Pearl GTL Project Shell Project No: HP-3000-QAT Project Document Number: T- 4.234.572

Purchase Order Number:

2MH127

Tag/Item Number(s):

N/A

Unit(s):

ASU

PCWBS:

Z

LINDE ENGINEERING

Contractor Project No: Project Rev.: A

Page 2 of 8

5887

QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

E

A

15.02.09

Ready for Construction

SB

EO

AG

RFC

D

O

04.01.09

Company Comments Incorporated

SB

AB

AG

CCI

C

O

30.12.08

Issued for Company Comments

SB

AB

AG

ICC

B

18.12.08

Issued for Review

SB

EO

AG

IFR

A

25.11.08

Issued for Internal Review

SB

EO

AG

IIR

Date

Description

GAMA Rev. No.

Project Rev No.

Prepared Checked Approved By By By ORIGINATOR

Status

Document Title:

LINDEGINEERING AG

ITP FOR INSTALLATION OF GYPSUM BOARD (BUILDINGS) Document No.

Contractor

Gama Qatar Co. W. L. L.

LOC470 GAM

ITP

QAC

GTL

044

E

Org. Code

Doc. Type

Disc. Code

Geogr. Area

Seq. No

Rev. No

Project Document Number: T- 4.234.572

Vendor Code

Rev No: A

QSGTL PEARL PROJECT C2 ASU Construction Works

ITP FOR INSTALLATION OF GYPSUM BOARD (Buildings) S. GAMA QATAR

X. CONTRACTOR QC

C. COMPANY

Document No.: GAM-ITP-QAC-GTL- 044 Date: 15.02.2009 Rev. E A. THIRD PARTY (TPI)

I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item

1.0 1.1 2.0 2.1

2.2 3.0

3.1

3.2

Activity

Test Frequency

METHOD STATEMENTS/PROCEDURES Method Statements / Prior to start of Procedures activity Preparation

Reference Document

Acceptance Criteria

Responsible Party

Verifying Documents

S

X

Subcontractor Method Statements / Procedure

Project Requirements

QA/QC

Project Specifications & Material Approval Request

H

R R

Manufacturers Technical data sheet, certificates

QC – Civil Inspector

Manufacturers Technical data sheets & certificates

H

R R

Manufacturer’s recommendation.

QC – Civil Inspector

Visual confirmation

I

S S

QC – Civil Inspector

GAM-QCR-QACGTL- 168

I

S S

QC – Civil Inspector

GAM-QCR-QACGTL-166

I

W S

C

MATERIALS CERTIFICATES Verification of Acoustical & rock wool material. Storage and handling of Acoustical & rock wool material. INSPECTIONS Environmental Conditions 1. Ambient temp.

Inspection for surface preparation ( Repairing the surface of R.C.C Wall)

T- 4.234.572

Rev. A

100%

100%

100%

100%

T.4.234582 , DEP 34.17.00.32-Gen & DEP 34.17.10.30-Gen T.4.234.582 , DEP 34.17.00.32-Gen & DEP 34.17.10.30-Gen

T.4.234.582 , DEP 34.17.00.32-Gen & DEP 34.17.10.30-Gen

T.4.234.582 & T.4.234.555

DEP 34.17.00.32Gen & DEP 34.17.10.30-Gen & Manufacturer’s data sheet DEP 34.17.00.32Gen & DEP 34.17.10.30-Gen & Manufacturer’s data sheet

Page 4

A

QSGTL PEARL PROJECT C2 ASU Construction Works

ITP FOR GYPSUM BOARD INSTALLATION (Buildings) S. GAMA QATAR

X. CONTRACTOR QC

C. COMPANY

Document No.: GAM-ITP-QAC-GTL- 044 Date: 15.02.2009 Rev. E A. THIRD PARTY (TPI)

I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item

Activity

Test Frequency

Reference Document

Acceptance Criteria

Responsible Party

Verifying Documents

S

X

100%

T.4.234.582 , DEP 34.17.00.32-Gen & DEP 34.17.10.30-Gen

T.4.234.555 Procedure for Building works

QC – Civil Inspector

GAM-QCR-QACGTL-168

I

W S

T.4.234.582 & Manufacturer’s recommendation

Manufacturer’s recommendation & RFC drawings

QC – Civil Inspector

GAM-QCR-QACGTL-168

I

S

T.4.234.582 & Manufacturer’s recommendation

Manufacturer’s recommendation & RFC drawings

QC – Civil Inspector

GAM-QCR-QACGTL-168

I

W S

T.4.234.582 & Manufacturer’s recommendation

Manufacturer’s recommendation

QC – Civil Inspector

GAM-QCR-QACGTL-168

I

S

S

Visual confirmation

Site Engineer & QC – Civil Inspector

Check Records & Punch List

I

H

W

3.3

Inspection for installation of framing system

3.4

Inspection for Installation of Conduits (If applicable)

100%

3.5

Inspection for 40mm thick rock wool insulation

100%

3.6

In process inspection of Gypsum Board Installation system

100%

3.7

Final inspection & Punch Listing

T- 4.234.572

Rev. A

100%

Mechanical Completion Documentation

Page 5

C

S

A

QSGTL PEARL PROJECT C2 ASU Construction Works

ITP FOR GYPSUM BOARD INSTALLATION (Buildings) S. GAMA QATAR

X. CONTRACTOR QC

C. COMPANY

Document No.: GAM-ITP-QAC-GTL- 044 Date: 15.02.2009 Rev. E A. THIRD PARTY (TPI)

I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item

3.8

Activity

Disposal of high risk wastes such as rock wool waste & gypsum board waste.

T- 4.234.572

Rev. A

Test Frequency

100%

Reference Document

Acceptance Criteria

T.13.377.450Construction waste Management Procedure

Check & ensure in Hazard area ,flammable area any paint material

Responsible Party

Verifying Documents

S

X

C

Visual

I

S S

Site Engineer

Page 6

A

QSGTL-PEARL GTL PROJECT C2-ASU-Construction Project Inspection Form for Surface Preparation(Buildings) GAM-QCR-QAC-GTL-166 Rev. O

Date :

GAM-ITP-QAC-GTL-

Location Bldg/Area: Drawing No: Tag No and Tag description :

Item

Details of Activity

Remarks

Sign off will Confirm Released to Next activity GAMA QATAR Name

Signature

Date

LINDE

QSGTL or its PMC

QSGTL PEARL PROJECT C2 ASU Construction Works FORM NO: GAM-QCRQAC-GTL-168 Rev. O

Gypsum Board , Suspended Ceiling Date: works & Rock Wool Installation ITP No: GAM–ITP–QAC–GTLCheck List

Report No: Item description: Item location/area: Drawing reference:

Ambient Temp. :

Tag No & Description:

Ref.

DETAIL OF ACTIVITY

1

GYPSUM BOARD WORK Dimensionally correct plumb, level and square etc ... complete. Screws, Anchors, U-Channels, Studs, Brackets fixing. Application of Joint Filler or joint tape etc ... complete.

1.1 1.2 1.3 2 2.1 2.2 2.3

Hangers, channels, studs, furring correctly spaced, braced. Plumbed and level Material application and jointing correctly installed at ceilings, openings and fittings Trims are installed level and clean.

4 5

Work area is clean and free from debris

3.1 3.2 3.3

REMARKS

SUSPENDED CEILING

ROCK WOOL INSULATION ( Roof & Wall) Positioning, grouting and curing in accord with codes of practice and vendor instructions Finish with plumb, level, clean and free from spalls Gaps and coursing, expansion joints, stained joints are in accord with the relevant drawing and specifications All works are Completed with final touch-ups

3

COMPLIANCE YES NO N/A

SIGN OFF AS ACCEPTED GAMA QATAR Name

Signature

Date

LINDE

QSGTL or its PMC

0

C