Pearl GTL Project LINDE ENGINEERING
Shell Project No: HP-3000-QAT Project Document Number: T- 4.234.577
Purchase Order Number:
2MH127
Tag/Item Number(s):
N/A
Unit(s):
ASU
PCWBS:
Z
Contractor Project No : 5887 Project Rev.: D
Page 2 of 16
QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION H
D
10.02.09
After clarification with PMC, Issued for Review
SK
EO
AG
IFR
G
C
10.12.08
As per Site Condition, Issued for Review
SK
EO
AG
IFR
F
B
31.07.08
Issued for Company Comments
SB
EO
AG
ICC
E
B
15.07.08
Ready for Construction
KC
EO
AG
RFC
D
A
25.06.08
Issued for Company Comments
KC
EO
AG
ICC
C
O
10.06.08
Issued for Company Comments
FB
EO
AG
ICC
B
10.06.08
Issued for review
FB
EO
AG
IFR
A
09.06.08
Issued for internal review
FB
EO
AG
IIR
Date
Description
GAMA Rev. No.
Project Rev No.
Prepared Checked Approved By By By ORIGINATOR
Status
Document Title:
ITP FOR U/G GRP PIPING
LINDE ENGINEERING AG
Document No.
Contractor
Gama Qatar Co. W. L. L.
GAM
ITP
QAC
GTL
030
H
Org. Code
Doc. Type
Disc. Code
Geogr. Area
Seq. No
Rev. No
Project Document Number: T-4.234.577
LOC470 Vendor Code
Rev No: D
QSGTL PEARL PROJECT
Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
Rev / Date
ITP FOR U/G GRP PIPING S : GAMA QATAR I: INSPECTION Item
1.0
1.1 1.2
R: DOCUMENT REVIEW
Activity
Characteristic to be Verified
C : COMPANY
S: SURVEILLANCE
Control Procedure Reference
Acceptance Criteria
V : VENDOR
H: HOLD POINT. W: Responsible Party
WITNESS
Verifying Documents
S
X
C
V
METHOD STATEMENTS / PROCEDURES Method statement for fabrication and installation of GRP PIPING
Applicable to ASU Pearl GTL
Testing of GRP piping systems
Applicable to ASU Pearl GTL
1.3 2.0
Verification of qualification of personnel
2.1
Torque Wrench
2.2
X : CONTRACTOR QC
: Rev-H / 10.02.2009
T-4.234.087
Approved RFC
Approved Documents I
R
R
R
I
R
R
R
I
H
H
H
I
R
R
R
R
T-4.234.087
Manufacturer’s recommendation
ISO 14692 Part 4 Annex D
Training by Vendor / Manufacturer
Manufacturer Certificate
Torque Value Achieved
T-4.250.955
1 Month
Calibration Certificate
Validation Sticker
T-4.234.548
1 Month
QA/QC Engineer
Calibration Certificate
I
Visual Damage
QC Inspector
GAM-QCR-QAC-GTL-079
I
R
R
R
I
S
S
S
Previous Experience
Site Engineer
Approved Documents
CONTROL OF INSPECTION ,MEASURING AND TEST EQUIPMENT
Pressure Test Gauges
2.3
Visual Inspection of GRP Pipes and components
3.0
MATERIAL
3.1
Material Receipt & Visual Inspection
As per Company Specification
3.2
Storage and Preservation
As per Manufacture recommendation
3.3 4.0
Sub-Contractor Material Approval INSPECTIONS
T-4.234.577 Rev. D
DELETED
Manufactures Data Sheets
As per Manufacturer Manufactures recommendation Data Sheets DELETED
Store In charge
As per specification
Page 4
QSGTL PEARL PROJECT
Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
Rev / Date
ITP FOR U/G GRP PIPING S : GAMA QATAR I: INSPECTION Item
X : CONTRACTOR QC
R: DOCUMENT REVIEW
Activity
Characteristic to be Verified
4.1
Verification of Trench Excavation
Elevation, Orientation & Width
4.2
Laying of bedding material, prior to Installation of the GRP pipes
Bedding Granules level
4.2.1
4.3
Cleanliness before laying of pipes into the bed
Bell and Spigot a)
QC Inspector shall verify correct O Ring for the service has been selected
The surfaces to be connected, including the gasket grooves, shall be clean c) The Seal ring and groove to be checked for the correct dimension. d) Non-symmetric seals, such as lip seals, shall be checked for correct installation in the grooves e) Clean non-contaminated lubricant shall be used on both seals and spigot
Internal Cleaning As per Manufacturer recommendation’s
C : COMPANY
S: SURVEILLANCE
Control Procedure Reference
As per the drg. T-4.259.773 As per the drawing T-4.259.773 T.13.377.360 Rev E & DEP 31.40.19Gen ISO 14692-4:2002 Annex C Figure C.3
Acceptance Criteria
Survey Report
QA/QC Civil Report No foreign materials inside the pipe & Internal Cleaning before laying into trench As per Manufacturer recommendation As per Manufacturer recommendation’s
: Rev-H / 10.02.2009 V : VENDOR
H: HOLD POINT. W: Responsible Party
WITNESS S
X
C
V
Excavation Survey Report
I
S
R
S
Sand Bedding Survey Report
I
S
S
S
Site Engineer
GAM-QCR-QAC-GTL-139
I
W
W
S
Site Engineer
GAM-QCR- QAC-GTL045
QA/QC Engineer
QA/QC Engineer
Verifying Documents
I
S
S
W
b)
T-4.234.577 Rev. D
I
S
S
W
I
S
S
W
I
S
S
W
I
S
S
W
Page 5
QSGTL PEARL PROJECT
Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
Rev / Date
ITP FOR U/G GRP PIPING S : GAMA QATAR I: INSPECTION Item
X : CONTRACTOR QC
R: DOCUMENT REVIEW
Activity
Characteristic to be Verified
C : COMPANY
S: SURVEILLANCE
Control Procedure Reference
V : VENDOR
H: HOLD POINT. W:
X
C
V
f) The correct tooling shall be used to enter the spigot into bell to avoid damage to the seals
I
S
S
W
g) Entry location marks on the spigot (If applicable) should be checked to ensure correct entry distance
I
S
S
W
h) Pipe sections shall be aligned as straight as possible in order to retain the O-rings in their groves
I
S
S
W
i) A feeler gauge shall be used to establish good seating of the seals
I
S
S
W
j) For key lock tensile –resistance joints, clean and lubricated locking strip should be inserted in complete circumference of the locking strip groove ,and the locking strip shall have the correct cross section and length
I
S
S
W
I
H
H
H
T-4.234.577 Rev. D
No leak
Manufacturer receipt, T.13.376.808E& DEP 31.40.10.19
As per Manufacturer recommendation
Responsible Party
WITNESS S
k) Identification and repairing of defective joints / pipes etc (if any)
Acceptance Criteria
: Rev-H / 10.02.2009
Site Engineer
Verifying Documents
GAM-QCR-QAC-GTL045,047,048
Page 6
QSGTL PEARL PROJECT
Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
Rev / Date
ITP FOR U/G GRP PIPING S : GAMA QATAR I: INSPECTION Item
R: DOCUMENT REVIEW
Activity
l) Sealing Test of Joints
4.3.1
4.4
X : CONTRACTOR QC
Test Pack Preparation
Torque of the flange Bolts
C : COMPANY
S: SURVEILLANCE
Characteristic to be Verified
Control Procedure Reference
Acceptance Criteria
Leaks
T-4.240.925
No Leak
As per Specification
Bolt Tightness
T.4.234.548 & Manufacturer’s recommendation T.13.376.808E& DEP 31.40.10.19,T.13. 377.360
GRP Test Pack
: Rev-H / 10.02.2009 V : VENDOR
H: HOLD POINT. W: Responsible Party
QA/QC Engineer Site Engineer
WITNESS
Verifying Documents
GAM-QCR-QAC-GTL-045 As per specification
GAM-QCR- QAC-GTL041
S
X
I
S
I
R/A
I
S
C
S
V
W
R/A
Torque Value Achieved
Site Engineer
Category ‘’A’’ Completed/ Corrected
Site Engineer
Linde Mechanical Check of test System(R 01) including punch list
I
H
H
GAM-QCR-QAC-GTL050
Site Engineer
Visual
I
S
R
S
S
Final Inspection Before Test 1. Visual Check. 2.
Flange alignment verification
3.
Permanent gaskets installation, bolts & nuts (if any)
4.5
4.6
4.
Valve installation
5.
Dimensionnel check, elevation, orientation etc.
6.
Support installation (If any)
Intermediate Back Fill
4.7
T-4.234.577 Rev. D
Installation Complete
As per Manufacturer’s recommendation & As per Company Specifications
T.13.377.421
T-4.234.069, Manufacturer’s Recipe, T13.376.808 &DEP 31.40.19
Shifted to 4.3.1
Page 7
S
QSGTL PEARL PROJECT
Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
Rev / Date
ITP FOR U/G GRP PIPING S : GAMA QATAR I: INSPECTION Item
X : CONTRACTOR QC
R: DOCUMENT REVIEW
Activity
C : COMPANY
S: SURVEILLANCE
: Rev-H / 10.02.2009 V : VENDOR
H: HOLD POINT. W:
Characteristic to be Verified
Control Procedure Reference
Acceptance Criteria
No Leak
T-4.234.548 & Manufacturer’s Recipe & DEP 31.40.19/Design Code
Manufacturer’s recommendation
Site Engineer/ QA-QC Engineer
Water disposal
Manufacturer’s recommendation
Manufacturer’s recommendation
Responsible Party
WITNESS
Verifying Documents
S
X
C
V
Test Pack (MC Inspection & Test record (R02))
I
H
H
H
Site Engineer
MC Inspection & Test record (R02)
I
S
S
S
Manufacturer’s recommendation
Site Engineer
Reinstatement Check List (R03)
I
H
H
Manufacturer’s recommendation
Site Engineer
QAM-QCR-QAC-GTL-050
I
S
S
Manufacturer’s recommendation
Site Engineer
Manufacturer’s recommendation & As per Test Pack
I
W
W
4.8
4.9
Hydrostatic Pressure Testing
4.9.1
Flushing / Water disposal
4.10
Re instatement Punch Out
4.11
Final Back Fill Trench
4.12
Gross leak test for the completed subsystems (for pressure lines).
Restoration No damage of pipe & No voids at bottom of pipe No Leak
T-4.234.074 & DEP 31.40.19 Manufacturer’s recommendation & DEP 31.40.19 DEP 31.40.10.19,
4.13
Flawless Start-up Initiative (FSI) Tightness (in Valve boxes) a)
Bolt
a) Loose Bolt b) Wrong Type of Bolt c) Flange Face Condition
T.13.377.360 Rev E, DEP 70.10.70.11Gen
Full Tight without leak
Site Engineer
Joint Integrity Control Procedure T.13.377.453 , T.13.377.454 ,
I
T.13.376.815 & Flaw List
DEP 31.38.01.11-
T-4.234.577 Rev. D
Page 8
H
H
QSGTL PEARL PROJECT
Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
Rev / Date
ITP FOR U/G GRP PIPING S : GAMA QATAR I: INSPECTION Item
R: DOCUMENT REVIEW
Activity
b)
X : CONTRACTOR QC
Gasket Installation
Characteristic to be Verified
a) Damaged Gasket b) Gasket Installed off centre c) Old Temporary Hydro test Gaskets still in place d) Incorrect Flange alignment in line flanges e) Debris in valve seat as a result of transport form manufacturer
C : COMPANY
S: SURVEILLANCE
Control Procedure Reference
Acceptance Criteria
Full Tight without leak
V : VENDOR
H: HOLD POINT. W: Responsible Party
DEP 31.40.10.19Gen, T.13.377.360 Rev E,
: Rev-H / 10.02.2009
Site Engineer
DEP 70.10.70.11Gen
WITNESS
Verifying Documents
Joint Integrity Control Procedure T.13.377.453 , T.13.377.454 ,
S
X
C
I
H
H
V
T.13.376.815 & Flaw List
DEP 31.38.01.11-
Flawless Start-up Initiative (FSI) – 4.14
Deleted (REF. ITEM CODE 4.2.1) Cleanliness
4.15
5.0
Closing of the pipe ends after Flushing
Video Recording Internal Inspection of the Pipes
T-4.234.577 Rev. D
Internal Cleaning
Internal Cleaning
T-4.231.172 T-13.377.561 Project Spec. Part 4, Chapter 6
No foreign materials inside the pipe after flushing
QA / QC Engineer
Visual
I
S
S
No foreign materials inside the pipe after flushing
QA / QC Engineer
Recorded Video
I
R
R
Page 9
S
C2 ASU PEARL GTL PROJECT RASLAFFAN INDUSTRIAL CITY BOLT TIGHTENING INSPECTION REPORT
Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem:
ITP No.:
Ref. DWG / Docs: Used Measuring and test equipment ref. (if applicable): INSPECTIONS Item No/Spool No
Mark No./Joint No Grade
Accepted By
ORGANIZATIONS
DATE
THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-041
Bolting
Rev. O
Size
NAME
Bolt Tightening (Torque Value)
Inspector’s Signature
SIGNATURE
QATAR - PEARL GTL PROJECT- C2 ASU
Q Q
A A
T T A A
GRP SPOOL VISUAL + NIPPLE TEST INSPECTION REPORT
R R
Report No.:
Item Description:
Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem:
ITP No.: GAM-ITP-QAC-GTL-
Ref. DWG / Documents: Used Measuring and test equipment ref. (if applicable):
Line No.: Unit No:
Isometric No.: Pressure Class
Sl. Joint Spool/ item No. No No.
Dia (Inch)
Sealing Test
Joint Type Test Medium
Bonder Shop No. /Field
INSPECTION ACTIVITIES Visual Fit-up & Repair Cutting (Rep. Ref. O-Ring /Tapering Cleanliness Allignmen Defective Remarks Installation QCR of Joints t Joints FORM-
Note : DSC for lamination and adhesive joint only
ACCEPTED
ORGANIZATIONS
GAMA QATAR REP.
LINDE REP.
QS GTL or its PMC
GAM-QCR-QAC-GTL-045, Rev-A
NAME
SIGNATURE
DATE
C2 ASU PEARL GTL PROJECT RASLAFFAN INDUSTRIAL CITY BARCOL HARDNESS TESTING REPORT Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem:
ITP No.:
Ref. DWG / Documents: Used Measuring and test equipment ref. (if applicable): INSPECTIONS SPOOL NO
REMARKS:
JOINT NO
BASE LINE VALUE
PERCENTAGE
INSPECTOR SIGNATURE
The Actual value should not be less than 90% of the Minimum Base line value
ORGANIZATIONS
Accepted By
ACTUAL VALUE
THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-047 Rev. O
DATE
NAME
SIGNATURE
PEARL GTL PROJECT-RLC-QATAR
Q A T A R
DAILY GRP LAMINATION FOLLOW-UP REPORT
Subcontract Ref.: Item Description: Item Location / Area: Subsystem: Ref. DWG / Documents: Used Measuring and test equipment ref. (if applicable):
Report No. Inspection Date: Test Code No.: ITP No.:
Drawing No. :
Pipe Dia. :
Spool No. : Lam. kit No. : Bond Width :
Nominal Pressure : Test Pressure : Bond Thickness : Finishing Date on :
Starting Date on :
at
hrs.
at
hrs.
Temperature: Humidity: Manufacturer Recipe Ref:
Bonder No.:
Fit Layer No. of Layers
W/R Type
Resin Type
Resin Quantity
Catalyst LPT Quantity
Resin Quantity
Catalyst LPT Quan. Delayer
Vinylester
Structure Lay up No. of Layers
W/R Type
Resin Type
Vinylester Top Tape
Internal layer Bond Widt W/R Type
Bond Thickness :
No. of Layers
Resin Type
Resin Quantity
Catalyst LPT Quantity
Vinylester Surface mat.
Accepted By
ORGANIZATIONS
DATE
THIRD PARTY REP. GAMA QATAR REP. LINDE REP. QS GTL
GAM-QCR-QAC-GTL-048, Rev-0
NAME
SIGNATURE
Q A T A R
PEARL GTL PROJECT- RLCQATAR EXCAVATION / BACKFILLING REPORT
Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem:
ITP No.:
Ref. DWG / Documents: Used Measuring and test equipment ref. (if applicable):
Area
:
Location
:
Description of Filling
:
a) Sand
:
b) Gravel (SC1)
:
Site Clearance
:
Excavation
:
ELEVATION AS PER DRAWING : ACTUAL ELEVATION
:
ACCEPTABLE
REMARKS:
YES
Accepted By
ORGANIZATIONS
DATE
THIRD PARTY REP. GAMA LINDE QS GTL
GAM-QCR-QAC-GTL-050 Rev. O
NAME
NO SIGNATURE
C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY
MATERIAL RECEIPT CHECK SHEET
ITEM No:
PO No:
UNIT No:
MANUFACTURER :
ITEMS TO BE CHECKED
1 Visual damage 2 Quantity 3 Test certificates 4 5 6 7 8
Date of initial inspection:
Name and signature of Inspector:
GAM-QCR-QAC-GTL-079 Rev. O
INSPECTOR INITIAL
REQ No:
REMARKS
SYSTEM CLEANLINESS ACCEPTANCE REPORT 1110 A05M
Project No
Doc.No: 0100-W-QA-1825
Isometric No: (Line No)
Page 1 of 1
GAMA
Preservation Method
Inspection result
Spool
Cleaning Method
Prefabrication
Cleanliness Class
Sheet
Piping Contractor:
Inspection method
Project No:
Piping Contractor
Date
Signature
Erection Company
Date
Signature
LINDE
Date
Signature
PMC
Name:
Name:
Name:
Signature:
Signature
Signature:
Date:
Date:
Date:
GAM-QCR-QAC-GTL-139 Rev. O
Piping Contractor-GAMA
Company-Linde
Date
Signature
View more...
Comments