QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
G
A
18.02.09
Ready for Construction
SB
EO
AG
RFC
F
A
12.02.09
Ready for Construction
SB
EO
AG
RFC
E
O
28.12.08
Issued for Review
SB
EO
AG
IFR
D
O
24.12.08
Company Comments Incorporated
SB
EO
AG
CCI
C
O
14.12.08
Issued for Company Comments
SB
EO
AG
ICC
B
08.11.08
Issued for Review
SB
EO
AG
IFR
A
25.10.08
Issued for Internal Review
SB
EO
AG
IIR
Date
Description
GAMA Rev. No.
Project Rev No.
Prepared Checked Approved By By By ORIGINATOR
Status
Document Title:
ITP FOR PAINTING (BUILDINGS) LINDEGINEERING AG Document No.
Contractor
Gama Qatar Co. W. L. L.
LOC470 GAM
ITP
QAC
GTL
041
G
Org. Code
Doc. Type
Disc. Code
Geogr. Area
Seq. No
Rev. No
Project Document Number: T-4.318.708
Vendor Code
Rev No: A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-041
C2 ASU Construction Works
ITP FOR PAINTING (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 18.02.2009 Rev. G A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
1.0 1.1
Activity
Test Frequency
METHOD STATEMENTS/PROCEDURES Method Statements / Prior to start of Procedures activity Preparation
Reference Document
Acceptance Criteria
Responsible Party
Verifying Documents
S
X
Subcontractor Method Statements / Procedure
Project Requirements
QA/QC
-
I
R R
T.4.234.582 & As per project specification
Manufacturers Technical data sheet, certificates
QC – Civil Inspector
GAM-QCR-QACGTL-164
H
R R
Manufacturer’s recommendation.
QC – Civil Inspector
Visual confirmation
I
S S
QC – Civil Inspector
GAM-QCR-QACGTL-164
I
S S
2.0
MATERIALS CERTIFICATES
2.1
Verification of Paints & Paint colors
100%
2.2
Storage and handling of Paints
100%
T.4.234.582 & As per manufacturers recommendation
3.0
INSPECTIONS
100%
T.4.234.582 & As per manufacturers recommendation
3.1
Environmental Conditions 1. Ambient temp.
Manufacturer’s data sheet
C
3.2
Identification of repair
100%
T.4.234.582
T.4.234.582
QCI
GAM-QCR-QACGTL-166
I
W S
3.3
Surface preparation & released for next activity ( Application of Putty – If required)
100%
T.4.234.582 - Procedure for Building works & Project Specification
T.4.234.582 Procedure for Building works
Site Engineer
GAM-QCR-QACGTL-166
I
W S
T-4.318.708 Rev. A
Page 4
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-041
C2 ASU Construction Works
ITP FOR PAINTING (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 18.02.2009 Rev. G A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
Activity
3.4
Inspection for primer coat
3.5
Release to painting
3.6
In process inspection of Painting system
3.7
Inspection of intermediate coats & minimum time between the applications of different coats.
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
Activity
Test Frequency
100%
3.8
DFT Checking
3.9
Inspection of repair / touch up of paintings /coatings.
100%
3.10
Final Coat inspection & Punch Listing
100%
T-4.318.708 Rev. A
Reference Document
T.4.234.582 & Manufacturer’s recommendation
Acceptance Criteria
Responsible Party
Verifying Documents
S
X
C
I
W S
Manufacturer’s recommendation
Site Engineer & QCI
GAM-QCR-QACGTL-164
T.4.234.582 & Project Specification
Manufacturer’s recommendation
Site Engineer & QC – Civil Inspector
GAM.-QCR-QACGTL-164
I
W W
----
Visual confirmation
Site Engineer & QC – Civil Inspector
Linde Punch List
I
W W
Page 6
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-041
C2 ASU Construction Works
ITP FOR PAINTING (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 18.02.2009 Rev. G A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
Activity
3.11
Disposal of high risk wastes such as catalyst drums, chemical drums for first fill, paint cans