RELATED SECTIONS
QUALITY ASSURANCE A.
Applicable Standards: Comply with the Standards specified in this Section. Comply with AES-N-004. (January 1, 1983).
B.
Insulation must be compatible with the membrane roofing system being used.
C.
Fire Ratings: Comply with fire resistance ratings as shown, and as required by governing authorities and codes and comply with the following roof insulation requirements: SECTION 07220
CONSTRUCTION SPECIFICATIONS
DWG. TYPE PLANT NO. INDEX
KAUST TOWN CENTER RESIDENTIAL &
RABIGH
DRAWING NO.
DOC
K55
COMMUNITY SUPPORT BUILDINGS
SAUDI ARABIA
¿
JOB/EWO#
A
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
À
Saudi Aramco 2616-ENG (3/99)
VE-417361 BI-25-00002
SHT. NO. REV. NO.
1 OF 3
00
OPERNS.
PMT
SAUDI ARAMCO OIL COMPANY
CERT
UL listing for "Roof Deck Construction" which are rated "FireAcceptable".
DESCRIPTION
ENG’G
1.05
PRODUCT DELIVERY AND STORAGE A.
Delivery: Deliver insulation undamaged and in a dry condition. Materials received which are obviously not dry or otherwise damaged will be rejected.
B.
Storage: Store insulation on wood blocking and under a weather tight cover. Do not store on new concrete or on the ground.
PART 2 - PRODUCTS
REV. NO.
DATE JOB/EWO
2.01
2.02
MANUFACTURERS A.
Saptex
B.
The Arabian Chemical Company (Polystrene)
C.
Arabian Fiberglass Insulation Company.
MATERIALS
DISCIPLINE ENGINEER
Roof insulation shall be polyisocynurate PIR rigid foam with skin, as manufactured by SAPTEX. Density shall be 35kg/m3 or 2 lb./ft. compressive strength of 280 kPa (40 psi). Water absorption 1% in volume.
CERTIFIED
B.
Insulation shall have a minimum R-value of 18 ft2.h.oF/BTU.
_ __________
C.
To reach 15 ft2.h oF/BTU thermal resistance thickness shall be 4".
PROJECT ENGINEER
½
____________ DATE
DATE: ________
CONSTRUCTION AGENCY ________________ DATE:
PART 3 - EXECUTION 3.01
INSTALLATION
OPERATIONS
A.
14-Sep-07
Date:
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
¾
A.
__ ________ _ DATE: ________
General: Keep insulation dry during and after application, and protect against excessive foot and wheel traffic. Cut insulation to fit neatly around projections, pipes and vents through roofing. Lay insulation loosely on top of roof metal or concrete slab Install only as much as can be covered by roofing membrane on the same day. Do not leave insulation exposed to sunlight or weather. Seal all edges of insulation adjoining vertical surfaces as recommended by the membrane roofing manufacturer.
SECTION 07220
CONSTRUCTION SPECIFICATIONS
DWG. TYPE PLANT NO. INDEX
KAUST TOWN CENTER RESIDENTIAL &
K55
COMMUNITY SUPPORT BUILDINGS
RABIGH
DRAWING NO.
DOC
SAUDI ARABIA
¿
JOB/EWO#
A
VE-417361 BI-25-00002
SHT. NO. REV. NO.
2 OF 3
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
À
Saudi Aramco 2616-ENG (3/99)
00
OPERNS.
PMT
SAUDI ARAMCO OIL COMPANY
ENG’G
CERT
B.
3.02
The separation layer, F2B Fiberfex, or Carlisle HP Protective Mat or equal as recommended by the SAUDI ARAMCO Representative. Shall be loosely laid on top of the EPDM membrane (at areas below concrete walkways tiles).
CLEANING
DESCRIPTION
Remove Trash, debris, equipment and parts from job site. 3.03
PROTECTION Finished roof areas shall be protected from damage by Contractor during construction.
REV. NO.
DATE JOB/EWO
END OF SECTION
DISCIPLINE ENGINEER
½
__ ________ _ DATE: ________
PROJECT ENGINEER ____________ DATE
CERTIFIED _ __________ DATE: ________
CONSTRUCTION AGENCY ________________ DATE:
OPERATIONS
14-Sep-07
Date:
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
¾
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.