2 Drilling Fluids
Short Description
drilling fluids...
Description
DRILLING FLUIDS
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-1 Drilling Muds Drilling Supervisors Training Course
RPW2021A
1
INDEX BASIC CHEMISTRY……….................…3 RHEOLOGY AND HYDRAULICS……..63 ENGINEERING CALCULATIONS……142
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-2 Drilling Muds Drilling Supervisors Training Course
RPW2021A
2
INTRODUCTION •
Mass – The unit of measurement normally used for the mass are grams (g) and pounds.
•
Volume – Gallons (gal), barrels (bbl), cubic feet (ft3), litres (l) cubic metre (m3).
•
Density – Pounds per gallon (lb/gal), pounds per cubic foot (lb/ft3), kilograms per cubic metre (kg/m3) and grams per cubic centimetre (g/cm3). Specific Weight is a particular definition of density often used for solids and liquids. It is a ratio between the weight of a substance and the weight of the distilled water at a temperature of 4 centigrades.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-3 Drilling Muds Drilling Supervisors Training Course
RPW2021A
3
CLASSIFICATION OF MATTER There are three different states in which matter can exist in the universe: – Solid – Liquid – Gaseous •
SOLIDS – Characterized by higher density than liquids. – Solids keep their own shape and volume, independent of the container.
•
LIQUIDS – Lower density than solids but higher than gases. Liquids take the shape of the container they are in.
•
GASES – Lack of definite shape and volume, easy contraction and expansion.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-4 Drilling Muds Drilling Supervisors Training Course
RPW2021A
4
CLASSIFICATION OF MATTER All the substances can be divided in one of the following two categories: – Homogeneous substances (pure substances). Like table salt where each grain is identical in chemical composition. – Heterogeneous substances (mixture of substances) as the riverbed gravel, mixture of rocks having different chemical composition. It is possible to separate the pure substances in two categories: – Elements. Cannot be decomposed into simpler substances by ordinary chemical methods. – Compounds. Can be reduced into two or more simpler substances.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-5 Drilling Muds Drilling Supervisors Training Course
RPW2021A
5
CLASSIFICATION OF MATTER COMMON ELEMENTS Element
Symbol
Atomic Weight
Common Valence
Alluminium
Al
26,98
3+
Arsenic
As
74,92
5+
Barium
Ba
137,34
2+
Boron
B
10,81
3+
Bromine
Br
79,90
1-
Cadmium
Cd
112,40
2+
Calcium
Ca
40,08
2+
Carbon
C
12,01
4+
Caesium
Cs
132,91
1+
Chlorine
Cl
35,45
1-
Chromium
Cr
52,00
6+
Copper
Cu
63,55
2+
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-6 Drilling Muds Drilling Supervisors Training Course
RPW2021A
6
CLASSIFICATION OF MATTER Element
Symbol
Atomic Weight
Common Valence
Fluorine
F
19,00
1-
Hydrogen
H
1,01
1+
Iodine
I
126,90
1-
Iron
Fe
55,85
3+
Lead
Pb
207,19
2+
Lithium
Li
6,94
1+
Magnesium
Mg
24,31
2+
Manganese
Mn
54,94
2+
Mercury
Hg
200,59
2+
Nickel
Ni
58,71
2+
Nitrogen
N
14,00
5+
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-7 Drilling Muds Drilling Supervisors Training Course
RPW2021A
7
CLASSIFICATION OF MATTER Element
Symbol
Atomic Weight
Common Valence
Oxygen
O
16,00
2-
Phosphorus
P
30,97
5+
Potassium
K
39,10
1+
Silicon
Si
28,09
4+
Silver
Ag
107,87
1+
Sodium
Na
22,99
1+
Sulphur
S
32,06
2-
Tin
Sn
118,69
2+
Titanium
Ti
47,90
4+
Zirconium
Zr
91,22
4+
Zinc
Zn
65,37
2+
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-8 Drilling Muds Drilling Supervisors Training Course
RPW2021A
8
ATOMIC STRUCTURE Atoms are made up of three subatomic particles:
Diffuse cloud of electrons (-) orbiting the nucleus in structured shells
– Protons – Neutrons – Electrons
Nucleus is compact and dense, containing protons (+) and neutrons (neutral) Atom structure
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-9 Drilling Muds Drilling Supervisors Training Course
RPW2021A
9
ATOMIC STRUCTURE •The atoms have two distinct zones: a small dense nucleus, which contains the protons and neutrons, surrounded by a diffuse cloud of electrons •The nucleus is spherical in shape, 10-4 angstrom (Å) in diameter. •The nucleus contains only protons and neutrons. •The proton has positive charge. •The neutron has no charge. •Surrounding the nucleus is the electron cloud, in which electrons orbit the nucleus in specific orbits. The electron cloud is also approximately spherical, 1 Å (10-10m) in diameter and contains only electrons. •The electron has a negative charge equal in strenght to the positive charge of the proton. •Every atom has a specific number of electrons that surround the nucleus and if the atom is neutral (has no charge) that number is equal to the number of protons in the atom’s nucleus
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-10 Drilling Muds Drilling Supervisors Training Course
RPW2021A
10
ATOMIC STRUCTURE Certain atoms can acquire or loose electrons = name ion Ion with positive charge = cation When electron is lost. Ion with negative charge = anion When electron is gained. The mass, that belongs to a proton or a neutron is approximatively 1837 times greater than the mass of an electron Proton and neutrons mass ≃ atom mass (electron mass is irrilevant) Mass and charge of subatomic particles
Agip KCO
Particle
Charge
Mass (g)
Proton
Positive (1+)
1,6724 X 10–24
Neutron
None (neutral)
1,6757 X 10–24
Elettron
Negative (1-)
0,000911 X 10–24
Well Area Operations ENGINEERING CALCULATIONS-MAP-11 Drilling Muds Drilling Supervisors Training Course
RPW2021A
11
ATOMIC STRUCTURE The nucleus of an atom has a very high density: around 1,770 tons/in.3 (98.000 kg/cm3). The electrons cloud has a diameter 10.000 times larger than that of the nucleus. The average density of the electron cloud is between 2 and 20 g/cm3. The hydrogen that is the lightest and simplest element has only one proton in each nucleus. Atoms of other elements contain 1 to 93 protons in their nucleus. 92 elements occur in nature which in various combinations form the physical world. The number of protons in the nucleus is used to define each element and is called atomic number Number of protons = (p+) Atomic number = (z) Atomic mass a = p+ + n. Isotopics atomic number (z), atomic mass number (a) (azX). The hydrogen has three isotopes. (11H), (21H) (31H).
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-12 Drilling Muds Drilling Supervisors Training Course
RPW2021A
12
ATOMIC STRUCTURE Most recurrent compounds in the drilling activity Name
Formula
Silver nitrate
AgNO3
Aluminium oxide
Al2O3
Alumina
Barium sulphate
BaSO4
Barite
Barium carbonate
BaCO3
Mineral whiterite
Barium hydroxide
Ba(OH)2
Calcium hydroxide
Ca(OH)2
Hydrated Lime
Calcium sulphate (anhydrous)
CaSO4
Anhydrite
Calcium sulphate (hydrous)
CaSO4 • 2H2O
Gypsum
Calcium carbonate
CaCO3
Calcite
Calcium chloride
CaCl2
Agip KCO
Common name
Well Area Operations ENGINEERING CALCULATIONS-MAP-13 Drilling Muds Drilling Supervisors Training Course
RPW2021A
13
ATOMIC STRUCTURE
Agip KCO
Name
Formula
Common name
Calcium oxide
CaO
Quick lime, Hot lime
Hydrochloric acid
HCl
Muriatic acid
Hydrogen oxide
H2O
Water
Sulphuric acid
H2SO4
Hydrogen sulphide
H2S
Magnesium oxide
MgO
Mag ox
Magnesium hydroxide
Mg(OH)2
—
Nitric acid
HNO3
Aqua fortis
Potassium chloride
KCl
Muriate of potash
Sodium hydroxide
NaOH
Caustic soda
Well Area Operations ENGINEERING CALCULATIONS-MAP-14 Drilling Muds Drilling Supervisors Training Course
RPW2021A
14
ATOMIC STRUCTURE
Name
Formula
Common name
Sodium bicarbonate
NaHCO3
Baking soda
Sodium chloride
NaCl
Salt
Sodium carbonate
Na2CO3
Soda ash
Sodium sulphate
Na2SO4•10H2O
Salt cake, Glauber’s salt
Sodium acid pyrophosphate
Na2H2P2O7
SAPP
Sodium tetraphosphate
Na6P4O13
Phos
Silicon dioxide
SiO2
Quartz, silica
Zinc carbonate
ZnCO3
Zinc sulphide
ZnS
Zinc oxide
ZnO
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-15 Drilling Muds Drilling Supervisors Training Course
RPW2021A
15
VALENCE The valence of an element or of a ion represents the number of elettrons that it can acquire loose or share to become a stable, neutral charged compound.
Symbols of elements and compounds and their valences
Agip KCO
Element
Symbol
Valence
Hydrogen
H
1+
Oxygen
O
2-
Potassium
K
1+
Sodium
Na
1+
Calcium
Ca
2+
Magnesium
Mg
2+
Aluminum
Al
3+
Well Area Operations ENGINEERING CALCULATIONS-MAP-16 Drilling Muds Drilling Supervisors Training Course
RPW2021A
16
VALENCE Element
Symbol
Zinc
Zn
Iron
Agip KCO
Fe
Valence 2+ 3+, 2+
Silver
Ag
Carbon
C
4+
Phosphorus
P
5+
Sulphur
S
2+,4+,6+
Chlorine
Cl
1+,3+,5+,7+
Well Area Operations ENGINEERING CALCULATIONS-MAP-17 Drilling Muds Drilling Supervisors Training Course
1+
RPW2021A
17
VALENCE
Agip KCO
Ion or group
Symbol
Valence
Hydroxide
OH
1-
Oxide
O
2-
Carbonate
CO3
2-
Bicarbonate
HCO3
1-
Sulphate
SO4
2-
Sulphite
SO3
2-
Sulphide
S
2-
Well Area Operations ENGINEERING CALCULATIONS-MAP-18 Drilling Muds Drilling Supervisors Training Course
RPW2021A
18
VALENCE
Agip KCO
Ion or group
Symbol
Valence
Nitrate
NO3
1-
Nitrite
NO2
1-
Phosphate
PO4
3-
Ammonium
NH4
3-
Acetate
C2H3O2
1-
Formate
CHO2
1-
Thiocyanate
SCN
1-
Well Area Operations ENGINEERING CALCULATIONS-MAP-19 Drilling Muds Drilling Supervisors Training Course
RPW2021A
19
ELECTRONIC STRUCTURE •
Electrons orbit around the nucleus of an atom in an ordered disposition called electron shell.
•
Each shell can contain only a maximum and defined number of electrons, and in general each following shell cannot contain more than 8 electrons.
•
The first orbital or shell cannot contain more than two electrons. Completely filled shells form stable structure; they tend not to accept or give up electrons.
•
N=1
•
N=2
•
N=3
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-20 Drilling Muds Drilling Supervisors Training Course
RPW2021A
20
IONIC BONDING Electron shells and ionic bonding
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-21 Drilling Muds Drilling Supervisors Training Course
RPW2021A
21
COVALENT BONDING •
Hydrogen bond:
Water: 2 Hydrogen atoms
Oxygen atoms
Covalent bond Shared electrons
Water and hydrogen gas covalent bond
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-22 Drilling Muds Drilling Supervisors Training Course
RPW2021A
22
HYDROGEN BONDING
Polar molecule and hydrogen bonding in water.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-23 Drilling Muds Drilling Supervisors Training Course
RPW2021A
23
IONIC BOND Clay hydration by means of water through hydrogen bond
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-24 Drilling Muds Drilling Supervisors Training Course
RPW2021A
24
COMPOUNDS
A compound is a substance composed of elements in definite proportions. The following rules are applied to all compounds: – The composition of a compound is always the same; it is uncheangeable and exact. – The elements loose their own identity (and their peculiar characteristics) when they combine to form a compound. – A compound is homogeneous.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-25 Drilling Muds Drilling Supervisors Training Course
RPW2021A
25
FORMULA
•
The formula of a compound represents a molecule of the same compound.
•
The weight is used to measure the quantity of chemical substances involved in chemical reactions.
•
A sodium atom weights 22,99 a.m.u.
•
A chlorine atom weights 35,45 a.m.u.
•
22,99 g of sodium will combine with a definite number of atoms in 35,45 g of chlorine to originate salt (sodium chloride)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-26 Drilling Muds Drilling Supervisors Training Course
RPW2021A
26
FORMULA
• The atomic weight corresponds to 6,023 x 1023 atoms. (Avogadro’s number) • This value corresponds to the weight of a ‘gram-atom’ molecular or ‘mole’ • A mole is a quantitative unit of measurement which contains a definite number of atoms. • A mole is a quantitative unit of measure that contains the exact number of atoms, molecules or formula units which have a mass in grams, equal to the atomic, molecular or formula weight. The normal usage of the mole is the formula weight expressed in grams. For sodium chloride, the formula weight is 58.44 (sodium 22.99 a.m.u., chlorine 35.45 a.m.u.), so one mole of Sodium Chloride would be 58.44 g.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-27 Drilling Muds Drilling Supervisors Training Course
RPW2021A
27
FORMULA The number of atoms of an element in the formula of a compound is equal to the number of moles of that element needed to form one mole of the compound. •Water: -Hydrogen (atomic weight 1,01) -Oxygen (atomic weight 16,00) •Ratio: -2,02 g of hydrogen for 16,00 g of oxygen -The formula is H2O.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-28 Drilling Muds Drilling Supervisors Training Course
RPW2021A
28
STOICHIOMETRY – STOICHIOMETRIC REACTIONS •
Atoms react with the other atoms according to their valence. This is the reason why the compounds show a fixed ratio between the elements.
•
Atoms react according to these ratios based on predetermined weights of each atom involved.
•
Stoichiometry deals with the quantities and the ratios among reacting substances
•
Stoichiometric calculations permit to fix exactly the weight and ratio of the chemical elements which will react to be fixed exactly and will determine the desired result.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-29 Drilling Muds Drilling Supervisors Training Course
RPW2021A
29
EQUIVALENT WEIGHT •
Often, chemical test and reactions are carried out with unknown materials.
•
Since we do not know the correct composition, it is often convenient to express the results in terms of “equivalents” of a standard compound instead of moles.
•
The equivalent weight is the molecular weight of an element, molecule or ion divided by its valence.
– H2SO4 + 2OH– Æ 2H2O + SO42– – HCl + OH– Æ H2 O + Cl –
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-30 Drilling Muds Drilling Supervisors Training Course
RPW2021A
30
BALANCE OF THE CHEMICAL EQUATION – To balance the chemical equation is the first step to determine the stoichiometric reaction. Considering this non balanced equation involving the reaction between iron (Fe3+) and oxygen (O2–) which generates iron oxide: - Fe3+ + O22– Æ Fe23+O32– We can observe that the equation is not balanced in the number of atoms and in the valence charges: there are 2 oxygen atoms on the left side and 3 on the right; there are 4 neg. charges (2 x 2-) on the left and 6 neg. charges (3 x 2-) on the right. The correct equation becomes: 1) Fe3+ + 3O22– Æ 2Fe23+O32– 2) 4Fe3+ + 3O22– Æ 2Fe23+O32– 3) 4Fe + 3O2 Æ 2Fe2O3 Stoichiometrically, 4 moles of Iron combine with 3 moles of Oxigen to yield two moles of Iron Oxide.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-31 Drilling Muds Drilling Supervisors Training Course
RPW2021A
31
BALANCE OF THE CHEMICAL EQUATION Atomic weight Fe = 55,85 4 moles Fe = 4 x 55,85 = 223,4 g Atomic weight O ≈ 16 3 moles O2 = 3 x 2 x 16 = 96 g How many grams of Oxigen would be required to react with 140 gr of Iron to produce iron oxide? •
Since only 140 g of iron are used (and not 223,4)
•
The ratio given by 140 and divided 223,4 must be multiplied by 96 g of oxigen to determine the quantity of oxygen needed to react with 140 g of iron.
•
Oxygen needed = (140 g Fe / 223,4 g Fe) x 96 g O2 = 60,2 g O2
•
Hence, 60.2 g of oxygen are necessary to react with 140 g of iron to produce iron oxide.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-32 Drilling Muds Drilling Supervisors Training Course
RPW2021A
32
SOLUBILITY •
SOLUTIONS – Sugar + Water
solution of sugar in water.
– Sugar = Solute (Substance dissolved). – Water = Solvent (Substance that does the dissolving). – A saturated solution is a solution that contains as much dissolved materials as it can hold at a given temperature.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-33 Drilling Muds Drilling Supervisors Training Course
RPW2021A
33
SOLUBILITY BONDS EFFECTS
Sodium chloride ionization in water
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-34 Drilling Muds Drilling Supervisors Training Course
RPW2021A
34
SOLUBILITY Solubility quantification •The quantity of solute which dissolves in a quantity of solvent to have a saturates solution. •Unit grams of solute per 100 grams of water. Compound
Name
Solubility (g per 100 g of water)
NaOH
Causic soda
119
CaCl2
Calcium chloride
47,5
NaCl
Sodium chloride (kitchen salt)
36
KCl
Potassium chloride
34,7
Na2CO3
Sodium carbonate
21,5
NaHCO3
Sodium bicarbonate
9,6
CaSO4
Anhydride
0,290
Ca(OH)2
Lime
0,185
MgCO3
Magnesium carbonate
0,129
CaCO3
Limestone
0,0014
Mg(OH)2
Milk of magnesia
0,0009
BaSO4
Barite
0,0002
ZnO
Zinc oxide
0,00016
Solubility of common chemical compounds
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-35 Drilling Muds Drilling Supervisors Training Course
RPW2021A
35
SOLUBILITY Factors affecting solubility
Temperature pH (acid or basic) Ionic ambient (salinity) Pressure
Temperature For the majority of solids and liquids, the solubility increases as the temperature increases. Generally, gas solubility decreases as the temperature increases.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-36 Drilling Muds Drilling Supervisors Training Course
RPW2021A
36
SOLUBILITY pH pH (potential (of) hydrogen) is a measure of the relative acid or basic condition of a solution. The solubility of many chemicals is a function of pH. Some salts of hydroxide or carbonate are more soluble in acid condition. Others are soluble only in neutral pH range and others like organic acids and ligno-sulfonate are more soluble when pH is over 9.5.
Calcium solubility decreasing as the pH increases
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-37 Drilling Muds Drilling Supervisors Training Course
RPW2021A
37
SOLUBILITY
Carbonate-bicarbonate equilibrium
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-38 Drilling Muds Drilling Supervisors Training Course
RPW2021A
38
SOLUBILITY Ionic Ambient (salinity) • Chlorides concentrations or salinity. A salinity increase generally causes an increase of the solubility of other salts and additives and will affect both the chemical reactions and precipitations. This trend decreases as the salinity approaches saturation Pressure • A pressure increase, increases the solubility of a gas in a liquid, but it has no effect on the solubility of the liquids and solids.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-39 Drilling Muds Drilling Supervisors Training Course
RPW2021A
39
pH AND ALKALINITY pH – The pH is used to define the acidity or the basicity of the solutions. – pH is defined as the negative logarithm of the concentration of the hydrogen ions. – Low values of the pH correspond to an increase of the acidity and high vlues of the pH correspond to a high basicity.
Water is in equilibrium with the ions according to the following equation: 2H2O ⇌ H3O+ (aq) + OH– (aq) The expression of equilibrium for the process of autoionization is: Kw = [H+] [OH–]
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-40 Drilling Muds Drilling Supervisors Training Course
RPW2021A
40
pH AND ALKALINITY • AT 25°C, Kw = l,0 x 10–14 • Kw, the product [H+] e [OH–] • It is constant provided that the temperature is constant. • In a neutral solution, the concentration of hydrogen [H+] is equal to the concentration of hydroxide[OH–]; hence, each will have a concentration of 1,0 x 10–7, and the solution will have a pH of 7,0. • If the [H+] increases, the [OH–] decreases and the solution becomes more acid. Similarly, if the [OH–] increases, then the [H+] must decrease and the solution becomes more basic. • The terms pH and pOH are defined as: - pH = - log [H+] - pOH = - log [OH–]
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-41 Drilling Muds Drilling Supervisors Training Course
RPW2021A
41
pH AND ALKALINITY
• Ratio between pH and pOH: pKw = -log Kw = -log [H+] -log [OH–] Through the above definitions of pH and pOH, we find that at 25° C: pKw = pH + pOH because Kw = l,0 x 10–14 pKw = - log Kw = 14 pH + pOH = 14
pH range, acids and bases
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-42 Drilling Muds Drilling Supervisors Training Course
RPW2021A
42
pH AND ALKALINITY ALKALINITY - Alkalinity titrations define the OH–, HCO3– and CO32– concentrations with the measurement of the quantity of acid required to reduce the pH. - Alkalinity is the aggregating force of a base measured by the quantity of acid which can react to form a salt. - Phenolphtalein alkalinity (P) is reported as the number of millimetres of 0,02 N H2SO4 (water-based mud) required to titrate a millimetre of filtrate (Pf) or mud (Pm), reducing the pH at 8,3. - The alkalinity of the methylorange filtrate (Mf) measures the acid required to reduce the pH to 4,3.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-43 Drilling Muds Drilling Supervisors Training Course
RPW2021A
43
pH AND ALKALINITY Ratio between the pH and the alkalinity for the distilled water.
• Alkalinity measurements (Pf, Mf and other values) are used to calculate the concentrations of hydroxide, bicarbonate and carbonate.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-44 Drilling Muds Drilling Supervisors Training Course
RPW2021A
44
ACIDS, BASES AND SALTS ACIDS - Substances with a sour taste - Their pH is in the range from 0 to 7 - Effervescence when in contact with bicarbonates - React with bases and alkalis to form salts - All the acids contain hydrogen . - Acids are defined “strong” or “weak” according to the concentrations of hydrogen ion (H+)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-45 Drilling Muds Drilling Supervisors Training Course
RPW2021A
45
ACIDS, BASES ANS SALTS BASES - Bases taste sour - Bases have pH in the range from 7 to 14 - React with the acids to form the salts - A base is defined strong or weak according to the number of molecules that dissociate into hydroxide ion (OH–) in the solution. SALTS - Salts are simply the combination of an anion (negative ion), of an acid with a cation (positive ion) of a base. The combination of a weak acid and a strong base form an alkaline salt. The combination of strong acid and a weak base form an acidic salt. The combination of strong acid and a strong base in a neutral salt.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-46 Drilling Muds Drilling Supervisors Training Course
RPW2021A
46
ACIDS, BASES AND SALTS Acids, bases and common salts
Agip KCO
Chemical noun
Usual name
Formula
Type
Chloridric acid
Muriatic acid
HCl
Acid (strong)
Sulphuric acid
—
H2SO4
Acid (strong)
Nitric acid
Aqua fortis
HNO3
Acid (strong)
Phosphoric acid
Ortho-phosphoric
H3PO4
Acid (weak)
Carbonic acid
Soda (effervescent)
H2CO3
Acid (weak)
Citric acid
—
H3C6H5O7
Acid (weak)
Sodium hydroxide
Caustic soda
NaOH
Base (strong)
Potassium hydroxide
Caustic potash
KOH
Base (strong)
Magnesium hydroxide
Magnesium hydrate
Mg(OH)2
Base
Sodium carbonate
Soda ash
Na2CO3
Base (weak)
Calcium hydroxide
Slaked Lime
Ca(OH)2
Base (strong)
Calcium oxyde
Lime
CaO
Base (strong)
Spdium chloride
Salt
NaCl
Salt
Potassium chloride
Muriate of Potash
KCl
Salt
Calcium chloride
—
CaCl2
Salt
Calcium sulphate
Anhydrite (gypsum)
CaSO4 ( • 2H2O )
Salt
Well Area Operations ENGINEERING CALCULATIONS-MAP-47 Drilling Muds Drilling Supervisors Training Course
RPW2021A
47
ACIDS, BASES AND SALTS BUFFER SOLUTIONS - Certain solutions called buffer solutions, resist large pH changes when a base or an acid is added to a solution. - Many drilling liquids and chemical compounds to treat the muds are buffer solutions. Buffering can be highly beneficial to maintain stable fluid properties ELECTROLYTE - An electrolyte is an element or compound that, when dissolved or melted in water or other solvent, dissociates into ions and is able to conduct electric current - All the solutions of ionic compounds are electrolytes - Acids, bases, and salts are common electrolytes. Salt: NaCl = Na+ + Cl– Lime: Ca(OH)2 = Ca2+ + 2OH– Electrolyts that are excellent conductors, contain high concentration of ions in solution and are called strong electrolytes. In general, salts are strong electrolytes as well as some strong acids and hydroxides. Pure water is not a good electrolyte
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-48 Drilling Muds Drilling Supervisors Training Course
RPW2021A
48
OSMOSIS •
The process takes place when two solutions of different salinity are reported by a semi-permeable membrane. There is a movement of solvent (water) from the solution with the lower salinity to the solution of high concentration of the solute.
•
Transfer of water through a membrane from a low solute concentration to one of higher concentration occurs until the two solutions have a similar solute concentration (salinity)
•
The ‘activity’ of a solution is a measure of the vapour pressure or ‘relative humidity’ and it is connected to the concentration of the solute (salinity)
•
In drilling reactive shale it is important to provide similar activity for mud and formation, to minimize the transfer of water from mud to shales. This is also more important when drilling with OBM or synthetic base fluids
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-49 Drilling Muds Drilling Supervisors Training Course
RPW2021A
49
TITRATION The chemical tests made in the mud are called titrations. •
The fundamental equation which refers to this quantitative analysis is: V2 x N2 = V1 x N1 where N1 is a solution of known concentration and N2 is the unknown concentration V1 the volume required to reach the end-Point and V2 the sample of known volume
•
Solving this equation N2 will be obtained as follows: N2 = (V1/ V2) x N1
INDICATORS The chemical compounds used to determine the end-Point in the titrations are called indicators. The indicators are compounds that change colour when change the pH or the chemical concentration. This change in colour happens at a proper pH (particular and exact for every indicator).
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-50 Drilling Muds Drilling Supervisors Training Course
RPW2021A
50
TITRATION Indicator
Original colour
Colour change
Titration
Chemical compound for titration
Phenolphthalein
Pink/red: pH >8,3
Absence of colour: pH 4,3
Yellow: pH 4,3
Rose/red: pH 3,8
Yellow: pH 5,4
Rose/Red: pH 1: the fluid is dilatant, shear thickening (drilling fluids do not belong to this category) (shear thickening – increasing of the stress viscosity, expanding behaviour. This behaviour, is opposite to the shear thinning, and is characterized by an increase in viscosity, as the shear rate increases)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-113 Drilling Muds Drilling Supervisors Training Course
RPW2021A
113
RHEOLOGY For the pseudoplastic fluids: τ = K (γ)n; (0 < n < 1) where: τ = shear stress γ = shear rate K = fluid consistency index (constant characteristic of a fluid) n = flow behaviour index
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-114 Drilling Muds Drilling Supervisors Training Course
RPW2021A
114
RHEOLOGY Dilatant fluids τ = K (γ)n; (n > 1)
“n” effects on fluids behaviour
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-115 Drilling Muds Drilling Supervisors Training Course
RPW2021A
115
RHEOLOGY Thyxotropic fluids
Rheogram of the hysteresis cycle
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-116 Drilling Muds Drilling Supervisors Training Course
RPW2021A
116
RHEOLOGY Law of modified power (YPL- yield power law model)
Comparison on rheological models
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-117 Drilling Muds Drilling Supervisors Training Course
RPW2021A
117
RHEOLOGY
Comparison on rheological models in logarithmic coordinates
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-118 Drilling Muds Drilling Supervisors Training Course
RPW2021A
118
RHEOLOGY The Herschel-Bulkley equation is expressed as follows: τ = τо+ K(γ)n Where: τ = Shear stress τо = yield stress or stress to begin the motion K = Consistency index γ= Shear rate n = Power law index
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-119 Drilling Muds Drilling Supervisors Training Course
RPW2021A
119
FLOW RUNNING Stage 1 — No flow
Stage 2 — Plug flow
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-120 Drilling Muds Drilling Supervisors Training Course
RPW2021A
120
FLOW RUNNING Stage 3 —Transition from plug flow to laminar flow
Stage 4 — Laminar flow
Stage 5 — Transition from laminar flow to turbulent flow
Stage 6 — Turbulent flow
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-121 Drilling Muds Drilling Supervisors Training Course
RPW2021A
121
FLOW RUNNING
or
Agip KCO
laminar flow
Flow stages
Well Area Operations ENGINEERING CALCULATIONS-MAP-122 Drilling Muds Drilling Supervisors Training Course
RPW2021A
122
HYDRAULIC RHEOLOGICAL MODELS Bingham Plastic Due to its semplicity, the Bingham Plastic is the most used model to describe the rheological properties of a drilling fluid. It assumes that the shear stress would be a linear function of the shear rate and it is expressed as follows:
YP = yield point, lbf /100 ft2, PV = plastic viscosity, cp (centipoise).
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-123 Drilling Muds Drilling Supervisors Training Course
RPW2021A
123
HYDRAULIC RHEOLOGICAL MODELS As this model is developed by the determination of the data of shear rates from 500 to 1000 sec-1, it allows a better identification of a fluid with higher shear rates. The PV and YP are calculated from data obtained by the conventional rotating viscometer, at 300 and at 600 rpm with the following formula: PV = θ600 – θ300 Where:
PV = plastic viscosity, cp θ600 = 600 rpm (instrument reading) θ300 = 300 rpm (instrument reading)
YP = θ300 – PV Multiplying the rpm by 1.702 the shear rate in sec-1 is obtained. Once having determined the PV and YP values, the model can be used to determine the shear stress at whatever shear rate
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-124 Drilling Muds Drilling Supervisors Training Course
RPW2021A
124
HYDRAULIC RHEOLOGICAL MODELS Power Law The Power Law model describes a fluid where the shear stress meets the shear rate in a straight line. As it is less approximate than the Bingham Plastic model, this module is often used to keep the characteristics of suspension under control and to calculate the pressure losses of the mud in the annular space. The Power Law formula is: τ = Kγⁿ where:
K = flow consistency index (lb-secn/100 ft2),
n = flow behaviour index (dimensionless).
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-125 Drilling Muds Drilling Supervisors Training Course
RPW2021A
125
HYDRAULIC RHEOLOGICAL MODELS The rheological parameters n and K can be calculated through two points of whatever shear-rate/shear-stress. As it is fairly improbable that in a log-log graph of rheological data a straight line can be obtained, it is better to determine n and K in the drill pipes (np and Kp) and in the annular space (na and Ka). The most accurate results will be obtained with the use of n and K in the range from 5 to 200 sec-1 in the annular space and from 200 to 100 sec-1 in the pipes (rpm = sec-1 ÷1.7).
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-126 Drilling Muds Drilling Supervisors Training Course
RPW2021A
126
HYDRAULICS RHEOLOGICAL MODELS The reading of a normal instrument at six velocities, allows the determination of the power law constants. The formula for n and K are:
⎛τ 2 ⎞ log ⎜⎜ ⎟⎟ τ1 ⎠ ⎝ n= ⎛γ2 ⎞ log ⎜⎜ ⎟⎟ ⎝ γ1 ⎠
Agip KCO
τ 2 K = (γ 2 )n
Well Area Operations ENGINEERING CALCULATIONS-MAP-127 Drilling Muds Drilling Supervisors Training Course
RPW2021A
127
HYDRAULIC RHEOLOGICAL MODELS Where:
τ2= reading shear stress at higher shear rate, τ1= reading shear stress at low shear rate, γ2 = high shear rate range (rpm), γ1 = low shear rate range (rpm). If readings from 600 to 300 rpm are carried out, the formula is simplified as follows:
⎛ θ 600 n = 3 . 32 log ⎜⎜ ⎝ θ 300
Agip KCO
⎞ ⎟⎟ ⎠
K
=
θ
300
511
Well Area Operations ENGINEERING CALCULATIONS-MAP-128 Drilling Muds Drilling Supervisors Training Course
n
RPW2021A
128
HYDRAULIC RHEOLOGICAL MODELS Herschel - Buckley (modified Power Law) It is a combination of the characteristics of the Newtonian model,Bingham Plastic and Power Law. The formula is:
τ = YP + K γ
n
This model using three parameters, reproduces the results of the three models described previously. Due to the difficulty to obtain this data, using the rheometer a γp = 3 RPM is assumed.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-129 Drilling Muds Drilling Supervisors Training Course
RPW2021A
129
HYDRAULIC RHEOLOGICAL MODELS
Guide to the hydraulics optimization
Where:
n = 3.32log [(θ 600 − YP ) ÷ (θ 300 − YP )] YP = θ3 (lb/100 ft2),
K
Agip KCO
=
θ 300 511
n
Well Area Operations ENGINEERING CALCULATIONS-MAP-130 Drilling Muds Drilling Supervisors Training Course
RPW2021A
130
HYDRAULIC RHEOLOGICAL MODELS REYNOLDS NUMBER The number of Reynolds (NRe) is a dimensionless number that is used to determine whether a fluid is in laminar or turbulent flow. According to the API rule, the number of Reynolds, lower or equal to 2100 indicates a laminar flow while if it is higher than 2.100 the regime is turbulent flow.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-131 Drilling Muds Drilling Supervisors Training Course
RPW2021A
131
HYDRAULIC RHEOLOGICAL MODELS •
The general formula for the number of Reynolds is:
N
Re
⎛ ρ ⎞ = VD ⎜⎜ ⎟⎟ ⎝µ ⎠
Where: V = Velocity D =Diameter ρ = Density µ =Viscosity
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-132 Drilling Muds Drilling Supervisors Training Course
RPW2021A
132
HYDRAULIC RHEOLOGICAL MODELS The number of Reynolds in the pipes is:
N
Agip KCO
Rep
⎛ ρ ⎞ ⎟ = 15 . 467 V p D ⎜ ⎜ µ ep ⎟ ⎠ ⎝
Well Area Operations ENGINEERING CALCULATIONS-MAP-133 Drilling Muds Drilling Supervisors Training Course
RPW2021A
133
HYDRAULIC RHEOLOGICAL MODELS The number of Reynolds in the annular is:
N Rea
Agip KCO
⎛ ρ = 15 .467 Va (D 2 - D 1 )⎜⎜ ⎝ µ ea
Well Area Operations ENGINEERING CALCULATIONS-MAP-134 Drilling Muds Drilling Supervisors Training Course
RPW2021A
⎞ ⎟⎟ ⎠
134
HYDRAULIC RHEOLOGICAL MODELS Where:
Agip KCO
D
= ID drill pipe or drill collars
D2
= ID hole or casing
D1
= OD drill pipe or drill collars
µep
= Effective viscosity (cP) pipe
µea
= Effective viscosity (cP) annulus
Well Area Operations ENGINEERING CALCULATIONS-MAP-135 Drilling Muds Drilling Supervisors Training Course
RPW2021A
135
FRICTION FACTORS FOR THE POWER-LAW MODULE
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-136 Drilling Muds Drilling Supervisors Training Course
RPW2021A
136
HYDRAULIC EQUATIONS AVERAGE BULK VELOCITY The API calls in this way the velocity of a fluid in an annular space or inside the pipes, assuming that all the fluids flow at the same velocity. Average bulk velocity in the pipes (Vp):
V
Agip KCO
p
0 . 408 Q = 2 D
Well Area Operations ENGINEERING CALCULATIONS-MAP-137 Drilling Muds Drilling Supervisors Training Course
RPW2021A
137
HYDRAULIC EQUATIONS
Average bulk velocity in the annulus (Va):
Va
0 . 408 Q = 2 2 D 2 − D1
(
)
Where: V = Velocity (ft/sec) Q = Rate (gpm) D = Diameter (in.)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-138 Drilling Muds Drilling Supervisors Training Course
RPW2021A
138
HYDRAULIC EQUATIONS Pressure Losses In the drilling, the flow inside the pipes on the surface, their connections, drill pipe, drill collars and at the bit chokes is always turbulent.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-139 Drilling Muds Drilling Supervisors Training Course
RPW2021A
139
HYDRAULIC EQUATIONS The flow in the annulus can be both laminar and turbulent. However, the annular pressure losses are rather low compared to the total pressure fall. In the turbulent flow, the effect of the viscosity properties of the mud in the pressure losses are very limited. As a consequence, the calculations are usually made using programmes, rules, tables, etc based on turbulent flow.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-140 Drilling Muds Drilling Supervisors Training Course
RPW2021A
140
HYDRAULIC EQUATIONS In the indications of a hydraulic programme it is necessary to calculate the pressure losses in the one or more flow rates. The circulating pressure, Pc, corresponds to the sum of the following pressure losses: 1.
Surface connection (standpipe, rotary hose, kelly e swivel).
2.
Drillpipes.
3.
Heavy-weight drillpipes.
4.
Drill collars.
5.
Annulus between the drill collars and the open hole.
6.
Annulus between the drillpipes the open hole.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-141 Drilling Muds Drilling Supervisors Training Course
RPW2021A
141
ENGINEERING CALCULATIONS
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-142 Drilling Muds Drilling Supervisors Training Course
RPW2021A
142
INTRODUCTION
This section is a guide for calculations regarding the drilling fluid such as capacity of mud, tanks volumes, tubulars and holes, circulation times, velocity of the mud in the annular and in the drill pipes and other important calculations. The capacity of calculating muds formulations and various situations by means of solids and liquids additives is necessary in fluids engineering.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-143 Drilling Muds Drilling Supervisors Training Course
RPW2021A
143
FIELD UNIT SYSTEM The unit of measure most commonly used is the Field Unit. However, the decimal measuring system is more and more used in drilling.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-144 Drilling Muds Drilling Supervisors Training Course
RPW2021A
144
FIELD UNIT SYSTEM
Agip KCO
Metric System
Field Unit
Mass
Kilogramme (kg)
Pounds (lb)
Length
Meters (m)
Feet (ft) and inches (in.)
Volume, Capacity and Displacement
Cubic meters (m3) and litres (l)
Barrels (bbl) and gallons (gal)
Density
grams/ cubic centimetres (g/cm3) e (kg/l) – Either equal at specific weight
Pounds/gallon (lb/gal) and pounds/foot3 (lb/ft3)
Pressure
kiloPascals (kPa), bar or atmospheres
pounds/inch2 (lb/in.2 o psi)
Concentration
kilogram/cubic meter (kg/m3)
pounds /barrel (lb/bbl)
Well Area Operations ENGINEERING CALCULATIONS-MAP-145 Drilling Muds Drilling Supervisors Training Course
RPW2021A
145
CONVERSION FACTORS Multiply
by
To obtain
Volume Barrels(bbl)
5.615
Feet3 (ft3)
Barrels(bbl)
0.159
Meters3 (m3)
Barrels(bbl)
42
Cubic feet (ft3)
0.0283
Cubic feet(ft3)
7.48
Gallons, U.S. (gal) Meters3 (m3) Gallons, U.S. (gal) Meters3 (m3)
Gallons, U.S. (gal)
0.00379
Gallons, U.S. (gal)
3.785
Litre(l)
Cubic Meters (m3)
6.289
Barrels(bbl)
Cubic Meters (m3)
1,000
Litres(l)
Pounds (lb)
453.6
Grams (g)
Pounds (lb)
0.4536
Kilograms(kg)
Kilograms (kg)
2.204
Pound (lb)
Metric tons (mt)
1,000
Kilograms (kg)
0.3048
Metres (m)
Mass or Weight
Length Feet (ft) Inches (in.)
2.54
Centimetre(cm)
Inches (in.)
25.4
Milliletre (mm)
Meters (m)
3.281
Feet (ft)
Miles (mi)
1.609
Kilometres (km)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-146 Drilling Muds Drilling Supervisors Training Course
RPW2021A
146
CONVERSION FACTORS Multiply
To obtain
by
Pressure lb/in.2 (psi)
6.8948
lb/in.2 (psi)
0.068948
lb/in.2 (psi)
0.0703
kg/cm2
kiloPascal (kPa)
0.145
lb/in.2 (psi)
bar (bar)
100
kiloPascal (kPa) bar (bar)
kiloPascal (kPa)
Concentration pounds/barrels (lb/bbl)
2.853
kg/m3
kilograms/cubic metre(kg/m3)
0.3505
lb/bbl
119.83
kg/m3
kilogram/cubic meter (kg/m3)
0.008345
lb/gal
pound/gallon (lb/gal)
0.11983
g/cm3, kg/l or SG
Density pounds /gallons (lb/gal)
pound/cubic feet (lb/ft3)
16.02
kg/m3 and g/l
g/cm3, kg/l or SG
8.345
lb/gal
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-147 Drilling Muds Drilling Supervisors Training Course
RPW2021A
147
HOLE CALCULATIONS
¾ Capacity ¾ Volume ¾ Displacement
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-148 Drilling Muds Drilling Supervisors Training Course
RPW2021A
148
HOLE CALCULATIONS
Mud pits and tanks – Capacity and Volume Rectangular Tanks V = Volume or Tank Capacity L = Length W = Width H = Height M = Fluid Level
Volume = L x W x H
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-149 Drilling Muds Drilling Supervisors Training Course
RPW2021A
149
HOLE CALCULATIONS Vertical cylindrical tanks Vcyl = Cylindrical tank capacity D = Cylinder diameter Acqua distillata H = Cylinder height M = Fluid level π= 3.1416 To calculate the diameter, measure the circumference and divide by 3.1416: D = Circumference/π The formula to calculate the capacity of a vertical cylindrical tank is: Vcyl
=
2
π D
H
4
The volume of the fluid (VMud) in a vertical cylindircal tank is calculated as follows : π x D2 M 3 3 VMud (ft or m ) = 4
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-150 Drilling Muds Drilling Supervisors Training Course
RPW2021A
150
HOLE CALCULATIONS Horizontal Cylindrical Tanks.
Figure 3
VCyl = Horizontal cylinder capacity D = Cylinder diameter L = Cylinder length M = Material level π = 3.1416
VCyl
Agip KCO
L = 2
⎡ ⎢ (2 M − D ) MD − M ⎢⎣
2
2 D2 ⎞ πD −1 ⎛ 2 M + − 1⎟ + sin ⎜ 2 4 ⎝ D ⎠
Well Area Operations ENGINEERING CALCULATIONS-MAP-151 Drilling Muds Drilling Supervisors Training Course
RPW2021A
⎤ ⎥ ⎥⎦
151
HOLE CALCULATIONS Hole Volume The volume of each interval is calculated as follows:
V
Hole
=
section
2
π D
L
4
Where: DW = Internal diameter (ID) of the casing, liner or open hole L = Interval Length If the diameter (DW) is in inches:
VHole
D2 W ( in.) section (bbl / ft ) = 1029
On the contrary, with the decimal measuring system:
V Hole
Agip KCO
section
D 2 W ( in. ) m /m = 1974
(
3
)
Well Area Operations ENGINEERING CALCULATIONS-MAP-152 Drilling Muds Drilling Supervisors Training Course
RPW2021A
152
HOLE CALCULATIONS Drill Pipe or Drill Collars capacity (volume of the internal diameter) The volume, with the drill string in the hole, is the sum of the internal capacity of the drill pipes plus the volume of the annular space.
V
Pipe
(bbl
/ ft
)=
ID
)=
ID
2
P
(in . )
1029
With the metric system:
V Pipe
Agip KCO
(l
/ m
2
P
(in . )
1974
Well Area Operations ENGINEERING CALCULATIONS-MAP-153 Drilling Muds Drilling Supervisors Training Course
RPW2021A
153
HOLE CALCULATIONS Annular volume The volume of the annular space is determined subtracting the external volume of the drill string from the hole capacity(or casing).
V Annulus
ID 2 W (in .) − OD 2 P (in .) (bbl/f t ) = 1029
Where: IDW = Internal diameter hole or casing ODP = External diameter drill pipes or drill collars With the metric system:
ID 2 W (in.) − OD 2 P (in.) VAnnulus (l/m ) = 1974 Or: VAnnulus = CapacityWell – DisplacementDrillstring – CapacityDrillstring
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-154 Drilling Muds Drilling Supervisors Training Course
Annular Volume
RPW2021A
154
HOLE CALCULATIONS Displacement The drill string displacement can be estimated (VPipe Displ.) using the OD and the ID of the drill pipes and the drill collars.
V Pipe
Displaceme nt
(bbl/f t ) =
OD
2
P
(in .) − ID 2 P (in .) 1029
Where: ODP = External diameter drill pipe or drill collars IDP = Internal diameter drill pipe or drill collars With the metric system:
VPipe
Agip KCO
Displaceme nt
(l/m ) =
OD
2
P
(in .) − ID 2 P (in .) 1974
Well Area Operations ENGINEERING CALCULATIONS-MAP-155 Drilling Muds Drilling Supervisors Training Course
RPW2021A
155
PUMPS CAPACITY TRIPLEX PUMPS In the triplex pump, pistons are three and operate in the same direction. Generally, they are short stroke, (from 6-in. to 12-in.) and operate at rates from 60- to 120-stk/min. Triplex pump performance calculation formula:
V Pump
Agip KCO
Output
=
3 x 3 . 1416 xID
2
Liner
xLxP Eff
4
Well Area Operations ENGINEERING CALCULATIONS-MAP-156 Drilling Muds Drilling Supervisors Training Course
RPW2021A
156
PUMPS CAPACITY Where: VPump Output = Pumps Performance IDLiner = Liner Internal Diameter L = Stroke Length PEff = Volumetric efficiency (dimensionless)
V Pump
Output
(bbl
/ stk ) =
ID
2
Liner
(in .)xL (in .)xP Eff 4117 . 7
With the metric system:
V Pump
Agip KCO
Output
(l
/ stk
)=
ID
2
Liner
(in . )xL (in . )xP Eff 25 . 90
Well Area Operations ENGINEERING CALCULATIONS-MAP-157 Drilling Muds Drilling Supervisors Training Course
RPW2021A
157
PUMPS CAPACITY
DUPLEX PUMPS The pistons of a duplex pump are two and operate in both directions. The difference between the calculations for a duplex and for a triplex is that the volume of the rod pistons must be subtracted form the volume of one of the cylinders plus the difference in number of cylinders, 4 for a duplex and 3 for a triplex. Generally, the duplex pumps have a longer stroke (from 10 to 18 in.) and operate at lower rate from 40 to 80-stk/min.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-158 Drilling Muds Drilling Supervisors Training Course
RPW2021A
158
PUMPS CAPACITY The general equation for a duplex pump is :
VPump Output
[
) ]
(
2π = x ID 2 Liner xL + ID 2 Liner − OD 2 Rod xL xPEff 4
Where:
IDLiner = Internal diameter liner VPump Output = Pump rate ODRod = Rode external diameter L = Stroke length PEff = Volumetric efficiency (dimensionless)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-159 Drilling Muds Drilling Supervisors Training Course
RPW2021A
159
PUMPS CAPACITY
Pump rate bbl/stroke for a duplex pump with ID liner, OD pipe and stroke length are in inches:
V Pump
Output
⎡ (bbl / stk ) = ⎢ 2 xID ⎢⎣
2
Liner
(in . ) − OD
2
Rod
6174
(in . ) ⎤ xL (in . )xP ⎥ ⎥⎦
Eff
With the metric system:
VPump Output
Agip KCO
⎡ 2 xID 2 Liner (in.) − OD 2 Rod (in.) ⎤ (l / stk ) = ⎢ ⎥ xL (in.)xPEff 38.85 ⎦ ⎣
Well Area Operations ENGINEERING CALCULATIONS-MAP-160 Drilling Muds Drilling Supervisors Training Course
RPW2021A
160
ANNULAR VELOCITY The annular velocity (AV) is the average velocity of the fluid which flows in the annular space. For a correct well cleaning, a minimum velocity is needed. The latter depends on a certain number of factors such as ROP, cuttings size, hole inclination, mud density and rheology.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-161 Drilling Muds Drilling Supervisors Training Course
RPW2021A
161
ANNULAR VELOCITY •
Equations for the calculation of the anular velocity based on pumps rate and the annular volume:
AV
=
AV (ft/min
V
V
)=
AV (m/min ) =
Agip KCO
→ Output
Pump
Ann
V Pump
Output
(bbl
/ min
V Ann (bbl / ft )
)
VPump Output (l / min ) V Ann (l / m )
Well Area Operations ENGINEERING CALCULATIONS-MAP-162 Drilling Muds Drilling Supervisors Training Course
RPW2021A
162
CIRCULATION TIME The total circulation time is the time (or number of strokes) to make a complete loop, from the tank, following the path down to the bit, go up from the annular and come back in the circulating tank.
Total circulatio n time (min) =
Agip KCO
VSystem VPump Output
Well Area Operations ENGINEERING CALCULATIONS-MAP-163 Drilling Muds Drilling Supervisors Training Course
RPW2021A
163
CIRCULATION TIME Where: VSystem = Total attive volume (bbl o m3) V Pump Output = Pumps capacity (bbl/min o m3/min) Total circulation (strokes) = Total circulation time (min) x pumps velocity (stks/min)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-164 Drilling Muds Drilling Supervisors Training Course
RPW2021A
164
CIRCULATION TIME
Bottoms-up is the time (or number of strokes) the mud circulates from bottom hole throught the annular up on the surface. The bottoms-up is calculated as follows:
Bottom
− up time(min)
=
V Annulus V Pump
Output
Where: VAnnulus = Annular volume (bbl or m3) VPump Output = Pumps capacity (bbl/min or m3/min)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-165 Drilling Muds Drilling Supervisors Training Course
RPW2021A
165
CIRCULATION TIME
Bottoms-up (strokes) = Bottoms-up (min) x pumps velocity (stk/min) The total circulation time (or number of strokes) to make a complete circulation, starting from the tank down to the bit and up to the annular returning back in the tanks. The circulation total time is calculated as follows:
Hole cycle time(min)=
Agip KCO
VHole − VDrillsringDispl VPump Output
Well Area Operations ENGINEERING CALCULATIONS-MAP-166 Drilling Muds Drilling Supervisors Training Course
RPW2021A
166
CIRCULATION TIME Where: V Hole = Total well volume (bbl o m3) V Drillstring Displ = Pipes displacement (bbl o m3) V Pump Output = Pumps capacity (bbl/min o m3/min) Complete circulation (strokes) = time for a complete circulation (min) x pumps velocity(stk/min)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-167 Drilling Muds Drilling Supervisors Training Course
RPW2021A
167
HYDROSTATIC PRESSURE The hydrostatic pressure (Ph) is the pressure exerted by a column of liquid and depends on the density of the fluid and the vertical depth or True Vertical Depth (TVD). In a well, it is the pressure exerted on the wall to avoid cavings and controls the formation pressure as well.
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-168 Drilling Muds Drilling Supervisors Training Course
RPW2021A
168
HYDROSTATIC PRESSURE Hydrostatic pressure is calculated as follows:
P H (bar
)=
Mud Weight
(kg/l )x TVD (m ) 10.2
Hydrostatic pressure = Mud density x TVD x conversion factor (0.0981)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-169 Drilling Muds Drilling Supervisors Training Course
RPW2021A
169
HYDROSTATIC PRESSURE Field unit system:
P H (lb/in.2) = Mud density (lb/gal) x TVD (ft) x 0.052
Conversion
Agip KCO
12 in./ft factor 0.052 = 231 in. 3 /gal
Well Area Operations ENGINEERING CALCULATIONS-MAP-170 Drilling Muds Drilling Supervisors Training Course
RPW2021A
170
EXAMPLES • Data: • Surface Casing: 1,600 m - 133/8-in. 48-lb/ft, (323-mm ID) • Bit diameter: 121/4 in • T.D.: 3,400 m • Drillstring: Drill Pipe: 5-in. 19.50-lb/ft, (127-mm OD, 108.6-mm ID), Drill collars 200 m of 71/4-in. x 23/4-in (185-mm OD x72-mm ID) • Surface systems: 2 tanks: depth 4-m, width 3-m, length 10-m. Both tanks have 2.5 m of mud with pipes in well. • Mud density: SG 1.50 o 1.5 kg/l • Mud pumps: Triplex: 6 in x 12 in (152.4 mm x 304.8 mm) 110 stk/min, with 90% efficiency
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-171 Drilling Muds Drilling Supervisors Training Course
RPW2021A
171
EXAMPLES
13.3/8 in. casing 1600 m 12.1/4 in. Open Hole Drill Pipe 5 in. 19.5-lb/ft
DC 71/4-in. x 23/4-in 3400 m Well Diagram
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-172 Drilling Muds Drilling Supervisors Training Course
RPW2021A
172
EXAMPLES
Part I: Determine the capacity of the surface system in m3, m3/m e m3/cm. VPit (m3) 1 tank = 4 m x 3 m x 10 m = 120 m3 VPit (m3) 2 tanks = 120 m3 x 2 = 240 m3 VPit (m3/m) 2 tanks = 240 m3 ÷ 4 = 60 m3/m VPit (m3/cm) 2 tanks = 60 m3/m ÷ 100 cm/m = 0.60 m3/cm Part II: Determine the total volume of the mud on the surface, in m3. VSurface (m3)= VMud (m3) 2 tanks = 60 m3/m x 2.5 m = 150 m3
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-173 Drilling Muds Drilling Supervisors Training Course
RPW2021A
173
EXAMPLES Part III: Determine the total volume of the well without drill string. Calculate the volume of the mud in each interval and sum the volumes.
V Well
(m ) 3
( )
VCsgl m
3
ID 2 Well = 1,273,000
x L (m
)
323 2 mm 2 = x 1,600 (m ) = 131.1 m 3 1,273,000
( )
250.82 mm2 x1,800(m) = 88.9 m3 VOH m = 1,273,000 3
Total without the drill string: V System = V Csg + V OH = 131.1 m3 + 88.9 m3 = 220 m3
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-174 Drilling Muds Drilling Supervisors Training Course
RPW2021A
174
EXAMPLES Part IV: Determine the total volume with the string in the well . Volume in the string: V Drillstrin
( )
VDP m
3
g
(m )
ID 2 DS (mm = 1,273,000
) x L (m )
108.6 2 (mm ) = x 3200 (m ) = 29.6 m 3 1,273,000
( )
V DC m
3
3
72 2 (mm = 1,273,000
)
x 200 (m ) = 0.8 m
3
Total volume in the string: V Drillstring = V DP + V DC = 29.6 m 3 + 0.8 m 3 = 30.4 m 3
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-175 Drilling Muds Drilling Supervisors Training Course
RPW2021A
175
EXAMPLES Volume in the annulus:
VAnnulus
ID 2 Well (mm) − OD 2 DS (mm) x L (m ) m = 1,273,000
( ) 3
3232 (mm) − 1272 (mm) VAnn(Csg DP) m = x 1,600 (m) = 0.06927 x 1,600 = 110.8 m 3 1,273,000
( ) 3
250.82 (mm) − 127 2 (mm) VAnn(OH DP) m = x 1,600 (m ) = 0.03673 x 1,600 = 58.8 m 3 1,273,000
( ) 3
250.82 (mm) − 1852 (mm) VAnn (OH DC ) m = x 200 (m ) = 0.02252 x 200 = 4.5 m 3 1,273,000
( ) 3
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-176 Drilling Muds Drilling Supervisors Training Course
RPW2021A
176
EXAMPLES
VAnnulus
(m ) = V 3
Total
Ann (Csg DP )
+ VAnn (OH DP ) + VAnn (OH DC )
V Annulus Total = 110.8 + 58.8 + 4.5 = 174.1 m3
Total volume of the hole with a string:
V Well/DS = V Annulus Total + V Drillstring = 174.1 + 30.4 = 204.5 m 3
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-177 Drilling Muds Drilling Supervisors Training Course
RPW2021A
177
EXAMPLES Part V: Determine the circulation total volume. V Total = V Well/DS + V Surface = 204.5 m3 + 150 m3 = 354.5 m3
Part VI: Determine the time needed for a complete circulation and bottoms-up.
ID2 Liner (mm) x L (mm) x Eff (decimal) VP ump Output (l/stk) = 424,333
152.4 2 Liner (mm) x 304.8 (mm) x 0.9 (decimal) VP ump Output (l/stk ) = = 15.01 (l/stk ) 424,333
(
VP ump Output (l/min ) = 15.01 (l/stk ) x 110 stk/min = 1,651 (l/min ) = 1.651 m 3 / min
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-178 Drilling Muds Drilling Supervisors Training Course
RPW2021A
178
)
EXAMPLES
354.5 m 3 Total circulatio n time (min ) = = 215 min 3 1.651 m /min
(
)
Total circulation (stk) = 215 min x 110 stk/min = 23,650 stk
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-179 Drilling Muds Drilling Supervisors Training Course
RPW2021A
179
EXAMPLES Hole cycle time (min ) =
( )
V Well/DS m 3
(
V P ump Output m 3 / min
)
=
204 .5 = 124 min 1.651
Hole cycle (stk) = 124 min x 110 stk = 13,640 stk
Bottoms - up time (min ) =
V Annulus
Total
(
(m ) 3
V P ump Output m 3 / min
)
=
174 . 1 = 106 min 1.651
Bottoms-up (stk) = 106 min x 110 stk = 11,660 stk
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-180 Drilling Muds Drilling Supervisors Training Course
RPW2021A
180
EXAMPLES Part VII: Determine the velocity in the annular per each single interval.
AV =
V Pump
AV(OH/DC) =
AV(OH/DP) =
AV(Csg/DP) =
Agip KCO
V
Output Ann
( (m
) = 1.651(m / min) = 73 m/min / m) 0.02252(m / m)
VPumpOutput m3 / min VAnn OH/DC
3
( (m
3
3
) = 1.651 (m / min) = 45 m/min 0.03673 (m / m ) / m)
VPump Output m 3 / min VAnn OH/DP
( (m
3
3
3
) = 1.651 (m / min) = 24 m/min / m) 0.06927 (m / m )
VPump Output m 3 / min VAnn Csg/DP
3
3
3
Well Area Operations ENGINEERING CALCULATIONS-MAP-181 Drilling Muds Drilling Supervisors Training Course
RPW2021A
181
EXAMPLES
Part VIII: Determine the hydrostatic pressure at the TD
P
P
H
H
Agip KCO
(bar ) =
(bar ) =
Mud
Weight
(kg/l
)x TVD
(m )
10.2
1.5
(kg/l ) x 10.2
3,400
(m ) =
Well Area Operations ENGINEERING CALCULATIONS-MAP-182 Drilling Muds Drilling Supervisors Training Course
RPW2021A
500
182
bars
DENSITY INCREASE THROUGH ADDITIVES
Weight increase (specific weight d = 4.2)
(
W kg/m
with:
3
( d 2 − d1 ) ) = 4200 (4.2 - d ) 2
W = weight of the barite to be added in kg/m3 d1 = mud initial denisty (specific weight) d2 = desired mud density (specific weight)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-183 Drilling Muds Drilling Supervisors Training Course
RPW2021A
183
DENSITY INCREASE THROUGH ADDITIVES
Weight increase using Calcium Carbonate
(
W M kg/m
with:
3
) = 2650
(d 2 − d 1 ) (2.65 - d 2 )
W = weight of the calcium carbonate to be added in kg/m3 d1 = mud initial density (specific weight) d2 = desired mud density (specific weight)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-184 Drilling Muds Drilling Supervisors Training Course
RPW2021A
184
DENSITY REDUCTION THROUGH WATER OR OIL
Water needed to reduce density (density H2O d = 1)
(
VWater liters/m
with:
3
) = 1000 x
(d1 − d 2 ) (d 2 − 1)
VWater = water volume (litres) to be added at 1 m3 of mud d1 = mud initial density (specific weight) d2 = desired mud density (specific weight)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-185 Drilling Muds Drilling Supervisors Training Course
RPW2021A
185
DENSITY REDUCTION THROUGH WATER OR OIL
Oil needed to reduce the density (oil density d = 0.85)
(
Voil liters/m
3
) = 1000 x
(d 1 − d 2 )
(d 2 − 0 .85 )
with: VOil = oil volume (litres) to be added 1 m3 of mud d1 = mud initial density (specific weight) d2 = desired mud density (specific weight)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-186 Drilling Muds Drilling Supervisors Training Course
RPW2021A
186
VOLUME INCREASE WITH ADDITIVES
Final volume after the addition of additives
V
F
with:
(l ) =
V
I
+
M d
a a
VF = final volume (litres) VI = initial volume of 1,000 l (1 m3) Ma = additives weight da = additives specific weight
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-187 Drilling Muds Drilling Supervisors Training Course
RPW2021A
187
MIXING OF LIQUIDS WITH DIFFERENT DENSITY Final volume after mixing VA + VB = VF (VA x dA)+ (VB x dB) = (VF x dF)
with: VA = fluid volume A (m3) VB = fluid volume B (m3) VF = final volume(m3) dA = fluid density A (kg/l) dB = fluid density B (kg/l) dF = final density of the mixed fluids (kg/l)
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-188 Drilling Muds Drilling Supervisors Training Course
RPW2021A
188
MUD REPORT
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-189 Drilling Muds Drilling Supervisors Training Course
RPW2021A
189
MUD REPORT
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-190 Drilling Muds Drilling Supervisors Training Course
RPW2021A
190
MUD REPORT
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-191 Drilling Muds Drilling Supervisors Training Course
RPW2021A
191
Agip KCO
Well Area Operations ENGINEERING CALCULATIONS-MAP-192 Drilling Muds Drilling Supervisors Training Course
RPW2021A
192