2.00%
23.83%
0.36%
4.61%
-19.22%
18.83%
1.12%
6.02%
-12.81%
11.45%
1.56%
7.81%
-3.64%
0.10%
4.98%
-10.16%
1.43%
11.11%
9.47%
1.52%
9.72%
-2.42%
0.00%
0.00%
0.00%
23.37%
2.61%
20.76%
Saudi Aramco: Company General Use
Status
10.00%
Page 5 of 9
Minutes of Meeting (Weekly Progress Report) 21
4.F- 1 Interface Progress: S.NO
Interface Description
SUPPORT LETTER
PERMIT STATUS
START DATE
END DATE
CONSTRAINT CONTRAC /IMPACT
REMARKS
AREA 1 1)
IRRIGATION TION PIPE SWCC A : 60" IRRIGA CROSSING LOOP 1 & 2
DONE
VALID
1-Aug-19
15-Oct-19
N/A
2)
SWCC B : 60" WATER PIPE CROSSING LOOP 1 & 2
DONE
VALID
1-Aug-19
15-Oct-19
N/A
3)
IRRIGATION ION PIPE SIO : 60" IRRIGAT CROSSING LOOP 1 & 2
DONE
VALID
10-Aug-19
25-Oct-19
4)
MONG : UNDERGROUNND FIBER OPTIC CABLE CROSSING EAST & WEST RAMPS
DONE
VALID (MOT PERMIT)
1-Aug-19
5)
STC : UNDERGROUNND FIBER OPTIC CABLE CROSSING EAST & WEST RAMPS
DONE
VALID (MOT PERMIT)
6)
MODA : UNDERGROUNND FIBER OPTIC CABLE CROSSING EAST & WEST RAMPS
DONE
VALID (MOT PERMIT)
7)
NEW MODA (GCC) : UNDERGROUNND FIBER OPTIC CABLE CROSSING EAST & WEST RAMPS
VALID (MOT PERMIT)
8)
: UNDERGROUNND FIBER MOBILY : OPTIC CABLE CROSSING EAST & WEST RAMPS
DONE
VALID (MOT PERMIT)
9)
SRO : SRO RAIL LINE
DONE
IN PROGRESS
NONE
EXCAVATION IS IS ON ONGOING
N/A
NONE
DESIGN STAGE
9-Oct-19
ITEA
NONE
HIGH PRICE QUOTATION. COORDINATION IN PROGRESS, METHOD STATEMENT WAS SUBMITTED
13- Jan-20
30-Mar-20
MASTOURA
NONE
1-Aug-19
9-Oct-19
ERICSSON
NONE
SITAF
PIER 1 FOUNDATION
NAHI
ABUTMENT 1 FOUNDATION
IN PROGRESS
9-Sep-19
24-Sep-19
IN PROGRESS
SITAF
COORDINATION WITH MASTOURA IS IN PROGRESS / WAITING FOR QUOTATION
MODA ALREADY SIGNED AGREEMENT, CCCC WILL SIGN & COPY TO SAPMT GCC VISITED SITE & SAPMT TO CONFIRM THE INFO AGREED ON SITE TO PROCESS APPROV APPROVAL AL DESIGN LAYING OF CABLE CROSSING A1 WAS COMPLETED ON 13SEP19, WAITING FOR OUTAGE. OFFICIAL EMAIL FROM SAPMT TO MOBILY REQUIRED TO GET APPROVAL OF DESIGN
PIER PUSHING SITAF TO OFFER FOUNDATION THE QUOTATION (NORTH SIDE)
AREA 2 10)
ARAMCO : DR-2 30" GAS PIPE
DONE
IN PROGRESS
8-Sep-19
17-Nov-19
11)
ARAMCO : DR - 1 20" GAS PIPE
DONE
IN PROGRESS
8-Sep-19
17-Nov-19
12)
ARAMCO : AD - 3 14" CRUDE PIPE
DONE
IN PROGRESS
8-Sep-19
17-Nov-19
13)
SEC : 230 KV OHTL ABQAIQ CENTRAL TO AL WAIRQI AL SENAEYAH
DONE
IN PROGRESS
16-Oct-19
3-Oct-20
14)
SEC : 380 KV OHTL GHUNAN TO QURRAYAH PP
DONE
IN PROGRESS
16-Oct-19
3-Oct-20
15)
SEC : 380 KV OHTL GHUNAN TO KHURAIS
DONE
IN PROGRESS
16-Oct-19
3-Oct-20
16)
SWCC : 56" WATER LINE
DONE
DONE
23-Mar-20
1- Jun-20
SEMI SAHARA
MAIN ROAD EARTHWORKS
EXCAVATION IS ONGOING EXCAVATION (50M COMPLETED FOR DR1 & DR2, 15M FOR AD3) SEMI-SAHARA WAITING FOR SA PERMIT ;
AL HAIDER
MAIN ROAD EARTHWORKS
DESIGN STAGE
N/A
MAIN ROAD EARTHWORKS
DESIGN STAGE
AL HAIDER
MODON ROAD EARTHWORKS
DESIGN STAGE
DUBAIB & SULAIM CO.
MODON ROAD EARTHWORKS
WAITING FOR QUOTATION
AREA 3 17)
SEC : SEC 380 KV OHTL QURAYYAH IPP TO DAHIYAH / QURAYYAH IPP TO DIC3 HALFMOON HALFMOON
DONE
IN PROGRESS
14-Nov-19
17-Dec-20
18)
SEC : SEC 380KV OHTL QURAYYAH IPP TO HALFMOON
DONE
IN PROGRESS
14-Nov-19
17-Dec-20
19)
SEC : 380 KV OHTL QURAYYAH PP2 TO HALFMOON
DONE
IN PROGRESS
14-Nov-19
17-Dec-20
20)
SEC : 380 KV OHTL QURAYYAH TO GHUNAN
DONE
IN PROGRESS
14-Nov-19
17-Dec-20
-
IN PROGRESS
ARAMCO UNDERGROUND
21) TELEPHONE CABLE
IN PROGRESS
ITEM #
STATUS
DUE DATE
ACTION BY
SAPMT reminded CCCC to hire more equipment and manpower as per company requirement to comply and to expedite the work, otherwise, SAPMT will hire the 4.G.1 CONTRACTOR/s to do the work as they have right and backcharge the CCCC with actual prices.
Info
/
CCCC
SAPMT advised CCCC Certications and Conditions of Equipment and Operators 'D'. must comply with minimum requirements requirements as per Schedule 'D'.
Closed
/
CCCC
SAPMT requested CCCC to provide Organization provide Organization Chart for each site with contact 4.G.3 information of Site In-Charge, Site Engineers, Quality, Safety and Construction Personnel.
Closed
Sep/22/2019
CCCC
4.G.4 SAPMT advised CCCC to conduct complete survey for all the areas & submit it for review & approval
Action
Oct/03/2019
CCCC
4.G.5 SAPMT advised CCCC to submit the Week Plan for Survey. Survey .
Action
Weekly
CCCC
4.G.2
RFIs' for review and approval. SAPMT advised CCCC to submit all the Survey RFIs' for
4.H - Delay Analysis DELAY
REASONS / ACTION
Saudi Aramco: Company General Use
RESPONSIBLE PARTY
Page 6 of 9
Minutes of Meeting (Weekly Progress Report) 21
Saudi Aramco: Company General Use
Page 7 of 9
Minutes of Meeting (Weekly Progress Report) 21
5-BUSINESS / ADMINISTRATION 5.A-Contractual Information:
720 0
72 0
0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
0
0
10 000000
20000000
30 000000
40000000
50000000
600000 00
70000000
800000 00
90000000
100000000
0 0
20000000
40000000
0
600000 00
0
80000000
1 00000000
5.B-Saudization CATEGORIES
Saudi National
Expat
Total
Saudization %
Required Saudization As per Contract
A
3
7
10
30.00%
25%
B
12
38
50
24.00%
25%
C
42
150
192
21.88%
25% 25%
D
54
197
251
21.51%
OVERALL
111
392
503
22.07%
5.C-Overview ITEM # SAPMT advised CCCC to 5.C.1 submittals with MOM. * Please see attachment.
provide
attachment
of
outstanding
STATUS
DUE DATE
ACTION BY
Action
Ongoing
CCCC
Action
9-Sep-19
CCCC
technical
SAPMT advised CCCC to provide list of manpower with their ID/IQAMA/National ID 5.C.2 for Saudization. * Please see attachment.
APMT PROJECT ENGINEE Mr Sulaiman I. Al-Afaleq
C SENIOR PROJECT MANA Mr Bai Xiao
Saudi Aramco: Company General Use
Page 8 of 9
PROJECT AMOUNT Duraton
720
28/Apr/2019
Elapsed
159
04/Oc/2019
Remaining
561
Duraton %
100%
Elapsed
22.1%
Remaining
77.9%
Invoice Amoun Toal Amoun Cumml. Invoice
0
Paid
0
Under-process
0
Remaining
Saudi Aramco: Company General Use