DS Agile GATEWAY OVERVIEW DS Agile Training Level 1 Global Systems Engineering 03/05/2012

GRID

GSE

SAM

Summary

1) DS Agile Gateway Features

Page 3

2) DS Agile Gateway HMI

Page 11

3) SACU & WACU

Page 16

4) Troubleshooting

Page 22

L1-10-DS Agile GTW Overview - Rev G - P 2

GSE

1.1) Purpose

General purposes : How in DS Agile? Gets process data

SBUS IEC61850 (RP only)

Transmits data to Remote Control Point (SCADA) SCADA Protocol Receives controls from Remote Control Point (SCADA), Sends controls to SBUS devices

SBUS IEC61850 (RP only)

L1-10-DS Agile GTW Overview - Rev G - P 3

GSE

1.2) Technical Data DS Agile GTW Technical Data :

Number of Datapoints : ~25000 Datapoints

Number of SCADA communications : Up to 4 SCADA Links with redundant possibility

=> 8 serial Ports

Certification : T101 IEC 60870-5-101

Certified Kema + Years of use

Hardware of physical device L1-10-DS Agile GTW Overview - Rev G - P 4

GSE

1.3) Supported protocols

Validated : Serial Usual Protocol: IEC-60870-5-101, MODBUS, DNP3 Ethernet Protocol: IEC-60870-5-104, OPC IEC61850

Serial Specific Protocol : GI74, CDC type I & II

L1-10-DS Agile GTW Overview - Rev G - P 5

GSE

1.3) TBUS information Speed communication 300

bits/s

4800

bits/s

600

bits/s

9600

bits/s

1200

bits/s

19200

bits/s

2400

bits/s

Protocols utilities Refer to companion standard (GTW documentation, chapter CT)

L1-10-DS Agile GTW Overview - Rev G - P 6

GSE

1.4) DB Management

Generated by SCE

DS Agile SMT

DS Agile GTW DB1 DB2

Current Database Stand-By Database

SBUS Download into Stand-by database

L1-10-DS Agile GTW Overview - Rev G - P 7

GSE

1.7) Modes Management

Operating Mode :

Running mode Maintenance Mode NO TEST MODE

Exploitation Mode : Remote/Local Substation : Remote, GTW accepts SCADA controls Take Control : define which SCADA port has the control SBMC Mode : controls by SCADA rejected all DP of the bay sent as “Suppressed SBMC” Bay mode Local : GTW refuses SCADA controls L1-10-DS Agile GTW Overview - Rev G - P 8

GSE

1.8) DS Agile GTW Settings 1) automatic logon : what for? At start-up, OS and gateway application must start directly. (No screen, no keyboard, no mouse)

2) SCADA deviation from protocol standard Registry keys to scope with customer specification (cf. MF chapter) Ex: Maintenance_if_dcnx_ethernet = 0

So the GTW goes in maintenance mode if SBUS is disconnected. Maintenance_if_dcnx_ethernet = 1 So the GTW sends to SCADA all DP as unknown with SBUS disconnection time

L1-10-DS Agile GTW Overview - Rev G - P 9

GSE

Summary

1) DS Agile Gateway Features

Page 3

2) DS Agile Gateway HMI

Page 11

3) SACU & WACU

Page 16

4) Troubleshooting

Page 22

L1-10-DS Agile GTW Overview - Rev G - P 10

GSE

2.1) Basic Display Menu Bar

Version reminder

Initialisation information Data

Protocol per port L1-10-DS Agile GTW Overview - Rev G - P 11

GSE

2.2) Buttons (1) Equipment Status : − gives devices status

Selection drop lists

L1-10-DS Agile GTW Overview - Rev G - P 12

GSE

2.2) Buttons (2) Digital Information : − gives DI status

Selection drop lists Reference* : internal ref. in configuration L1-10-DS Agile GTW Overview - Rev G - P 13

GSE

2.2) Buttons (3) Analogue Information : − gives AI value and status

Selection drop lists Reference* : internal ref. in configuration L1-10-DS Agile GTW Overview - Rev G - P 14

GSE

Summary

1) DS Agile Gateway Features

Page 3

2) DS Agile Gateway HMI

Page 11

3) SACU & WACU

Page 16

4) Troubleshooting

Page 22

L1-10-DS Agile GTW Overview - Rev G - P 15

GSE

3.3°- Presentation GTW – Introduction

Substation Automation Control Unit (SACU) Wide Area Control Unit (WACU) Ensure automation inside a substation (SACU) or between substations (WACU) using IEC 61131-3

 Hot stand-by redundancy available  Fully configured within DS Agile configurator  PC base solution without rotating part (XPe)  No Additional PC (use the same gateway hardware)

 Fully compliant with Electrical installation constraints (IEC 60255 & IEC 1004 EMC)

L1-10-DS Agile GTW Overview - Rev G - P 16

GSE

3°- Presentation GTW – Introduction Protocols Scada Network (PLC Output)

Lower Network (PLC Input)

IEC 61850

IEC 61850

IEC 870-5-101 slave

IEC 870-5-101 master

IEC 870-5-104 slave

IEC 870-5-104 master (future)

Modbus GI74 OPC DA

Automatism capabilities :  Slow automation given with Isagraf (5.22) runtime  Executed with RTX2011 Kernel

L1-10-DS Agile GTW Overview - Rev G - P 17

DNP3 SAS CDC type 2

GSE

3.3°- Presentation GTW – Automatism capabilities

L1-10-DS Agile GTW Overview - Rev G - P 18

SPS / DPS / MV SPS / DPS / MV

SPC / DPC / SP

Note : GTW Case, Automation has the priority in GTW

Windows XP Embeded

- The automation requires to install RTX on GTWs, A real-time extension for Win32 platform. - The RTX allows Windows to run only when all real-time processing is finished.

SPC / DPC / SP

Gateway /SACU Internal architecture

GSE

3.3°- Presentation GTW – Automatism capabilities Reminder in case protocol: Transmits data to Remote Control Point (SCADA)

SCADA Protocol

Receives controls from Remote Control Point (SCADA)

Gateway

Automation IEC-61131

What does it mean ? - Data of the bay, managed by a GTW, are only transmitted to SCADA or upper network. Data are not transmitted to lower network. BCU / PROTECTION - Command (xPC and SetPoints) are only send to lower direction. The command of the bay are only transmitted to lower network

BCU / PROTECTION

It must be taken into account during the design of the automation. L1-10-DS Agile GTW Overview - Rev G - P 19

GSE

3.3°- Presentation GTW – Automatism Redundancy

It needs to install an additional network card to have this comunication Special NIC Card : Intel Network Card PRO/1000 GT •The automation runs simultaneously on both gateways (hot redundancy), but outputs are allowed only on the active gateway. • The redundancy of the gateway doesn’t manage the switch for the automation, it has to be made through another automation.

L1-10-DS Agile GTW Overview - Rev G - P 20

GSE

Summary

1) DS Agile Gateway Features

Page 3

2) DS Agile Gateway HMI

Page 11

3) SACU & WACU

Page 16

4) Troubleshooting

Page 22

L1-10-DS Agile GTW Overview - Rev G - P 21

GSE

3.1) Debug Tool : DbgView DbgView soft is under C:\Program Files\ALSTOM\DCS\Gateway Buttons to activate / deactivate GTW traces capture Clear Log : max log supported is 64MBytes Log : GTW traces capture, contains : -GTW kernel messages -Serial protocol frames (received and transmitted)

Possibility to save log L1-10-DS Agile GTW Overview - Rev G - P 22

GSE

3.2) References identification (1) References are generated at Gateway Level. Use GtwIDToUCA.exe soft to retrieve SBUS @ for DI, DO, AI Soft is under C:\Program Files\ALSTOM\DCS\Gateway\Ecdd1 or Ecdd2

L1-10-DS Agile GTW Overview - Rev G - P 23

GSE

3.2) References identification (2) Internal reference

L1-10-DS Agile GTW Overview - Rev G - P 24

Relevant information IEC61850 (check in SCE)

GSE

www.alstom.com