02.SDR Hardware Installation Guide_BBU+RRU
Short Description
SDR Hardware Installation...
Description
Internal Only?
SDR Hardware Installation Guide _BBU+RRU Prepared By Samiran Ojha(199080).
Internal Only?
Goal of the Course n
after complete the course, you will n
n
n
2011-9-23
Understand hardware architecture of ZXSDR B8200&R8860 Understand ZXSDR B8200&R8860 Device installation specification Understand cable layout & labeling specification
2
Internal Only?
Contents of the course ZXSDR B8200&R8860 hardware introduction (4 -26) ZXSDR B8200&R8860 installation specification (28 – 115) Cable layout & labeling specification (115 – 134) B8200+R8860 installation sketch map (135 – 143) Site Swap Scenario (145 – 160)
ZXSDR Series Integrated Base Station n
Internal Only?
ZXSDR Series Integrated Base Station is a new generation of ZTE SDR-based software platform for multi-mode base station products It include core unit B8200, the indoor RF modules RSU40/RSU60, remote radio unit R8860 together constitute .Through the flexible combination of modules, to build indoor BS8800, outdoor S8900, distributed base station D-B8200, outdoor micro base stations, BS8906, to meet the requirements of the whole scene coverage, build GSM / UMTS-dimensional overlay network.
Internal Only?
BTS Overview
8700 BTS
BS8200(BBU INDOOR)
+
R8840/8860(RRU OUTDOOR) = 8700 BTS
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Tools Kit
Internal Only?
Continued
Internal Only?
Continued….
Internal Only?
Continued….
Internal Only?
Continued…
Internal Only?
Continued…..
Internal Only?
Internal Only?
Baseband UnitB8200 Power Module
Fabric switch
Gnd Point
ESD Point
Site Alarm board
Control&Clock board
Module Name
n n
Baseband Processing board(GSM&UMTS)
Fan Module
Module Function Description
CC
Control & Clock board
FS
Fabric Switch board
UBPG
Universal Baseband Processing board for GSM
BPC
Base band Processing type C for UMTS
SA
Site Alarm board
NIS
Network Interface of STM-1
PM
Power Module
FAM
FAN Module
B8200 Size 88.4mm × 482.6mm × 197mm (H×W×D) The weight of a fully configured cabinet is less than 8.75 kg B8200 adopts -48V DC power supply(-57DC~-40V DC) . If AC power should be adopted need to additional AC/DC rectifier module.
Internal Only?
RRU Overview
RRU Heat Sink
Bolt with using all type Washer
RRU CLAMP
RRU Supporting Plate
RRU Back side total assembly
RRU Interfaces
Internal Only?
RRU Different interfaces RRU Back side
B8200 Power Cable Introduction n
Internal Only?
The especial power cable should be used to connect B8200 to DC cabinet, the especial cable connector , as shown in figure.
Internal Only?
B8200 SA Cable Introduction n
B8200 SA cable
B4: Alarm signal connector
as show in nether figure
B2: E1/T1 transmission Connector B1: Grounding Connector
B3:RS232/RS485 connector
Internal Only?
B8200 RS232 Cable Introduction n
RS232 cable connector is DB9 type it should be connected to B2 connector of SA cable. The inverse terminal of RS232 cable should be connector to DC cabinet. As show in nether figure 3.
figure3 . RS232/RS485 cable
Internal Only?
75Ω E1 cable introduction n
1
There are 2 types E1 cable: 75ohm and 120 ohm. Commonly, The 75ohm E1 cable should be used internal, the one terminal type of this cable is DB44
The inverse
terminal should be separated to 2 cables(the terminal connector need to processed in site ),there are 8 slender cables to support 4 pairs E1 signal in each E1 cable , as show nether figure
Internal Only?
75Ω E1 cable introduction 75 Ω E1 cable
2
R8860 320mm
160mm
Internal Only?
1 0
9
8
6
7
370mm
5 n
n
n
R8860 size 370mm × 320mm × 160mm (H×W×D) Weight:16.5KG R8860 adopts -48V DC power supply and 110/220 AC power supply R8860 60W
4
3
Number
marker
1
LC1
BBU RRU
2
LC2
RRU
3
AISG
AISG
4
MON
5
PWR
6
RX
7
TX/RX
8
RXout
9
RXin
10
GND
2 Interface
/
/RRU
1
Internal Only?
R8860 cable introduction n
The especial aviation connector should be use in R8860 power cable, the connecter should be connected to RRU power interface , the inverse terminal are 4 core-cable(2
Power connector
blue &2 black), the 2 blue to -48 port in OLP and the 2 black to -48 RTN port. As show in figure 1. n
The R8860 alarm cable should be connected between RRU and OLP , as show in figure 2.
Alarm cable connector
Internal Only?
R8860 cable introduction n
The RRU AISG interface is 8 core aviation connector, The AISG cable should be used to connected between RRU and ALPD or NSBT or RCU interface in antenna. As show in nether figure 3. The are 3 kinds AISG cable: 3m, 6m, 10m.
Figure 3. AISG cable and connector
Internal Only?
Contents of the course ZXSDR B8200&R8860 hardware introduction ZXSDR B8200&R8860 installation specification Cable layout & labeling specification B8200+R8860 installation sketch map Site Swap Scenario
Internal Only?
B8200 installation method n
Having equipment room • Installed in existing 19’inch cabinet • Installed in facility rack on the wall • Installed in new 19’inch cabinet • Installed in especial 19’inch cabinet
n
Don’t having equipment room • Installed in BC8180 indoor • Installed in W121 cabinet outdoor
Dimensions of BBU
Internal Only?
Internal Only?
BBU Installation Method n
n n n
Installation at 19’ Rack Ø New Rack Ø Existing Rack Ø Special Rack Wall Mount Installation. Installation at BBU Hub at Wall. Installation at outdoor W121 M02 cabinet.
B8200 installation method 1A n
n
n
Installation requirement • The empty space is more than 5U in existing cabinet. Strongpoint • Use existing cabinet, and save installation space. • Save the grounding cable • It is convenient and easy. Attention • The power cable and signal cable should have different routing. • Credible grounding.
Internal Only?
Installed in existing 19’inch cabinet
B8200 installation method 1B Installed in new 19’inch rack n
n
n
Installation requirement • Before the rack , the operation space is more the 400mm. The space are more the 100mm in the both of rack flank, and convenient for aeration Strongpoint • Supply new space for other transmission equipments. • It is convenient and easy. Attention • Have a right curving degree and nylon ties should be used for optical cable. • The power cable and signal cable should have different routing. B8200 installed inside 19 inch rank
Internal Only?
Internal Only?
B8200 installation method 1C n
Installed in especial 19’inch cabinet
Installation requirement
• Install support accessory, board, bracket to the right position, as show in figure 1 n
n
Strongpoint • Same to in 19’inch cabinet Attention • Credible grounding. 19’inch cabinet
special 19’inch cabinet
Cable Layout Diagram
Internal Only?
B8200 installation method 2 n
n
n
Internal Only?
Installed in facility rack on the wall
Installation requirement • Before the rack , the operation space is more the 400mm. The space are more the 100mm in the both of rack flank, and convenient for aeration Strongpoint • No need space on the floor. • PVC groove can be used on the wall • It is convenient and easy. Attention • Must insulated between rack and wall • Have a right curving degree and nylon ties should be used for optical cable. • The power cable and signal cable should have different routing.
Cable laying
Grounding point
Cable Layout Diagram
Internal Only?
Installation Steps.
Internal Only?
B8200 installation method 3: Installed in BC8180 cabinet n
Internal Only?
Installation requirement
• When there is not
enough space in BTS room, the BBU can be installed on the wall in narrow alleyway. The BC8180 cabinet can guard against thief and dustproof. But can’t be waterproof.
n
BC8180 installation BC8180 Cabinet
Strongpoint
• Normal installation • Easy to protect the equipment.
n
Attention
• Must install it in
waterproof place. • The space are enough in the both of rack flank, and convenient for aeration. BC8180 installed on the wall
PSU installed inside BC8180
Cable Layout Diagram
Internal Only?
Installation Steps
Internal Only?
Continued….
Internal Only?
Continued….
Internal Only?
B8200 installation method 4 n
Installation requirement • This installation method can be action for no room condition.
n
Strongpoint • It is easy to get the power,W121 can support AC 220V and AC 380V.
n
Attention • Must take out dummy board
Installed in W121 cabinet
before B8200 installation, if there are not equipment in cabinet, then the dummy board must be used at right slot. • In cabinet, grounding point must be connected to grounding earth with 16mm2 cable.
W121 M02
M02 Power Cabinet
Inside M02
Internal Only?
Internal Only?
Installed in W121 cabinet –The requirement of cable routing n
n
The cable routing is extend down in M02 cabinet , as show in figure 1, there are three extending holes in the front of cabinet: • hole 1) : for cabinet grounding cable, transmission cable, and optical • hole 2) : standby channel • hole 3) : for power cable there are two extending holes in the back of cabinet: • hole 1) : AC 220V power cable • hole 2) : When battery should be used, the hole is for power cable and signal cable of temperature sensor. otherwise it is standby channel.
figure1 extending holes in the front of cabinet:
figure2 extending holes in the back of cabinet
Installed in W121 cabinet –The requirement of sensor & cable
Internal Only?
n
The temperature sensor should be put in the back of M02 cabinet, “environment temperature”is showed on the sensor cable, before installation, the protection paper must be took out from sensor, as show in figure 1
n
There is red cap on the smoking in M02, it must be took out before installation, in order to normal work. As show in figure 1.
Figure1. temperature sensor and smoking sensor
Internal Only?
Installed in W121 cabinet –The requirement of sensor & cable n
The water sensor should be installed in the bottom of M02 cabinet, and redundant cable must be tied orderly, as show in figure.
n
B8200special power cable is threaded in left hole, and
Figure 2 . Water sensor in W121
connected to sixth port of W121. as show in figure 3.
Figure 3 . Special power cable connection
Internal Only?
Installed in W121 cabinet –The requirement of sensor & cable n
The one terminal of RS232 cable is connected to LPU, and inverse terminal is connected to surveillance interface of M02 through back hole. As show in figure 4.
Figure 4. RS232 interface
Internal Only?
W121 M02 cabinet introduction n
DC W121 M02 cabinet just have power cabinet and don’t have battery cabinet, as show in figure 1.
n
The inbreak, hot convection, LP module alarm should be sent to BBU through alarm jumper.
Figure3. AC M02 cabinet
Figure 1. M02 power cabinet
Figure 2. DC M02 cabinet
Cable Connection
Internal Only?
Continued…..
Internal Only?
Installation Steps.
Internal Only?
Continued….
Internal Only?
Continued….
Internal Only?
Continued…
Internal Only?
Cabinet Grouting
Internal Only?
O/D cabinet cable routing through Conduce Pipe
Internal Only?
Internal Only?
Ponder Question How to install the BBU on the wall when the wall is very weak method n The big wood board can be used and fix the board on the wall first, then fix the BBU rack on the wood board, as show in figure 1. n Make a support rack and install the BBU on the rack, as show in figure 2. n
Figure 1
Figure 2
R8860 installation method Installed on the pole • Single RRU installation on the same pole • Double RRU installation on the same pole • Three RRU installation on the same pole n Installed on the wall n Installed on the rack R8860 installation Attention: • Must shoes win convection place. And it is better that put the RRU in shadow • The R8860 must be far away form the chimney and rain dropping. n
Internal Only?
Dimension
Internal Only?
Cable Diagram
Internal Only?
R8860 installation method 1: installed on the pole
1
2
Internal Only?
3
Figure2 . Double RRU Figure1. Single RRU installation on pole
i
installation on the same pole
i
Figure23. There RRU installation on the same pole
n
The requirement of pole: the pole’s diameter must be 60mm 120mm
n
R8860 installation position must be under ½ of pole. Because there are not any metallic equipments(except antenna) in the back of antenna, the R8860 and OLP must be put under the antenna on the same pole.
n
The 16mm2 grounding cable must be connected to earthing system for R8860 and OLP. The cable length is less than 1m, and must keep within 2m, can’t connect OLP to R8860 and then R8860 to busbar with grounding cable.
RRU assembling material
Internal Only?
•Pic 1 is showing the assembly for RRU installation. 1. RRU Supporting plate. 2. Insulation bar. 3. Nut bolt assembly.
•
Pic 2 is showing the set of nut bolts along with all washer. (Plastic washer>Flat washer>spring washer>nut/bolt)
RRU assembling material
Internal Only?
• Fixing Bracket assembly for pole mount installation.
1 3
2
4
• Total assembling of 1. Supporting plate, 2. clamp, 3. insulation pad and 4. nut bolt
RRU installation Procedure
Internal Only?
• First unpacked all the material from the box. And check whether the material are in good condition. • Verify the material with the packing list. • Fix the supporting plate and clamp together with using the nut/bolt and use the washer in proper manner.
Final assembly of supporting plate and clamp
Internal Only?
• The complete assembly of supporting plate from front side • The complete assembly of supporting plate from back side. • The proper manner of nut/bolt and washer shown in the figure.
RRU Pole Mount Installation (2 RRU )
Internal Only?
Continued….. Ø
Internal Only?
1.Perform the following steps to install the anchor ears.
1.M8×40 hexagon head bolt 2. Standard spring washer 3. Big washer 8 4. Insulation flange 5. Supporting panel 6. Insulation board 7. Long anchor clamp 8. M10×120 hexagon head bolt (full thread) 9. Pole 10. Short anchor clamp 11. Flat washer10 12. Standard spring washer 10 13. I-type common M10 hexagonal nut
Continued…..
Internal Only?
2.Mount the ZXSDR R8841 C804 on the supporting panels and fasten the cabinets with M6 safeguard screws as shown in the following: Ø M6 safeguard screw Ø Supporting panel Ø Retaining board
RRU Pole Mount Installation (2 RRU )
Internal Only?
Continued….
Internal Only?
R8860 installation method 2: installed on the wall n
Internal Only?
R8860 can be installed on the wall, it is include indoor and out door wall.
Figure 1 . Installed on the outdoor wall
Figure 2. installed on the indoor wall
Continued……
Internal Only?
RRU Wall Mount Installation Process
Internal Only?
R8860 installation method 3: installed on the rack
Figure 1. installed on the indoor rack
n
RRU can be installed on the indoor rack RRU or 3 RRU& 1 B8200
One rack can support 4
But B8200 must be put in the facility
rack (box) then fix it on the rack. as show in figure 1
Internal Only?
Installation Steps
Internal Only?
Continued…..
Internal Only?
Continued….
Internal Only?
Continued…..
Internal Only?
Continued….
Internal Only?
OLP installation procedure
Internal Only?
• Take out the OLP and accessories from the box.
OLP assembling
Internal Only?
Fix the OLP accessories like clamp on then back side of the OLP and tighten the screw using the proper washer
OLP assembling(Outdoor Lightening Protection)
Internal Only?
• Put the long nut bolt and support clamp and make for fixing the OLP on the pole. • Be sure that all the washer has been used in correct sequence.
OLP(Outdoor Lightening Protection) assembling
Internal Only?
• Fix the OLP box on pole using the clamp and tighten all the nut bolt. • The minimum distance between RRU and OLP should be 300mm.
Power cable connection in OLP
Internal Only?
• P1 port –For power cable connection from OLP to DC PWR •P2 Port –For Power cable connection from RRU to OLP •ALM Port –For RRU MON cable connection. •GND Port –For OLP grounding.
ALM P1 P2
GND
Cable connection port at RRU.
Internal Only?
• Connect 1 end of Power cable connector to PWR port at RRU end, connect another end power cable to OLP. •For alarm cable connect one end of cable connector to RRU at MON port and another end to OLP at ALM port. •Same procedure we have to do for 2nd RRU.
OFC Cable installation Procedure
Internal Only?
OFC cable connection at RRU end STEP1 • The OFC cable is very delicate cable handle it carefully. • First take out one end of OFC cable from the role. • First open the outer cap of OFC connector.
Internal Only?
STEP2
•Take out the softer part of OFC from outer cover by just lightly pulling.
Internal Only?
STEP3
•Remove the dust cover(white cap) from the OFC cable. •Be aware don’t touch the top point OFC.
Internal Only?
STEP4
•Connect the OFC connector safely to the LC1 connector at RRU end. • Don’t bend the OFC cable at connector end.
Internal Only?
STEP 5
•Fix the outer cap and fasten it properly to the RRU. • Make sure that OFC cable not getting bend more then its specified radius. •Weatherproofing above the cap as per weatherproofing process. Note:- Same procedure we have to follow for all sector RRU as well as for cascading.
OFC Cable installation Procedure at BBU
Internal Only?
OFC cable connection at BBU end
• Connect the OFC cable to BBU at FS board from right to left. • First sector OFC cable should be connect in the right most optical port.(Marked as RX0 and TX0)
Internal Only?
Cable lugs making 1
2
4
1. 2. 3. 4. 5. 6.
3
Cut the outer coat the cable. Wearing lugs. Crimp the lugs properly. Use Proper crimping tool for crimping the lugs Paste the protected sleeves with the hot gun. Same process follow for All power & grounding cables
OLP power cable routing
Internal Only?
Internal Only?
Fiber Cable connection at RRU
RRU to OLP power cable routing
Internal Only?
Internal Only?
Preparation and Specifications of Antenna Feeder Connector — 7/8 DIN Feeder Connector
2. Straighten the feeder to be installed with the connector and strip off a section of sheath of the feeder with a guarded knife. Keep the notch flat when stripping the feeder.
3. At the place about 28 mm away from the stripped point, cut off the feeder with a Andrew Cutter or other Feeder cutter tools. The section must be flat and on the wave crest of the feeder.
Page 96
Internal Only?
Preparation and Specifications of Antenna Feeder Connector — 7/8 DIN Feeder Connector 4. Use the expansion tool to expand the external conductor of the feeder. If the inner or external conductor of the section of the feeder has burrs, use the file to remove the burrs.
Page 97
Internal Only?
Preparation and Specifications of Antenna Feeder Connector — 7/8 DIN Feeder Connector 5. Use a brush or tape to remove the debris of the connector. Before installing the connector, unscrew the connector first.
Page 98
Internal Only?
Preparation and Specifications of Antenna Feeder Connector — 7/8 DIN Feeder Connector 6. Manually screw the connector on to the feeder. Use one spanner on the connector cap and remain steady, and use another spanner to fasten the screw.
Page 99
Internal Only?
Preparation and Specifications of Antenna Feeder Connector — 7/8 DIN Feeder Connector 7. By now, installation of the feeder connector is completed. Before connecting the jumper, use a plastic bag or tape to cover the feeder connector to prevent any damage.
Page 100
Weather proofing on connectors
Internal Only?
• All the outdoor connectors like RRU, Antenna etc connectors need to do the weather proofing as per standard. • The procedure for weather proofing is 1Three layer of insulation tape.(down to top>top to down) 2- Three layer of weather proof. (down to top>top to down) 3- Three layer of insulation tape. (down to top>top to down) After completion of process need to put three ties.
Internal Only?
OLP power cable grounding
Outdoor Lightning Protection Box(OLP) n
Internal Only?
The OLP support DC -48V and AC 110/220V, the two kinds of OLP: DC OLP and AC OLP.
n
R8860 surveillance cable should be connected to OLP with one pairs(white and brown), other cable can be put it , as show in nether figure 1 & 2.
Figure 1. OLP outside configuration
Figure 2. OLP inside configuration
Internal Only?
Ponder Question n Can we install the RRU on the back of antenna when pole is very short Answer n Can’t do it reason n Because antenna is a radiation equipment, the metallic equipment can’t be put on back of antenna, otherwise the metallic equipment shall affect antenna eradiation wave,.
Internal Only?
Ponder Question n How to connect the power cable when AC RRU is installed in building Answer n No need the LP when RRU is installed in building. n When RRU is near the ACDB, we can connect it to ACDB with special power cable. n If the distance is long between RRU and ACDB, we can add a new air-break or ACDB near RRU, first connect the air-break & ACDB to main ACDB with ordinary AC power cable, then connect RRU to air-break & new ACDB with special power cable.
The fiber cable between BBU & RRU n n
Internal Only?
Fiber cable connector is form factory LC/PC-LC/PC) , at the end of the RRU, the connector have waterproof function . When fiber cable connect to BBU, the cable order must be right, the cable must be connected to TX0/RX0 on FS board form sector A others are one by one.
Internal Only?
Jumper and feeder installation n
½ jumper have 3 kinds
2m? 3m? 5m).
n
commonly ,R8860 should be installed near the antenna the feeder choice and grounding standard is showed in nether frame :
L L
View more...
Comments