ABB Power Technologies AB Västerås - Sweden

REC670 Product Integration Training Course



Start CCT tool and create a new project:



Give a “Project name” and browse for the folder



Import into CCT the exported SCL-file from PCM

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 1

ABB Power Technologies AB Västerås - Sweden



REC670 Product Integration Training Course

The structure of your project shown by CCT should look like this

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 2

ABB Power Technologies AB Västerås - Sweden

Data Set Engineering

REC670 Product Integration Training Course



Navigate your “REC670” object down to LD0/LLN0 level:



Add a new data set into LLN0 and rename it to “GOOSE”.

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 3

ABB Power Technologies AB

REC670 Product Integration Training Course Click/select on ”GOOSE” dataset. Under “IED Data Model” browse and select the signals you want to add :

Västerås - Sweden



-reservation request:

-acknow. the reservation request

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 4

ABB Power Technologies AB Västerås - Sweden

REC670 Product Integration Training Course

-apparatus position QB1+QB2

QB2

QB1

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 5

ABB Power Technologies AB



REC670 Product Integration Training Course The complete GOOSE dataset for Line bay should look like this:



Create GOOSE dataset for Bus Coupler bay.



Add resp. signals from ”IED Data Model” :

Västerås - Sweden

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 6

ABB Power Technologies AB Västerås - Sweden

REC670 Product Integration Training Course

GOOSE Control Engineering • Define a GOOSE control block and insert your dataset. (have remain on the same level in the project structure)



Click on Goose Control Engineering and then on GSE Control



Associate your GOOSE dataset to this NewGSEControl:

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 7

ABB Power Technologies AB

REC670 Product Integration Training Course

Västerås - Sweden



Click on

• •

Save Do the same procedure for BusCouplers IED.:



Define a new MAC Address of your GOOSE message:



Save



Drag and drop the REC670 (client-IED) to REC670_BC (sending-IED) Goose Control Engineerings window .

and then define the MAC Address of your GOOSE message:

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 8

ABB Power Technologies AB Västerås - Sweden

REC670 Product Integration Training Course



You can now see the REC670 (client-IED) in the structure



Update the data flow you just created and Save.



You can now see the “Inputs” for REC670 (client-IED):



Do the same procedure for Line Bay IED. Drag and drop the REC670_BC (client-IED) to REC670 Goose Control Engineerings window . Substation Automation & Protection Training

SA.T. Training Product Integration REC670 2007-01-15

Page 9

ABB Power Technologies AB Västerås - Sweden

REC670 Product Integration Training Course

• •

Update the data flow. Save Verify that you can see the “Inputs” under REC670_BC



Export SCD file from CCT, now containing the GOOSE part.



Import SCD file to PCM600.

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 10

ABB Power Technologies AB Västerås - Sweden



REC670 Product Integration Training Course

Start SMT, do the connection both Line bay REC670………

…….and BusCoupler REC670_BC:

• •

Save. Close SMT.

Substation Automation & Protection Training SA.T. Training Product Integration REC670 2007-01-15

Page 11

ABB Power Technologies AB

REC670 Product Integration Training

Västerås - Sweden



Start PST. You need to activate IEC61850 communication and GOOSE messaging.

Settings for REC670:

Settings for REC670_BC:

Substation Automation & Protection Training SA.T. REC670 Product Integration Training Course 2007-01-16

Page 12

ABB Power Technologies AB

REC670 Product Integration Training

Västerås - Sweden



Save and close PST.

• 1. 2. 3. 4.

Download to IEDs CAP-configuration PST (settings) SMT GDE (If necessary)



Verify that horizontal communication (GOOSE) is working.

Substation Automation & Protection Training SA.T. REC670 Product Integration Training Course 2007-01-16