RESOURCES PTE LTD

Co. Reg. No. 200101754G

59 WOODLANDS IND PK E2, SINGAPORE 757476 TEL: 64649959 FAX: 64649949

7th March 2014 From: Eng Yong Chye To: General Manager Subject: #09-2014 ACTIVITY HAZARD RISK ASSESSMENT FOR INSTALLATION OF CONDUITS AND CABLES FOR T2 MASTER CLOCK Ref: (a) Ministry of Manpower Regulations Regarding General Safety and Health 354A 1. Per reference (a), this risk assessment was completed to identify hazards that pose risk to workers, evaluate those hazards for severity and likelihood of occurrence, and recommend corrective actions that will eliminate or minimize hazards associated with the installation of conduits & cables for T2 Master Clock 2. This AHRA will be reviewed periodically and updated as needed to reflect changes in working conditions, processes or addition of new materials or equipment. Inventory of Work Activities………………………………………………………………………………….Page 3 1

Activity Risk Assessment Matrix…………………………………………………………………….…..…Page 4 Activity Based Risk Assessment Form……………………………………………………………………Pages 5-7 Listing of Competent Persons……………………………………………………………………………….Page 8 Fall Protection Plan………………………………………………………………………………………………Pages 9-10 Daily Man-Lift Inspection Checklist………………………………………………………………………Page 11 Please address any questions or concerns to me at 8205 8249 or [email protected].

Respectfully, T. L. Wilson

2

Risk Assessment Form

#09-2014, Activity-Based Risk Assessment for Installation of Conduits and Cables for the T2 Master Clock Inventory of Work Activities Company/Contractor: PNH Resources Pte Ltd 7th March 2014 No . 1

Process Description

Work Activities

Deliver materials to job-site

Deliver tools, materials, lift equipment as needed, equipment for working at height etc.

2

Site preparation

3

Working at Height

3

Install cable in conduit and associated accessories.

Set up safety barricades, hoarding, safety signs, traffic control cones, directional signs or blinking lights to support traffic control. Ensure that a first aid kit is available for the project. Employ either scaffolding or ladders to access work areas above 1.8 meters in height. Work above this height also requires the use of personal fall arrest systems (PFAS). See fall protection plan on pages 9 and 10 of this document. Install electrical components including: a. 2.5sq mm PVC Insulated cables b. 20 mm diameter PVC conduit c. 13A switch socket outlet d. 20A DP MCB

4

Working in heat

5

List of Competent Persons

If the project is to be conducted outdoors, ensure that workers have drinking water and ensure that they are trained in how to recognize heat injuries and perform first aid as needed. This is a list of competent personnel with their hand phone numbers who can be contacted in the event that situations arise that may require their expertise.

3

#09-2014, ACTIVITY HAZARD RISK ASSESSMENT – FIVE POINT MATRIX EMPLOYED TO QUANTIFY RISK – 7th March 2014 Risk Criteria Severity (1-5, Lowest – Highest)

Likelihood ( 1-5, Lowest Highest)

1-Negligible Injuries: slight injury or health effect, 2-Minor Injuries: Injury or ill health requiring first aid treatment only 3-Moderate Injury: Injury requiring medical treatment or ill health leading to disability 4-Major Injury Disability: serious injury or life threatening occupational disease 5-Castrophic: serious injury resulting in fatality or irreversible health damage with death 1-Rare: very unlikely to happen, 2-Remote: not likely to happen most of the time, 3-Occasional: likely to happen sometime, 4-Major Injury Disability: likely to happen several times regularly, 5-Almost Certain: Likely to happen

Risk Level (Severity x Likelihood) Trivial Risk : 1 to 2 (L) - First aid treatment injury, minor cuts or bruises, clean-up effort for environmental impact Tolerable Risk : 3 to 9 (L) - First aid treatment Injury, minor cuts or bruises, clean-up effort for environmental impact Moderate Risk : 10 to 19 (M) - Temporary disability, lost time injury, outpatient treatment, minor or short term environmental impact Substantial Risk : 20 to 24 (H) - Serious Injury, permanent disability, major disruption and damage to equipment or structure, significant environmental Intolerable Risk : 25 (H) - Fatality or fatalities, serious injury, permanent disability, major structural or equipment damage, detriment environmental

The table above provides numerical methodology to better prioritize hazards. These values are the criteria for the Activity-Based Risk Assessments beginning on the following page. No catastrophic risk of any certainty was identified. 4

Risk is calculated mathematically by multiplying severity of the operation by the likelihood an accident will occur. Generally risk levels calculated at 9 and below are considered acceptable, manageable risk. This does not preclude the need to try and mitigate all risk to the lowest possible level. However, those above nine should receive additional scrutiny to determine what steps are available to reduce overall risk including, administrative controls, substitution of a higher hazardous material for a less hazardous material, use of engineering controls or use of personal protective equipment (PPE).

Risk Assessment Form Activity-Based Risk Assessment Form Company:

PNH RESOURCES PTE LTD

Process/Locatio n:

Installation of Conduits and Cables for T2 Master Clock

Approved by: Eng Yong Chye (Name, Project Manager designation) 7th March 21014 (Date) 1. Hazard Identification

Conducted by: (Names, designations) (Date)

Lee Wilson Senior Safety Manager 7th March 2014

Last Review Date:

Next Review Date:

7th March 2014

2. Risk Evaluation

7th September 2014

3. Risk Control

1a

1b

1c

1d

2a

2b

2c

2d

3a

3b

N o

Work Activity

Hazard

Existing Risk Control (if any)

Sev erit y

Likel yhoo d

Ris k Lev el

Additional Risk Control

Action Officer Designati on

1

Moving equipment, manpower,

Possible Accident/ Ill Health & Persons at Risk Workers assigned to complete

Musculoskelet al – Sprains, Strains,

PNH workers undergo regular training on how to

5

2

2

4

Training should include: Specifically: 1. Lift with the legs, 2. Keep back straight,

Project Manager and Senior

tools & scaffolding components into position at the jobsite.

2

N o

Working at Heights either using scaffolding or ladders.

Work Activity

ligament damage or other types musculoskele tal disorders (MSD).

Falls

Hazard

work on this phase of the project.

Persons working at height or persons transiting the area where work at height is being performed.

Possible Accident/ Ill Health & Persons at

avoid these types of injuries multiple times over the course of the year as part of their routine training. We have had 0 injuries requiring lost time x 3+ years. If scaffolding is being used, it shall be inspected by a competent person. If work is being conducted above 1.8 meters (six feet) workers shall wear safety harnesses. All ladders shall be inspected prior to being used for overall condition, foot treads, step treads and presence of debris on steps. In no instance shall a workers stand on a ladder above the third step from the top. Existing Risk Control (if any)

6

3. 4. 5.

3

2

6

Hold the load close to the body, Don’t twist while carrying the load, Review your path prior to moving the load

PNH employs a generic fall protection plan that can be used as a reference or tailored to a specific job. A copy of this plan is included on page(s) 9 & 10 of this document.

Safety Manager

Project Manager and Senior Safety Manager

If a ladder is too short to accomplish the test requiring a height above the 3rd step, management shall provide a ladder capable of reaching a higher height. Use of a man-lift may be an option as well. If it is used it should only be operated by a competent person and must be inspected daily. A man-lift inspection sheet is provided in this document on page 11.

Sev erit y

Likel yhoo d

Ris k Lev el

Additional Risk Control

Action Officer Designati on

3

Working at height

4

Component Installation : Metal conduits

N

Work

Workers assigned to work on the scaffold will come under the purview of the fall protection plan which is listed on pages 9 - 10 . Dropped tools, materials or other components from the scaffold working platform.

Potential noise from operating power hand tools

Hazard

Risk Persons assigned to work at height

Serious injuries including fractures, concussion. Lacerations or worse due to the height of the work.

Workers involved with the installation of these components.

Possible

Review of the Fall Protection Plan during the preproject safety brief. Use of personal fall arrest systems for any and all work conducted at 1.8 meters and above. Secure all tools and tool handles shall be used when raising or lowering tools Tools shall be carried in a bag, belt or sheath designed to hold tools and not put in the pockets or stuck in the top of boot Hearing protection is provided to all PNH workers and they receive training on the correct use of this equipment and the hazards of working unprotected around loud noise sources. Existing Risk

7

3

3

9

Ensure that workers inspect all harnesses prior to working at height. Inspections will include a review of: 1. Harness webbing, 2. Snaps, Hooks Fasteners and Karabiners, 3. D Rings and 4. Buckles and Adjusters

Project Manager and Senior Safety Manager

3

2

6

All materials used at height shall be maintained to prevent them from being dropped. The area beneath the scaffold will be restricted from access while work is being performed. A safety observer will be onsite to ensure traffic control and prevent any unauthorized access at all times.

2

2

4

A noise survey may be requested from the Safety Office; however, past experience has shown that this type of drilling to support the installation of these components will not require the use of double hearing protection. To arrange a noise survey contact Mr. Lee Wilson at 8205 8249.

Project Manager and Senior Safety Manager

Sev

Likel

Ris

Additional Risk Control

Action

o

Activity

5

6

Exposure to Electrical Components and Electrical Circuitry.

7

Worksite Cleanup – remove all tools and excess materials

Eye hazard from falling debris if work is done above the worker’s head on the ceiling Electric Shock or Electrocution should workers come in contact with live circuits. Musculoskelet al

Accident/ Ill Health & Persons at Risk Workers conducting work from the scaffold on the ceiling.

Control (if any)

erit y

yhoo d

k Lev el

Eye protection is provided to all PNH workers.

2

2

4

Sight Conservation training is conducted multiple times during the year.

Project Manager and Senior Safety Manager

Workers performing hands on electrical work.

Exercise Lock Out/Tag Out Procedures as appropriate and prior to working on or adjacent to live circuits.

3

2

6

All questions regarding Lock Out/Tag Out procedures should be addressed to the Project Manager and Electrical Competent Person, Mr. Eng Yong Chye, HP: 9626 9262

Senior Safety Manager

Persons involved in worksite cleanup.

As discussed in section 1 above.

2

1

2

As discussed in section 1 above

Senior Safety Manager

8

Officer Designati on

QUALIFICATIONS AND POINTS OF CONTACT FOR THIS PROJECT FROM PNH RESOURCES PTE LTD AND GOODMNAN ENVIRONMENTAL PTE LTD 2014 Competent/Qualified Personnel: Lee Wilson – Senior Safety Manager - 8205 8249 QP/ First Aid CPR/ Heat Stress Program/ Respiratory Protection Program/ Hearing/Sight Conservation Program/Training Coordinator Project Manager/Site Safety Eng Yong Chye Lim Joseph – PNH Executive Manager - 9683 7072 CP/ Scaffolds/ Fall Protection Eng Yong Chye – 9626 9262 CP/ Electrical/ First Aid CPR/Lock Out/Tag Out Equipment Used: Ladders/Scaffolds Hand and Power Tools First Aid Kit Eyewash Station LOTO Kit Fire Extinguishers

Inspection Requirements:

Training Requirements

Inspect PPE daily and before use. Inspect first aid kit at least weekly. Inspect electrical extension cords before use Visual inspection of Fire extinguisher daily Daily Housekeeping of work areas Daily site safety inspections by Safety Manager and project Quality Control

9

Ladders/Scaffolds Proper Lifting Techniques First Aid/CPR Emergency Telephone Numbers Daily/Weekly Safety Tool Box Meetings

Fall Protection Plan Falls to the ground can occur from unprotected edges and sides of roofing systems, ladders, scaffolding or falls from upper levels during installation of equipment. The order of control measures (hierarchy of controls) to abate falls or to select and use a fall protection method to protect workers from performing work at heights shall be: Elimination Prevention Work Platforms Personal Protection Systems Administrative Controls Primary protection for elevated work consists of a platform or scaffold which is erected properly. The bases are on flat surfaces and secured with braces and guardrails and toe boards are provided on all four sides. The guardrail system shall be capable of withstanding without failure a force of 200 lbs. applied in an outward or downward direction at any point. The top rail shall be 42 +/- 3 inches high and the mid rails shall be installed midway between the top rail and the floor, platform, runway, or ramp. The ends of the top rails and mid rails shall not overhang the terminal posts except where such overhang does not create a projection hazard. Toe boards shall be at least 4 inches high. If there is no fixed empennage stand to restrain workers from falling, workers shall wear an approved personal fall arrest system (PFAS). Personal fall arrest systems include a full-body harness, safety sleeve, 3 foot rope adjuster lanyard, 50 foot lifeline with one free end and a self-locking snap hook at the other, and an anchorage point (D-ring 10

anchorage connector). The anchorage point shall be capable to support at least 5000 pounds per workers. One system per person; each component is essential to restrain movement and prevent falls. Workers will use the rope adjuster to position themselves for a free lateral mobility. Note the PFAS requires conscious effort by each individual to avoid falls from the roof and sides. No employee shall be allowed in the elevated area unless the employee is wearing a PFAS and performing elevated work in that area. Project site safety inspector shall be assigned as the competent person to monitor the safety of other employees. The safety monitor shall be competent to recognize fall hazards, shall warn employees when it appears that the employee is unaware of a fall hazard or is acting in an unsafe manner. The safety monitor shall be in the same area and within visual sighting distance and close enough to communicate orally with the employee being monitored and the safety monitor shall not have other responsibilities which could take the monitor’s attention from the monitoring function. For the Pavilion project ensure that life lines will support at least 5000 pounds. If scaffolding is use, it shall be inspected prior to beginning each pavilion project. The scaffolding shall not be considered a work platform but just an access platform to the top of the pavilion. The scaffolding shall be inspected daily.

11

DAILY INSPECTIONS TO BE CONDUCTED WITH MAN-LIFTS # 1 2 3 4 5 6 7 8 9 10 11 12 13 14

DATE

HAZARDS

Y/N

Overhead Hazards Observed? Operator Qualified? ________________ Ground Hazards Observed? Copy of Operating Manual Available? Safety Harnesses Available and Used? Wheel Chocks installed? Lift Controls Tested Prior to Use? Boom and Basket Load Limits Exceeded? Articulating Boom with Upper/Lower Controls? Lower Controls Override Upper Controls? Are the Controls plainly marked as to function? When parked is the parking brake set? If parked on an incline, are the wheels Chocked? Are copies of all equipment inspections maintained at the worksite?

12

REMARKS Name: