2 RRU,DBS and BTS Introduction and Hardware Installation
Short Description
Download 2 RRU,DBS and BTS Introduction and Hardware Installation...
Description
Security Level: Internal
2G/3G BTS DBS RRU TMA Installation Introduction
www.huawei.com
Quality Department
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Objectives Master the features of the Equipment Master the hardware installation method of
RRU, DBS, BTS and TMA Master the hardware installation method of the
cables of the RRU
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 2
Reference
« Huawei DBS Hardware Installation » « Huawei BTS Hardware Installation » « RRU User Guide »
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 3
Appearance of the RRU
Note: The mounting brk position of the RRU can be changed HUAWEI TECHNOLOGIES Co., Ltd.
HUAWEI Confidential
Page 4
RRU Main Function The RRU receives RF signals from the antenna system, down-converts the RF signals to IF signals, and then transmits them to the BBU or the macro NodeB after amplification, analog-to-digital conversion, digital down-conversion, matched filtering, and Digital Automatic Gain Control (DAGC). Support 12dB, 24dB gain TMA RTWP statistic and report Interference scan function Standing wave detect and report (VSWR if a problem sweep remove fly lead and sweep to antenna) Support ASIG (Antenna Interface Standards Group) 2.0 Receiver reference sensitivity typical value -125.5dBm
Intermodulation sensitivity -115dBm
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 5
Appearance and Panels of RRU
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 6
LEDs on RRUs Label
Color
Status
Description
RUN
Green
ON
The module has power input, yet the module is faulty
OFF
The module has no power input or is reporting alarms
1s on, 2s off
The module is operational
0.5s on, 0.5s off
Software is being loaded to the module
ON
The module is reporting alarms (excluding VSWRrelated alarms
OFF
The module is operational
ON
The module is running
OFF
No specific meaning
ALM
TX_ACT
Red
Green
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 7
LEDs on the RRU Label
Color
Status
Description
VSWR
Red
ON
VSWR-related alarms are reported
OFF
No VSWP-related alarm is reported
ON (green)
The CPRI link is normal
ON (red)
The optical module receives local alarms related to LOS
0.5s ON, 0.5s OFF (red)
The CPRI is out of lock
OFF
The optical module is not in position or is powered off
ON (green)
The CPRI link is normal
ON (red)
The optical module receives local alarms related to LOS
0.5s ON, 0.5s OFF (red)
The CPRI is out of lock
OFF
The optical module is not in position or is powered off
CPRI_ W
CPRI_E
Red/g reen
Red/g reen
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 8
RRU Installation RRU hardware installation consists of:
Installing three RRUs
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 9
RRU Installation • Installation of RRU 1. The RRU replaces the TMA’s 2. Use existing fly leads from Ant to TMA’s 3. Ensure using a torque wrench to connect the fly leads to RR’s 4. Use existing Labels on fly leads 5. Connect the power cable supplied to each RRU 6. Connect the Optical cable supplied to CPRI W port
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 10
RRU Installation
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 11
RRU Installation
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 12
Installing the PGND cable of RRU Connecting the PGND cable (only RRU is installed)
The green and yellow PGND cable is a single cable with a cross-sectional area of 16 mm2. Both ends of the cable are OT terminals to connect to the grounding
bolt on the RRU module. If you prepare the cable by yourself, it is recommended to use a copper-based cable with a minimum cross-sectional area of 16 mm2.
PGND
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 13
Installing the Power Cable of RRU 1: Measure the length of the cable route It is better to measure the length of power cable before cutting, sometimes the survey info is not correct. You can get the cable length info from the cable marker. Use a measuring tape or first use one power cable and route it to the correct position before cutting the power cable. Then repeat the process over for the remaining two sectors.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 14
Installing the Power Cable of RRU
2: Put color rings You must put a color ring on the power cable when you are starting to install the power cable. Each ring for every sector to ensure that the sectors are not swapped. One ring for sector one. Two rings for sector two. Three rings for sector Three. This must be done to avoid sector swap at either end of the connection.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 15
Installing the Power Cable of RRU
3: Surge Protection Straps Make sure that the surge protection straps are installed correctly. Seal the connection correctly according to the connector sealing specification. If the kits are not supplied write it in the Site file for follow up and retrofit. Inform the QA department for monitoring process.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 16
Installing the Power Cable of RRU RRU only support the -48V DC power cable Step 1: Route the power cable. One end of the cable is two OT terminals, and the other end is bare. The OT terminals need to be made on site. Use the correct crimping tool. Take a photo of the procedure.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 17
Installing the Power Cable of RRU Step 2: Add two OT terminals to one end of the power cable A. Determine l the lengths of power cable for different operation according to the scales on the cover plate of the cabling cavity as shown:
B. Based on the determined lengths, remove the jacket and shielding layer from the power cable. Then remove the jacket of a specified length from each wire.
D. Remove about 15mm jacket from the power cable
C. Add an OT terminals to each wire
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 18
Installing the Power Cable of RRU Step 3: Remove the waterproof fillers from the cable troughs of the cabling cavity. Route the power cable along its dedicated cable trough. Place the waterproofing fillers not used back into the openings. Take a photo..
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 19
Installing the Power Cable of RRU Step 4: Open the cover over the terminals for the power cable
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 20
Installing the Power Cable of RRU Step 5:Remove the screw on the strap labeled PGND. Step 6: Press the strap on the exposed shielding layer of the power cable, then tighten the screw.
Step 7: Connect the OT terminal on the blue -48V DC wire to the terminal labeled NEG(-). Connect the OT terminal on the black or brown GND wire to the terminal labeled RTN(+). Then tight the screw. Step 8: Close the cover. Step 9: Bind the -48V DC power cable to the binding slot in the lower angle piece.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 21
Installing the Power Cable of RRU Step 10: Connect the other end of the power cable grounding. a. Remove about 50mm jacket from the power cable. b. Twist the shielding layer of the power cable into one strand, and then wrap the strand with heatshrinkable tube of Ф5.
d. Wrap the power cable with the heatshrinkable tube of Ф14 at the point where the shielding layer is removed . f. Connect the PGND cable to the shielding grounding bar of power supply equipment. g. Add OT terminals to the blue –48 V wire and the black GND wire, and then connect the OT terminals to the wiring terminals on the power supply.
C. Add a OT terminal to the other end of the PGND cable.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 22
Installing the Power Cable of RRU Step 11. DCDU-03 Connect the RRU power cable to one of the LOAD0 to LOAD6 (12amp) terminals on the DCDU-03.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 23
Installing the Power / Optic Cable of RRU
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 24
Installing the Power / Optic Cable of RRU 1.Opening and Closing the Cover Plate of the RRU Cabling Cavity
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 25
Opening and Closing of the lid
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 26
RF Jumper of the RRU The RF jumper of the RRU is of two types Antenna jumper: transmits and receives RF signals. Both ends of the antenna jumper have DIN connectors. Ensure to seal the connectors according to the TMA and RRU specification.
Waterproofed Joints
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 27
Installing the Optic Cable of RRU 1: Put color rings You must put a color ring on the fiber cable when you are starting to install the fiber cable. Each ring for every sector to ensure that the sectors are not swapped.
2: Protect the connector We must place protection for fiber cable, because it is easy to damage the fiber connectors. Do not bend the fiber pig tail it will get damaged.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 28
Installing the Optic Cable of RRU
3: Clamp Installation Clamps has to be installed inside a tower unless specified and all ways on a lattice tower from the RRU to the entry plate.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 29
Installing the Optic Cable of RRU
4: Fiber / Clamp Installation All ways ensure that the rubber insulation is installed taking great care. Fasten the clamps as firmly as possible. It must be installed in a straight line.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 30
Installing the Optic Cable of RRU 5: Fiber entry plate All ways ensure that the cables are sealed correctly at the entry plate. It needs to be fed through a coupling. When removing the feeders from the gland plate ensure to seal them correctly.
6: Fiber Preparation Ensure that the optic Fiber is pulled up the tower at the same rate. Do not allow it to kink or twist. The fiber needs to be installed in the clamps in a straight line without any twists.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 31
After Photos Photos 1. 2. 3. 4. 5.
Take photos of the installation of the RRU’s. Take photos of the Optic Cable in the CPRI W position and power cable installation. Take Photos of the earth cable. Take photos of the sealing of the fly leads. Take photos of the labels.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 32
DBS Hardware Installation Cabinet Placement 3G expansion will be mostly software license expansion, but if a new cabinet has to be installed, the second 3G NodeB cabinet will be stacked up on the first 3G cabinet.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 33
DBS Hardware Installation 1:Move the Node B Move the Node B forward after it has been loosened from the u rail.
2: Move the U Rail Move the u rail to fit the template provided.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 34
DBS Hardware Installation 3: 3G Cabinet Installation Before installing the cabinet make sure that the grid are installed correctly and firmly as specified by the site supervisor and as per photo.
4: 3G Cabinet Installation After assembling the cabinet according to the assembly instructions. Place the cabinet in the correct position as specified by the Site Supervisor and site installation standard. Ensure that the cabinet is fastened securely to the C Profile. HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 35
DBS Hardware Installation 5: CB Connection Connect the power cable in the correct manner to the CB. Always double check electrical installations.
6: Cable routing inside DB Board Routing to be done neatly and according to the electrical specifications. Use the correct tools when working on the DB board.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 36
DBS Hardware Installation 7: Cable routing inside trunking Rooting to be done neatly and according to the electrical specifications.
8: Cable routing Routing to be done neatly and according to the electrical specifications. Route it neatly down the cable tray in the correct position.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 37
DBS Hardware Installation 9: OT Connection Clean the wire correctly. Place the correct lug 25mm Power Cable. Use the correct crimping tool and crimp the lug and pull for security. No exses copper wire may be seen.
10: Connection safe Use the black heat shrink to secure and cover the open connections.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 38
DBS Hardware Installation Equipment Placement
• • •
•
HUAWEI TECHNOLOGIES CO., LTD.
Install the equipment according to the placement indicated in the Photo. BBU installation of DBS NodeB DBS rack has 10U space. BBU3900 will occupy 2U space and DC box will occupy another 1U space. 5U space can be used future expansion. indicates the BBU installation position or as specified by the standards.
Huawei Confidential
Page 39
DBS Hardware Installation
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 40
DBS Hardware Installation Power Cable Connect the OT terminal of the power cable to the LOAD7 or 8 (6amp) terminal on the DCDU, and then fix the 3W3 connector of the power cable to the PWR port on the BBU
Load 7 or 8
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 41
DBS Hardware Installation •
Install the CPRI optical cable Connect one end of the optical cable to the CPRI0, CPRI1, or CPRI2 port on the GTMU panel of the BBU and the other end to the CPRI_W port on the RRU. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port, and then turn outwards the puller on the optical module. Insert one end of the CPRI optical cable into the optical module, and then lead the CPRI optical cable out of the cabinet along the right side of the cabinet. Wrap the fiber tail with the winding pipe. The TX port on the BBU is connected to the RX port on the RRU; the RX port on the BBU is connected to the TX port on the RRU
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 42
After Photos Photos 1. 2. 3. 4. 5.
Take photos of the position of the cabinet. Take photo of the equipment. Take photo of the power connection. Take photo of the RRU power connection. Take photo of the BBU optic cable connection.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 43
E1 Installation •
Install the E1 Connect one end of the E1 cable to the E1/T1 port on the GTMU, and then lead the other end out of the cabinet along the right side of the cabinet. Fix the DB26 connector of the E1 cable to the E1/T1 port on the GTMU. Take note that on the 3G installations 2E1 Cables are required at all times. Make sure that it is supplied.
E1 Cable
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 44
E1 Installation 1.Strip the jacket off the E1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer. 2.Thread the E1 cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the E1 cable in full contact with the grounding clip. Finally, connect the grounding cable on the grounding clip to the grounding screw on the cage.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 45
E1 Installation
E1 Installation Ensure that the connection is done correctly and to the correct Krone Block according to the connection diagram.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 46
2G hardware Installation Cabinet Placement 1.
2.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
2G expansion cabinet will be stacked on the first 2G BTS cabinet. In the scenario the two 2G BTS cabinets can’t meet the requirement of huge capacity expansion, the third 2G cabinet will be near the 3G Node B.
Page 47
2G hardware Installation Possible Installation 1.
2G installation could be stacked one on top of the first cabinet.
2. shows the cabinet position. The 150mmdistance shall be remaining for heat loading and easyoperation of future cabinet expansion.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 48
2G hardware Installation 1: Free Equipment Un fasten all ancor screws on the equipment specified to be swapped.
2: Free B mon’s Un fasten the B mon’s and pull away from the mounting grid.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 49
2G hardware Installation 3: Move Equipment Pull the equipment away from the wall and of the U rails.
4: U rail Installation Place the template on the U rails and fasten the U rails to the floor.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 50
2G hardware Installation 5: Base plate Installation Place the BTS base plate on the U rail and secure it tightly with the correct bolts supplied are the correct torque.
6: Wire Grid Fit the grid against the wall as specified with all swaps.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 51
2G hardware Installation 7: BTS Placement Place the BTS 3900 on the base plate.
8: Cable routing Run the power cables to the DB board secure the cables according to the specification for installation of a CB. Do not use the cable indiscriminately and measure the correct length before cutting.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 52
2G hardware Installation 9: CB Connection Connect the power cable in the correct manner. Always double check electrical installations.
10: Power Cable Routing Routing to be done neatly and according to the electrical specifications. Use the correct tools when working on the DB board.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 53
2G hardware Installation 11 : OT Connection Clean the wire correctly. Place the correct lug 25mm Power Cable. Use the correct crimping tool and crimp the lug and pull for security. No exes copperware may be seen.
12: Connection Safe Use the black heat shrink to secure and cover the open connections.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 54
2G hardware Installation 13: Routing Do not bend the cables to tight around the sharp edges of the cabinet.
14:DCDU Power Connect the power to the DCDU securely and according to the specification.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 55
2G hardware Installation 15 a: 2G BBU Continue with the power connections until all is correctly completed. Switch the power on in the correct sequence.
15 b: 3G BBU Continue with the power connections until all is correctly completed. Switch the power on in the correct sequence.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 56
2G Hardware Installation 16: a Install the EMUA monitoring signal cable If the MON1 port on the BBU is available, fix the RJ45 connector of the EMUA monitoring signal cable to the MON1 port on the UPEU and the DB9 connector to the corresponding port on the EMUA.
BBU
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 57
2G Hardware Installation 16: b Alarm cables Connect the alarm cable as in the photo. Connect connector 1,2,3 and 4 for as follow. 1: in Ext Alm 0 2: in Ext Alm 1 3: in Ext Alm 2 4: in Ext Alm 3
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 58
2G hardware Installation 17: Jumper Installation for BTS On certain sites, the indoor jumper will be between BTS and combiner, while some sites the jumper directly connects BTS with B mon. The actual connection and jumper length will be decided based on survey result.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 59
2G hardware Installation Connector
Type
(A) Connector of Feeder/Bom/Combiner
DIN-7/16’-Straight-Female
(B) Connector of jumper
DIN-7/16’-Straight-Male.
(C) Connector of BTS/NodeB
DIN-7/16-Female
(D) Connector of jumper
DIN-7/16’-Right Angle-Male.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 60
2G hardware Installation 18: RF Connection Ensure that the tools used are correct or calibrated to spec to ensure that the connectors will be assembled correctly. Do the connection on the BTS side first. Double check that the length is correct before cutting the Rf cable. Place the connectors on the Radio’s and do the feed to the Bmon’s to secure position.
19: RF Connection Now do the B mon side of the RF connection. Ensure that the tools used are correct or calibrated to spec to ensure that the connectors will be assembled correctly.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 61
2G hardware Installation 20:Preperation The Cut and clean must be done correctly. This will ensure that the connection of the connector is done correct the first time.
21: Connector assembly Place the connector firmly on the RF cable. Screw it in clock wise about three turns. Feel connector should be firmly in place.
22: Connector Secure Tighten the nut in the back of the connector. Then tighten the locknut. The connector should be firm.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 62
2G hardware Installation 23: Sweep Preparation Now you power down the equipment and loosen the RF connectors.
24: Equipment Movement Remove the equipment from the container. Do not damage any equipment at any stage.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 63
2G hardware Installation 25: Before Sweeps Do the sweeps of the old equipment and save every sweep.
26: Old RF Disconnect Disconnect the old RF cables at the B mon side after the sweeps are complete.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 64
2G hardware Installation 27: New RF Connection Connect the new RF cables to the B mon.
28: After Sweeps After the connectors had been torque do the sweeps again to ensure correct installation. Save the Before and after sweeps as this must be handed in with the Site File.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 65
2G hardware Installation 29: Power on Radios Ensure that the connector torques are done at the radio side. Then switch the radios on from sector 0 1 2.
30:Alarm Cable Make sure that the alarm cable connection on the EMUA has been don correctly. Connect the alarm cables to the existing plugs and correct connection will be verified as soon as the alarms are tested.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 66
3G TMA hardware Installation Fly lead Connection None of the existing TMA’s will be re-used, the connectors of new TMA’s will also be Female and the existing outdoor jumper will be re-used.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 67
3G TMA hardware Installation Connector
Type
(A) Connector of jumper (antenna side)
DIN-7/16’-Straight-Male
(B) Connector of TMA (antenna side)
DIN-7/16’-Female
(C) Connector of TMA (Equipment side)
DIN-7/16-Female
(D) Connector of jumper(Equipment side)
DIN-7/16’-Straight-Male.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 68
3G TMA hardware Installation 1: Waterproof and Airproof for outdoor connector Installation team should apply the waterproofing and airproof treatment to the outdoor connectors immediately after the installation.
2:Materials: 1. PVC insulation tape; 2. Rubber tape (3M 1.6mm*50mm rubber tape or Bishop [Plymouth] 1.65mm*51mm rubber tape)
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 69
3G TMA hardware Installation 3: Installation specification 1. Clean the feeder and connectors. 2. Wrap 2 layers of PVC tape before wrapping the waterproof tape for the convenience of removing the tapes. 3. Uncoil the waterproof-insulating tape. Stick the end of the tape to the feeder at the point 2 to 5 cm above the connector. Note that the glued side should face the feeder. 4. Stretch the tape until it is as 3/4 to 1/2 wide as its original shape. Make sure that the stretched width is at least 1/2 of the original width, otherwise over-stretching may damage the molecular structure of the tape and lower its reliability. 5. Wrap up the feeder spirally upward while maintaining this stretching strength. Make sure that the overlapping area of adjacent tape layers is 1/2 of the stretched width, as shown below. 6. When wrapping to the point 2 to 5 cm under the connector, reverse the direction to let the wrapping goes back towards starting point. In this way, the feeder is wrapped up with 2 layers of waterproof tape. 7. After wrapping, squeeze the tape stuck to the feeder to make sure no air remains between the tape layers. 8. After wrapping the waterproof-insulating tape, it is necessary to wrap it up with PVC tape to prevent the wearing and aging of the waterproof-insulating tape. 9. The wrapping of PVC tape is similar to that of waterproof-insulating tape. Start wrapping spirally upward with 1/2 width of overlapping between adjacent layers. Reserve the wrapping direction to make 2 layer PVC tape cover. Make sure to maintain the stretching strength.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 70
Labels Ensure that the labeling on the B mon’s are fitted and correct.
Ensure that the Labeling on the Radios are fitted and correct.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 71
Labels Ensure that the labels leading into the DB Board are done and correct.
Ensure that the labels on the PDCA is done and correct on the DBS side.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 72
Labels Ensure the labels are correct and fitted at the Power connection at the cabinet.
Ensure the labels are correct and fitted on the optics.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 73
Thank you www.huawei.com
View more...
Comments