2. Planos de Ingeniería Sede 15-b

March 21, 2019 | Author: Jorge Eduardo Rojas Silva | Category: N/A
Share Embed Donate


Short Description

PLANOS...

Description

 A

B

C

4,19

D

3,35

9,05

17,18

1

SOBRECIMIENTO 15/40 CIMIENTO 60/60

3,85

   0    6    /    0    6    O    T    N    E    I    M    I    C

4,45

   0    4    /    5    1    O    T    N    E    I    M    I    C    E    R    B    O    S

A"

2,84 D  VIGAFUNDACION15/33

1,6

0,25

D  "   

   3    3    /    5    1    N    O    I    C    A    D    N    U    F    A    G    I    V

2,05 2,74

0,45 3,25

0,88 D 

   0    4    /    5    1    O    T    N    E    I    M    I    C    0    E    6    /    R    0    B    6    O    O    S    T    N    E    I    M    I    C

6,94

D  "   

0,25

CIMIENTO 60/60

CIMIENTO 60/60    3    3    /    5    1    N    O    I    C    A    D    N    U    F    A    G    I    V

1,6

 A

SOBRECIMIENTO15/40

SOBRECIMIENTO15/40



3,7

D  "   

 A

8,44

A" 4,37

VIGAFUNDACION15/33

1,84

1,5

0,85

2,74

0,93

2

D  "    SOBRECIMIENTO15/40

5,95

VIGAFUNDACION15/33

D  "   

7,15

VIGAFUNDACION15/33

8,44

 A 4,18 1,86 1,87

Pilar  50mm.

A"

   0    6    /    0    6    O    T    N    E    I    M    I    C



CIMIENTO 60/60

3

 A 4,37



1,5

   0    4    /    5    1    O    T    N    E    I    M    I    C    E    R    B    O    S

3,13

   3    3    /    5    1    N    O    I    C    A    D    N    U    F    A    G    I    V

   0    4    /    5    1    0    O    6    /    T    0    N    6    E    I    O   M    T    I

A"

   0    4    /    5    1    O    T    N    E    I    M    I    C    E    R    B    O    S

1,71

3,21

   N   C    E    I    E    R    M   B    I    C   O    S

2,76

 (Ver detalle anclaje Pilar)

   3    3    /    5    1    N    O    I    C    A    D    N    U    F    A    G    I    V

SOBRECIMIENTO15/40

e=3mm

CIMIENTO 60/60

   0    4    /    5    1    O    T    N    E    I    M    I    C    E    R    B    O    S

3,13

 A

A"

0,84 3,36

4

0,83 SOBRECIMIENTO15/40 CIMIENTO 60/60

9,64

I. Municipalidadde Chiguayante

SECPLAN   

DETALLE ANCLAJE PILAR

PROYECTO:

ESC.1:10

ESPECIALIDAD:

 ESCALERILLA

                 0,5                                                                      0,5                                                                        0,5                             

ESCALERILLA

ESCALERILLA

ESCALERILLA

SEDE SOCIAL 

 JUNTA DE VECINOS 15-B

VIGAy/o CADENA

PROYECTO DE ESTRUCTURA

  

Pilar  50mm.

 

PROPIETARIO:



Pl 100 x100x6 mm.

 

    Alcalde Municipalidad de Chiguayante

  

Rep.Legal



0,4

 0,50



RADIERe=7 cm. (5 cm.en Obr.Gruesa + 2 cm.Term.) POLIETILENOe=0.2mm. RELLENO RIPIO e=10 cm.

0,15

0,12



0,4

0,36

H-25

SOBRECIMIENTO -Barras : 6 Fe  10mm -Estribos:Fe  8mm @ 20cm. L=104 cm.

EMPLANTILLADOe=5cm.

0,05

RADIERe=7 cm. (5 cm.en Obr.Gruesa + 2 cm.Term.)

0,15

H-25 RELLENO ESTABILIZADO DEPLANTA.

SOBRECIMIENTO15/40

CIMIENTO 60/60

0,02

POLIETILENOe=0.2mm. RELLENO RIPIO e=10 cm.

0,04

H-25

RELLENO ESTABILIZADO DEPLANTA.

RADIERe=7 cm. (5 cm.en Obr.Gruesa + 2 cm.Term.)

0,33

0,02

0,05

RELLENO RIPIO e=10 cm. H-25

0,29 RELLENO ESTABILIZADO DEPLANTA.

0,33

   

0,12 0,04

0,29

VIGAFUNDACION15/33

0,3 H-25 CIMIENTO 60/60 EMPLANTILLADOe=5cm.

DIRECCION:     CHIGUAYANTE

0,15

0,12 0,04

SOBRECIMIENTO15/33

H-25

SOBRECIMIENTO -Barras : 4 Fe  10mm -Estribos:Fe  8mm @ 20cm. L=90 cm.

PROYECTISTA:

VIGAFUNDACION -Barras : 4 Fe  10mm -Estribos:Fe  8mm @ 20cm. L=90 cm.

TERRENONATURALCOMPACTADO

TERRENONATURALCOMPACTADO

TERRENONATURALCOMPACTADO

   

   

   

Claudio Astorga Cerpa Ingeniero Civil [email protected]

NOTAS GENERALES

CONTENIDO:





OBSERVACIONES

FECHA

PLANTA DE FUNDACIONES DETALLES FUNDACIONES



C FECHA:

LAMINA:

OCTUBRE 2016

1 DE 5

DIBUJO:

ESCALAS:

 A

B

D

C

4,19

3,35

9,05

16,78

5,86 7,54 1,3

CANAL AG.LL.

1

0,24

1,22

9,25

1,22

   L    L .   G   A   A    D   J  A   A    B

1,22

1,22

.

CANALAG.LL.

   L    L .   G   A   A    D   J  A   A    B

CANAL AG.LL.

1,32

0,89

1,22

1,22

.

CANAL AG.LL.

   L    L .   G   A   A    D   J  A   A    B

CANAL AG.LL.

1,22

1,22

1,22

.

CANAL AG.LL.

   L    L .   G   A   A    D   J  A   A    B

CANALAG.LL.

1,22

0,86

0,83

0,71

.

0,2 CANAL AG.LL.

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3" CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

0,37

0,61

5,74

0,61

3,85

1,86

0,84

0,61 0,61 Costanera P.B.I. 2x3"

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

1

2

3

4

0,61 3,85

0,61

0,61

5,91

0,61

6,75 0,61

      1          A CostaneraP.B.I.2x3"       H       C       R CostaneraP.B.I.2x3"       E       C

      1          A       H       C       R       E       C

      1          A       H5,86       C       R       E       C

      1          A       H       C       R       E       C

5,74

      2          A       H       C       R       E       C

      2          A       H       C       R       E       C

      2          A       H       C       R       E       C

      3       3             A       A CostaneraP.B.I. 2x3"       H       H       C       C       R       R CostaneraP.B.I. 2x3"       E       E       C       C

6,69

      3          A       H       C       R       E       C

      3          A       H       C       R       E       C

      3          A       H       C       R       E       C

      3          A       H       C       R       E       C

      3          A       H       C       R       E       C

      3    -       3          A      A       H      H       C      C       R      R       E      E       C      C

0,61

0,61

6,75

0,61

2

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

CostaneraP.B.I.2x3"

0,61 0,61

1,86

5,86

0,61 0,61

0,71

0,58 0,61

3

Costanera P.B.I. 2x3"

0,84

0,83

0,2

CostaneraP.B.I.2x3"

CERCHA-4

0,61

0,84 CostaneraP.B.I.2x3"

4 5,74 7,54

9,25

3,85

1,86

1

0,84

2

3

4

I. Municipalidadde Chiguayante

SECPLAN   

PROYECTO:

6,69

ESPECIALIDAD:

0,4

PROYECTO DE ESTRUCTURA

0,83

0,4

PROPIETARIO:

Pilar  50mm. e=3mm

4,19 3,85

1,86

2

3,35

    Alcalde Muni cipalidad de Chiguayante

0,84

 A 1

3

SEDE SOCIAL 

 JUNTA DE VECINOS 15-B

7,64

B

C

4

Rep.Legal

DIRECCION:     CHIGUAYANTE

PROYECTISTA:

Claudio Astorga Cerpa Ingeniero Civil [email protected]

NOTAS GENERALES

CONTENIDO:





OBSERVACIONES

FECHA

PLANTA DE TECHUMBRE CERCHAS



C FECHA:

LAMINA:

OCTUBRE 2016

4 DE 5

DIBUJO:

ESCALAS:

 A

D

0,4 0,83 0,71

C

I. Municipalidadde Chiguayante

SECPLAN   

PROYECTO:

SEDE SOCIAL 

 JUNTA DE VECINOS 15-B ESPECIALIDAD:

PROYECTO DE ESTRUCTURA

PROPIETARIO:

    Alcalde Muni cipalidad de Chiguayante Rep.Legal

DIRECCION:     CHIGUAYANTE

PROYECTISTA:

Claudio Astorga Cerpa Ingeniero Civil [email protected]

NOTAS GENERALES

CONTENIDO:

 100



OBSERVACIONES

FECHA



DETALLES CERCHAS

C 90-92

FECHA:

LAMINA:

OCTUBRE 2016

5 DE 5

84

DIBUJO:

ESCALAS:

View more...

Comments